1CAN111201, Engineering Report CALC-ANO1-CS-12-00002, Rev. 0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Pages 332 Through 560: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 14: Line 14:
| document type = Report, Technical
| document type = Report, Technical
| page count = 414
| page count = 414
| project =
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:Engineering Report No. CALC-ANO I-CS-i12-00002 Attachment C Rev. 0 Page 332 of 560 Sheet I of 5 Status: YZ NEI UF-Seismic Walkdown Checklist (SWC) SWELl-065 Equipment ID No. F-52B Equip. Class' 17- ENGINE GENERATORS Equipment Description DG2 ENGINE MOUNTED TURBO FILTER Location:
{{#Wiki_filter:Engineering Report No. CALC-ANO I-CS-i12-00002 Attachment C Rev. 0 Page 332 of 560 Sheet I of 5 Status: YZ NEI UF-Seismic Walkdown Checklist (SWC)                   SWELl-065 Equipment ID No.         F-52B                     Equip. Class' 17- ENGINE GENERATORS Equipment Description DG2 ENGINE MOUNTED TURBO FILTER Location: Bldg. RAB                 Floor El. 369           Room, Area 86 Manufacturer, Model, Etc. (optional but recommended)               Electro-Motive Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Bldg. RAB Floor El. 369 Room, Area 86 Manufacturer, Model, Etc. (optional but recommended)
Anchorage
Electro-Motive Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
: 1. Is the anchorage configuration verification required (i.e., is the item one     YE] No of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YE] No of the 50% of SWEL items requiring such verification)?
No anchorage configuration verification required.
No anchorage configuration verification required.2. Is the anchorage free of bent, broken, missing or loose hardware?The anchorage is free of bent, broken, missing and loose hardware.YE NEI UE] N/AE-3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               YE NEI      UE] N/AE-The anchorageis free of bent, broken, missing and loose hardware.
: 3. Is the anchorage free of corrosion that is more than mild surface               Y'Z NEI uE- N/AE oxidation?
The anchorage is free of corrosion.
The anchorage is free of corrosion.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?This component is anchored directly to the EDG skid. No cracks in concrete around skid observed.Y'Z NEI uE- N/AE YZ NEI UE1 N/AE-I Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the                 YZ NEI      UE1 N/AE-anchors?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 333 of 560 Sheet 2 of 5 Status: Y[ NO UI-Seismic Walkdown Checklist (SWC) SWELl-065 Equipment ID No. F-52B Equip. Class2 17- ENC Fv-iinmp.nt 1l3c..rintinn  
This component is anchored directly to the EDG skid. No cracks in concrete around skid observed.
/f)(2 FN(INF MOIJNTFfl TUJRRO FILTF-R INE GENERA TORS 5. Is the anchorage configuration consistent with plant documentation?
I Enter the equipment class name from Appendix B: Classes of Equipment.
Y[-- NEI ULI N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
 
This is not applicable since it is not part of the 50% of SWEL items requiring anchorage configuration verification.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 333 of 560 Sheet 2 of 5 Status: Y[     NO UI-Seismic Walkdown Checklist (SWC)                     SWELl-065 Equipment ID No.         F-52B                     Equip. Class2 17- ENC INE GENERA TORS Fv-iinmp.nt 1l3c..rintinn /f)(2FN(INF MOIJNTFfl TUJRRO FILTF-R
: 6. Based on the above anchorage evaluations, is the anchorage free of YE N[W U[I potentially adverse seismic conditions?
: 5. Is the anchorage configuration consistent with plant documentation?         Y[-- NEI   ULI N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Based on the above anchorage evaluations, the anchorage is free of potentially adverse seismic conditions.
This is not applicablesince it is not part of the 50% of SWEL items requiringanchorage configuration verification.
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 6. Based on the above anchorage evaluations, is the anchorage free of           YE N[W U[I potentially adverse seismic conditions?
The turbocharger filter is bolted at the rear end of the diesel engine.There were no major structures or equipment that could have any significant interaction with the filter.YZ NEI UEIZ N/AEl 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NO UEL N/AEZ and masonry block walls not likely to collapse onto the equipment?
Based on the above anchorage evaluations, the anchorage is free of potentiallyadverse seismic conditions.
There is overhead duct work that is properly secured with steel hangers.9. Do attached lines have adequate flexibility to avoid damage?Attached lines have adequate flexibility.
Interaction Effects
'(Y NEI UED N/AL[10. Based on the above seismic interaction evaluations, is equipment free Y[( NE] UFl of potentially adverse seismic interaction effects?Based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.2 Enter the equipment class name from Appendix B: Classes of Equipment.
: 7. Are soft targets free from impact by nearby equipment or structures?         YZ NEI      UEIZ N/AEl The turbochargerfilter is bolted at the rearend of the diesel engine.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 334 of 560 Sheet 3 of 5 Status: YZ NE] U[-Seismic Walkdown Checklist (SWC) SWELl-065 Equipment ID No. F-52B Equip. Class3 17- ENGINE GENERATORS Equipment Description DG2 ENGINE MOUNTED TURBO FILTER Other Adverse Conditions
There were no major structures or equipment that could have any significantinteraction with the filter.
: 11. Have you looked for and found no other seismic conditions that could YZ NE] UZýadversely affect the safety functions of the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YZ NO UEL N/AEZ and masonry block walls not likely to collapse onto the equipment?
It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found.Comments (Additional pages may be added as necessary)
There is overhead duct work that is properlysecured with steel hangers.
The Turbocharger Filter is a critical component of the diesel engine. Every mounting bolt was observed to be in place. The entire engine appeared clean and well maintained.
: 9. Do attached lines have adequate flexibility to avoid damage?                 '(Y   NEI   UED N/AL[
There were no visible leaks or signs of previous leaks at any location were accessory components were bolted to the main engine block.TW ug. Vh.R-V- I OC0Isn6"%', { --Date: 10/03/2012 Evaluated by: Daniel Parker Eric Dilbone 10/03/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
Attached lines have adequate flexibility.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 335 of 560 Sheet 4 of 5 Status: Y[ NEI U-Seismic Walkdown Checklist (SWC) SWELl-065 Equipment ID No. F-52B Equip. Class4 17- ENGINE GENERATORS Equipment Description DG2 ENGINE MOUNTED TURBO FILTER Photographs Note: Note: Top of Component 4 Enter the equipment class name from Appendix B: Classes of Equipment.
: 10. Based on the above seismic interaction evaluations, is equipment free         Y[(   NE] UFl of potentially adverse seismic interaction effects?
Engineering Report No. CALC-ANO I-CS-12-00002 Attachment C Rev. 0 Page 336 of 560 Sheet 5 of 5 Status: YZ NE U-Seismic Walkdown Checklist (SWC) SWELl-065 Equipment ID No. F-52B Equip. Class5 17- ENGINE GENERATORS Equipment Description DG2 ENGINE MOUNTED TURBO FILTER Note: Component Attachment 5 Enter the equipment class name from Appendix B: Classes of Equipment.
Based on the above seismic interactionevaluations, the equipment is free of potentiallyadverse seismic interactioneffects.
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 337 of 560 Sheet I of 5 Status: YZ Nil UL]Seismic Walkdown Checklist (SWC) SWELl-066 Equipment ID No. M-225B Equip. Class, 17- Engine Generators Equipment Description DIESEL GENERATOR TURBOCHARGER Location:
2 Enter the equipment class name from Appendix B: Classes of Equipment.
Bldg. RAB Floor El. 369 Room, Area 86 Manufacturer, Model, Etc. (optional but recommended)
 
Electro-Motive T2001 Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 334 of 560 Sheet 3 of 5 Status: YZ NE]     U[-
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Seismic Walkdown Checklist (SWC)                   SWELl-065 Equipment ID No.         F-52B                     Equip. Class3 17- ENGINE GENERATORS Equipment Description DG2 ENGINE MOUNTED TURBO FILTER Other Adverse Conditions
No anchorage configuration verification required.2. Is the anchorage free of bent, broken, missing or loose hardware?The anchorage is free of bent, broken, missing and loose hardware.YD NZ YZ NEI U[- N/A[D 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 11. Have you looked for and found no other seismic conditions that could                 YZ NE] UZý adversely affect the safety functions of the equipment?
The anchorage is free of corrosion.
It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?This component is anchored directly to the EDG skid.YZ N[I UD N/A[]Y; NEI U[1 N/A[-1 Enter the equipment class name from Appendix B: Classes of Equipment.
Comments (Additional pages may be added as necessary)
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 338 of 560 Sheet 2 of 5 Status: YZ NF UI-Seismic Walkdown Checklist (SWC) SWELl-066 Equipment ID No. M-225B -Equip. Class2 17- Engine Generators Equipment Description DIESEL GENERATOR TURBOCHARGER
The TurbochargerFilteris a criticalcomponent of the diesel engine. Every mounting bolt was observed to be in place. The entire engine appearedclean and well maintained. There were no visible leaks or signs of previous leaks at any location were accessorycomponents were bolted to the main engine block.
: 5. Is the anchorage configuration consistent with plant documentation?
TW ug. Vh.R-V- IOC0Isn6" Evaluated by: DanielParker %',                 {       --                                   Date: 10/03/2012 Eric Dilbone                                                                       10/03/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
YE NE-' uEF N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
 
This is not applicable since it is not part of the 50% of SWEL items requiring anchorage configuration verification.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 335 of 560 Sheet 4 of 5 Status: Y[   NEI U-Seismic Walkdown Checklist (SWC)                   SWELl-065 Equipment ID No.       F-52B                     Equip. Class4 17- ENGINE GENERATORS Equipment Description DG2 ENGINE MOUNTED TURBO FILTER Photographs Note:                                                             Note: Top of Component 4 Enter the equipment class name from Appendix B: Classes of Equipment.
: 6. Based on the above anchorage evaluations, is the anchorage free of Y[ NI-] ULI potentially adverse seismic conditions?
 
Based on the above anchorage evaluations, the anchorage is free of potentially adverse seismic conditions.
Engineering Report No. CALC-ANO I-CS-12-00002 Attachment C Rev. 0 Page 336 of 560 Sheet 5 of 5 Status: YZ NE U-Seismic Walkdown Checklist (SWC)                   SWELl-065 Equipment ID No.         F-52B                     Equip. Class5 17- ENGINE GENERATORS Equipment Description DG2 ENGINE MOUNTED TURBO FILTER Note: Component Attachment 5 Enter the equipment class name from Appendix B: Classes of Equipment.
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
 
The turbocharger is bolted at the rear end of the diesel engine. There were no significant structures or equipment that could have any significant interaction with the turbocharger.
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 337 of 560 Sheet I of 5 Status: YZ Nil UL]
Y[ NEI UE1 N/A[-]8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NE'] UE N/AE-and masonry block walls not likely to collapse onto the equipment?
Seismic Walkdown Checklist (SWC)                     SWELl-066 Equipment ID No.         M-225B                   Equip. Class, 17- Engine Generators Equipment Description DIESEL GENERATOR TURBOCHARGER Location: Bldg. RAB                   Floor El. 369           Room, Area 86 Manufacturer, Model, Etc. (optional but recommended)               Electro-Motive T2001 Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
There is overhead duct work that is properly secured with steel hangers.9. Do attached lines have adequate flexibility to avoid damage?Attached lines have adequate flexibility.
Anchorage
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.Y' NEi UEi N/A['-YZ NEI UEJ 2 Enter the equipment class name from Appendix B: Classes of Equipment.
: 1. Is the anchorage configuration verification required (i.e., is the item one       YD NZ of the 50% of SWEL items requiring such verification)?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 339 of 560 Sheet 3 of 5 Status: YZ NEI Ur-1 Seismic Walkdown Checklist (SWC) SWELl -066 Equipment ID No. M-225B -Equip. ClaSS3 17 -Engine Generators Enuinment Descrintion DEISEL GENERATOR TURBOCHARGER Other Adverse Conditions
No anchorage configuration verification required.
: 11. Have you looked for and found no other seismic conditions that could Y' NIZ U[-adversely affect the safety functions of the equipment?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                 YZ NEI U[-    N/A[D The anchorageis free of bent, broken, missing and loose hardware.
It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found.Comments (Additional pages may be added as necessary)
: 3. Is the anchorage free of corrosion that is more than mild surface                 YZ N[I UD N/A[]
The turbocharger is a critical component of the diesel engine. Every mounting bolt was observed to be in place. The entire engine appeared clean and well maintained.
oxidation?
There were no visible leaks or signs of previous leaks at any location were accessory components were bolted to the main engine block.Three-Ouwtrr Right Rear View, I6.Cylnftr Evaluated by: Daniel Parker Eric Dilbone Date: 10/22012 10/2/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
The anchorageis free of corrosion.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 340 of 560 Sheet 4 of 5 Seismic Walkdown Checklist (SWC) SWELl-066 Status: YE NF- U--Equipment ID No. M-225B Equip. CIass4 17- Engine Generators Equipment Description DEISEL GENERATOR TURBOCHARGER Photociraphs Note: Component Overview Note: Component Overview 4 Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the                 Y;    NEI U[1 N/A[-
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 341 of 560 Sheet 5 of 5 Status: YE NF U-Seismic Walkdown Checklist (SWC) SWELl-066 Equipment ID No. M-225B Equip. Class5 17- Enqine Generators Equipment Description DEISEL GENERATOR TURBOCHARGER Note: Close up of Component from underside Note: Close up of component from underside 5 Enter the equipment class name from Appendix B: Classes of Equipment.
anchors?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 342 of 560 Sheet I of 5 Status: YZ No UI-Seismic Walkdown Checklist (SWC) SWELl- 067 Equipment ID No. SS-5211 Equip. Class' 18 -Instrument Racks Equipment Description DG1 OVERSPEED TRIP SWITCH Location:
This component is anchored directly to the EDG skid.
Bldg. RAB Floor El. 369 Room, Area 87 Manufacturer, Model, Etc. (optional but recommended)
1 Enter the equipment class name from Appendix B: Classes of Equipment.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
 
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 338 of 560 Sheet 2 of 5 Status: YZ NF UI-Seismic Walkdown Checklist (SWC)                   SWELl-066 Equipment ID No.       M-225B               -   Equip. Class2 17- Engine Generators Equipment Description DIESEL GENERATOR TURBOCHARGER
Item is not part of the 50%.2. Is the anchorage free of bent, broken, missing or loose hardware?The bolts anchoring the switch to the EDG skid are free of bent, broken, missing and loose hardware.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 5. Is the anchorage configuration consistent with plant documentation?           YE NE-' uEF     N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
The anchorage had very mild surface oxidation, but is free of corrosion otherwise.
This is not applicable since it is not part of the 50% of SWEL items requiringanchorage configurationverification.
No adverse seismic conditions exist because of this.4. Is the anchorage free of visible cracks in the concrete near the anchors?The switch is anchored to the EDG. No cracks around EDG skid were observed.YZI NO YO N[il U[:] N/A[:l YZ NDl UD N/ADl YZ NDI UiD N/AED 1 Enter the equipment class name from Appendix B: Classes of Equipment.
: 6. Based on the above anchorage evaluations, is the anchorage free of           Y[   NI-] ULI potentially adverse seismic conditions?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 343 of 560 Sheet 2 of 5 Status: YE NEI UE--Seismic Walkdown Checklist (SWC) SWELl- 067 Equipment ID No. SS-5211 Equip. Class Equipment Description DG1 OVERSPEED TRIP SWITCH 8 -Instrument Racks 5. Is the anchorage configuration consistent with plant documentation?
Based on the above anchorageevaluations, the anchorage is free of potentiallyadverse seismic conditions.
YE N[E UEi N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Interaction Effects
This does not apply since this item is not part of the 50% requiring anchorage configuration verification.
: 7. Are soft targets free from impact by nearby equipment or structures?         Y[    NEI UE1 N/A[-]
: 6. Based on the above anchorage evaluations, is the anchorage free of Y] NEI UE-potentially adverse seismic conditions?
The turbochargeris bolted at the rearend of the diesel engine. There were no significantstructures or equipment that could have any significantinteraction with the turbocharger.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,     YZ NE'] UE N/AE-and masonry block walls not likely to collapse onto the equipment?
There is overhead duct work that is properlysecured with steel hangers.
: 9. Do attached lines have adequate flexibility to avoid damage?                 Y'    NEi UEi N/A['-
Attached lines have adequate flexibility.
: 10. Based on the above seismic interaction evaluations, is equipment free         YZ NEI UEJ of potentially adverse seismic interaction effects?
Based on the above seismic interactionevaluations, the equipment is free of potentially adverse seismic interaction effects.
2 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 339 of 560 Sheet 3 of 5 Status: YZ NEI Ur-1 Seismic Walkdown Checklist (SWC)                       SWELl -066 Equipment ID No.         M-225B               -Equip. ClaSS3     17 -Engine Generators Enuinment Descrintion DEISEL GENERATOR TURBOCHARGER Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could                       Y'   NIZ U[-
adversely affect the safety functions of the equipment?
It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found.
Comments (Additional pages may be added as necessary)
The turbochargeris a critical component of the diesel engine. Every mounting bolt was observed to be in place. The entire engine appearedclean and well maintained. There were no visible leaks or signs of previous leaks at any location were accessorycomponents were bolted to the main engine block.
Three-Ouwtrr Right Rear View, I6.Cylnftr Evaluated by: Daniel Parker                                                                         Date: 10/22012 Eric Dilbone                                                                              10/2/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 340 of 560 Sheet 4 of 5 Status: YE NF- U--
Seismic Walkdown Checklist (SWC)                   SWELl-066 Equipment ID No.       M-225B                     Equip. CIass4 17- Engine Generators Equipment Description DEISEL GENERATOR TURBOCHARGER Photociraphs Note: Component Overview                                           Note: Component Overview 4 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 341 of 560 Sheet 5 of 5 Status: YE NF U-Seismic Walkdown Checklist (SWC)                   SWELl-066 Equipment ID No.         M-225B                   Equip. Class5 17- Enqine Generators Equipment Description DEISEL GENERATOR TURBOCHARGER Note: Close up of Component from underside                         Note: Close up of component from underside 5 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 342 of 560 Sheet I of 5 Status: YZ No UI-Seismic Walkdown Checklist (SWC)                     SWELl- 067 Equipment ID No.         SS-5211                   Equip. Class' 18 - Instrument Racks Equipment Description DG1 OVERSPEED TRIP SWITCH Location: Bldg. RAB                 Floor El. 369             Room, Area 87 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one     YZI NO of the 50% of SWEL items requiring such verification)?
Item is not part of the 50%.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               YO N[il U[:] N/A[:l The bolts anchoring the switch to the EDG skid are free of bent, broken, missing and loose hardware.
: 3. Is the anchorage free of corrosion that is more than mild surface               YZ NDl UD N/ADl oxidation?
The anchorage had very mild surface oxidation, but is free of corrosion otherwise. No adverse seismic conditions exist because of this.
: 4. Is the anchorage free of visible cracks in the concrete near the                 YZ NDI    UiD N/AED anchors?
The switch is anchoredto the EDG. No cracks around EDG skid were observed.
1 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 343 of 560 Sheet 2 of 5 Status: YE   NEI UE--
Seismic Walkdown Checklist (SWC)              SWELl- 067 Equipment ID No.      SS-5211                Equip. Class 1*8 - Instrument Racks Equipment Description DG1 OVERSPEED TRIP SWITCH
: 5. Is the anchorage configuration consistent with plant documentation?         YE N[E UEi N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
This does not apply since this item is not part of the 50% requiring anchorageconfiguration verification.
: 6. Based on the above anchorage evaluations, is the anchorage free of           Y] NEI     UE-potentially adverse seismic conditions?
All visible anchorage was free of potentially adverse seismic conditions.
All visible anchorage was free of potentially adverse seismic conditions.
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects
There are no soft targets that could be impacted by nearby equipment or structures.
: 7. Are soft targets free from impact by nearby equipment or structures?         YEr NEi UEi    N/AE There are no soft targets that could be impacted by nearby equipment or structures.
YEr NEi UEi N/AE 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NE UEI N/AE and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NE         UEI N/AE and masonry block walls not likely to collapse onto the equipment?
There are no masonry block walls or ceiling tiles in the room. The lights are in good condition, and do not present an interaction effect.9. Do attached lines have adequate flexibility to avoid damage?The attached lines have adequate flexibility.
There are no masonry block walls or ceiling tiles in the room. The lights are in good condition, and do not present an interaction effect.
YO NEI UEi N/AE-10. Based on the above seismic interaction evaluations, is equipment free Y[ NE] UEJ of potentially adverse seismic interaction effects?Based on the above evaluation, the switch is free of potentially adverse seismic interaction effects.
: 9. Do attached lines have adequate flexibility to avoid damage?                 YO NEI UEi N/AE-The attached lines have adequate flexibility.
Engineering Report No. CALC-ANO I-CS-i12-00002 Attachment C Rev. 0 Page 344 of 560 Sheet 3 of 5 Status: Y[I NR U[F]Seismic Walkdown Checklist (SWC) SWELl- 067 Equipment ID No. SS-5211 Equip. Class 18- Instrument Racks Equipment Description DG1 OVERSPEED TRIP SWITCH Other Adverse Conditions
: 10. Based on the above seismic interaction evaluations, is equipment free       Y[   NE] UEJ of potentially adverse seismic interaction effects?
: 11. Have you looked for and found no other seismic conditions that could YO N[il ULI adversely affect the safety functions of the equipment?
Based on the above evaluation, the switch is free of potentially adverse seismic interaction effects.
It was looked for, and no other seismic conditions, that could adversely affect the safety functions were found.Comments (Additional pages may be added as necessary)
 
SS-5211 is not immediately identifiable using the primary equipment ID tag. A tag of "S 23" is visible on the component, and this is listed in Asset Suite as a Component Alternate Tag for SS-5211.Evaluated by: Daniel Parker t,, -Date: 10/11/2012 Eric Dilbone 10/11/2012 Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 345 of 560 Sheet 4 of 5 Seismic Walkdown Checklist (SWC) SWELl- 067 Equipment ID No. SS-5211 Equip. Class 18 -Instrument Racks Equipment Description DGI OVERSPEED TRIP SWITCH Status: YE NEI UI-Photographs Note: Altemate tag showing S 23 identifies the component SS-521 1.Note: Overspeed trip switch is shown mounted to the EDG.
Engineering Report No. CALC-ANO I-CS-i12-00002 Attachment C Rev. 0 Page 344 of 560 Sheet 3 of 5 Status: Y[I NR U[F]
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 346 of 560 Sheet 5 of 5 Status: YEI NEI UI-1 Seismic Walkdown Checklist (SWC) SWELl- 067 Equipment ID No. SS-5211 Equip. Class 18 -Instrument Racks Equipment Description DG1 OVERSPEED TRIP SWITCH Note: The manufacturer tao is shown for the Note: overspeed trip switch.
Seismic Walkdown Checklist (SWC)             SWELl- 067 Equipment ID No. SS-5211                 Equip. Class 18- Instrument Racks Equipment Description DG1 OVERSPEED TRIP SWITCH Other Adverse Conditions
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 347 of 560 Sheet I of 4 Status: YZ Nr I Url Seismic Walkdown Checklist (SWC) SWELl-068 Equipment ID No. SE-5220 Equip. Class' 18- INSTRUMENT RACKS Equipment Description SPEED DETECTOR FOR K-4B Location:
: 11. Have you looked for and found no other seismic conditions that could       YO N[il ULI adversely affect the safety functions of the equipment?
Bldg. RAB Floor El. 369 Room, Area 86 Manufacturer, Model, Etc. (optional but recommended)
It was looked for, and no other seismic conditions,that could adversely affect the safety functions were found.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Comments (Additional pages may be added as necessary)
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one Y[-] NZ of the 50% of SWEL items requiring such verification)?
SS-5211 is not immediately identifiable using the primary equipment ID tag. A tag of "S 23" is visible on the component, and this is listed in Asset Suite as a ComponentAlternate Tag for SS-5211.
Anchorage configuration verification is not required for this component.
Evaluated by: DanielParker  t,,               -                                 Date: 10/11/2012 Eric Dilbone 6*
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
10/11/2012
YZ NEI U [] N/A'-The anchorage hardware is free of bent, broken, missing and loose hardware.3. Is the anchorage free of corrosion that is more than mild surface YZ N[:] Ur- N/A-oxidation?
 
The anchorage is free of corrosion.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 345 of 560 Sheet 4 of 5 Status: YE NEI    UI-Seismic Walkdown Checklist (SWC)       SWELl- 067 Equipment ID No. SS-5211           Equip. Class 18 - Instrument Racks Equipment Description DGI OVERSPEED TRIP SWITCH Photographs Note: Altemate tag showing S 23 identifies         Note: Overspeed trip switch is shown the component SS-521 1.                           mounted to the EDG.
: 4. Is the anchorage free of visible cracks in the concrete near the Y[-] N[l U[I- N/AZ anchors?The component is not anchored into concrete; therefore, this question is not applicable.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 346 of 560 Sheet 5 of 5 Status: YEI NEI   UI-1 Seismic Walkdown Checklist (SWC)     SWELl- 067 Equipment ID No. SS-5211           Equip. Class 18 - Instrument Racks Equipment Description DG1 OVERSPEED TRIP SWITCH Note: The manufacturertao is shown for the       Note:
overspeed trip switch.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 347 of 560 Sheet I of 4 Status: YZ Nr I Url Seismic Walkdown Checklist (SWC)                     SWELl-068 Equipment ID No.         SE-5220                   Equip. Class' 18- INSTRUMENT RACKS Equipment Description SPEED DETECTOR FOR K-4B Location: Bldg. RAB                   Floor El. 369           Room, Area 86 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one   Y[-] NZ of the 50% of SWEL items requiring such verification)?
Anchorage configuration verification is not requiredfor this component.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               YZ NEI     U[] N/A'-
The anchoragehardware is free of bent, broken, missing and loose hardware.
: 3. Is the anchorage free of corrosion that is more than mild surface               YZ N[:] Ur-   N/A-oxidation?
The anchorageis free of corrosion.
: 4. Is the anchorage free of visible cracks in the concrete near the               Y[-] N[l U[I- N/AZ anchors?
The component is not anchored into concrete; therefore, this question is not applicable.
I Enter the equipment class name from Appendix B: Classes of Equipment.
I Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 348 of 560 Sheet 2 of 4 Status: YZ N[-- U[-Seismic Walkdown Checklist (SWC) SWELl-068 Equipment ID No. SE-5220 -Equip. Class 18- INSTRUMENT RACKS Equipment Description SPEED DETECTOR FOR K-4B 5. Is the anchorage configuration consistent with plant documentation?
 
YEI NEI UE- N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 348 of 560 Sheet 2 of 4 Status: YZ N[--   U[-
Seismic Walkdown Checklist (SWC)               SWELl-068 Equipment ID No.     SE-5220             -   Equip. Class 18- INSTRUMENT RACKS Equipment Description SPEED DETECTOR FOR K-4B
: 5. Is the anchorage configuration consistent with plant documentation?         YEI NEI UE- N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage configuration verification is not required for this component; therefore, this question is not applicable.
Anchorage configuration verification is not required for this component; therefore, this question is not applicable.
: 6. Based on the above anchorage evaluations, is the anchorage free of YE NE:] UEr potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of           YE NE:]   UEr potentially adverse seismic conditions?
Based on the above anchorage evaluation, the anchorage is free of potentially adverse seismic conditions.
Based on the above anchorageevaluation, the anchorageis free of potentially adverse seismic conditions.
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects
The primary soft target in the area is the electrical cable connected to SE-5220. The cable is free from impact by any nearby equipment or structures.
: 7. Are soft targets free from impact by nearby equipment or structures?       YZ NEi U[E- N/A[E]
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
The primarysoft target in the area is the electrical cable connected to SE-5220. The cable is free from impact by any nearby equipment or structures.
There are no potential interactions with overhead equipment, lighting or masonry block walls.9. Do attached lines have adequate flexibility to avoid damage?The attached lines have adequate flexibility to avoid damage.YZ NEi U[E- N/A[E]YN NEI UE[ N/AE-YZ NEI uE1 N/AEr 10. Based on the above seismic interaction evaluations, is equipment free YE NE- UEi of potentially adverse seismic interaction effects?Based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YN NEI UE[ N/AE-and masonry block walls not likely to collapse onto the equipment?
Engineering Report No. CALC-ANO 1-CS-12-00002 Attachment C Rev. 0 Page 349 of 560 Sheet 3 of 4 Status: YZ N] UI-I Seismic Walkdown Checklist (SWC) SWELl-068 Equipment ID No. SE-5220 Equip. Class 18-INSTRUMENT RACKS Equipment Description SPEED DETECTOR FOR K-4B Other Adverse Conditions
There are no potentialinteractionswith overhead equipment, lighting or masonry block walls.
: 11. Have you looked for and found no other seismic conditions that could YN N[:] U-adversely affect the safety functions of the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?                 YZ NEI    uE1 N/AEr The attachedlines have adequateflexibility to avoid damage.
It was looked for, and no seismic conditions that could adversely affect the safety function of the equipment was found.Comments (Additional pages may be added as necessary)
: 10. Based on the above seismic interaction evaluations, is equipment free       YE NE- UEi of potentially adverse seismic interaction effects?
SE-5220, Speed Detector for K-4B does not have an equipment tag; the component location was positively identified on design drawings and field verified by the Unit 1 Emergency Diesel Generators System Engineer.
Based on the above seismic interactionevaluations, the equipment is free of potentially adverse seismic interaction effects.
The Speed Detector is very well anchored.Evaluated by: Chris Johnson Date: 11/08/12 Oiaswi Shrestha 4-LA 11081 11108112 Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 350 of 560 Sheet 4 of 4 Status: YZ NE]I- UE-Seismic Walkdown Checklist (SWC) SWELl-068 Equipment ID No. SE-5220 Equip. Class 18- INSTRUMENT RACKS Equipment Description SPEED DETECTOR FOR K-4B Photographs Note: SE-5220 is mounted next the flywheel as indicated by the yellow arrow.Note: This photo shows the relative location of SE-5220 on K-4B.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 351 of 560 Sheet I of 5 Status: YE NEI UD-Seismic Walkdown Checklist (SWC) SWELI-069 Equipment ID No. PS-5284 Equip. Class' 18- INSTRUMENT RACKS Equipment Description K4B CRANKCASE PRESS HI Location:
Engineering Report No. CALC-ANO 1-CS-12-00002 Attachment C Rev. 0 Page 349 of 560 Sheet 3 of 4 Status: YZ N]     UI-I Seismic Walkdown Checklist (SWC)               SWELl-068 Equipment ID No.     SE-5220                 Equip. Class 18-INSTRUMENT RACKS Equipment Description SPEED DETECTOR FOR K-4B Other Adverse Conditions
Bldg. RAB Floor El. 369 Room, Area 86 Manufacturer, Model, Etc. (optional but recommended)
: 11. Have you looked for and found no other seismic conditions that could           YN N[:] U-adversely affect the safety functions of the equipment?
Electro-Motive 645E4B Turbocharqed Diesel Enqine Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
It was looked for, and no seismic conditions that could adversely affect the safety function of the equipment was found.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Comments (Additional pages may be added as necessary)
No anchorage configuration verification required.2. Is the anchorage free of bent, broken, missing or loose hardware?The anchorage is free of bent, broken, missing and loose hardware.YE- NO Y] NEI UEi N/A--3. Is the anchorage free of corrosion that is more than mild surface oxidation?
SE-5220, Speed Detector for K-4B does not have an equipment tag; the component location was positively identified on design drawings and field verified by the Unit 1 Emergency Diesel GeneratorsSystem Engineer. The Speed Detectoris very well anchored.
The anchorage is free of corrosion.
Evaluated by: Chris Johnson                                                           Date: 11/08/12 Oiaswi Shrestha                         4 -LA                               11081 11108112
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?This component is anchored directly to the EDG skid. No cracks in the concrete around the anchorage of the skid were observed.YO NEI U-- N/AD Y[ NDI UD- N/A[D-I Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 352 of 560 Sheet 2 of 5 Status: YZ NEI U--Seismic Walkdown Checklist (SWC) SWELl-069 Equipment ID No. PS-5284 Equip. Class2 18-INSTRUMENT RACKS Equipment Description K4B CRANKCASE PRESS HI 5. Is the anchorage configuration consistent with plant documentation?
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 350 of 560 Sheet 4 of 4 Status: YZ   NE]I- UE-Seismic Walkdown Checklist (SWC)       SWELl-068 Equipment ID No. SE-5220             Equip. Class 18- INSTRUMENT RACKS Equipment Description SPEED DETECTOR FOR K-4B Photographs Note: This photo shows the relative location of    Note: SE-5220 is mounted next the flywheel SE-5220 on K-4B.                                   as indicated by the yellow arrow.
YrI NE] U[-] N/As (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
 
This is not applicable since it is not part of the 50% of SWEL items requiring anchorage configuration verification.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 351 of 560 Sheet I of 5 Status: YE NEI     UD-Seismic Walkdown Checklist (SWC)                   SWELI-069 Equipment ID No.         PS-5284                   Equip. Class' 18- INSTRUMENT RACKS Equipment Description K4B CRANKCASE PRESS HI Location: Bldg. RAB                 Floor El. 369           Room, Area 86 Manufacturer, Model, Etc. (optional but recommended)               Electro-Motive 645E4B TurbocharqedDiesel Enqine Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
: 6. Based on the above anchorage evaluations, is the anchorage free of YZ NE] ULi potentially adverse seismic conditions?
Anchorage
Based on the above anchorage evaluations, the anchorage is free of potentially adverse seismic conditions.
: 1. Is the anchorage configuration verification required (i.e., is the item one     YE- NO of the 50% of SWEL items requiring such verification)?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
No anchorage configuration verification required.
Soft targets are free from impact by nearby equipment and structures.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               Y] NEI UEi N/A--
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
The anchorage is free of bent, broken, missing and loose hardware.
Overhead equipment, distribution systems and lighting are not likely to collapse onto the equipment.
: 3. Is the anchorage free of corrosion that is more than mild surface               YO NEI U-- N/AD oxidation?
: 9. Do attached lines have adequate flexibility to avoid damage?Attached lines have adequate flexibility.
The anchorageis free of corrosion.
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.'(Y NEI U[I N/AZl'(N NEI U-1 N/AZl YS( NEl uL1 N/A'-YZ NEI UM 2 Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the                 Y[    NDI  UD- N/A[D-anchors?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 353 of 560 Sheet 3 of 5 Status: YZ NEI U[-]Seismic Walkdown Checklist (SWC) SWELl-069 Equipment ID No. PS-5284 Equip. Class3 18- INSTRUMENT RACKS Eauinment Description K4B CRANKCASE PRESS HI Other Adverse Conditions
This component is anchored directly to the EDG skid. No cracks in the concrete aroundthe anchorageof the skid were observed.
: 11. Have you looked for and found no other seismic conditions that could Y( NED U[-I adversely affect the safety functions of the equipment?
I Enter the equipment class name from Appendix B: Classes of Equipment.
It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found.Comments (Additional pages may be added as necessary)
 
