{{#Wiki_filter:S-103 1 TASK TITLE:
{{#Wiki_filter:TASK TITLE:   Call Out For Shift Staffing JPM No.: S-103                                         REV:  NRC2006301 TPO No.: T.AM05-01                                           K&A No.: 2.1.5 TASK No.: S-AM-029, Ensure minimum shift staffing           K&A IMP: 2.3/3.4 and authorize additional shift staffing as necessary.
Call Out For Shift Staffing JPM No.:
TRAINEE:                                               SRO EVALUATOR:                                             DATE:
S-103   REV:  NRC2006301 TPO No.: T.AM05-01 K&A No.: 2.1.5 TASK No.: S-AM-029, Ensure minimum shift staffing K&A IMP: 2.3/3.4     and authorize additional shift       staffing as necessary.
The Trainee: PASSED             this JPM.             TIME STARTED:
TRAINEE:
FAILED                                   TIME FINISHED:
SRO   EVALUATOR:
CRITICAL ELEMENTS:   (*) 2, 3                         JPM TIME:
DATE:     The Trainee: PASSED this JPM.
CRITICAL TIME:   NA                                   APPROX COMPLETION TIME: 25 MINUTES EVALUATION METHOD:                                     LOCATION:
TIME STARTED:
X  PERFORM                               X  IN PLANT
FAILED TIME FINISHED:
_  SIMULATE                             X  SIMULATOR GENERAL  
CRITICAL ELEMENTS: (*) 2, 3 JPM TIME:   CRITICAL TIME:
NA APPROX COMPLETION TIME:
25 MINUTES EVALUATION METHOD:     LOCATION:
X  PERFORM X  IN PLANT
_  SIMULATE X  SIMULATOR GENERAL  


==REFERENCES:==
==REFERENCES:==
Line 36: Line 31:
: 3. BwAP 320-1, Rev.16 TASK STANDARDS:
: 3. BwAP 320-1, Rev.16 TASK STANDARDS:
: 1. Determine required shift staffing.
: 1. Determine required shift staffing.
: 2. Determine from staffing list which person is available to be forced to work  
: 2. Determine from staffing list which person is available to be forced to work overtime to ensure shift staffing requirements met.
 
overtime to ensure shift staffing requirements met.
TASK CONDITIONS:
TASK CONDITIONS:
: 1. You are a Unit Supervisor.
: 1. You are a Unit Supervisor.
Line 45: Line 38:
INITIATING CUES:
INITIATING CUES:
: 1. A fire brigade qualified NLO for shift N, May 16, 2006 has called in sick.
: 1. A fire brigade qualified NLO for shift N, May 16, 2006 has called in sick.
: 2. Without the NLO above, manning for shift N, May 16, 2006 is 4 non-fire brigade  
: 2. Without the NLO above, manning for shift N, May 16, 2006 is 4 non-fire brigade qualified NLOs, 3 fire brigade qualified NLOs, and the fire chief qualified field supervisor.
 
: 3. The Shift Manager has directed you to evaluate shift staffing for shift N, May 16, 2006.
qualified NLOs, 3 fire brigade qualified NLOs, and the fire chief qualified  
: 4. Inform the Shift Manger of your results.
 
1 S-103
field supervisor.
: 3. The Shift Manager has directed you to evaluate shift staffing for shift N, May  
 
16, 2006.
: 4. Inform the Shift Manger of your results.  
 
S-103 2 RECORD START TIME:
NOTE:  These steps may be performed in any order.
Performance Step Standard Circle Applicable
: 1. Refers to LS-AA-119 Overtime Controls main
 
body. CUE: If examinee locates LS-AA-119 provide copy.
CUE: If examinee locates BwAP 320-1 provide copy.
Perform the following:
o Locates copy of LS-AA-119 o Identifies step 4.1.2 requirements for work
 
hours. SAT    UNSAT      N/A Comments:*2. Determine one additional fire brigade member
 
required Note: Hand examinee copy of JPM  , overtime
 
tracking list, (JPM pages
 
6 & 7) and provide the


following cue. CUE: The shift manager directs you to determine who is
RECORD START TIME:
 
NOTE: These steps may be performed in any order.
eligible for overtime to  
Performance Step                  Standard        Circle Applicable
 
: 1. Refers to LS-AA-119        Perform the following:  SAT    UNSAT    N/A Overtime Controls main    o Locates copy of LS-AA- Comments:
cover the vacancy. CUE: All personnel on the overtime tracking list are
body.                        119 CUE:  If examinee locates LS-AA- o Identifies step 4.1.2 119 provide copy.             requirements for work CUE: If examinee locates BwAP      hours.
 
320-1 provide copy.
fire brigade qualified.
*2. Determine one additional   Determine one additional SAT    UNSAT    N/A fire brigade member        fire brigade member     Comments:
Determine one additional  
required                  required:
 
Note: Hand examinee copy of JPM    o Refer to BwAP 320-1 Attachment 1, overtime
fire brigade member  
* Determine 1 tracking list, (JPM pages      additional NLO 6 & 7) and provide the         required due to following cue.                 vacancy CUE:  The shift manager directs you to determine who is eligible for overtime to cover the vacancy.
 
CUE:   All personnel on the overtime tracking list are fire brigade qualified.
required:
2 S-103
o Refer to BwAP 320-1 Determine 1  
 
additional NLO
 
required due to
 
vacancy  SAT    UNSAT      N/A Comments:
S-103 3 Performance Step Standard Circle Applicable
*3. Determines NLO 3 is the only NLO that can be forced. C hecks each person's work hours: o NLO 1 would violate
 
the 72 hour limit.
o NLO 2 (NO) would
 
violate 24 hour in 48
 
hour limit. NLO 3 (YES) is
 
available.
o NLO 4 (NO) would
 
violate 24 hour in 48
 
hour limit and would
 
violate the 72 hour
 
limit. o NLO 5 (NO) would
 
violate 72 hour limit.
o NLO 6 (NO) would
 
violate the 24 h our in 48 hour limit.
o NLO 7 (NO) is already
 
working shift N
 
5/16/06 o NLO 8 (NO) would
 
violate 72 hour limit. Informs Shift manager  
 
that ONLY NLO 3 is  
 
available to be
 
forced. SAT    UNSAT      N/A Comments: (CUE:) THIS COMPLETES THIS JPM.  


Performance Step              Standard        Circle Applicable
*3. Determines NLO 3 is the Checks each persons work SAT    UNSAT    N/A only NLO that can be    hours:                    Comments:
forced.                o  NLO 1 would violate the 72 hour limit.
o  NLO 2 (NO) would violate 24 hour in 48 hour limit.
* NLO 3 (YES) is available.
o  NLO 4 (NO) would violate 24 hour in 48 hour limit and would violate the 72 hour limit.
o  NLO 5 (NO) would violate 72 hour limit.
o  NLO 6 (NO) would violate the 24 hour in 48 hour limit.
o  NLO 7 (NO) is already working shift N 5/16/06 o  NLO 8 (NO) would violate 72 hour limit.
* Informs Shift manager that ONLY NLO 3 is available to be forced.
(CUE:) THIS COMPLETES THIS JPM.
RECORD STOP TIME:
RECORD STOP TIME:
COMMENTS:  
COMMENTS:
3 S-103


S-103 4 TASK CONDITIONS:
TASK CONDITIONS:
: 1. You are a Unit Supervisor.
: 1.     You are a Unit Supervisor.
: 2. Both Units are at 100% power.
: 2.     Both Units are at 100% power.
: 3. The current date and time is: 05/14/2006, 0900.
: 3.     The current date and time is: 05/14/2006, 0900.
INITIATING CUES:
INITIATING CUES:
: 1. A fire brigade qualified NLO for shift N, May 16, 2006 has called in sick.
: 1.     A fire brigade qualified NLO for shift N, May 16, 2006 has called in sick.
: 2. Without the NLO above, manning for shift N, May 16, 2006 is 4 non-fire brigade qualified NLOs, 3 fire brigade qualified NLOs, and the fire chief qualified field  
: 2.     Without the NLO above, manning for shift N, May 16, 2006 is 4 non-fire brigade qualified NLOs, 3 fire brigade qualified NLOs, and the fire chief qualified field supervisor.
: 3.      The Shift Manager has directed you to evaluate shift staffing for shift N, May 16, 2006.
: 4.      Inform the Shift Manger of your results.
4 S-103
 
SIMULATOR SETUP GUIDE:
* Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST. (N/A if JPM NOT performed in simulator)
COMMENTS:
* Provide copy of LS-AA-119, Rev 3
* BwAP 320-1, Rev 16 5
S-103


supervisor.
Crew 1        May May May May May May May May May May May May May May May May May May May May May 8  8  8  9  9  9 10 10 10 11 11 11 12 12 12 13 13 13 14 14 14 Mon        Tue        Wed        Thurs      Fri        Sat        Sun 1  2  3  1  2  3  1  2  3  1  2  3  1  2  3   1  2  3  1  2  3 NLO 1 266 1-01                                    12          12          12          12 xx          xx xx1        2            1      N1C        NX          NX          NX NLO 2 200 1-02                                                12          12          12 xx        xx          xx        xx 1          2            1          1      NX          NX          NA NLO 3 251 1-03                                                12          12          12 xx        xx          xx        xx 1          2            1          1      NA          NA          NB NLO 4 910 1-04                                                12          12          12 xx        xx          xx        xx 1          2            1          1      NB          NB          NC NLO 5 233 1-05                                                12          12          12 xx        xx          xx        xx 1          2            1          1      NC          NC          ND NLO 6 924 1-06                                                12          12          12 xx        xx          xx        xx 1          2            1          1      ND          ND          NE NLO 7 724 1-07                                                12          12          12 xx        xx          xx        xx 1        1          2            1          1      NE          NE          NX NLO 8 323 1-08                                    12          12          12          12 xx        xx 1          2      N1A        N2X        NX          NX          NX Crew 1        May May May May May May May May May May May May May May May May May May May May May 15 15 15 16 16 16 17 17 17 18 18 18 19 19 19 20 20 20 21 21 21 Mon        Tue        Wed        Thurs      Fri        Sat        Sun 1  2  3  1  2  3  1  2  3  1  2  3  1  2  3  1  2  3  1  2  3 NLO 1 266 1-01 12                      12          12              12          12          12 NA              xx1    N2X        N1A            DB          DC          DD NLO 2 200 1-02 12              12                                12          12          12 xx NB            D1X          xx2          1          DC          DD          DE NLO 3 251 1-03 12                                      12          12          12          12 xx NC              1          xx2        D1A          DD          DE          DX NLO 4 910 1-04 12              12        12                      12          12          12 xx ND            D1X        D2X          1          DE          DX          DX NLO 5 233 1-05 12                          12          12          12          12          12 NE              xx1        D2C        D2D          DX          DX          DX S-103  (ATTACHMENT 1)
: 3. The Shift Manager has directed you to evaluate shift staffing for shift N, May 16, 2006. 4. Inform the Shift Manger of your results.
S-103 5 SIMULATOR SETUP GUIDE:
Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST. (N/A if JPM NOT performed in


simulator)
NLO 6 924 1-06 12              12                                  12          12          12 xx NX            D1B          xx2          1          DX          DX          DA NLO 7 724 1-07 12          12                          12          12          12          12 xx 1  NX          N1A            2          D1X          DX          DA          DB NLO 8 323 1-08 12                                  12              12          12          12 xx          xx NX              1          2      N1X            DX          DB          DC Crew 1        May May May May May May May May May May May May May May May May May May May May May 22 22 22 23 23 23 24 24 24 25 25 25 26 26 26 27 27 27 28 28 28 Mon        Tue        Wed        Thurs      Fri        Sat        Sun 1  2  3  1  2  3  1  2  3  1  2  3  1  2  3  1  2  3  1  2  3 NLO 1 266 1-01                  8          8          8          8 N2X              T          T          T          T          xx1        xx2 NLO 2 200 1-02                  8          8          8          8 xx 1          T          T          T          T          xx1        xx2 NLO 3 251 1-03                  8          8          8          8 xx 1          T          T          T          T          xx1        xx2 NLO 4 910 1-04                  8          8          8          8 xx 1          T          T          T          T          xx1        xx2 NLO 5 233 1-05                  8          8          8          8 xx 1          T          T          T          T          xx1        xx2 NLO 6 924 1-06                  8          8          8          8 xx 1          T          T          T          T          xx1        xx2 NLO 7 724 1-07                  8          8          8          8 xx 1        1          T          T          T          T          xx1        xx2 NLO 8 323 1-08 12              8          8          8          8 N1B              T          T          T          T          xx1        xx2 S-103  (ATTACHMENT 1)
COMMENTS:
Provide copy of LS-AA-119, Rev 3 BwAP 320-1, Rev 16


S-103  (ATTACHMENT 1)
TASK TITLE: Respond to a Fire Detection/Suppression System Alarm JPM No.:     S-105                                     REV:         NRC2006301 TPO No.:   8.E.AM-200                                 K&A No.:     2.1.14 TASK No.:   S-AM-200, Supervise actions for           K&A IMP:   2.5/3.3 combating a plant fire TRAINEE:                                               SRO EVALUATOR:                                             DATE:
Crew 1  May May May May May May May May May May May May May May May May May May May May May  8 8 8 9 9 9 10 10 10 11 11 11 12 12 12 13 13 13 14 14 14  Mon Tue Wed Thurs Fri Sat Sun  1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 NLO 1  266 1-01          12  12  12  12      xx1  xx 2  xx 1  N1C NX  NX  NX  NLO 2  200 1-02            12  12  12      xx 1  xx 2  xx 1  xx 1  NX  NX  NA  NLO 3  251 1-03            12  12  12      xx 1  xx 2  xx 1  xx 1  NA  NA  NB  NLO 4  910 1-04            12  12  12      xx 1  xx 2  xx 1  xx 1  NB  NB  NC  NLO 5  233 1-05            12  12  12      xx 1  xx 2  xx 1  xx 1  NC  NC  ND  NLO 6  924 1-06            12  12  12      xx 1  xx 2  xx 1  xx 1  ND  ND  NE  NLO 7  724 1-07            12  12  12    1  xx 1  xx 2  xx 1  xx 1  NE  NE  NX  NLO 8  323 1-08          12  12  12  12      xx 1  xx 2  N1A N2X NX  NX  NX    Crew 1  May May May May May May May May May May May May May May May May May May May May May  15 15 15 16 16 16 17 17 17 18 18 18 19 19 19 20 20 20 21 21 21  Mon Tue Wed Thurs Fri Sat Sun  1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 NLO 1  266 1-01 12      12  12  12  12  12    NA  xx1 N2X N1A  DB  DC  DD  NLO 2  200 1-02 12    12        12  12  12    NB  D1X xx2  xx 1  DC  DD  DE  NLO 3  251 1-03 12          12  12  12  12    NC    xx 1  xx2 D1A  DD  DE  DX  NLO 4  910 1-04 12    12  12    12  12  12    ND  D1X D2X  xx 1  DE  DX  DX  NLO 5  233 1-05 12      12  12  12  12  12    NE  xx1 D2C D2D  DX  DX  DX S-103  (ATTACHMENT 1)
The Trainee:       PASSED             this JPM.       TIME STARTED:
NLO 6  924 1-06 12    12        12  12  12    NX  D1B xx2  xx 1  DX  DX  DA  NLO 7  724 1-07 12  12      12  12  12  12    1 NX  N1A  xx 2  D1X  DX  DA  DB  NLO 8  323 1-08 12        12  12  12  12    NX    xx 1  xx 2  N1X  DX  DB  DC  Crew 1  May May May May May May May May May May May May May May May May May May May May May  22 22 22 23 23 23 24 24 24 25 25 25 26 26 26 27 27 27 28 28 28  Mon Tue Wed Thurs Fri Sat Sun  1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 NLO 1  266 1-01    8  8  8  8          N2X  T  T  T  T  xx1  xx2  NLO 2  200 1-02    8  8  8  8            xx 1  T  T  T  T  xx1  xx2  NLO 3  251 1-03    8  8  8  8            xx 1  T  T  T  T  xx1  xx2  NLO 4  910 1-04    8  8  8  8            xx 1  T  T  T  T  xx1  xx2  NLO 5  233 1-05    8  8  8  8            xx 1  T  T  T  T  xx1  xx2  NLO 6  924 1-06    8  8  8  8            xx 1  T  T  T  T  xx1  xx2  NLO 7  724 1-07    8  8  8  8          1  xx 1  T  T  T  T  xx1  xx2  NLO 8  323 1-08 12    8  8  8  8          N1B  T  T  T  T  xx1  xx2 S-105 1 TASK TITLE:
FAILED                             TIME FINISHED:
Respond to a Fire Detection/Suppression System Alarm JPM No.: S-105 REV: NRC2006301TPO No.: 8.E.AM-200 K&A No.: 2.1.14 TASK No.: S-AM-200, Supervise actions for K&A IMP: 2.5/3.3 combating a plant fire TRAINEE:
JPM TIME:             MINUTES CRITICAL ELEMENTS:       (*) 1, 3, 4, 8-10           APPROX COMPLETION TIME   15  MINUTES CRITICAL TIME:           NA EVALUATION METHOD:                                     LOCATION:
SRO   EVALUATOR:
PERFORM                               X  IN PLANT X  SIMULATE                             X  SIMULATOR GENERAL  
DATE:   The Trainee: PASSED           this JPM. TIME STARTED:
FAILED TIME FINISHED:
JPM TIME: MINUTES CRITICAL ELEMENTS:
(*) 1, 3, 4, 8-10 APPROX COMPLETION TIME 15  MINUTES CRITICAL TIME:
NA EVALUATION METHOD:
LOCATION:
PERFORM   X  IN PLANT X  SIMULATE X  SIMULATOR GENERAL  


==REFERENCES:==
==REFERENCES:==
Line 172: Line 107:
TASK STANDARDS:
TASK STANDARDS:
: 1. Perform Shift Manager designee required actions in response to a Fire Detection/Suppression System Alarm.
: 1. Perform Shift Manager designee required actions in response to a Fire Detection/Suppression System Alarm.
: 2. Complete Shift Manager designee applicable actions of Fire/Haz-Mat  
: 2. Complete Shift Manager designee applicable actions of Fire/Haz-Mat Response/Checklist (Appendix A).
 
