ML080840016: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:SAFEGUARDS INFORMATION
{{#Wiki_filter:SAFEGUARDS INFORMATION
 
                                              March 20, 2008
EA-08-064
SAFEGUARDS INFORMATION
  Enclosure Contains Safeguards Information.
March 20, 2008
  When Separated from enclosure, this
  document is not Safeguards Information.
EA-08-064
Mr. Charles G. Pardee
Chief Nuclear Officer and Senior Vice President
Exelon Generation Company, LLC
200 Exelon Way, KSA 3-E
Kennett Square, PA 19348
SUBJECT:          THREE MILE ISLAND, UNIT 1 - NRC PHYSICAL SECURITY BASELINE
                  INSPECTION REPORT 05000289/2008402; PRELIMINARY GREATER THAN
                  GREEN FINDING
Dear Mr. Pardee:
On February 8, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security
baseline inspection at your Three Mile Island, Unit 1 facility. The inspection covered one or
more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.
The enclosed inspection report documents the inspection results, which were discussed on
February 8, 2008, with Mr. Thomas Dougherty, Plant Manager and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and
compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed
personnel.
Based on the results of this inspection, a finding was identified which was preliminarily
determined to be greater than very low safety significance (i.e., greater than Green as
determined by the Physical Protection Significance Determination Process (PPSDP)). The
deficiency was identified by the licensee. Recognizing local sensitivities related to the
identification of inattentive officers at another facility last year, the staff notes that this finding
does not involve inattentive security officers.
                                                    SAFEGUARDS INFORMATION DETERMINATION
  Warning: Violation of section 147 of the Atomic
                                                    MADE BY:
  Energy Act, ASafeguards Information@ is subject to
                                                    NAME/TITLE: James Trapp, Chief
  civil and criminal penalties
                                                    ORGANIZATION: RI/DRS/PSB1
                                                    BASIS: DG-SG-1:_(300) Physical Protection Program
                                                    SIGNATURE___/RA/__________ DATE:_03/20/08_
                                    SAFEGUARDS INFORMATION


Enclosure Contains Safeguards Information. When Separated from enclosure, this document is not Safeguards Information.
                                    SAFEGUARDS INFORMATION
Mr. Charles G. Pardee 
C. Pardee                                        2
Chief Nuclear Officer and Senior Vice President
The deficiency was promptly corrected or compensated for, and the plant was in compliance
Exelon Generation Company, LLC
with applicable physical protection and security requirements within the scope of this inspection
200 Exelon Way, KSA 3-E
before the inspectors left the site. The finding is also an apparent violation (AV) of NRC
Kennett Square, PA 19348
requirements and is being considered for escalated enforcement action in accordance with the
Enforcement Policy, which can be found on the NRCs Web Site at http:// www.nrc.gov/reading-
room/adams.html.
Before we make a final significance decision regarding the preliminary greater than Green
findings, we are providing you an opportunity (1) to attend a Regulatory Conference where you
can present to the NRC your perspective on the facts and assumptions the NRC used to arrive
at the finding and assess its significance, or (2) submit your position on the finding to the NRC in
writing. If you request a Regulatory Conference, it should be held within 30 days of the receipt of
this letter and we encourage you to submit supporting documentation at least one week prior to
the conference in an effort to make the conference more efficient and effective. If a Regulatory
Conference is held, it will be closed to public observation because it involves security sensitive
information. If you decide to submit only a written response, such submittal should be sent to
the NRC within 30 days of the receipt of this letter. If you decline a Regulatory Conference and
choose not to submit a written response, the NRC will proceed with its final determination.
Please contact Mr. James Trapp of my staff at (610) 337- 5186 within 10 business days of the
date of your receipt of this letter to notify the NRC of your intentions. If we have not heard from
you within 10 days, we will continue with our significance determination decision.
You will be advised by separate correspondence of the results of our deliberations on this
matter. No response regarding the apparent violation is required at this time. Since the NRC
has not made a final determination in this matter, no Notice of Violation is being issued for this
inspection finding at this time. In addition, please be advised that the number and
characterization of the apparent violation described in the enclosed inspection report may
change as a result of further NRC review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is
accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room). However, because of the security-related concerns contained in the
enclosure, and in accordance with 10 CFR 73.21, a copy of this letters enclosure will not be
available for public inspection.
                                    SAFEGUARDS INFORMATION


