ML18113A975: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 6: | Line 6: | ||
| number = ML18113A976 | | number = ML18113A976 | ||
| issue date = 04/04/1979 | | issue date = 04/04/1979 | ||
| title = | | title = LER 79-006/03L-0 on 790309:fire Seals in Barrier Penetration Were Removed & Not Replaced.Leak Test Not Performed on Other Seals That Had Been Reinstalled.Caused by Inadequate Administrative Control | ||
| author name = Stewart W | | author name = Stewart W | ||
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) | | author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) | ||
Latest revision as of 14:42, 25 January 2020
| Date released: 12/10/2018 | Download: ML18113A975 |
|---|---|
| ML18113A976 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 04/04/1979 |
| From: | Stewart W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| Download: ML18113A976 (3) | |
| ML18113A974 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 04/04/1979 |
| From: | Stallings C VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| Download: ML18113A974 (1) | |