{{#Wiki_filter:UNCOMPLETED ITAAC NOTIFICATION CHECKLIST (UINC)
A Lead Reviewer in concert with other reviewer(s) assigned to an uncompleted ITAAC notification (UIN) review will complete this form for the ITAAC under review.
Docket No:          5200025                            Plant Name:        Vogtle Unit 3 Combined License Licensee Name:      Southern Nuclear Operating          Combined            NPF-91 Company, Inc.                      License No:
ITAAC ID No:        E.3.9.03.00.02                      ITAAC Type:        Targeted ITAAC Family Designation or      18D enter N/A:
Uncompleted ITAAC Notification (UIN) ADAMS ML No:                            ML18362A184 Name of Lead Reviewer:                                                      Kleeh, Edmund Name of Technical Reviewer assigned to UIN Review based on an affirmative response to statement f below:
Name of the Technical Reviewer:                    Musico, Bruce Enter Yes in the blank at the beginning of a statement below if the whole statement is true, No if the whole or part of the statement is not true, and N/A if the statement is not applicable.
: a.      Yes      The UIN identifies all of the following: (1) licensee, (2) plant site name, (3) unit number, and (4) plants docket number.
: b.      Yes      The ITAAC as stated in the UIN matches the ITAAC as stated in the combined license.
: c.      Yes      NRC personnel with the requisite technical and engineering knowledge has/have determined that the ITAAC Completion Description (ICD) of the UIN contains sufficient information, including summarizing the methodology for performing the ITAAC, to demonstrate that the licensee will successfully perform the inspection, test, and/or analysis stated in the ITAAC if the licensee uses the methodology described in the UIN.
The methodology described in the ICD of the UIN either was reviewed and approved by the NRC, or is acceptable based on sound scientific, mathematical, and/or engineering principles, and is repeatable, if necessary, without any significant change to the reported result.
: d.      Yes      NRC personnel with the requisite technical and engineering knowledge has/have determined that the ICD of the UIN contains sufficient information to demonstrate that the licensee will be able to show that it has fully met the entire acceptance criterion stated in the ITAAC if it performs the ITAAC as stated in the UIN.
: e.      N/A      For ITAAC specified as being performed on as-built structures, systems, or components (SSCs): If the UIN indicates that the Page 1 of 2
 
UNCOMPLETED ITAAC NOTIFICATION CHECKLIST (UINC) inspections, tests, and/or analyses of the ITAAC are being performed at location(s) other than the final installed location, then the UIN, based on the guidance in NEI 08-01 either summarizes a technical justification or provides a reference to a generic technical justification in the ICD of the UIN that establishes why it is acceptable to perform the ITAAC at location(s) other than the final installed location. [Enter N/A if the ITAAC is not being performed at a remote location or if the ITAAC is not specified as as-built.]
: f.      Yes      An additional reviewer was assigned to the UIN review with his or her name entered into the blank at the top of this page based on his or her expertise being required If the NRC reviewers determine that a UIN has sufficient information, this is based on the UINs description of the proposed methodology for completing the ITAAC. The UIN review is not based on consideration of actual performance of the ITAAC, the acceptance criteria results, the completion of NRC inspections, or the resolution of NRC inspection findings, if any. These matters will be addressed during the NRCs review of the later ITAAC closure notification (ICN) for that ITAAC. The NRC staff plans to rely on a UIN review in its review of the later ICN to the extent that the ITAAC completion methods described in the UIN and ICN are the same, subject to new information that might arise between the UIN and ICN reviews.
Lead Reviewer: Kleeh, Edmund                                                          Date: 1/9/2019 Lead Approver: Welch, Christopher                                                    Date: 1/9/2019 Licensing PM: Hoellman, Jordan Technical Reviewer: Musico, Bruce                                                    Date: 1/8/2019 Technical Approver:    Anderson, Joseph                                              Date: 1/8/2019 Page 2 of 2}}

Latest revision as of 06:50, 20 October 2019

Uncompleted ITAAC Notification Checklist (UINC) 3766 for ITAAC E.3.9.03.00.02 (Index No. 848) for Vogtle Unit 3
ML19015A283
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 01/09/2019
From:
NRC/NRO/DCIP/CIPB
To:
Kleeh E, NRO/DCIP
References
ITAAC E.3.9.03.00.02
Download: ML19015A283 (2)


Text

UNCOMPLETED ITAAC NOTIFICATION CHECKLIST (UINC)

A Lead Reviewer in concert with other reviewer(s) assigned to an uncompleted ITAAC notification (UIN) review will complete this form for the ITAAC under review.