The Crankcase Pressure Detector is a critical component of the diesel engine. Every mounting bolt was observed to be in place. The entire engine appeared clean and well maintained.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 352 of 560 Sheet 2 of 5 Status: YZ NEI U--
There were no visible leaks or signs of previous leaks at any location were accessory components were bolted to the main engine block.Croankcose Presure Detectcr TWree.uarter Left View, 16-C¥!i1der Evaluated by: Daniel Parker Eric Dilbone Date: 10/2/2012 10/2/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
Seismic Walkdown Checklist (SWC)                   SWELl-069 Equipment ID No.       PS-5284                   Equip. Class2 18-INSTRUMENT RACKS Equipment Description K4B CRANKCASE PRESS HI
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 354 of 560 Sheet 4 of 5 Status: Y[I NEI UD-Seismic Walkdown Checklist (SWC) SWELl-069 Equipment ID No. PS-5284 Equip. Class4 18-INSTRUMENT RACKS Equipment Description K4B CRANKCASE PRESS HI Photographs Note: Front of PS-5284 Note: Upper Mounting Bolts of PS-5284 4 Enter the equipment class name from Appendix B: Classes of Equipment.
: 5. Is the anchorage configuration consistent with plant documentation?           YrI NE] U[-] N/As (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 355 of 560 Sheet 5 of 5 Status: YZ N[i] U--i Seismic Walkdown Checklist (SWC) SWELl-069 Equipment ID No. PS-5284 Equip. Classs 18-INSTRUMENT RACKS Equipment Description K4B CRANKCASE PRESS HI Note: Lower Mounting Bolts of PS-5284 Note: 5 Enter the equipment class name from Appendix B: Classes of Equipment.
This is not applicable since it is not part of the 50% of SWEL items requiringanchorage configuration verification.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 356 of 560 Sheet 1 of 5 Seismic Walkdown Checklist (SWC) SWELl- 070 Status: YZ NEI U--Equipment ID No. D14 Equip. Class' 18 -Instrument Racks Equipment Description D06 MANUAL DISCONNECT Location:
: 6. Based on the above anchorage evaluations, is the anchorage free of           YZ NE] ULi potentially adverse seismic conditions?
Bldg. RAB Floor El. 372 Room, Area 98 Manufacturer, Model, Etc. (optional but recommended)
Based on the above anchorageevaluations, the anchorage is free of potentiallyadverse seismic conditions.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Interaction Effects
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 7. Are soft targets free from impact by nearby equipment or structures?         '(Y  NEI U[I N/AZl Soft targets are free from impact by nearby equipment and structures.
This item is part of the 50%.2. Is the anchorage free of bent, broken, missing or loose hardware?No bent broken or missing hardware was found.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,     '(N NEI U-1 N/AZl and masonry block walls not likely to collapse onto the equipment?
No corrosion was observed.4. Is the anchorage free of visible cracks in the concrete near the anchors?Concrete around anchors in support frame base plates were observed to be free of cracks.YZ NEI Y[ NE] U'- N/A['1 YN NEI UEl N/A[-YZ NEI UiE N/AD--I Enter the equipment class name from Appendix B: Classes of Equipment.
Overhead equipment, distributionsystems and lighting are not likely to collapse onto the equipment.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 357 of 560 Sheet 2 of 5 Seismic Walkdown Checklist (SWC) SWELl- 070 Equipment ID No. D14 Equip. Class 18 -Instrument Racks Eauinment Descrintion DO6 MANUAL DISCONNECT Status: YE NEI U-iJ 5. Is the anchorage configuration consistent with plant documentation?
: 9. Do attached lines have adequate flexibility to avoid damage?                 YS( NEl uL1 N/A'-
YZ NDi UD- N/AD-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Attached lines have adequate flexibility.
Anchorage configuration was determined to be consistent with CALC-94-SQ-1001-18, pages 19-29.6. Based on the above anchorage evaluations, is the anchorage free of Y' NDI U[D potentially adverse seismic conditions?
: 10. Based on the above seismic interaction evaluations, is equipment free         YZ NEI UM of potentially adverse seismic interaction effects?
Based on the above seismic interactionevaluations, the equipment is free of potentially adverse seismic interaction effects.
2 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 353 of 560 Sheet 3 of 5 Status: YZ NEI U[-]
Seismic Walkdown Checklist (SWC)                      SWELl-069 Equipment ID No.         PS-5284                    Equip. Class3 18- INSTRUMENT RACKS Eauinment Description K4B CRANKCASE PRESS HI Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could                        Y(    NED  U[-I adversely affect the safety functions of the equipment?
It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found.
Comments (Additional pages may be added as necessary)
The Crankcase PressureDetector is a criticalcomponent of the diesel engine. Every mounting bolt was observed to be in place. The entire engine appeared clean and well maintained. There were no visible leaks or signs of previous leaks at any location were accessory components were bolted to the main engine block.
Croankcose Presure Detectcr TWree.uarter Left Fr*nt View, 16-C¥!i1der Evaluated by: Daniel Parker                                                                         Date: 10/2/2012 Eric Dilbone                                                                              10/2/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 354 of 560 Sheet 4 of 5 Status: Y[I NEI UD-Seismic Walkdown Checklist (SWC)                   SWELl-069 Equipment ID No.       PS-5284                   Equip. Class4 18-INSTRUMENT RACKS Equipment Description K4B CRANKCASE PRESS HI Photographs Note: Front of PS-5284                                             Note: Upper Mounting Bolts of PS-5284 4 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 355 of 560 Sheet 5 of 5 Status: YZ N[i] U--i Seismic Walkdown Checklist (SWC)                   SWELl-069 Equipment ID No.       PS-5284                   Equip. Classs 18-INSTRUMENT RACKS Equipment Description K4B CRANKCASE PRESS HI Note: Lower Mounting Bolts of PS-5284                             Note:
5 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 356 of 560 Sheet 1 of 5 Status: YZ NEI U--
Seismic Walkdown Checklist (SWC)                     SWELl- 070 Equipment ID No.         D14                       Equip. Class' 18 - Instrument Racks Equipment Description D06 MANUAL DISCONNECT Location: Bldg. RAB                   Floor El. 372           Room, Area 98 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one     YZ NEI of the 50% of SWEL items requiring such verification)?
This item is partof the 50%.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               Y[    NE] U'-  N/A['1 No bent broken or missing hardware was found.
: 3. Is the anchorage free of corrosion that is more than mild surface               YN NEI UEl N/A[-
oxidation?
No corrosion was observed.
: 4. Is the anchorage free of visible cracks in the concrete near the                 YZ NEI    UiE N/AD--
anchors?
Concrete around anchors in support frame base plates were observed to be free of cracks.
I Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 357 of 560 Sheet 2 of 5 Status: YE NEI U-iJ Seismic Walkdown Checklist (SWC)               SWELl- 070 Equipment ID No. D14                           Equip. Class 18 - Instrument Racks Eauinment Descrintion DO6 MANUAL DISCONNECT
: 5. Is the anchorage configuration consistent with plant documentation?         YZ NDi     UD- N/AD-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage configurationwas determined to be consistent with CALC-94-SQ-1001-18, pages 19-29.
: 6. Based on the above anchorage evaluations, is the anchorage free of           Y'   NDI U[D potentially adverse seismic conditions?
Anchorage was determined to be free from adverse seismic conditions.
Anchorage was determined to be free from adverse seismic conditions.
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects
No soft targets were observed.YM NDi UD N/ADl 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NDI UDi N/AD'-and masonry block walls not likely to collapse onto the equipment?
: 7. Are soft targets free from impact by nearby equipment or structures?         YM NDi UD N/ADl No soft targets were observed.
Overhead support conditions appeared to be adequate.9. Do attached lines have adequate flexibility to avoid damage?Attached lines appear to be ok (both flexible and rigid conduits)YZ NDI uDl N/ADl 10. Based on the above seismic interaction evaluations, is equipment free YZ ND] UD1 of potentially adverse seismic interaction effects?No adverse seismic interaction conditions were observed.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,     YZ NDI     UDi N/AD'-
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 358 of 560 Sheet 3 of 5 Status: YN NIEI U[-i Seismic Walkdown Checklist (SWC) SWELl- 070 Equipment ID No. 014 Equip. Class 18 -Instrument Racks Eauipment Description D06 MANUAL DISCONNECT Other Adverse Conditions
and masonry block walls not likely to collapse onto the equipment?
: 11. Have you looked for and found no other seismic conditions that could YN N[] Ur adversely affect the safety functions of the equipment?
Overheadsupport conditions appearedto be adequate.
No other adverse seismic conditions were observed.Comments (Additional pages may be added as necessary)
: 9. Do attached lines have adequate flexibility to avoid damage?                 YZ NDI    uDl N/ADl Attached lines appearto be ok (both flexible and rigid conduits)
No adverse seismic conditions were observed.Evaluated by: DanielAndoh Date: 10/10/2012 Genaro Barraqan Jr. " 'f 10/10/2012 Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 359 of 560 Sheet 4 of 5 Status: YZ NO-- U-Seismic Walkdown Checklist (SWC) SWELl- 070 Equipment ID No. D14 Equip. Class 18 -Instrument Racks Equipment Description D06 MANUAL DISCONNECT Photographs Note: Equipment Tag Note: Support frame base plate Engineering Report No. CALC-ANO 1-CS-i12-00002 Attachment C Rev. 0 Page 360 of 560 Sheet 5 of 5 Seismic Walkdown Checklist (SWC) SWELl- 070 Equipment ID No. D14 Equip. Class 18 -Instrument Racks Equipment Description D06 MANUAL DISCONNECT Status: YZ NO ULI connection to wall Note: Panel support to frame Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 361 of 560 Sheet I of 5 Status: Y] NE-- U--Seismic Walkdown Checklist (SWC) SWELl-071 Equipment ID No. PT-2667A Equip. Class' 18 -Instrument Racks Equipment Description E24B MAIN STM PRESS-MSLI Location:
: 10. Based on the above seismic interaction evaluations, is equipment free         YZ ND] UD1 of potentially adverse seismic interaction effects?
Bldg. RAB Floor El. 386 Room, Area 144 Manufacturer, Model, Etc. (optional but recommended)
No adverse seismic interaction conditions were observed.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
 
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YM NE!of the 50% of SWEL items requiring such verification)?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 358 of 560 Sheet 3 of 5 Status: YN NIEI   U[-i Seismic Walkdown Checklist (SWC)             SWELl- 070 Equipment ID No. 014                     Equip. Class 18 - Instrument Racks Eauipment Description D06 MANUAL DISCONNECT Other Adverse Conditions
Yes, this is one of the 50% of SWEL items requiring anchorage configuration verification.
: 11. Have you looked for and found no other seismic conditions that could       YN N[] Ur adversely affect the safety functions of the equipment?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
No other adverse seismic conditions were observed.
Y'( NE] UE- N/AE!The anchorage is free of the conditions listed above.3. Is the anchorage free of corrosion that is more than mild surface Y( NE[-] UE- N/A[-]oxidation?
Comments (Additional pages may be added as necessary)
No adverse seismic conditions were observed.
Evaluated by: DanielAndoh                                                         Date: 10/10/2012 Genaro BarraqanJr. "       'f                                             10/10/2012
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 359 of 560 Sheet 4 of 5 Status: YZ NO--   U-Seismic Walkdown Checklist (SWC)     SWELl- 070 Equipment ID No. D14             Equip. Class 18 - InstrumentRacks Equipment Description D06 MANUAL DISCONNECT Photographs Note: Equipment Tag                             Note: Support frame base plate
 
Engineering Report No. CALC-ANO 1-CS-i12-00002 Attachment C Rev. 0 Page 360 of 560 Sheet 5 of 5 Status: YZ NO ULI Seismic Walkdown Checklist (SWC)         SWELl- 070 Equipment ID No. D14                 Equip. Class 18 - Instrument Racks Equipment Description D06 MANUAL DISCONNECT connection to wall             Note: Panel support to frame
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 361 of 560 Sheet I of 5 Status: Y] NE--     U--
Seismic Walkdown Checklist (SWC)                     SWELl-071 Equipment ID No.         PT-2667A                 Equip. Class' 18 - Instrument Racks Equipment Description E24B MAIN STM PRESS-MSLI Location: Bldg.       RAB             Floor El. 386           Room, Area   144 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one     YM NE!
of the 50% of SWEL items requiring such verification)?
Yes, this is one of the 50% of SWEL items requiringanchorage configuration verification.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               Y'(   NE] UE- N/AE!
The anchorageis free of the conditions listed above.
: 3. Is the anchorage free of corrosion that is more than mild surface                 Y(   NE[-] UE- N/A[-]
oxidation?
The anchorage is free of corrosion.
The anchorage is free of corrosion.
: 4. Is the anchorage free of visible cracks in the concrete near the Y; NE! UE] N/A[!anchors?The anchorage for the plate was inspected and there were no visible cracks in the concrete.I Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the                 Y;   NE! UE] N/A[!
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 362 of 560 Sheet 2 of 5 Status: YZ N-- U[-Seismic Walkdown Checklist (SWC) SWELl-071 Equipment ID No. PT-2667A Equip. Class 18 -Instrument Racks Equipment Description E24B MAIN STM PRESS-MSLI
anchors?
: 5. Is the anchorage configuration consistent with plant documentation?
The anchoragefor the plate was inspected and there were no visible cracks in the concrete.
Y[ NE] UE- N/Ar (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
I Enter the equipment class name from Appendix B: Classes of Equipment.
Yes, anchorage configuration is consistent with CALC-94-SQ-1001-18, pages 202-206.6. Based on the above anchorage evaluations, is the anchorage free of Y[ NE] uLI potentially adverse seismic conditions?
 
Yes, the anchorage is free of potentially adverse seismic conditions.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 362 of 560 Sheet 2 of 5 Status: YZ N-- U[-
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Seismic Walkdown Checklist (SWC)               SWELl-071 Equipment ID No.       PT-2667A               Equip. Class 18 - Instrument Racks Equipment Description E24B MAIN STM PRESS-MSLI
All soft targets are free from impact by nearby equipment.
: 5. Is the anchorage configuration consistent with plant documentation?         Y[     NE] UE- N/Ar (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes, anchorageconfigurationis consistent with CALC-94-SQ-1001-18, pages 202-206.
Overhead equipment is not likely to collapse onto the pressure transmitter.
: 6. Based on the above anchorage evaluations, is the anchorage free of           Y[     NE] uLI potentially adverse seismic conditions?
This room is not crowded and items are well dispersed throughout the room.9. Do attached lines have adequate flexibility to avoid damage?All attached lines appear to have adequate flexibility.
Yes, the anchorage is free of potentiallyadverse seismic conditions.
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Equipment is free of potentially adverse interaction effects."'Y NE] U[-] N/AEI-NEJ U[E N/AEl YZ NEl UE1 N/A[-]Y' NEI ur-1 Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 363 of 560 Sheet 3 of 5 Status: YE NEI UM Seismic Walkdown Checklist (SWC) SWELl-071 Equipment ID No. PT-2667A Equip. Class 18 -Instrument Racks Equipment Description E24B MAIN STM PRESS-MSLI Other Adverse Conditions
Interaction Effects
: 11. Have you looked for and found no other seismic conditions that could Y[ NEi UFJ adversely affect the safety functions of the equipment?
: 7. Are soft targets free from impact by nearby equipment or structures?         "'Y  NE] U[-] N/AEI-All soft targets are free from impact by nearby equipment.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   Y*    NEJ U[E N/AEl and masonry block walls not likely to collapse onto the equipment?
Overhead equipment is not likely to collapse onto the pressure transmitter.This room is not crowded and items are well dispersed throughout the room.
: 9. Do attached lines have adequate flexibility to avoid damage?                 YZ NEl UE1 N/A[-]
All attachedlines appearto have adequateflexibility.
: 10. Based on the above seismic interaction evaluations, is equipment free         Y'    NEI ur-1 of potentially adverse seismic interaction effects?
Equipment is free of potentially adverse interactioneffects.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 363 of 560 Sheet 3 of 5 Status: YE NEI UM Seismic Walkdown Checklist (SWC)             SWELl-071 Equipment ID No. PT-2667A               Equip. Class 18 - Instrument Racks Equipment Description E24B MAIN STM PRESS-MSLI Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       Y[   NEi   UFJ adversely affect the safety functions of the equipment?
Yes, no other seismic conditions that could adversely affect the safety functions of the equipment were identified.
Yes, no other seismic conditions that could adversely affect the safety functions of the equipment were identified.
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Anchorage was consistent with the plant documentation.
Anchorage was consistent with the plant documentation. The anchorage of concem was the 16 x 30 x 1/4 inch plate anchored to the wall. The pressure transmitter(PT-2667A) was bolted to this plate.
The anchorage of concem was the 16 x 30 x1/4 inch plate anchored to the wall. The pressure transmitter (PT-2667A) was bolted to this plate.The plate was bolted to the wall with a pair of Unistruts.
The plate was bolted to the wall with a pairof Unistruts. Each Unistrut was anchored with two expansion anchors. See SEWS package, PT-2667A (Rev.0) for more details.
Each Unistrut was anchored with two expansion anchors. See SEWS package, PT-2667A (Rev. 0) for more details.Evaluated by: Genaro Barraqan Jr.i Eric Dilbone 6U I Date: 10/9/2012 10/9/2012 Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 364 of 560 Sheet 4 of 5 Status: YE Nn-l U[]Seismic Walkdown Checklist (SWC) SWELl-071 Equipment ID No. PT-2667A Equip. Class 18 -Instrument Racks Equipment Description E24B MAIN STM PRESS-MSLI Photographs Note: General image of the equipment tag, PT-2667A.Note: General image of the Pressure Transmitter anchored to the plate in the wall.
Evaluated by: Genaro BarraqanJr.i                                                 Date: 10/9/2012 Eric Dilbone 6U I                                                          10/9/2012
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 365 of 560 Sheet 5 of 5 Status: YZ Nn U-I Seismic Walkdown Checklist (SWC) SWELl-071 Equipment ID No. PT-2667A Equip. Class 18 -Instrument Racks Equipment Description E24B MAIN STM PRESS-MSLI I Note: General image of the PT-2667A.Note: General image of the PT-2667A.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 366 of 560 Sheet I of 5 Status: YWI NFi- U-I Seismic Walkdown Checklist (SWC) SWELl-072 Equipment ID No. N/A Equip. Class' N/A Equipment Description NOT USED Location:
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 364 of 560 Sheet 4 of 5 Status: YE Nn-l U[]
Bldg. N/A Floor El. N/A Room, Area N/A Manufacturer, Model, Etc. (optional but recommended)
Seismic Walkdown Checklist (SWC)     SWELl-071 Equipment ID No. PT-2667A         Equip. Class 18 - Instrument Racks Equipment Description E24B MAIN STM PRESS-MSLI Photographs Note: General image of the equipment             Note: Generalimage of the Pressure tag, PT-2667A.                                   Transmitteranchored to the plate in the wall.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
 
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 365 of 560 Sheet 5 of 5 Status: YZ Nn U-I Seismic Walkdown Checklist (SWC)     SWELl-071 Equipment ID No. PT-2667A         Equip. Class 18 - Instrument Racks Equipment Description E24B MAIN STM PRESS-MSLI                             I Note: General image of the PT-2667A.             Note: General image of the PT-2667A.
Y[:] N[]2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
 
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y-I NE:] U[] N/AZ YE] NE] UI- N/AZ--YE] NE] UEJ N/A-I Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 366 of 560 Sheet I of 5 Status: YWI   NFi- U-I Seismic Walkdown Checklist (SWC)                   SWELl-072 Equipment ID No.         N/A                       Equip. Class' N/A Equipment Description NOT USED Location: Bldg. N/A                 Floor El. N/A           Room, Area N/A Manufacturer, Model, Etc. (optional but recommended)
Engineering Report No. CALC-ANO 1-CS-12-00002 Attachment C Rev. 0 Page 367 of 560 Sheet 2 of 5 Status: YEJ NEI ULI Seismic Walkdown Checklist (SWC) SWELl-072 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED 5. Is the anchorage configuration consistent with plant documentation?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
YE] NE-1 U[E N/AE[(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage
: 6. Based on the above anchorage evaluations, is the anchorage free of YE] NEI UE potentially adverse seismic conditions?
: 1. Is the anchorage configuration verification required (i.e., is the item one     Y[:] N[]
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
of the 50% of SWEL items requiring such verification)?
Y[-E NEi UE N/AE 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NE UE1 N/AE-and masonry block walls not likely to collapse onto the equipment?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               Y-I NE:] U[] N/AZ
: 9. Do attached lines have adequate flexibility to avoid damage?YF- NE- UE[ N/AE1 10. Based on the above seismic interaction evaluations, is equipment free YE- NEi UE of potentially adverse seismic interaction effects?
: 3. Is the anchorage free of corrosion that is more than mild surface               YE] NE] UI- N/AZ--
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 368 of 560 Sheet 3 of 5 Status: YEl- NO UL-Seismic Walkdown Checklist (SWC) SWELl-072 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Other Adverse Conditions
oxidation?
: 11. Have you looked for and found no other seismic conditions that could Y-l N il UIM adversely affect the safety functions of the equipment?
: 4. Is the anchorage free of visible cracks in the concrete near the               YE] NE] UEJ N/A-anchors?
IEnter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS-12-00002 Attachment C Rev. 0 Page 367 of 560 Sheet 2 of 5 Status: YEJ NEI ULI Seismic Walkdown Checklist (SWC)               SWELl-072 Equipment ID No.       N/A                   Equip. Class N/A Equipment Description NOT USED
: 5. Is the anchorage configuration consistent with plant documentation?         YE] NE-1 U[E N/AE[
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of         YE] NEI UE potentially adverse seismic conditions?
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       Y[-E NEi UE N/AE
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YE NE UE1 N/AE-and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?               YF- NE- UE[ N/AE1
: 10. Based on the above seismic interaction evaluations, is equipment free       YE- NEi UE of potentially adverse seismic interaction effects?
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 368 of 560 Sheet 3 of 5 Status: YEl- NO UL-Seismic Walkdown Checklist (SWC)             SWELl-072 Equipment ID No. N/A                     Equip. Class N/A Equipment Description NOT USED Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     Y-l N il UIM adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Evaluated by: Date:
Evaluated by:                                                                   Date:
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 369 of 560 Sheet 4 of 5 Status: Y-I NEI U--Seismic Walkdown Checklist (SWC) SWELl -072 Equipment ID No. N/A Equipment Description NOT USED Equip. Class N/A Photographs Note: Note:
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 370 of 560 Sheet 5 of 5 Status: Y-- NDý Ur-1 Seismic Walkdown Checklist (SWC) SWELl-072 Equipment ID No, N/A Equip. Class N/A Equipment Description NOT USED Note: Note:
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 369 of 560 Sheet 4 of 5 Status: Y-I NEI   U--
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 371 of 560 Sheet I of 5 Status: YZ NE- U El Seismic Walkdown Checklist (SWC) SWELl- 073 Equipment ID No. LSL-5206 Equip. Class' 18- Instrument Racks Equipment Description LOW LEVEL DIESEL SWITCH Location:
Seismic Walkdown Checklist (SWC) SWELl -072 Equipment ID No. N/A           Equip. Class N/A Equipment Description NOT USED Photographs Note:                                         Note:
Bldg. RAB Floor El. 369 Room, Area 87 Manufacturer, Model, Etc. (optional but recommended)
 
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 370 of 560 Sheet 5 of 5 Status: Y--   NDý Ur-1 Seismic Walkdown Checklist (SWC) SWELl-072 Equipment ID No,   N/A           Equip. Class N/A Equipment Description NOT USED Note:                                         Note:
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YE-] N[of the 50% of SWEL items requiring such verification)?
 
Item is not part of the 50%.2. Is the anchorage free of bent, broken, missing or loose hardware?
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 371 of 560 Sheet I of 5 Status: YZ NE-     U El Seismic Walkdown Checklist (SWC)                     SWELl- 073 Equipment ID No.         LSL-5206                 Equip. Class' 18- Instrument Racks Equipment Description LOW LEVEL DIESEL SWITCH Location: Bldg. RAB                   Floor El. 369           Room, Area 87 Manufacturer, Model, Etc. (optional but recommended)
Y" NEI UEJ N/AE3 The bolts anchoring the switch to the EDG skid are free of bent, broken, missing and loose hardware.3. Is the anchorage free of corrosion that is more than mild surface YZ NE] UE-] N/AE[oxidation?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one   YE-] N[
of the 50% of SWEL items requiring such verification)?
Item is not part of the 50%.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             Y"     NEI UEJ N/AE3 The bolts anchoring the switch to the EDG skid are free of bent, broken, missing and loose hardware.
: 3. Is the anchorage free of corrosion that is more than mild surface               YZ NE] UE-] N/AE[
oxidation?
The anchorage had very mild surface oxidation, but is free of corrosion otherwise.
The anchorage had very mild surface oxidation, but is free of corrosion otherwise.
: 4. Is the anchorage free of visible cracks in the concrete near the YZ NE-] UEJ anchors?The switch is anchored to the EDG skid. No cracks in concrete were observed around the skid anchorage.
: 4. Is the anchorage free of visible cracks in the concrete near the               YZ NE-] UEJ N/AE*
anchors?
The switch is anchored to the EDG skid. No cracks in concrete were observed around the skid anchorage.
I Enter the equipment class name from Appendix B: Classes of Equipment.
I Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 372 of 560 Sheet 2 of 5 Status: YZ N] U[I]Seismic Walkdown Checklist (SWC) SWELl- 073 Equipment ID No. LSL-5206 Equip. Class2 18 -Instrument Racks Equipment Description LOW LEVEL DIESEL SWITCH 5. Is the anchorage configuration consistent with plant documentation?
 
YO- N[! UE! N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 372 of 560 Sheet 2 of 5 Status: YZ N]       U[I]
This does not apply since this item is not part of the 50% requiring anchorage configuration
Seismic Walkdown Checklist (SWC)                   SWELl- 073 Equipment ID No.       LSL-5206                 Equip. Class2 18 - Instrument Racks Equipment Description LOW LEVEL DIESEL SWITCH
: 6. Based on the above anchorage evaluations, is the anchorage free of YZ N[! ULI potentially adverse seismic conditions?
: 5. Is the anchorage configuration consistent with plant documentation?             YO- N[!   UE! N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
This does not apply since this item is not part of the 50% requiring anchorageconfiguration
: 6. Based on the above anchorage evaluations, is the anchorage free of             YZ N[!     ULI potentially adverse seismic conditions?
All anchorage was free of potentially adverse seismic conditions.
All anchorage was free of potentially adverse seismic conditions.
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?           Y[    NE! UE- N/A[-]
There are no soft targets that could be impacted by nearby equipment or structures.
There are no soft targets that could be impacted by nearby equipment or structures.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NE!I UE! N/AD-and masonry block walls not likely to collapse onto the equipment?
There are no masonry block walls or ceiling tiles in the room. The lights are in good condition, and do not present an interaction effect.9. Do attached lines have adequate flexibility to avoid damage?The attached lines have adequate flexibility.
There are no masonry block walls or ceiling tiles in the room. The lights are in good condition, and do not present an interaction effect.
Y[ NE! UE- N/A[-]YO NE!I UE! N/AD-YED N[E] UE- N/A[D 10. Based on the above seismic interaction evaluations, is equipment free Y" NEI UD1 of potentially adverse seismic interaction effects?Based on the above evaluation, the component is free of potentially adverse seismic interaction effects.2 Enter the equipment class name from Appendix B: Classes of Equipment.
: 9. Do attached lines have adequate flexibility to avoid damage?                   YED N[E] UE- N/A[D The attachedlines have adequate flexibility.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 373 of 560 Sheet 3 of 5 Status: YZ NEI U[-1 Seismic Walkdown Checklist (SWC) SWELl- 073 Equipment ID No. LSL-5206 Equip. Class3 18 -Instrument Racks Equipment Description LOW LEVEL DIESEL SWITCH Other Adverse Conditions
: 10. Based on the above seismic interaction evaluations, is equipment free           Y"   NEI UD1 of potentially adverse seismic interaction effects?
: 11. Have you looked for and found no other seismic conditions that could YN NE] Ur--adversely affect the safety functions of the equipment?
Based on the above evaluation, the component is free of potentially adverse seismic interactioneffects.
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.Comments (Additional pages may be added as necessary) n'Evaluated by: Daniel Parker O--Date: 10/11/2012 Eric Dilbone 5 10/11/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
2 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 374 of 560 Sheet 4 of 5 Status: YZ NO U --Seismic Walkdown Checklist (SWC) SWELl- 073 Equipment ID No. LSL-5206 Equip. Class4 18 -Instrument Racks Equipment Description LOW LEVEL DIESEL SWITCH Photographs Note: View of the level switch with the equipment ID tag.Note: Side view of the switch showing the anchorage to the skid.4 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 375 of 560 Sheet 5 of 5 Seismic Walkdown Checklist (SWC) SWELl- 073 Status: YZ NEI UI-Equipment ID No. LSL-5206 Equip. Class5 18 -Instrument Racks Equipment Description LOW LEVEL DIESEL SWITCH Note: Overhead view of the switch showing the anchor bolt not visible in the previous image.Note: General view of the level switch showing attached lines.5 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 373 of 560 Sheet 3 of 5 Status: YZ NEI     U[-1 Seismic Walkdown Checklist (SWC)                   SWELl- 073 Equipment ID No.       LSL-5206                 Equip. Class3 18 - Instrument Racks Equipment Description LOW LEVEL DIESEL SWITCH Other Adverse Conditions
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 376 of 560 Sheet I of 5 Status: YE NE-I UD Seismic Walkdown Checklist (SWC) SWELl-074 Equipment ID No. PT-2812 Equip. Class' 18-INSTRUMENT RACKS Equipment Description EFWP P-7B DISCHARGE PRESSURE Location:
: 11. Have you looked for and found no other seismic conditions that could           YN NE] Ur--
Bldg. RAB Floor El. 335 Room, Area 38 Manufacturer, Model, Etc. (optional but recommended)
adversely affect the safety functions of the equipment?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YE] NZ of the 50% of SWEL items requiring such verification)?
Comments (Additional pages may be added as necessary) n' Evaluated by: Daniel Parker             O--                                             Date: 10/11/2012 Eric Dilbone
No anchorage configuration verification required.2. Is the anchorage free of bent, broken, missing or loose hardware?
* 5                                                   10/11/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
YZ NE- U[-] N/AE--The observed anchorage is free of bent, broken, missing and loose hardware.3. Is the anchorage free of corrosion that is more than mild surface YZ N[-] UE] N/A[E]oxidation?
 
The observed anchorage is free of corrosion.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 374 of 560 Sheet 4 of 5 Status: YZ NO U --
: 4. Is the anchorage free of visible cracks in the concrete near the YE] NE[ UE- N/AZ anchors?The component is anchored by a bracket to a clamp on a pipe, so concrete near the anchorage is not applicable.
Seismic Walkdown Checklist (SWC)                   SWELl- 073 Equipment ID No.       LSL-5206                   Equip. Class4 18 - Instrument Racks Equipment Description LOW LEVEL DIESEL SWITCH Photographs Note: View of the level switch with the                           Note: Side view of the switch showing the equipment ID tag.                                                  anchorageto the skid.
4 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 375 of 560 Sheet 5 of 5 Status: YZ NEI    UI-Seismic Walkdown Checklist (SWC)                     SWELl- 073 Equipment ID No.         LSL-5206                 Equip. Class5 18 - Instrument Racks Equipment Description LOW LEVEL DIESEL SWITCH Note: Overhead view of the switch showing                           Note: General view of the level switch the anchorbolt not visible in the previous                          showing attached lines.
image.
5 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 376 of 560 Sheet I of 5 Status: YE NE-I UD Seismic Walkdown Checklist (SWC)                     SWELl-074 Equipment ID No.         PT-2812                   Equip. Class' 18-INSTRUMENT RACKS Equipment Description EFWP P-7B DISCHARGE PRESSURE Location: Bldg. RAB                   Floor El. 335           Room, Area 38 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one   YE] NZ of the 50% of SWEL items requiring such verification)?
No anchorage configuration verification required.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               YZ NE- U[-] N/AE--
The observed anchorageis free of bent, broken, missing and loose hardware.
: 3. Is the anchorage free of corrosion that is more than mild surface               YZ N[-] UE] N/A[E]
oxidation?
The observed anchorageis free of corrosion.
: 4. Is the anchorage free of visible cracks in the concrete near the               YE] NE[   UE- N/AZ anchors?
The component is anchored by a bracket to a clamp on a pipe, so concrete near the anchorage is not applicable.
1 Enter the equipment class name from Appendix B: Classes of Equipment.
1 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 377 of 560 Sheet 2 of 5 Status: YZ NF U-I Seismic Walkdown Checklist (SWC) SWELl-074 Equipment ID No. PT-2812 Equip. Class2 18- INSTRUMENT RACKS Equipment Description EFWP P-7B DISCHARGE PRESSURE 5. Is the anchorage configuration consistent with plant documentation?
 
YE] NE] UE- N/A[9 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 377 of 560 Sheet 2 of 5 Status: YZ NF U-I Seismic Walkdown Checklist (SWC)                   SWELl-074 Equipment ID No.       PT-2812                   Equip. Class2 18- INSTRUMENT RACKS Equipment Description EFWP P-7B DISCHARGE PRESSURE
This is not part of the 50%.6. Based on the above anchorage evaluations, is the anchorage free of Y[9 NWI U[--potentially adverse seismic conditions?
: 5. Is the anchorage configuration consistent with plant documentation?           YE]   NE] UE- N/A[9 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Based on the above anchorage evaluations, the anchorage is free of potentially adverse seismic conditions.
This is not part of the 50%.
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 6. Based on the above anchorage evaluations, is the anchorage free of           Y[9 NWI     U[--
All adjacent equipment are adequately spaced apart from each other where this component is mounted.Y[Z NEI U[L N/AZ-8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y( NE- UL] N/A--and masonry block walls not likely to collapse onto the equipment?
potentially adverse seismic conditions?
All overhead piping systems and electrical conduit are adequately secured.9. Do attached lines have adequate flexibility to avoid damage?Attached lines have adequate flexibility.
Based on the above anchorageevaluations, the anchorageis free of potentially adverse seismic conditions.
YN N[' U-] N/Ar-10. Based on the above seismic interaction evaluations, is equipment free YZ NEI UWl of potentially adverse seismic interaction effects?Based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.2 Enter the equipment class name from Appendix B: Classes of Equipment.
Interaction Effects
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 378 of 560 Sheet 3 of 5 Status: YZ NOI U-Seismic Walkdown Checklist (SWC) SWELl-074 Equipment ID No. PT-2812 Equip. Class3 18- INSTRUMENT RACKS Equipment Description EFWP P-7B DISCHARGE PRESSURE Other Adverse Conditions
: 7. Are soft targets free from impact by nearby equipment or structures?         Y[Z NEI    U[L N/AZ-All adjacent equipment are adequately spaced apart from each other where this component is mounted.
: 11. Have you looked for and found no other seismic conditions that could Yo NEJ U--adversely affect the safety functions of the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   Y(   NE- UL] N/A--
and masonry block walls not likely to collapse onto the equipment?
All overhead piping systems and electrical conduit are adequately secured.
: 9. Do attached lines have adequate flexibility to avoid damage?                 YN N['     U-] N/Ar-Attached lines have adequate flexibility.
: 10. Based on the above seismic interaction evaluations, is equipment free         YZ NEI UWl of potentially adverse seismic interaction effects?
Based on the above seismic interactionevaluations, the equipment is free of potentially adverse seismic interaction effects.
2 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 378 of 560 Sheet 3 of 5 Status: YZ NOI   U-Seismic Walkdown Checklist (SWC)                   SWELl-074 Equipment ID No.       PT-2812                   Equip. Class3 18- INSTRUMENT RACKS Equipment Description EFWP P-7B DISCHARGE PRESSURE Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could         Yo NEJ U--
adversely affect the safety functions of the equipment?
A fire extinguisher is mounted on the wall near this component.
A fire extinguisher is mounted on the wall near this component.
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
The PT-2812 component is clamped to an ~I Y2 "diameter pipe support bolted into the adjacent RC wall. This pipe support and clamp appear to be adequately secure to support the equipment during a seismic event.Evaluated by: Michael E Perez Date: 10/8/2012 Daniel Parker_ _Q1 -,_ 10/8/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
The PT-2812 component is clamped to an ~I Y2 "diameterpipe support bolted into the adjacentRC wall. This pipe support and clamp appearto be adequately secure to support the equipment during a seismic event.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 379 of 560 Sheet 4 of 5 Status: YN NEI U-]Seismic Walkdown Checklist (SWC) SWELl-074 Equipment ID No. PT-2812 Equip. Class4 18-INSTRUMENT RACKS Equipment Description EFWP P-7B DISCHARGE PRESSURE Photographs Note: PT-2812 with equipment identification tag.4 Enter the equipment class name from Appendix B: Classes of Equipment.
Evaluated by: Michael E Perez                                                       Date: 10/8/2012 Daniel Parker                  _      -,_
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 380 of 560 Sheet 5 of 5 Status: YE NRI U-Seismic Walkdown Checklist (SWC) SWELl-074 Equipment ID No. PT-2812 Equip. Class5 18-INSTRUMENT RACKS Equipment Description EFWP P-7B DISCHARGE PRESSURE Note: Pipe anchorage to RC wall.5 Enter the equipment class name from Appendix B: Classes of Equipment.
_Q1                                  10/8/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 381 of 560 Sheet 1 of 5 Status: YEI NEI U-Seismic Walkdown Checklist (SWC) SWELl-075 Equipment ID No. N/A Equip. Class' N/A Equipment Description NOT USED Location:
 
Bldg. N/A Floor El. N/A Room, Area N/A Manufacturer, Model, Etc. (optional but recommended)
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 379 of 560 Sheet 4 of 5 Status: YN NEI U-]
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Seismic Walkdown Checklist (SWC)                   SWELl-074 Equipment ID No.       PT-2812                   Equip. Class4 18-INSTRUMENT RACKS Equipment Description EFWP P-7B DISCHARGE PRESSURE Photographs Note: PT-2812 with equipment identification tag.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
4 Enter the equipment class name from Appendix B: Classes of Equipment.
YO NO 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
 
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YE NE UE:] N/AE"]YE NE:] UE- N/AE-YE- NE UE- N/AE-1 1 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 380 of 560 Sheet 5 of 5 Status: YE NRI U-Seismic Walkdown Checklist (SWC)                   SWELl-074 Equipment ID No.       PT-2812                   Equip. Class5 18-INSTRUMENT RACKS Equipment Description EFWP P-7B DISCHARGE PRESSURE Note: Pipe anchorageto RC wall.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 382 of 560 Sheet 2 of 5 Status: YE] NE] UE]Seismic Walkdown Checklist (SWC) SWELl-075 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED 5. Is the anchorage configuration consistent with plant documentation?
5 Enter the equipment class name from Appendix B: Classes of Equipment.
YEI NEi UE: N/AEl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
 
: 6. Based on the above anchorage evaluations, is the anchorage free of YE] NE] UE]potentially adverse seismic conditions?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 381 of 560 Sheet 1 of 5 Status: YEI NEI   U-Seismic Walkdown Checklist (SWC)                     SWELl-075 Equipment ID No.         N/A                       Equip. Class' N/A Equipment Description NOT USED Location: Bldg. N/A                   Floor El. N/A           Room, Area N/A Manufacturer, Model, Etc. (optional but recommended)
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Anchorage
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y(E-- NEI UE- N/AE1 Y(E NEI UEi N/AE-Y-E NEI UEi N/AEl YE- NEI UM Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 383 of 560 Sheet 3 of 5 Status: Yr-L NI1 UZI Seismic Walkdown Checklist (SWC) SWELl-075 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Other Adverse Conditions
: 1. Is the anchorage configuration verification required (i.e., is the item one   YO NO of the 50% of SWEL items requiring such verification)?
: 11. Have you looked for and found no other seismic conditions that could Y[-- NEl UEI adversely affect the safety functions of the equipment?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               YE NE UE:] N/AE"]
: 3. Is the anchorage free of corrosion that is more than mild surface               YE NE:] UE- N/AE-oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the               YE- NE UE- N/AE-1 anchors?
1 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 382 of 560 Sheet 2 of 5 Status: YE] NE]   UE]
Seismic Walkdown Checklist (SWC)               SWELl-075 Equipment ID No.     N/A                     Equip. Class N/A Equipment Description NOT USED
: 5. Is the anchorage configuration consistent with plant documentation?         YEI NEi     UE: N/AEl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of         YE]   NE] UE]
potentially adverse seismic conditions?
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       Y(E-- NEI UE- N/AE1
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   Y(E NEI UEi    N/AE-and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?               Y-E NEI UEi N/AEl
: 10. Based on the above seismic interaction evaluations, is equipment free       YE- NEI UM of potentially adverse seismic interaction effects?
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 383 of 560 Sheet 3 of 5 Status: Yr-L NI1 UZI Seismic Walkdown Checklist (SWC)             SWELl-075 Equipment ID No. N/A                     Equip. Class N/A Equipment Description NOT USED Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     Y[-- NEl UEI adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Evaluated by: Date:
Evaluated by:                                                                   Date:
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 384 of 560 Sheet 4 of 5 Status: YE-- NEI UDýSeismic Walkdown Checklist (SWC) SWELl-075 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Photographs Note: Note:
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 385 of 560 Sheet 5 of 5 Status: YLI NEI U--Seismic Walkdown Checklist (SWC) SWELl-075 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 386 of 560 Sheet I of 5 Status: Y-I NE UI-Seismic Walkdown Checklist (SWC) SWELl-076 Equipment ID No. TE-1139 Equip. Class' 19- Temperature Sensors Equipment Description  
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 384 of 560 Sheet 4 of 5 Status: YE-- NEI   UDý Seismic Walkdown Checklist (SWC) SWELl-075 Equipment ID No. N/A           Equip. Class N/A Equipment Description NOT USED Photographs Note:                                         Note:
'B'LOOP TH TEMP Location:
 
Bldg. RB Floor El. 410 Room, Area 150 Manufacturer, Model, Etc. (optional but recommended)
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 385 of 560 Sheet 5 of 5 Status: YLI NEI U--
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Seismic Walkdown Checklist (SWC) SWELl-075 Equipment ID No. N/A           Equip. Class N/A Equipment Description NOT USED
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one Y[I NZ of the 50% of SWEL items requiring such verification)?
 