Response/Checklist (Appendix A).
TASK CONDITIONS:
TASK CONDITIONS:
: 1. You are the Shift Manager's Designee.
: 1. You are the Shift Managers Designee.
: 2. Both Units are at full power.
: 2. Both Units are at full power.
INITIATING CUES:
INITIATING CUES:
: 1. Annunciator 0-37-A4 for Unit 1 actuated a few minutes ago and has been  
: 1. Annunciator 0-37-A4 for Unit 1 actuated a few minutes ago and has been acknowledged by the Unit 1 Admin NSO. An Alarm on 1PM09J has also been acknowledged.
 
: 2. An NLO called the MCR via the emergency phone number to report a fire is in progress in the plant
acknowledged by the Unit 1 Admin NSO. An Alarm on 1PM09J has also been  
: 3. An NSO has completed the Unit Admin NSO portion of BwAP 1100-16, Appendix A, Fire/Haz-Mat Response/Checklist and has just forwarded it to you. (CUE: Hand examinee copy of the BwAP 1100-16 Appendix A Checklist with the NSO portion completed)
 
acknowledged.
: 2. An NLO called the MCR via the emergency phone number to report a fire is in  
 
progress in the plant
: 3. An NSO has completed the Unit Admin NSO portion of BwAP 1100-16, Appendix A, Fire/Haz-Mat Response/Checklist and has just forwarded it to you. (CUE: Hand examinee copy of the BwAP 1100-16 Appendix A Checklist with the NSO portion  
 
completed)
: 4. Another SRO is currently evaluating EALs related to the event.
: 4. Another SRO is currently evaluating EALs related to the event.
: 5. You are directed to complete the Shift Manager/Designee portion of the  
: 5. You are directed to complete the Shift Manager/Designee portion of the Fire/Haz-Mat Response/Checklist
: 6. Route the completed checklist to the Station Duty Officer when it is completed.
1 S-105


Fire/Haz-Mat Response/Checklist
RECORD START TIME Note:  Pages 8-9 contain key of correctly filled out form.
: 6. Route the completed checklist to the Station Duty Officer when it is
PERFORMANCE STEP                  STANDARD            Circle applicable
*1. Perform BwAP 1100-16          Locate and Open BwAP      SAT    UNSAT      N/A Appendix A, Shift            1100-16.                  Comments:
Manager/Designee section,    Review / perform the steps 1 & 2.                  required actions of the CUE:  All Prerequisites,    SM or designee:
Precautions,
* Contact Security Limitations and          Supervisor Actions have been met.
o Phone CUE:   As Security Shift Supervisor,              o Plant Page acknowledge the report    o Radio of the fire, and request for personnel.
* NOTIFY the Security Shift Supervisor
* Location of the fire
* Dispatch security personnel to the equipment cages
* Dispatch security personnel to fire area to control access
* Initial in block 1
* NOTIFY security to OPEN any Security Barriers as needed
* Initial in block 2
: 2. Perform BwAP 1100-16          Review / perform the      SAT    UNSAT      N/A Appendix A, Shift            required actions of the    Comments:
Manager/Designee section,    SM or designee:
step 3.                      o  VERIFY the fire CUE:  As NSO, or Fire          brigade has been Brigade, confirm          notified/dispatched notification/dispatch      o Contact Admin NSO of fire brigade.              to verify fire brigade dispatched o Contact Fire Chief and/or fire brigade members.
o Phone o Plant Page o Radio
* Initial in block 3 2
S-105


completed.  
PERFORMANCE STEP                  STANDARD            Circle applicable
*3. Perform BwAP 1100-16          Review / perform the      SAT    UNSAT      N/A Appendix A, Shift            required actions of the  Comments:
Manager/Designee section,    SM or designee:
step 4.
* Contact Rad Protection CUE:  As Rad Protection          o Phone acknowledge request for dispatch.              o Plant Page
* Initial in block 4
* Initial indicating the notification method used in block 4, other methods marked N/A.
*4. Perform BwAP 1100-16          Review / perform the      SAT    UNSAT      N/A Appendix A, Shift            required actions of the  Comments:
Manager/Designee section,    SM or designee:
step 5.
* Contact Fire Chief CUE:  As Fire Chief, report      o Phone that the fire was wood that was staged for an    o Plant Page upcoming outage. The      o Radio fire is out, no injuries, small fire,      o Communicates via no equipment damaged,        Admin NSO no outside assistance
* COMMUNICATE with the is necessary.            Fire Chief to If asked report that      determine the access to the ESF        following:
switchgear rooms is
* Conditions/status not impeded.                at fire scene
* Injuries
* Extent of fire
* Equipment damaged
* Assistance requirements
* Record applicable information block 5
* Initial each sub step in block 5 (Assistance required information and initial is not required to be filled in)
: 5. Perform BwAP 1100-16          Review / perform the      SAT    UNSAT      N/A Appendix A, Shift            required actions of the  Comments:
Manager/Designee section,    SM or designee:
step 6.
* Determine that step 6 is not required to be performed 3
S-105


S-105 2 RECORD START TIME NotePages 8-9 contain key of correctly filled out form.
PERFORMANCE STEP                  STANDARD            Circle applicable
PERFORMANCE STEP STANDARD Circle applicable
: 6. Perform BwAP 1100-16          Review / perform the      SAT    UNSAT      N/A Appendix A, Shift            required actions of the  Comments:
*1. Perform BwAP 1100-16 Appendix A, Shift Manager/Designee section, steps 1 & 2. CUE: All Prerequisites, Precautions, Limitations and  
Manager/Designee section,    SM or designee:
step 7.
* Determine if EALs have CUE:   SM will review EALs.      been evaluated o Review EALs
: 7. Perform BwAP 1100-16          Review / perform the      SAT    UNSAT      N/A Appendix A, Shift            required actions of the  Comments:
Manager/Designee section,    SM or designee:
step 8.
* NOTIFY the Station CUE:  Inform examinee          Fire Marshal, Station notifications have        Duty Officer, and already been performed    Chemistry by another SRO.
* Initial each sub step CUE:  OP-AA-106-101 will be    in block 8 (Notify reviewed by another      Others and Notify SRO.                      other Fire Departments and initial is not required to be filled in)
*8. Perform BwAP 1100-16         Request periodic status  SAT    UNSAT      N/A Appendix A, Shift             reports from the Exelon  Comments:
Manager/Designee section,     Fire Chief at no more step 9.                       than 20 minute intervals Note: If examinee determines  and note on the update not required at checklist:
this time (due to 20
* Contact Fire Chief minute time limit on      o Phone updates), provide the following cue              o Plant Page CUE:  20 minutes have            o Radio elapsed since you last o  COMMUNICATE with the spoke with Fire Chief    Fire Chief to CUE:   As Fire Chief provide    determine the the following info as    following:
an update:                o  Conditions/status The fire is out, the        at fire scene only visible damage is    o  Injuries charred paint/floor, and no assistance        o  Extent of fire necessary.                o  Equipment damaged o  Assistance requirements Record update from Exelon Fire Chief
* Initial in block 9 4
S-105


Actions have been met.CUE: As Security Shift Supervisor, acknowledge the report
PERFORMANCE STEP                  STANDARD            Circle applicable
  *9. Perform BwAP 1100-16          Perform the following    SAT    UNSAT      N/A Appendix A, Shift
* Contact the Work      Comments:
Manager/Designee section,        Execution Center step 10.
o Phone o Plant Page CUE:   Acknowledge notifications as WEC.      o Radio
* Notify WEC to perform the following:
* 0BwOS FP-Q5, Fire Brigade Cages Equipment Area Check surveillance
* Initial in block 10
*10. Perform BwAP 1100-16          List Fire Brigade Team    SAT    UNSAT      N/A Appendix A, Shift             Members on the checklist: Comments:
Manager/Designee section,
* Contact Fire Chief step 11.
o Phone CUE:  Team members are Chief: Dave Mills,        o Plant Page Members: Morgan,          o Radio Davito, Bannon, and
* Request roster of Fire Verchimak.                Brigade Members
* List Fire Brigade Chief and Fire Brigade Team Members in block 11.
* Initial in block 11
: 11. Route the completed          Route the completed      SAT    UNSAT      N/A checklist                    checklist for review      Comments:
CUE:  Acknowledge request to
* Contact Station Duty route completed          Officer checklist.                o Phone o Plant Page o Radio
* Route checklist to Station Duty Officer CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME COMMENTS:
5 S-105


of the fire, and
TASK CONDITIONS:
 
: 1. You are the Shift Managers Designee.
request for personnel.
Locate and Open BwAP
 
1100-16. Review / perform the
 
required actions of the
 
SM or designee:  Contact Security
 
Supervisor o Phone o Plant Page o Radio  NOTIFY the Security
 
Shift Supervisor  Location of the fire  Dispatch security
 
personnel to the
 
equipment cages  Dispatch security
 
personnel to fire
 
area to control
 
access  Initial in block 1  NOTIFY security to
 
OPEN any Security
 
Barriers as needed  Initial in block 2 SAT    UNSAT      N/A Comments: 2. Perform BwAP 1100-16
 
Appendix A, Shift
 
Manager/Designee section, step 3. CUE: As NSO, or Fire Brigade, confirm
 
notification/dispatch
 
of fire brigade.
Review / perform the
 
required actions of the
 
SM or designee:
o VERIFY the fire
 
brigade has been
 
notified/dispatched o Contact Admin NSO
 
to verify fire
 
brigade dispatched o Contact Fire Chief
 
and/or fire brigade
 
members. o Phone o Plant Page o Radio  Initial in block 3 SAT    UNSAT      N/A Comments:
S-105 3  PERFORMANCE STEP STANDARD Circle applicable
*3. Perform BwAP 1100-16 Appendix A, Shift Manager/Designee section, step 4. CUE: As Rad Protection acknowledge request
 
for dispatch.
Review / perform the
 
required actions of the
 
SM or designee:  Contact Rad Protection o Phone o Plant Page  Initial in block 4  Initial indicating the
 
notification method
 
used in block 4, other
 
methods marked N/A.
SAT    UNSAT      N/A Comments: *4. Perform BwAP 1100-16 Appendix A, Shift
 
Manager/Designee section, step 5. CUE: As Fire Chief, report that the fire was wood
 
that was staged for an
 
upcoming outage. The
 
fire is out, no
 
injuries, small fire, no equipment damaged, no outside assistance
 
is necessary.
If asked report that
 
access to the ESF
 
switchgear rooms is
 
not impeded.
Review / perform the
 
required actions of the
 
SM or designee:  Contact Fire Chief o Phone o Plant Page o Radio o Communicates via
 
Admin NSO  COMMUNICATE with the
 
Fire Chief to
 
determine the
 
following:  Conditions/status
 
at fire scene  Injuries  Extent of fire  Equipment damaged  Assistance
 
requirements  Record applicable
 
information block 5  Initial each sub step
 
in block 5 (Assistance
 
required information
 
and initial is not
 
required to be filled
 
in)  SAT    UNSAT      N/A Comments: 5. Perform BwAP 1100-16 Appendix A, Shift
 
Manager/Designee section, step 6. Review / perform the
 
required actions of the
 
SM or designee:  Determine that step 6
 
is not required to be
 
performed SAT    UNSAT      N/A Comments:
S-105 4  PERFORMANCE STEP STANDARD Circle applicable
: 6. Perform BwAP 1100-16 Appendix A, Shift Manager/Designee section, step 7. CUE: SM will review EALs.
Review / perform the
 
required actions of the
 
SM or designee:  Determine if EALs have been evaluated o Review EALs SAT    UNSAT      N/A Comments: 7. Perform BwAP 1100-16 Appendix A, Shift
 
Manager/Designee section, step 8. CUE: Inform examinee notifications have
 
already been performed
 
by another SRO. CUE: OP-AA-106-101 will be reviewed by another
 
SRO. Review / perform the
 
required actions of the
 
SM or designee:  NOTIFY the Station
 
Fire Marshal, Station
 
Duty Officer, and
 
Chemistry  Initial each sub step
 
in block 8 (Notify
 
Others and Notify
 
other Fire Departments
 
and initial is not
 
required to be filled
 
in)  SAT    UNSAT      N/A Comments: *8. Perform BwAP 1100-16 Appendix A, Shift
 
Manager/Designee section, step 9. Note: If examinee determines update not required at
 
this time (due to 20
 
minute time limit on
 
updates), provide the
 
following cue CUE: 20 minutes have elapsed since you last
 
spoke with Fire Chief CUE: As Fire Chief provide the following info as
 
an update:
The fire is out, the
 
only visible damage is
 
charred paint/floor, and no assistance
 
necessary.
Request periodic status
 
reports from the Exelon
 
Fire Chief at no more
 
than 20 minute intervals
 
and note on the
 
checklist:  Contact Fire Chief o Phone o Plant Page o Radio o COMMUNICATE with the
 
Fire Chief to
 
determine the
 
following:
o Conditions/status
 
at fire scene o Injuries o Extent of fire o Equipment damaged o Assistance
 
requirements Record
 
update from Exelon
 
Fire Chief  Initial in block 9 SAT    UNSAT      N/A Comments:
S-105 5  PERFORMANCE STEP STANDARD Circle applicable
*9. Perform BwAP 1100-16 Appendix A, Shift Manager/Designee section, step 10. CUE: Acknowledge notifications as WEC.
Perform the following  Contact the Work Execution Center o Phone o Plant Page o Radio  Notify WEC to perform the following:  0BwOS FP-Q5, Fire
 
Brigade Cages
 
Equipment Area
 
Check surveillance  Initial in block 10 SAT    UNSAT      N/A Comments: *10. Perform BwAP 1100-16 Appendix A, Shift
 
Manager/Designee section, step 11. CUE: Team members are Chief: Dave Mills, Members: Morgan, Davito, Bannon, and
 
Verchimak.
List Fire Brigade Team
 
Members on the checklist:  Contact Fire Chief o Phone o Plant Page o Radio  Request roster of Fire
 
Brigade Members  List Fire Brigade
 
Chief and Fire Brigade
 
Team Members in block
: 11. Initial in block 11 SAT    UNSAT      N/A Comments: 11. Route the completed checklist CUE: Acknowledge request to route completed
 
checklist.
Route the completed
 
checklist for review  Contact Station Duty Officer o Phone o Plant Page o Radio  Route checklist to Station Duty Officer SAT    UNSAT      N/A Comments:  CUE: THIS COMPLETES THIS JPM.
 
RECORD STOP TIME COMMENTS:
 
S-105 6  TASK CONDITIONS:
: 1. You are the Shift Manager's Designee.
: 2. Both Units are at full power.
: 2. Both Units are at full power.
INITIATING CUES:
INITIATING CUES:
: 1. Annunciator 0-37-A4 for Unit 1 actuated a few minutes ago and has been acknowledged by the Unit 1 Admin NSO. An Alarm on 1PM09J has also been  
: 1. Annunciator 0-37-A4 for Unit 1 actuated a few minutes ago and has been acknowledged by the Unit 1 Admin NSO. An Alarm on 1PM09J has also been acknowledged.
 
: 2. An NLO called the MCR via the emergency phone number to report a fire is in progress in the plant
acknowledged.
: 2. An NLO called the MCR via the emergency phone number to report a fire is in  
 
progress in the plant
: 3. An NSO has completed the Unit Admin NSO portion of BwAP 1100-16, Appendix A, Fire/Haz-Mat Response/Checklist and has just forwarded it to you.
: 3. An NSO has completed the Unit Admin NSO portion of BwAP 1100-16, Appendix A, Fire/Haz-Mat Response/Checklist and has just forwarded it to you.
: 4. Another SRO is currently evaluating EALs related to the event.
: 4. Another SRO is currently evaluating EALs related to the event.
: 5. You are directed to complete the Shift Manager/Designee portion of the  
: 5. You are directed to complete the Shift Manager/Designee portion of the Fire/Haz-Mat Response/Checklist
: 6. Route the completed checklist to the Station Duty Officer when it is completed.
6 S-105


Fire/Haz-Mat Response/Checklist
SIMULATOR SETUP GUIDE:
: 6. Route the completed checklist to the Station Duty Officer when it is
* Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST. (N/A if JPM NOT performed in simulator)
 
* Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon. (N/A if JPM NOT performed in simulator)
completed.
* Complete items on Simulator Ready for Training Checklist. (N/A if JPM NOT performed in simulator)
S-105 7 SIMULATOR SETUP GUIDE:
* Place simulator in RUN. (N/A if JPM NOT performed in simulator)
Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST. (N/A if JPM NOT performed in  
* Insert IMF PN0749 ON(N/A if JPM NOT performed in simulator)
 
COMMENTS:
simulator)
* Provide marked up copy of BwAP 1100-16, Appendix A, completed through step 15 (page 4, NSO actions)
Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon. (N/A if JPM NOT performed in simulator)
* Provide copy of BwAR 0-37-A4.
Complete items on Simulator Ready for Training Checklist. (N/A if JPM  
* The fire is on the 426 elevation of the U-1 Turbine Building outside of ESF Bus 141 room. The fire is a small fire and was in wood that was being staged for an upcoming outage.
 
