ML072420543: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Enlergy Nuclear Operations, inc. Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Mi 49043 August 23,2007 10 CFR 26.71 (d) U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Fitness for Dutv Pro~ram Performance Report  
{{#Wiki_filter:Enlergy Nuclear Operations, inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Mi 49043 August 23,2007                                                         10 CFR 26.71 (d)
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Fitness for Dutv P r o ~ r a mPerformance Report


==Dear Sir or Madam:==
==Dear Sir or Madam:==
In accordance with 10 CFR 26.71 (d), Entergy Nuclear Operations, Inc, is providing the Fitness for Duty Program Performance Report for the Palisades Nuclear Plant (PNP) for the period of January 1, 2007, through June 30, 2007.
 
Enclosures 1 and 2 summarize the test results at the PNP. Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.
In accordance with 10 CFR 26.71(d), Entergy Nuclear Operations, Inc, is providing the Fitness for Duty Program Performance Report for the Palisades Nuclear Plant (PNP) for the period of January 1, 2007, through June 30, 2007.
Site Vice President Palisades Nuclear Plant Enclosures (2) CC Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC ENCLOSURE 1 PALBSADESNUCLEARPLANT SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE  
Enclosures 1 and 2 summarize the test results at the PNP.
Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.
Site Vice President Palisades Nuclear Plant Enclosures (2)
CC     Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC
 
ENCLOSURE 1 PALBSADESNUCLEARPLANT SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE  


==SUMMARY==
==SUMMARY==
January "1thougk June 30,2007 1. MANAGEMENT  
 
January "1thougk J u n e 30,2007
: 1. MANAGEMENT  


==SUMMARY==
==SUMMARY==
A. RANDOM TESTING During this reporting period, a total of 244 random tests were conducted with the following results: Donor Group Random Tests Results Employees Contractors 153 Random testing identified no positive drug/alcohol results. 9 1 Random testing identified no positive drug/alcohol results. The percentage of random tests conducted during this period was 55%. The positive drug/alcohol rate for 2007 indicates a stable trend for employees and contractors:
 
Random Tests Positive Rate Leading Substance Emplovees C/V1s Emplovees C/V1s Cocaine THC B. PRE-ACCESS TESTING A total of 283 pre-access tests were conducted during this reporting period. One individual was denied access based on positive test results.
A. RANDOM TESTING During this reporting period, a total of 244 random tests were conducted with the following results:
Page 1 of 2 C. FOR CAUSEIPOST-ACCIDENT TESTING One for-cause test was required during the reporting period. The test was given because of observed behavior. The results of the test were negative. D. FOLLOW-UP TESTING No individuals tested positive during "follow-up" testing.
Donor Group                 Random Tests                 Results Employees                       153           Random testing identified no positive drug/alcohol results.
Contractors                      91            Random testing identified no positive drug/alcohol results.
The percentage of random tests conducted during this period was 55%.
The positive drug/alcohol rate for 2007 indicates a stable trend for employees and contractors:
Random Tests           Positive Rate       Leading Substance Emplovees C/V1s       Emplovees C/V1s       Cocaine THC B. PRE-ACCESS TESTING A total of 283 pre-access tests were conducted during this reporting period. One individual was denied access based on positive test results.
Page 1 of 2
 
C. FOR CAUSEIPOST-ACCIDENT TESTING One for-cause test was required during the reporting period. The test was given because of observed behavior. The results of the test were negative.
D. FOLLOW-UP TESTING No individuals tested positive during "follow-up" testing.
E. APPEALS The appeals process was not initiated during this reporting period
E. APPEALS The appeals process was not initiated during this reporting period
: 2. REPORTABLE EVENTS UNDER 10 CFR 26.73 During this six-month interval, Palisades Nuclear Plant encountered no Fitness for Duty events that required reporting in accordance with 10 CFR 26.73. Page 2 of 2 ENCLOSURE 2 PALlSABESNUCLEARPLANT SEMI-ANNUAL.
: 2. REPORTABLE EVENTS UNDER 10 CFR 26.73 During this six-month interval, Palisades Nuclear Plant encountered no Fitness for Duty events that required reporting in accordance with 10 CFR 26.73.
FITNESS FOR DUTY PROGRAM PERFORMANCE DNA January "1tkrough June 30,2007 Entergy Nuclear Operations, Inc.
Page 2 of 2
Company Palisades Nuclear Plant Location Brian Rabideau Contact Name June 30.2007 6 Months Ending 269-764-2575 Phone (include Areacode)
 