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 386 of 560 Sheet I of 5 Status: Y-I NE UI-Seismic Walkdown Checklist (SWC)                   SWELl-076 Equipment ID No.         TE-1139                   Equip. Class' 19- Temperature Sensors Equipment Description 'B'LOOP TH TEMP Location: Bldg. RB                   Floor El. 410           Room, Area 150 Manufacturer, Model, Etc. (optional but recommended)
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[-] N[I] UN N/A[D YE] NEI] U N/A-]Y-I NEI U[ N/A--I Enter the equipment class name from Appendix B: Classes of Equipment.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 387 of 560 Sheet 2 of 5 Status: YOI NZ UD Seismic Walkdown Checklist (SWC) SWELl-076 Equipment ID No. TE-1139 Equip. Class 19- Temperature Sensors Equipment Description  
Anchorage
'B' LOOP TH TEMP 5. Is the anchorage configuration consistent with plant documentation?
: 1. Is the anchorage configuration verification required (i.e., is the item one   Y[I NZ of the 50% of SWEL items requiring such verification)?
YD- NDI UZ N/AD-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             Y[-] N[I] UN N/A[D
: 6. Based on the above anchorage evaluations, is the anchorage free of Yil NEI U[potentially adverse seismic conditions?
: 3. Is the anchorage free of corrosion that is more than mild surface             YE] NEI] U      N/A-]
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
oxidation?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 4. Is the anchorage free of visible cracks in the concrete near the               Y-I NEI U[     N/A--
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YDI ND-' UZ N/AD--Y-I ND- UZ N/AD-YD- NDI UZ N/AD-YD- NEI UZ Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 388 of 560 Sheet 3 of 5 Status: YE[ NE U[--Seismic Walkdown Checklist (SWC) SWELl-076 Equipment ID No. TE-1139 Equip. Class 19- Temperature Sensors Equipment Description  
anchors?
'B'LOOP TH TEMP Other Adverse Conditions
I Enter the equipment class name from Appendix B: Classes of Equipment.
: 11. Have you looked for and found no other seismic conditions that could YO NEIl US adversely affect the safety functions of the equipment?
 
.Comments (Additional pages may be added as necessary)
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 387 of 560 Sheet 2 of 5 Status: YOI   NZ UD Seismic Walkdown Checklist (SWC)               SWELl-076 Equipment ID No.       TE-1139                 Equip. Class 19- Temperature Sensors Equipment Description 'B' LOOP TH TEMP
Evaluated by: Date:
: 5. Is the anchorage configuration consistent with plant documentation?         YD- NDI     UZ N/AD-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 389 of 560 Sheet 4 of 5 Status: YDI NE U-Seismic Walkdown Checklist (SWC) SWELl-076 Equipment ID No. TE-1139 Equip. Class 19- Temperature Sensors Equipment Description  
: 6. Based on the above anchorage evaluations, is the anchorage free of           Yil NEI     U[
'B' LOOP TH TEMP Photographs Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 390 of 560 Sheet 5 of 5 Status: Y-I NZ U'I Seismic Walkdown Checklist (SWC) SWELl-076 Equipment ID No. TE-1139 Equip. Class 19- Temperature Sensors Equipment Description  
potentially adverse seismic conditions?
'B' LOOP TH TEMP Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 391 of 560 Sheet 1 of 5 Status: YZ Nr I UrD Seismic Walkdown Checklist (SWC) SWELl-077 Equipment ID No. TS-7904 Equip. Class, 19- TEMPERATURE SENSORS Equipment Description H&V EMGCY D-G RM FAN D Location:
Interaction Effects
Bldg. RAB Floor El. 369 Room, Area 86 Manufacturer, Model, Etc. (optional but recommended)
: 7. Are soft targets free from impact by nearby equipment or structures?         YDI ND-' UZ N/AD--
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   Y-I ND- UZ N/AD-and masonry block walls not likely to collapse onto the equipment?
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 9. Do attached lines have adequate flexibility to avoid damage?               YD- NDI    UZ N/AD-
This item is part of the 50% configuration check.2. Is the anchorage free of bent, broken, missing or loose hardware?The anchorage is free of bent, broken, missing and loose hardware.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 10. Based on the above seismic interaction evaluations, is equipment free       YD-NEI UZ of potentially adverse seismic interaction effects?
The anchorage is free of corrosion.
 
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Mounted to Unistrut.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 388 of 560 Sheet 3 of 5 Status: YE[   NE U[--
Unistrut anchorage to concrete.
Seismic Walkdown Checklist (SWC)             SWELl-076 Equipment ID No. TE-1139                 Equip. Class 19- Temperature Sensors Equipment Description 'B'LOOP TH TEMP Other Adverse Conditions
Concrete is free of cracks.Y[ ND]Y" NEI UD- N/AD-YN NDI U-- N/AD-YZ NDI UiJ N/AFD'Enter the equipment class name from Appendix B: Classes of Equipment.
: 11. Have you looked for and found no other seismic conditions that could     YO NEIl US adversely affect the safety functions of the equipment?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 392 of 560 Sheet 2 of 5 Status: YZ N-- U--]Seismic Walkdown Checklist (SWC) SWELl-077 Equipment ID No. TS-7904 -Equip. Clas Equipment Description H&V EMGCY D-G RM FAN D S2 19 -TEMPERA TURE SENSORS 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
. Comments (Additional pages may be added as necessary)
TS-7904 temperature sensor is mounted to piece of Unistrut which is adequately anchored to the north wall near the center of the room. The anchorage configuration is consistent with CALC-94-SQ-1001-19, page 32.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Evaluated by:                                                                   Date:
Based on the above anchorage evaluations, the anchorage is free of potentially adverse seismic conditions.
 
YZ NEI Ur- N/AE-YZ NEI UE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 389 of 560 Sheet 4 of 5 Status: YDI   NE U-Seismic Walkdown Checklist (SWC)       SWELl-076 Equipment ID No. TE-1139             Equip. Class 19- Temperature Sensors Equipment Description 'B' LOOP TH TEMP Photographs
All components mounted on the wall near TS-7904 are mounted similarly on anchored uni-strut.
 
Overhead fluorescent lighting fixtures are adequately secured to prevent falling during a seismic event.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 390 of 560 Sheet 5 of 5 Status: Y-I NZ U'I Seismic Walkdown Checklist (SWC)       SWELl-076 Equipment ID No. TE-1139           Equip. Class 19- Temperature Sensors Equipment Description 'B' LOOP TH TEMP
All rigid electrical conduit, piping, and exhaust ducts overhead are adequately secured to prevent any seismic interaction with the component.
 
: 9. Do attached lines have adequate flexibility to avoid damage?Attached lines have adequate flexibility.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 391 of 560 Sheet 1 of 5 Status: YZ Nr I UrD Seismic Walkdown Checklist (SWC)                   SWELl-077 Equipment ID No.       TS-7904                   Equip. Class, 19- TEMPERATURE SENSORS Equipment Description H&V EMGCY D-G RM FAN D Location: Bldg. RAB                 Floor El. 369           Room, Area 86 Manufacturer, Model, Etc. (optional but recommended)
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.YN N[-] U[-1 N/A[:]YN NEI U[-1 N/AZ1 YN NEI U-I N/A--Y" NEM U--2 Enter the equipment class name from Appendix B: Classes of Equipment.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 393 of 560 Sheet 3 of 5 Status: YE NIZ U--Seismic Walkdown Checklist (SWC) SWELl-077 Equipment ID No. TS-7904 Equip. Class3 19- TEMPERATURE SENSORS Equipment Description H&VEMGCYD-G RM FAN D Other Adverse Conditions
Anchorage
: 11. Have you looked for and found no other seismic conditions that could Y[ N[- UI-adversely affect the safety functions of the equipment?
: 1. Is the anchorage configuration verification required (i.e., is the item one   Y[    ND]
It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found.Comments (Additional pages may be added as necessary)
of the 50% of SWEL items requiring such verification)?
The component was mounted to a piece of uni-strut anchored to the RC wall. The anchorage was judged to be adequate and sufficient as per ANO documentation, 6030.113 Seismic Raceway Supports, Attachment 3, Support Mounting Details, Attachment 10, Box Supports.Evaluated by: Eric Dilbone 6 Date: 10/2/2012 Daniel Parker 10/2/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
This item is part of the 50% configuration check.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 394 of 560 Sheet 4 of 5 Status: YZ NEI U[--Seismic Walkdown Checklist (SWC) SWELl-077 Equipment ID No. TS-7904 Equip. Class4 19- TEMPERATURE SENSORS Equipment Description H&VEMGCYD-G RM FAN D Photographs Note: TS-7904 Temperature Sensor Note: TS-7904 Temperature Sensor, Uni-Strut Anchorage to Wall.4 Enter the equipment class name from Appendix B: Classes of Equipment.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               Y"    NEI UD- N/AD-The anchorageis free of bent, broken, missing and loose hardware.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 395 of 560 Sheet 5 of 5 Status: YZ NEI U-il Seismic Walkdown Checklist (SWC) SWELl-077 Equipment ID No. TS-7904 Equip. Cla Equipment Description H&V EMGCY D-G RM FAN D Ss5 19- TEMPERATURE SENSORS Note: TS-7904 Temperature Sensor, Uni-Strut Anchorage to Wall.Note: Above TS-7904 Temperature Sensor.5 Enter the equipment class name from Appendix B: Classes of Equipment.
: 3. Is the anchorage free of corrosion that is more than mild surface               YN NDI U-- N/AD-oxidation?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 396 of 560 Sheet I of 5 Status: YZ ND UD Seismic Walkdown Checklist (SWC) SWELl-078 Equipment ID No. C10 Equip. Class' 20 -Instrumentation and Control Panels Equipment Description VERT BD- ELEC AUX Location:
The anchorageis free of corrosion.
Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)
: 4. Is the anchorage free of visible cracks in the concrete near the               YZ NDI    UiJ N/AFD anchors?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Mounted to Unistrut. Unistrut anchorage to concrete. Concrete is free of cracks.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YD] N Z of the 50% of SWEL items requiring such verification)?
'Enter the equipment class name from Appendix B: Classes of Equipment.
This item is not part of the 50%.2. Is the anchorage free of bent, broken, missing or loose hardware?
 
YZ NDI UDl N/AD3 Visual confirmation of 7 welds on front of cabinet in good condition.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 392 of 560 Sheet 2 of 5 Status: YZ N-- U--]
It was confirmed that 2 anchor bolts in the front of the cabinet are in good shape. The 2 corresponding anchor bolts in the rear of the cabinet were not visible due to wires on floor.3. Is the anchorage free of corrosion that is more than mild surface YZ NDI UDl N/A[D]oxidation?
Seismic Walkdown Checklist (SWC)                   SWELl-077 Equipment ID No.         TS-7904             -   Equip. Clas S2 19 - TEMPERA TURE SENSORS Equipment Description H&V EMGCY D-G RM FAN D
No mild surface oxidation present.4. Is the anchorage free of visible cracks in the concrete near the YZ ND-] UDI N/AD-anchors?Cabinet is welded to an embedded steel channel, but the concrete surrounding the channel was free of cracks.1 Enter the equipment class name from Appendix B: Classes of Equipment.
: 5. Is the anchorage configuration consistent with plant documentation?           YZ NEI Ur- N/AE-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 397 of 560 Sheet 2 of 5 Status: YZ ND] UI Seismic Walkdown Checklist (SWC) SWELl-078 Equipment ID No. CIO Equip. Class2 20 -Instrumentation and Control Panels Equipment Description VERT BD- ELEC AUX 5. Is the anchorage configuration consistent with plant documentation?
TS-7904 temperaturesensoris mounted to piece of Unistrut which is adequately anchoredto the north wall near the center of the room. The anchorageconfiguration is consistent with CALC-94-SQ-1001-19, page 32.
Y[-] ND] ULI N/A[(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of           YZ NEI      UE potentially adverse seismic conditions?
All anchorage that was visible was confirmed against CALC-94-SW-1001-20, pages 39-52, but not all anchorage could be seen.6. Based on the above anchorage evaluations, is the anchorage free of YE ND-- UD-potentially adverse seismic conditions?
Based on the above anchorageevaluations, the anchorage is free of potentially adverse seismic conditions.
All visible anchorage was free of potentially adverse seismic conditions.
Interaction Effects
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 7. Are soft targets free from impact by nearby equipment or structures?         YN N[-] U[-1 N/A[:]
There are no soft targets that could be impacted by nearby equipment or structures.
All components mounted on the wall near TS-7904 are mounted similarly on anchored uni-strut. Overhead fluorescent lighting fixtures are adequately secured to prevent falling during a seismic event.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,     YN NEI U[-1 N/AZ1 and masonry block walls not likely to collapse onto the equipment?
Masonry block walls in the room are seismically qualified, and painted with a qualification number. Ceiling tiles and lights are all in good condition, and are adequately supported.
All rigid electricalconduit, piping, and exhaust ducts overhead are adequatelysecured to prevent any seismic interaction with the component.
: 9. Do attached lines have adequate flexibility to avoid damage?The attached lines have adequate flexibility.
: 9. Do attached lines have adequate flexibility to avoid damage?                   YN NEI U-I N/A--
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Based on the above evaluation, the cabinet is free of potentially adverse seismic interaciton effects.Y] NDI UD] N/AD-YZ N[D UD- N/AD-YZ NDl UDl N/AD YZ NDJ UD-2 Enter the equipment class name from Appendix B: Classes of Equipment.
Attached lines have adequate flexibility.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 398 of 560 Sheet 3 of 5 Status: YZ NEI U-I Seismic Walkdown Checklist (SWC) SWELl-078 Equipment ID No. C10 Equip. Class3 20 -Instrumentation and Control Panels Equipment Description VERT BD- ELEC AUX Other Adverse Conditions
: 10. Based on the above seismic interaction evaluations, is equipment free           Y"  NEM U--
: 11. Have you looked for and found no other seismic conditions that could Y[( Ni[ UIM adversely affect the safety functions of the equipment?
of potentially adverse seismic interaction effects?
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.Comments (Additional pages may be added as necessary)
Based on the above seismic interactionevaluations, the equipment is free of potentially adverse seismic interactioneffects.
Evaluated by: Roy Berryman Date: 10/4/2012 Eric Dilbone 6 U.:- " 10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
2 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 399 of 560 Sheet 4 of 5 Status: YZ NEI] ULI Seismic Walkdown Checklist (SWC) SWELl-078 Equipment ID No. C10 Equip. Class4 20- Instrumentation and Control Panels Equipment Description VERT BD- ELEC AUX Photographs Note: Cabinet CIO tag from the back.Note: View inside the cabinet. Some of the steel channel anchor bolts were covered by wires that could not be moved for inspection.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 393 of 560 Sheet 3 of 5 Status: YE NIZ U--
Seismic Walkdown Checklist (SWC)                   SWELl-077 Equipment ID No.         TS-7904                   Equip. Class3 19- TEMPERATURE SENSORS Equipment Description H&VEMGCYD-G RM FAN D Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could         Y[   N[-   UI-adversely affect the safety functions of the equipment?
It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found.
Comments (Additional pages may be added as necessary)
The component was mounted to a piece of uni-strut anchoredto the RC wall. The anchorage was judged to be adequate and sufficient as perANO documentation, 6030.113 Seismic Raceway Supports, Attachment 3, Support Mounting Details, Attachment 10, Box Supports.
Evaluated by: Eric Dilbone 6
* Date: 10/2/2012 Daniel Parker                                                             10/2/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 394 of 560 Sheet 4 of 5 Status: YZ NEI     U[--
Seismic Walkdown Checklist (SWC)                   SWELl-077 Equipment ID No.         TS-7904                   Equip. Class4 19- TEMPERATURE SENSORS Equipment Description H&VEMGCYD-G RM FAN D Photographs Note: TS-7904 Temperature Sensor                                   Note: TS-7904 Temperature Sensor, Uni-Strut Anchorage to Wall.
4 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 395 of 560 Sheet 5 of 5 Status: YZ NEI     U-il Seismic Walkdown Checklist (SWC)                   SWELl-077 Equipment ID No.         TS-7904                   Equip. Cla Ss5  19- TEMPERATURE SENSORS Equipment Description H&V EMGCY D-G RM FAN D Note: TS-7904 Temperature Sensor, Uni-Strut                       Note: Above TS-7904 Temperature Sensor.
Anchorage to Wall.
5 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 396 of 560 Sheet I of 5 Status: YZ ND UD Seismic Walkdown Checklist (SWC)                     SWELl-078 Equipment ID No.         C10                       Equip. Class' 20 - Instrumentationand Control Panels Equipment Description VERT BD- ELEC AUX Location: Bldg. RAB                   Floor El. 386           Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one     YD] NZ of the 50% of SWEL items requiring such verification)?
This item is not part of the 50%.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               YZ NDI     UDl N/AD3 Visual confirmation of 7 welds on front of cabinet in good condition. It was confirmed that 2 anchorbolts in the front of the cabinet are in good shape. The 2 corresponding anchorbolts in the rearof the cabinet were not visible due to wires on floor.
: 3. Is the anchorage free of corrosion that is more than mild surface               YZ NDI UDl N/A[D]
oxidation?
No mild surface oxidation present.
: 4. Is the anchorage free of visible cracks in the concrete near the                 YZ ND-] UDI N/AD-anchors?
Cabinet is welded to an embedded steel channel, but the concrete surroundingthe channel was free of cracks.
1 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 397 of 560 Sheet 2 of 5 Status: YZ   ND] UI Seismic Walkdown Checklist (SWC)                   SWELl-078 Equipment ID No.         CIO                       Equip. Class2 20 - Instrumentation and Control Panels Equipment Description VERT BD- ELEC AUX
: 5. Is the anchorage configuration consistent with plant documentation?             Y[-] ND] ULI N/A[
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
All anchorage that was visible was confirmed against CALC-94-SW-1001-20, pages 39-52, but not all anchoragecould be seen.
: 6. Based on the above anchorage evaluations, is the anchorage free of             YE ND-- UD-potentially adverse seismic conditions?
All visible anchoragewas free of potentially adverse seismic conditions.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?           Y] NDI UD] N/AD-There are no soft targetsthat could be impacted by nearby equipment or structures.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,       YZ N[D UD- N/AD-and masonry block walls not likely to collapse onto the equipment?
Masonry block walls in the room are seismically qualified, and painted with a qualification number. Ceiling tiles and lights are all in good condition, and are adequatelysupported.
: 9. Do attached lines have adequate flexibility to avoid damage?                   YZ NDl UDl N/AD The attachedlines have adequate flexibility.
: 10. Based on the above seismic interaction evaluations, is equipment free           YZ NDJ UD-of potentially adverse seismic interaction effects?
Based on the above evaluation, the cabinet is free of potentially adverse seismic interaciton effects.
2 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 398 of 560 Sheet 3 of 5 Status: YZ NEI U-I Seismic Walkdown Checklist (SWC)                   SWELl-078 Equipment ID No.       C10                       Equip. Class3 20 - Instrumentationand Control Panels Equipment Description VERT BD- ELEC AUX Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could             Y[(   Ni[   UIM adversely affect the safety functions of the equipment?
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.
Comments (Additional pages may be added as necessary)
Evaluated by: Roy Berryman                                                               Date: 10/4/2012 Eric Dilbone   6U.:-         "                                                 10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 399 of 560 Sheet 4 of 5 Status: YZ NEI] ULI Seismic Walkdown Checklist (SWC)                   SWELl-078 Equipment ID No.       C10                       Equip. Class4 20- Instrumentationand Control Panels Equipment Description VERT BD- ELEC AUX Photographs Note: Cabinet CIO tag from the back.                             Note: View inside the cabinet. Some of the steel channel anchor bolts were covered by wires that could not be moved for inspection.
4 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 400 of 560 Sheet 5 of 5 Status: Y[    NE] UD-Seismic Walkdown Checklist (SWC)                    SWELl--078 Equipment ID No.        C10                      Equip. Class5 20 - Instrumentationand Control Panels Equipment Description VERT BD- ELEC AUX Note: A representativeweld on the front of the                    Note: Cabinet CIO from the front.
cabinet to the steel channel.
5 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 401 of 560 Sheet I of 5 Status: YN NEI U-Seismic Walkdown Checklist (SWC)                    SWELl- 079 Equipment ID No.        PY-2618-A1                Equip. Class' 20 - Instrumentation and Control Panels Equipment Description IW CONVERTER STM GEN A PRESS Location: Bldg. RAB                Floor El. 368            Room, Area 104 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one      Yil NZ of the 50% of SWEL items requiring such verification)?
This item is not part of the 50%.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?              YZ NEI      ur-D N/Ar-This component is located in a nest in cabinet C539A. No bent, broken, missing or loose hardware was observed.
: 3. Is the anchorage free of corrosion that is more than mild surface                Y[    NEI U[1 N/AFD oxidation?
No corrosion was observed.
: 4. Is the anchorage free of visible cracks in the concrete near the                'YZ N[:] UIE] N/AEl anchors?
The component is located in a nest of cabinet C539A. No cracks in the concrete were observed around the panel anchorage IEnter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 402 of 560 Sheet 2 of 5 Status: YE NIZ U[--
Seismic Walkdown Checklist (SWC)                    SWELl- 079 Equipment ID No.        PY-2618-Al                Equip. Class2 20 - Instrumentation and Control Panels Equipment Description IN CONVERTER STM GEN A PRESS
: 5. Is the anchorage configuration consistent with plant documentation?            YE-  NEJ ULI N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
This item is not part of the 50%.
: 6. Based on the above anchorage evaluations, is the anchorage free of              YE  NEJ U[I potentially adverse seismic conditions?
Based on the above anchorageevaluations, the anchorageis free of potentially adverse seismic conditions.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?          YZ NEI      UE1 N/A[E]
Soft targets are free from impact since they are in a cabinet that is latched closed.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,      'Y[] NE:] UE1 N/AZ and masonry block walls not likely to collapse onto the equipment?
This does not apply since the component is located inside of a cabinet.
: 9. Do attached lines have adequate flexibility to avoid damage?                    YZ NEI U-      N/AE1 Attached lines have adequateflexibility.
: 10. Based on the above seismic interaction evaluations, is equipment free            YZ NE] UM of potentially adverse seismic interaction effects?
Based on the above seismic interaction evaluations, the equipment is free of potentiallyadverse seismic interactioneffects.
2 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 403 of 560 Sheet 3 of 5 Status: YZ NOI U-I Seismic Walkdown Checklist (SWC)                    SWELl- 079 Equipment ID No.        PY-2618-A1                Equip. Class3 20 - Instrumentationand Control Panels Equipment Description I/V CONVERTER STM GEN A PRESS Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could            Y[    N[] Ur-adversely affect the safety functions of the equipment?
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.
Comments (Additional pages may be added as necessary)
Evaluated by: Eric Dilbone 6u                &-                                          Date: 10/10/2012 Daniel Parker                                                                  10/10/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 404 of 560 Sheet 4 of 5 Status: YE NE]    UI]
Seismic Walkdown Checklist, (SWC)                  SWELl- 079 Equipment ID No.        PY-2618-A1                Equip. Class4 20- Instrumentation and Control Panels Equipment Description        I/V CONVERTER STM GEN A PRESS Photographs Note: Front view of component.                                    Note: Sign on cabinet door.
4 Enter the equipment class name from Appendix B: Classes of Equipment.
4 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 400 of 560 Sheet 5 of 5 Status: Y[ NE] UD-Seismic Walkdown Checklist (SWC) SWELl--078 Equipment ID No. C10 Equip. Class5 20 -Instrumentation and Control Panels Equipment Description VERT BD- ELEC AUX Note: A representative weld on the front of the cabinet to the steel channel.Note: Cabinet CIO from the front.5 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 401 of 560 Sheet I of 5 Status: YN NEI U-Seismic Walkdown Checklist (SWC) SWELl- 079 Equipment ID No. PY-2618-A1 Equip. Class' 20 -Instrumentation and Control Panels Equipment Description IW CONVERTER STM GEN A PRESS Location:
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 405 of 560 Sheet 5 of 5 Status: YZ NE] UM Seismic Walkdown Checklist (SWC)                   SWELl- 079 Equipment ID No.       PY-2618-Al                Equip. CIass5 20 - Instrumentation and Control Panels Equipment Description IW CONVERTER STM GEN A PRESS Note: Wingnut and washerare used to keep                        Note:
Bldg. RAB Floor El. 368 Room, Area 104 Manufacturer, Model, Etc. (optional but recommended)
the metal plate over the door to keep it from swinging open. As the nameplate reads, this is necessary to maintain seismic qualificationsfor the cabinet.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Enter the equipment class name from Appendix B: Classes of Equipment.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
 
This item is not part of the 50%.2. Is the anchorage free of bent, broken, missing or loose hardware?This component is located in a nest in cabinet C539A. No bent, broken, missing or loose hardware was observed.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 406 of 560 Sheet I of 4 Status: YZ NiF ULI-Seismic Walkdown Checklist (SWC)                   SWELl-080 Equipment ID No.         PB-0144                  Equip. Class, 20 - Instrumentation and Control Panels Equipment Description START BUTTON FOR DIESEL GENERATOR #1 Location: Bldg. RAB                 Floor El. 386            Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)
No corrosion was observed.4. Is the anchorage free of visible cracks in the concrete near the anchors?The component is located in a nest of cabinet C539A. No cracks in the concrete were observed around the panel anchorage Yil NZ YZ NEI ur-D N/Ar-Y[ NEI U[1 N/AFD'YZ N[:] UIE] N/AEl I Enter the equipment class name from Appendix B: Classes of Equipment.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 402 of 560 Sheet 2 of 5 Status: YE NIZ U[--Seismic Walkdown Checklist (SWC) SWELl- 079 Equipment ID No. PY-2618-Al Equip. Class2 20 -Instrumentation and Control Panels Equipment Description IN CONVERTER STM GEN A PRESS 5. Is the anchorage configuration consistent with plant documentation?
Anchorage
YE- NEJ ULI N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is the anchorage configuration verification required (i.e., is the item one     YE- No of the 50% of SWEL items requiring such verification)?
This item is not part of the 50%.6. Based on the above anchorage evaluations, is the anchorage free of YE NEJ U[I potentially adverse seismic conditions?
This item is not part of the 50%.
Based on the above anchorage evaluations, the anchorage is free of potentially adverse seismic conditions.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               Y'    NEi UEJ N/AE[-
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
This component is face mounted to a cabinet. No bent, broken, missing or loose hardware was observed.
Soft targets are free from impact since they are in a cabinet that is latched closed.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 3. Is the anchorage free of corrosion that is more than mild surface               YZ NEI      uEr N/AE-1 oxidation?
This does not apply since the component is located inside of a cabinet.9. Do attached lines have adequate flexibility to avoid damage?Attached lines have adequate flexibility.
This component is face mounted to a cabinet. No corrosion was observed.
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.YZ NEI UE1 N/A[E]'Y[] NE:] UE1 N/AZ YZ NEI U- N/AE1 YZ NE] UM 2 Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the               YZ NEI      UE- N/AE-1 anchors?
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 403 of 560 Sheet 3 of 5 Status: YZ NO I U-I Seismic Walkdown Checklist (SWC) SWELl- 079 Equipment ID No. PY-2618-A1 Equip. Class3 20 -Instrumentation and Control Panels Equipment Description I/V CONVERTER STM GEN A PRESS Other Adverse Conditions
This component is face mounted to a cabinet. No cracks in concrete were observed.
: 11. Have you looked for and found no other seismic conditions that could Y[ N[] Ur-adversely affect the safety functions of the equipment?
IEnter the equipment class name from Appendix B: Classes of Equipment.
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.Comments (Additional pages may be added as necessary)
 
Evaluated by: Eric Dilbone 6u &-Date: 10/10/2012 Daniel Parker 10/10/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 407 of 560 Sheet 2 of 4 Status: YZ NF1    U-Seismic Walkdown Checklist (SWC)                   SWELl-080 Equipment ID No.       PB-0144                    Equip. Class2 20 - Instrumentationand Control Panels Equipment Description START BUTTON FOR DIESEL GENERATOR #1
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 404 of 560 Sheet 4 of 5 Status: YE NE] UI]Seismic Walkdown Checklist, (SWC) SWELl- 079 Equipment ID No. PY-2618-A1 Equip. Class4 20- Instrumentation and Control Panels Equipment Description I/V CONVERTER STM GEN A PRESS Photographs Note: Front view of component.
: 5. Is the anchorage configuration consistent with plant documentation?             YEI NEI U[] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Note: Sign on cabinet door.4 Enter the equipment class name from Appendix B: Classes of Equipment.
This item is not part of the 50%.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 405 of 560 Sheet 5 of 5 Status: YZ NE] UM Seismic Walkdown Checklist (SWC) SWELl- 079 Equipment ID No. PY-2618-Al Equip. CIass5 20 -Instrumentation and Control Panels Equipment Description IW CONVERTER STM GEN A PRESS Note: Wingnut and washer are used to keep the metal plate over the door to keep it from swinging open. As the nameplate reads, this is necessary to maintain seismic qualifications for the cabinet.Note: Enter the equipment class name from Appendix B: Classes of Equipment.
: 6. Based on the above anchorage evaluations, is the anchorage free of             YZ NE]I UE potentially adverse seismic conditions?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 406 of 560 Sheet I of 4 Status: YZ NiF ULI-Seismic Walkdown Checklist (SWC) SWELl-080 Equipment ID No. PB-0144 Equip. Class, 20 -Instrumentation and Control Panels Equipment Description START BUTTON FOR DIESEL GENERATOR
The anchorageis not visible since it is mounted in the face of a panel. The cabinet could not be opened due to Control Room Operations. However, the button appearsto be installedproperly and there is no apparentreason why it would be adversely affected in a seismic event.
#1 Location:
Interaction Effects
Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)
: 7. Are soft targets free from impact by nearby equipment or structures?           Y[    NEI UE] N/AE]
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
There are no soft targetsthat could be impacted by nearby equipment or structures.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YE- No of the 50% of SWEL items requiring such verification)?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,       Y[    NE] UEI N/AE]
This item is not part of the 50%.2. Is the anchorage free of bent, broken, missing or loose hardware?This component is face mounted to a cabinet. No bent, broken, missing or loose hardware was observed.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
and masonry block walls not likely to collapse onto the equipment?
This component is face mounted to a cabinet. No corrosion was observed.4. Is the anchorage free of visible cracks in the concrete near the anchors?This component is face mounted to a cabinet. No cracks in concrete were observed.Y' NEi UEJ N/AE[-YZ NEI uEr N/AE-1 YZ NEI UE- N/AE-1 I Enter the equipment class name from Appendix B: Classes of Equipment.
Masonry block walls in the room are seismically qualified, and painted with a qualificationnumber. Ceiling tiles and lights are all in good condition, and are adequatelysupported.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 407 of 560 Sheet 2 of 4 Status: YZ NF1 U-Seismic Walkdown Checklist (SWC) SWELl-080 Equipment ID No. PB-0144 Equip. Class2 20 -Instrumentation and Control Panels Equipment Description START BUTTON FOR DIESEL GENERATOR
: 9. Do attached lines have adequate flexibility to avoid damage?                    '(Y  NEI UE] N/AE]
#1 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
There are no visible attachedlines, since the button is mounted on the face of a panel.
This item is not part of the 50%.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 10. Based on the above seismic interaction evaluations, is equipment free            Y0 NEI UE]
The anchorage is not visible since it is mounted in the face of a panel. The cabinet could not be opened due to Control Room Operations.
of potentially adverse seismic interaction effects?
However, the button appears to be installed properly and there is no apparent reason why it would be adversely affected in a seismic event.YEI NEI U[] N/AZ YZ NE]I UE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Based on the above evaluation, the button is free of potentially adverse seismic interacitoneffects.
There are no soft targets that could be impacted by nearby equipment or structures.
2 Enter the equipment class name from Appendix B: Classes of Equipment.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
 
Masonry block walls in the room are seismically qualified, and painted with a qualification number. Ceiling tiles and lights are all in good condition, and are adequately supported.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 408 of 560 Sheet 3 of 4 Status: YZ NF U-Seismic Walkdown Checklist (SWC)                    SWELl-080 Equipment ID No.       PB-0144                    Equip. Class3 20 - Instrumentationand Control Panels Equipment Description START BUTTON FOR DIESEL GENERATOR #1 Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?There are no visible attached lines, since the button is mounted on the face of a panel.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Based on the above evaluation, the button is free of potentially adverse seismic interaciton effects.Y[ NEI UE] N/AE]Y[ NE] UEI N/AE]'(Y NEI UE] N/AE]Y0 NEI UE]2 Enter the equipment class name from Appendix B: Classes of Equipment.
: 11. Have you looked for and found no other seismic conditions that could            YZ N[] UM adversely affect the safety functions of the equipment?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 408 of 560 Sheet 3 of 4 Status: YZ NF U-Seismic Walkdown Checklist (SWC) SWELl-080 Equipment ID No. PB-0144 Equip. Class3 20 -Instrumentation and Control Panels Equipment Description START BUTTON FOR DIESEL GENERATOR
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.
#1 Other Adverse Conditions
Comments (Additional pages may be added as necessary)
: 11. Have you looked for and found no other seismic conditions that could YZ N[] UM adversely affect the safety functions of the equipment?
Evaluated by: Roy Berryman                                                              Date: 10/4/2012 Eric flbohnse  6z41                                                          10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.Comments (Additional pages may be added as necessary)
 
Evaluated by: Roy Berryman Date: 10/4/2012 Eric flbohnse 6z41 10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 409 of 560 Sheet 4 of 4 Status: YZ NEi] UF-1 Seismic Walkdown Checklist (SWC)                    SWELl-080 Equipment ID No.       PB-0144                    Equip. Class4 20 - Instrumentationand Control Panels Equipment Description START BUTTON FOR DIESEL GENERATOR #1 Photographs Note: PB-0144 is shown mounted in the face                        Note:
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 409 of 560 Sheet 4 of 4 Status: YZ NEi] UF-1 Seismic Walkdown Checklist (SWC) SWELl-080 Equipment ID No. PB-0144 Equip. Class4 20 -Instrumentation and Control Panels Equipment Description START BUTTON FOR DIESEL GENERATOR
of a panel 4 Enter the equipment class name from Appendix B: Classes of Equipment.
#1 Photographs Note: PB-0144 is shown mounted in the face of a panel Note: 4 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 410 of 560 Sheet I of 5 Status: YZ NEI UDE-Seismic Walkdown Checklist (SWC) SWELl- 081 Equipment ID No. C539A Equip. Class' 20 -Instrumentation and Control Panels Equipment Description EFIC SIGNAL CONDITIONING CABINET Location:
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 410 of 560 Sheet I of 5 Status: YZ NEI      UDE-Seismic Walkdown Checklist (SWC)                   SWELl- 081 Equipment ID No.         C539A                    Equip. Class' 20 - Instrumentationand Control Panels Equipment Description EFIC SIGNAL CONDITIONING CABINET Location: Bldg. RAB             Floor El. 368            Room, Area 104 Manufacturer, Model, Etc. (optional but recommended)
Bldg. RAB Floor El. 368 Room, Area 104 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Anchorage
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one Y[I- NZ of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one     Y[I- NZ of the 50% of SWEL items requiring such verification)?
This is not part of the 50%.2. Is the anchorage free of bent, broken, missing or loose hardware?
This is not part of the 50%.
Y' NEi ULi N/A-'The visible anchorage is free of bent, broken and loose hardware.However, only half of the anchorage was visible.3. Is the anchorage free of corrosion that is more than mild surface YZ N[i U[i] N/A[--oxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               Y'    NEi  ULi N/A-'
The visible anchorage is free of bent, broken and loose hardware.
However, only half of the anchoragewas visible.
: 3. Is the anchorage free of corrosion that is more than mild surface               YZ N[i    U[i] N/A[--
oxidation?
The visible anchorage is free of corrosion.
The visible anchorage is free of corrosion.
: 4. Is the anchorage free of visible cracks in the concrete near the YZ NEI U[I N/A--anchors?The cabinet anchorage is free of cracks in the concrete near the anchors.Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the               YZ NEI U[I     N/A--
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 411 of 560 Sheet 2 of 5 Status: YZ No] U'Seismic Walkdown Checklist (SWC) SWELl- 081 Equipment ID No. C539A Equip. Class 20 -Instrumentation and Control Panels Equipment Description EFIC SIGNAL CONDITIONING CABINET 5. Is the anchorage configuration consistent with plant documentation?
anchors?
YE] NE] UE] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
The cabinet anchorageis free of cracks in the concrete near the anchors.
This item is not part of the 50%. However, visible anchorage is consistent with CALC-94-SQ-1001-20, pages 235-246.6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UE]potentially adverse seismic conditions?
Enter the equipment class name from Appendix B: Classes of Equipment.
All visible anchorage was free of potentially adverse seismic conditions.
 