                                  SAFEGUARDS INFORMATION
SUBJECT: THREE MILE ISLAND, UNIT 1 - NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT 05000289/2008402; PRELIMINARY GREATER THAN
C. Pardee                                      3
GREEN FINDING
In accordance with 10 CFR 2.390(b) (1) (ii), the NRC is waiving the affidavit requirements for
your response, if any. This practice will ensure that your response will not be made available
Dear Mr. Pardee:
electronically for public inspection in the NRC Public Document Room or from the NRCs
document system, ADAMS. If Safeguards Information is necessary to provide an acceptable
response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark
your entire response Security-Related Information - Withhold Under 10 CFR 2.390 and follow
the instructions for withholding in 10 CFR 2.390(b) (1).
                                              Sincerely,
                                              /RA/
                                              Marsha K. Gamberoni, Director
                                              Division of Reactor Safety
Docket Nos. 50-289
License Nos. DPR-50
Enclosure:      Inspection Report 05000289/2008402
                  w/Attachment: Supplemental Information
                (CONTAINS SAFEGUARDS INFORMATION (SGI))
                                  SAFEGUARDS INFORMATION


                                                        SAFEGUARDS INFORMATION
On February 8, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security
              C. Pardee                                                  3
baseline inspection at your Three Mile Island, Unit 1 facility. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process.
              In accordance with 10 CFR 2.390(b) (1) (ii), the NRC is waiving the affidavit requirements for
The enclosed inspection report documents the inspection results, which were discussed on
              your response, if any. This practice will ensure that your response will not be made available
February 8, 2008, with Mr. Thomas Dougherty, Plant Manager and other members of your staff.
              electronically for public inspection in the NRC Public Document Room or from the NRCs
              document system, ADAMS. If Safeguards Information is necessary to provide an acceptable
              response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark
              your entire response Security-Related Information - Withhold Under 10 CFR 2.390 and follow
              the instructions for withholding in 10 CFR 2.390(b) (1).
                                                                        Sincerely,
                                                                        /RA/
                                                                        Marsha K. Gamberoni, Director
                                                                        Division of Reactor Safety
              Docket Nos. 50-289
              License Nos. DPR-50
              Enclosure:        Inspection Report 05000289/2008402
                                    w/Attachment: Supplemental Information
                                (CONTAINS SAFEGUARDS INFORMATION (SGI))
DOCUMENT NAME: A:\TMI BI 2008 Att 5 SGI Report 02-4-8-08 Rev 8.doc
SUNSI Review Complete: JMT                            (Reviewer=s Initials) ADAMS ACCESSION NO. ML080840016
After declaring this document AAn Official Agency Record,@ the letter only will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" =
No copy
OFFICE        RI/DRS                    E RI/DRS                          RI/DRS                  RI/DRS/SRA                RI/DRP
NAME          GSmith/JMT for*                DJohnson/JMT for*            DCaron/DCC              WSchmidt/WLS              RBellamy/GSB for
DATE          03/10/08                      03/10/08                      03/20/08                03/11/08                  03/11/08
OFFICE        RI/DRS                        RI/ORA                        HQ/NSIR                RI/DRS
NAME          JTrapp/JMT*                    RSummers/RJS*                RCorreia/via            MGamberoni/MKG
                                              w/comments                    email to RJS
DATE          03/20/08                      03/20/08                      03/20/08                03/20/08
                                                    OFFICIAL RECORD COPY
* See Previous Concurrence Page
                                                        SAFEGUARDS INFORMATION


                                SAFEGUARDS INFORMATION
The inspection examined activities conducted under your license as they relate to security and
                                                4
compliance with the Commission's rules and regulations and with the conditions of your license.
cc w/encl w/SGI:
The inspectors reviewed selected procedures and records, observed activities, and interviewed
D. Mohre, Security Manager, TMI
personnel.
D. Allard, Director, PA Department of Environmental Protection
 
Based on the results of this inspection, a finding was identified which was preliminarily
determined to be greater than very low safety significance (i.e., greater than Green as
determined by the Physical Protection Significance Determination Process (PPSDP)).  The
deficiency was identified by the licensee.  Recognizing local sensitivities related to the
identification of inattentive officers at another facility last year, the staff notes that this finding does not involve inattentive security officers.
 
