{{#Wiki_filter:consumers | {{#Wiki_filter:consumers Power POWERING MICHIGAN'S. | ||
Power POWERING MICHIGAN'S. | PROGRESS . Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 : | ||
PROGRESS . Palisades | * July 6, 1993 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 GB Slade General Manager DOCKET | ||
Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 : * July 6, 1993 Nuclear Regulatory | |||
Commission | |||
Document Control Desk Washington, DC 20555 GB Slade General Manager DOCKET | |||
-LICENSE | -LICENSE | ||
- | - | ||
PLANT -REPLY TO NOTICE OF VIOLATION; | PLANT -REPLY TO NOTICE OF VIOLATION; NRC INSPECTION REPORT No .. 92-028 -EXTENSION OF COMPLETION DATE NRC Inspection Report No. 92028, dated january 21, 1993, _forwarded the results of the NRC inspection conducted from December 7 through 18, 1992 in the area of irtservice testing. The inspection report identified an apparent violation of NRC requirements pertaining to inadequate acceptance criteria to verify . that the Primary Coolant System (PCS) loop check valves and Low Pressure Injection (lPSI) check valves were exercised to their full open position. | ||
NRC INSPECTION | Our reply to the of Vio.lation was dated February 22, 1993. Corrective action 4, in the reply to the Notice of Violation to avoid non-compliance, was a verification that the check valve part of ISi program would be reviewed to verify that; (a) all check valves* requiring full flow testing are -included in th_e valve testing program, (b) the correct required flow rates and basis for the flow rate are properly listed for each . check valve in the valve testing program, and (c) all test protedures that take.credit for full flow testing state the correct flow rates as acceptance criteria. | ||
REPORT No .. 92-028 -EXTENSION | These actions were proposed to be completed by July 15, 1993 which was the forecast end of the refueling outage. . . . Because of the other work activities have higher priority, we are extending the forecast cdmpletion date of corrective action 4 in our reply to the Notice of Violation from July 15, 1993 until December 1, 1993. Specific actions for verification that the PCS and LPSI check valves will go to their full open position during flow testing are on schedule for completion during the ongoing 1993 refueling outage. Gerald B Slade General Manager . CC: Administrator, Region Ill Resident Inspector, Palisades 9307140226 930706 PDR ADOCK 05000255 G PDR \IJ: . . ?'.*" A cMs ENERGY COMPANY *}} | ||
OF COMPLETION | |||
DATE NRC Inspection | |||
Report No. 92028, dated january 21, 1993, _forwarded | |||
the results of the NRC inspection | |||
conducted | |||
from December 7 through 18, 1992 in the area of irtservice | |||
testing. The inspection | |||
report identified | |||
an apparent violation | |||
of NRC requirements | |||
pertaining | |||
to inadequate | |||
acceptance | |||
criteria to verify . that the Primary Coolant System (PCS) loop check valves and Low Pressure | |||
Injection (lPSI) check valves were exercised | |||
to their full open position. | |||
Our reply to the | |||
of Vio.lation | |||
was dated February 22, 1993. Corrective | |||
action 4, in the reply to the Notice of Violation | |||
to avoid | |||
non-compliance, was a verification | |||
that the check valve part of ISi program would be reviewed to verify that; (a) all check valves* requiring | |||
full flow testing are -included | |||
in th_e valve testing program, (b) the correct required flow rates and basis for the flow rate are properly listed for each . check valve in the valve testing program, and (c) all test protedures | |||
that take.credit | |||
for full flow testing state the correct flow rates as acceptance | |||
criteria. | |||
These actions were proposed to be completed | |||
by July 15, 1993 which was the forecast end of the refueling | |||
outage. . . . Because of the other work activities | |||
have | |||
higher priority, we are extending | |||
the forecast cdmpletion | |||
date of corrective | |||
action 4 in our reply to the Notice of Violation | |||
from July 15, 1993 until December 1, 1993. Specific | |||
actions for verification | |||
that the PCS and LPSI check valves will go to their full open position during flow testing are on schedule for completion | |||
during the ongoing 1993 refueling | |||
outage. Gerald B Slade General Manager . CC: Administrator, Region Ill Resident Inspector, Palisades | |||
9307140226 | |||
930706 PDR ADOCK 05000255 G PDR \IJ: . . ?'.*" A cMs ENERGY COMPANY * | |||
}} | |||
Revision as of 23:40, 16 August 2019
| ML18058B917 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 07/06/1993 |
| From: | Slade G CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9307140226 | |
| Download: ML18058B917 (1) | |
Text
consumers Power POWERING MICHIGAN'S.
PROGRESS . Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 :
- July 6, 1993 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 GB Slade General Manager DOCKET
-LICENSE
-
PLANT -REPLY TO NOTICE OF VIOLATION; NRC INSPECTION REPORT No ..92-028 -EXTENSION OF COMPLETION DATE NRC Inspection Report No. 92028, dated january 21, 1993, _forwarded the results of the NRC inspection conducted from December 7 through 18, 1992 in the area of irtservice testing. The inspection report identified an apparent violation of NRC requirements pertaining to inadequate acceptance criteria to verify . that the Primary Coolant System (PCS) loop check valves and Low Pressure Injection (lPSI) check valves were exercised to their full open position.
Our reply to the of Vio.lation was dated February 22, 1993. Corrective action 4, in the reply to the Notice of Violation to avoid non-compliance, was a verification that the check valve part of ISi program would be reviewed to verify that; (a) all check valves* requiring full flow testing are -included in th_e valve testing program, (b) the correct required flow rates and basis for the flow rate are properly listed for each . check valve in the valve testing program, and (c) all test protedures that take.credit for full flow testing state the correct flow rates as acceptance criteria.
These actions were proposed to be completed by July 15, 1993 which was the forecast end of the refueling outage. . . . Because of the other work activities have higher priority, we are extending the forecast cdmpletion date of corrective action 4 in our reply to the Notice of Violation from July 15, 1993 until December 1, 1993. Specific actions for verification that the PCS and LPSI check valves will go to their full open position during flow testing are on schedule for completion during the ongoing 1993 refueling outage. Gerald B Slade General Manager . CC: Administrator, Region Ill Resident Inspector, Palisades 9307140226 930706 PDR ADOCK 05000255 G PDR \IJ: . . ?'.*" A cMs ENERGY COMPANY *