ML17208A358: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 6: Line 6:
| number = ML17266A158
| number = ML17266A158
| issue date = 03/17/1980
| issue date = 03/17/1980
| title = Forwards LER 80-010/03L-0
| title = LER 80-010/03L-0:on 800217,during 100% Power Operation, Control Element Assembly 65 Dropped to Full Insertion When Selected to Manual Insertion for A.S.I. Damping.Cause Undetermined.Assembly Operated Properly in Normal Position
| author name = Schoppman M
| author name = Schoppman M
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.

Latest revision as of 11:27, 8 March 2020

Forwards LER 80-010/03L-0
Date released: 01/25/2018 Download: ML17208A358


LER 80-010/03L-0:on 800217,during 100% Power Operation, Control Element Assembly 65 Dropped to Full Insertion When Selected to Manual Insertion for A.S.I. Damping.Cause Undetermined.Assembly Operated Properly in Normal Position
ML17266A158
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/17/1980
From: Schoppman M
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17266A158 (2)
Forwards LER 80-010/03L-0
ML17208A357
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/17/1980
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17208A357 (2)