7 S-105
NOT performed in simulator)
Place simulator in RUN. (N/A if JPM NOT performed in simulator)
Insert IMF PN0749 ON (N/A if JPM NOT performed in simulator) OMMENTS: Provide marked up copy of BwAP 1100-16, Appendix A, completed through  
 
step 15 (page 4, NSO actions)
Provide copy of BwAR 0-37-A4.
The fire is on the 426' elevation of the U-1 Turbine Building outside  
 
of ESF Bus 141 room. The fire is a small fire and was in wood that  
 
was being staged for an upcoming outage.  
 
BwAP 1100-16 Revision 22


Information Use S-105 8 APPENDIX A FIRE/HAZ-MAT RESPONSE/CHECKLIST Nuclear Station Operator
KEY BwAP 1100-16 APPENDIX A KE Y Revision 22 Information Use FIRE/HAZ-MAT RESPONSE/CHECKLIST Nuclear Station Operator
__JN__1. Name of Caller/Informant:
__JN__ 1.     Name of Caller/Informant:                   Tom NLO__________________________________
Tom NLO____
__JN__2.       Phone Number of Informant (if available):   7588______________________________________
______________________________
__JN__3.       Date:                                       Today_____________________________________
__JN__2. Phone Number of Informant (if available): 7588
__JN__4.       Time:                                       __5 minutes ago____________________________
______________________________________
__JN__5.       Location of Fire/Spill (Bldg/Elev/Area):     Turbine Building 426 outside ESF Bus 141 room___
__JN__3. Date: Today_____________________________________
__JN__6.       Size of Fire/Spill:                         Small_____________________________________
__JN__4. Time: __5 minutes ago
__JN__7.       Type of Fire Spill (Circle/Explain):         Wood/Trash/Rubbish: Wood staged for outage Flammable/Combustible Liquid:
____________________________
Plant Equipment:
__JN__5. Location of Fire/Spill (Bldg/Elev/Area):
Other:                     ___________________
Turbine Building 426' outside ESF Bus 141 room_
Type of Chemical:           ___________________
__  __JN__6. Size of Fire/Spill:
__JN__8.       Notify the Shift Manager or designee of the situation.
Small_____________________________________
__JN__9.       Radio Announcement of location Fire/Spill (Include fire type/size or Chemical if known).
__JN__7. Type of Fire Spill (Circle/Explain): Wood/Trash/Rubbish: Wood staged for outage Flammable/Combustible Liquid:
__JN__10.     Sound Plant Fire Siren (10-15 seconds).
Plant Equipment: Other:   ___________________ Type of Chemical: ___________________
__JN__11.     P.A. Announcement of location, type and size of fire/spill (Use EMER PAGE button and handset button concurrently).
__JN__8. Notify the Shift Manager or designee of the situation.
__JN__12.     Sound Plant Fire Siren (10-15 seconds).
__JN__9. Radio Announcement of location Fire/Spill (Include fire type/size or Chemical if known).
__JN__13.     P.A. Announcement of location, type and size of fire/spill (Use EMER PAGE button and handset button concurrently).
__JN__10. Sound Plant Fire Siren (10-15 seconds).
_N/A__14.     Notify Unit Operator(s) to refer to BwOP FP-100, Fire Response Guidelines for a fire in any of the following areas:
__JN__11. P.A. Announcement of location, type and size of fire/spill (Use 'EMER PAGE" button and handset button concurrently).
{        VCT Room (11.6A-_)
__JN__12. Sound Plant Fire Siren (10-15 seconds).
{        Aux Bldg. 426 Chemistry Lab/Office (11.6B-0)
__JN__13. P.A. Announcement of location, type and size of fire/spill (Use 'EMER PAGE" button and handset button concurrently).
{        Kitchen/Locker Room Area (18.5-1)
_N/A__14. Notify Unit Operator(s) to refer to BwOP FP-100, Fire Response Guidelines for a fire in any of the following areas:
{        RH Heat Exchanger Room (11.3_-_)
VCT Room (11.6A-_) Aux Bldg. 426' Chemistry Lab/Office (11.6B-0) Kitchen/Locker Room Area (18.5-1) RH Heat Exchanger Room (11.3_-_) Letdown Heat Exchanger Room (11.4C-_) DG Room/Switchgear Room Air Shaft (18._-_) Radwaste Drumming Station and Radwaste Tunnel (14.1-0)
{        Letdown Heat Exchanger Room (11.4C-_)
__JN__15. Relay information to the Shift Manager.
{        DG Room/Switchgear Room Air Shaft (18._-_)
NSO/Time _Joe NSO
{        Radwaste Drumming Station and Radwaste Tunnel (14.1-0)
____________/__Current Time
__JN__15.     Relay information to the Shift Manager.
_______ K K E E Y Y  K K E E Y Y  K K E E Y Y  K K E E Y Y BwAP 1100-16 Revision 22
NSO/Time         _Joe NSO____________/__Current Time_______
KEY S-105 8
KEY


Information Use S-105 9 APPENDIX A (Cont)
KEY                                                                                                        KEY BwAP 1100-16 Revision 22 Information Use APPENDIX A (Cont)
FIRE/HAZ-MAT RESPONSE/CHECKLIST Shift Manager/Designee
FIRE/HAZ-MAT RESPONSE/CHECKLIST Shift Manager/Designee
__SM__1. Notify the Security Shift Supervisor of the incident location in order to dispatch security personnel to the fire/spill area and fire equipment/Haz-Mat Equipment cages and to provide access control as necessary.
__SM__1.     Notify the Security Shift Supervisor of the incident location in order to dispatch security personnel to the fire/spill area and fire equipment/Haz-Mat Equipment cages and to provide access control as necessary.
__SM__2. Have Security OPEN any Security Barri ers as needed (Track Way Gates, Doors, etc.)
__SM__2.     Have Security OPEN any Security Barriers as needed (Track Way Gates, Doors, etc.)
__SM__3. Verify the fire brigade has been notified/dispatched.
__SM__3.     Verify the fire brigade has been notified/dispatched.
NOTE Appendix E contains information on the duties and requirements for Rad Protection Personnel.
NOTE Appendix E contains information on the duties and requirements for Rad Protection Personnel.
__SM__4. Notify Rad Protection.
__SM__4.     Notify Rad Protection.
__SM*__ x2240 *Examinee initials in space denoting notification method (only 1 method required)
__SM*__       {          x2240 *Examinee initials in space denoting notification method (only 1 method required)
__SM*__ x2241 __SM*__ Plant Page
__SM*__       {          x2241
__SM*__       {          Plant Page
: 5. Communicate with the Fire Chief/Incident Commander to determine the following:
: 5. Communicate with the Fire Chief/Incident Commander to determine the following:
__SM__ Conditions/status at the fire scene Small wood fire_
__SM__       z          Conditions/status at the fire scene             Small wood fire_________________________
________________________
__SM__       z          Injuries                                       No injuries, None, or N/A_________________
__SM__ Injuries     No injuries, None, or N/A
__SM__       z          Extent of fire                                 Fire is out, extinguished, etc.______________
_________________
__SM__       z          Equipment damaged                               No equipment damaged, none, or N/A_______
__SM__ Extent of fire   Fire is out, extinguished, etc.
__SM__       z          Assistance required                             No outside assistance required, none, or N/A__
______________
NOTE Reported Fires in buildings outside the Protected area shall be handled by the off-site Fire Department. At Braidwoods owner controlled area at the Plant, notify Braidwood Fire Department (9-911 or 9-458-2121). At River Screen House, call Custer Twp. Fire Department (9-458-2119).
__SM__ Equipment damaged   No equipment damaged, none, or N/A
_______ __SM__ Assistance required   No outside assistance required, none, or N/A
__  NOTE Reported Fires in buildings outside the Protected area shall be handled by the off-site Fire Department. At Braidwood's owner controlled area at the Plant, notify Braidwood Fire Department (9-911 or 9-458-2121). At River Screen House, call Custer Twp. Fire Department (9-458-2119).
: 6. If Off-Site Assistance Required:
: 6. If Off-Site Assistance Required:
NOTE INFORM the Braidwood Fire Department with as much information as possible, i.e., type of fire/spill, size, location of fire/spill, point of plant entry, etc.
NOTE INFORM the Braidwood Fire Department with as much information as possible, i.e., type of fire/spill, size, location of fire/spill, point of plant entry, etc.
__N/A__ CALL Braidwood Fire Dept. (9-911 or 9-458-2121).
__N/A__       {          CALL Braidwood Fire Dept. (9-911 or 9-458-2121).
__N/A__ CALL Custer Twp Fire Dept. (9-458-2119) for River Screen House. NOTIFY Security Shift Supervisor of the following:
__N/A__       {          CALL Custer Twp Fire Dept. (9-458-2119) for River Screen House.
__N/A__   Off-Site Fire Dept. responding.
z          NOTIFY Security Shift Supervisor of the following:
__N/A__   Desired Plant Access Point.
__N/A__                 z        Off-Site Fire Dept. responding.
__N/A__   Location of Command Post Area. Refer to the Exelon Nuclear Radiological Emergency Plan, Braidwood Annex, for emergency action levels.
__N/A__                 z        Desired Plant Access Point.
__N/A__ Fire Chief notified of Off-Site response.
__N/A__                 z        Location of Command Post Area.
__N/A__ Site Communications Director notified of Off-Site response.
z          Refer to the Exelon Nuclear Radiological Emergency Plan, Braidwood Annex, for emergency action levels.
K K E E Y Y  K K E E Y Y  K K E E Y Y  K K E E Y Y BwAP 1100-16 Revision 22
__N/A__       z          Fire Chief notified of Off-Site response.
__N/A__       z          Site Communications Director notified of Off-Site response.
KEY S-105 9
KEY


Information Use 10 K K E E Y S-105 APPENDIX A (Cont)
KEY                                          APPENDIX A (Cont)
FIRE/HAZ-MAT RESPONSE/CHECKLIST Shift Manager/Designee
KEY BwAP 1100-16 Revision 22 Information Use FIRE/HAZ-MAT RESPONSE/CHECKLIST Shift Manager/Designee
__SM__7, Refer to the Exelon Nuclear Radiological Em ergency Plan, Braidwood Annex, for emergency action levels if not already referred to.
__SM__7,     Refer to the Exelon Nuclear Radiological Emergency Plan, Braidwood Annex, for emergency action levels if not already referred to.
: 8. Notify the following:
: 8. Notify the following:
__SM__ Station Fire Marshal
__SM__       z        Station Fire Marshal
__SM__ Station Duty Officer
__SM__       z        Station Duty Officer
__SM__ Chemistry
__SM__       z        Chemistry
__
__
* __
* __       z        Others per OP-AA-106-101 (*will be completed by another SRO)
Others per OP-AA-106-101 (*will be completed by another SRO)
__N/A__       z        Notify other Fire Departments or other assistance as requested by the Exelon Fire Chief.
__N/A__ Notify other Fire Departments or other assi stance as requested by the Exelon Fire Chief.
__SM__9.     Request periodic status/damage reports from the Exelon Fire chief at no more than twenty (20) minute intervals.
__SM__9. Request periodic status/damage reports from t he Exelon Fire chief at no more than twenty (20) minute intervals.
The fire is out, the only visible damage is charred paint/floor, no assistance necessary ---_____
The fire is out, the only visible damage is cha rred paint/floor, no assistance necessary   ---
_____________________________________________________________________________
_____ _____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
__SM__10. Notify the WEC to perform the following:
__SM__10. Notify the WEC to perform the following:
0BwOS FP-Q5, Fire Brigade Cages Equipment Area Check Surveillance, must be performed for all Fire Brigade cage equipment used during a fire. 0BwOS HM-Q1, Operations Hazardous Materi als Emergency Response Equipment Inventory, must be performed for each cage used during a Hazardous Material Spill.
z        0BwOS FP-Q5, Fire Brigade Cages Equipment Area Check Surveillance, must be performed for all Fire Brigade cage equipment used during a fire.
{        0BwOS HM-Q1, Operations Hazardous Materials Emergency Response Equipment Inventory, must be performed for each cage used during a Hazardous Material Spill.
__SM__11. List Fire Brigade/Hazmat Team Members:
__SM__11. List Fire Brigade/Hazmat Team Members:
Fire Brigade Chief: Mills
z        Fire Brigade Chief:       Mills_______________________________
_______________________________  Members: Morgan
z        Members:                 Morgan_____________________________
_____________________________ Davito______________________________
Davito______________________________
Smith_______________________________ Verchimak___________________________
Smith_______________________________
Verchimak___________________________
: 12. The completed Fire Checklist SHALL be routed in the following order for review:
: 12. The completed Fire Checklist SHALL be routed in the following order for review:
_____ a. Station Duty Officer.
____ _        a.       Station Duty Officer.
NOTE The Fire Marshal will make c opies of the Checklist for: 1. Rad Protection Supervisor. 2. EP Coordinator (if an Emergency Event declared). 3. Environmental Supervisor.
NOTE The Fire Marshal will make copies of the Checklist for:
_____ b. Fire Marshal.
: 1. Rad Protection Supervisor.
__ ___ c. Operations Clerk.
: 2. EP Coordinator (if an Emergency Event declared).
Y K K E E Y Y    K K E E Y Y  K K E E Y Y  (Final)
: 3. Environmental Supervisor.
S-204 1 TASK TITLE:
__ ___        b.       Fire Marshal.
Initiate a LCOAR JPM No.: S-204 REV: NRC2006301TPO No.: 8.E.AM-120 K&A No.: 2.2.23 TASK No.: S-AM-073: Initiate/Terminate K&A IMP: 2.6/3.8 an AAR/LCOAR TRAINEE:
__ ___       c.       Operations Clerk.
SRO   EVALUATOR:
(Final)
DATE:   The Trainee: PASSED           this JPM. TIME STARTED:
KEY S-105 10                                  KE Y
FAILED TIME FINISHED:
 
JPM TIME: MINUTES CRITICAL ELEMENTS:
TASK TITLE: Initiate a LCOAR JPM No.:     S-204                                     REV:       NRC2006301 TPO No.:   8.E.AM-120                                 K&A No.:   2.2.23 TASK No.:   S-AM-073: Initiate/Terminate               K&A IMP:   2.6/3.8 an AAR/LCOAR TRAINEE:                                               SRO EVALUATOR:                                             DATE:
(*) 2, 3, 4 APPROX COMPLETION TIME:
The Trainee:       PASSED             this JPM.       TIME STARTED:
20 MINUTES CRITICAL TIME:
FAILED                             TIME FINISHED:
NA EVALUATION METHOD:
JPM TIME:             MINUTES CRITICAL ELEMENTS:       (*) 2, 3, 4                 APPROX COMPLETION TIME: 20 MINUTES CRITICAL TIME:           NA EVALUATION METHOD:                                     LOCATION:
LOCATION:
X  PERFORM                               X  IN PLANT SIMULATE                             X  SIMULATOR GENERAL  
X  PERFORM   X  IN PLANT SIMULATE X  SIMULATOR GENERAL  


==REFERENCES:==
==REFERENCES:==
Line 592: Line 340:
: 1. 1BwOL 3.7.8 Rev 4.
: 1. 1BwOL 3.7.8 Rev 4.
TASK STANDARDS:
TASK STANDARDS:
: 1. Initiate LCOAR 3.7.8 for a failure of the 1A SX pump to perform it's intended  
: 1. Initiate LCOAR 3.7.8 for a failure of the 1A SX pump to perform its intended function.
 
function.
TASK CONDITIONS:
TASK CONDITIONS:
: 1. You are the Unit Supervisor.
: 1. You are the Unit Supervisor.
: 2. Both units are at full power.
: 2. Both units are at full power.
INITIATING CUES:
INITIATING CUES:
: 1. The Engineering staff notified you that the 1A SX pump has failed surveillance  
: 1. The Engineering staff notified you that the 1A SX pump has failed surveillance 1BwVSR 5.5.8.SX.1 ASME Surveillance Requirements for 1A Essential Service Water Pump, due to inadequate pump delta-P (10 minutes ago). Initiate the LCOAR. An IR (# 123456) and a WR (# 123456) have been written.
 