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 411 of 560 Sheet 2 of 5 Status: YZ No] U' Seismic Walkdown Checklist (SWC)               SWELl- 081 Equipment ID No.     C539A                   Equip. Class 20 - Instrumentation and Control Panels Equipment Description EFIC SIGNAL CONDITIONING CABINET
Soft targets are free from impact by nearby equipment and structures.
: 5. Is the anchorage configuration consistent with plant documentation?         YE] NE]     UE] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
This item is not part of the 50%. However, visible anchorage is consistent with CALC-94-SQ-1001-20, pages 235-246.
There are no masonry block walls or ceiling tiles in the room. The lights are in good condition, and do not present an interaction effect.9. Do attached lines have adequate flexibility to avoid damage?The attached lines have adequate flexibility.
: 6. Based on the above anchorage evaluations, is the anchorage free of           YZ NEI     UE]
YZ NEi UIE] N/AE1'Y[Z NE] UE-] N/AE]Y[ NEI UE1 N/A[-]10. Based on the above seismic interaction evaluations, is equipment free Y[ NE] UE]of potentially adverse seismic interaction effects?Based on the above evaluation, the cabinet is free of potentially adverse seismic interaction effects.
potentially adverse seismic conditions?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 412 of 560 Sheet 3 of 5 Status: YZ NEI' U-Seismic Walkdown Checklist (SWC) SWELl- 081 Equipment ID No. C539A Equip. Class 20 -Instrumentation and Control Panels Equipment Description EFIC SIGNAL CONDITIONING CABINET Other Adverse Conditions
All visible anchoragewas free of potentially adverse seismic conditions.
: 11. Have you looked for and found no other seismic conditions that could YN N[: Uij adversely affect the safety functions of the equipment?
Interaction Effects
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.Comments (Additional pages may be added as necessary)
: 7. Are soft targets free from impact by nearby equipment or structures?         YZ NEi      UIE] N/AE1 Soft targets are free from impact by nearby equipment and structures.
Evaluated by: Eric Dilbone Daniel Parker Date: 10/10/2012 10/10/2012 Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 413 of 560 Sheet 4 of 5 Status: YE NF Ur Seismic Walkdown Checklist (SWC) SWELl- 081 Equipment ID No. C539A Equip. Class 20 -Instrumentation and Control Panels Equipment Description EFIC SIGNAL CONDITIONING CABINET Photographs Note: Note: View of the inside of the front of C m A.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   'Y[Z  NE] UE-] N/AE]
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 414 of 560 Sheet 5 of 5 Status: YZ NF U-Seismic Walkdown Checklist (SWC) SWELl- 081 Equipment ID No. C539A -Equip. Class 20 -Instrumentation and Control Panels Equipment Description EFIC SIGNAL CONDITIONING CABINET Note: View of bottom of C539A from the rear.Note: View of C5 taken off.
and masonry block walls not likely to collapse onto the equipment?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 415 of 560 Sheet I of 5 Status: Y-I NE] U-I Seismic Walkdown Checklist (SWC) SWELl-082 Equipment ID No. N/A Equip. Class, N/A Equipment Description NOT USED Location:
There are no masonry block walls or ceiling tiles in the room. The lights are in good condition, and do not present an interaction effect.
Bldg. N/A Floor El. N/A Room, Area N/A Manufacturer, Model, Etc. (optional but recommended)
: 9. Do attached lines have adequate flexibility to avoid damage?                 Y[   NEI   UE1 N/A[-]
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
The attachedlines have adequate flexibility.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one Y[-- NE of the 50% of SWEL items requiring such verification)?
: 10. Based on the above seismic interaction evaluations, is equipment free       Y[     NE] UE]
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
of potentially adverse seismic interaction effects?
YE-] NEl UEi N/AEl 3. Is the anchorage free of corrosion that is more than mild surface YE-] NE] UEi N/AEl oxidation?
Based on the above evaluation, the cabinet is free of potentially adverse seismic interactioneffects.
: 4. Is the anchorage free of visible cracks in the concrete near the YE NEl UE-] N/AE--anchors?1 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 416 of 560 Sheet 2 of 5 Status: YE- NI- U-Seismic Walkdown Checklist (SWC) SWELl-082 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED 5. Is the anchorage configuration consistent with plant documentation?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 412 of 560 Sheet 3 of 5 Status: YZ NEI' U-Seismic Walkdown Checklist (SWC)             SWELl- 081 Equipment ID No. C539A                   Equip. Class 20 - Instrumentation and Control Panels Equipment Description EFIC SIGNAL CONDITIONING CABINET Other Adverse Conditions
YE NEI UE N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 11. Have you looked for and found no other seismic conditions that could       YN N[:     Uij adversely affect the safety functions of the equipment?
: 6. Based on the above anchorage evaluations, is the anchorage free of Y[- NE UE-1 potentially adverse seismic conditions?
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YO NE uE N/AE-1 YE] NE UE:] N/AE: YE NE UE N/A[-]YE- NEI U--
Engineering Report No. CALC-ANO I-C S- 12-00002 Attachment C Rev. 0 Page 417 of 560 Sheet 3 of 5 Status: YE[- NF] U-]Seismic Walkdown Checklist (SWC) SWELl-082 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could Y[-] NE ULI adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Evaluated by: Date:
Evaluated by: Eric Dilbone                                                        Date: 10/10/2012 Daniel Parker                                                              10/10/2012
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 418 of 560 Sheet 4 of 5 Status: YEr- NEI U -]Seismic Walkdown Checklist (SWC) SWELl-082 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Photographs Note: Note:
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 419 of 560 Sheet 5 of 5 Status: Y[-- NEI Uni-Seismic Walkdown Checklist (SWC) SWELl-082 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Note: Note:
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 413 of 560 Sheet 4 of 5 Status: YE NF Ur Seismic Walkdown Checklist (SWC)     SWELl- 081 Equipment ID No. C539A            Equip. Class 20 - Instrumentation and Control Panels Equipment Description EFIC SIGNAL CONDITIONING CABINET Photographs m
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 420 of 560 Sheet I of 5 Status: YEI NF ULI Seismic Walkdown Checklist (SWC) SWELl-083 Equipment ID No. N/A Equip. Class, N/A Equipment Description NOT USED Location:
Note: (*                                          Note: View of the inside of the front of C    A.
Bldg. N/A Floor El. N/A Room, Area N/A Manufacturer, Model, Etc. (optional but recommended)
 
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 414 of 560 Sheet 5 of 5 Status: YZ NF U-Seismic Walkdown Checklist (SWC)     SWELl- 081 Equipment ID No. C539A          - Equip. Class 20 - Instrumentation and Control Panels Equipment Description EFIC SIGNAL CONDITIONING CABINET Note: View of bottom of C539A from the rear.      Note: View of C5 taken off.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
 
Y[--W NEW 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 415 of 560 Sheet I of 5 Status: Y-I NE] U-I Seismic Walkdown Checklist (SWC)                     SWELl-082 Equipment ID No.         N/A                       Equip. Class, N/A Equipment Description NOT USED Location: Bldg. N/A                   Floor El. N/A           Room, Area N/A Manufacturer, Model, Etc. (optional but recommended)
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YW-] N[l U- N/A-Y[-- NEI UW- N/A[--Y-I NWJ U-- N/A[]1 Enter the equipment class name from Appendix B: Classes of Equipment.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 421 of 560 Sheet 2 of 5 Status: Y-- Nn Ur Seismic Walkdown Checklist (SWC) SWELl-083 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED 5. Is the anchorage configuration consistent with plant documentation?
Anchorage
Y[-- NWi UW3 N/A'-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is the anchorage configuration verification required (i.e., is the item one   Y[-- NE of the 50% of SWEL items requiring such verification)?
: 6. Based on the above anchorage evaluations, is the anchorage free of YLI NEI ULI potentially adverse seismic conditions?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             YE-] NEl UEi N/AEl
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 3. Is the anchorage free of corrosion that is more than mild surface             YE-] NE] UEi N/AEl oxidation?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 4. Is the anchorage free of visible cracks in the concrete near the               YE NEl    UE-] N/AE--
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?*YEI Nn UW N/A[-]Y[-] NW ] UW-1 N/Ar-Y-I NE] UWJ N/A[: YEJ NEJ Un Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 422 of 560 Sheet 3 of 5 Status: YO-] NE] U[-]Seismic Walkdown Checklist (SWC) SWELl-083 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Other Adverse Conditions
anchors?
: 11. Have you looked for and found no other seismic conditions that could YO-- N[-] U[-]adversely affect the safety functions of the equipment?
1 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 416 of 560 Sheet 2 of 5 Status: YE-  NI- U-Seismic Walkdown Checklist (SWC)               SWELl-082 Equipment ID No.     N/A                     Equip. Class N/A Equipment Description NOT USED
: 5. Is the anchorage configuration consistent with plant documentation?         YE NEI      UE N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of           Y[-  NE UE-1 potentially adverse seismic conditions?
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?         YO NE uE        N/AE-1
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YE] NE UE:] N/AE:
and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?               YE NE UE N/A[-]
: 10. Based on the above seismic interaction evaluations, is equipment free       YE- NEI U--
of potentially adverse seismic interaction effects?
 
Engineering Report No. CALC-ANO I-C S- 12-00002 Attachment C Rev. 0 Page 417 of 560 Sheet 3 of 5 Status: YE[- NF] U-]
Seismic Walkdown Checklist (SWC)             SWELl-082 Equipment ID No. N/A                     Equip. Class N/A Equipment Description NOT USED Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     Y[-] NE    ULI adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Evaluated by: Date:
Evaluated by:                                                                   Date:
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 423 of 560 Sheet 4 of 5 Status: YO- No U[D Seismic Walkdown Checklist (SWC) SWELl-083 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Photographs Note: Note:
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 424 of 560 Sheet 5 of 5 Status: YO NF U[-Seismic Walkdown Checklist (SWC) SWELl-083 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Note: Note:
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 418 of 560 Sheet 4 of 5 Status: YEr-  NEI    U -]
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 425 of 560 Sheet I of 5 Status: YZ NE-] U-Seismic Walkdown Checklist (SWC) SWELl- 084 Equipment ID No. PI-2811A Equip. Class' 20 -Instrumentation and Control Panels Equipment Description EFWP P-7A DISCH PRESS Location:
Seismic Walkdown Checklist (SWC)  SWELl-082 Equipment ID No. N/A          Equip. Class N/A Equipment Description NOT USED Photographs Note:                                        Note:
Bldg. RAB Floor El. 335 Room, Area 38 Manufacturer, Model, Etc. (optional but recommended)
 
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 419 of 560 Sheet 5 of 5 Status: Y[-- NEI  Uni-Seismic Walkdown Checklist (SWC)  SWELl-082 Equipment ID No. N/A          Equip. Class N/A Equipment Description NOT USED Note:                                        Note:
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
 
Verification is required for this item. There are four anchor bolts in the item, and thus, this item is part of the 50%.2. Is the anchorage free of bent, broken, missing or loose hardware?Anchorage in the item appears to be free from the conditions stated above.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 420 of 560 Sheet I of 5 Status: YEI NF ULI Seismic Walkdown Checklist (SWC)                    SWELl-083 Equipment ID No.          N/A                      Equip. Class, N/A Equipment Description NOT USED Location: Bldg. N/A                  Floor El. N/A            Room, Area N/A Manufacturer, Model, Etc. (optional but recommended)
There was no sign of corrosion found anywhere in the item.4. Is the anchorage free of visible cracks in the concrete near the anchors?No visible cracks have been found.YZ N[-YZ NEI ULI N/AZ!YZ NEI] Ur- N/AF-YZ NEI UEl N/AZ!' Enter the equipment class name from Appendix B: Classes of Equipment.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 426 of 560 Sheet 2 of 5 Status: YZ ND] UFD Seismic Walkdown Checklist (SWC) SWELl- 084 Equipment IDNo. PI-2811A Equip. Class 20 -Instrumentation and Control Panels Equipment Description EFWP P-7A DISCH PRESS 5. Is the anchorage configuration consistent with plant documentation?  
Anchorage
'YZ ND] UD- N/AD-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is the anchorage configuration verification required (i.e., is the item one    Y[--W NEW of the 50% of SWEL items requiring such verification)?
The anchorage configuration matches with the description specified in CALC-94-SQ-1001-20, pages 1048 to 1051.6. Based on the above anchorage evaluations, is the anchorage free of Y( ND- UD potentially adverse seismic conditions?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?              YW-] N[l U-    N/A-
No potentially adverse seismic conditions have been found.Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 3. Is the anchorage free of corrosion that is more than mild surface              Y[-- NEI  UW- N/A[--
All soft targets appear to be free from any impact by nearby equipment and structures.
oxidation?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 4. Is the anchorage free of visible cracks in the concrete near the                Y-I NWJ U-- N/A[]
Overhead equipment is properly placed. Therefore, it is very unlikely that they would collapse onto this item.9. Do attached lines have adequate flexibility to avoid damage?All attached lines appear to have adequate flexibility.
anchors?
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Because all the mass is found near the anchor, it is very unlikely that it will seismically interact with other equipment.
1 Enter the equipment class name from Appendix B: Classes of Equipment.
Y" NDI uD-] N/AD-1"Y NDI UD1 N/AD-YZ ND-1 UD- N/AD-YZ N[:D UM Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 427 of 560 Sheet 3 of 5 Status: YZ NE] UW--Seismic Walkdown Checklist (SWC) SWELl- 084 Equipment ID No. PI-2811A Equip. Class 20 -Instrumentation and Control Panels Equipment Description EFWP P-7A DISCH PRESS Other Adverse Conditions
 
: 11. Have you looked for and found no other seismic conditions that could Y[ NEJ UFJ adversely affect the safety functions of the equipment?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 421 of 560 Sheet 2 of 5 Status: Y--  Nn Ur Seismic Walkdown Checklist (SWC)                SWELl-083 Equipment ID No.      N/A                    Equip. Class N/A Equipment Description NOT USED
: 5. Is the anchorage configuration consistent with plant documentation?        Y[-- NWi    UW3 N/A'-
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of          YLI NEI ULI potentially adverse seismic conditions?
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?        *YEI Nn UW N/A[-]
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,  Y[-] NW] UW-1 N/Ar-and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?                Y-I NE] UWJ N/A[:
: 10. Based on the above seismic interaction evaluations, is equipment free      YEJ NEJ Un of potentially adverse seismic interaction effects?
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 422 of 560 Sheet 3 of 5 Status: YO-] NE]  U[-]
Seismic Walkdown Checklist (SWC)              SWELl-083 Equipment ID No. N/A                      Equip. Class N/A Equipment Description NOT USED Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could    YO--  N[-] U[-]
adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Evaluated by:                                                                  Date:
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 423 of 560 Sheet 4 of 5 Status: YO- No     U[D Seismic Walkdown Checklist (SWC) SWELl-083 Equipment ID No. N/A           Equip. Class N/A Equipment Description NOT USED Photographs Note:                                         Note:
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 424 of 560 Sheet 5 of 5 Status: YO NF U[-
Seismic Walkdown Checklist (SWC) SWELl-083 Equipment ID No. N/A           Equip. Class N/A Equipment Description NOT USED Note:                                         Note:
 
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 425 of 560 Sheet I of 5 Status: YZ NE-] U-Seismic Walkdown Checklist (SWC)                   SWELl- 084 Equipment ID No.         PI-2811A                 Equip. Class' 20 - Instrumentation and Control Panels Equipment Description EFWP P-7A DISCH PRESS Location: Bldg. RAB                 Floor El. 335           Room, Area 38 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one     YZ N[-
of the 50% of SWEL items requiring such verification)?
Verification is requiredfor this item. There are four anchorbolts in the item, and thus, this item is partof the 50%.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               YZ NEI    ULI N/AZ!
Anchorage in the item appears to be free from the conditions stated above.
: 3. Is the anchorage free of corrosion that is more than mild surface               YZ NEI] Ur- N/AF-oxidation?
There was no sign of corrosion found anywhere in the item.
: 4. Is the anchorage free of visible cracks in the concrete near the                 YZ NEI    UEl N/AZ!
anchors?
No visible cracks have been found.
' Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 426 of 560 Sheet 2 of 5 Status: YZ ND] UFD Seismic Walkdown Checklist (SWC)               SWELl- 084 Equipment IDNo.       PI-2811A               Equip. Class 20 - Instrumentation and Control Panels Equipment Description EFWP P-7A DISCH PRESS
: 5. Is the anchorage configuration consistent with plant documentation?         'YZ ND] UD- N/AD-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
The anchorageconfigurationmatches with the description specified in CALC-94-SQ-1001-20, pages 1048 to 1051.
: 6. Based on the above anchorage evaluations, is the anchorage free of         Y(   ND- UD potentially adverse seismic conditions?
No potentially adverse seismic conditions have been found.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       Y"    NDI uD-] N/AD-1 All soft targets appearto be free from any impact by nearby equipment and structures.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   "Y    NDI  UD1 N/AD-and masonry block walls not likely to collapse onto the equipment?
Overheadequipment is properlyplaced. Therefore, it is very unlikely that they would collapse onto this item.
: 9. Do attached lines have adequate flexibility to avoid damage?               YZ ND-1 UD- N/AD-All attachedlines appearto have adequateflexibility.
: 10. Based on the above seismic interaction evaluations, is equipment free       YZ N[:D UM of potentially adverse seismic interaction effects?
Because all the mass is found near the anchor,it is very unlikely that it will seismically interactwith other equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 427 of 560 Sheet 3 of 5 Status: YZ NE] UW--
Seismic Walkdown Checklist (SWC)               SWELl- 084 Equipment ID No. PI-2811A               Equip. Class 20 - Instrumentation and Control Panels Equipment Description EFWP P-7A DISCH PRESS Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could         Y[   NEJ UFJ adversely affect the safety functions of the equipment?
No other seismic conditions were found in the area to affect the equipment's safety functions.
No other seismic conditions were found in the area to affect the equipment's safety functions.
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Component is found to be in adequate conditions with respect to anchorage, soft targets, overhead equipment, flexibility in attached lines, and seismic interaction.
Component is found to be in adequateconditions with respect to anchorage,soft targets,overhead equipment, flexibility in attachedlines, and seismic interaction. No severe issues have been found to affect the component's integrity.
No severe issues have been found to affect the component's integrity.
Evaluated by: Daniel Parker                                                       Date: 10/8/2012 Michael E. Perez /                                                          10/8/2012
Evaluated by: Daniel Parker Michael E. Perez /Date: 10/8/2012 10/8/2012 Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 428 of 560 Sheet 4 of 5 Status: YZ NEI UL-I Seismic Walkdown Checklist (SWC) SWELl- 084 Equipment ID No. PI-2811A Equip. Class 20 -Instrumentation and Control Panels Equipment Description EFWP P-7A DISCH PRESS Photographs Note: Equipment ID tag for Item PI-281 IA.Note: Equipment is mounted on a pipe rack that is anchored by 4 bolts, as specified in the SEWS. As can be seen, the anchorage is in adequate conditions.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 429 of 560 Sheet 5 of 5 Status: YZ NO UI'Seismic Walkdown Checklist (SWC) SWELl- 084 Equipment ID No. PI-2811A Equip. Class 20 -Instrumentation and Control Panels Equipment Description EFWP P-7A DISCH PRESS Note: Note that the additional anchors found within the component are free from any signs of corrosion.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 428 of 560 Sheet 4 of 5 Status: YZ NEI     UL-I Seismic Walkdown Checklist (SWC)       SWELl- 084 Equipment ID No. PI-2811A           Equip. Class 20 - Instrumentation and Control Panels Equipment Description EFWP P-7A DISCH PRESS Photographs Note: Equipment ID tag for Item PI-281 IA.         Note: Equipment is mounted on a pipe rack that is anchored by 4 M*" bolts, as specified in the SEWS. As can be seen, the anchorageis in adequate conditions.
Note:
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 430 of 560 Sheet 1 of 5 Status: YE No UD-Seismic Walkdown Checklist (SWC) SWELl-085 Equipment ID No. C88 Equip. Class, 20 -Instrumentation and Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. 1 Location:
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 429 of 560 Sheet 5 of 5 Status: YZ NO UI' Seismic Walkdown Checklist (SWC)       SWELl- 084 Equipment ID No. PI-2811A           Equip. Class 20 - Instrumentation and Control Panels Equipment Description EFWP P-7A DISCH PRESS Note: Note that the additionalanchors found         Note:
Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)
within the component are free from any signs of corrosion.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
 
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one Y5 ND-of the 50% of SWEL items requiring such verification)?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 430 of 560 Sheet 1 of 5 Status: YE No     UD-Seismic Walkdown Checklist (SWC)                     SWELl-085 Equipment ID No.         C88                       Equip. Class, 20 - Instrumentation and Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. 1 Location: Bldg. RAB                   Floor El. 386           Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)
Not part of the 50% anchorage configuration verification.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
YZ NEI UD-- N/AD-]All anchorage is visible, and is free of bent, broken, missing and loose hardware.3. Is the anchorage free of corrosion that is more than mild surface YN ND-] U[-] N/Ar oxidation?
: 1. Is the anchorage configuration verification required (i.e., is the item one     Y5   ND-of the 50% of SWEL items requiring such verification)?
Not part of the 50% anchorageconfiguration verification.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               YZ NEI UD-- N/AD-]
All anchorageis visible, and is free of bent, broken, missing and loose hardware.
: 3. Is the anchorage free of corrosion that is more than mild surface               YN ND-] U[-] N/Ar oxidation?
There was no observablecorrosion,or even mild surface oxidation on the anchorage.
: 4. Is the anchorage free of visible cracks in the concrete near the                YN ND-I U'- N/AD-'
anchors?
The anchorageis free of visible cracks in the concrete near the anchors.
1 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 431 of 560 Sheet 2 of 5 Status: Y[    NEI  UrD Seismic Walkdown Checklist (SWC)                    SWELl-085 Equipment ID No.        C88                      Equip. Class2 20 - Instrumentation and Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. I
: 5. Is the anchorage configuration consistent with plant documentation?              YZ N[1 UE" N/AD--
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
The anchorageconfiguration is consistent with plant documentation.
The anchorageis in accordancewith the description in CALC-94-SQ-1001-20, page 299. Additionally, the configurationis consistent with Drawing C-264, Detail 4.
: 6. Based on the above anchorage evaluations, is the anchorage free of              Y[    N[-] U[]
potentially adverse seismic conditions?
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?            YZ NEI U[:] N/A-There are no soft targets that are susceptible to impact by nearby equipment or structures. All soft targets are containedwithin the cabinet, and the cabinet is latched closed.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,      Y[    N[-] U[-] N/A[D-and masonry block walls not likely to collapse onto the equipment?
None of the overhead equipment, ceiling tiles or lighting are likely to collapse onto the equipment. The masonry block walls in the room are seismically qualified.
: 9. Do attached lines have adequate flexibility to avoid damage?                    YZ NDI U[-D N/AD1 Attached lines have adequate flexibility to avoid damage.
: 10. Based on the above seismic interaction evaluations, is equipment free            YN NDI    UD of potentially adverse seismic interaction effects?
Based on the above seismic interactionevaluations, the equipment is free of potentially adverse seismic interaction effects.
2 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 432 of 560 Sheet 3 of 5 Status: YZ NEI    U[-
Seismic Walkdown Checklist (SWC)                    SWELl-085 Equipment ID No.        C88                      Equip. Class3 20 - Instrumentation and Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. 1 Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could            Y[    NE] U[-
adversely affect the safety functions of the equipment?
It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found. It was observed that neighboring cabinets were appropriatelybolted together to avoid interactioneffects.
Comments (Additional pages may be added as necessary)
Evaluated by: Roy Berryman                                                              Date: 10/4/2012 Eric Dilbone    6    A  &1F.--.                  -                          10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 433 of 560 Sheet 4 of 5 Status: YM N-      UF-I Seismic Walkdown Checklist (SWC)                    SWELl-085 Equipment ID No.        C88                      Equip. CIass4 20 - Instrumentationand Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. 1 Photographs V
Expansion anchors Note: Equipment ID tag identifying the                            Note: View inside the? bottom of the front of cabinet.                                                          the cabinet with the door open. Two of the four expansion anchors are visible.
4 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 434 of 560 Sheet 5 of 5 Status: Y[    NEI    UrD Seismic Walkdown Checklist (SWC)                    SWELl-085 Equipment ID No.        C88                      Equip. Classs 20 - Instrumentation and Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. 1 I
Expansion anchor Note: View of one of the expansion anchors in                      Note: View of the bottom of the cabinet from the rearof the cabinet, as seen from the front                    the outside. Consistent with plant with the door open.                                                documentation,no anchorage is visible without opening the cabinet.
5 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 435 of 560 Sheet I of 5 Status: YE NIh U[--
Seismic Walkdown Checklist (SWC)                    SWELl-086 Equipment ID No.          C89                      Equip. Class' 20 - Instrumentation and Control Panels Equipment Description ESAS ANALOG SUBSYSTEM No. 2 Location: Bldg. RAB                  Floor El. 386            Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one    Y"    NEI of the 50% of SWEL items requiring such verification)?
This item is part of the 50%.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?              YN NEI      U[L N/A[--
All anchorageis visible, and is free of bent, broken, missing and loose hardware.
: 3. Is the anchorage free of corrosion that is more than mild surface              YZ NEI      UI1 N/AZI oxidation?
There was no observable corrosion, or even mild surface oxidation on the anchorage.
There was no observable corrosion, or even mild surface oxidation on the anchorage.
: 4. Is the anchorage free of visible cracks in the concrete near the YN ND-I U'- N/AD-'anchors?The anchorage is free of visible cracks in the concrete near the anchors.1 Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the                 YZ NEil UI1 N/A-'
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 431 of 560 Sheet 2 of 5 Status: Y[ NEI UrD Seismic Walkdown Checklist (SWC) SWELl-085 Equipment ID No. C88 Equip. Class2 20 -Instrumentation and Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. I 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
anchors?
The anchorage configuration is consistent with plant documentation.
The anchorageis free of visible cracks in the concrete near the anchors.
The anchorage is in accordance with the description in CALC-94-SQ-1001-20, page 299. Additionally, the configuration is consistent with Drawing C-264, Detail 4.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
1 Enter the equipment class name from Appendix B: Classes of Equipment.
YZ N[1 UE" N/AD--Y[ N[-] U[]Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
 
There are no soft targets that are susceptible to impact by nearby equipment or structures.
Engineering Report No. CALC-ANO 1-C S- 12-00002 Attachment C Rev. 0 Page 436 of 560 Sheet 2 of 5 Status: YE ND UD-1 Seismic Walkdown Checklist (SWC)                   SWELl-086 Equipment ID No.         C89                      Equip. Class2 20 - Instrumentation and Control Panels Equipment Description ESAS ANALOG SUBSYSTEM No. 2
All soft targets are contained within the cabinet, and the cabinet is latched closed.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 5. Is the anchorage configuration consistent with plant documentation?             YZ NDI      UD- N/AD-'
None of the overhead equipment, ceiling tiles or lighting are likely to collapse onto the equipment.
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
The masonry block walls in the room are seismically qualified.
The anchorage configurationis consistent with plant documentation.
: 9. Do attached lines have adequate flexibility to avoid damage?Attached lines have adequate flexibility to avoid damage.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.YZ NEI U[:] N/A-Y[ N[-] U[-] N/A[D-YZ NDI U[-D N/AD1 YN NDI UD 2 Enter the equipment class name from Appendix B: Classes of Equipment.
The anchorageis in accordance with the description in CALC-94-SQ-1001-20, page 303. Additionally, the configurationis consistent with Drawing C-264, Detail4.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 432 of 560 Sheet 3 of 5 Status: YZ NEI U[-Seismic Walkdown Checklist (SWC) SWELl-085 Equipment ID No. C88 Equip. Class3 20 -Instrumentation and Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. 1 Other Adverse Conditions
: 6. Based on the above anchorage evaluations, is the anchorage free of             Y"    ND-] u[--
: 11. Have you looked for and found no other seismic conditions that could Y[ NE] U[-adversely affect the safety functions of the equipment?
potentially adverse seismic conditions?
It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found. It was observed that neighboring cabinets were appropriately bolted together to avoid interaction effects.Comments (Additional pages may be added as necessary)
Based on the above anchorage evaluations, the anchorageis free of potentially adverse seismic conditions.
Evaluated by: Roy Berryman Date: 10/4/2012 Eric Dilbone 6 *A &1F.--. -10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
Interaction Effects
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 433 of 560 Sheet 4 of 5 Status: YM N- UF-I Seismic Walkdown Checklist (SWC) SWELl-085 Equipment ID No. C88 Equip. CIass4 20 -Instrumentation and Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. 1 Photographs V Expansion anchors Note: Equipment ID tag identifying the cabinet.Note: View inside the? bottom of the front of the cabinet with the door open. Two of the four expansion anchors are visible.4 Enter the equipment class name from Appendix B: Classes of Equipment.
: 7. Are soft targets free from impact by nearby equipment or structures?           YN NDJ U[-D N/A[D There are no soft targets that are susceptible to impact by nearby equipment or structures. All soft targets are containedwithin the cabinet, and the cabinet is latched closed.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 434 of 560 Sheet 5 of 5 Status: Y[ NEI UrD Seismic Walkdown Checklist (SWC) SWELl-085 Equipment ID No. C88 Equip. Classs 20 -Instrumentation and Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. 1 I Expansion anchor Note: View of one of the expansion anchors in the rear of the cabinet, as seen from the front with the door open.Note: View of the bottom of the cabinet from the outside. Consistent with plant documentation, no anchorage is visible without opening the cabinet.5 Enter the equipment class name from Appendix B: Classes of Equipment.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,       YZ NDI      UD1 N/ADl and masonry block walls not likely to collapse onto the equipment?
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 435 of 560 Sheet I of 5 Status: YE NIh U[--Seismic Walkdown Checklist (SWC) SWELl-086 Equipment ID No. C89 Equip. Class' 20 -Instrumentation and Control Panels Equipment Description ESAS ANALOG SUBSYSTEM No. 2 Location:
None of the overhead equipment, ceiling tiles or lighting are likely to collapse onto the equipment. The masonry block walls in the room are seismically qualified.
Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)
: 9. Do attached lines have adequate flexibility to avoid damage?                   Y'    NDJ UD- N/AD-Attached lines have adequateflexibility to avoid damage.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
: 10. Based on the above seismic interaction evaluations, is equipment free           Y'    NDi UD-of potentially adverse seismic interaction effects?
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Based on the above seismic interactionevaluations, the equipment is free of potentially adverse seismic interaction effects.
This item is part of the 50%.2. Is the anchorage free of bent, broken, missing or loose hardware?All anchorage is visible, and is free of bent, broken, missing and loose hardware.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
2 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 437 of 560 Sheet 3 of 5 Status: YZ NE] U-Seismic Walkdown Checklist (SWC)                   SWELl-086 Equipment ID No.         C89                      Equip. Class3 20 - Instrumentationand Control Panels Equipment Description ESAS ANALOG SUBSYSTEM No. 2 Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could             Y'    N]   UMi adversely affect the safety functions of the equipment?
It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found. It was observed that neighboringcabinets were appropriatelybolted together to avoid interaction effects.
Comments (Additional pages may be added as necessary)
Evaluated by: Roy Berryman                                                               Date: 10/4/2012 Eric Dilbone       2                                                          10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 438 of 560 Sheet 4 of 5 Status: Y[    NEI U[-
Seismic Walkdown Checklist (SWC)                   SWELl-086 Equipment ID No.         C89                      Equip. Class4 20 - Instrumentationand ControlPanels Equipment Description ESAS ANALOG SUBSYSTEM No. 2 Photographs Note: Equipment ID tag identifying the                             Note: View inside the bottom of the front of cabinet.                                                           the cabinet.
4 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 439 of 560 Sheet 5 of 5 Status: Y[   NR-- U-Seismic Walkdown Checklist (SWC)                   SWELl-086 Equipment ID No.         C89                      Equip. CIass5 20 - Instrumentation and Control Panels Equipment Description ESAS ANALOG SUBSYSTEM No. 2 COl Note: View of the side of the cabinet with the                     Note: Closer view inside the bottom of the door open. The cabinet is bolted to the                            cabinet from the front with the door open.
neighboring cabinet as shown.
5 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 440 of 560 Sheet 1 of 5 Status: YE NE]    U[Ij Seismic Walkdown Checklist (SWC)                     SWELl-087 Equipment ID No.         C90                      Equip. Class' 20 - Instrumentation and Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. 3 Location: Bldg. RAB                   Floor El. 386           Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one     YN ND]
of the 50% of SWEL items requiring such verification)?
This item is partof the 50%.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               Y[    NEI UD- N/A[D]
All anchorageis visible, and is free of bent, broken, missing and loose hardware.
: 3. Is the anchorage free of corrosion that is more than mild surface               Y[    NDI  ULI N/AD-oxidation?
There was no observable corrosion, or even mild surface oxidation on the anchorage.
There was no observable corrosion, or even mild surface oxidation on the anchorage.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?The anchorage is free of visible cracks in the concrete near the anchors.Y" NEI YN NEI U[L N/A[--YZ NEI UI1 N/AZI YZ NEil UI1 N/A-'1 Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the                 Y[    NDI U[-- N/AD--
Engineering Report No. CALC-ANO 1-C S- 12-00002 Attachment C Rev. 0 Page 436 of 560 Sheet 2 of 5 Status: YE ND UD-1 Seismic Walkdown Checklist (SWC) SWELl-086 Equipment ID No. C89 Equip. Class2 20 -Instrumentation and Control Panels Equipment Description ESAS ANALOG SUBSYSTEM No. 2 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
anchors?
The anchorage configuration is consistent with plant documentation.
The anchorage is free of visible cracks in the concrete near the anchors.
The anchorage is in accordance with the description in CALC-94-SQ-1001-20, page 303. Additionally, the configuration is consistent with Drawing C-264, Detail 4.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
I Enter the equipment class name from Appendix B: Classes of Equipment.
Based on the above anchorage evaluations, the anchorage is free of potentially adverse seismic conditions.
 
