ML18024A677: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 6: Line 6:
| number = ML18024A678
| number = ML18024A678
| issue date = 02/08/1979
| issue date = 02/08/1979
| title = Forwards LER 79-001/03L-0
| title = LER 79-001/03L-0 on 790113:during Test of high-pressure Injection Coolant Sys,Steam Supply Valve FCV-73-16 Failed to Open,Rendering Sys Inoperative.Caused by Failure of Limitorque Valve Operator Limit Switch
| author name =  
| author name =  
| author affiliation = TENNESSEE VALLEY AUTHORITY
| author affiliation = TENNESSEE VALLEY AUTHORITY

Latest revision as of 13:48, 6 March 2020

Forwards LER 79-001/03L-0
Date released: 09/27/2018 Download: ML18024A677


LER 79-001/03L-0 on 790113:during Test of high-pressure Injection Coolant Sys,Steam Supply Valve FCV-73-16 Failed to Open,Rendering Sys Inoperative.Caused by Failure of Limitorque Valve Operator Limit Switch
ML18024A678
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 02/08/1979
From:
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18024A678 (4)
Forwards LER 79-001/03L-0
ML18024A676
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 02/09/1979
From: Fox H
TENNESSEE VALLEY AUTHORITY
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18024A676 (2)