{{#Wiki_filter:July 16, | {{#Wiki_filter:July 16, 2007 Mr. Michael D. Wadley Site Vice President Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Drive East Welch, MN 55089 | ||
==SUBJECT:== | ==SUBJECT:== | ||
INFORMATION REQUEST TO SUPPORT UPCOMING | INFORMATION REQUEST TO SUPPORT UPCOMING PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2, PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION | ||
==Dear Mr. Wadley:== | ==Dear Mr. Wadley:== | ||
This letter is to request information to support our biennial PI&R inspection | This letter is to request information to support our biennial PI&R inspection beginning September 10, 2007, at Prairie Island Nuclear Generating Plant, Units 1 and 2. This inspection will be performed in accordance with the Nuclear Regulatory Commission (NRC) baseline Inspection Procedure 71152. | ||
Experience has shown that these inspections are extremely resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required for the inspection. | |||
The documents requested are copies of performance indicator reports and lists of information, necessary to ensure the inspection team is adequately prepared for the inspection. The information may be provided in either CD-ROM or hard copy format and should be ready for NRC review by August 27, 2007. Ms. Desiree R. Smith, the Lead Inspector, will contact you to determine the best method of providing the requested information. | |||
If there are any questions about the material requested, or the inspection in general, please do not hesitate to call Ms. Desiree R. Smith at (630) 829-9637, or to contact her by email at drc1@nrc.gov. | |||
M. Wadley | M. Wadley In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Sincerely, | |||
/RA/ | |||
Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60 | |||
==Enclosure:== | ==Enclosure:== | ||
Requested Information to Support | Requested Information to Support PI&R Inspection cc w/encl: D. Cooper, Senior Vice President and Chief Nuclear Officer M. Sellman, President and Chief Executive Officer Regulatory Affairs Manager J. Rogoff, Vice President, Counsel & Secretary Nuclear Asset Manager State Liaison Officer, Minnesota Department of Health Tribal Council, Prairie Island Indian Community Administrator, Goodhue County Courthouse Commissioner, Minnesota Department of Commerce Manager, Environmental Protection Division Office of the Attorney General of Minnesota | ||
M. Wadley In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60 | |||
==Enclosure:== | ==Enclosure:== | ||
Requested Information to Support | Requested Information to Support PI&R Inspection cc w/encl: D. Cooper, Senior Vice President and Chief Nuclear Officer M. Sellman, President and Chief Executive Officer Regulatory Affairs Manager J. Rogoff, Vice President, Counsel & Secretary Nuclear Asset Manager State Liaison Officer, Minnesota Department of Health Tribal Council, Prairie Island Indian Community Administrator, Goodhue County Courthouse Commissioner, Minnesota Department of Commerce Manager, Environmental Protection Division Office of the Attorney General of Minnesota DOCUMENT NAME: G:/PrairieIslandPI&RRequestLetter2007.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME DSmith:dtp RSkokowski DATE 07/12/2007 07/16/2007 OFFICIAL RECORD COPY | ||
Letter to M. Wadley from R. Skokowski dated July 16, 2007 DISTRIBUTION: | |||
5.A list of QA audits completed since August 2005 with brief description of areas | TEB MLC RidsNrrDirsIrib GEG KGO JTA DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number) | ||
7.A list of root cause evaluations completed since August 2005. | |||
8.A list of test failures (In-service Test (IST) or Technical Specification surveillances) | Requested Information to Support Problem Identification and Resolution (PI&R) | ||
18.A list of rework items and repeat failures since August 2005. | Inspection | ||
: 19. A list of maintenance rule (a)(1) systems and components, and the | : 1. A copy of administrative procedure(s) for the corrective action process, trending program, quality assurance audit program, self-assessment program, corrective action effectiveness review program, and industry experience review program, operator work around, and temporary modification. | ||
21.A list of dates, times and locations for all scheduled meetings associated | : 2. A copy of Quality Assurance (QA) audits and/or self-assessments of the corrective action program completed since August 2005. | ||
23.A list of the top ten risk-significant systems. Documents requested to be available during the inspection:a.Updated Final Safety Analysis | : 3. A copy of the QA manual. | ||
