ENS 53057: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 11/07/2017 03:37 CST
| event date = 11/07/2017 03:37 CST
| last update date = 11/07/2017
| last update date = 11/07/2017
| title = Loss Of Inbound Commercial Lines And Fts Lines To Facility
| title = Loss of Inbound Commercial Lines and Fts Lines to Facility
| event text = On November 7, 2017, at approximately 0337 (CST) hours, Waterford 3 [WF3] Control Room received a phone call from Entergy's Load Dispatcher to inform us that the NRC was unable to call Waterford 3 by ENS [emergency notification system] phone or by PABX [private automatic branch exchange] phone. The NRC was called by the Waterford 3 Control Room using the PABX at 0339 (CST) hours. However, the ENS phone could not call the NRC. Also, outside lines were not able to call in to Waterford 3.
| event text = On November 7, 2017, at approximately 0337 (CST) hours, Waterford 3 [WF3] Control Room received a phone call from Entergy's Load Dispatcher to inform us that the NRC was unable to call Waterford 3 by ENS [emergency notification system] phone or by PABX [private automatic branch exchange] phone. The NRC was called by the Waterford 3 Control Room using the PABX at 0339 (CST) hours. However, the ENS phone could not call the NRC. Also, outside lines were not able to call in to Waterford 3.
Offsite prompt Public Warning Sirens were available at all times. State and Local notification capability was available via PABX. WF3 Emergency Response Organization notification capability was available at all times. WF3 site Emergency Response Facility intercommunications were available at all times.
Offsite prompt Public Warning Sirens were available at all times. State and Local notification capability was available via PABX. WF3 Emergency Response Organization notification capability was available at all times. WF3 site Emergency Response Facility intercommunications were available at all times.

Latest revision as of 20:41, 1 March 2018

ENS 53057 +/-
Where
Waterford Entergy icon.png
Louisiana (NRC Region 4)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+1.2 h0.05 days <br />0.00714 weeks <br />0.00164 months <br />)
Opened: Matthew Naylor
10:49 Nov 7, 2017
NRC Officer: Howie Crouch
Last Updated: Nov 7, 2017
53057 - NRC Website
Loading map...