YZ NDI UD- N/AD-'Y" ND-] u[--Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Engineering Report No. CALC-ANO 1-C S- 12-00002 Attachment C Rev. 0 Page 441 of 560 Sheet 2 of 5 Status: YZ NE] U[I Seismic Walkdown Checklist (SWC)                     SWELl-087 Equipment ID No.         C90                      Equip. Class2 20 - Instrumentationand Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. 3
There are no soft targets that are susceptible to impact by nearby equipment or structures.
: 5. Is the anchorage configuration consistent with plant documentation?           YZ    NE] UEL N/AZ1 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
All soft targets are contained within the cabinet, and the cabinet is latched closed.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
The anchorageconfiguration is consistent with plant documentation.
None of the overhead equipment, ceiling tiles or lighting are likely to collapse onto the equipment.
The anchorageis in accordance with the description in CALC-94-SQ-1001-20, page 307. Additionally, the configuration is consistent with Drawing C-264, Detail 4.
The masonry block walls in the room are seismically qualified.
: 6. Based on the above anchorage evaluations, is the anchorage free of             YZ NEI UEJ potentially adverse seismic conditions?
: 9. Do attached lines have adequate flexibility to avoid damage?Attached lines have adequate flexibility to avoid damage.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.YN NDJ U[-D N/A[D YZ NDI UD1 N/ADl Y' NDJ UD- N/AD-Y' NDi UD-2 Enter the equipment class name from Appendix B: Classes of Equipment.
Based on the above anchorageevaluations, the anchorage is free of potentially adverse seismic conditions.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 437 of 560 Sheet 3 of 5 Status: YZ NE] U-Seismic Walkdown Checklist (SWC) SWELl-086 Equipment ID No. C89 Equip. Class3 20 -Instrumentation and Control Panels Equipment Description ESAS ANALOG SUBSYSTEM No. 2 Other Adverse Conditions
Interaction Effects
: 11. Have you looked for and found no other seismic conditions that could Y' N] UMi adversely affect the safety functions of the equipment?
: 7. Are soft targets free from impact by nearby equipment or structures?           Y[    NEI UE] N/AE]
It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found. It was observed that neighboring cabinets were appropriately bolted together to avoid interaction effects.Comments (Additional pages may be added as necessary)
There are no soft targets that are susceptible to impact by nearby equipment or structures. All soft targets are containedwithin the cabinet, and the cabinet is latched closed.
Evaluated by: Roy Berryman Date: 10/4/2012 Eric Dilbone 2 10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,     YZ NEI UE] N/A[-]
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 438 of 560 Sheet 4 of 5 Status: Y[ NEI U[-Seismic Walkdown Checklist (SWC) SWELl-086 Equipment ID No. C89 Equip. Class4 20 -Instrumentation and Control Panels Equipment Description ESAS ANALOG SUBSYSTEM No. 2 Photographs Note: Equipment ID tag identifying the cabinet.Note: View inside the bottom of the front of the cabinet.4 Enter the equipment class name from Appendix B: Classes of Equipment.
and masonry block walls not likely to collapse onto the equipment?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 439 of 560 Sheet 5 of 5 Status: Y[ NR-- U-Seismic Walkdown Checklist (SWC) SWELl-086 Equipment ID No. C89 Equip. CIass5 20 -Instrumentation and Control Panels Equipment Description ESAS ANALOG SUBSYSTEM No. 2 COl Note: View of the side of the cabinet with the door open. The cabinet is bolted to the neighboring cabinet as shown.Note: Closer view inside the bottom of the cabinet from the front with the door open.5 Enter the equipment class name from Appendix B: Classes of Equipment.
None of the overhead equipment, ceiling tiles or lighting are likely to collapse onto the equipment. The masonry block walls in the room are seismically qualified.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 440 of 560 Sheet 1 of 5 Status: YE NE] U[Ij Seismic Walkdown Checklist (SWC) SWELl-087 Equipment ID No. C90 Equip. Class' 20 -Instrumentation and Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. 3 Location:
: 9. Do attached lines have adequate flexibility to avoid damage?                   YZ NE] uE] N/AE]
Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)
Attached lines have adequateflexibility to avoid damage.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
: 10. Based on the above seismic interaction evaluations, is equipment free         YZ N[:] UE]
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YN ND]of the 50% of SWEL items requiring such verification)?
of potentially adverse seismic interaction effects?
This item is part of the 50%.2. Is the anchorage free of bent, broken, missing or loose hardware?All anchorage is visible, and is free of bent, broken, missing and loose hardware.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Based on the above seismic interaction evaluations, the equipment is free of potentiallyadverse seismic interactioneffects.
There was no observable corrosion, or even mild surface oxidation on the anchorage.
2 Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?The anchorage is free of visible cracks in the concrete near the anchors.Y[ NEI UD- N/A[D]Y[ NDI ULI N/AD-Y[ NDI U[-- N/AD--I Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-C S- 12-00002 Attachment C Rev. 0 Page 441 of 560 Sheet 2 of 5 Status: YZ NE] U[I Seismic Walkdown Checklist (SWC) SWELl-087 Equipment ID No. C90 Equip. Class2 20 -Instrumentation and Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. 3 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 442 of 560 Sheet 3 of 5 Status: YZ No U--
The anchorage configuration is consistent with plant documentation.
Seismic Walkdown Checklist (SWC)                   SWELl-087 Equipment ID No.         C90                -    Equip. Class3 20 - Instrumentation and Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. 3 Other Adverse Conditions
The anchorage is in accordance with the description in CALC-94-SQ-1001-20, page 307. Additionally, the configuration is consistent with Drawing C-264, Detail 4.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 11. Have you looked for and found no other seismic conditions that could             YZ Nil U[I adversely affect the safety functions of the equipment?
Based on the above anchorage evaluations, the anchorage is free of potentially adverse seismic conditions.
It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found. It was observed that neighboringcabinets were appropriatelybolted together to avoid interactioneffects.
YZ NE] UEL N/AZ1 YZ NEI UEJ Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Comments (Additional pages may be added as necessary)
There are no soft targets that are susceptible to impact by nearby equipment or structures.
Evaluated by: Roy Berryman                                                               Date: 10/4/2012 Eric Dilbone     ""    `,'c    -                                            10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
All soft targets are contained within the cabinet, and the cabinet is latched closed.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
 
None of the overhead equipment, ceiling tiles or lighting are likely to collapse onto the equipment.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 443 of 560 Sheet 4 of 5 Status: YE NEI     UL-I Seismic Walkdown Checklist (SWC)                   SWELl-087 Equipment ID No.       C90                        Equip. Class4 20 - Instrumentationand Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. 3 Photographs Note: Equipment ID tag identifying the                           Note: View inside the bottom of the cabinet cabinet.                                                         with the front door open.
The masonry block walls in the room are seismically qualified.
4 Enter the equipment class name from Appendix B: Classes of Equipment.
: 9. Do attached lines have adequate flexibility to avoid damage?Attached lines have adequate flexibility to avoid damage.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.Y[ NEI UE] N/AE]YZ NEI UE] N/A[-]YZ NE] uE] N/AE]YZ N[:] UE]2 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 442 of 560 Sheet 3 of 5 Status: YZ No U--Seismic Walkdown Checklist (SWC) SWELl-087 Equipment ID No. C90 -Equip. Class3 20 -Instrumentation and Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. 3 Other Adverse Conditions
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 444 of 560 Sheet 5 of 5 Status: YZ NDI    U in Seismic Walkdown Checklist (SWC)                   SWELl-087 Equipment ID No.         C90                      Equip. Class5 20 - Instrumentationand Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. 3 Note: View of the side of the cabinet with the                   Note:
: 11. Have you looked for and found no other seismic conditions that could YZ Nil U[I adversely affect the safety functions of the equipment?
front door open. The bolting to the neighboring cabinet is visible along the side.
It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found. It was observed that neighboring cabinets were appropriately bolted together to avoid interaction effects.Comments (Additional pages may be added as necessary)
5 Enter the equipment class name from Appendix B: Classes of Equipment.
Evaluated by: Roy Berryman Date: 10/4/2012 Eric Dilbone "" `,'c -10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 443 of 560 Sheet 4 of 5 Status: YE NEI UL-I Seismic Walkdown Checklist (SWC) SWELl-087 Equipment ID No. C90 Equip. Class4 20 -Instrumentation and Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. 3 Photographs Note: Equipment ID tag identifying the cabinet.Note: View inside the bottom of the cabinet with the front door open.4 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 445 of 560 Sheet I of 4 Status: YZ NL- U-Seismic Walkdown Checklist (SWC)                   SWELl-088 Equipment ID No.         PWR-2406                  Equip. Class' 20 - Instrumentation and Control Panels Equipment Description REACTOR BLDG SPRAY ENG SAFEG'D POWER SUPPLY Location: Bldg. RAB                 Floor El. 386           Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 444 of 560 Sheet 5 of 5 Status: YZ NDI U in Seismic Walkdown Checklist (SWC) SWELl-087 Equipment ID No. C90 Equip. Class5 20 -Instrumentation and Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. 3 Note: View of the side of the cabinet with the front door open. The bolting to the neighboring cabinet is visible along the side.Note: 5 Enter the equipment class name from Appendix B: Classes of Equipment.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 445 of 560 Sheet I of 4 Status: YZ NL- U-Seismic Walkdown Checklist (SWC) SWELl-088 Equipment ID No. PWR-2406 Equip. Class' 20 -Instrumentation and Control Panels Equipment Description REACTOR BLDG SPRAY ENG SAFEG'D POWER SUPPLY Location:
Anchorage
Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)
: 1. Is the anchorage configuration verification required (i.e., is the item one     YDi NZ of the 50% of SWEL items requiring such verification)?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
This item is not part of the 50%.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               YZ NEI      UEI N/AD1 Item is mounted in a cabinet. No adverse hardware conditions were observed.
This item is not part of the 50%.2. Is the anchorage free of bent, broken, missing or loose hardware?Item is mounted in a cabinet. No adverse hardware conditions were observed.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface               YZ N[I- U-I    N/AD-oxidation?
Item is mounted in a cabinet. No oxidation was observed 4. Is the anchorage free of visible cracks in the concrete near the anchors?Item is mounted in a cabinet. No cracks in concrete were observed YDi NZ YZ NEI UEI N/AD1 YZ N[I- U-I N/AD-YZ NEI UED N/AD--I Enter the equipment class name from Appendix B: Classes of Equipment.
Item is mounted in a cabinet. No oxidation was observed
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 446 of 560 Sheet 2 of 4 Status: YZ ND ULI Seismic Walkdown Checklist (SWC) SWELl-088 Equipment ID No. PWR-2406 Equip. Class2 20 -Instrumentation and Control Panels Equipment Description REACTOR BLDG SPRAY ENG SAFEG'D POWER SUPPLY 5. Is the anchorage configuration consistent with plant documentation?
: 4. Is the anchorage free of visible cracks in the concrete near the               YZ NEI UED N/AD--
YOI ND UIl N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
anchors?
This item is not part of the 50%.6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI U[D potentially adverse seismic conditions?
Item is mounted in a cabinet. No cracks in concrete were observed I Enter the equipment class name from Appendix B: Classes of Equipment.
Based on the above anchorage evaluations, the anchorage is free of potentially adverse seismic conditions.
 
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 446 of 560 Sheet 2 of 4 Status: YZ ND ULI Seismic Walkdown Checklist (SWC)                   SWELl-088 Equipment ID No.         PWR-2406                  Equip. Class2 20 - Instrumentationand Control Panels Equipment Description REACTOR BLDG SPRAY ENG SAFEG'D POWER SUPPLY
There are no soft targets that could be impacted by nearby equipment or structures.
: 5. Is the anchorage configuration consistent with plant documentation?             YOI  ND UIl N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
This item is not part of the 50%.
Masonry block walls in the room are seismically qualified, and painted with a qualification number. Ceiling tiles and lights are all in good condition, and are adequately supported.
: 6. Based on the above anchorage evaluations, is the anchorage free of              YZ NEI      U[D potentially adverse seismic conditions?
: 9. Do attached lines have adequate flexibility to avoid damage?There are no visible attached lines, since the power supply is rack-mounted in a cabinet that can only be opened from the front without disassembling the cabinet.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Based on the above evaluation, the power supply is free of potentially adverse seismic interaciton effects.YN NDI UDl N/AD YZ NDI UD N/AD YO ND U[-] N/A--YE ND Uil 2 Enter the equipment class name from Appendix B: Classes of Equipment.
Based on the above anchorageevaluations, the anchorage is free of potentially adverse seismic conditions.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 447 of 560 Sheet 3 of 4 Status: YZ NEI UI-Seismic Walkdown Checklist (SWC) SWELl-088 Equipment ID No. PWR-2406 Equip. Class3 20 -Instrumentation and Control Panels Equipment Description REACTOR BLDG SPRAY ENG SAFEG'D POWER SUPPLY Other Adverse Conditions
Interaction Effects
: 11. Have you looked for and found no other seismic conditions that could Y' NiZ U[adversely affect the safety functions of the equipment?
: 7. Are soft targets free from impact by nearby equipment or structures?           YN NDI      UDl N/AD There are no soft targets that could be impacted by nearby equipment or structures.
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.Comments (Additional pages may be added as necessary)
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,       YZ NDI      UD N/AD and masonry block walls not likely to collapse onto the equipment?
Evaluated by: Roy Berryman Date: 10/4/2012 Eric Dilbone 6 _ _ _ _10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
Masonry block walls in the room are seismically qualified, and painted with a qualificationnumber. Ceiling tiles and lights are all in good condition, and are adequately supported.
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 448 of 560 Sheet 4 of 4 Status: YO NEI U[-Seismic Walkdown Checklist (SWC) SWELl-088 Equipment ID No. PWR-2406 Equip. CIass4 20 -Instrumentation and Control Panels Equipment Description REACTOR BLDG SPRAY ENG SAFEG'D POWER SUPPLY Photographs Note: PWR-2406 as seen from the front with the cabinet door open.Note: View inside the cabinet door. The power supply is identified as the top two rack positions, as seen in the previous image (upper). Also, a zoomed in version of the section in the rectangle is shown (lower).4 Enter the equipment class name from Appendix B: Classes of Equipment.
: 9. Do attached lines have adequate flexibility to avoid damage?                   YO ND U[-] N/A--
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 449 of 560 Sheet I of 5 Status: YZ NE] UD--Seismic Walkdown Checklist (SWC) SWELl-089 Equipment ID No. C14 Equip. Class, 20 -Instrumentation and Control Panels Equipment Description VERTICAL BOARD, PRIMARY COOLANT Location:
There are no visible attachedlines, since the power supply is rack-mounted in a cabinet that can only be opened from the front without disassembling the cabinet.
Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)
: 10. Based on the above seismic interaction evaluations, is equipment free           YE ND Uil of potentially adverse seismic interaction effects?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Based on the above evaluation, the power supply is free of potentially adverse seismic interaciton effects.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2 Enter the equipment class name from Appendix B: Classes of Equipment.
This item is not part of the 50%.2. Is the anchorage free of bent, broken, missing or loose hardware?There were no missing bolts or welds.Y[-- N Z YZ N[1 ULI N/A[-]3. Is the anchorage free of corrosion that is more than mild surface oxidation?
 
There were no signs of oxidation on hardware.4. Is the anchorage free of visible cracks in the concrete near the anchors?The concrete was free of cracks near anchors.YZ NEI ur- N/AD-YZ NEI UD- N/AD-]' Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 447 of 560 Sheet 3 of 4 Status: YZ NEI    UI-Seismic Walkdown Checklist (SWC)                   SWELl-088 Equipment ID No.         PWR-2406                  Equip. Class3 20 - Instrumentationand Control Panels Equipment Description REACTOR BLDG SPRAY ENG SAFEG'D POWER SUPPLY Other Adverse Conditions
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 450 of 560 Sheet 2 of 5 Status: YZ NE U-Seismic Walkdown Checklist (SWC) SWELl-089 Equipment ID No. C14 Equip. Class2 20 -Instrumentation and Control Panels Equipment Description VERTICAL BOARD, PRIMARY COOLANT 5. Is the anchorage configuration consistent with plant documentation?
: 11. Have you looked for and found no other seismic conditions that could             Y'    NiZ  U[
YE NE] UE- N/As (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
adversely affect the safety functions of the equipment?
There was sufficient plant documentation to perform an anchorage verification, but one of the anchors was not visible due to cables on the ground.6. Based on the above anchorage evaluations, is the anchorage free of YZ NE: UE: potentially adverse seismic conditions?
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.
Based on the above anchorage evaluation, the anchorage is free of potentially adverse seismic conditions.
Comments (Additional pages may be added as necessary)
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Evaluated by: Roy Berryman                                                               Date: 10/4/2012 Eric Dilbone   6          _      _      _      _
There were no soft targets to be impacted by equipment in the area.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
Masonry block walls in the room are seismically qualified, and painted with a qualification number. Ceiling tiles and lights are all in good condition, and are adequately supported.
 
: 9. Do attached lines have adequate flexibility to avoid damage?The attached lines have adequate flexibility.
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 448 of 560 Sheet 4 of 4 Status: YO NEI     U[-
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Based on the above evaluation, the cabinet is free of potentially adverse seismic interaciton effects.YZ NEI UE1 N/AE1 YZ NEJ UE- N/A[-]YZ N[E] UE- N/AEJ YZ NEI UE-2 Enter the equipment class name from Appendix B: Classes of Equipment.
Seismic Walkdown Checklist (SWC)                   SWELl-088 Equipment ID No.         PWR-2406                  Equip. CIass4 20 - Instrumentation and Control Panels Equipment Description REACTOR BLDG SPRAY ENG SAFEG'D POWER SUPPLY Photographs Note: PWR-2406 as seen from the front with                        Note: View inside the cabinet door. The power the cabinet door open.                                             supply is identified as the top two rack positions, as seen in the previous image (upper). Also, a zoomed in version of the section in the rectangle is shown (lower).
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 451 of 560 Sheet 3 of 5 Status: Y[ NEI U[--Seismic Walkdown Checklist (SWC) SWELl-089 Equipment ID No. C14 Equip. Class3 20 -Instrumentation and Control Panels Equipment Description VERTICAL BOARD, PRIMARY COOLANT Other Adverse Conditions
4 Enter the equipment class name from Appendix B: Classes of Equipment.
: 11. Have you looked for and found no other seismic conditions that could Y[ NI-] U-I adversely affect the safety functions of the equipment?
 
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.Comments (Additional pages may be added as necessary)
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 449 of 560 Sheet I of 5 Status: YZ NE] UD--
Evaluated by: Roy Berryman Date: 10/4/2012 Eric Dilbone 6e-. ---10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
Seismic Walkdown Checklist (SWC)                     SWELl-089 Equipment ID No.         C14                      Equip. Class, 20 - Instrumentation and Control Panels Equipment Description VERTICAL BOARD, PRIMARY COOLANT Location: Bldg. RAB                  Floor El. 386            Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 452 of 560 Sheet 4 of 5 Status: YZ NO U--Seismic Walkdown Checklist (SWC) SWELl-089 Equipment ID No. C14 Equip. Class4 20 -Instrumentation and Control Panels Equipment Description VERTICAL BOARD, PRIMARY COOLANT Photographs Note: Cabinet C14 from the front.Note: Bottom of cabinet C14 as viewed from the back. The cables in the far left corner obscured the view of the last anchor bolt.4 Enter the equipment class name from Appendix B: Classes of Equipment.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 453 of 560 Sheet 5 of 5 Status: YZ N[-I U-]Seismic Walkdown Checklist (SWC) SWELl-089 Equipment ID No. C14 Equ ip. Classs 20 -Instrumentation and Control Panels Equipment Description VERTICAL BOARD, PRIMARY COOLANT Note: View of a weld to the embedded steel channel, and an anchor bolt for the embedded steel channel.Note: View of anchor bolt for the embedded steel channel.5 Enter the equipment class name from Appendix B: Classes of Equipment.
Anchorage
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 454 of 560 Sheet 1 of 5 Status: YN NE U--Seismic Walkdown Checklist (SWC) SWELl-090 Equipment ID No. C42 Equip. Class, 20 -Instrumentation and Control Panels Equipment Description NI & RPS SYSTEM B Location:
: 1. Is the anchorage configuration verification required (i.e., is the item one      Y[-- NZ of the 50% of SWEL items requiring such verification)?
Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)
This item is not partof the 50%.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?              YZ N[1 ULI N/A[-]
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YE] N Z of the 50% of SWEL items requiring such verification)?
There were no missing bolts or welds.
Anchorage configuration verification is not possible because only two of the four documented anchors are visible due to fireboard covering.2. Is the anchorage free of bent, broken, missing or loose hardware?All hardware visible was present, tight and in good condition.
: 3. Is the anchorage free of corrosion that is more than mild surface                YZ NEI ur- N/AD-oxidation?
YZ NEI UE- N/AE-3. Is the anchorage free of corrosion that is more than mild surface oxidation?
There were no signs of oxidation on hardware.
Mild surface oxidation was observed on some of the anchorage in the bottom of the cabinet. There is no adverse conditions as a result 4. Is the anchorage free of visible cracks in the concrete near the anchors?No cracks in concrete were observed."Z NEI UE- N/AE-"Z N[1 U[E] N/AE'1 Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the                YZ NEI    UD- N/AD-]
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 455 of 560 Sheet 2 of 5 Status: YE NEI U-]Seismic Walkdown Checklist (SWC) SWELl-090 Equipment ID No. C42 Equip. Class2 20 -Instrumentation and Control Panels Equipment Description NI & RPS SYSTEM B 5. Is the anchorage configuration consistent with plant documentation?
anchors?
Y--] N[l U[-] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
The concrete was free of cracks near anchors.
This cabinet was not part of the 50%, so this is not applicable.
' Enter the equipment class name from Appendix B: Classes of Equipment.
: 6. Based on the above anchorage evaluations, is the anchorage free of YZ NEl ULi potentially adverse seismic conditions?
 
Based on the above anchorage evaluations, the anchorage is free of potentially adverse seismic conditions.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 450 of 560 Sheet 2 of 5 Status: YZ NE U-Seismic Walkdown Checklist (SWC)                    SWELl-089 Equipment ID No.          C14                      Equip. Class2 20 - Instrumentation and Control Panels Equipment Description VERTICAL BOARD, PRIMARY COOLANT
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 5. Is the anchorage configuration consistent with plant documentation?            YE NE] UE- N/As (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
There was sufficient plant documentation to perform an anchorage verification, but one of the anchors was not visible due to cables on the ground.
: 6. Based on the above anchorage evaluations, is the anchorage free of             YZ NE: UE:
potentially adverse seismic conditions?
Based on the above anchorageevaluation,the anchorage is free of potentiallyadverse seismic conditions.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?           YZ NEI UE1 N/AE1 There were no soft targets to be impacted by equipment in the area.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,      YZ NEJ UE- N/A[-]
and masonry block walls not likely to collapse onto the equipment?
Masonry block walls in the room are seismically qualified, and painted with a qualificationnumber. Ceiling tiles and lights are all in good condition, and are adequately supported.
: 9. Do attached lines have adequate flexibility to avoid damage?                    YZ N[E] UE- N/AEJ The attached lines have adequateflexibility.
: 10. Based on the above seismic interaction evaluations, is equipment free           YZ NEI     UE-of potentially adverse seismic interaction effects?
Based on the above evaluation, the cabinet is free of potentially adverse seismic interaciton effects.
2 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 451 of 560 Sheet 3 of 5 Status: Y[    NEI U[--
Seismic Walkdown Checklist (SWC)                    SWELl-089 Equipment ID No.       C14                        Equip. Class3 20 - Instrumentationand Control Panels Equipment Description VERTICAL BOARD, PRIMARY COOLANT Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could            Y[    NI-] U-I adversely affect the safety functions of the equipment?
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.
Comments (Additional pages may be added as necessary)
Evaluated by: Roy Berryman                                                              Date: 10/4/2012 Eric Dilbone 6e-.            -       --                                       10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 452 of 560 Sheet 4 of 5 Status: YZ NO      U--
Seismic Walkdown Checklist (SWC)                   SWELl-089 Equipment ID No.         C14                      Equip. Class4 20 - Instrumentationand Control Panels Equipment Description VERTICAL BOARD, PRIMARY COOLANT Photographs Note: Cabinet C14 from the front.                                 Note: Bottom of cabinet C14 as viewed from the back. The cables in the far left corner obscured the view of the last anchor bolt.
4 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 453 of 560 Sheet 5 of 5 Status: YZ N[-I U-]
Seismic Walkdown Checklist (SWC)                   SWELl-089 Equipment ID No.         C14                      Equ ip. Classs 20 - Instrumentationand Control Panels Equipment Description VERTICAL BOARD, PRIMARY COOLANT Note: View of a weld to the embedded steel                        Note: View of anchorbolt for the embedded channel,and an anchorbolt for the embedded                        steel channel.
steel channel.
5 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 454 of 560 Sheet 1 of 5 Status: YN NE U--
Seismic Walkdown Checklist (SWC)                     SWELl-090 Equipment ID No.         C42                      Equip. Class, 20 - Instrumentationand Control Panels Equipment Description NI & RPS SYSTEM B Location: Bldg. RAB                   Floor El. 386           Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one     YE] NZ of the 50% of SWEL items requiring such verification)?
Anchorage configuration verification is not possible because only two of the four documented anchors are visible due to fireboard covering.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               YZ NEI    UE- N/AE-All hardware visible was present, tight and in good condition.
: 3. Is the anchorage free of corrosion that is more than mild surface               "Z  NEI UE- N/AE-oxidation?
Mild surface oxidation was observed on some of the anchorage in the bottom of the cabinet. There is no adverse conditions as a result
: 4. Is the anchorage free of visible cracks in the concrete near the                "Z  N[1 U[E] N/AE' anchors?
No cracks in concrete were observed.
1 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 455 of 560 Sheet 2 of 5 Status: YE NEI U-]
Seismic Walkdown Checklist (SWC)                     SWELl-090 Equipment ID No.         C42                      Equip. Class2 20 - Instrumentationand Control Panels Equipment Description NI & RPS SYSTEM B
: 5. Is the anchorage configuration consistent with plant documentation?           Y--] N[l U[-] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
This cabinet was not partof the 50%, so this is not applicable.
: 6. Based on the above anchorage evaluations, is the anchorage free of             YZ NEl    ULi potentially adverse seismic conditions?
Based on the above anchorage evaluations, the anchorage is free of potentiallyadverse seismic conditions.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?           Y[] NEJ U[i N/A[-]
Soft targets are free from impact by nearby equipment and structures.
Soft targets are free from impact by nearby equipment and structures.
Y[] NEJ U[i N/A[-]8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI UEi N/AF and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,       YZ NEI     UEi N/AF and masonry block walls not likely to collapse onto the equipment?
The masonry block wall in the room is seismically qualified.
The masonry block wall in the room is seismically qualified. The ceiling tiles and lighting in the room are in good condition, and are not likely to collapse onto the cabinet.
The ceiling tiles and lighting in the room are in good condition, and are not likely to collapse onto the cabinet.9. Do attached lines have adequate flexibility to avoid damage? YZ N[-] U[i- N/A[--Attached lines have adequate flexibility.
: 9. Do attached lines have adequate flexibility to avoid damage?                   YZ N[-] U[i-   N/A[--
: 10. Based on the above seismic interaction evaluations, is equipment free YE NE! Uif-of potentially adverse seismic interaction effects?Based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.2 Enter the equipment class name from Appendix B: Classes of Equipment.
Attached lines have adequateflexibility.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 456 of 560 Sheet 3 of 5 Status: Y[ NIE] U-Seismic Walkdown Checklist (SWC) SWELl-090 Equipment ID No. C42 Equip. Class3 20 -Instrumentation and Control Panels Equipment Description NI & RPS SYSTEM B Other Adverse Conditions
: 10. Based on the above seismic interaction evaluations, is equipment free           YE NE! Uif-of potentially adverse seismic interaction effects?
: 11. Have you looked for and found no other seismic conditions that could YZ N[- U[adversely affect the safety functions of the equipment?
Based on the above seismic interactionevaluations, the equipment is free of potentiallyadverse seismic interactioneffects.
It was looked for, and no other seismic conditions that could adversely affect the safety funcitons of the equipment were found.Comments (Additional pages may be added as necessary)
2 Enter the equipment class name from Appendix B: Classes of Equipment.
Evaluated by: Roy Berryman Date: 10/4/2012 Eric Dilbone 6z4-.10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 457 of 560 Sheet 4 of 5 Status: YZ NEI UM Seismic Walkdown Checklist (SWC) SWELl-090 Equipment ID No. C42 Equip. Class4 20 -Instrumentation and Control Panels Equipment Description NI & RPS SYSTEM B Photoqraphs Note: Equipment ID tag identifying the cabinet.Note: View into the bottom of the cabinet with the door open on the front.4 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 456 of 560 Sheet 3 of 5 Status: Y[     NIE] U-Seismic Walkdown Checklist (SWC)                   SWELl-090 Equipment ID No.         C42                     Equip. Class3 20 - Instrumentation and Control Panels Equipment Description NI & RPS SYSTEM B Other Adverse Conditions
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 458 of 560 Sheet 5 of 5 Status: YZ N- UI-Seismic Walkdown Checklist (SWC) SWELl-090 Equipment ID No. C42 -Equip. CIass5 20 -Instrumentation and Control Panels Equipment Description NI & RPS SYSTEM B Note: Closer front view of the bottom and side of the cabinet with the door open.Note: View of the bottom of the rear of the cabinet with the door open.5 Enter the equipment class name from Appendix B: Classes of Equipment.
: 11. Have you looked for and found no other seismic conditions that could           YZ N[-     U[
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 459 of 560 Sheet I of 5 Status: YZ NE] UI1 Seismic Walkdown Checklist (SWC) SWELl-091 Equipment ID No. C44 Equip. Class' 20 -Instrumentation and Control Panels Equipment Description NI & RPS SYSTEM D Location:
adversely affect the safety functions of the equipment?
Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)
It was looked for, and no other seismic conditions that could adversely affect the safety funcitons of the equipment were found.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Comments (Additional pages may be added as necessary)
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Evaluated by: Roy Berryman                                                             Date: 10/4/2012 Eric Dilbone 6z4-.                                                           10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
Anchorage configuration verification is not possible because only two of the four documented anchors are visible due to fireboard covering.2. Is the anchorage free of bent, broken, missing or loose hardware?All hardware visible was present, tight and in good condition.
 
Y[-1 NZ YZ NEI ur N/AD'3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 457 of 560 Sheet 4 of 5 Status: YZ NEI     UM Seismic Walkdown Checklist (SWC)                   SWELl-090 Equipment ID No.       C42                       Equip. Class4 20 - Instrumentationand Control Panels Equipment Description NI & RPS SYSTEM B Photoqraphs Note: Equipment ID tag identifying the                             Note: View into the bottom of the cabinet with cabinet.                                                          the door open on the front.
Mild surface oxidation was observed on some of the anchorage in the bottom of the cabinet.4. Is the anchorage free of visible cracks in the concrete near the anchors?No cracks in concrete were observed.YZ N[D] UD1 N/A-1 Y[ NDl U[:] N/A[D 1 Enter the equipment class name from Appendix B: Classes of Equipment.
4 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO I-CS-12-00002 Attachment C Rev. 0 Page 460 of 560 Sheet 2 of 5 Status: YZ NE] U-]Seismic Walkdown Checklist (SWC) SWELl-091 Equipment ID No. C44 Equip. Class2 20 -Instrumentation and Control Panels Equipment Description NI & RPS SYSTEM D 5. Is the anchorage configuration consistent with plant documentation?
 
YE] NEI UI' N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 458 of 560 Sheet 5 of 5 Status: YZ N-     UI-Seismic Walkdown Checklist (SWC)                   SWELl-090 Equipment ID No.         C42                 -   Equip. CIass5 20 - Instrumentation and Control Panels Equipment Description NI & RPS SYSTEM B Note: Closer front view of the bottom and side                     Note: View of the bottom of the rearof the of the cabinet with the door open.                                 cabinet with the door open.
5 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 459 of 560 Sheet I of 5 Status: YZ NE] UI1 Seismic Walkdown Checklist (SWC)                   SWELl-091 Equipment ID No.         C44                       Equip. Class' 20 - Instrumentation and Control Panels Equipment Description NI & RPS SYSTEM D Location: Bldg. RAB                 Floor El. 386           Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one     Y[-1 NZ of the 50% of SWEL items requiring such verification)?
Anchorage configuration verification is not possible because only two of the four documented anchors are visible due to fireboard covering.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               YZ NEI      ur  N/AD' All hardware visible was present, tight and in good condition.
: 3. Is the anchorage free of corrosion that is more than mild surface               YZ N[D] UD1 N/A-1 oxidation?
Mild surface oxidation was observed on some of the anchorage in the bottom of the cabinet.
: 4. Is the anchorage free of visible cracks in the concrete near the               Y[   NDl U[:] N/A[D anchors?
No cracks in concrete were observed.
1 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS-12-00002 Attachment C Rev. 0 Page 460 of 560 Sheet 2 of 5 Status: YZ NE] U-]
Seismic Walkdown Checklist (SWC)                   SWELl-091 Equipment ID No.         C44                       Equip. Class2 20 - Instrumentation and Control Panels Equipment Description NI & RPS SYSTEM D
: 5. Is the anchorage configuration consistent with plant documentation?             YE] NEI UI' N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
This cabinet was not part of the 50%, so this is not applicable.
This cabinet was not part of the 50%, so this is not applicable.
: 6. Based on the above anchorage evaluations, is the anchorage free of YE Nn- UI-potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of             YE Nn- UI-potentially adverse seismic conditions?
Based on the above anchorage evaluations, the anchorage is free of potentially adverse seismic conditions.
Based on the above anchorageevaluations, the anchorageis free of potentially adverse seismic conditions.
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects
Soft targets are free from impact by nearby equipment and structures.
: 7. Are soft targets free from impact by nearby equipment or structures?           YZ NE] u[-] NIAE-Soft targets are free from impact by nearby equipment and structures.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,       'Y[Z N[il U[--] N/A[--]
The masonry block wall in the room is seismically qualified.
and masonry block walls not likely to collapse onto the equipment?
The ceiling tiles and lighting in the room are in good condition, and are not likely to collapse onto the cabinet.9. Do attached lines have adequate flexibility to avoid damage?Attached lines have adequate flexibility.
The masonry block wall in the room is seismically qualified. The ceiling     'Y[  NE-] UE-] NIAE-]
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.YZ NE] u[-] NIAE-'Y[Z N[il U[--] N/A[--]'Y[ NE-] UE-] NIAE-]Y[ NEI uE] N/AEu YZNEI UE]2 Enter the equipment class name from Appendix B: Classes of Equipment.
tiles and lighting in the room are in good condition, and are not likely to collapse onto the cabinet.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 461 of 560 Sheet 3 of 5 Status: YZ NEI-I U-Seismic Walkdown Checklist (SWC) SWELl-091 Equipment ID No. C44 Equip. Class3 20 -Instrumentation and Control Panels Equipment Description NI & RPS SYSTEM D Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?                   Y[    NEI  uE] N/AEu Attached lines have adequate flexibility.
: 11. Have you looked for and found no other seismic conditions that could Y[N NE] ULi adversely affect the safety functions of the equipment?
: 10. Based on the above seismic interaction evaluations, is equipment free             YZNEI UE]
It was looked for, and no other seismic conditions that could adversely affect the safety funcitons of the equipment were found.Comments (Additional pages may be added as necessary)
of potentially adverse seismic interaction effects?
It was noted that a bolt on top of the cabinet was not screwed in all the way. This bolt is not part of the cabinet anchorage, and was tightened at the time of inspection by Operations personnel.
Based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.
See image below.,42 Evaluated by: Roy Berryman Date: 10/4/2012 Eric Dilbone &eA , -10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
2 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO 1-C S- 12-00002 Attachment C Rev. 0 Page 462 of 560 Sheet 4 of 5 Status: YZ NEI UF--I Seismic Walkdown Checklist (SWC) SWELl-091 Equipment ID No. C44 Equip. Class4 20 -Instrumentation and Control Panels Equipment Description NI & RPS SYSTEM D Photographs Note: Equipment ID tag identifying cabinet.Note: View inside the bottom of the cabinet with the front door open. Anchorage is not visible.4 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 463 of 560 Sheet 5 of 5 Status: YZ NEI] U--Seismic Walkdown Checklist (SWC) SWELl-091 Equipment ID No. C44 Equip. CIass5 20 -Instrumentation and Control Panels Equipment Description NI & RPS SYSTEM D I Loose bolt Note: View of the front of the cabinet with the doors closed. The anchorage is not visible, since it is contained within the cabinet.Note: A loose bolt is shown on top of cabinet C44. The bolt was tightened at the time of inspection by Operations personnel.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 461 of 560 Sheet 3 of 5 Status: YZ NEI-I U-Seismic Walkdown Checklist (SWC)                   SWELl-091 Equipment ID No.         C44                       Equip. Class3 20 - Instrumentation and Control Panels Equipment Description NI & RPS SYSTEM D Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could             Y[N NE] ULi adversely affect the safety functions of the equipment?
It was looked for, and no other seismic conditions that could adversely affect the safety funcitons of the equipment were found.
Comments (Additional pages may be added as necessary)
It was noted that a bolt on top of the cabinet was not screwed in all the way. This bolt is not part of the cabinet anchorage,and was tightened at the time of inspection by Operationspersonnel. See image below.
                                    ,42 Evaluated by: Roy Berryman                                                               Date: 10/4/2012 Eric Dilbone &eA,           -                                               10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-C S- 12-00002 Attachment C Rev. 0 Page 462 of 560 Sheet 4 of 5 Status: YZ NEI     UF--I Seismic Walkdown Checklist (SWC)                   SWELl-091 Equipment ID No.         C44                       Equip. Class4 20 - Instrumentationand Control Panels Equipment Description NI & RPS SYSTEM D Photographs Note: Equipment ID tag identifying cabinet.                       Note: View inside the bottom of the cabinet with the front door open. Anchorage is not visible.
4 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 463 of 560 Sheet 5 of 5 Status: YZ NEI] U--
Seismic Walkdown Checklist (SWC)                   SWELl-091 Equipment ID No.         C44                       Equip. CIass5 20 - Instrumentationand Control Panels Equipment Description NI & RPS SYSTEM D LooseI bolt Note: View of the front of the cabinet with the                   Note: A loose bolt is shown on top of cabinet doors closed. The anchorage is not visible,                        C44. The bolt was tightened at the time of since it is contained within the cabinet.                          inspection by Operationspersonnel.
5 Enter the equipment class name from Appendix B: Classes of Equipment.
5 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 464 of 560 Sheet 1 of 5 Status: YZ NEI UDýSeismic Walkdown Checklist (SWC) SWELl-092 Equipment ID No. C26 Equip. Class, 20 -Instrumentation and Control Panels Equipment Description VERT BD- SUP ENGR SFGO Location:
 
Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 464 of 560 Sheet 1 of 5 Status: YZ NEI     UDý Seismic Walkdown Checklist (SWC)                     SWELl-092 Equipment ID No.         C26                       Equip. Class, 20 - Instrumentationand Control Panels Equipment Description VERT BD- SUP ENGR SFGO Location: Bldg. RAB                 Floor El. 386           Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YO NZ of the 50% of SWEL items requiring such verification)?
Anchorage
Not part of the 50%.2. Is the anchorage free of bent, broken, missing or loose hardware?
: 1. Is the anchorage configuration verification required (i.e., is the item one   YO NZ of the 50% of SWEL items requiring such verification)?
YO NE:l ULI N/A[]The welds on the underside of the front of the cabinet are all in good condition, and are consistent with plant documentation.
Not part of the 50%.
The back cabinet doors were opened, but the rear welds were not visible without crossing the plane of the cabinet.3. Is the anchorage free of corrosion that is more than mild surface YN NEI uJE N/AZ oxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               YO NE:l ULI N/A[]
The welds on the underside of the front of the cabinet are all in good condition, and are consistent with plant documentation. The back cabinet doors were opened, but the rearwelds were not visible without crossing the plane of the cabinet.
: 3. Is the anchorage free of corrosion that is more than mild surface               YN NEI     uJE N/AZ oxidation?
There were no signs of any oxidation on the visible anchorage.
There were no signs of any oxidation on the visible anchorage.
: 4. Is the anchorage free of visible cracks in the concrete near the YN N[:] UL N/AEJ anchors?There were no visible cracks in the concrete near the vicinity of the cabinet.I Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the               YN N[:] UL N/AEJ anchors?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 465 of 560 Sheet 2 of 5 Status: YM NO Ur Seismic Walkdown Checklist (SWC) SWELl-092 Equipment ID No. C26 Equip. Class2 20 -Instrumentation and Control Panels Equipment Description VERT BD- SUP ENGR SFGO 5. Is the anchorage configuration consistent with plant documentation?
There were no visible cracks in the concrete near the vicinity of the cabinet.
Y' NEI U[-E N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
I Enter the equipment class name from Appendix B: Classes of Equipment.
All visible anchorage is consistent with plant documentation.
 