1BwVSR 5.5.8.SX.1 ASME Surveillance Requirements for 1A Essential Service  
 
Water Pump, due to inadequate pump delta-P (10 minutes ago). Initiate the  
 
LCOAR. An IR (# 123456) and a WR (# 123456) have been written.
: 2. No other inoperable equipment exists on either Unit.
: 2. No other inoperable equipment exists on either Unit.
: 3. Inform the Shift Manager when you have completed initiating the LCOAR.  
: 3. Inform the Shift Manager when you have completed initiating the LCOAR.
1 S-204


S-204 2 RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable
RECORD START TIME PERFORMANCE STEP                 STANDARD             Circle applicable
: 1. Refer to the LCOAR CUE: After the examinee demonstrates he/she  
: 1. Refer to the LCOAR           Locate 1BwOL 3.7.8        SAT    UNSAT      N/A CUE:   After the examinee                               Comments:
demonstrates he/she can locate the LCOAR, provide a copy.
Note: If the examinee requests to review 1BwVSR 5.5.8.SX.1, provide the attached copy.
Examiners note: A correctly completed LOCAR form is included on pages 6-9. LCOAR completion steps may be performed in any order.
*2. Complete Section A,          Complete Section A.      SAT    UNSAT      N/A Notification, of 1BwOL 3.7.8  Notification, of 1BwOL    Comments:
3.7.8:
* Present Mode: 1 Note: Underlined phrases or
* Initiating Event:
words to that effect      Failure of 1BwVSR are acceptable for        5.5.8.SX.1 ASME due to completion of LCOAR      inadequate pump P paperwork.
* SFD Performed:
Performs SFD per page 2 and determines no loss of safety function exists
* Check No box (B.1.a) on page 2
* Checks YES box on page 1 and initials next to YES
* Does this inoperability invalidate any previous SFD: No 2
S-204


can locate the LCOAR, provide a copy. Note: If the examinee requests to review
PERFORMANCE STEP                STANDARD            Circle applicable
 
  *2   Step 2 Continued                                        SAT    UNSAT      N/A CUE:   As Shift Manager,
1BwVSR 5.5.8.SX.1, provide the attached
* Notify Shift Manager  Comments:
 
acknowledge LCOAR        of LCOAR entry (Craig entry. Provide name       Ingold) of SM - Craig Ingold.
copy. Locate 1BwOL 3.7.8 SAT    UNSAT      N/A Comments: Examiner's note:  A correctly completed LOCAR form is included on pages 6-9. LCOAR
* Time Date:
 
(notification time and todays date)
completion steps may be performed in any order.
*2. Complete Section A, Notification, of 1BwOL 3.7.8 Note: Underlined phrases or words to that effect
 
are acceptable for
 
completion of LCOAR
 
paperwork.
Complete Section A.
 
Notification, of 1BwOL
 
3.7.8:  Present Mode:
1  Initiating Event:
Failure of 1BwVSR 5.5.8.SX.1 ASME due to inadequate pump P  SFD Performed:
 
Performs SFD per page
 
2 and determines no
 
loss of safety
 
function exists  Check No box (B.1.a) on page 2  Checks YES box on
 
page 1 and initials
 
next to YES  Does this
 
inoperability
 
invalidate any
 
previous SFD:
No  SAT    UNSAT      N/A Comments:
S-204 3  PERFORMANCE STEP STANDARD Circle applicable
*2 Step 2 Continued CUE: As Shift Manager, acknowledge LCOAR entry. Provide name  
 
of SM - Craig Ingold.
Note: From cue sheet, IR
Note: From cue sheet, IR
(#123456) and WR  
* Was an IR written:
(#123456) and WR             Yes, #123456
              #123456 written.
* Related WRs: Yes,
                                          #123456 CUE:  C/O will be prepared  o  Related C/O(s): No at later time.
* SRO Signature:
(examinees signature)
CUE:  Examiner sign for Unit
* Unit NSO signature:
NSO.                      (Unit NSO name signed by examiner)
*3. Complete LCOAR Index          On page 6 of 1BwOL 3.7.8, SAT    UNSAT      N/A Essential Service Water (SX)  sign and date Condition A Comments:
System                        line and refer to page 7:
* Examinees signature
* Todays date
*4. Initiate LCOAR 1BwOL 3.7.8    On page 7 of 1BwOL 3.7.8, SAT    UNSAT      N/A Note: If examinee attempts    enter time, date and      Comments:
to update LCO          signature in Condition database, provide the  column:
following cue.
* JPM start time - 10 CUE:  Another SRO will          minutes.
update LCO database.
* Todays date
* Examinees signature
* Notify SM LOCAR entry complete CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME COMMENTS:
3 S-204


#123456 written.
TASK CONDITIONS:
CUE: C/O will be prepared at later time.
CUE: Examiner sign for Unit NSO. Notify Shift Manager
 
of LCOAR entry (Craig Ingold)  Time Date: (notification time and today's date)
Was an IR written:
Yes, #123456 Related WRs:
Yes, #123456 o Related C/O(s):
No  SRO Signature:
 
(examinee's signature)  Unit NSO signature:
 
(Unit NSO name signed by examiner)  SAT    UNSAT      N/A Comments:*3. Complete LCOAR Index Essential Service Water (SX)
 
System  On page 6 of 1BwOL 3.7.8, sign and date Condition A
 
line and refer to page 7:  Examinee's signature  Today's date SAT    UNSAT      N/A Comments: *4. Initiate LCOAR 1BwOL 3.7.8 Note: If examinee attempts to update LCO
 
database, provide the
 
following cue. CUE: Another SRO will update LCO database.
On page 7 of 1BwOL 3.7.8, enter time, date and
 
signature in Condition
 
column:  JPM start time - 10 minutes. Today's date  Examinee's signature  Notify SM LOCAR entry complete  SAT    UNSAT      N/A Comments:  CUE: THIS COMPLETES THIS JPM.
 
RECORD STOP TIME COMMENTS:
 
S-204 4 TASK CONDITIONS:
: 1. You are the Unit Supervisor.
: 1. You are the Unit Supervisor.
: 2. Both units are at full power.
: 2. Both units are at full power.
INITIATING CUES:
INITIATING CUES:
: 1. The Engineering staff notified you that the 1A SX pump has failed surveillance 1BwVSR 5.5.8.SX.1 ASME Surveillance Requirements for 1A Essential Service Water Pump, due to  
: 1. The Engineering staff notified you that the 1A SX pump has failed surveillance 1BwVSR 5.5.8.SX.1 ASME Surveillance Requirements for 1A Essential Service Water Pump, due to inadequate pump delta-P (10 minutes ago). Initiate the LCOAR. An IR (# 123456) and a WR (# 123456) have been written.
 
inadequate pump delta-P (10 minutes ago). Initiate the LCOAR. An IR (# 123456) and a  
 
WR (# 123456) have been written.
: 2. No other inoperable equipment exists on either Unit.
: 2. No other inoperable equipment exists on either Unit.
: 3. Inform the Shift Manager when you have completed initiating the LCOAR.  
: 3. Inform the Shift Manager when you have completed initiating the LCOAR.
4 S-204


S-204 5 SIMULATOR SETUP GUIDE:
SIMULATOR SETUP GUIDE:
Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST. (N/A if JPM NOT performed in  
* Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST. (N/A if JPM NOT performed in simulator)
 
* Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon. (N/A if JPM NOT performed in simulator)
simulator)
* Complete items on Simulator Ready for Training Checklist. (N/A if JPM NOT performed in simulator)
Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon. (N/A if JPM NOT performed in simulator)
* Place simulator in RUN. (N/A if JPM NOT performed in simulator)
Complete items on Simulator Ready for Training Checklist. (N/A if JPM  
COMMENTS:
 
* Provide copy of 1BwOL 3.7.8, Rev 4.
NOT performed in simulator)
* Provide marked up copy of 1BwVSR 5.5.8.SX.1, Rev 5.
Place simulator in RUN. (N/A if JPM NOT performed in simulator)
5 S-204
C OMMENTS: Provide copy of 1BwOL 3.7.8, Rev 4.
Provide marked up copy of 1BwVSR 5.5.8.SX.1, Rev 5.  


1BwOL 3.7.8 Revision 4 Reference Use S-204 6 LCOAR ESSENTIAL SERVICE WATER (SX) SYSTEM TECH SPEC LCO 3.7.8 A. NOTIFICATION If it is discovered that a Surveillance was not performed within its specified  
KEY                                          LCOAR KEY1BwOL 3.7.8 Revision 4 Reference Use ESSENTIAL SERVICE WATER (SX) SYSTEM TECH SPEC LCO 3.7.8 A. NOTIFICATION If it is discovered that a Surveillance was not performed within its specified Surveillance Frequency, complete Action Z (SR 3.0.3) prior to declaring the LCO not met.
PRESENT MODE:  1              APPLICABLE MODE(S):          1, 2, 3, and 4 INITIATING EVENT(S): Failure of 1BwVSR 5.5.8.SX.1 ASME due to inadequate pump P SAFETY FUNCTION DETERMINATION (SFD)
PERFORMED? (Page 2)                      YES, Examinee init. (SRO)
DOES THIS INOPERABILITY INVALIDATE ANY PREVIOUS SFD?                    YES      NO LCO 3.0.3:  APPLICABLE      MODE CHANGE ALLOWED?:        YES - Action C.2 SEPARATE CONDITION ENTRY ALLOWED:    NO COMPLETION TIME EXTENSION ALLOWED:    NO NAME OF SHIFT MANAGER NOTIFIED: C. Ingold                  TIME/DATE: Current time/date WAS AN ISSUE WRITTEN?      YES    NO RELATED WR(S):
WR 123456__________      WR ________________
WR ________________      WR ________________
WR ________________      WR ________________
WR ________________      WR ________________
WR ________________      WR ________________
RELATED C/O(S): NONE
_______________        _______________          _______________
_______________        _______________          _______________
_______________        _______________          _______________
SRO signature: Examinee signature    TIME/DATE:  Current time/date TIME/DATE:  Current time/date Unit NSO signature: Examiners signature KEY                                                                        KE Y 6
S-204


Surveillance Frequency, complete Action Z (SR 3.0.3) prior to declaring the LCO not
KEY            B. SAFETY FUNCTION DETERMINATION PROGRAM REQUIREMENTS KE Y 1BwOL 3.7.8 Revision 4 Reference Use
 
met. PRESENT MODE:
1 APPLICABLE MODE(S):
1, 2, 3, and 4 INITIATING EVENT(S):
Failure of 1BwVSR 5.5.8.SX.1 ASME due to inadequate pump P      SAFETY FUNCTION DETERMINATION (SFD)
PERFORMED?  (Page 2)
YES, Examinee init. (SRO) DOES THIS INOPERABILITY INVALIDATE ANY PREVIOUS SFD?  YES    NO LCO 3.0.3:
APPLICABLE MODE CHANGE ALLOWED?:
YES - Action C.2 SEPARATE CONDITION ENTRY ALLOWED:
NO COMPLETION TIME EXTENSION ALLOWED:
NO NAME OF SHIFT MANAGER NOTIFIED:
C. Ingold TIME/DATE:
Current time/date WAS AN ISSUE WRITTEN?
YES  NO RELATED WR(S):
WR 123456__________  WR ________________
WR ________________  WR ________________  WR ________________  WR ________________  WR ________________  WR ________________  WR ________________  WR ________________
RELATED C/O(S):
NONE _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________
SRO signature:
Examinee signature TIME/DATE:
Current time/date Unit NSO signature:
Examiners signature TIME/DATE:
Current time/date K K E E Y Y  K K E E Y Y  K K E E Y Y  K K E E Y Y 1BwOL 3.7.8 Revision 4 Reference Use S-204 7B. SAFETY FUNCTION DETERMINATION PROGRAM REQUIREMENTS
: 1. LOSS OF SAFETY FUNCTION (LOSF) EVALUATION:
: 1. LOSS OF SAFETY FUNCTION (LOSF) EVALUATION:
Is there any inoperable or degraded SUPPORT SYSTEM or SUPPORTED SYSTEM equipment on the opposite/redundant train that, when coupled with this  
Is there any inoperable or degraded SUPPORT SYSTEM or SUPPORTED SYSTEM equipment on the opposite/redundant train that, when coupled with this inoperable equipment, might result in a complete loss of a Tech Spec required safety function.
 
inoperable equipment, might result in a complete loss of a Tech Spec required  
 
safety function.
: a. No  - No LOSF exists. No further evaluation is necessary.
: a. No  - No LOSF exists. No further evaluation is necessary.
: b. Yes - A LOSF may exist. Using the SFDP and BwAP 340-1, evaluate which of the following conditions apply:
: b. Yes - A LOSF may exist. Using the SFDP and BwAP 340-1, evaluate which of the following conditions apply:
: 1) The SSC is part of an LCO with multiple subsystems and the LCO specified function is intact. No LOSF exists.
: 1)   The SSC is part of an LCO with multiple subsystems and the LCO specified function is intact. No LOSF exists.
: 2) The SSC will still perform its required safety function as defined in the Safety Analysis Report (SAR). No LOSF exists.
: 2)   The SSC will still perform its required safety function as defined in the Safety Analysis Report (SAR). No LOSF exists.
: 3) A LOSF exists. Perform the Required Actions of the SSC LCO in which the LOSF exists for the specific Condition(s) that apply.
: 3)   A LOSF exists. Perform the Required Actions of the SSC LCO in which the LOSF exists for the specific Condition(s) that apply.
: 2. LCO 3.0.6 - DELAYED LCOAR ENTRY CALCULATION.
: 2. LCO 3.0.6 - DELAYED LCOAR ENTRY CALCULATION.
Perform this step only if No LOSF exists and it is desired to delay SUPPORTED  
Perform this step only if No LOSF exists and it is desired to delay SUPPORTED SYSTEM LCOAR entry as allowed by LCO 3.0.6. A LOSF does not exist if the redundant train of the inoperable SUPPORTED SYSTEM(S) equipment is OPERABLE.
 
SYSTEM LCOAR entry as allowed by LCO 3.0.6. A LOSF does not exist if the  
 
redundant train of the inoperable SUPPORTED SYSTEM(S) equipment is OPERABLE.
: a. Rules of Use:
: a. Rules of Use:
: 1) Rule 1: With a single SUPPORT SYSTEM inoperable, the affected SUPPORTED SYSTEM(s) LCOAR entry(s) is not required to be entered  
: 1)   Rule 1: With a single SUPPORT SYSTEM inoperable, the affected SUPPORTED SYSTEM(s) LCOAR entry(s) is not required to be entered unless directed by the SUPPORT SYSTEM Required Actions.
: 2)    Rule 2: In the event additional SUPPORT SYSTEM(s) become inoperable during the Completion Time for restoration of the first SUPPORT SYSTEM, the LCOAR entry(s) of the SUPPORTED SYSTEM may be delayed by either the maximum allowed Completion Time of the SUPPORT SYSTEM(s), or 2 times the Completion Time for restoration of the SUPPORTED SYSTEM (applied at the time the second SUPPORT SYSTEM becomes inoperable), whichever is less.
KEY                                                          KEY 7
S-204


unless directed by the SUPPORT SYSTEM Required Actions.
KEY                                    LCOAR INDEX ESSENTIAL SERVICE WATER (SX) SYSTEM KEY 1BwOL 3.7.8 Revision 4 Reference Use SRO Sign and Date  Content                    Description                Page SRO: Examinee      Condition A  One unit-specific SX train inoperable.      7 signature Date: Todays date SRO:                Condition B  One unit-specific SX train inoperable.     8 Date:
: 2) Rule 2: In the event additional SUPPORT SYSTEM(s) become inoperable during the Completion Time for restoration of the first
SRO:                Condition C  Opposite-unit SX train inoperable.          9 Date:
SRO:               Condition D  Required Action and associated Completion   10 Time of Condition A or B not met.
Date:
SRO:                Condition Z  SR 3.0.3                                  11 Date:
SRO:                    N/A      Risk Assessment required by LCO 3.0.4.b    N/A Date:                            complete to allow MODE change.
KEY                                                          KEY 8
S-204


SUPPORT SYSTEM, the LCOAR entry(s) of the SUPPORTED SYSTEM may be
KEY                                  LCOAR ACTION CHART ESSENTIAL SERVICE WATER (SX) SYSTEM KE Y1BwOL 3.7.8 Revision 4 Reference Use CONDITION              REQUIRED ACTION          COMPLETION    ACTION MET TIME
  ***********NOTE******** A.1  ********NOTES********
        ***                    1. Enter applicable Not applicable to Unit              Conditions and 1 during replacement of             Required Actions the SX suction                      of LCO 3.8.1, isolation valves during            "AC Sources -
Unit 2 Refueling 11                Operating," for while Unit 2 is in MODE            Emergency Diesel 5, 6, or defueled.                  Generator made
  ***********************            inoperable by
        ******                        SX.
A. One unit-specific      2. Enter applicable SX train                      Conditions and inoperable.                  Required Actions of LCO 3.4.6, JPM start time minus            "RCS Loops -
10 minutes/Todays              MODE 4," for date                            Residual Heat Time/Date                        Removal loops made inoperable Examinee signature              by SX.
SRO                        **********************
72 hours  __________/____
Restore                        Time/Date unit-specific SX                    SRO train to OPERABLE status.
KEY                                                            KEY (Final) 9 S-204


delayed by either the maximum allowed Completion Time of the
TASK TITLE: Prepare/Perform a Liquid Radwaste Release JPM No.:     S-303                                     REV: NRC2006301 TPO No.:   8C.HP-001                                 K&A No.: 2.3.6 TASK No.:   S-HP-001, Authorize a liquid               K&A IMP: 2.1/3.1 radwaste release TRAINEE:                                               SRO EVALUATOR:                                             DATE:
 
The Trainee:       PASSED            this JPM.         TIME STARTED:
SUPPORT SYSTEM(s), or 2 times the Completion Time for restoration of the SUPPORTED SYSTEM (applied at the time the second SUPPORT
FAILED                             TIME FINISHED:
 