  Warning:  Violation of section 147 of the Atomic
Energy Act, A Safeguards Information
@ is subject to civil and criminal penalties
  SAFEGUARDS INFORMATION DETERMINATION  MADE BY:
NAME/TITLE: James Trapp, Chief
ORGANIZATION:  RI/DRS/PSB1
BASIS: DG-SG-1:_(300) Physical Protection Program
SIGNATURE___/RA/__________  DATE:_03/20/08
SAFEGUARDS INFORMATION
C. Pardee 2 SAFEGUARDS INFORMATION
  The deficiency was promptly corrected or compensated for, and the plant was in compliance
with applicable physical protection and security requirements within the scope of this inspection
before the inspectors left the site.  The finding is also an apparent violation (AV) of NRC
requirements and is being considered for escalated enforcement action in accordance with the
Enforcement Policy, which can be found on the NRC's Web Site at http:// www.nrc.gov/reading-room/adams.html.
 
Before we make a final significance decision regarding the preliminary "greater than Green"
findings, we are providing you an opportunity (1) to attend a Regulatory Conference where you
can present to the NRC your perspective on the facts and assumptions the NRC used to arrive
at the finding and assess its significance, or (2) submit your position on the finding to the NRC in
writing.  If you request a Regulatory Conference, it should be held within 30 days of the receipt of
this letter and we encourage you to submit supporting documentation at least one week prior to
the conference in an effort to make the conference more efficient and effective.  If a Regulatory
Conference is held, it will be closed to public observation because it involves security sensitive information.  If you decide to submit only a written response, such submittal should be sent to
the NRC within 30 days of the receipt of this letter.  If you decline a Regulatory Conference and
choose not to submit a written response, the NRC will proceed with its final
determinat
ion. 
Please contact Mr. James Trapp of my staff at (610) 337- 5186 within 10 business days of the
date of your receipt of this letter to notify the NRC of your intentions.  If we have not heard from
you within 10 days, we will continue with our significance det
ermination
decision.
You will be advised by separate correspondence of the results of
our deliberat
ions on this matter.  No response regarding the apparent violation is required at this time.  Since the NRC
has not made a final determination in this matter, no Notice of Violation is being issued for this
inspection finding at this time.  In addition, please be advised that the number and
characterization of the apparent violation described in the enclosed inspection report may
change as a result of further NRC review.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRC's document system, ADAMS.  ADAMS is
accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  However, because of the security-related concerns contained in the
enclosure, and in accordance with 10 CFR 73.21, a copy of this
letter's enclosure will not be available for public inspection. 
SAFEGUARDS INFORMATION
C. Pardee    3 SAFEGUARDS INFORMATION
  In accordance with 10 CFR 2.390(b) (1) (ii), the NRC is waiving the affidavit requirements for
your response, if any.  This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's
document system, ADAMS.  If Safeguards Information is necessary to provide an acceptable
response, please provide the level of protection described in 10 CFR 73.21.  Otherwise, mark
your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow
the instructions for withholding in 10 CFR 2.390(b) (1).
 
Sincerely,        /RA/ 
Marsha K. Gamberoni, Director
Division of Reactor Safety
Docket Nos. 50-289
License Nos. DPR-50
 
Enclosure: Inspection Report 05000289/2008402    w/Attachment: Supplemental Information (CONTAINS SAFEGUARDS INFORMATION (SGI))
 
SAFEGUARDS INFORMATION
C. Pardee    3 SAFEGUARDS INFORMATION
  In accordance with 10 CFR 2.390(b) (1) (ii), the NRC is waiving the affidavit requirements for
your response, if any.  This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's
document system, ADAMS.  If Safeguards Information is necessary to provide an acceptable
response, please provide the level of protection described in 10 CFR 73.21.  Otherwise, mark
your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow
the instructions for withholding in 10 CFR 2.390(b) (1).
 