However, not all anchorage could be verified without extensive cabinet disassembly.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 465 of 560 Sheet 2 of 5 Status: YM NO Ur Seismic Walkdown Checklist (SWC)                   SWELl-092 Equipment ID No.         C26                       Equip. Class2 20 - Instrumentation and Control Panels Equipment Description VERT BD- SUP ENGR SFGO
: 6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI U[E potentially adverse seismic conditions?
: 5. Is the anchorage configuration consistent with plant documentation?             Y'   NEI   U[-E N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Based on the above anchorage evaluations, all visible anchorage is free of potentially adverse seismic conditions.
All visible anchorage is consistent with plant documentation. However, not all anchoragecould be verified without extensive cabinet disassembly.
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 6. Based on the above anchorage evaluations, is the anchorage free of             YZ NEI     U[E potentially adverse seismic conditions?
There are no soft targets that could potentially be impacted by nearby equipment or structures.
Based on the above anchorageevaluations, all visible anchorage is free of potentially adverse seismic conditions.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Interaction Effects
Masonry block walls in the room are seismically qualified, and painted with a qualification number. Ceiling tiles and lights are all in good condition, and are adequately supported.
: 7. Are soft targets free from impact by nearby equipment or structures?           Y[    NEI uE1 N/A-There are no soft targets that could potentially be impacted by nearby equipment or structures.
: 9. Do attached lines have adequate flexibility to avoid damage?The attached lines have adequate flexibility.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,       YZ NEI UE- N/AE1 and masonry block walls not likely to collapse onto the equipment?
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Based on the above evaluation, the cabinet is free of potentially adverse seismic interaciton effects.Y[ NEI uE1 N/A-YZ NEI UE- N/AE1 YZ NEJ UE] N/AE: YZ NEI uE-2 Enter the equipment class name from Appendix B: Classes of Equipment.
Masonry block walls in the room are seismically qualified,and painted with a qualificationnumber. Ceiling tiles and lights are all in good condition, and are adequately supported.
Engineering Report No. CALC-ANO I-C S- 12-00002 Attachment C Rev. 0 Page 466 of 560 Sheet 3 of 5 Status: Y[ NI 1 U--Seismic Walkdown Checklist (SWC) SWELl-092 Equipment ID No. C26 Equip. Class3 20 -Instrumentation and Control Panels Equipment Description VERT BD- SUP ENGR SFGO Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?                   YZ NEJ UE] N/AE:
: 11. Have you looked for and found no other seismic conditions that could YZ NE] U[-adversely affect the safety functions of the equipment?
The attached lines have adequateflexibility.
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.Comments (Additional pages may be added as necessary)
: 10. Based on the above seismic interaction evaluations, is equipment free           YZ NEI uE-of potentially adverse seismic interaction effects?
Additionally, it was noted that there were four emergency respiratory protective equipment cases that were stacked upon one another and were not secured. The cases were deemed far enough from the cabinet not to present an interaction effect.Evaluated by: Roy Berryman Date: 10/4/2012 Eric Dilbone 6Z41-10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
Based on the above evaluation, the cabinet is free of potentially adverse seismic interaciton effects.
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 467 of 560 Sheet 4 of 5 Status: YE NF U--Seismic Walkdown Checklist (SWC) SWELl-092 Equipment ID No. C26 Equip. CIass4 20 -Instrumentation and Control Panels Equipment Description VERT BD- SUP ENGR SFGO Photographs Note: View of front of C-26.Note: View of welds on the font, bottom edge of cabinet C-26.4 Enter the equipment class name from Appendix B: Classes of Equipment.
2 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 468 of 560 Sheet 5 of 5 Status: YZ NE] U-Seismic Walkdown Checklist (SWC) SWELl-092 Equipment ID No. C26 Equip. CIass5 20 -Instrumentation and Control Panels Equipment Description VERT BD- SUP ENGR SFGO Note: Shown above are the louvers on the rear doors of cabinet C-26. No anchorage is visible from the rear of the cabinet.Note: 5 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 469 of 560 Sheet I of 5 Status: YE NEI Ur-Seismic Walkdown Checklist (SWC) SWELl- 093 Equipment ID No. PY-1042A Equip. Class, 20 -Instrumentation and Control Panels Equipment Description RCS PRESSURE Location:
Engineering Report No. CALC-ANO I-C S- 12-00002 Attachment C Rev. 0 Page 466 of 560 Sheet 3 of 5 Status: Y[     NI 1 U--
Bldg. RAB Floor El. 368 Room, Area 104 Manufacturer, Model, Etc. (optional but recommended)
Seismic Walkdown Checklist (SWC)                   SWELl-092 Equipment ID No.         C26                       Equip. Class3 20 - Instrumentationand Control Panels Equipment Description VERT BD- SUP ENGR SFGO Other Adverse Conditions
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
: 11. Have you looked for and found no other seismic conditions that could             YZ NE]     U[-
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
adversely affect the safety functions of the equipment?
This item is not part of the 50%.2. Is the anchorage free of bent, broken, missing or loose hardware?This component is located in a nest in cabinet C539A. No bent, broken, missing or loose hardware was observed.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.
No corrosion was observed 4. Is the anchorage free of visible cracks in the concrete near the anchors?No cracks in concrete were observed near cabinet YJ- NO YZ NiD U[-] N/ADJ YO NDl U[-- N/AD--YO ND-' U['] N/AD-]' Enter the equipment class name from Appendix B: Classes of Equipment.
Comments (Additional pages may be added as necessary)
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 470 of 560 Sheet 2 of 5 Status: YZ N[- UL]Seismic Walkdown Checklist (SWC) SWELl- 093 Equipment ID No. PY-1042A Equip. Class2 20 -Instrumentation and Control Panels Equipment Description RCS PRESSURE 5. Is the anchorage configuration consistent with plant documentation?
Additionally, it was noted that there were four emergency respiratoryprotective equipment cases that were stacked upon one anotherand were not secured. The cases were deemed far enough from the cabinet not to present an interactioneffect.
Y[I NWi ULI N/A[(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Evaluated by: Roy Berryman                                                               Date: 10/4/2012 Eric Dilbone 6Z41-                                                           10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
This item is not part of the 50%.6. Based on the above anchorage evaluations, is the anchorage free of 'YE Nn U[I potentially adverse seismic conditions?
 
Based on the above anchorage evaluations, the anchorage is free of potentially adverse seismic conditions.
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 467 of 560 Sheet 4 of 5 Status: YE NF U--
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Seismic Walkdown Checklist (SWC)                   SWELl-092 Equipment ID No.         C26                       Equip. CIass4 20 - Instrumentationand Control Panels Equipment Description VERT BD- SUP ENGR SFGO Photographs Note: View of front of C-26.                                     Note: View of welds on the font, bottom edge of cabinet C-26.
Soft targets are free from impact since they are in a cabinet that is latched closed.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
4 Enter the equipment class name from Appendix B: Classes of Equipment.
This does not apply since the component is located inside of a cabinet.9. Do attached lines have adequate flexibility to avoid damage?Attached lines have adequate flexibility.
 
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.Y" NW'- UW- N/AD" YEI NWI UW1 N/AZ YZ NW-] UW1 N/AW1 YZ NEI UW1 2 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 468 of 560 Sheet 5 of 5 Status: YZ NE] U-Seismic Walkdown Checklist (SWC)                   SWELl-092 Equipment ID No.         C26                       Equip. CIass5 20 - Instrumentation and Control Panels Equipment Description VERT BD- SUP ENGR SFGO Note: Shown above are the louvers on the                           Note:
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 471 of 560 Sheet 3 of 5 Status: YN NEI- U--Seismic Walkdown Checklist (SWC) SWELl- 093 Equipment ID No. PY-1042A Equip. Class3 20 -Instrumentation and Control Panels Equipment Description RCS PRESSURE Other Adverse Conditions
reardoors of cabinet C-26. No anchorage is visible from the rearof the cabinet.
: 11. Have you looked for and found no other seismic conditions that could YN NEI Ui adversely affect the safety functions of the equipment?
5 Enter the equipment class name from Appendix B: Classes of Equipment.
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.Comments (Additional pages may be added as necessary)
 
Evaluated by: Eric Dilbone 6 6 Date: 10/110/2012 Daniel Parker % O'ý Y"-Q," 10/10/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 469 of 560 Sheet I of 5 Status: YE NEI     Ur-Seismic Walkdown Checklist (SWC)                     SWELl- 093 Equipment ID No.         PY-1042A                 Equip. Class, 20 - Instrumentationand Control Panels Equipment Description RCS PRESSURE Location: Bldg. RAB                   Floor El. 368           Room, Area 104 Manufacturer, Model, Etc. (optional but recommended)
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 472 of 560 Sheet 4 of 5 Status: Y[ ND UD--Seismic Walkdown Checklist (SWC) SWELl- 093 Equipment ID No. PY-1042A Equip. Class4 20 -Instrumentation and Control Panels Equipment Description RCS PRESSURE Photographs
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
/Note: Front view of component.
Anchorage
Note: Sign on cabinet door.4 Enter the equipment class name from Appendix B: Classes of Equipment.
: 1. Is the anchorage configuration verification required (i.e., is the item one     YJ- NO of the 50% of SWEL items requiring such verification)?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 473 of 560 Sheet 5 of 5 Status: YE NF U-Seismic Walkdown Checklist (SWC) SWELl- 093 Equipment ID No. PY-1042A Equip. CIasss 20 -Instrumentation and Control Panels Equipment Description RCS PRESSURE Note: Wingnut and washer are used to keep the metal plate over the door to keep it from swinging open. As the nameplate reads, this is necessary to maintain seismic qualifications for the cabinet.Note: 5 Enter the equipment class name from Appendix B: Classes of Equipment.
This item is not partof the 50%.
Engineering Report No. CALC-ANO l-CS- 12-00002 Attachment C Rev. 0 Page 474 of 560 Sheet I of 5 Status: YZ NEI U-i Seismic Walkdown Checklist (SWC) SWELl-094 Equipment IDeNo. LY-1411A Equip. Class' 20 -Instruments and Control Panels Equipment Description BWST LEVEL #1 Location:
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               YZ NiD U[-] N/ADJ This component is located in a nest in cabinet C539A. No bent, broken, missing or loose hardware was observed.
Bldg. RAB Floor El. 374 Room, Area 96 Manufacturer, Model, Etc. (optional but recommended)
: 3. Is the anchorage free of corrosion that is more than mild surface               YO NDl U[-- N/AD--
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
oxidation?
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No corrosion was observed
This item is not part of the 50%.2. Is the anchorage free of bent, broken, missing or loose hardware?The bolts holding the component into the cabinet are free of all of the above conditions.
: 4. Is the anchorage free of visible cracks in the concrete near the                 YO ND-'    U['] N/AD-]
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
anchors?
No cracks in concrete were observed near cabinet
' Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 470 of 560 Sheet 2 of 5 Status: YZ N[-       UL]
Seismic Walkdown Checklist (SWC)                   SWELl- 093 Equipment ID No.       PY-1042A                   Equip. Class2 20 - Instrumentationand Control Panels Equipment Description RCS PRESSURE
: 5. Is the anchorage configuration consistent with plant documentation?             Y[I NWi     ULI N/A[
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
This item is not partof the 50%.
: 6. Based on the above anchorage evaluations, is the anchorage free of             'YE Nn U[I potentially adverse seismic conditions?
Based on the above anchorage evaluations,the anchorage is free of potentially adverse seismic conditions.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?           Y"    NW'- UW- N/AD" Soft targets are free from impact since they are in a cabinet that is latched closed.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,       YEI NWI UW1 N/AZ and masonry block walls not likely to collapse onto the equipment?
This does not apply since the component is located inside of a cabinet.
: 9. Do attached lines have adequate flexibility to avoid damage?                   YZ NW-] UW1 N/AW1 Attached lines have adequate flexibility.
: 10. Based on the above seismic interaction evaluations, is equipment free           YZ NEI UW1 of potentially adverse seismic interaction effects?
Based on the above seismic interaction evaluations,the equipment is free of potentially adverse seismic interactioneffects.
2 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 471 of 560 Sheet 3 of 5 Status: YN NEI- U--
Seismic Walkdown Checklist (SWC)                   SWELl- 093 Equipment ID No.         PY-1042A                 Equip. Class3 20 - Instrumentation and Control Panels Equipment Description RCS PRESSURE Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could             YN NEI Ui adversely affect the safety functions of the equipment?
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.
Comments (Additional pages may be added as necessary)
Evaluated by: Eric Dilbone 6             6                                             Date: 10/110/2012 Daniel Parker %       O'ý     Y"-Q,"                                         10/10/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 472 of 560 Sheet 4 of 5 Status: Y[   ND UD--
Seismic Walkdown Checklist (SWC)                   SWELl- 093 Equipment ID No.         PY-1042A                 Equip. Class4 20 - Instrumentationand Control Panels Equipment Description RCS PRESSURE Photographs
                          /
Note: Front view of component.                                   Note: Sign on cabinet door.
4 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 473 of 560 Sheet 5 of 5 Status: YE NF U-Seismic Walkdown Checklist (SWC)                   SWELl- 093 Equipment ID No.       PY-1042A                   Equip. CIasss 20 - Instrumentationand Control Panels Equipment Description RCS PRESSURE Note: Wingnut and washer are used to keep                         Note:
the metal plate over the door to keep it from swinging open. As the nameplate reads, this is necessary to maintain seismic qualificationsfor the cabinet.
5 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO l-CS- 12-00002 Attachment C Rev. 0 Page 474 of 560 Sheet I of 5 Status: YZ NEI U-i Seismic Walkdown Checklist (SWC)                     SWELl-094 Equipment IDeNo.         LY-1411A                   Equip. Class' 20 - Instruments and Control Panels Equipment Description BWST LEVEL #1 Location: Bldg. RAB                 Floor El. 374             Room, Area 96 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one     YO    NZ of the 50% of SWEL items requiring such verification)?
This item is not part of the 50%.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               YN NOi      ULII N/A-The bolts holding the component into the cabinet are free of all of the above conditions.
: 3. Is the anchorage free of corrosion that is more than mild surface               YZ ND U-        N/AD oxidation?
The bolts holding the component into the cabinet are free of corrosion.
The bolts holding the component into the cabinet are free of corrosion.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No cracks in concrete were observed near anchorage of cabinet.YO NZ YN NOi ULII N/A-YZ ND U- N/AD Y' NDI U[-] N/A[-D 1 Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the                 Y'    NDI  U[-] N/A[-D anchors?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 475 of 560 Sheet 2 of 5 Status: YZ NE] U--Seismic Walkdown Checklist (SWC) SWELl-094 Equipment ID No. LY-1411A flp.cerintinn RWqTI LEVEI #1 Equip. Class2 20 -Instruments and Control Panels 5. Is the anchorage configuration consistent with plant documentation?
No cracks in concrete were observed near anchorage of cabinet.
YEI NEI U[-I NIAED (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
1 Enter the equipment class name from Appendix B: Classes of Equipment.
Item is not part of the 50%.6. Based on the above anchorage evaluations, is the anchorage free of YZ NEi UEi potentially adverse seismic conditions?
 
Component mounted inside cabinet C543. Located in "grey" nest box 3. All mounting bolts for component and support box were identified and adequate.Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 475 of 560 Sheet 2 of 5 Status: YZ NE] U--
Soft targets are free from impact since the component is located inside of a cabinet.YN NEi U[E N/A--8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI UEI N/AF-and masonry block walls not likely to collapse onto the equipment?
Seismic Walkdown Checklist (SWC)                   SWELl-094 Equipment ID No.       LY-1411A                 Equip. Class2 20 - Instruments and Control Panels Friiinm*.nt flp.cerintinn RWqTILEVEI #1
The component is located in cabinet C543. It is protected from any intrusion from adjacent equipment when the door panel is in the normal closed and locked position.9. Do attached lines have adequate flexibility to avoid damage? YZ NEI UE- N/A--Attached lines have adequate flexibility.
: 5. Is the anchorage configuration consistent with plant documentation?           YEI NEI     U[-I NIAED (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.YE NEI U[--2 Enter the equipment class name from Appendix B: Classes of Equipment.
Item is not partof the 50%.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 476 of 560 Sheet 3 of 5 Status: YZ NEI U-I Seismic Walkdown Checklist (SWC) SWELl-094 Equipment ID No. LY-1411A Equip. Class3 20- Instruments and Control Panels Equipment Description BWST LEVEL #1 Other Adverse Conditions
: 6. Based on the above anchorage evaluations, is the anchorage free of           YZ NEi     UEi potentially adverse seismic conditions?
: 11. Have you looked for and found no other seismic conditions that could YZ Nr-I U[M adversely affect the safety functions of the equipment?
Component mounted inside cabinet C543. Located in "grey"nest box 3. All mounting bolts for component and support box were identified and adequate.
It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found.Comments (Additional pages may be added as necessary)
Interaction Effects
Evaluated by: Daniel Parker 2:QN-Y Eric Dilbone _Date: 10/10/2012 10/10/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
: 7. Are soft targets free from impact by nearby equipment or structures?         YN NEi U[E N/A--
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 477 of 560 Sheet 4 of 5 Status: YZ N[-] U--Seismic Walkdown Checklist (SWC) SWELl-094 Equipment ID No. LY-1411A Equip. CIass4 20- Instruments and Control Panels Equipment Description BWST LEVEL #1 Photographs Note: Component LY-1411A inside nested panel box.Note: Component LY-1411A inside nested panel box.4 Enter the equipment class name from Appendix B: Classes of Equipment.
Soft targets are free from impact since the component is located inside of a cabinet.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 478 of 560 Sheet 5 of 5 Status: YZ NEI U'Seismic Walkdown Checklist (SWC) SWELl-094 Equipment ID No. LY-1411A Equip. Class5 20- Instruments and Control Panels Equipment Description BWST LEVEL #1 Note: Cabinet containing LY-1411A.s Enter the equipment class name from Appendix B: Classes of Equipment.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,     YZ NEI UEI       N/AF-and masonry block walls not likely to collapse onto the equipment?
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 479 of 560 Sheet I of 5 Status: YN NEI UE Seismic Walkdown Checklist (SWC) SWELl- 095 Equipment ID No. LY-4204A Equip. Class' 20 -Instrumentation and Control Panels Equipment Description CST T41B LEVEL RED//Location:
The component is located in cabinet C543. It is protected from any intrusion from adjacent equipment when the doorpanel is in the normal closed and locked position.
Bldg. RAB Floor El. 368 Room, Area 104 Manufacturer, Model, Etc. (optional but recommended)
: 9. Do attached lines have adequate flexibility to avoid damage?                 YZ NEI UE- N/A--
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Attached lines have adequate flexibility.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one Y[E] NZ of the 50% of SWEL items requiring such verification)?
: 10. Based on the above seismic interaction evaluations, is equipment free         YE NEI U[--
This item is not part of the 50%.2. Is the anchorage free of bent, broken, missing or loose hardware?
of potentially adverse seismic interaction effects?
YZ NE] U[] N/AE-No adverse hardware conditions were observed.3. Is the anchorage free of corrosion that is more than mild surface YZ N[E] UE N/AE-oxidation?
Based on the above seismic interaction evaluations, the equipment is free of potentiallyadverse seismic interaction effects.
No corrosion observed.4. Is the anchorage free of visible cracks in the concrete near the YZ NEI UIE N/AE-1 anchors?No cracks in concrete observed 1 Enter the equipment class name from Appendix B: Classes of Equipment.
2 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 480 of 560 Sheet 2 of 5 Status: YZ NF] U-]Seismic Walkdown Checklist (SWC) SWELl- 095 Equipment ID No. LY-4204A Equip. Class2 20 -Instrumentation and Control Panels Equipment Description CST T41B LEVEL REDI/V 5. Is the anchorage configuration consistent with plant documentation?
 
Y-I NEi UI- N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 476 of 560 Sheet 3 of 5 Status: YZ NEI U-I Seismic Walkdown Checklist (SWC)                   SWELl-094 Equipment ID No.       LY-1411A                   Equip. Class3 20- Instruments and Control Panels Equipment Description BWST LEVEL #1 Other Adverse Conditions
This item is not part of the 50%.6. Based on the above anchorage evaluations, is the anchorage free of YE NoJ UrI potentially adverse seismic conditions?
: 11. Have you looked for and found no other seismic conditions that could           YZ Nr-I U[M adversely affect the safety functions of the equipment?
Based on the above anchorage evaluations, the anchorage is free of potentially adverse seismic conditions.
It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found.
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Comments (Additional pages may be added as necessary)
Soft targets are free from impact since they are in a cabinet that is latched closed.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Evaluated by: Daniel Parker               2:QN-Y       -*                            Date: 10/10/2012 Eric Dilbone
This does not apply since the component is located inside of a cabinet.9. Do attached lines have adequate flexibility to avoid damage?Attached lines have adequate flexibility.
* _                                              10/10/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.YZ N[:] UE] N/All YiE NEI UE] N/AZ YM NE:] ur- N/AE-YN NEI UE]2 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 481 of 560 Sheet 3 of 5 Status: YE No' UD-Seismic Walkdown Checklist (SWC) SWELl- 095 Equipment ID No. LY-4204A Equip.Equipment Description CST T41B LEVEL REDIN Class3 20 -Instrumentation and Control Panels Other Adverse Conditions
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 477 of 560 Sheet 4 of 5 Status: YZ N[-] U--
: 11. Have you looked for and found no other seismic conditions that could YZ NDI U[-]adversely affect the safety functions of the equipment?
Seismic Walkdown Checklist (SWC)                   SWELl-094 Equipment ID No.         LY-1411A                 Equip. CIass4 20- Instruments and Control Panels Equipment Description BWST LEVEL #1 Photographs Note: Component LY-1411A inside nested                           Note: Component LY-1411A inside nested panel box.                                                       panel box.
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.Comments (Additional pages may be added as necessary)
Evaluated by: Eric Dilbone Daniel Parker < , -Date: 10/10/2012 10/10/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 482 of 560 Sheet 4 of 5 Status: Y[ NF U[-Seismic Walkdown Checklist (SWC) SWELl- 095 Equipment ID No. LY-4204A Equip. Class4 20 -Instrumentation and Control Panels Equipment Description CST T41B LEVEL REDI/V Photographs
/Note: View of equipment ID tag identifying the component.
4 Enter the equipment class name from Appendix B: Classes of Equipment.
4 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 483 of 560 Sheet 5 of 5 Status: YE NEI Ur-Seismic Walkdown Checklist (SWC) SWELl- 095 Equipment ID No. LY-4204A Equip. CIasss 20 -Instrumentation and Control Panels Equipment Description CST T41B LEVEL REDIN Note: Wingnut and washer are used to keep the metal plate over the door to keep it from swinging open. As the nameplate reads, this is necessary to maintain seismic qualifications for the cabinet.Note: 5 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 484 of 560 Sheet 1 of 5 Status: YZ NEI Ur--Seismic Walkdown Checklist (SWC) SWELl- 096 Equipment ID No. PY-2667-Al Equip. Class' 20 -Instrumentation and Control Panels Equipment Description I/V CONVERTER STM GEN B PRESS Location:
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 478 of 560 Sheet 5 of 5 Status: YZ    NEI U' Seismic Walkdown Checklist (SWC)                   SWELl-094 Equipment ID No.         LY-1411A                  Equip. Class5 20- Instruments and Control Panels Equipment Description BWST LEVEL #1 Note: Cabinet containing LY-1411A.
Bldg. RAB Floor El. 368 Room, Area 104 Manufacturer, Model, Etc. (optional but recommended)
s Enter the equipment class name from Appendix B: Classes of Equipment.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
 
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 479 of 560 Sheet I of 5 Status: YN NEI     UE Seismic Walkdown Checklist (SWC)                     SWELl- 095 Equipment ID No.         LY-4204A                  Equip. Class' 20 - Instrumentationand Control Panels Equipment Description CST T41B LEVEL RED//
This item is not part of the 50%.2. Is the anchorage free of bent, broken, missing or loose hardware?No adverse hardware conditions were observed.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Location: Bldg. RAB                 Floor El. 368             Room, Area 104 Manufacturer, Model, Etc. (optional but recommended)
No corrosion observed.4. Is the anchorage free of visible cracks in the concrete near the anchors?No cracks in concrete observed YN NE- UE- N/A[]YZ N[E UE- N/A--YZ NEI U N/AR-'Enter the equipment class name from Appendix B: Classes of Equipment.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 485 of 560 Sheet 2 of 5 Status: YZ NEI ULI Seismic Walkdown Checklist (SWC) SWELl- 096 Equipment ID No. PY-2667-A1 Equip. Class 20- Instrumentation and Control Panels Equipment Description IN CONVERTER STM GEN B PRESS 5. Is the anchorage configuration consistent with plant documentation?
Anchorage
Y-I NWI U[1 N/A2 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is the anchorage configuration verification required (i.e., is the item one     Y[E] NZ of the 50% of SWEL items requiring such verification)?
This item is not part of the 50%.6. Based on the above anchorage evaluations, is the anchorage free of YZ NWi UW-potentially adverse seismic conditions?
This item is not part of the 50%.
Based on the above anchorage evaluations, the anchorage is free of potentially adverse seismic conditions.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               YZ NE] U[] N/AE-No adverse hardware conditions were observed.
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 3. Is the anchorage free of corrosion that is more than mild surface               YZ N[E] UE N/AE-oxidation?
Soft targets are free from impact since they are in a cabinet that is latched closed.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
No corrosion observed.
This does not apply since the component is located inside of a cabinet.9. Do attached lines have adequate flexibility to avoid damage?Attached lines have adequate flexibility.
: 4. Is the anchorage free of visible cracks in the concrete near the               YZ NEI      UIE N/AE-1 anchors?
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.YN N[-] UW' N/AWl Y[-- NWJ U-- N/AZ YO NWI U-- N/A[-]YN NWI Uil Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 486 of 560 Sheet 3 of 5 Status: YZ No U[--Seismic Walkdown Checklist (SWC) SWELl- 096 Equipment ID No. PY-2667-A1 Equip. Class 20 -Instrumentation and Control Panels Equipment Description IW CONVERTER STM GEN B PRESS Other Adverse Conditions
No cracks in concrete observed 1 Enter the equipment class name from Appendix B: Classes of Equipment.
: 11. Have you looked for and found no other seismic conditions that could YM No UEI]adversely affect the safety functions of the equipment?
 
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.Comments (Additional pages may be added as necessary)
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 480 of 560 Sheet 2 of 5 Status: YZ NF] U-]
Evaluated by: Eric Dilbone 6 1 Date: 10/10/2012 Daniel Parker 10/10/20 12 Daniel Parker 1011012012 Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 487 of 560 Sheet 4 of 5 Status: YN NO] U-I Seismic Walkdown Checklist (SWC) SWELl- 096 Equipment ID No. PY-2667-A1 Equip. Class 20 -Instrumentation and Control Panels Equipment Description I/V CONVERTER STM GEN B PRESS Photoqraphs i/Note: View of equipment ID tag identifying the component.
Seismic Walkdown Checklist (SWC)                    SWELl- 095 Equipment ID No.         LY-4204A                  Equip. Class2 20 - Instrumentation and Control Panels Equipment Description CST T41B LEVEL REDI/V
: 5. Is the anchorage configuration consistent with plant documentation?            Y-I NEi    UI- N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
This item is not part of the 50%.
: 6. Based on the above anchorage evaluations, is the anchorage free of             YE NoJ UrI potentially adverse seismic conditions?
Based on the above anchorageevaluations, the anchorage is free of potentially adverse seismic conditions.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?           YZ N[:] UE] N/All Soft targets are free from impact since they are in a cabinet that is latched closed.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,       YiE NEI UE] N/AZ and masonry block walls not likely to collapse onto the equipment?
This does not apply since the component is located inside of a cabinet.
: 9. Do attached lines have adequate flexibility to avoid damage?                   YM NE:] ur- N/AE-Attached lines have adequate flexibility.
: 10. Based on the above seismic interaction evaluations, is equipment free           YN NEI UE]
of potentially adverse seismic interaction effects?
Based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.
2 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 481 of 560 Sheet 3 of 5 Status: YE No' UD-Seismic Walkdown Checklist (SWC)                    SWELl- 095 Equipment ID No.       LY-4204A                  Equip. Class3 20 - Instrumentationand Control Panels Equipment Description CST T41B LEVEL REDIN Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could            YZ NDI U[-]
adversely affect the safety functions of the equipment?
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.
Comments (Additional pages may be added as necessary)
Evaluated by: Eric Dilbone                                                              Date: 10/10/2012 Daniel Parker    <          ,        -                                      10/10/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 482 of 560 Sheet 4 of 5 Status: Y[    NF U[-
Seismic Walkdown Checklist (SWC)                    SWELl- 095 Equipment ID No.        LY-4204A                  Equip. Class4 20 - Instrumentation and Control Panels Equipment Description CST T41B LEVEL REDI/V Photographs
                          /
Note: View of equipment ID tag identifying the component.
4 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 483 of 560 Sheet 5 of 5 Status: YE NEI    Ur-Seismic Walkdown Checklist (SWC)                    SWELl- 095 Equipment ID No.        LY-4204A                  Equip. CIasss 20 - Instrumentation and Control Panels Equipment Description CST T41B LEVEL REDIN Note: Wingnut and washerare used to keep                          Note:
the metal plate over the door to keep it from swinging open. As the nameplate reads, this is necessary to maintain seismic qualificationsfor the cabinet.
5 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 484 of 560 Sheet 1 of 5 Status: YZ NEI    Ur--
Seismic Walkdown Checklist (SWC)                    SWELl- 096 Equipment ID No.        PY-2667-Al                Equip. Class' 20 - Instrumentation and Control Panels Equipment Description I/V CONVERTER STM GEN B PRESS Location: Bldg. RAB                  Floor El. 368            Room, Area  104 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
This item is not part of the 50%.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?              YN    NE- UE-  N/A[]
No adverse hardware conditions were observed.
: 3. Is the anchorage free of corrosion that is more than mild surface              YZ N[E UE- N/A--
oxidation?
No corrosion observed.
: 4. Is the anchorage free of visible cracks in the concrete near the                YZ NEI    U  N/AR-anchors?
No cracks in concrete observed
'Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 485 of 560 Sheet 2 of 5 Status: YZ NEI      ULI Seismic Walkdown Checklist (SWC)                SWELl- 096 Equipment ID No.      PY-2667-A1              Equip. Class 20- Instrumentation and Control Panels Equipment Description IN CONVERTER STM GEN B PRESS
: 5. Is the anchorage configuration consistent with plant documentation?          Y-I NWI    U[1 N/A2 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
This item is not part of the 50%.
: 6. Based on the above anchorage evaluations, is the anchorage free of            YZ NWi    UW-potentially adverse seismic conditions?
Based on the above anchorageevaluations, the anchorageis free of potentially adverse seismic conditions.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?        YN N[-] UW' N/AWl Soft targets are free from impact since they are in a cabinet that is latched closed.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,    Y[-- NWJ U-- N/AZ and masonry block walls not likely to collapse onto the equipment?
This does not apply since the component is located inside of a cabinet.
: 9. Do attached lines have adequate flexibility to avoid damage?                  YO NWI U-- N/A[-]
Attached lines have adequate flexibility.
: 10. Based on the above seismic interaction evaluations, is equipment free        YN NWI    Uil of potentially adverse seismic interaction effects?
Based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 486 of 560 Sheet 3 of 5 Status: YZ No U[--
Seismic Walkdown Checklist (SWC)             SWELl- 096 Equipment ID No. PY-2667-A1             Equip. Class 20 - Instrumentation and Control Panels Equipment Description IW CONVERTER STM GEN B PRESS Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       YM No       UEI]
adversely affect the safety functions of the equipment?
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.
Comments (Additional pages may be added as necessary)
Evaluated by: Eric Dilbone 6       1                                               Date: 10/10/2012 Daniel ParkerDaniel Parker                                                   10/10/20 12 1011012012
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 487 of 560 Sheet 4 of 5 Status: YN NO] U-I Seismic Walkdown Checklist (SWC)       SWELl- 096 Equipment ID No. PY-2667-A1         Equip. Class 20 - Instrumentation and Control Panels Equipment Description I/V CONVERTER STM GEN B PRESS Photoqraphs i/
Note: View of equipment ID tag identifying the component.
Note: Alternate view of the component.
Note: Alternate view of the component.
Engineering Report No. CALC-ANO I-C S- 12-00002 Attachment C Rev. 0 Page 488 of 560 Sheet 5 of 5 Status: YZ NE] UI-Seismic Walkdown Checklist (SWC) SWELl- 096 Equipment ID No. PY-2667-A1 Equip. Class 20- Instrumentation and Control Panels Equipment Description IV CONVERTER STM GEN B PRESS Note: Wingnut and washer are used to keep the metal plate over the door to keep it from swinging open. As the nameplate reads, this is necessary to maintain seismic qualifications for the cabinet.Note:
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 489 of 560 Sheet I of 4 Status: YZ No uID Seismic Walkdown Checklist (SWC) SWELl-097 Equipment ID No. PB-2670 Equip. Class' 20 -Instrumentation and Control Panels Equipment Description EMERG EW TO SG A FROM P7B VLV CV-2670 Location:
Engineering Report No. CALC-ANO I-C S- 12-00002 Attachment C Rev. 0 Page 488 of 560 Sheet 5 of 5 Status: YZ NE]     UI-Seismic Walkdown Checklist (SWC)           SWELl- 096 Equipment ID No. PY-2667-A1             Equip. Class 20- Instrumentation and Control Panels Equipment Description IV CONVERTER STM GEN B PRESS Note: Wingnut and washerare used to keep               Note:
Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)
the metal plate over the door to keep it from swinging open. As the nameplate reads, this is necessary to maintain seismic qualificationsfor the cabinet.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
 
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YO N Z of the 50% of SWEL items requiring such verification)?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 489 of 560 Sheet I of 4 Status: YZ No uID Seismic Walkdown Checklist (SWC)                   SWELl-097 Equipment ID No.       PB-2670                   Equip. Class' 20 - Instrumentation and Control Panels Equipment Description EMERG EW TO SG A FROM P7B VLV CV-2670 Location: Bldg. RAB                 Floor El. 386             Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)
This item is not part of the 50%.2. Is the anchorage free of bent, broken, missing or loose hardware?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Y[( NI ULI N/A[Z No adverse hardware conditions were observed.3. Is the anchorage free of corrosion that is more than mild surface YZ NI UL] N/AZ&#xfd;oxidation?
Anchorage
No corrosion observed.4. Is the anchorage free of visible cracks in the concrete near the Y[ NO UrI N/AZ anchors?No cracks in concrete observed Enter the equipment class name from Appendix B: Classes of Equipment.
: 1. Is the anchorage configuration verification required (i.e., is the item one   YO N   Z of the 50% of SWEL items requiring such verification)?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 490 of 560 Sheet 2 of 4 Status: YZ NE] UW-Seismic Walkdown Checklist (SWC) SWELl -097 Equipment ID No. PB-2670 Equip. Class2 20 -Instrumentation and Control Panels Equipment Description EMERG EW TO SG A FROM P7B VLV CV-2670 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
This item is not part of the 50%.
This item is not part of the 50%.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               Y[(   NI   ULI N/A[Z No adverse hardwareconditions were observed.
The anchorage is not visible since it is mounted in the face of a panel. The cabinet could not be opened due to Control Room Operations.
: 3. Is the anchorage free of corrosion that is more than mild surface               YZ NI       UL] N/AZ&#xfd; oxidation?
However, the button appears to be installed properly and there is no apparent reason why it would be adversely affected in a seismic event.YEI NEI UIZ N/An YN NEI ULI Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
No corrosion observed.
There are no soft targets that could be impacted by nearby equipment or structures.
: 4. Is the anchorage free of visible cracks in the concrete near the                 Y[   NO UrI N/AZ anchors?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
No cracks in concrete observed Enter the equipment class name from Appendix B: Classes of Equipment.
Masonry block walls in the room are seismically qualified, and painted with a qualification number. Ceiling tiles and lights are all in good condition, and are adequately supported.
 