JPM TIME:             MINUTES CRITICAL ELEMENTS:       (*) 3, 5                     APPROX COMPLETION TIME:   30 MINUTES CRITICAL TIME:           NA EVALUATION METHOD:                                     LOCATION:
SYSTEM becomes inoperable), whichever is less. K K E E Y Y  K K E E Y Y  K K E E Y Y  K K E E Y Y 1BwOL 3.7.8 Revision 4 Reference Use  S-204 8 LCOAR INDEX ESSENTIAL SERVICE WATER (SX) SYSTEM SRO Sign and Date Content Description Page SRO: Examinee signature Date: Today's date Condition A One unit-specific SX train inoperable.
X  PERFORM                                   IN PLANT SIMULATE                             X  SIMULATOR GENERAL  
7 SRO:  Date: Condition B One unit-specific SX train inoperable.
8 SRO:  Date: Condition C Opposite-unit SX train inoperable.
9 SRO:  Date: Condition D R equired Action and associated Completion Time of Condition A or B not met.
10 SRO:  Date: Condition Z SR 3.0.3 11 SRO:  Date:  N/A Risk Assessment required by LCO 3.0.4.b complete to allow MODE change.
N/A  K K E E Y Y  K K E E Y Y  K K E E Y Y  K K E E Y Y 1BwOL 3.7.8 Revision 4 Reference Use  S-204 9 LCOAR ACTION CHART ESSENTIAL SERVICE WATER (SX) SYSTEM CONDITION REQUIRED ACTION COMPLETION TIME ACTION MET
***********NOTE********
*** Not applicable to Unit
 
1 during replacement of
 
the SX suction
 
isolation valves during
 
Unit 2 Refueling 11
 
while Unit 2 is in MODE
 
5, 6, or defueled.
***********************
******  A. One unit-specific SX train inoperable.
JPM start time minus 10 minutes/Today's date Time/Date Examinee signature SRO    A.1 ********NOTES********
: 1. E nter applicable Conditions and R equired Actions of LCO 3.8.1, "AC Sources-
 
Operating," for E mergency Diesel Generator made
 
inoperable by
 
SX. 2. E nter applicable Conditions and R equired Actions of LCO 3.4.6, "RCS Loops-
 
MODE 4," for
 
Residual Heat
 
Removal loops
 
made inoperable
 
by SX.  **********************
Restore unit-s pecific SX train to OPERABLE status.
72 hours                          __________/____
Time/Date SRO    K K E E Y Y  K K E E Y Y  K K E E Y Y  K K E E Y Y  (Final)
S-303 1 TASK TITLE:
Prepare/Perform a Liquid Radwaste Release JPM No.: S-303 REV: NRC2006301TPO No.: 8C.HP-001 K&A No.: 2.3.6 TASK No.: S-HP-001, Authorize a liquid K&A IMP: 2.1/3.1 radwaste release     TRAINEE:
SRO   EVALUATOR:
DATE:   The Trainee: PASSED            this JPM. TIME STARTED:
FAILED TIME FINISHED:
JPM TIME: MINUTES CRITICAL ELEMENTS:
(*) 3, 5 APPROX COMPLETION TIME:
30 MINUTES CRITICAL TIME:
NA EVALUATION METHOD:
LOCATION:
X  PERFORM       IN PLANT SIMULATE X  SIMULATOR GENERAL  


==REFERENCES:==
==REFERENCES:==
Line 835: Line 491:
: 2. Both Units are at full power.
: 2. Both Units are at full power.
INITIATING CUES:
INITIATING CUES:
: 1. The Shift Manager has handed you a portion of a 0WX01T liquid release package,  
: 1. The Shift Manager has handed you a portion of a 0WX01T liquid release package,
#L-06-100, completed through section F.5, and has directed you to complete  
            #L-06-100, completed through section F.5, and has directed you to complete Section G. (Hand examinee copy of BwOP WX-501T1). All previous sections of the release package have been successfully completed.
 
: 2. The current time is 0700 today. Due to scheduled work on the liquid release line, the release must be COMMENCED by 0900 today.
Section G. (Hand examinee copy of BwOP WX-501T1). All previous sections of the release package have been successfully completed.
: 2. The current time is 0700 today. Due to scheduled work on the liquid release  
 
line, the release must be COMMENCED by 0900 today.
: 3. Release duration per BwOP WX-501T1 step D.6.g.2) is 120 minutes.
: 3. Release duration per BwOP WX-501T1 step D.6.g.2) is 120 minutes.
: 4. The dechlorination skid is in operation.
: 4. The dechlorination skid is in operation.
: 5. Notify the Shift Manager when Section G of the release package is complete.  
: 5. Notify the Shift Manager when Section G of the release package is complete.
1 S-303


S-303 2 RECORD START TIME Note: Provide the examinee with a copy of Section G of BwOP WX-501T1 completed through Step F.5.
RECORD START TIME Note:   Provide the examinee with a copy of Section G of BwOP WX-501T1 completed through Step F.5.
PERFORMANCE STEP STANDARD Circle applicable
PERFORMANCE STEP                 STANDARD             Circle applicable
: 1. Obtain and record current Kankakee River flow data NOTE: The USGS internet site can be accessed from the computer desk top  
: 1. Obtain and record current     Obtain and record current  SAT      UNSAT      N/A Kankakee River flow data     Kankakee River flow data  Comments:
NOTE: The USGS internet site by performing the can be accessed from   following:
the computer desk top
* Access the United from workgroup apps        States Geological menu or by using          Survey internet site normal internet            (usgs.gov).
access.
* Access water watch-NOTE: After examinee locates    current stream flow Kankakee river flow on    conditions for Illinois usgs web site,
* Access USGS 05527500 indicator, provide        Kankakee River near following cue:            Wilmington Il flow CUE:  Kankakee river
* Record discharge flow discharge flow is 5680 cfs at 0700 on todays date.
NOTE: If examinee attempts to access the Unit 1 US turnover, provide  o Record Kankakee River the following cue:        flow in Unit 1 US turnover CUE:  Kankakee river flow has been logged in the Unit 1 US turnover.
: 2. Determine CW blowdown flow    Determine CW blowdown      SAT      UNSAT      N/A flow per BwOP WX-501T2 as  Comments:
follows:
o  Record liquid release
                                        #L-06-100 NOTE: After examinee locates
* Obtain and record CW blowdown flow            current Kankakee River indicator, provide          flow (5680 cfs) following cue:
* Record CW blowdown CUE:  CW blowdown flow is        flow 22,000 gpm.
o F2400 o OUR-CW032 2
S-303


from workgroup apps
PERFORMANCE STEP                STANDARD            Circle applicable
  *3  Determine the Liquid Release Determine the Liquid      SAT    UNSAT      N/A Window per BwOP WX-501T2    Release Window per BwOP  Comments:
CUE:  After examinee locates WX-501T2 as follows:
correct procedure, provide copy.
NOTE: After examinee locates
* Access Liquid Release liquid release spread    Window spread sheet sheet, inform student    (k:/shift/excel/liquid to use spreadsheet on    release) computer desktop.
o  Enter arrival date at NOTE: A completed copy of      Wilmington (tomorrows the liquid release        date) spread sheet is located on page 7.
* Enter river flow rate (5680 cfs)
* Enter release duration (120 mins from initial cue)
* Enter blowdown flow rate (22,000 gpm)
* Record the Liquid Release Window times on BwOP WX-501T1
* Target start time (1630)
* Start after time (1300)
* Start before time (2000)
: 4. Evaluate the expected time  Evaluate the expected    SAT    UNSAT      N/A of release                  time of release so that  Comments:
both biocide treatment and the release can be accommodated by performing the following:
CUE:  Dechlorination skid is
* Check if in operation. (from      dechlorination skid in initial cue)              operation
* Verify CW blowdown flow  8000 gpm (22,000 from previous cue) 3 S-303


menu or by using
PERFORMANCE STEP            STANDARD            Circle applicable
*5. Identify release will not Perform the following:    SAT    UNSAT      N/A start within desired time
* Determine release will Comments:
be performed outside of release start time window (from initiating cue, release must start at 0900)
* Determine BwOP WX-501T3 must be completed prior to authorizing release CUE:  Acknowledge as SM notification of    o  Notify SM release will release performed    be performed outside outside start time    of release start time window. Inform        window examinee another  OR supervisor will perform BwOP WX-  o Notify SM to delay 501T3.                release until work completed OR o Notify SM to delay work until release completed within desired time window.
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME COMMENTS:
4 S-303


normal internet
TASK CONDITIONS:
 
access. NOTE: After examinee locates Kankakee river flow on
 
usgs web site, indicator, provide
 
following cue: CUE: Kankakee river discharge flow is 5680
 
cfs at 0700 on today's
 
date. NOTE: If examinee attempts to access the Unit 1
 
US turnover, provide
 
the following cue: CUE: Kankakee river flow has been logged in the
 
Unit 1 US turnover.
Obtain and record current
 
Kankakee River flow data
 
by performing the
 
following:  Access the United
 
States Geological
 
Survey internet site (usgs.gov). Access water watch-
 
current stream flow
 
conditions for Illinois Access USGS 05527500
 
Kankakee River near
 
Wilmington Il flow  Record discharge flow o Record Kankakee River
 
flow in Unit 1 US
 
turnover  SAT    UNSAT      N/A Comments: 2. Determine CW blowdown flow NOTE: After examinee locates CW blowdown flow
 
indicator, provide
 
following cue: CUE: CW blowdown flow is 22,000 gpm.
Determine CW blowdown
 
flow per BwOP WX-501T2 as
 
follows: o Record liquid release
 
#L-06-100  Obtain and record
 
current Kankakee River
 
flow (5680 cfs)  Record CW blowdown
 
flow  o F2400 o OUR-CW032 SAT    UNSAT      N/A Comments:
S-303 3  PERFORMANCE STEP STANDARD Circle applicable
*3 Determine the Liquid Release Window per BwOP WX-501T2 CUE: After examinee locates correct procedure, provide copy.
NOTE: After examinee locates liquid release spread
 
sheet, inform student
 
to use spreadsheet on
 
computer desktop.
NOTE: A completed copy of the liquid release
 
spread sheet is
 
located on page 7.
Determine the Liquid
 
Release Window per BwOP
 
WX-501T2 as follows:
Access Liquid Release
 
Window spread sheet (k:/shift/excel/liquid
 
release) o Enter arrival date at
 
Wilmington (tomorrow's
 
date)  Enter river flow rate
 
(5680 cfs)  Enter release duration
 
(120 mins from initial
 
cue)  Enter blowdown flow
 
rate (22,000 gpm)  Record the Liquid Release Window times
 
on BwOP WX-501T1  Target start time
 
(1630)  Start after time
 
(1300)  Start before time
 
(2000)  SAT    UNSAT      N/A Comments: 4. Evaluate the expected time of release CUE: Dechlorination skid is in operation. (from
 
initial cue)
Evaluate the expected
 
time of release so that
 
both biocide treatment
 
and the release can be
 
accommodated by
 
performing the following:  Check if dechlorination skid in
 
operation  Verify CW blowdown
 
flow  8000 gpm (22,000 from previous
 
cue)  SAT    UNSAT      N/A Comments:
S-303 4  PERFORMANCE STEP STANDARD Circle applicable
*5. Identify release will not start within desired time CUE: Acknowledge as SM notification of release performed
 
outside start time
 
window. Inform
 
examinee another
 
supervisor will
 
perform BwOP WX-
 
501T3. Perform the following:  Determine release will
 
be performed outside
 
of release start time
 
window (from
 
initiating cue, release must start at
 
0900)  Determine BwOP WX-
 
501T3 must be
 
completed prior to
 
authorizing release o Notify SM release will
 
be performed outside
 
of release start time
 
window OR o Notify SM to delay release until work
 
completed OR o Notify SM to delay work until release
 
completed within
 
desired time window.
SAT    UNSAT      N/A Comments:    CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME COMMENTS:
 
S-303 5  TASK CONDITIONS:
: 1. You are the Unit 1 Unit Supervisor.
: 1. You are the Unit 1 Unit Supervisor.
: 2. Both Units are at full power.
: 2. Both Units are at full power.
INITIATING CUES:
INITIATING CUES:
: 1. The Shift Manager has handed you a portion of a 0WX01T liquid release package, #L-06-100, completed through section F.5, and has directed you to complete Section G.
: 1. The Shift Manager has handed you a portion of a 0WX01T liquid release package, #L-06-100, completed through section F.5, and has directed you to complete Section G.
 
All previous sections of the release package have been successfully completed.
All previous sections of the release package have been successfully completed.
: 2. The current time is 0700 today. Due to scheduled work on the liquid release line, the release must be COMMENCED by 0900 today.
: 2. The current time is 0700 today. Due to scheduled work on the liquid release line, the release must be COMMENCED by 0900 today.
: 3. Release duration per BwOP WX-501T1 step D.6.g.2) is 120 minutes.
: 3. Release duration per BwOP WX-501T1 step D.6.g.2) is 120 minutes.
: 4. The dechlorination skid is in operation.
: 4. The dechlorination skid is in operation.
: 5. Notify the Shift Manager when Section G of the release package is complete.  
: 5. Notify the Shift Manager when Section G of the release package is complete.
5 S-303


S-303 6 SIMULATOR SETUP GUIDE:
SIMULATOR SETUP GUIDE:
Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
* Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.
* Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.
Complete items on Simulator Ready for Training Checklist.
* Complete items on Simulator Ready for Training Checklist.
Place simulator in RUN.
* Place simulator in RUN.
Verify/copy Liquid Release Window spreadsheet to computer desktop prior to administering JPM. Spreadsheet is located at  
* Verify/copy Liquid Release Window spreadsheet to computer desktop prior to administering JPM. Spreadsheet is located at k:/shift/excel/liquid release.
* Clear data from INPUTS field of Liquid Release Window spread sheet prior to administering JPM.
* Clear computer history of recently accessed documents, programs, and web sites visited prior to administering JPM by performing the following:
* Right mouse click on task bar
* Select properties
* Select advanced tab
* Select clear
* Delete Liquid Release Window spreadsheet from computer desktop after administering JPM to all candidates.
COMMENTS:
* BwOP WX-501T1, Rev. 38.
* BwOP WX-501T2, Rev 5.
* BwOP WX-501T3, Rev 1.
6 S-303


k:/shift/excel/liquid release.
KEY                                                              KEY Braidwood Release Time Calulator BwOP WX-501 and/or BwOP WX-526 Enter data into blue cells only.
INPUTS Arrival Date at Wilmington                mm/dd/yyyy  Tomorrow River Flow Rate                            CFS          5680 Release Duration                          Minutes      120 Blowdown Rate (F2400)                      GPM        22000 CALCULATED RESULTS Blowdown Time To River                    Minutes        120 River Time To Wilmington Intake            Minutes      420 Blowdown Peak Time To Wilmington Intake    Minutes        600 Margin                                    Minutes      420 Start After Time                                      Today  1300 Time      #VALUE!
( = Peak Arrives at 10 PM)
Normal Start                                        Today  1630 Time      #VALUE!
( = Center of Peak occurs at 2:30 AM)
Start BeforeTime                                    Today  2000 Time      #VALUE!
( = Peak Departs at 7 AM)
KEY                                                              KEY (Final) 7 S-303


Clear data from INPUTS field of Liquid Release Window spread sheet
TASK TITLE: Screen an Event for Reportability JPM No.:     S-402                                     REV:       NRC2006301 TPO No.:   8E.AM-102                                 K&A No.:   (2.4.30)
 
TASK No.:   S-AM-102: Screen Reportable or           K&A IMP:     2.2/3.6 Significant Events for Reportability TRAINEE:                                               SRO EVALUATOR:                                             DATE:
prior to administering JPM.
The Trainee:       PASSED           this JPM.         TIME STARTED:
Clear computer history of recently accessed documents, programs, and
FAILED                             TIME FINISHED:
 
JPM TIME:             MINUTES CRITICAL ELEMENTS:       (*) 2, 3                     APPROX COMPLETION TIME: 25 MINUTES CRITICAL TIME:           NA EVALUATION METHOD:                                     LOCATION:
web sites visited prior to administering JPM by performing the following:
X  PERFORM                                   IN PLANT SIMULATE                             X  SIMULATOR GENERAL  
Right mouse click on task bar  Select properties  Select advanced tab  Select clear Delete Liquid Release Window spreadsheet from computer desktop after administering JPM to all candidates.
OMMENTS: C  BwOP WX-501T1, Rev. 38.
 
BwOP WX-501T2, Rev 5.
BwOP WX-501T3, Rev 1.
 
S-303 7        BwOP WX-501  and/or  BwOP WX-526Enter data into blue cells only.INPUTSArrival Date at Wilmington mm/dd/yyyyTomorrowRiver Flow RateCFS 5680Release Duration Minutes 120Blowdown Rate (F2400)GPM 22000CALCULATED RESULTS Blowdown Time To RiverMinutes 120River Time To Wilmington Intake Minutes 420Blowdown Peak Time To Wilmington IntakeMinutes 600Margin Minutes 420    Start After Time      ( = Peak Arrives at 10 PM)Time#VALUE!Normal Start
( = Center of Peak occurs at 2:30 AM)TimeStart BeforeTime
( = Peak Departs at 7 AM)TimeBraidwood Release Time Calulator
#VALUE!#VALUE!Today 1300 Today 1630 Today 2000 K K E E Y Y  K K E E Y Y  K K E E Y Y  K K E E Y Y  (Final)
S-402 1 TASK TITLE:
Screen an Event for Reportability JPM No.: S-402 REV: NRC2006301TPO No.: 8E.AM-102 K&A No.: (2.4.30) TASK No.: S-AM-102: Screen Reportable or K&A IMP: 2.2/3.6 Significant Events for Reportability TRAINEE:
SRO   EVALUATOR:
DATE:   The Trainee: PASSED           this JPM. TIME STARTED:
FAILED TIME FINISHED:
JPM TIME: MINUTES CRITICAL ELEMENTS:
(*) 2, 3 APPROX COMPLETION TIME:
25 MINUTES CRITICAL TIME:
NA EVALUATION METHOD:
LOCATION:
X  PERFORM       IN PLANT SIMULATE X  SIMULATOR GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. LS-AA-1010, Rev. 9; Exelon Reportability Reference Manual Table of Contents.
: 1. LS-AA-1010, Rev. 9; Exelon Reportability Reference Manual Table of Contents.
: 2. LS-AA-1020, Rev. 8, Exelon Reportability Reference Manual Operations Decision Tree. 3. LS-MW-1110, Rev. 6, Exelon Reportability Reference Manual SAF 1.
: 2. LS-AA-1020, Rev. 8, Exelon Reportability Reference Manual Operations Decision Tree.
: 3. LS-MW-1110, Rev. 6, Exelon Reportability Reference Manual SAF 1.
MATERIALS:
MATERIALS:
: 1. Copies of the references listed above.
: 1. Copies of the references listed above.
TASK STANDARDS:
TASK STANDARDS:
: 1. Determine all reporting requirements of  
: 1. Determine all reporting requirements of < 8 hours per the Exelon Reportability Reference Manual.
< 8 hours per the Exelon Reportability Reference Manual.
TASK CONDITIONS:
TASK CONDITIONS:
: 1. You are the Unit 1 Unit Supervisor.
: 1. You are the Unit 1 Unit Supervisor.
Line 1,085: Line 612:
: 7. A NARS form has been transmitted to the state INITIATING CUES:
: 7. A NARS form has been transmitted to the state INITIATING CUES:
: 1. The Shift Manager has directed you to screen the event and determine ALL reporting requirements that are LESS THAN OR EQUAL TO 8 HOURS per the Exelon Reportability Reference Manual.
: 1. The Shift Manager has directed you to screen the event and determine ALL reporting requirements that are LESS THAN OR EQUAL TO 8 HOURS per the Exelon Reportability Reference Manual.
: 2. Inform the Shift Manager of applicable reporting requirements.  
: 2. Inform the Shift Manager of applicable reporting requirements.
 