Sincerely,        /RA/ 
Marsha K. Gamberoni, Director
Division of Reactor Safety
Docket Nos. 50-289
License Nos. DPR-50
 
Enclosure: Inspection Report 05000289/2008402    w/Attachment: Supplemental Information (CONTAINS SAFEGUARDS INFORMATION (SGI))
DOCUMENT NAME:  A:\TMI  BI 2008 Att 5 SGI Report 02-4-8-08 Rev 8.doc SUNSI Review Complete:    JMT          (Reviewer
=s Initials)    ADAMS ACCESSION NO. ML080840016 After declaring this document
AAn Official Agency Record,@ the letter only will be released to the Public. To receive a copy of this document, indicate in the box: 
" C" = Copy without attachment/enclosure  " E" = Copy with attachment/enclosure  " N" = No copy  OFFICE  RI/DRS  E  RI/DRS    RI/DRS    RI/DRS/SRA
  RI/DRP    NAME  GSmith/JMT for*
DJohnson/JMT for* 
DCaron/DCC 
WSchmidt/WLS
RBellamy/GSB for
DATE  03/10/08  03/10/08 03/20/08  03/11/08  03/11/08  OFFICE RI/DRS    RI/ORA    HQ/NSIR    RI/DRS        NAME  JTrapp/JMT*
RSummers/RJS* w/comments RCorreia/via email to RJS
MGamberoni/MKG
 
DATE  03/20/08 03/20/08 03/20/08
03/20/08    OFFICIAL RECORD COPY * See Previous Concurrence Page 
SAFEGUARDS INFORMATION
4 SAFEGUARDS INFORMATION
  cc w/encl w/SGI
: D. Mohre, Security Manager, TMI
D. Allard, Director, PA Department of Environmental Protection  
J. Powers, Director, PA Office of Homeland Security
J. Powers, Director, PA Office of Homeland Security
 
cc w/o encl w/o SGI:
cc w/o encl w/o SGI
C. Crane, Executive Vice President and Chief Operating Officer, Exelon Generation
: C. Crane, Executive Vice President and Chief Operating Officer, Exelon Generation  
W. Noll, Site Vice President - TMI Unit 1, AmerGen
W. Noll, Site Vice President - TMI Unit 1, AmerGen  
T. Dougherty, Plant Manager - TMI, Unit 1, AmerGen
T. Dougherty, Plant Manager - TMI, Unit 1, AmerGen  
Manager, Regulatory Assurance - TMI, Unit 1, AmerGen
Manager, Regulatory Assurance - TMI, Unit 1, AmerGen  
Senior Vice President - Nuclear Services, AmerGen
Senior Vice President - Nuclear Services, AmerGen  
Senior Vice President - Mid-Atlantic Operations, AmerGen
Senior Vice President - Mid-Atlantic Operations, AmerGen  
Senior Vice President - Operations Support, AmerGen
Senior Vice President - Operations Support, AmerGen  
Vice President - Licensing and Regulatory Affairs, AmerGen
Vice President - Licensing and Regulatory Affairs, AmerGen  
Director Licensing - AmerGen
Director Licensing - AmerGen  
Manager Licensing - TMI, AmerGen
Manager Licensing - TMI, AmerGen  
Vice President - General Counsel and Secretary, AmerGen
Vice President - General Counsel and Secretary, AmerGen  
T. ONeill, Associate General Counsel, Exelon Generation Company
T. O'Neill, Associate General Counsel, Exelon Generation Company J. Fewell, Esq., Assistant General Counsel, Exelon Nuclear  
J. Fewell, Esq., Assistant General Counsel, Exelon Nuclear
Correspondence Control Desk - AmerGen  
Correspondence Control Desk - AmerGen
Chairman, Board of County Commissioners of Dauphin County  
Chairman, Board of County Commissioners of Dauphin County
Chairman, Board of Supervisors of Londonderry Township  
Chairman, Board of Supervisors of Londonderry Township
R. Janati, Director, Bureau of Radiation Protection, State of PA  
R. Janati, Director, Bureau of Radiation Protection, State of PA
J. Johnsrud, National Energy Committee  
J. Johnsrud, National Energy Committee
E. Epstein, TMI-Alert (TMIA)  
E. Epstein, TMI-Alert (TMIA)
R. French, Director, PA Emergency Management Agency
R. French, Director, PA Emergency Management Agency
SAFEGUARDS INFORMATION
                                SAFEGUARDS INFORMATION
5 SAFEGUARDS INFORMATION
  Distribution w/o encl w/o SGI, Via e-mail
: S. Collins, RA
M. Dapas, DRA
D. Lew, DRP
J. Clifford, DRP
R. Bellamy, DRP
S. Barber, DRP
A. Rosebrook, DRP
J. Brand, DRP, Resident Inspector
C. LaRegina, DRP, OA
G. West, RI OEDO
P. Bamford, PM, NRR
E. Miller, NRR, Backup
J. Lubinski, NRR
H. Chernoff, NRR
ROPreports@nrc.gov
Region I Docket Room (with concurrences)
D. Holody, ORA, RI
K. Farrar, ORA, RI
R. Summers, ORA, RI
A. DeFrancisco, ORA, RI
C. O'Daniell, ORA, RI
M. Gamberoni, DRS
D. Roberts, DRS
J. Trapp, DRS