: 9. Do attached lines have adequate flexibility to avoid damage?There are no visible attached lines, since the button is mounted on the face of a panel.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Based on the above evaluation, the button is free of potentially adverse seismic interaciton effects.YN NiE U[-] N/AI'Y" N[-- U-I N/AI-]YE NEI UW1 N/A[]YZ N[- UED 2 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 490 of 560 Sheet 2 of 4 Status: YZ NE] UW-Seismic Walkdown Checklist (SWC)                   SWELl -097 Equipment ID No.       PB-2670                   Equip. Class2 20 - Instrumentationand Control Panels Equipment Description EMERG EW TO SG A FROM P7B VLV CV-2670
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 491 of 560 Sheet 3 of 4 Status: YZ NEIl UD Seismic Walkdown Checklist (SWC) SWELl-097 Equipment ID No. PB-2670 Equip. Class3 20 -Instrumentation and Control Panels Equipment Description EMERG EW TO SG A FROM P7B VLV CV-2670 Other Adverse Conditions
: 5. Is the anchorage configuration consistent with plant documentation?             YEI NEI UIZ N/An (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 11. Have you looked for and found no other seismic conditions that could YZ Nil Ur-adversely affect the safety functions of the equipment?
This item is not partof the 50%.
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.Comments (Additional pages may be added as necessary)
: 6. Based on the above anchorage evaluations, is the anchorage free of             YN NEI      ULI potentially adverse seismic conditions?
Evaluated by: Roy Berryman Date: 10/4/2012 Frir D~ilhnnto&e, 10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
The anchorageis not visible since it is mounted in the face of a panel. The cabinet could not be opened due to Control Room Operations. However, the button appearsto be installed properly and there is no apparentreason why it would be adversely affected in a seismic event.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 492 of 560 Sheet 4 of 4 Status: YE NEI U--Seismic Walkdown Checklist (SWC) SWELl-097 Equipment ID No. PB-2670 Equip. CIass4 20 -Instrumentation and Control Panels Equipment Description EMERG EW TO SG A FROM P7B VLV CV-2670 Photographs Note: PB-2670 is shown mounted in the face of a panel Note: -oomec in version or me previous image.4 Enter the equipment class name from Appendix B: Classes of Equipment.
Interaction Effects
Engineering Report No. CALC-ANO 1-C S- 12-00002 Attachment C Rev. 0 Page 493 of 560 Sheet I of 4 Status: YZ NIJ UF Seismic Walkdown Checklist (SWC) SWELl-098 Equipment ID No. SS-1220 Equip. Class' 20 -Instrumentation and Control Panels Equipment Description HPI ISO VV CV 1220 Location:
: 7. Are soft targets free from impact by nearby equipment or structures?           YN NiE      U[-] N/AI' There are no soft targets that could be impacted by nearby equipment or structures.
Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,       Y"    N[-- U-I N/AI-]
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
and masonry block walls not likely to collapse onto the equipment?
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YO NO of the 50% of SWEL items requiring such verification)?
Masonry block walls in the room are seismically qualified, and painted with a qualification number. Ceiling tiles and lights are all in good condition, and are adequatelysupported.
This item is not part of the 50%.2. Is the anchorage free of bent, broken, missing or loose hardware?
: 9. Do attached lines have adequate flexibility to avoid damage?                   YE NEI      UW1 N/A[]
YO NEi U[I: N/A[D No adverse hardware conditions were observed.3. Is the anchorage free of corrosion that is more than mild surface YZ NDl U[l N/AF-]oxidation?
There are no visible attachedlines, since the button is mounted on the face of a panel.
No corrosion observed.4. Is the anchorage free of visible cracks in the concrete near the YZ N[D U-- N/A[-anchors?No cracks in concrete observed I Enter the equipment class name from Appendix B: Classes of Equipment.
: 10. Based on the above seismic interaction evaluations, is equipment free           YZ N[-      UED of potentially adverse seismic interaction effects?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 494 of 560 Sheet 2 of 4 Status: YZ NO UD&#xfd;Seismic Walkdown Checklist (SWC) SWELl-098 Equipment ID No. SS-1220 Equip. Class2 20 -Instrumentation and Control Panels Equipment Description HPI ISO VV CV 1220 5. Is the anchorage configuration consistent with plant documentation?  
Based on the above evaluation, the button is free of potentially adverse seismic interaciton effects.
'Y[E NE] U[-] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
2 Enter the equipment class name from Appendix B: Classes of Equipment.
Not part of the 50%.6. Based on the above anchorage evaluations, is the anchorage free of YZ N[EI UE-potentially adverse seismic conditions?
 
The cabinet was opened from the back, and no adverse seismic conditions were observed.Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 491 of 560 Sheet 3 of 4 Status: YZ NEIl UD Seismic Walkdown Checklist (SWC)                   SWELl-097 Equipment ID No.       PB-2670                   Equip. Class3 20 - Instrumentationand Control Panels Equipment Description EMERG EW TO SG A FROM P7B VLV CV-2670 Other Adverse Conditions
There are no soft targets that could be impacted by nearby equipment or structures.
: 11. Have you looked for and found no other seismic conditions that could             YZ Nil Ur-adversely affect the safety functions of the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.
Masonry block walls in the room are seismically qualified, and painted with a qualification number. Ceiling tiles and lights are all in good condition, and are adequately supported.
Comments (Additional pages may be added as necessary)
: 9. Do attached lines have adequate flexibility to avoid damage?The attached lines have adequate flexibility.
Evaluated by: Roy Berryman                                                               Date: 10/4/2012 Frir D~ilhnnto&e,                                                             10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Based on the above evaluation, the switch is free of potentially adverse seismic interaciton effects.YN NEI UE1 N/AEl Y' NEI uE1 N/AE-]YN NEI UE1 N/AE--Y[ NEI UE--2 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 495 of 560 Sheet 3 of 4 Status: YN NO UD&#xfd;Seismic Walkdown Checklist (SWC) SWELl-098 Equipment ID No. SS-1220 Equip. Class3 20 -Instrumentation and Control Panels Equipment Description HPI ISO VV CV 1220 Other Adverse Conditions
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 492 of 560 Sheet 4 of 4 Status: YE NEI     U--
: 11. Have you looked for and found no other seismic conditions that could YZ NEI UI-]adversely affect the safety functions of the equipment?
Seismic Walkdown Checklist (SWC)                   SWELl-097 Equipment ID No.       PB-2670                   Equip. CIass4 20 - Instrumentationand Control Panels Equipment Description EMERG EW TO SG A FROM P7B VLV CV-2670 Photographs Note: PB-2670 is shown mounted in the face                       Note: -oomec in version or me previous of a panel                                                        image.
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.Comments (Additional pages may be added as necessary)
4 Enter the equipment class name from Appendix B: Classes of Equipment.
Evaluated by: Roy Berryman Date: 10/4/2012 Eric Dilbone 10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 496 of 560 Sheet 4 of 4 Seismic Walkdown Checklist (SWC) SWELl-09 Equipment ID No. SS-1220 Equip. Class4 Equipment Description HPI ISO VV CV 1220 Status: YZ NEI U--8 20 -Instrumentation and Control Panels Photographs Note: View of the front of cabinet C18, which contains SS-1220.Note: Zoomed version of the previous image, detailing SS-1220.4 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO 1-C S- 12-00002 Attachment C Rev. 0 Page 493 of 560 Sheet I of 4 Status: YZ NIJ UF Seismic Walkdown Checklist (SWC)                     SWELl-098 Equipment ID No.         SS-1220                 Equip. Class' 20 - Instrumentation and Control Panels Equipment Description HPI ISO VV CV 1220 Location: Bldg. RAB                   Floor El. 386           Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 497 of 560 Sheet 1 of 4 Status: YZ Nn U-Seismic Walkdown Checklist (SWC) SWELl-099 Equipment ID No. TR-1139 Equip. Class, 20 -Instrumentation and Control Panels Equipment Description RC LOOP B WR HOT LEG TEMP Location:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)
Anchorage
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
: 1. Is the anchorage configuration verification required (i.e., is the item one     YO NO of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one Y[] N[Z of the 50% of SWEL items requiring such verification)?
This item is not partof the 50%.
This item is not part of the 50%.2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               YO NEi     U[I: N/A[D No adverse hardware conditions were observed.
Y" NEI UE] N/AEl No adverse hardware conditions were observed.3. Is the anchorage free of corrosion that is more than mild surface YZ NE-] UE N/AE-]oxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface               YZ NDl U[l N/AF-]
No corrosion observed.4. Is the anchorage free of visible cracks in the concrete near the Y[ NE] UIE-I N/AEl anchors?No cracks in concrete observed' Enter the equipment class name from Appendix B: Classes of Equipment.
oxidation?
Engineering Report No. CALC-ANO I-CS-i12-00002 Attachment C Rev. 0 Page 498 of 560 Sheet 2 of 4 Status: YE NE U-Seismic Walkdown Checklist (SWC) SWELl-099 Equipment ID No. TR-1139 Equip. Class2 20 -Instrumentation and Control Panels Equipment Description RC LOOP B WR HOT LEG TEMP 5. Is the anchorage configuration consistent with plant documentation?
No corrosion observed.
Y[] NE] UE] N/A2 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 4. Is the anchorage free of visible cracks in the concrete near the                 YZ N[D U-- N/A[-
Not part of the 50%.6. Based on the above anchorage evaluations, is the anchorage free of YN NE] ULI potentially adverse seismic conditions?
anchors?
No other adverse seismic conditions were observed.Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
No cracks in concrete observed I Enter the equipment class name from Appendix B: Classes of Equipment.
There are no soft targets that could be impacted by nearby equipment or structures.
 
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 494 of 560 Sheet 2 of 4 Status: YZ NO UD&#xfd; Seismic Walkdown Checklist (SWC)                   SWELl-098 Equipment ID No.       SS-1220                   Equip. Class2 20 - Instrumentationand Control Panels Equipment Description HPI ISO VV CV 1220
Masonry block walls in the room are seismically qualified, and painted with a qualification number. Ceiling tiles and lights are all in good condition, and are adequately supported.
: 5. Is the anchorage configuration consistent with plant documentation?             'Y[E NE] U[-] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 9. Do attached lines have adequate flexibility to avoid damage?The attachedlines have adequate flexibility.
Not part of the 50%.
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Based on the above evaluation, the temperature recorder is free of potentially adverse seismic interaciton effects.Y[Z NEI UE1 N/AE-'(Y NEJ UE[ N/AEl'(Y NEI UE: N/A[-1''1 NEl U --2 Enter the equipment class name from Appendix B: Classes of Equipment.
: 6. Based on the above anchorage evaluations, is the anchorage free of             YZ N[EI UE-potentially adverse seismic conditions?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 499 of 560 Sheet 3 of 4 Status: YZ NI U[--I Seismic Walkdown Checklist (SWC) SWELl-099 Equipment ID No. TR-1139 Equip. Class3 20 -Instrumentation and Control Panels Equipment Description RC LOOP B WR HOT LEG TEMP Other Adverse Conditions
The cabinet was opened from the back, and no adverse seismic conditions were observed.
: 11. Have you looked for and found no other seismic conditions that could Y[ Nil U--adversely affect the safety functions of the equipment?
Interaction Effects
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.Comments (Additional pages may be added as necessary)
: 7. Are soft targets free from impact by nearby equipment or structures?           YN NEI      UE1 N/AEl There are no soft targets that could be impacted by nearby equipment or structures.
Evaluated by: Roy Berryman Date: 10/4/2012 Eric Dilbone .10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,       Y'    NEI uE1 N/AE-]
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 500 of 560 Sheet 4 of 4 Status: YO NF-- UL-Seismic Walkdown Checklist (SWC) SWELl-099 Equipment ID No. TR-1139 Equip. Class4 20- Instrumentation and Control Panels Equipment Description RC LOOP B WR HOT LEG TEMP Photographs TR-1139 Note: View of the panel containing TR-1 139.Note: Zoomed view of the previous image.4 Enter the equipment class name from Appendix B: Classes of Equipment.
and masonry block walls not likely to collapse onto the equipment?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 501 of 560 Sheet I of 5 Status: YZ NE] UDF-Seismic Walkdown Checklist (SWC) SWELl-100 Equipment ID No. LIS-1421 Equip. Class' 20 -Instrumentation and Control Panels Equipment Description BWST LEVEL No. 2 Location:
Masonry block walls in the room are seismically qualified, and painted with a qualification number. Ceiling tiles and lights are all in good condition, and are adequatelysupported.
Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)
: 9. Do attached lines have adequate flexibility to avoid damage?                   YN NEI UE1 N/AE--
_Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
The attachedlines have adequate flexibility.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one Y[] N[of the 50% of SWEL items requiring such verification)?
: 10. Based on the above seismic interaction evaluations, is equipment free             Y[    NEI UE--
This item is not part of the 50%.2. Is the anchorage free of bent, broken, missing or loose hardware?The level indicator is mounted in cabinet C18, and the hardware is visible from inside the rear of the cabinet. The anchorage is free of bent, broken and loose hardware.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
of potentially adverse seismic interaction effects?
Based on the above evaluation, the switch is free of potentially adverse seismic interaciton effects.
2 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 495 of 560 Sheet 3 of 4 Status: YN NO UD&#xfd; Seismic Walkdown Checklist (SWC)                   SWELl-098 Equipment ID No.       SS-1220                   Equip. Class3 20 - Instrumentationand Control Panels Equipment Description HPI ISO VV CV 1220 Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could           YZ NEI     UI-]
adversely affect the safety functions of the equipment?
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.
Comments (Additional pages may be added as necessary)
Evaluated by: Roy Berryman                                                             Date: 10/4/2012 Eric Dilbone                                                                 10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 496 of 560 Sheet 4 of 4 Status: YZ NEI    U--
Seismic Walkdown Checklist (SWC)                   SWELl-09 8 Equipment ID No.         SS-1220                 Equip. Class4 20 - Instrumentation and Control Panels Equipment Description HPI ISO VV CV 1220 Photographs Note: View of the front of cabinet C18, which                     Note: Zoomed version of the previous image, contains SS-1220.                                                  detailing SS-1220.
4 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 497 of 560 Sheet 1 of 4 Status: YZ Nn U-Seismic Walkdown Checklist (SWC)                     SWELl-099 Equipment ID No.         TR-1139                 Equip. Class, 20 - Instrumentation and Control Panels Equipment Description RC LOOP B WR HOT LEG TEMP Location: Bldg. RAB                 Floor El. 386             Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one   Y[] N[Z of the 50% of SWEL items requiring such verification)?
This item is not partof the 50%.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             Y"     NEI UE] N/AEl No adverse hardware conditions were observed.
: 3. Is the anchorage free of corrosion that is more than mild surface             YZ NE-] UE N/AE-]
oxidation?
No corrosion observed.
: 4. Is the anchorage free of visible cracks in the concrete near the               Y[   NE] UIE-I N/AEl anchors?
No cracks in concrete observed
' Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS-i12-00002 Attachment C Rev. 0 Page 498 of 560 Sheet 2 of 4 Status: YE NE U-Seismic Walkdown Checklist (SWC)                   SWELl-099 Equipment ID No.         TR-1139                 Equip. Class2 20 - Instrumentationand Control Panels Equipment Description RC LOOP B WR HOT LEG TEMP
: 5. Is the anchorage configuration consistent with plant documentation?           Y[] NE] UE] N/A2 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not part of the 50%.
: 6. Based on the above anchorage evaluations, is the anchorage free of             YN NE] ULI potentially adverse seismic conditions?
No other adverse seismic conditions were observed.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?           Y[Z NEI    UE1 N/AE-There are no soft targets that could be impacted by nearby equipment or structures.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,     '(Y    NEJ UE[ N/AEl and masonry block walls not likely to collapse onto the equipment?
Masonry block walls in the room are seismically qualified, and painted with a qualificationnumber. Ceiling tiles and lights are all in good condition, and are adequately supported.
: 9. Do attached lines have adequate flexibility to avoid damage?                   '(Y NEI UE: N/A[-1 The attachedlineshave adequate flexibility.
: 10. Based on the above seismic interaction evaluations, is equipment free         ''1    NEl U --
of potentially adverse seismic interaction effects?
Based on the above evaluation, the temperaturerecorderis free of potentiallyadverse seismic interaciton effects.
2 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 499 of 560 Sheet 3 of 4 Status: YZ NI     U[--I Seismic Walkdown Checklist (SWC)                   SWELl-099 Equipment ID No.         TR-1139                 Equip. Class3 20 - Instrumentation and Control Panels Equipment Description RC LOOP B WR HOT LEG TEMP Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could           Y[   Nil U--
adversely affect the safety functions of the equipment?
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.
Comments (Additional pages may be added as necessary)
Evaluated by: Roy Berryman                                                             Date: 10/4/2012 Eric Dilbone ,,*.         .                                                  10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 500 of 560 Sheet 4 of 4 Status: YO NF--   UL-Seismic Walkdown Checklist (SWC)                   SWELl-099 Equipment ID No.         TR-1139                   Equip. Class4 20- Instrumentationand Control Panels Equipment Description RC LOOP B WR HOT LEG TEMP Photographs TR-1139 Note: View of the panel containing TR-1 139.                       Note: Zoomed view of the previous image.
4 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 501 of 560 Sheet I of 5 Status: YZ NE] UDF-Seismic Walkdown Checklist (SWC)                     SWELl-100 Equipment ID No.         LIS-1421                 Equip. Class' 20 - Instrumentationand Control Panels Equipment Description BWST LEVEL No. 2 Location: Bldg. RAB                   Floor El. 386           Room, Area 129 Manufacturer, Model, Etc. (optional but recommended)               _
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one   Y[] N[
of the 50% of SWEL items requiring such verification)?
This item is not part of the 50%.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               YN NEI UDJ N/A[:D The level indicatoris mounted in cabinet C18, and the hardware is visible from inside the rearof the cabinet. The anchorageis free of bent, broken and loose hardware.
: 3. Is the anchorage free of corrosion that is more than mild surface               YZ NEI UI[I N/A[-]
oxidation?
No mild surface oxidation present on anchorage.
No mild surface oxidation present on anchorage.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?The level indicator is mounted in the front face of the cabinet. No cracks in concrete around cabinet anchorage.
: 4. Is the anchorage free of visible cracks in the concrete near the               YZ NDl U-1 N/AD1 anchors?
YN NEI UDJ N/A[:D YZ NEI UI[I N/A[-]YZ NDl U-1 N/AD1 1 Enter the equipment class name from Appendix B: Classes of Equipment.
The level indicatoris mounted in the front face of the cabinet. No cracks in concrete aroundcabinet anchorage.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 502 of 560 Sheet 2 of 5 Status: YE NR U-Seismic Walkdown Checklist (SWC) SWELl-100 Equipment ID No. LIS-1421 E Pnauinment Descrintinn RWS;T LFVFI No_ 2-quip. Class2 20 -Instrumentation and Control Panels 5. Is the anchorage configuration consistent with plant documentation?
1 Enter the equipment class name from Appendix B: Classes of Equipment.
Y[] NE-- UE' N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
 
This item is not part of the 50%.6. Based on the above anchorage evaluations, is the anchorage free of Y[ NE] U[-]potentially adverse seismic conditions?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 502 of 560 Sheet 2 of 5 Status: YE NR U-Seismic Walkdown Checklist (SWC)                   SWELl-100 Equipment ID No. LIS-1421                         E-quip. Class2 20 - Instrumentationand Control Panels Pnauinment Descrintinn RWS;T LFVFI No_ 2
All visible anchorage was free of potentially adverse seismic conditions.
: 5. Is the anchorage configuration consistent with plant documentation?             Y[] NE-- UE' N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
This item is not part of the 50%.
: 6. Based on the above anchorage evaluations, is the anchorage free of               Y[   NE] U[-]
potentially adverse seismic conditions?
All visible anchoragewas free of potentially adverse seismic conditions.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?             YZ NEI      UE- N/AE--
There are no soft targets that could be impacted by nearby equipment or structures.
There are no soft targets that could be impacted by nearby equipment or structures.
YZ NEI UE- N/AE--8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[ NE-1 UE[ N/AE-and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,       Y[   NE-1 UE[ N/AE-and masonry block walls not likely to collapse onto the equipment?
Masonry block walls in the room are seismically qualified, and painted with a qualification number. Ceiling tiles and lights are all in good condition, and are adequately supported.
Masonry block walls in the room are seismically qualified, and painted with a qualificationnumber. Ceiling tiles and lights are all in good condition, and are adequately supported.
: 9. Do attached lines have adequate flexibility to avoid damage? YZ NE] UEi N/AE--The attached lines have adequate flexibility.
: 9. Do attached lines have adequate flexibility to avoid damage?                     YZ NE] UEi N/AE--
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Based on the above evaluation, the level indicator in the cabinet is free of potentially adverse seismic interaciton effects.YE N[-E UE-2 Enter the equipment class name from Appendix B: Classes of Equipment.
The attached lines have adequate flexibility.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 503 of 560 Sheet 3 of 5 Status: Y[ NEI Ur-Seismic Walkdown Checklist (SWC) SWELI-1O0 Equipment ID No. LIS-1421 Equip. Class3 20 -Instrumentation and Control Panels Equipment Description BWST LEVEL No. 2 Other Adverse Conditions
: 10. Based on the above seismic interaction evaluations, is equipment free           YE N[-E UE-of potentially adverse seismic interaction effects?
: 11. Have you looked for and found no other seismic conditions that could Y[ NE] UDJ adversely affect the safety functions of the equipment?
Based on the above evaluation, the level indicatorin the cabinet is free of potentiallyadverse seismic interacitoneffects.
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.Comments (Additional pages may be added as necessary)
2 Enter the equipment class name from Appendix B: Classes of Equipment.
Evaluated by: Roy Berryman Eric Dilbone Date: 10/4/2012 10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-C S- 12-00002 Attachment C Rev. 0 Page 504 of 560 Sheet 4 of 5 Seismic Walkdown Checklist (SWC) SWELl-1O0 Equipment ID No. LIS-1421 Equip. Class4_Equipment Description BWST LEVEL No. 2 Status: YE NOI UD-20 -Instrumentation and Control Panels Photoqraphs LIS-1421 from rear Note: LIS-1421 equipment ID tag.Note: View inside the back of cabinet C18, containing LIS-1421.4 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 503 of 560 Sheet 3 of 5 Status: Y[     NEI Ur-Seismic Walkdown Checklist (SWC)                   SWELI-1O0 Equipment ID No.       LIS-1421                   Equip. Class3 20 - Instrumentation and Control Panels Equipment Description BWST LEVEL No. 2 Other Adverse Conditions
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 505 of 560 Sheet 5 of 5 Status: YZ Nn U-Seismic Walkdown Checklist (SWC) SWELl-100 Equipment ID No. LIS-1421 Equip. CIass5 20 -Instrumentation and Control Panels Equipment Description BWST LEVEL No. 2 LIS-1421 from rear Note: General view of the back of cabinet C18.Note: 5 Enter the equipment class name from Appendix B: Classes of Equipment.
: 11. Have you looked for and found no other seismic conditions that could             Y[   NE]   UDJ adversely affect the safety functions of the equipment?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 506 of 560 Sheet I of 5 Status: YZ NE] U-Seismic Walkdown Checklist (SWC) SWELl- 101 Equipment ID No. T-78A Equip. Class' 21 -Tanks and Heat Exchangers Equipment Description EMERG. DIESEL GEN (K4A) COOLING WATER EXP TANK Location:
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.
Bldg. RAB Floor El. 369 Room, Area 87 Manufacturer, Model, Etc. (optional but recommended)
Comments (Additional pages may be added as necessary)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Evaluated by: Roy Berryman                                                               Date: 10/4/2012 Eric Dilbone                                                                  10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
 
Item is part of the 50%.2. Is the anchorage free of bent, broken, missing or loose hardware?The bolts anchoring the tank to the EDG skid are free of bent, broken, missing and loose hardware.
Engineering Report No. CALC-ANO 1-C S- 12-00002 Attachment C Rev. 0 Page 504 of 560 Sheet 4 of 5 Status: YE NOI UD-Seismic Walkdown Checklist (SWC)                   SWELl-1O0 Equipment ID No.         LIS-1421                 Equip. Class4_ 20 - Instrumentation and Control Panels Equipment Description BWST LEVEL No. 2 Photoqraphs LIS-1421 from rear Note: LIS-1421 equipment ID tag.                                   Note: View inside the back of cabinet C18, containingLIS-1421.
Additionally, the welds were all in good condition.
4 Enter the equipment class name from Appendix B: Classes of Equipment.
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
 
The anchorage is free of corrosion and is painted blue without any chipped paint.4. Is the anchorage free of visible cracks in the concrete near the anchors?The tank is anchored to a steel frame on the EDG skid. No cracks around EDG skid anchorage Y[ N E]YZ NEI UDl N/ADl YZ NDI UD1 N/AD-YZ NEI UDl N/ADl I Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 505 of 560 Sheet 5 of 5 Status: YZ Nn U-Seismic Walkdown Checklist (SWC)                   SWELl-100 Equipment ID No.         LIS-1421                 Equip. CIass5 20 - Instrumentationand Control Panels Equipment Description BWST LEVEL No. 2 LIS-1421 from rear Note: General view of the back of cabinet                         Note:
Engineering Report No. CALC-ANO I -CS- 12-00002 Attachment C Rev. 0 Page 507 of 560 Sheet 2 of 5 Status: YZ NEI U[-I Seismic Walkdown Checklist (SWC) SWELl- 101 Equipment ID No. T-78A Equip. Class 21 -Tanks and Heat Exchanqers Equipment Description EMERG. DIESEL GEN (K4A) COOLING WATER EXP T4NK 5. Is the anchorage configuration consistent with plant documentation?
C18.
YN N[-] UI- N/A[-](Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
5 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 506 of 560 Sheet I of 5 Status: YZ NE] U-Seismic Walkdown Checklist (SWC)                     SWELl- 101 Equipment ID No.         T-78A                     Equip. Class' 21 - Tanks and Heat Exchangers Equipment Description EMERG. DIESEL GEN (K4A) COOLING WATER EXP TANK Location: Bldg. RAB                   Floor El. 369           Room, Area 87 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one   Y[    NE]
of the 50% of SWEL items requiring such verification)?
Item is part of the 50%.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             YZ NEI      UDl N/ADl The bolts anchoringthe tank to the EDG skid are free of bent, broken, missing and loose hardware.Additionally, the welds were all in good condition.
: 3. Is the anchorage free of corrosion that is more than mild surface             YZ NDI      UD1 N/AD-oxidation?
The anchorageis free of corrosion and is paintedblue without any chipped paint.
: 4. Is the anchorage free of visible cracks in the concrete near the               YZ NEI      UDl N/ADl anchors?
The tank is anchored to a steel frame on the EDG skid. No cracks around EDG skid anchorage I Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I -CS- 12-00002 Attachment C Rev. 0 Page 507 of 560 Sheet 2 of 5 Status: YZ NEI     U[-I Seismic Walkdown Checklist (SWC)               SWELl- 101 Equipment ID No.       T-78A                   Equip. Class 21 - Tanks and Heat Exchanqers Equipment Description EMERG. DIESEL GEN (K4A) COOLING WATER EXP T4NK
: 5. Is the anchorage configuration consistent with plant documentation?         YN N[-] UI- N/A[-]
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is consistent with calculation 6600-M12AC-117-1.
Anchorage is consistent with calculation 6600-M12AC-117-1.
: 6. Based on the above anchorage evaluations, is the anchorage free of YZ Nil U[-I potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of           YZ Nil U[-I potentially adverse seismic conditions?
All visible anchorage was free of potentially adverse seismic conditions.
All visible anchoragewas free of potentially adverse seismic conditions.
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?         Y[    NEI  ur- N/A[-
There are no soft targets that could be impacted by nearby equipment or structures.
There are no soft targets that could be impacted by nearby equipment or structures.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NEI        UEl N/A[--
There are no masonry block walls or ceiling tiles in the room. The lights are in good condition, and do not present an interaction effect.9. Do attached lines have adequate flexibility to avoid damage?The attached lines have adequate flexibility.
and masonry block walls not likely to collapse onto the equipment?
Y[ NEI ur- N/A[-YN NEI UEl N/A[--YZ NEI UE-- N/AEl 10. Based on the above seismic interaction evaluations, is equipment free YN NEl UM-of potentially adverse seismic interaction effects?Based on the above evaluation, the level switch is free of potentially adverse seismic interaction effects.
There are no masonry block walls or ceiling tiles in the room. The lights are in good condition, and do not present an interaction effect.
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 508 of 560 Sheet 3 of 5 Status: YE NEI U[-Seismic Walkdown Checklist (SWC) SWELl- 101 Equipment ID No. T-78A Equip. Class 21 -Tanks and Heat Exchanqers Enuinment Description EMERG. DIESEL GEN (K4A) COOLING WATER EXP TANK Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?                 YZ NEI UE-- N/AEl The attachedlines have adequateflexibility.
: 11. Have you looked for and found no other seismic conditions that could YE N[- UI--adversely affect the safety functions of the equipment?
: 10. Based on the above seismic interaction evaluations, is equipment free         YN NEl UM-of potentially adverse seismic interaction effects?
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.Comments (Additional pages may be added as necessary)
Based on the above evaluation, the level switch is free of potentially adverse seismic interaction effects.
Evaluated by: Daniel Parker " , -Date: 10/11/2012 Eric Dilbone 6 u l- &10/11/2012 Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 509 of 560 Sheet 4 of 5 Status: YN NO U-Seismic Walkdown Checklist (SWC) SWELl- 101 Equipment ID No. T-78A Equip. Class 21 -Tanks and Heat Exchanqers Equipment Description EMERG. DIESEL GEN (K4A) COOLING WATER EXP TANK Photographs Note: Close-up view of T-78A welded to bracket used to bolt to steel frame on skid.View from North side of skid.Note: Tank T-78A welded to bracket that is bolted to steel frame on K4A skid. View from North side of skid.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 510 of 560 Sheet 5 of 5 Status: YM N[-- U--Seismic Walkdown Checklist (SWC) SWELl- 101 Equipment ID No. T-78A -Equip. Class 21 -Tanks and Heat Exchangers Equipment Description EMERG. DIESEL GEN (K4A) COOLING WATER EXP TANK Note: View from North side of skid showing Note: View from South side of skid showing attached lines, the steel frame used to mount bracket welded to T-78A (top of picture).
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 508 of 560 Sheet 3 of 5 Status: YE NEI   U[-
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 511 of 560 Sheet I of 4 Status: YZ NDI UD-1 Seismic Walkdown Checklist (SWC) SWELl-102 Equipment ID No. T-78B Equip. Class' 21 -Tanks and Heat Exchangers Equipment Description EMERG. DIESEL GEN (K4B) COOLING WATER EXP. TANK Location:
Seismic Walkdown Checklist (SWC)             SWELl- 101 Equipment ID No. T-78A                   Equip. Class 21 - Tanks and Heat Exchanqers Enuinment Description EMERG. DIESEL GEN (K4A) COOLING WATER EXP TANK Other Adverse Conditions
Bldg. RAB Floor El. 369 Room, Area 86 Manufacturer, Model, Etc. (optional but recommended)
: 11. Have you looked for and found no other seismic conditions that could       YE N[-     UI--
Electro-Motive Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
adversely affect the safety functions of the equipment?
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YZ NDJ of the 50% of SWEL items requiring such verification)?
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.
Comments (Additional pages may be added as necessary)
Evaluated by: Daniel Parker         "   ,       -                               Date: 10/11/2012 Eric Dilbone 6 u l-                                                 10/11/2012
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 509 of 560 Sheet 4 of 5 Status: YN NO U-Seismic Walkdown Checklist (SWC)         SWELl- 101 Equipment ID No. T-78A                 Equip. Class 21 - Tanks and Heat Exchanqers Equipment Description EMERG. DIESEL GEN (K4A) COOLING WATER EXP TANK Photographs Note: Close-up view of T-78A welded to               Note: Tank T-78A welded to bracket that is bracket used to bolt to steel frame on skid.          bolted to steel frame on K4A skid. View from View from North side of skid.                        North side of skid.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 510 of 560 Sheet 5 of 5 Status: YM N[--   U--
Seismic Walkdown Checklist (SWC)       SWELl- 101 Equipment ID No. T-78A           - Equip. Class 21 - Tanks and Heat Exchangers Equipment Description EMERG. DIESEL GEN (K4A) COOLING WATER EXP TANK Note: View from North side of skid showing         Note: View from South side of skid showing attachedlines,                                     the steel frame used to mount bracket welded to T-78A (top of picture).
 
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 511 of 560 Sheet I of 4 Status: YZ NDI   UD-1 Seismic Walkdown Checklist (SWC)                   SWELl-102 Equipment ID No.         T-78B                     Equip. Class' 21 - Tanks and Heat Exchangers Equipment Description EMERG. DIESEL GEN (K4B) COOLING WATER EXP. TANK Location: Bldg. RAB                 Floor El. 369           Room, Area 86 Manufacturer, Model, Etc. (optional but recommended)               Electro-Motive Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one       YZ NDJ of the 50% of SWEL items requiring such verification)?
Item is part of the 50% configuration.
Item is part of the 50% configuration.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                 Y[   NDJ UD-- N/AD-The anchorageis free of bent, broken, missing and loose hardware.
Y[ NDJ UD-- N/AD-The anchorage is free of bent, broken, missing and loose hardware.3. Is the anchorage free of corrosion that is more than mild surface YN NDJ UD- N/AD-oxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface                 YN NDJ UD- N/AD-oxidation?
The anchorage is free of corrosion.
The anchorageis free of corrosion.
: 4. Is the anchorage free of visible cracks in the concrete near the YZ NDl UD- N/AD anchors?Component mounted to EDG skid. No cracks around skid anchorage.
: 4. Is the anchorage free of visible cracks in the concrete near the                 YZ NDl UD- N/AD anchors?
Component mounted to EDG skid. No cracks around skid anchorage.
' Enter the equipment class name from Appendix B: Classes of Equipment.
' Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO I-C S- 12-00002 Attachment C Rev. 0 Page 512 of 560 Sheet 2 of 4 Status: YZ NF U-I Seismic Walkdown Checklist (SWC) SWELl-102 Equipment ID No. T-78B Equip. Class2 21 -Tanks and Heat Exchangers Equipment Description EMERG. DIESEL GEN (K4B) COOLING WATER EXP. TANK 5. Is the anchorage configuration consistent with plant documentation?
 
YE NE] U[-] N/A--(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Engineering Report No. CALC-ANO I-C S- 12-00002 Attachment C Rev. 0 Page 512 of 560 Sheet 2 of 4 Status: YZ NF U-I Seismic Walkdown Checklist (SWC)                   SWELl-102 Equipment ID No.         T-78B                     Equip. Class2 21 - Tanks and Heat Exchangers Equipment Description EMERG. DIESEL GEN (K4B) COOLING WATER EXP. TANK
Anchorage is consistent with calculation 6600-M12AC-1 17-1.6. Based on the above anchorage evaluations, is the anchorage free of 'YE NE] UEi potentially adverse seismic conditions?
: 5. Is the anchorage configuration consistent with plant documentation?           YE NE] U[-] N/A--
Based on the above anchorage evaluations, the anchorage is free of potentially adverse seismic conditions.
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Anchorage is consistent with calculation 6600-M12AC-1 17-1.
Y[D NEi UE- N/A[E The water expansion tank was mounted to the accessory end of the diesel generator.
: 6. Based on the above anchorage evaluations, is the anchorage free of           'YE   NE] UEi potentially adverse seismic conditions?
A large air-duct mounted overhead adequately supported with steel hangers. There is no other equipment overhead or nearby that could have a credible significant interaction with the tank during a seismic event.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[ NEI UEI N/AE--and masonry block walls not likely to collapse onto the equipment?
Based on the above anchorageevaluations, the anchorage is free of potentially adverse seismic conditions.
There is overhead duct work that is properly secured with steel hangers.9. Do attached lines have adequate flexibility to avoid damage?Attached lines have adequate flexibility.
Interaction Effects
Y[N NE] U[-- N/AE[-10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.Y[ NEI UEl 2 Enter the equipment class name from Appendix B: Classes of Equipment.
: 7. Are soft targets free from impact by nearby equipment or structures?         Y[D   NEi UE- N/A[E The water expansion tank was mounted to the accessory end of the diesel generator.A large air-ductmounted overhead adequately supported with steel hangers. There is no other equipment overhead or nearby that could have a credible significant interaction with the tank during a seismic event.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 513 of 560 Sheet 3 of 4 Status: YN NEI Ui'Seismic Walkdown Checklist (SWC) SWELl-102 Equipment ID No. T-78B Equip. Class3 21 -Tanks and Heat Exchanqers Equipment Description EMERG. DIESEL GEN (K4B) COOLING WATER EXP. TANK Other Adverse Conditions
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,     Y[   NEI UEI N/AE--
: 11. Have you looked for and found no other seismic conditions that could Y' N[i ULI adversely affect the safety functions of the equipment?
and masonry block walls not likely to collapse onto the equipment?
It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found.Comments (Additional pages may be added as necessary)
There is overhead duct work that is properly secured with steel hangers.
The cooling water expansion tank was mounted horizontally at the accessory end of the diesel generator.
: 9. Do attached lines have adequate flexibility to avoid damage?                 Y[N NE] U[-- N/AE[-
The tank was welded directly to support brackets on either side of the tanks. The support brackets were bolted directly to the structural frame of the diesel engine.Evaluated by: Eric Dilbone 6 '-" 1 Date: 10/212012 Daniel Parker 10/212012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
Attached lines have adequate flexibility.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 514 of 560 Sheet 4 of 4 Status: YZ NE] UI-Seismic Walkdown Checklist (SWC) SWELl-102 Equipment ID No. T-78B Equip. Class4 21 -Tanks and Heat Exchanqers Equipment Description EMERG. DIESEL GEN (K4B) COOLING WATER EXP. TANK Photographs Note: Component ID Note: Component Overview 4 Enter the equipment class name from Appendix B: Classes of Equipment.
: 10. Based on the above seismic interaction evaluations, is equipment free         Y[    NEI UEl of potentially adverse seismic interaction effects?
Engineering Report No. CALC-ANO 1-C S- 12-00002 Attachment C Rev. 0 Page 515 of 560 Sheet I of 5 Status: YE NEIl U[-Seismic Walkdown Checklist (SWC) SWELl-103 Equipment ID No. E-197A Equip. Class' 21 -Tanks and Exchangers Equipment Description A EDG LUBE OIL HEAT EXCHANGER Location:
Based on the above seismic interactionevaluations, the equipment is free of potentially adverse seismic interaction effects.
Bldg. RAB Floor El. 369 Room, Area 87 Manufacturer, Model, Etc. (optional but recommended)
2 Enter the equipment class name from Appendix B: Classes of Equipment.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
 
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 513 of 560 Sheet 3 of 4 Status: YN NEI     Ui' Seismic Walkdown Checklist (SWC)                   SWELl-102 Equipment ID No.         T-78B                   Equip. Class3 21 - Tanks and Heat Exchanqers Equipment Description EMERG. DIESEL GEN (K4B) COOLING WATER EXP. TANK Other Adverse Conditions
Item is not part of the 50%.2. Is the anchorage free of bent, broken, missing or loose hardware?The bolts anchoring the heat exchanger to the EDG skid are free of bent, broken, missing and loose hardware.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 11. Have you looked for and found no other seismic conditions that could         Y'   N[i   ULI adversely affect the safety functions of the equipment?
It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found.
Comments (Additional pages may be added as necessary)
The cooling water expansion tank was mounted horizontally at the accessory end of the diesel generator.The tank was welded directly to support brackets on either side of the tanks. The supportbrackets were bolted directly to the structuralframe of the diesel engine.
Evaluated by: Eric Dilbone       6     1 '-"                                         Date: 10/212012 Daniel Parker *j                                                            10/212012 3 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 514 of 560 Sheet 4 of 4 Status: YZ NE]     UI-Seismic Walkdown Checklist (SWC)                   SWELl-102 Equipment ID No.         T-78B                   Equip. Class4 21 - Tanks and Heat Exchanqers Equipment Description EMERG. DIESEL GEN (K4B) COOLING WATER EXP. TANK Photographs Note: Component ID                                               Note: Component Overview 4 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-C S- 12-00002 Attachment C Rev. 0 Page 515 of 560 Sheet I of 5 Status: YE NEIl U[-
Seismic Walkdown Checklist (SWC)                   SWELl-103 Equipment ID No.         E-197A                   Equip. Class' 21 - Tanks and Exchangers Equipment Description A EDG LUBE OIL HEAT EXCHANGER Location: Bldg. RAB                 Floor El. 369           Room, Area 87 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one   Y[    NZ of the 50% of SWEL items requiring such verification)?
Item is not part of the 50%.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             YZ NO ulfl N/A[:]
The bolts anchoringthe heat exchanger to the EDG skid are free of bent, broken, missing and loose hardware.
: 3. Is the anchorage free of corrosion that is more than mild surface               YZ NO U-1 N/A[-]
oxidation?
Some of the blue paint is cracked, but there are no signs of corrosion.
Some of the blue paint is cracked, but there are no signs of corrosion.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?The heat exchanger is anchored to a steel frame on the EDG skid. No cracks in concrete around skid observed.Y[ NZ YZ NO ulfl N/A[:]YZ NO U-1 N/A[-]Y' NEI ur N/AD-1 IEnter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the               Y'    NEI  ur  N/AD-1 anchors?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 516 of 560 Sheet 2 of 5 Status: YZ N[:] U[-Seismic Walkdown Checklist (SWC) SWELl- 103 Equipment ID No. E-197A Equip. Class 21 -Tanks and Exchangers Equipment Description A EDG LUBE OIL HEAT EXCHANGER 5. Is the anchorage configuration consistent with plant documentation?
The heat exchanger is anchored to a steel frame on the EDG skid. No cracks in concrete aroundskid observed.
Y[-E NEI U- N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
IEnter the equipment class name from Appendix B: Classes of Equipment.
This does not apply since this item is not part of the 50% requiring anchorage configuration.
 