1 S-402
S-402 2 RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable
: 1. Refer to Exelon Reportability Reference Manual Note: If JPM is performed in simulator, examinee will use simulator
 
copy of Exelon
 
Reportability Manual.
 
If JPM NOT performed
 
in simulator, provide
 
examinee with a copy
 
of Exelon
 
Reportability Manual.
Perform the following:  Locate and open Exelon Reportability Reference Manual LS-
 
AA-1020  SAT    UNSAT      N/A Comments:*2. Screen Event Note: See pages 6-9 for a key of the operations
 
decision trees.
Refer to Operations
 
Decision Trees (LS-AA-
 
1020, page 89)
Determine the following
 
apply:  SAF 1.1 - Emergency Plan Activated  SAF 1.5 - ECCS
 
Injection/Actuation  SAF 1.6 - RPS
 
Actuation with the
 
reactor critical  SAF 1.7 - System
 
Actuation Not


Including RPS o SAF 1.23 - Occurrence
RECORD START TIME PERFORMANCE STEP              STANDARD            Circle applicable
 
: 1. Refer to Exelon              Perform the following:    SAT    UNSAT      N/A Reportability Reference
of an Incident SAT    UNSAT      N/A Comments:
* Locate and open Exelon Comments:
S-402 3  PERFORMANCE STEP STANDARD Circle applicable
Manual                          Reportability Note: If JPM is performed in    Reference Manual LS-simulator, examinee      AA-1020 will use simulator copy of Exelon Reportability Manual.
*3. Determine Notification Use Operations Decision Trees to determine the  
If JPM NOT performed in simulator, provide examinee with a copy of Exelon Reportability Manual.
*2. Screen Event                Refer to Operations      SAT    UNSAT      N/A Note: See pages 6-9 for a    Decision Trees (LS-AA-    Comments:
key of the operations 1020, page 89) decision trees.      Determine the following apply:
* SAF 1.1 - Emergency Plan Activated
* SAF 1.5 - ECCS Injection/Actuation
* SAF 1.6 - RPS Actuation with the reactor critical
* SAF 1.7 - System Actuation Not Including RPS o  SAF 1.23 - Occurrence of an Incident 2
S-402


PERFORMANCE STEP          STANDARD            Circle applicable
*3. Determine Notification Use Operations Decision  SAT    UNSAT      N/A Trees to determine the    Comments:
following:
following:
SAF 1.1 (LS-AA-1110, page 1) o 15 minute State and  
* SAF 1.1 (LS-AA-1110, page 1) o 15 minute State and Local Notification (already performed per initial cue)
* 1 hr NRC Notification required o  2 hr ANI and INPO Notification required
* SAF 1.5 (LS-AA-1110, page 16)
* 4 hr NRC Notification required
* SAF 1.6 (LS-AA-1110, page 20)
* 4 hr NRC Notification required
* SAF 1.7 (LS-AA-1110, page 24)
* 8 hr NRC Notification required o  SAF 1.23 LS-AA-1110 page 68) o  Notify NEIL ASAP via telephone o  Evaluate other notifications and determine they do not apply CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME COMMENTS:
3 S-402


Local Notification (already performed
TASK CONDITIONS:
 
per initial cue)  1 hr NRC Notification
 
required o 2 hr ANI and INPO
 
Notification
 
required  SAF 1.5 (LS-AA-1110, page 16)  4 hr NRC Notification
 
required  SAF 1.6 (LS-AA-1110, page 20)  4 hr NRC Notification
 
required  SAF 1.7 (LS-AA-1110, page 24)  8 hr NRC Notification
 
required o SAF 1.23 LS-AA-1110
 
page 68) o Notify NEIL ASAP
 
via telephone o Evaluate other
 
notifications and
 
determine they do not
 
apply  SAT    UNSAT      N/A Comments: CUE: THIS COMPLETES THIS JPM.
 
RECORD STOP TIME COMMENTS:
 
S-402 4  TASK CONDITIONS:
: 1. You are the Unit 1 Unit Supervisor.
: 1. You are the Unit 1 Unit Supervisor.
: 2. Unit 1 was at 100% power
: 2. Unit 1 was at 100% power
Line 1,171: Line 651:
: 7. A NARS form has been transmitted to the state INITIATING CUES:
: 7. A NARS form has been transmitted to the state INITIATING CUES:
: 1. The Shift Manager has directed you to screen the event and determine ALL reporting requirements that are LESS THAN OR EQUAL TO 8 HOURS per the Exelon Reportability Reference Manual.
: 1. The Shift Manager has directed you to screen the event and determine ALL reporting requirements that are LESS THAN OR EQUAL TO 8 HOURS per the Exelon Reportability Reference Manual.
: 2. Inform the Shift Manager of applicable reporting requirements.  
: 2. Inform the Shift Manager of applicable reporting requirements.
4 S-402


S-402 5 SIMULATOR SETUP GUIDE:
SIMULATOR SETUP GUIDE:
Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST. (N/A if JPM NOT performed in  
* Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST. (N/A if JPM NOT performed in simulator)
 
* If it is desired to simulate actual plant conditions, perform the following (otherwise N/A)
simulator) If it is desired to simulate actual plant conditions, perform the  
* Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon. (N/A if JPM NOT performed in simulator)
* Complete items on Simulator Ready for Training Checklist. (N/A if JPM NOT performed in simulator)
* Place simulator in RUN. (N/A if JPM NOT performed in simulator)
* Insert IMF TH06D 540000(N/A if JPM NOT performed in simulator)
COMMENTS:
5 S-402


following (otherwise N/A)
KEY EXAM MATERIAL KEY 6
Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon. (N/A if JPM NOT performed in simulator)
S-402
Complete items on Simulator Ready for Training Checklist. (N/A if


JPM NOT performed in simulator)
KEY 7
Place simulator in RUN. (N/A if JPM NOT performed in simulator)
S-402
Insert IMF TH06D 540000 (N/A if JPM NOT performed in simulator)  COMMENTS:


S-402 6  K K E E Y Y  K K E E Y Y  E E X X A A M M  M M A A T T E E R R I I A A L L S-402 7  K K E E Y Y S-402 8  K K E E Y Y  (Final)}}
KEY (Final) 8 S-402}}

Revision as of 18:23, 23 November 2019

Final As-Administered Administrative JPMs for the Braidwood Initial Examination - May 2006
ML061710307
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 05/15/2006
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
References
Download: ML061710307 (41)


Text

TASK TITLE: Call Out For Shift Staffing JPM No.: S-103 REV: NRC2006301 TPO No.: T.AM05-01 K&A No.: 2.1.5 TASK No.: S-AM-029, Ensure minimum shift staffing K&A IMP: 2.3/3.4 and authorize additional shift staffing as necessary.

TRAINEE: SRO EVALUATOR: DATE:

The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

CRITICAL ELEMENTS: (*) 2, 3 JPM TIME:

CRITICAL TIME: NA APPROX COMPLETION TIME: 25 MINUTES EVALUATION METHOD: LOCATION:

X PERFORM X IN PLANT

_ SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. LS-AA-119 OVERTIME CONTROLS Rev 3
2. BwAP 320-1 SHIFT STAFFING. Rev 16 MATERIALS:
1. Overtime Tracking list, attachment 1
2. LS-AA-119, Rev. 3
3. BwAP 320-1, Rev.16 TASK STANDARDS:
1. Determine required shift staffing.
2. Determine from staffing list which person is available to be forced to work overtime to ensure shift staffing requirements met.

TASK CONDITIONS:

1. You are a Unit Supervisor.
2. Both Units are at 100% power.
3. The current date and time is: 05/14/2006, 0900.

INITIATING CUES:

1. A fire brigade qualified NLO for shift N, May 16, 2006 has called in sick.
2. Without the NLO above, manning for shift N, May 16, 2006 is 4 non-fire brigade qualified NLOs, 3 fire brigade qualified NLOs, and the fire chief qualified field supervisor.
3. The Shift Manager has directed you to evaluate shift staffing for shift N, May 16, 2006.
4. Inform the Shift Manger of your results.

1 S-103

RECORD START TIME:

NOTE: These steps may be performed in any order.

Performance Step Standard Circle Applicable

1. Refers to LS-AA-119 Perform the following: SAT UNSAT N/A Overtime Controls main o Locates copy of LS-AA- Comments:

body. 119 CUE: If examinee locates LS-AA- o Identifies step 4.1.2 119 provide copy. requirements for work CUE: If examinee locates BwAP hours.

320-1 provide copy.

  • 2. Determine one additional Determine one additional SAT UNSAT N/A fire brigade member fire brigade member Comments:

required required:

Note: Hand examinee copy of JPM o Refer to BwAP 320-1 Attachment 1, overtime

  • Determine 1 tracking list, (JPM pages additional NLO 6 & 7) and provide the required due to following cue. vacancy CUE: The shift manager directs you to determine who is eligible for overtime to cover the vacancy.

CUE: All personnel on the overtime tracking list are fire brigade qualified.

2 S-103

Performance Step Standard Circle Applicable

  • 3. Determines NLO 3 is the Checks each persons work SAT UNSAT N/A only NLO that can be hours: Comments:

forced. o NLO 1 would violate the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> limit.

o NLO 2 (NO) would violate 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> limit.

  • NLO 3 (YES) is available.

o NLO 4 (NO) would violate 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> limit and would violate the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> limit.

o NLO 5 (NO) would violate 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> limit.

o NLO 6 (NO) would violate the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> limit.

o NLO 7 (NO) is already working shift N 5/16/06 o NLO 8 (NO) would violate 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> limit.

  • Informs Shift manager that ONLY NLO 3 is available to be forced.

(CUE:) THIS COMPLETES THIS JPM.

RECORD STOP TIME:

COMMENTS:

3 S-103

TASK CONDITIONS:

1. You are a Unit Supervisor.
2. Both Units are at 100% power.
3. The current date and time is: 05/14/2006, 0900.

INITIATING CUES:

1. A fire brigade qualified NLO for shift N, May 16, 2006 has called in sick.
2. Without the NLO above, manning for shift N, May 16, 2006 is 4 non-fire brigade qualified NLOs, 3 fire brigade qualified NLOs, and the fire chief qualified field supervisor.
3. The Shift Manager has directed you to evaluate shift staffing for shift N, May 16, 2006.
4. Inform the Shift Manger of your results.

4 S-103

SIMULATOR SETUP GUIDE:

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST. (N/A if JPM NOT performed in simulator)

COMMENTS:

  • BwAP 320-1, Rev 16 5

S-103

Crew 1 May May May May May May May May May May May May May May May May May May May May May 8 8 8 9 9 9 10 10 10 11 11 11 12 12 12 13 13 13 14 14 14 Mon Tue Wed Thurs Fri Sat Sun 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 NLO 1 266 1-01 12 12 12 12 xx xx xx1 2 1 N1C NX NX NX NLO 2 200 1-02 12 12 12 xx xx xx xx 1 2 1 1 NX NX NA NLO 3 251 1-03 12 12 12 xx xx xx xx 1 2 1 1 NA NA NB NLO 4 910 1-04 12 12 12 xx xx xx xx 1 2 1 1 NB NB NC NLO 5 233 1-05 12 12 12 xx xx xx xx 1 2 1 1 NC NC ND NLO 6 924 1-06 12 12 12 xx xx xx xx 1 2 1 1 ND ND NE NLO 7 724 1-07 12 12 12 xx xx xx xx 1 1 2 1 1 NE NE NX NLO 8 323 1-08 12 12 12 12 xx xx 1 2 N1A N2X NX NX NX Crew 1 May May May May May May May May May May May May May May May May May May May May May 15 15 15 16 16 16 17 17 17 18 18 18 19 19 19 20 20 20 21 21 21 Mon Tue Wed Thurs Fri Sat Sun 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 NLO 1 266 1-01 12 12 12 12 12 12 NA xx1 N2X N1A DB DC DD NLO 2 200 1-02 12 12 12 12 12 xx NB D1X xx2 1 DC DD DE NLO 3 251 1-03 12 12 12 12 12 xx NC 1 xx2 D1A DD DE DX NLO 4 910 1-04 12 12 12 12 12 12 xx ND D1X D2X 1 DE DX DX NLO 5 233 1-05 12 12 12 12 12 12 NE xx1 D2C D2D DX DX DX S-103 (ATTACHMENT 1)

NLO 6 924 1-06 12 12 12 12 12 xx NX D1B xx2 1 DX DX DA NLO 7 724 1-07 12 12 12 12 12 12 xx 1 NX N1A 2 D1X DX DA DB NLO 8 323 1-08 12 12 12 12 12 xx xx NX 1 2 N1X DX DB DC Crew 1 May May May May May May May May May May May May May May May May May May May May May 22 22 22 23 23 23 24 24 24 25 25 25 26 26 26 27 27 27 28 28 28 Mon Tue Wed Thurs Fri Sat Sun 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 NLO 1 266 1-01 8 8 8 8 N2X T T T T xx1 xx2 NLO 2 200 1-02 8 8 8 8 xx 1 T T T T xx1 xx2 NLO 3 251 1-03 8 8 8 8 xx 1 T T T T xx1 xx2 NLO 4 910 1-04 8 8 8 8 xx 1 T T T T xx1 xx2 NLO 5 233 1-05 8 8 8 8 xx 1 T T T T xx1 xx2 NLO 6 924 1-06 8 8 8 8 xx 1 T T T T xx1 xx2 NLO 7 724 1-07 8 8 8 8 xx 1 1 T T T T xx1 xx2 NLO 8 323 1-08 12 8 8 8 8 N1B T T T T xx1 xx2 S-103 (ATTACHMENT 1)

TASK TITLE: Respond to a Fire Detection/Suppression System Alarm JPM No.: S-105 REV: NRC2006301 TPO No.: 8.E.AM-200 K&A No.: 2.1.14 TASK No.: S-AM-200, Supervise actions for K&A IMP: 2.5/3.3 combating a plant fire TRAINEE: SRO EVALUATOR: DATE:

The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 1, 3, 4, 8-10 APPROX COMPLETION TIME 15 MINUTES CRITICAL TIME: NA EVALUATION METHOD: LOCATION:

PERFORM X IN PLANT X SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. BwAR 0-37-A4, Rev. 13, UNIT 1 AREA FIRE.
2. BwAP 1100-16, Rev. 22, Fire/Hazardous Spill and/or Injury Response.

MATERIALS:

1. BwAR 0-37-A4, Rev. 13.
2. Partially completed BwAP 1100-16, Rev. 22, Appendix A.

TASK STANDARDS:

1. Perform Shift Manager designee required actions in response to a Fire Detection/Suppression System Alarm.
2. Complete Shift Manager designee applicable actions of Fire/Haz-Mat Response/Checklist (Appendix A).

TASK CONDITIONS:

1. You are the Shift Managers Designee.
2. Both Units are at full power.

INITIATING CUES:

1. Annunciator 0-37-A4 for Unit 1 actuated a few minutes ago and has been acknowledged by the Unit 1 Admin NSO. An Alarm on 1PM09J has also been acknowledged.
2. An NLO called the MCR via the emergency phone number to report a fire is in progress in the plant
3. An NSO has completed the Unit Admin NSO portion of BwAP 1100-16, Appendix A, Fire/Haz-Mat Response/Checklist and has just forwarded it to you. (CUE: Hand examinee copy of the BwAP 1100-16 Appendix A Checklist with the NSO portion completed)
4. Another SRO is currently evaluating EALs related to the event.
5. You are directed to complete the Shift Manager/Designee portion of the Fire/Haz-Mat Response/Checklist
6. Route the completed checklist to the Station Duty Officer when it is completed.

1 S-105

RECORD START TIME Note: Pages 8-9 contain key of correctly filled out form.