                                SAFEGUARDS INFORMATION
Distribution w/encl w/SGI
                                          5
: G. Smith, DRS  
Distribution w/o encl w/o SGI, Via e-mail:
D. Kern, DRP, Sr. Resident Inspector  
S. Collins, RA
M. Dapas, DRA
D. Lew, DRP
J. Clifford, DRP
R. Bellamy, DRP
S. Barber, DRP
A. Rosebrook, DRP
J. Brand, DRP, Resident Inspector
C. LaRegina, DRP, OA
G. West, RI OEDO
P. Bamford, PM, NRR
E. Miller, NRR, Backup
J. Lubinski, NRR
H. Chernoff, NRR
ROPreports@nrc.gov
Region I Docket Room (with concurrences)
D. Holody, ORA, RI
K. Farrar, ORA, RI
R. Summers, ORA, RI
A. DeFrancisco, ORA, RI
C. ODaniell, ORA, RI
M. Gamberoni, DRS
D. Roberts, DRS
J. Trapp, DRS
Distribution w/encl w/SGI:
G. Smith, DRS
D. Kern, DRP, Sr. Resident Inspector
D. Riffle, NSIR
D. Riffle, NSIR
                                SAFEGUARDS INFORMATION
}}
}}

Revision as of 18:28, 14 November 2019

IR 05000289-08-402; on 02/04/2008 - 02/08/2008; Three Mile Island, Unit 1; Protective Strategy. (Cover Letter)
ML080840016
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/20/2008
From: Gamberoni M
Division of Reactor Safety I
To: Pardee C
Exelon Generation Co
References
EA-08-064 IR-08-402
Download: ML080840016 (6)


See also: IR 05000289/2008402

Text

SAFEGUARDS INFORMATION

March 20, 2008

EA-08-064

Enclosure Contains Safeguards Information.

When Separated from enclosure, this

document is not Safeguards Information.

Mr. Charles G. Pardee

Chief Nuclear Officer and Senior Vice President

Exelon Generation Company, LLC

200 Exelon Way, KSA 3-E

Kennett Square, PA 19348

SUBJECT: THREE MILE ISLAND, UNIT 1 - NRC PHYSICAL SECURITY BASELINE

INSPECTION REPORT 05000289/2008402; PRELIMINARY GREATER THAN

GREEN FINDING

Dear Mr. Pardee:

On February 8, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security

baseline inspection at your Three Mile Island, Unit 1 facility. The inspection covered one or

more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.