Docket No: 5200025 Plant Name: Vogtle Unit 3 Combined License Licensee Name: Southern Nuclear Operating Combined NPF-91 Company, Inc. License No:

ITAAC ID No: E.3.9.03.00.02 ITAAC Type: Targeted ITAAC Family Designation or 18D enter N/A:

Uncompleted ITAAC Notification (UIN) ADAMS ML No: ML18362A184 Name of Lead Reviewer: Kleeh, Edmund Name of Technical Reviewer assigned to UIN Review based on an affirmative response to statement f below:

Name of the Technical Reviewer: Musico, Bruce Enter Yes in the blank at the beginning of a statement below if the whole statement is true, No if the whole or part of the statement is not true, and N/A if the statement is not applicable.

a. Yes The UIN identifies all of the following: (1) licensee, (2) plant site name, (3) unit number, and (4) plants docket number.
b. Yes The ITAAC as stated in the UIN matches the ITAAC as stated in the combined license.
c. Yes NRC personnel with the requisite technical and engineering knowledge has/have determined that the ITAAC Completion Description (ICD) of the UIN contains sufficient information, including summarizing the methodology for performing the ITAAC, to demonstrate that the licensee will successfully perform the inspection, test, and/or analysis stated in the ITAAC if the licensee uses the methodology described in the UIN.

The methodology described in the ICD of the UIN either was reviewed and approved by the NRC, or is acceptable based on sound scientific, mathematical, and/or engineering principles, and is repeatable, if necessary, without any significant change to the reported result.

d. Yes NRC personnel with the requisite technical and engineering knowledge has/have determined that the ICD of the UIN contains sufficient information to demonstrate that the licensee will be able to show that it has fully met the entire acceptance criterion stated in the ITAAC if it performs the ITAAC as stated in the UIN.
e. N/A For ITAAC specified as being performed on as-built structures, systems, or components (SSCs): If the UIN indicates that the Page 1 of 2

UNCOMPLETED ITAAC NOTIFICATION CHECKLIST (UINC) inspections, tests, and/or analyses of the ITAAC are being performed at location(s) other than the final installed location, then the UIN, based on the guidance in NEI 08-01 either summarizes a technical justification or provides a reference to a generic technical justification in the ICD of the UIN that establishes why it is acceptable to perform the ITAAC at location(s) other than the final installed location. [Enter N/A if the ITAAC is not being performed at a remote location or if the ITAAC is not specified as as-built.]

f. Yes An additional reviewer was assigned to the UIN review with his or her name entered into the blank at the top of this page based on his or her expertise being required If the NRC reviewers determine that a UIN has sufficient information, this is based on the UINs description of the proposed methodology for completing the ITAAC. The UIN review is not based on consideration of actual performance of the ITAAC, the acceptance criteria results, the completion of NRC inspections, or the resolution of NRC inspection findings, if any. These matters will be addressed during the NRCs review of the later ITAAC closure notification (ICN) for that ITAAC. The NRC staff plans to rely on a UIN review in its review of the later ICN to the extent that the ITAAC completion methods described in the UIN and ICN are the same, subject to new information that might arise between the UIN and ICN reviews.

Lead Reviewer: Kleeh, Edmund Date: 1/9/2019 Lead Approver: Welch, Christopher Date: 1/9/2019 Licensing PM: Hoellman, Jordan Technical Reviewer: Musico, Bruce Date: 1/8/2019 Technical Approver: Anderson, Joseph Date: 1/8/2019 Page 2 of 2