Cutoffs: Screen/Confirmation (nglml) : Appendix A to 10 CFR 26 Marijuana 100 / 15 Amphetamines 1000 / 500 1 Cocaine 300 / 150 Phencyclidine 25 / 25 1 Opiates 300 / 300 Alcohol (% BAC)* 0.04 / 0.04 1 "Anv detectable amount for situations other than random.
ENCLOSURE 2 PALlSABESNUCLEARPLANT SEMI-ANNUAL. FITNESS FOR DUTY PROGRAM PERFORMANCE D N A January "1tkrough June 30,2007 Entergy Nuclear Operations, Inc.                                                       June 30.2007 Company                                                                    6 Months Ending Palisades Nuclear Plant Location 269-764-2575 Phone (include Areacode)
Page 1 of 2 Testing Results Average Number With Unescorted Access Categories Pre-Access FOR CAUSE Licensee Employees 541 Post- Accident Observed Behavior #Tested 36 0 1 153 20 0 21 0 Random Follow-UP Other TOTAL #Positive 0 0 0 0 0 0 0 Long-Term Contractor Personnel N/A #Tested --- --- --- --- --- --- --- Short-Term Contractor Personnel 348 #Positive
Brian Rabideau Contact Name Cutoffs: Screen/Confirmation (nglml) : Appendix A to 10 CFR 26 Marijuana       100 / 15               Amphetamines         1000 / 500                               1 Cocaine         300 / 150               Phencyclidine           25 / 25                               1 Opiates         300 / 300               Alcohol (% BAC)*       0.04 / 0.04                             1 "Anv detectable amount for situations other than random.
--- --- --- --- --- --- --- #Tested 247 0 0 9 1 14 0 352 #Positive 1 0 0 0 0 0 1 Breakdown of Confirmed Positive Tests for Specific Substances Page 2 of 2 Licensee Employees Long-Term Contractors Short-Term Contractors Total Marijuana Cocaine 1 1 Opiates Amphe- tamines Phency- clidine Alcohol Refusal to Test 1 2 I I 3 4 5}}
Long-Term              Short-Term Testing Results                               Licensee              Contractor      Contractor Personnel Employees                Personnel Average Number With Unescorted Access                                 541                   N/A                  348
                                            #Tested    #Positive  #Tested     #Positive   #Tested   #Positive Categories Pre-Access                                                          ---           ---
36        0                                247        1 FOR                      Post-               0        0          ---           ---      0          0 CAUSE                    Accident Observed            1        0          ---           ---       0          0 Behavior Random                                        153        0          ---           ---       91        0 Follow-UP                                      20        0          ---           ---       14        0 Other                                            0        0          ---           ---       0          0 TOTAL                                        210        0          ---           ---     352         1 Page 1 of 2
 
Breakdown of Confirmed Positive Tests for Specific Substances Amphe-  Phency-          Refusal Marijuana Cocaine  Opiates  tamines  clidine Alcohol to Test 1 2 3 4 5 Licensee Employees Long-Term Contractors 1
Short-Term Contractors Total                                 1 I I Page 2 of 2}}

Revision as of 03:06, 23 November 2019

Fitness for Duty Program Performance Report for Period of January 1, 2007 Through June 30, 2007
ML072420543
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/23/2007
From: Schwarz C
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML072420543 (5)


Text

Enlergy Nuclear Operations, inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Mi 49043 August 23,2007 10 CFR 26.71 (d)

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Fitness for Dutv P r o ~ r a mPerformance Report

Dear Sir or Madam:

In accordance with 10 CFR 26.71(d), Entergy Nuclear Operations, Inc, is providing the Fitness for Duty Program Performance Report for the Palisades Nuclear Plant (PNP) for the period of January 1, 2007, through June 30, 2007.

Enclosures 1 and 2 summarize the test results at the PNP.

Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.

Site Vice President Palisades Nuclear Plant Enclosures (2)

CC Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC

ENCLOSURE 1 PALBSADESNUCLEARPLANT SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE

SUMMARY

January "1thougk J u n e 30,2007

1. MANAGEMENT

SUMMARY

A. RANDOM TESTING During this reporting period, a total of 244 random tests were conducted with the following results:

Donor Group Random Tests Results Employees 153 Random testing identified no positive drug/alcohol results.

Contractors 91 Random testing identified no positive drug/alcohol results.

The percentage of random tests conducted during this period was 55%.

The positive drug/alcohol rate for 2007 indicates a stable trend for employees and contractors:

Random Tests Positive Rate Leading Substance Emplovees C/V1s Emplovees C/V1s Cocaine THC B. PRE-ACCESS TESTING A total of 283 pre-access tests were conducted during this reporting period. One individual was denied access based on positive test results.

Page 1 of 2

C. FOR CAUSEIPOST-ACCIDENT TESTING One for-cause test was required during the reporting period. The test was given because of observed behavior. The results of the test were negative.

D. FOLLOW-UP TESTING No individuals tested positive during "follow-up" testing.

E. APPEALS The appeals process was not initiated during this reporting period

2. REPORTABLE EVENTS UNDER 10 CFR 26.73 During this six-month interval, Palisades Nuclear Plant encountered no Fitness for Duty events that required reporting in accordance with 10 CFR 26.73.

Page 2 of 2

ENCLOSURE 2 PALlSABESNUCLEARPLANT SEMI-ANNUAL. FITNESS FOR DUTY PROGRAM PERFORMANCE D N A January "1tkrough June 30,2007 Entergy Nuclear Operations, Inc. June 30.2007 Company 6 Months Ending Palisades Nuclear Plant Location 269-764-2575 Phone (include Areacode)

Brian Rabideau Contact Name Cutoffs: Screen/Confirmation (nglml) : Appendix A to 10 CFR 26 Marijuana 100 / 15 Amphetamines 1000 / 500 1 Cocaine 300 / 150 Phencyclidine 25 / 25 1 Opiates 300 / 300 Alcohol (% BAC)* 0.04 / 0.04 1 "Anv detectable amount for situations other than random.

Long-Term Short-Term Testing Results Licensee Contractor Contractor Personnel Employees Personnel Average Number With Unescorted Access 541 N/A 348

  1. Tested #Positive #Tested #Positive #Tested #Positive Categories Pre-Access --- ---

36 0 247 1 FOR Post- 0 0 --- --- 0 0 CAUSE Accident Observed 1 0 --- --- 0 0 Behavior Random 153 0 --- --- 91 0 Follow-UP 20 0 --- --- 14 0 Other 0 0 --- --- 0 0 TOTAL 210 0 --- --- 352 1 Page 1 of 2

Breakdown of Confirmed Positive Tests for Specific Substances Amphe- Phency- Refusal Marijuana Cocaine Opiates tamines clidine Alcohol to Test 1 2 3 4 5 Licensee Employees Long-Term Contractors 1

Short-Term Contractors Total 1 I I Page 2 of 2