The enclosed inspection report documents the inspection results, which were discussed on

February 8, 2008, with Mr. Thomas Dougherty, Plant Manager and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and

compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed

personnel.

Based on the results of this inspection, a finding was identified which was preliminarily

determined to be greater than very low safety significance (i.e., greater than Green as

determined by the Physical Protection Significance Determination Process (PPSDP)). The

deficiency was identified by the licensee. Recognizing local sensitivities related to the

identification of inattentive officers at another facility last year, the staff notes that this finding

does not involve inattentive security officers.

SAFEGUARDS INFORMATION DETERMINATION

Warning: Violation of section 147 of the Atomic

MADE BY:

Energy Act, ASafeguards Information@ is subject to

NAME/TITLE: James Trapp, Chief

civil and criminal penalties

ORGANIZATION: RI/DRS/PSB1

BASIS: DG-SG-1:_(300) Physical Protection Program

SIGNATURE___/RA/__________ DATE:_03/20/08_

SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION

C. Pardee 2

The deficiency was promptly corrected or compensated for, and the plant was in compliance

with applicable physical protection and security requirements within the scope of this inspection

before the inspectors left the site. The finding is also an apparent violation (AV) of NRC

requirements and is being considered for escalated enforcement action in accordance with the

Enforcement Policy, which can be found on the NRCs Web Site at http:// www.nrc.gov/reading-

room/adams.html.

Before we make a final significance decision regarding the preliminary greater than Green

findings, we are providing you an opportunity (1) to attend a Regulatory Conference where you

can present to the NRC your perspective on the facts and assumptions the NRC used to arrive

at the finding and assess its significance, or (2) submit your position on the finding to the NRC in

writing. If you request a Regulatory Conference, it should be held within 30 days of the receipt of

this letter and we encourage you to submit supporting documentation at least one week prior to

the conference in an effort to make the conference more efficient and effective. If a Regulatory

Conference is held, it will be closed to public observation because it involves security sensitive

information. If you decide to submit only a written response, such submittal should be sent to

the NRC within 30 days of the receipt of this letter. If you decline a Regulatory Conference and

choose not to submit a written response, the NRC will proceed with its final determination.

Please contact Mr. James Trapp of my staff at (610) 337- 5186 within 10 business days of the

date of your receipt of this letter to notify the NRC of your intentions. If we have not heard from

you within 10 days, we will continue with our significance determination decision.

You will be advised by separate correspondence of the results of our deliberations on this

matter. No response regarding the apparent violation is required at this time. Since the NRC

has not made a final determination in this matter, no Notice of Violation is being issued for this

inspection finding at this time. In addition, please be advised that the number and

characterization of the apparent violation described in the enclosed inspection report may

change as a result of further NRC review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is

accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room). However, because of the security-related concerns contained in the

enclosure, and in accordance with 10 CFR 73.21, a copy of this letters enclosure will not be

available for public inspection.

SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION

C. Pardee 3

In accordance with 10 CFR 2.390(b) (1) (ii), the NRC is waiving the affidavit requirements for

your response, if any. This practice will ensure that your response will not be made available

electronically for public inspection in the NRC Public Document Room or from the NRCs

document system, ADAMS. If Safeguards Information is necessary to provide an acceptable

response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark

your entire response Security-Related Information - Withhold Under 10 CFR 2.390 and follow

the instructions for withholding in 10 CFR 2.390(b) (1).

Sincerely,

/RA/

Marsha K. Gamberoni, Director

Division of Reactor Safety

Docket Nos. 50-289

License Nos. DPR-50

Enclosure: Inspection Report 05000289/2008402

w/Attachment: Supplemental Information

(CONTAINS SAFEGUARDS INFORMATION (SGI))

SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION

C. Pardee 3

In accordance with 10 CFR 2.390(b) (1) (ii), the NRC is waiving the affidavit requirements for

your response, if any. This practice will ensure that your response will not be made available

electronically for public inspection in the NRC Public Document Room or from the NRCs

document system, ADAMS. If Safeguards Information is necessary to provide an acceptable

response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark

your entire response Security-Related Information - Withhold Under 10 CFR 2.390 and follow

the instructions for withholding in 10 CFR 2.390(b) (1).