PERFORMANCE STEP STANDARD Circle applicable

  • 1. Perform BwAP 1100-16 Locate and Open BwAP SAT UNSAT N/A Appendix A, Shift 1100-16. Comments:

Manager/Designee section, Review / perform the steps 1 & 2. required actions of the CUE: All Prerequisites, SM or designee:

Precautions,

  • Contact Security Limitations and Supervisor Actions have been met.

o Phone CUE: As Security Shift Supervisor, o Plant Page acknowledge the report o Radio of the fire, and request for personnel.

  • NOTIFY the Security Shift Supervisor
  • Location of the fire
  • Dispatch security personnel to the equipment cages
  • Dispatch security personnel to fire area to control access
  • Initial in block 1
  • NOTIFY security to OPEN any Security Barriers as needed
  • Initial in block 2
2. Perform BwAP 1100-16 Review / perform the SAT UNSAT N/A Appendix A, Shift required actions of the Comments:

Manager/Designee section, SM or designee:

step 3. o VERIFY the fire CUE: As NSO, or Fire brigade has been Brigade, confirm notified/dispatched notification/dispatch o Contact Admin NSO of fire brigade. to verify fire brigade dispatched o Contact Fire Chief and/or fire brigade members.

o Phone o Plant Page o Radio

  • Initial in block 3 2

S-105

PERFORMANCE STEP STANDARD Circle applicable

  • 3. Perform BwAP 1100-16 Review / perform the SAT UNSAT N/A Appendix A, Shift required actions of the Comments:

Manager/Designee section, SM or designee:

step 4.

  • Contact Rad Protection CUE: As Rad Protection o Phone acknowledge request for dispatch. o Plant Page
  • Initial in block 4
  • Initial indicating the notification method used in block 4, other methods marked N/A.
  • 4. Perform BwAP 1100-16 Review / perform the SAT UNSAT N/A Appendix A, Shift required actions of the Comments:

Manager/Designee section, SM or designee:

step 5.

  • Contact Fire Chief CUE: As Fire Chief, report o Phone that the fire was wood that was staged for an o Plant Page upcoming outage. The o Radio fire is out, no injuries, small fire, o Communicates via no equipment damaged, Admin NSO no outside assistance
  • COMMUNICATE with the is necessary. Fire Chief to If asked report that determine the access to the ESF following:

switchgear rooms is

  • Conditions/status not impeded. at fire scene
  • Injuries
  • Extent of fire
  • Equipment damaged
  • Assistance requirements
  • Record applicable information block 5
  • Initial each sub step in block 5 (Assistance required information and initial is not required to be filled in)
5. Perform BwAP 1100-16 Review / perform the SAT UNSAT N/A Appendix A, Shift required actions of the Comments:

Manager/Designee section, SM or designee:

step 6.

  • Determine that step 6 is not required to be performed 3

S-105

PERFORMANCE STEP STANDARD Circle applicable

6. Perform BwAP 1100-16 Review / perform the SAT UNSAT N/A Appendix A, Shift required actions of the Comments:

Manager/Designee section, SM or designee:

step 7.

  • Determine if EALs have CUE: SM will review EALs. been evaluated o Review EALs
7. Perform BwAP 1100-16 Review / perform the SAT UNSAT N/A Appendix A, Shift required actions of the Comments:

Manager/Designee section, SM or designee:

step 8.

  • NOTIFY the Station CUE: Inform examinee Fire Marshal, Station notifications have Duty Officer, and already been performed Chemistry by another SRO.
  • Initial each sub step CUE: OP-AA-106-101 will be in block 8 (Notify reviewed by another Others and Notify SRO. other Fire Departments and initial is not required to be filled in)
  • 8. Perform BwAP 1100-16 Request periodic status SAT UNSAT N/A Appendix A, Shift reports from the Exelon Comments:

Manager/Designee section, Fire Chief at no more step 9. than 20 minute intervals Note: If examinee determines and note on the update not required at checklist:

this time (due to 20

  • Contact Fire Chief minute time limit on o Phone updates), provide the following cue o Plant Page CUE: 20 minutes have o Radio elapsed since you last o COMMUNICATE with the spoke with Fire Chief Fire Chief to CUE: As Fire Chief provide determine the the following info as following:

an update: o Conditions/status The fire is out, the at fire scene only visible damage is o Injuries charred paint/floor, and no assistance o Extent of fire necessary. o Equipment damaged o Assistance requirements Record update from Exelon Fire Chief

  • Initial in block 9 4

S-105

PERFORMANCE STEP STANDARD Circle applicable

  • 9. Perform BwAP 1100-16 Perform the following SAT UNSAT N/A Appendix A, Shift
  • Contact the Work Comments:

Manager/Designee section, Execution Center step 10.

o Phone o Plant Page CUE: Acknowledge notifications as WEC. o Radio

  • Notify WEC to perform the following:
  • 0BwOS FP-Q5, Fire Brigade Cages Equipment Area Check surveillance
  • Initial in block 10
  • 10. Perform BwAP 1100-16 List Fire Brigade Team SAT UNSAT N/A Appendix A, Shift Members on the checklist: Comments:

Manager/Designee section,

  • Contact Fire Chief step 11.

o Phone CUE: Team members are Chief: Dave Mills, o Plant Page Members: Morgan, o Radio Davito, Bannon, and

  • Request roster of Fire Verchimak. Brigade Members
  • List Fire Brigade Chief and Fire Brigade Team Members in block 11.
  • Initial in block 11
11. Route the completed Route the completed SAT UNSAT N/A checklist checklist for review Comments:

CUE: Acknowledge request to

  • Contact Station Duty route completed Officer checklist. o Phone o Plant Page o Radio
  • Route checklist to Station Duty Officer CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

5 S-105

TASK CONDITIONS:

1. You are the Shift Managers Designee.
2. Both Units are at full power.

INITIATING CUES:

1. Annunciator 0-37-A4 for Unit 1 actuated a few minutes ago and has been acknowledged by the Unit 1 Admin NSO. An Alarm on 1PM09J has also been acknowledged.
2. An NLO called the MCR via the emergency phone number to report a fire is in progress in the plant
3. An NSO has completed the Unit Admin NSO portion of BwAP 1100-16, Appendix A, Fire/Haz-Mat Response/Checklist and has just forwarded it to you.
4. Another SRO is currently evaluating EALs related to the event.
5. You are directed to complete the Shift Manager/Designee portion of the Fire/Haz-Mat Response/Checklist
6. Route the completed checklist to the Station Duty Officer when it is completed.

6 S-105

SIMULATOR SETUP GUIDE:

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST. (N/A if JPM NOT performed in simulator)
  • Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon. (N/A if JPM NOT performed in simulator)
  • Complete items on Simulator Ready for Training Checklist. (N/A if JPM NOT performed in simulator)
  • Place simulator in RUN. (N/A if JPM NOT performed in simulator)
  • Insert IMF PN0749 ON(N/A if JPM NOT performed in simulator)

COMMENTS:

  • Provide marked up copy of BwAP 1100-16, Appendix A, completed through step 15 (page 4, NSO actions)
  • Provide copy of BwAR 0-37-A4.
  • The fire is on the 426 elevation of the U-1 Turbine Building outside of ESF Bus 141 room. The fire is a small fire and was in wood that was being staged for an upcoming outage.

7 S-105

KEY BwAP 1100-16 APPENDIX A KE Y Revision 22 Information Use FIRE/HAZ-MAT RESPONSE/CHECKLIST Nuclear Station Operator

__JN__ 1. Name of Caller/Informant: Tom NLO__________________________________

__JN__2. Phone Number of Informant (if available): 7588______________________________________

__JN__3. Date: Today_____________________________________

__JN__4. Time: __5 minutes ago____________________________

__JN__5. Location of Fire/Spill (Bldg/Elev/Area): Turbine Building 426 outside ESF Bus 141 room___

__JN__6. Size of Fire/Spill: Small_____________________________________

__JN__7. Type of Fire Spill (Circle/Explain): Wood/Trash/Rubbish: Wood staged for outage Flammable/Combustible Liquid:

Plant Equipment:

Other: ___________________

Type of Chemical: ___________________

__JN__8. Notify the Shift Manager or designee of the situation.

__JN__9. Radio Announcement of location Fire/Spill (Include fire type/size or Chemical if known).

__JN__10. Sound Plant Fire Siren (10-15 seconds).

__JN__11. P.A. Announcement of location, type and size of fire/spill (Use EMER PAGE button and handset button concurrently).

__JN__12. Sound Plant Fire Siren (10-15 seconds).

__JN__13. P.A. Announcement of location, type and size of fire/spill (Use EMER PAGE button and handset button concurrently).

_N/A__14. Notify Unit Operator(s) to refer to BwOP FP-100, Fire Response Guidelines for a fire in any of the following areas:

{ VCT Room (11.6A-_)

{ Aux Bldg. 426 Chemistry Lab/Office (11.6B-0)

{ Kitchen/Locker Room Area (18.5-1)

{ RH Heat Exchanger Room (11.3_-_)

{ Letdown Heat Exchanger Room (11.4C-_)

{ DG Room/Switchgear Room Air Shaft (18._-_)

{ Radwaste Drumming Station and Radwaste Tunnel (14.1-0)

__JN__15. Relay information to the Shift Manager.

NSO/Time _Joe NSO____________/__Current Time_______

KEY S-105 8

KEY

KEY KEY BwAP 1100-16 Revision 22 Information Use APPENDIX A (Cont)

FIRE/HAZ-MAT RESPONSE/CHECKLIST Shift Manager/Designee

__SM__1. Notify the Security Shift Supervisor of the incident location in order to dispatch security personnel to the fire/spill area and fire equipment/Haz-Mat Equipment cages and to provide access control as necessary.

__SM__2. Have Security OPEN any Security Barriers as needed (Track Way Gates, Doors, etc.)

__SM__3. Verify the fire brigade has been notified/dispatched.

NOTE Appendix E contains information on the duties and requirements for Rad Protection Personnel.

__SM__4. Notify Rad Protection.

__SM*__ { x2240 *Examinee initials in space denoting notification method (only 1 method required)

__SM*__ { x2241

__SM*__ { Plant Page

5. Communicate with the Fire Chief/Incident Commander to determine the following:

__SM__ z Conditions/status at the fire scene Small wood fire_________________________

__SM__ z Injuries No injuries, None, or N/A_________________

__SM__ z Extent of fire Fire is out, extinguished, etc.______________

__SM__ z Equipment damaged No equipment damaged, none, or N/A_______

__SM__ z Assistance required No outside assistance required, none, or N/A__

NOTE Reported Fires in buildings outside the Protected area shall be handled by the off-site Fire Department. At Braidwoods owner controlled area at the Plant, notify Braidwood Fire Department (9-911 or 9-458-2121). At River Screen House, call Custer Twp. Fire Department (9-458-2119).

6. If Off-Site Assistance Required:

NOTE INFORM the Braidwood Fire Department with as much information as possible, i.e., type of fire/spill, size, location of fire/spill, point of plant entry, etc.

__N/A__ { CALL Braidwood Fire Dept. (9-911 or 9-458-2121).

__N/A__ { CALL Custer Twp Fire Dept. (9-458-2119) for River Screen House.

z NOTIFY Security Shift Supervisor of the following:

__N/A__ z Off-Site Fire Dept. responding.

__N/A__ z Desired Plant Access Point.

__N/A__ z Location of Command Post Area.

z Refer to the Exelon Nuclear Radiological Emergency Plan, Braidwood Annex, for emergency action levels.

__N/A__ z Fire Chief notified of Off-Site response.

__N/A__ z Site Communications Director notified of Off-Site response.

KEY S-105 9

KEY

KEY APPENDIX A (Cont)

KEY BwAP 1100-16 Revision 22 Information Use FIRE/HAZ-MAT RESPONSE/CHECKLIST Shift Manager/Designee

__SM__7, Refer to the Exelon Nuclear Radiological Emergency Plan, Braidwood Annex, for emergency action levels if not already referred to.

8. Notify the following:

__SM__ z Station Fire Marshal

__SM__ z Station Duty Officer

__SM__ z Chemistry

__

__N/A__ z Notify other Fire Departments or other assistance as requested by the Exelon Fire Chief.

__SM__9. Request periodic status/damage reports from the Exelon Fire chief at no more than twenty (20) minute intervals.

The fire is out, the only visible damage is charred paint/floor, no assistance necessary ---_____

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

__SM__10. Notify the WEC to perform the following:

z 0BwOS FP-Q5, Fire Brigade Cages Equipment Area Check Surveillance, must be performed for all Fire Brigade cage equipment used during a fire.

{ 0BwOS HM-Q1, Operations Hazardous Materials Emergency Response Equipment Inventory, must be performed for each cage used during a Hazardous Material Spill.

__SM__11. List Fire Brigade/Hazmat Team Members:

z Fire Brigade Chief: Mills_______________________________

z Members: Morgan_____________________________

Davito______________________________

Smith_______________________________

Verchimak___________________________

12. The completed Fire Checklist SHALL be routed in the following order for review:

____ _ a. Station Duty Officer.

NOTE The Fire Marshal will make copies of the Checklist for:

1. Rad Protection Supervisor.
2. EP Coordinator (if an Emergency Event declared).
3. Environmental Supervisor.

__ ___ b. Fire Marshal.

__ ___ c. Operations Clerk.

(Final)

KEY S-105 10 KE Y

TASK TITLE: Initiate a LCOAR JPM No.: S-204 REV: NRC2006301 TPO No.: 8.E.AM-120 K&A No.: 2.2.23 TASK No.: S-AM-073: Initiate/Terminate K&A IMP: 2.6/3.8 an AAR/LCOAR TRAINEE: SRO EVALUATOR: DATE:

The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 2, 3, 4 APPROX COMPLETION TIME: 20 MINUTES CRITICAL TIME: NA EVALUATION METHOD: LOCATION:

X PERFORM X IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. 1BwOL 3.7.8, Rev 4, LCOAR Essential Service Water (SX) System Tech Spec 3.7.8.
2. 1BwVSR 5.5.8.SX.1, Rev 5, ASME Surveillance Requirements for 1A Essential Service Water Pump.

MATERIALS:

1. 1BwOL 3.7.8 Rev 4.

TASK STANDARDS:

1. Initiate LCOAR 3.7.8 for a failure of the 1A SX pump to perform its intended function.

TASK CONDITIONS:

1. You are the Unit Supervisor.
2. Both units are at full power.

INITIATING CUES:

1. The Engineering staff notified you that the 1A SX pump has failed surveillance 1BwVSR 5.5.8.SX.1 ASME Surveillance Requirements for 1A Essential Service Water Pump, due to inadequate pump delta-P (10 minutes ago). Initiate the LCOAR. An IR (# 123456) and a WR (# 123456) have been written.
2. No other inoperable equipment exists on either Unit.
3. Inform the Shift Manager when you have completed initiating the LCOAR.

1 S-204

RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable

1. Refer to the LCOAR Locate 1BwOL 3.7.8 SAT UNSAT N/A CUE: After the examinee Comments:

demonstrates he/she can locate the LCOAR, provide a copy.

Note: If the examinee requests to review 1BwVSR 5.5.8.SX.1, provide the attached copy.

Examiners note: A correctly completed LOCAR form is included on pages 6-9. LCOAR completion steps may be performed in any order.

  • 2. Complete Section A, Complete Section A. SAT UNSAT N/A Notification, of 1BwOL 3.7.8 Notification, of 1BwOL Comments:

3.7.8:

  • Present Mode: 1 Note: Underlined phrases or
  • Initiating Event:

words to that effect Failure of 1BwVSR are acceptable for 5.5.8.SX.1 ASME due to completion of LCOAR inadequate pump P paperwork.

  • SFD Performed:

Performs SFD per page 2 and determines no loss of safety function exists

  • Check No box (B.1.a) on page 2
  • Checks YES box on page 1 and initials next to YES
  • Does this inoperability invalidate any previous SFD: No 2

S-204

PERFORMANCE STEP STANDARD Circle applicable

  • 2 Step 2 Continued SAT UNSAT N/A CUE: As Shift Manager,
  • Notify Shift Manager Comments:

acknowledge LCOAR of LCOAR entry (Craig entry. Provide name Ingold) of SM - Craig Ingold.

  • Time Date:

(notification time and todays date)

Note: From cue sheet, IR

  • Was an IR written:

(#123456) and WR Yes, #123456

  1. 123456 written.
  • Related WRs: Yes,
  1. 123456 CUE: C/O will be prepared o Related C/O(s): No at later time.

(examinees signature)

CUE: Examiner sign for Unit

  • Unit NSO signature:

NSO. (Unit NSO name signed by examiner)

  • 3. Complete LCOAR Index On page 6 of 1BwOL 3.7.8, SAT UNSAT N/A Essential Service Water (SX) sign and date Condition A Comments:

System line and refer to page 7:

  • Examinees signature
  • Todays date
  • 4. Initiate LCOAR 1BwOL 3.7.8 On page 7 of 1BwOL 3.7.8, SAT UNSAT N/A Note: If examinee attempts enter time, date and Comments:

to update LCO signature in Condition database, provide the column:

following cue.

  • JPM start time - 10 CUE: Another SRO will minutes.

update LCO database.

  • Todays date
  • Examinees signature
  • Notify SM LOCAR entry complete CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

3 S-204

TASK CONDITIONS:

1. You are the Unit Supervisor.
2. Both units are at full power.

INITIATING CUES:

1. The Engineering staff notified you that the 1A SX pump has failed surveillance 1BwVSR 5.5.8.SX.1 ASME Surveillance Requirements for 1A Essential Service Water Pump, due to inadequate pump delta-P (10 minutes ago). Initiate the LCOAR. An IR (# 123456) and a WR (# 123456) have been written.
2. No other inoperable equipment exists on either Unit.
3. Inform the Shift Manager when you have completed initiating the LCOAR.