: 4. A copy of the Employee Concerns Program/Ombudsman administrative procedure. | |||
: 5. A list of QA audits completed since August 2005 with brief description of areas where findings were identified. | |||
: 6. A list of self-assessments completed since August 2005. | |||
: 7. A list of root cause evaluations completed since August 2005. | |||
: 8. A list of test failures (In-service Test (IST) or Technical Specification surveillances) since August 2005, with a brief description of component/system which failed. | |||
: 9. A list of all open condition reports sorted by significance level including a description of the issue, the date initiated, and the significance category. | |||
: 10. A list of condition reports closed since August 2005 including description of issue, significance category, date initiated, date closed, and whether there is an associated operability evaluation. | |||
: 11. A list of condition reports initiated since August 2005 that involve inadequate or ineffective corrective actions. Include the date initiated, a brief description, status, and significance category of the issue. | |||
: 12. A list of condition reports initiated since August 2005 that identify trends of conditions adverse to quality. Include the date initiated, a brief description, status, and significance category for each item. | |||
: 13. A copy of any performance reports for the past two years used to track the corrective action program effectiveness. | |||
: 14. A list of condition reports issued during the past two refueling outages sorted by system and component, including a brief description, status, and significant category for each item. | |||
1 Enclosure | |||
: 15. A copy of condition reports associated with non-cited and cited violations since August 2005. | |||
: 16. A list of operating experience documents received since August 2005 and any associated condition reports. | |||
: 17. A list of effectiveness reviews completed since August 2005. | |||
: 18. A list of rework items and repeat failures since August 2005. | |||
: 19. A list of maintenance rule (a)(1) systems and components, and the associated health reports since August 2005. | |||
: 20. A copy of any corrective action program trend reports for the past two years. | |||
: 21. A list of dates, times and locations for all scheduled meetings associated with the implementation of the corrective action program. | |||
: 22. A copy of the latest organization chart and phone listing. | |||
: 23. A list of the top ten risk-significant systems. | |||
Documents requested to be available during the inspection: | |||
: a. Updated Final Safety Analysis Report | |||
: b. Technical Specifications | |||
: c. Procedures | |||
: d. Copies of any self-assessments and associated condition reports generated in preparation for the inspection 2 Enclosure}} | |||
Revision as of 04:34, 23 November 2019
| ML071970498 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 07/16/2007 |
| From: | Richard Skokowski NRC/RGN-III/DRP/RPB3 |
| To: | Wadley M Nuclear Management Co |
| References | |
| Download: ML071970498 (6) | |
Text
July 16, 2007 Mr. Michael D. Wadley Site Vice President Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Drive East Welch, MN 55089
SUBJECT:
INFORMATION REQUEST TO SUPPORT UPCOMING PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2, PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION
Dear Mr. Wadley:
This letter is to request information to support our biennial PI&R inspection beginning September 10, 2007, at Prairie Island Nuclear Generating Plant, Units 1 and 2. This inspection will be performed in accordance with the Nuclear Regulatory Commission (NRC) baseline Inspection Procedure 71152.
Experience has shown that these inspections are extremely resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required for the inspection.
The documents requested are copies of performance indicator reports and lists of information, necessary to ensure the inspection team is adequately prepared for the inspection. The information may be provided in either CD-ROM or hard copy format and should be ready for NRC review by August 27, 2007. Ms. Desiree R. Smith, the Lead Inspector, will contact you to determine the best method of providing the requested information.
If there are any questions about the material requested, or the inspection in general, please do not hesitate to call Ms. Desiree R. Smith at (630) 829-9637, or to contact her by email at drc1@nrc.gov.