Sincerely,

/RA/

Marsha K. Gamberoni, Director

Division of Reactor Safety

Docket Nos. 50-289

License Nos. DPR-50

Enclosure: Inspection Report 05000289/2008402

w/Attachment: Supplemental Information

(CONTAINS SAFEGUARDS INFORMATION (SGI))

DOCUMENT NAME: A:\TMI BI 2008 Att 5 SGI Report 02-4-8-08 Rev 8.doc

SUNSI Review Complete: JMT (Reviewer=s Initials) ADAMS ACCESSION NO. ML080840016

After declaring this document AAn Official Agency Record,@ the letter only will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" =

No copy

OFFICE RI/DRS E RI/DRS RI/DRS RI/DRS/SRA RI/DRP

NAME GSmith/JMT for* DJohnson/JMT for* DCaron/DCC WSchmidt/WLS RBellamy/GSB for

DATE 03/10/08 03/10/08 03/20/08 03/11/08 03/11/08

OFFICE RI/DRS RI/ORA HQ/NSIR RI/DRS

NAME JTrapp/JMT* RSummers/RJS* RCorreia/via MGamberoni/MKG

w/comments email to RJS

DATE 03/20/08 03/20/08 03/20/08 03/20/08

OFFICIAL RECORD COPY

  • See Previous Concurrence Page

SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION

4

cc w/encl w/SGI:

D. Mohre, Security Manager, TMI

D. Allard, Director, PA Department of Environmental Protection

J. Powers, Director, PA Office of Homeland Security

cc w/o encl w/o SGI:

C. Crane, Executive Vice President and Chief Operating Officer, Exelon Generation

W. Noll, Site Vice President - TMI Unit 1, AmerGen

T. Dougherty, Plant Manager - TMI, Unit 1, AmerGen

Manager, Regulatory Assurance - TMI, Unit 1, AmerGen

Senior Vice President - Nuclear Services, AmerGen

Senior Vice President - Mid-Atlantic Operations, AmerGen

Senior Vice President - Operations Support, AmerGen

Vice President - Licensing and Regulatory Affairs, AmerGen

Director Licensing - AmerGen

Manager Licensing - TMI, AmerGen

Vice President - General Counsel and Secretary, AmerGen

T. ONeill, Associate General Counsel, Exelon Generation Company

J. Fewell, Esq., Assistant General Counsel, Exelon Nuclear

Correspondence Control Desk - AmerGen

Chairman, Board of County Commissioners of Dauphin County

Chairman, Board of Supervisors of Londonderry Township

R. Janati, Director, Bureau of Radiation Protection, State of PA

J. Johnsrud, National Energy Committee

E. Epstein, TMI-Alert (TMIA)

R. French, Director, PA Emergency Management Agency

SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION

5

Distribution w/o encl w/o SGI, Via e-mail:

S. Collins, RA

M. Dapas, DRA

D. Lew, DRP

J. Clifford, DRP

R. Bellamy, DRP

S. Barber, DRP

A. Rosebrook, DRP

J. Brand, DRP, Resident Inspector

C. LaRegina, DRP, OA

G. West, RI OEDO

P. Bamford, PM, NRR

E. Miller, NRR, Backup

J. Lubinski, NRR

H. Chernoff, NRR

ROPreports@nrc.gov

Region I Docket Room (with concurrences)

D. Holody, ORA, RI

K. Farrar, ORA, RI

R. Summers, ORA, RI

A. DeFrancisco, ORA, RI

C. ODaniell, ORA, RI

M. Gamberoni, DRS

D. Roberts, DRS

J. Trapp, DRS

Distribution w/encl w/SGI:

G. Smith, DRS

D. Kern, DRP, Sr. Resident Inspector

D. Riffle, NSIR

SAFEGUARDS INFORMATION