4 S-204

SIMULATOR SETUP GUIDE:

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST. (N/A if JPM NOT performed in simulator)
  • Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon. (N/A if JPM NOT performed in simulator)
  • Complete items on Simulator Ready for Training Checklist. (N/A if JPM NOT performed in simulator)
  • Place simulator in RUN. (N/A if JPM NOT performed in simulator)

COMMENTS:

  • Provide copy of 1BwOL 3.7.8, Rev 4.
  • Provide marked up copy of 1BwVSR 5.5.8.SX.1, Rev 5.

5 S-204

KEY LCOAR KEY1BwOL 3.7.8 Revision 4 Reference Use ESSENTIAL SERVICE WATER (SX) SYSTEM TECH SPEC LCO 3.7.8 A. NOTIFICATION If it is discovered that a Surveillance was not performed within its specified Surveillance Frequency, complete Action Z (SR 3.0.3) prior to declaring the LCO not met.

PRESENT MODE: 1 APPLICABLE MODE(S): 1, 2, 3, and 4 INITIATING EVENT(S): Failure of 1BwVSR 5.5.8.SX.1 ASME due to inadequate pump P SAFETY FUNCTION DETERMINATION (SFD)

PERFORMED? (Page 2) YES, Examinee init. (SRO)

DOES THIS INOPERABILITY INVALIDATE ANY PREVIOUS SFD? YES NO LCO 3.0.3: APPLICABLE MODE CHANGE ALLOWED?: YES - Action C.2 SEPARATE CONDITION ENTRY ALLOWED: NO COMPLETION TIME EXTENSION ALLOWED: NO NAME OF SHIFT MANAGER NOTIFIED: C. Ingold TIME/DATE: Current time/date WAS AN ISSUE WRITTEN? YES NO RELATED WR(S):

WR 123456__________ WR ________________

WR ________________ WR ________________

WR ________________ WR ________________

WR ________________ WR ________________

WR ________________ WR ________________

RELATED C/O(S): NONE

_______________ _______________ _______________

_______________ _______________ _______________

_______________ _______________ _______________

SRO signature: Examinee signature TIME/DATE: Current time/date TIME/DATE: Current time/date Unit NSO signature: Examiners signature KEY KE Y 6

S-204

KEY B. SAFETY FUNCTION DETERMINATION PROGRAM REQUIREMENTS KE Y 1BwOL 3.7.8 Revision 4 Reference Use

1. LOSS OF SAFETY FUNCTION (LOSF) EVALUATION:

Is there any inoperable or degraded SUPPORT SYSTEM or SUPPORTED SYSTEM equipment on the opposite/redundant train that, when coupled with this inoperable equipment, might result in a complete loss of a Tech Spec required safety function.

a. No - No LOSF exists. No further evaluation is necessary.
b. Yes - A LOSF may exist. Using the SFDP and BwAP 340-1, evaluate which of the following conditions apply:
1) The SSC is part of an LCO with multiple subsystems and the LCO specified function is intact. No LOSF exists.
2) The SSC will still perform its required safety function as defined in the Safety Analysis Report (SAR). No LOSF exists.
3) A LOSF exists. Perform the Required Actions of the SSC LCO in which the LOSF exists for the specific Condition(s) that apply.
2. LCO 3.0.6 - DELAYED LCOAR ENTRY CALCULATION.

Perform this step only if No LOSF exists and it is desired to delay SUPPORTED SYSTEM LCOAR entry as allowed by LCO 3.0.6. A LOSF does not exist if the redundant train of the inoperable SUPPORTED SYSTEM(S) equipment is OPERABLE.

a. Rules of Use:
1) Rule 1: With a single SUPPORT SYSTEM inoperable, the affected SUPPORTED SYSTEM(s) LCOAR entry(s) is not required to be entered unless directed by the SUPPORT SYSTEM Required Actions.
2) Rule 2: In the event additional SUPPORT SYSTEM(s) become inoperable during the Completion Time for restoration of the first SUPPORT SYSTEM, the LCOAR entry(s) of the SUPPORTED SYSTEM may be delayed by either the maximum allowed Completion Time of the SUPPORT SYSTEM(s), or 2 times the Completion Time for restoration of the SUPPORTED SYSTEM (applied at the time the second SUPPORT SYSTEM becomes inoperable), whichever is less.

KEY KEY 7

S-204

KEY LCOAR INDEX ESSENTIAL SERVICE WATER (SX) SYSTEM KEY 1BwOL 3.7.8 Revision 4 Reference Use SRO Sign and Date Content Description Page SRO: Examinee Condition A One unit-specific SX train inoperable. 7 signature Date: Todays date SRO: Condition B One unit-specific SX train inoperable. 8 Date:

SRO: Condition C Opposite-unit SX train inoperable. 9 Date:

SRO: Condition D Required Action and associated Completion 10 Time of Condition A or B not met.

Date:

SRO: Condition Z SR 3.0.3 11 Date:

SRO: N/A Risk Assessment required by LCO 3.0.4.b N/A Date: complete to allow MODE change.

KEY KEY 8

S-204

KEY LCOAR ACTION CHART ESSENTIAL SERVICE WATER (SX) SYSTEM KE Y1BwOL 3.7.8 Revision 4 Reference Use CONDITION REQUIRED ACTION COMPLETION ACTION MET TIME

                      • NOTE******** A.1 ********NOTES********
      • 1. Enter applicable Not applicable to Unit Conditions and 1 during replacement of Required Actions the SX suction of LCO 3.8.1, isolation valves during "AC Sources -

Unit 2 Refueling 11 Operating," for while Unit 2 is in MODE Emergency Diesel 5, 6, or defueled. Generator made

A. One unit-specific 2. Enter applicable SX train Conditions and inoperable. Required Actions of LCO 3.4.6, JPM start time minus "RCS Loops -

10 minutes/Todays MODE 4," for date Residual Heat Time/Date Removal loops made inoperable Examinee signature by SX.

SRO **********************

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> __________/____

Restore Time/Date unit-specific SX SRO train to OPERABLE status.

KEY KEY (Final) 9 S-204

TASK TITLE: Prepare/Perform a Liquid Radwaste Release JPM No.: S-303 REV: NRC2006301 TPO No.: 8C.HP-001 K&A No.: 2.3.6 TASK No.: S-HP-001, Authorize a liquid K&A IMP: 2.1/3.1 radwaste release TRAINEE: SRO EVALUATOR: DATE:

The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 3, 5 APPROX COMPLETION TIME: 30 MINUTES CRITICAL TIME: NA EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. BwOP WX-501T1, Rev. 38, Liquid Release Tank 0WX01T Release Form
2. BwOP WX-501T2, Rev 5, Liquid Release Window Determination
3. BwOP WX-501T3, Rev 1, Authorization to Release Outside of Release Window MATERIALS:
1. BwOP WX-501T1, Rev. 38, Liquid Release Tank 0WX01T Release Form
2. BwOP WX-501T2, Rev 5, Liquid Release Window Determination
3. BwOP WX-501T3, Rev 1, Authorization to Release Outside of Release Window TASK STANDARDS:
1. Complete Section G of a liquid release tank release form in accordance with BwOP WX-501T1.
2. Determine release start time is outside release start time window.

TASK CONDITIONS:

1. You are the Unit 1 Unit Supervisor.
2. Both Units are at full power.

INITIATING CUES:

1. The Shift Manager has handed you a portion of a 0WX01T liquid release package,
  1. L-06-100, completed through section F.5, and has directed you to complete Section G. (Hand examinee copy of BwOP WX-501T1). All previous sections of the release package have been successfully completed.
2. The current time is 0700 today. Due to scheduled work on the liquid release line, the release must be COMMENCED by 0900 today.
3. Release duration per BwOP WX-501T1 step D.6.g.2) is 120 minutes.
4. The dechlorination skid is in operation.
5. Notify the Shift Manager when Section G of the release package is complete.

1 S-303

RECORD START TIME Note: Provide the examinee with a copy of Section G of BwOP WX-501T1 completed through Step F.5.

PERFORMANCE STEP STANDARD Circle applicable

1. Obtain and record current Obtain and record current SAT UNSAT N/A Kankakee River flow data Kankakee River flow data Comments:

NOTE: The USGS internet site by performing the can be accessed from following:

the computer desk top

  • Access the United from workgroup apps States Geological menu or by using Survey internet site normal internet (usgs.gov).

access.

  • Access water watch-NOTE: After examinee locates current stream flow Kankakee river flow on conditions for Illinois usgs web site,
  • Record discharge flow discharge flow is 5680 cfs at 0700 on todays date.

NOTE: If examinee attempts to access the Unit 1 US turnover, provide o Record Kankakee River the following cue: flow in Unit 1 US turnover CUE: Kankakee river flow has been logged in the Unit 1 US turnover.

2. Determine CW blowdown flow Determine CW blowdown SAT UNSAT N/A flow per BwOP WX-501T2 as Comments:

follows:

o Record liquid release

  1. L-06-100 NOTE: After examinee locates
  • Obtain and record CW blowdown flow current Kankakee River indicator, provide flow (5680 cfs) following cue:
  • Record CW blowdown CUE: CW blowdown flow is flow 22,000 gpm.

o F2400 o OUR-CW032 2

S-303

PERFORMANCE STEP STANDARD Circle applicable

  • 3 Determine the Liquid Release Determine the Liquid SAT UNSAT N/A Window per BwOP WX-501T2 Release Window per BwOP Comments:

CUE: After examinee locates WX-501T2 as follows:

correct procedure, provide copy.

NOTE: After examinee locates

  • Access Liquid Release liquid release spread Window spread sheet sheet, inform student (k:/shift/excel/liquid to use spreadsheet on release) computer desktop.

o Enter arrival date at NOTE: A completed copy of Wilmington (tomorrows the liquid release date) spread sheet is located on page 7.

  • Enter river flow rate (5680 cfs)
  • Enter release duration (120 mins from initial cue)
  • Enter blowdown flow rate (22,000 gpm)
  • Record the Liquid Release Window times on BwOP WX-501T1
  • Target start time (1630)
  • Start after time (1300)
  • Start before time (2000)
4. Evaluate the expected time Evaluate the expected SAT UNSAT N/A of release time of release so that Comments:

both biocide treatment and the release can be accommodated by performing the following:

CUE: Dechlorination skid is

  • Check if in operation. (from dechlorination skid in initial cue) operation
  • Verify CW blowdown flow 8000 gpm (22,000 from previous cue) 3 S-303

PERFORMANCE STEP STANDARD Circle applicable

  • 5. Identify release will not Perform the following: SAT UNSAT N/A start within desired time
  • Determine release will Comments:

be performed outside of release start time window (from initiating cue, release must start at 0900)

  • Determine BwOP WX-501T3 must be completed prior to authorizing release CUE: Acknowledge as SM notification of o Notify SM release will release performed be performed outside outside start time of release start time window. Inform window examinee another OR supervisor will perform BwOP WX- o Notify SM to delay 501T3. release until work completed OR o Notify SM to delay work until release completed within desired time window.

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

4 S-303

TASK CONDITIONS:

1. You are the Unit 1 Unit Supervisor.
2. Both Units are at full power.

INITIATING CUES:

1. The Shift Manager has handed you a portion of a 0WX01T liquid release package, #L-06-100, completed through section F.5, and has directed you to complete Section G.

All previous sections of the release package have been successfully completed.

2. The current time is 0700 today. Due to scheduled work on the liquid release line, the release must be COMMENCED by 0900 today.
3. Release duration per BwOP WX-501T1 step D.6.g.2) is 120 minutes.
4. The dechlorination skid is in operation.
5. Notify the Shift Manager when Section G of the release package is complete.

5 S-303

SIMULATOR SETUP GUIDE:

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
  • Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.
  • Complete items on Simulator Ready for Training Checklist.
  • Place simulator in RUN.
  • Verify/copy Liquid Release Window spreadsheet to computer desktop prior to administering JPM. Spreadsheet is located at k:/shift/excel/liquid release.
  • Clear data from INPUTS field of Liquid Release Window spread sheet prior to administering JPM.
  • Clear computer history of recently accessed documents, programs, and web sites visited prior to administering JPM by performing the following:
  • Right mouse click on task bar
  • Select properties
  • Select advanced tab
  • Select clear
  • Delete Liquid Release Window spreadsheet from computer desktop after administering JPM to all candidates.

COMMENTS:

  • BwOP WX-501T1, Rev. 38.
  • BwOP WX-501T2, Rev 5.
  • BwOP WX-501T3, Rev 1.

6 S-303

KEY KEY Braidwood Release Time Calulator BwOP WX-501 and/or BwOP WX-526 Enter data into blue cells only.

INPUTS Arrival Date at Wilmington mm/dd/yyyy Tomorrow River Flow Rate CFS 5680 Release Duration Minutes 120 Blowdown Rate (F2400) GPM 22000 CALCULATED RESULTS Blowdown Time To River Minutes 120 River Time To Wilmington Intake Minutes 420 Blowdown Peak Time To Wilmington Intake Minutes 600 Margin Minutes 420 Start After Time Today 1300 Time #VALUE!

( = Peak Arrives at 10 PM)

Normal Start Today 1630 Time #VALUE!

( = Center of Peak occurs at 2:30 AM)

Start BeforeTime Today 2000 Time #VALUE!

( = Peak Departs at 7 AM)

KEY KEY (Final) 7 S-303

TASK TITLE: Screen an Event for Reportability JPM No.: S-402 REV: NRC2006301 TPO No.: 8E.AM-102 K&A No.: (2.4.30)

TASK No.: S-AM-102: Screen Reportable or K&A IMP: 2.2/3.6 Significant Events for Reportability TRAINEE: SRO EVALUATOR: DATE:

The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 2, 3 APPROX COMPLETION TIME: 25 MINUTES CRITICAL TIME: NA EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. LS-AA-1010, Rev. 9; Exelon Reportability Reference Manual Table of Contents.
2. LS-AA-1020, Rev. 8, Exelon Reportability Reference Manual Operations Decision Tree.
3. LS-MW-1110, Rev. 6, Exelon Reportability Reference Manual SAF 1.

MATERIALS:

1. Copies of the references listed above.

TASK STANDARDS:

1. Determine all reporting requirements of < 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> per the Exelon Reportability Reference Manual.

TASK CONDITIONS:

1. You are the Unit 1 Unit Supervisor.
2. Unit 1 was at 100% power
3. A RCS LOCA occurred and the reactor tripped and SI actuated.
4. All systems functioned as designed.
5. No release is in progress.
6. An Alert (FA1) has been declared
7. A NARS form has been transmitted to the state INITIATING CUES:
1. The Shift Manager has directed you to screen the event and determine ALL reporting requirements that are LESS THAN OR EQUAL TO 8 HOURS per the Exelon Reportability Reference Manual.
2. Inform the Shift Manager of applicable reporting requirements.

1 S-402

RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable

1. Refer to Exelon Perform the following: SAT UNSAT N/A Reportability Reference
  • Locate and open Exelon Comments:

Manual Reportability Note: If JPM is performed in Reference Manual LS-simulator, examinee AA-1020 will use simulator copy of Exelon Reportability Manual.

If JPM NOT performed in simulator, provide examinee with a copy of Exelon Reportability Manual.

  • 2. Screen Event Refer to Operations SAT UNSAT N/A Note: See pages 6-9 for a Decision Trees (LS-AA- Comments:

key of the operations 1020, page 89) decision trees. Determine the following apply:

  • SAF 1.5 - ECCS Injection/Actuation
  • SAF 1.6 - RPS Actuation with the reactor critical
  • SAF 1.7 - System Actuation Not Including RPS o SAF 1.23 - Occurrence of an Incident 2

S-402

PERFORMANCE STEP STANDARD Circle applicable

  • 3. Determine Notification Use Operations Decision SAT UNSAT N/A Trees to determine the Comments:

following:

  • SAF 1.1 (LS-AA-1110, page 1) o 15 minute State and Local Notification (already performed per initial cue)
  • 1 hr NRC Notification required o 2 hr ANI and INPO Notification required
  • 4 hr NRC Notification required
  • 4 hr NRC Notification required
  • 8 hr NRC Notification required o SAF 1.23 LS-AA-1110 page 68) o Notify NEIL ASAP via telephone o Evaluate other notifications and determine they do not apply CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

3 S-402

TASK CONDITIONS:

1. You are the Unit 1 Unit Supervisor.
2. Unit 1 was at 100% power
3. A RCS LOCA occurred and the reactor tripped and SI actuated.
4. All systems functioned as designed.
5. No release is in progress.
6. An Alert (FA1) has been declared
7. A NARS form has been transmitted to the state INITIATING CUES:
1. The Shift Manager has directed you to screen the event and determine ALL reporting requirements that are LESS THAN OR EQUAL TO 8 HOURS per the Exelon Reportability Reference Manual.
2. Inform the Shift Manager of applicable reporting requirements.

4 S-402

SIMULATOR SETUP GUIDE:

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST. (N/A if JPM NOT performed in simulator)
  • If it is desired to simulate actual plant conditions, perform the following (otherwise N/A)
  • Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon. (N/A if JPM NOT performed in simulator)
  • Complete items on Simulator Ready for Training Checklist. (N/A if JPM NOT performed in simulator)
  • Place simulator in RUN. (N/A if JPM NOT performed in simulator)
  • Insert IMF TH06D 540000(N/A if JPM NOT performed in simulator)

COMMENTS:

5 S-402

KEY EXAM MATERIAL KEY 6

S-402

KEY 7

S-402

KEY (Final) 8 S-402