M. Wadley In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60
Enclosure:
Requested Information to Support PI&R Inspection cc w/encl: D. Cooper, Senior Vice President and Chief Nuclear Officer M. Sellman, President and Chief Executive Officer Regulatory Affairs Manager J. Rogoff, Vice President, Counsel & Secretary Nuclear Asset Manager State Liaison Officer, Minnesota Department of Health Tribal Council, Prairie Island Indian Community Administrator, Goodhue County Courthouse Commissioner, Minnesota Department of Commerce Manager, Environmental Protection Division Office of the Attorney General of Minnesota
M. Wadley In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60
Enclosure:
Requested Information to Support PI&R Inspection cc w/encl: D. Cooper, Senior Vice President and Chief Nuclear Officer M. Sellman, President and Chief Executive Officer Regulatory Affairs Manager J. Rogoff, Vice President, Counsel & Secretary Nuclear Asset Manager State Liaison Officer, Minnesota Department of Health Tribal Council, Prairie Island Indian Community Administrator, Goodhue County Courthouse Commissioner, Minnesota Department of Commerce Manager, Environmental Protection Division Office of the Attorney General of Minnesota DOCUMENT NAME: G:/PrairieIslandPI&RRequestLetter2007.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME DSmith:dtp RSkokowski DATE 07/12/2007 07/16/2007 OFFICIAL RECORD COPY
Letter to M. Wadley from R. Skokowski dated July 16, 2007 DISTRIBUTION:
TEB MLC RidsNrrDirsIrib GEG KGO JTA DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)
Requested Information to Support Problem Identification and Resolution (PI&R)
Inspection
- 1. A copy of administrative procedure(s) for the corrective action process, trending program, quality assurance audit program, self-assessment program, corrective action effectiveness review program, and industry experience review program, operator work around, and temporary modification.
- 2. A copy of Quality Assurance (QA) audits and/or self-assessments of the corrective action program completed since August 2005.
- 3. A copy of the QA manual.
- 4. A copy of the Employee Concerns Program/Ombudsman administrative procedure.
- 5. A list of QA audits completed since August 2005 with brief description of areas where findings were identified.
- 6. A list of self-assessments completed since August 2005.
- 7. A list of root cause evaluations completed since August 2005.
- 8. A list of test failures (In-service Test (IST) or Technical Specification surveillances) since August 2005, with a brief description of component/system which failed.
- 9. A list of all open condition reports sorted by significance level including a description of the issue, the date initiated, and the significance category.
- 10. A list of condition reports closed since August 2005 including description of issue, significance category, date initiated, date closed, and whether there is an associated operability evaluation.
- 11. A list of condition reports initiated since August 2005 that involve inadequate or ineffective corrective actions. Include the date initiated, a brief description, status, and significance category of the issue.
- 12. A list of condition reports initiated since August 2005 that identify trends of conditions adverse to quality. Include the date initiated, a brief description, status, and significance category for each item.
- 13. A copy of any performance reports for the past two years used to track the corrective action program effectiveness.
- 14. A list of condition reports issued during the past two refueling outages sorted by system and component, including a brief description, status, and significant category for each item.
1 Enclosure
- 15. A copy of condition reports associated with non-cited and cited violations since August 2005.
- 16. A list of operating experience documents received since August 2005 and any associated condition reports.
- 17. A list of effectiveness reviews completed since August 2005.
- 18. A list of rework items and repeat failures since August 2005.
- 19. A list of maintenance rule (a)(1) systems and components, and the associated health reports since August 2005.
- 20. A copy of any corrective action program trend reports for the past two years.
- 21. A list of dates, times and locations for all scheduled meetings associated with the implementation of the corrective action program.
- 22. A copy of the latest organization chart and phone listing.
- 23. A list of the top ten risk-significant systems.
Documents requested to be available during the inspection:
- b. Technical Specifications
- c. Procedures
- d. Copies of any self-assessments and associated condition reports generated in preparation for the inspection 2 Enclosure