: 6. Based on the above anchorage evaluations, is the anchorage free of YN NEi U-" potentially adverse seismic conditions?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 516 of 560 Sheet 2 of 5 Status: YZ N[:] U[-
All visible anchorage was free of potentially adverse seismic conditions.
Seismic Walkdown Checklist (SWC)               SWELl- 103 Equipment ID No.     E-197A                 Equip. Class 21 - Tanks and Exchangers Equipment Description A EDG LUBE OIL HEAT EXCHANGER
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 5. Is the anchorage configuration consistent with plant documentation?         Y[-E NEI   U- N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
There are no soft targets that could be impacted by nearby equipment or structures.
This does not apply since this item is not part of the 50% requiring anchorageconfiguration.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 6. Based on the above anchorage evaluations, is the anchorage free of         YN NEi     U-"
There are no masonry block walls or ceiling tiles in the room. The lights are in good condition, and do not present an interaction effect.9. Do attached lines have adequate flexibility to avoid damage?The attached lines have adequate flexibility.
potentially adverse seismic conditions?
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Based on the above evaluation, the heat exchanger is free of potentially adverse seismic interaction effects.YZ NEI UD N/AD YZ ND uF-I N/AD-'YZ ND UD N/A[D]Y' NM uDU Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 517 of 560 Sheet 3 of 5 Status: Y[ N- U--1 Seismic Walkdown Checklist (SWC) SWELl- 103 Equipment ID No. E-197A Equip. Class 21 -Tanks and Exchangers Equipment Description A EDG LUBE OIL HEAT EXCHANGER Other Adverse Conditions
All visible anchoragewas free of potentially adverse seismic conditions.
: 11. Have you looked for and found no other seismic conditions that could YN NiE U-I adversely affect the safety functions of the equipment?
Interaction Effects
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.Comments (Additional pages may be added as necessary)
: 7. Are soft targets free from impact by nearby equipment or structures?       YZ NEI      UD N/AD There are no soft targets that could be impacted by nearby equipment or structures.
Evaluated by: Daniel Parker Date: 10/11/2012 Eric Dilbone 1/20 1011112012 Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 518 of 560 Sheet 4 of 5 Status: YZ NI- ULID Seismic Walkdown Checklist (SWC) SWELl- 103 Equipment ID No. E-197A Equip. Class 21 -Tanks and Exchangers Equipment Description A EDG LUBE OIL HEAT EXCHANGER Photographs Note: Close-up view of equipment ID tag and bolts anchoring heat exchanger to the steel frame.Note: Side view from South side of skid showing diagonal orientation of heat exchanger.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ ND uF-I        N/AD-'
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 519 of 560 Sheet 5 of 5 Status: YZ NEI] Uil Seismic Walkdown Checklist (SWC) SWELl- 103 Equipment ID No. E-197A Equip. Class 21 -Tanks and Exchangers Equipment Description A EDG LUBE OIL HEAT EXCHANGER Note: View of anchor bolts along the upper (top) and lower (bottom) edges of the heat exchanger.
and masonry block walls not likely to collapse onto the equipment?
Note: View of anchor bolts used to mount the heat exchanger to the steel frame located on the K4A skid.
There are no masonry block walls or ceiling tiles in the room. The lights are in good condition, and do not present an interaction effect.
Engineering Report No. CALC-ANO I-C S- 12-00002 Attachment C Rev. 0 Page 520 of 560 Sheet 1 of 5 Status: Y] NF UI-Seismic Walkdown Checklist (SWC) SWELl- 104 Equipment ID No. E-109 Equip. Class' 21 -Tanks and Heat Exchanqers Equipment Description OIL COOLER Location:
: 9. Do attached lines have adequate flexibility to avoid damage?                 YZ ND UD N/A[D]
Bldg. RAB Floor El. 335 Room, Area 38 Manufacturer, Model, Etc. (optional but recommended)
The attachedlines have adequate flexibility.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
: 10. Based on the above seismic interaction evaluations, is equipment free       Y'    NM uDU of potentially adverse seismic interaction effects?
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Based on the above evaluation, the heat exchanger is free of potentially adverse seismic interaction effects.
This equipment item is part of the 50% of SWEL items requiring anchorage configuration verification.
 
: 2. Is the anchorage free of bent, broken, missing or loose hardware?All anchorage was free of the conditions listed above.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 517 of 560 Sheet 3 of 5 Status: Y[   N-   U--1 Seismic Walkdown Checklist (SWC)             SWELl- 103 Equipment ID No. E-197A                 Equip. Class 21 - Tanks and Exchangers Equipment Description A EDG LUBE OIL HEAT EXCHANGER Other Adverse Conditions
No corrosion was observed.4. Is the anchorage free of visible cracks in the concrete near the anchors?No visible cracks were observed in the concrete.YZ N[-YN NEIl U[-] N/A--YX NE] U[-- N/A-1 YZ NEI UD- N/AE-' Enter the equipment class name from Appendix B: Classes of Equipment.
: 11. Have you looked for and found no other seismic conditions that could       YN NiE     U-I adversely affect the safety functions of the equipment?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 521 of 560 Sheet 2 of 5 Status: YN NEI UI Seismic Walkdown Checklist (SWC) SWELl- 104 Equipment ID No. E-109 Equip. Class 21 -Tanks and Heat Exchanqers Equipment Description OIL COOLER 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
It was looked for, and no other seismic conditions that could adversely affect the safety functions were found.
Information for anchorage configuration was taken from CR-ANO-I-2008-01239 pg. 103. The anchorage configuration consists of four bolts, two per angle beam support and each .625 inch in diameter.
Comments (Additional pages may be added as necessary)
The anchorage configuration in the equipment drawing was consistent with what was evident in the seismic inspection.
Evaluated by: Daniel Parker                                                       Date: 10/11/2012 Eric Dilbone                                                               1/20 1011112012
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 518 of 560 Sheet 4 of 5 Status: YZ NI- ULID Seismic Walkdown Checklist (SWC)         SWELl- 103 Equipment ID No. E-197A               Equip. Class 21 - Tanks and Exchangers Equipment Description A EDG LUBE OIL HEAT EXCHANGER Photographs Note: Close-up view of equipment ID tag and         Note: Side view from South side of skid bolts anchoring heat exchanger to the steel          showing diagonalorientation of heat frame.                                              exchanger.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 519 of 560 Sheet 5 of 5 Status: YZ NEI] Uil Seismic Walkdown Checklist (SWC)         SWELl- 103 Equipment ID No. E-197A               Equip. Class 21 - Tanks and Exchangers Equipment Description A EDG LUBE OIL HEAT EXCHANGER Note: View of anchor bolts along the upper           Note: View of anchorbolts used to mount the (top) and lower (bottom) edges of the heat           heat exchanger to the steel frame located on exchanger.                                          the K4A skid.
 
Engineering Report No. CALC-ANO I-C S- 12-00002 Attachment C Rev. 0 Page 520 of 560 Sheet 1 of 5 Status: Y] NF UI-Seismic Walkdown Checklist (SWC)                     SWELl- 104 Equipment ID No.         E-109                     Equip. Class' 21 - Tanks and Heat Exchanqers Equipment Description OIL COOLER Location: Bldg. RAB                   Floor El. 335           Room, Area 38 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one     YZ N[-
of the 50% of SWEL items requiring such verification)?
This equipment item is part of the 50% of SWEL items requiring anchorageconfiguration verification.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               YN NEIl U[-] N/A--
All anchorage was free of the conditions listed above.
: 3. Is the anchorage free of corrosion that is more than mild surface               YX NE] U[-- N/A-1 oxidation?
No corrosion was observed.
: 4. Is the anchorage free of visible cracks in the concrete near the               YZ NEI UD- N/AE-anchors?
No visible cracks were observed in the concrete.
' Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 521 of 560 Sheet 2 of 5 Status: YN NEI     UI Seismic Walkdown Checklist (SWC)               SWELl- 104 Equipment ID No.     E-109                   Equip. Class 21 - Tanks and Heat Exchanqers Equipment Description OIL COOLER
: 5. Is the anchorage configuration consistent with plant documentation?         YE NI U[EI N/AD-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Information for anchorage configurationwas taken from CR-ANO-I-2008-01239 pg. 103. The anchorageconfiguration consists of four bolts, two per angle beam support and each .625 inch in diameter. The anchorageconfiguration in the equipment drawing was consistent with what was evident in the seismic inspection.
: 6. Based on the above anchorage evaluations, is the anchorage free of           YE NEI UM potentially adverse seismic conditions?
All anchorage is free of adverse seismic conditions.
All anchorage is free of adverse seismic conditions.
YE NI U[EI N/AD-YE NEI UM Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YZ ND] UD] N/AD]
All soft targets are free from impact by nearby equipment.
All soft targets are free from impact by nearby equipment.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YM N[-] UD1 N/AD-and masonry block walls not likely to collapse onto the equipment?
Overhead equipment is not likely to collapse onto the equipment item.9. Do attached lines have adequate flexibility to avoid damage?All attached lines have adequate flexibility.
Overheadequipment is not likely to collapse onto the equipment item.
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Equipment is free of potentially adverse seismic interaction effects. Item is well anchored to the floor.YZ ND] UD] N/AD]YM N[-] UD1 N/AD-YZ NDl UD] N/AD: YZ NEI UD-1 Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 522 of 560 Sheet 3 of 5 Status: Y] NO U-Seismic Walkdown Checklist (SWC) SWELl- 104 Equipment ID No. E-109 Equip. Class 21 -Tanks and Heat Exchanqers Equipment Description OIL COOLER Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?               YZ NDl UD] N/AD:
: 11. Have you looked for and found no other seismic conditions that could Y" NMi UMi adversely affect the safety functions of the equipment?
All attachedlines have adequate flexibility.
: 10. Based on the above seismic interaction evaluations, is equipment free       YZ NEI UD-1 of potentially adverse seismic interaction effects?
Equipment is free of potentially adverse seismic interaction effects. Item is well anchored to the floor.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 522 of 560 Sheet 3 of 5 Status: Y] NO U-Seismic Walkdown Checklist (SWC)               SWELl- 104 Equipment ID No. E-109                     Equip. Class 21 - Tanks and Heat Exchanqers Equipment Description OIL COOLER Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could         Y"   NMi   UMi adversely affect the safety functions of the equipment?
Yes, no other seismic conditions that could affect the safety functions of the equipment were discovered.
Yes, no other seismic conditions that could affect the safety functions of the equipment were discovered.
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Equipment item, E-109, had no clear visible tag number. Although this was evident in the inspection, the oil cooler was clearly identified through an image in the SEWS package and also through the tag on the component feeding into the Oil Cooler.Evaluated by: Genaro Barraqan Jr. Date: 1 2 Date: 101912012 Eric Dilbone '10//2 1 101912012 Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 523 of 560 Sheet 4 of 5 Status: YZ NEi-] UI-Seismic Walkdown Checklist (SWC) SWELl- 104 Equipment ID No. E-109 Equip. Class 21 -Tanks and Heat Exchanqers Equipment Description OIL COOLER Photographs Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 524 of 560 Sheet 5 of 5 Status: YZ ND U[7 Seismic Walkdown Checklist (SWC) SWELl- 104 Equipment ID No. E-109 Equip. Class 21 -Tanks and Heat Exchangers Equipment Description OIL COOLER Note: General image of Oil Cooler (E-109).Note: General image of Oil Cooler (E-109).
Equipment item, E-109, had no clear visible tag number. Although this was evident in the inspection, the oil cooler was clearly identified through an image in the SEWS package and also through the tag on the component feeding into the Oil Cooler.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 525 of 560 Sheet I of 5 Status: Y- NF U-Seismic Walkdown Checklist (SWC) SWELl-105 Equipment ID No. N/A Equip. Class, Equipment Description NOT USED Location:
Date: 1        2 Evaluated by: Genaro BarraqanJr.                                                   Date: 101912012 Eric Dilbone '10//2                                                                 1 101912012
Bldg. N/A Floor El. N/A Room, Area N/A Manufacturer, Model, Etc. (optional but recommended)
 
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 523 of 560 Sheet 4 of 5 Status: YZ NEi-] UI-Seismic Walkdown Checklist (SWC) SWELl- 104 Equipment ID No. E-109         Equip. Class 21 - Tanks and Heat Exchanqers Equipment Description OIL COOLER Photographs
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
 
YE"] Nn 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 524 of 560 Sheet 5 of 5 Status: YZ ND U[7 Seismic Walkdown Checklist (SWC)     SWELl- 104 Equipment ID No. E-109             Equip. Class 21 - Tanks and Heat Exchangers Equipment Description OIL COOLER Note: Generalimage of Oil Cooler (E-109).         Note: General image of Oil Cooler (E-109).
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YEJ NEJ UE[ N/AE[YE- NFE UE- N/AE--YE] NE: UEJ N/AE[-I Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 526 of 560 Sheet 2 of 5 Status: YE] NI] U--Seismic Walkdown Checklist (SWC) SWELl-105 Equipment ID No. N/A Equip. I Equipment Description NOT USED 5. Is the anchorage configuration consistent with plant documentation?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 525 of 560 Sheet I of 5 Status: Y-   NF U-Seismic Walkdown Checklist (SWC)                   SWELl-105 Equipment ID No.         N/A                       Equip. Class, Equipment Description NOT USED Location: Bldg. N/A                 Floor El. N/A           Room, Area N/A Manufacturer, Model, Etc. (optional but recommended)
YEI- NE] UE] N/A[](Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
: 6. Based on the above anchorage evaluations, is the anchorage free of YE] NE-] UE]potentially adverse seismic conditions?
Anchorage
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 1. Is the anchorage configuration verification required (i.e., is the item one   YE"] Nn of the 50% of SWEL items requiring such verification)?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             YEJ NEJ UE[ N/AE[
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YE] NEi UE] N/AE]YEI NEI UE] N/AE-]YEI NE] UE]1 N/AE]YEI NE[:] UE]-
: 3. Is the anchorage free of corrosion that is more than mild surface             YE- NFE UE- N/AE--
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 527 of 560 Sheet 3 of 5 Status: YO] NO] Ut]Seismic Walkdown Checklist (SWC) SWE Equipment ID No. N/A Equip.Equipment Description NOT USED Other Adverse Conditions
oxidation?
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
: 4. Is the anchorage free of visible cracks in the concrete near the               YE] NE: UEJ N/AE[-
Y[L]NE]UFJ Comments (Additional pages may be added as necessary)
anchors?
Evaluated by: Date:
I Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 528 of 560 Sheet 4 of 5 Status: Y-- NE] Ur-1 Seismic Walkdown Checklist (SWC) SWELl-105 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Photographs Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 529 of 560 Sheet 5 of 5 Status: YW-- Nil Ur-1 Seismic Walkdown Checklist (SWC) SWELl-105 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Note: Note:
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 530 of 560 Sheet 1 of 6 Status: YZ NE] UE1 Seismic Walkdown Checklist (SWC) SWELl-106 Equipment ID No. T-208 -Equip. Class' 21-Tanks and Heat Exchangers Equipment Description ACCUM TANK FOR CV-2234 AIR OPERATOR Location:
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 526 of 560 Sheet 2 of 5 Status: YE] NI] U--
Bldg. RAB Floor El. 356 Room, Area 77 Manufacturer, Model, Etc. (optional but recommended)
Seismic Walkdown Checklist (SWC)               SWELl-105 Equipment ID No.     N/A                     Equip. I Equipment Description NOT USED
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
: 5. Is the anchorage configuration consistent with plant documentation?         YEI- NE] UE] N/A[]
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one Y[] NZ of the 50% of SWEL items requiring such verification)?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
This item is anchored to Item CV-2234 using steel frames. This item is also not part of the 50%.2. Is the anchorage free of bent, broken, missing or loose hardware?
: 6. Based on the above anchorage evaluations, is the anchorage free of           YE] NE-] UE]
YZ NEI UE- N/AE-It appears that one of the anchored bolts is slightly loose. However, there are no signs for this being an adverse seismic condition for the equipment item. Other than this minor issue, all other anchorage is free of the conditions listed above.3. Is the anchorage free of corrosion that is more than mild surface Y' N[E uE-l N/AE-oxidation?
potentially adverse seismic conditions?
No corrosion was observed.4. Is the anchorage free of visible cracks in the concrete near the YE- NE] UEi N/AZ anchors?Equipment is attached to a metal frame in Item CV-2234.I Enter the equipment class name from Appendix B: Classes of Equipment.
Interaction Effects
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 531 of 560 Sheet 2 of 6 Status: Y[ NEiI UDl Seismic Walkdown Checklist (SWC) SWELl-106 Equipment ID No. T-208 Equip. Class 21-Tanks and Heat Exchangers Equipment Description ACCUM TANK FOR CV-2234 AIR OPERATOR 5. Is the anchorage configuration consistent with plant documentation?
: 7. Are soft targets free from impact by nearby equipment or structures?         YE] NEi UE] N/AE]
Y-- NF] U' N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YEI NEI    UE] N/AE-]
Item is not part of the 50%.6. Based on the above anchorage evaluations, is the anchorage free of YN NI] U[]potentially adverse seismic conditions?
and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?               YEI NE] UE]1 N/AE]
: 10. Based on the above seismic interaction evaluations, is equipment free       YEI NE[:] UE]-
of potentially adverse seismic interaction effects?
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 527 of 560 Sheet 3 of 5 Status: YO] NO] Ut]
Seismic Walkdown Checklist (SWC)              SWE Equipment ID No. N/A                      Equip.
Equipment Description NOT USED Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could    Y[L]NE]UFJ adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Evaluated by:                                                                    Date:
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 528 of 560 Sheet 4 of 5 Status: Y--  NE] Ur-1 Seismic Walkdown Checklist (SWC) SWELl-105 Equipment ID No. N/A          Equip. Class N/A Equipment Description NOT USED Photographs
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 529 of 560 Sheet 5 of 5 Status: YW-- Nil Ur-1 Seismic Walkdown Checklist (SWC) SWELl-105 Equipment ID No. N/A           Equip. Class N/A Equipment Description NOT USED Note:                                        Note:
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 530 of 560 Sheet 1 of 6 Status: YZ NE] UE1 Seismic Walkdown Checklist (SWC)                   SWELl-106 Equipment ID No.         T-208                -  Equip. Class' 21-Tanks and Heat Exchangers Equipment Description ACCUM TANK FOR CV-2234 AIR OPERATOR Location: Bldg. RAB                  Floor El. 356            Room, Area 77 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one    Y[] NZ of the 50% of SWEL items requiring such verification)?
This item is anchored to Item CV-2234 using steel frames. This item is also not partof the 50%.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?              YZ NEI      UE- N/AE-It appears that one of the anchored bolts is slightly loose. However, there are no signs for this being an adverse seismic condition for the equipment item. Other than this minor issue, all other anchorageis free of the conditionslisted above.
: 3. Is the anchorage free of corrosion that is more than mild surface              Y'    N[E uE-l N/AE-oxidation?
No corrosion was observed.
: 4. Is the anchorage free of visible cracks in the concrete near the              YE- NE] UEi N/AZ anchors?
Equipment is attachedto a metal frame in Item CV-2234.
I Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 531 of 560 Sheet 2 of 6 Status: Y[   NEiI UDl Seismic Walkdown Checklist (SWC)              SWELl-106 Equipment ID No.      T-208                  Equip. Class 21-Tanks and Heat Exchangers Equipment Description ACCUM TANK FOR CV-2234 AIR OPERATOR
: 5. Is the anchorage configuration consistent with plant documentation?        Y-- NF] U'      N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Item is not partof the 50%.
: 6. Based on the above anchorage evaluations, is the anchorage free of         YN NI] U[]
potentially adverse seismic conditions?
Anchorage is free of potentially adverse seismic conditions.
Anchorage is free of potentially adverse seismic conditions.
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YZ NEi ULI N/A[--
Soft targets are free from impact by nearby equipment.
Soft targets are free from impact by nearby equipment.
YZ NEi ULI N/A[--8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NEil UZI' N/A[--and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YE NEil UZI'   N/A[--
Steel frame protects the tank from overhead hazards.9. Do attached lines have adequate flexibility to avoid damage?Lines appear to have adequate flexibility.
and masonry block walls not likely to collapse onto the equipment?
Y' NEI uLI N/A--10. Based on the above seismic interaction evaluations, is equipment free YZ NE- U '-1 of potentially adverse seismic interaction effects?Equipment has enough space in its surroundings to avoid negative interaction effects.
Steel frame protects the tank from overhead hazards.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 532 of 560 Sheet 3 of 6 Status: Y[ NEIl U[-Seismic Walkdown Checklist (SWC) SWELl-106 Equipment ID No. T-208 Equip. Class 21-Tanks and Heat Exchangers Equipment Description ACCUM TANK FOR CV-2234 AIR OPERATOR Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?               Y'   NEI uLI   N/A--
: 11. Have you looked for and found no other seismic conditions that could YN NoI UF-adversely affect the safety functions of the equipment?
Lines appearto have adequate flexibility.
No other seismic conditions that could adversely affect the safety functions of the equipment were observed.Comments (Additional pages may be added as necessary)
: 10. Based on the above seismic interaction evaluations, is equipment free       YZ NE- U '-1 of potentially adverse seismic interaction effects?
Accumulator tank did not have an equipment ID tag. Tank ID was noted on the tee fitting directly above the tank. Also, one of the anchored bolts was slightly loose; there are no signs of it being a seismic concern for the accumulator.
Equipment has enough space in its surroundingsto avoid negative interactioneffects.
See images below.Evaluated by: Genaro Barraqan Jr. .'Date: 10/3/2012 Michael E. Perez 10//2-101312012 Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 533 of 560 Sheet 4 of 6 Status: YZ NEI UD-]Seismic Walkdown Checklist (SWC) SWELl-106 Equipment ID No. T-208 Equip. Class 21-Tanks and Heat Exchangers Equipment Description ACCUM TANK FOR CV-2234 AIR OPERATOR Photographs Note: Image shows the Accumulator tank ID T-208.Note: It seems that there is one bolt that appears to be slightly loose. Although this may not show signs of an adverse seismic condition, it is advised that the bolt should be checked for tightness.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 534 of 560 Sheet 5 of 6 Status: YZ NEI-] UI-Seismic Walkdown Checklist (SWC) SWELl-106 Equipment ID No. T-208 Equip. Class 21-Tanks and Heat Exchangers Equipment Description ACCUM TANK FOR CV-2234 AIR OPERATOR Note: General image of Accumulator Tank.Note: Image shows the anchorage configuration of the accumulator tank.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 532 of 560 Sheet 3 of 6 Status: Y[     NEIl U[-
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 535 of 560 Sheet 6 of 6 Status: YZ N[-] U-I Seismic Walkdown Checklist (SWC) SWELl-106 Equipment ID No. T-208 Equip. Class 21-Tanks and Heat Exchangers Equipment Description ACCUM TANK FOR CV-2234 AIR OPERATOR Note: General image showing the top section of the tank.Note:
Seismic Walkdown Checklist (SWC)               SWELl-106 Equipment ID No. T-208                   Equip. Class 21-Tanks and Heat Exchangers Equipment Description ACCUM TANK FOR CV-2234 AIR OPERATOR Other Adverse Conditions
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 536 of 560 Sheet 1 of 5 Status: YLI NR U-Seismic Walkdown Checklist (SWC) SWELl-107 Equipment ID No. N/A Equip. I Equipment Description NOT USED Location:
: 11. Have you looked for and found no other seismic conditions that could       YN NoI UF-adversely affect the safety functions of the equipment?
Bldg. N/A Floor El. N/A Room, Area N/A Manufacturer, Model, Etc. (optional but recommended)
No other seismic conditions that could adversely affect the safety functions of the equipment were observed.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
'Y[-E NE-]2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[E] NEJ U[-E N/AE-YE- NEI UE-' N/AE--'YE NE:] UEJ N/A[E]1 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 537 of 560 Sheet 2 of 5 Status: YEI Nn- U-Seismic Walkdown Checklist (SWC) SWELl -107 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED 5. Is the anchorage configuration consistent with plant documentation?
YE- NE- U[:] N/Ar](Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of YE- NE UE]potentially adverse seismic conditions?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YEI NEi UE- N/AE-YEI NEI UE1 N/AE1 Y[I NEI UE- N/AE-YEI NEI UE Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 538 of 560 Sheet 3 of 5 Status: YD-- NE] U--Seismic Walkdown Checklist (SWC) SWELl-107 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could YE]" Nil uD-adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Evaluated by: Date: Evaluated by: Date:
Accumulator tank did not have an equipment ID tag. Tank ID was noted on the tee fitting directly above the tank. Also, one of the anchored bolts was slightly loose; there are no signs of it being a seismic concern for the accumulator.See images below.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 539 of 560 Sheet 4 of 5 Status: YD-- No-- ULII Seismic Walkdown Checklist (SWC) SWELl-107 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Photographs Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 540 of 560 Sheet 5 of 5 Status: YDI NEI U--Seismic Walkdown Checklist (SWC) SWELl-107 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Note: Note:
Evaluated by: Genaro BarraqanJr. .          '                                    Date: 10/3/2012 Michael E. Perez                                                            10//2-101312012
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 541 of 560 Sheet I of 5 Status: YZ N[:] UM Seismic Walkdown Checklist (SWC) SWELl-108 Equipment ID No. E-35A Equip. Class' 21 -Tanks and Heat Exchanqers Equipment Description  
 
'A' LOOP DH CLR Location:
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 533 of 560 Sheet 4 of 6 Status: YZ NEI UD-]
Bldg. RAB Floor El. 317 Room, Area 14 Manufacturer, Model, Etc. (optional but recommended)
Seismic Walkdown Checklist (SWC)    SWELl-106 Equipment ID No. T-208            Equip. Class 21-Tanks and Heat Exchangers Equipment Description ACCUM TANK FOR CV-2234 AIR OPERATOR Photographs Note: Image shows the Accumulator tank ID        Note: It seems that there is one bolt that T-208.                                          appears to be slightly loose. Although this may not show signs of an adverse seismic condition, it is advised that the bolt should be checked for tightness.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
 
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YZ N[E of the 50% of SWEL items requiring such verification)?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 534 of 560 Sheet 5 of 6 Status: YZ    NEI-] UI-Seismic Walkdown Checklist (SWC)      SWELl-106 Equipment ID No. T-208            Equip. Class 21-Tanks and Heat Exchangers Equipment Description ACCUM TANK FOR CV-2234 AIR OPERATOR Note: General image of Accumulator Tank.          Note: Image shows the anchorage configuration of the accumulatortank.
This equipment is anchored to two concrete pedestals.
 
Anchorage configuration verification is required for this equipment.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 535 of 560 Sheet 6 of 6 Status: YZ N[-] U-I Seismic Walkdown Checklist (SWC)      SWELl-106 Equipment ID No. T-208            Equip. Class 21-Tanks and Heat Exchangers Equipment Description ACCUM TANK FOR CV-2234 AIR OPERATOR Note: General image showing the top section      Note:
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
of the tank.
YE N[: UE- N/AE"]Anchorage appears to be free from the conditions stated above.3. Is the anchorage free of corrosion that is more than mild surface YZ N[: UE- N/AEl oxidation?
 
No signs of any type of corrosion have been found on the anchorage of the component.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 536 of 560 Sheet 1 of 5 Status: YLI NR U-Seismic Walkdown Checklist (SWC)                    SWELl-107 Equipment ID No.          N/A                      Equip. I Equipment Description NOT USED Location: Bldg. N/A                  Floor El. N/A            Room, Area N/A Manufacturer, Model, Etc. (optional but recommended)
: 4. Is the anchorage free of visible cracks in the concrete near the YZ NEl U[-] N/A[--anchors?No cracks were observed in the concrete piers in the vicinity of the anchor bolts. Concrete piers (3ft high) appeared to be in sound condition.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one    'Y[-E NE-]
of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?              Y[E] NEJ U[-E N/AE-
: 3. Is the anchorage free of corrosion that is more than mild surface              YE- NEI UE-'  N/AE--
oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the                'YE NE:] UEJ N/A[E]
anchors?
1 Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 537 of 560 Sheet 2 of 5 Status: YEI  Nn- U-Seismic Walkdown Checklist (SWC)                SWELl -107 Equipment ID No.      N/A                      Equip. Class N/A Equipment Description NOT USED
: 5. Is the anchorage configuration consistent with plant documentation?          YE- NE- U[:] N/Ar]
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of          YE-  NE UE]
potentially adverse seismic conditions?
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?        YEI NEi UE- N/AE-
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,    YEI NEI UE1 N/AE1 and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?                Y[I NEI UE- N/AE-
: 10. Based on the above seismic interaction evaluations, is equipment free        YEI NEI UE of potentially adverse seismic interaction effects?
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 538 of 560 Sheet 3 of 5 Status: YD-- NE] U--
Seismic Walkdown Checklist (SWC)              SWELl-107 Equipment ID No. N/A                    Equip. Class N/A Equipment Description NOT USED Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could    YE]" Nil uD-adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Evaluated by:                                                                   Date:
Date:
Evaluated by:
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 539 of 560 Sheet 4 of 5 Status: YD-- No-- ULII Seismic Walkdown Checklist (SWC) SWELl-107 Equipment ID No. N/A           Equip. Class N/A Equipment Description NOT USED Photographs
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 540 of 560 Sheet 5 of 5 Status: YDI   NEI   U--
Seismic Walkdown Checklist (SWC) SWELl-107 Equipment ID No. N/A           Equip. Class N/A Equipment Description NOT USED Note:                                         Note:
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 541 of 560 Sheet I of 5 Status: YZ N[:] UM Seismic Walkdown Checklist (SWC)                     SWELl-108 Equipment ID No.         E-35A                     Equip. Class' 21 - Tanks and Heat Exchanqers Equipment Description 'A' LOOP DH CLR Location: Bldg.     RAB             Floor El. 317             Room, Area 14 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one   YZ N[E of the 50% of SWEL items requiring such verification)?
This equipment is anchoredto two concrete pedestals. Anchorage configuration verification is requiredfor this equipment.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               YE N[:     UE- N/AE"]
Anchorage appears to be free from the conditions stated above.
: 3. Is the anchorage free of corrosion that is more than mild surface               YZ N[:     UE- N/AEl oxidation?
No signs of any type of corrosion have been found on the anchorageof the component.
: 4. Is the anchorage free of visible cracks in the concrete near the               YZ NEl U[-] N/A[--
anchors?
No cracks were observed in the concrete piers in the vicinity of the anchor bolts. Concrete piers (3ft high) appearedto be in sound condition.
1 Enter the equipment class name from Appendix B: Classes of Equipment.
1 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 542 of 560 Sheet 2 of 5 Status: Y[ NE] U[]Seismic Walkdown Checklist (SWC) SWELl-108 Equipment ID No. E-35A Equip. Class 21 -Tanks and Heat Exchangers Equipment Description A' LOOP DH CLR 5. Is the anchorage configuration consistent with plant documentation?
 
Y[ NEI U[- N/AD-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 542 of 560 Sheet 2 of 5 Status: Y[   NE] U[]
The anchorage configuration that has been found during the inspection complied with the specifications stated in the documentation (CALC-94-SQ-1001-21, page 25 and Drawing C-261, Sht. 1, Rev. 15).6. Based on the above anchorage evaluations, is the anchorage free of YZ NE] UD-]potentially adverse seismic conditions?
Seismic Walkdown Checklist (SWC)               SWELl-108 Equipment ID No.     E-35A                   Equip. Class 21 - Tanks and Heat Exchangers Equipment Description A' LOOP DH CLR
All anchorage supporting the system was found to be free from adverse seismic conditions.
: 5. Is the anchorage configuration consistent with plant documentation?         Y[   NEI U[-   N/AD-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
The anchorageconfiguration that has been found during the inspection complied with the specificationsstated in the documentation (CALC       SQ-1001-21, page 25 and Drawing C-261, Sht. 1, Rev. 15).
None of the soft targets found in the equipment have been shown to potentially suffer impact by nearby equipment.
: 6. Based on the above anchorage evaluations, is the anchorage free of         YZ NE] UD-]
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
potentially adverse seismic conditions?
Overhead equipment near Item E-35B appeared to be properly secured so as to avoid any collapse during a seismic hazard.9. Do attached lines have adequate flexibility to avoid damage?All attached lines have been ruled to have adequate flexibility.
All anchoragesupporting the system was found to be free from adverse seismic conditions.
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Equipment appears to be free from seismic interaction effects.Y[N ND-] UD- N/AD-Y[D ND:] UD- N/AD-Y' NDI UD- N/AD-YN ND"] U[-D Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 543 of 560 Sheet 3 of 5 Status: Y[ NIF U-]Seismic Walkdown Checklist (SWC) SWELl-108 Equipment ID No. E-35A Equip. Class 21 -Tanks and Heat Exchangers Equipment Description  
Interaction Effects
'A'LOOP OH CLR Other Adverse Conditions
: 7. Are soft targets free from impact by nearby equipment or structures?       Y[N ND-] UD- N/AD-None of the soft targets found in the equipment have been shown to potentiallysuffer impact by nearby equipment.
: 11. Have you looked for and found no other seismic conditions that could YN NEI UD1 adversely affect the safety functions of the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[D ND:]      UD- N/AD-and masonry block walls not likely to collapse onto the equipment?
Overheadequipment near Item E-35B appeared to be properlysecured so as to avoid any collapse during a seismic hazard.
: 9. Do attached lines have adequate flexibility to avoid damage?               Y'    NDI UD- N/AD-All attachedlines have been ruled to have adequate flexibility.
: 10. Based on the above seismic interaction evaluations, is equipment free       YN ND"] U[-D of potentially adverse seismic interaction effects?
Equipment appears to be free from seismic interaction effects.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 543 of 560 Sheet 3 of 5 Status: Y[   NIF U-]
Seismic Walkdown Checklist (SWC)               SWELl-108 Equipment ID No. E-35A                     Equip. Class 21 - Tanks and Heat Exchangers Equipment Description 'A'LOOP OH CLR Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       YN NEI     UD1 adversely affect the safety functions of the equipment?
No other seismic conditions were found to affect the equipment's integrity.
No other seismic conditions were found to affect the equipment's integrity.
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
The anchorage found in the system appeared to be in very good condition.
The anchoragefound in the system appeared to be in very good condition. There was no sign of oxidation. Additionally, no cracks in the concrete were observed.
There was no sign of oxidation.
Evaluated by: Michael Perez         -   -                                         Date: 10/11/2012 Sean Smolarek Z/122                                                       1011112012
Additionally, no cracks in the concrete were observed.Evaluated by: Michael Perez --Date: 10/11/2012 Sean Smolarek Z/122 1011112012 Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 544 of 560 Sheet 4 of 5 Seismic Walkdown Checklist (SWC)Equipment ID No. E-35A Equipment Description
 
'A' LOOP DH CLR Status: YZ NI] U--SWELl-108 Equip. Class 21 -Tanks and Heat Exchangers Photographs Note: General Overview Note: Concrete Pedastel Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 545 of 560 Sheet 5 of 5 Status: YE Nr D UI-Seismic Walkdown Checklist (SWC) SWELl-108 Equipment ID No. E-35A Equip. Class 21 -Tanks and Heat Exchanqers Equipment Description  
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 544 of 560 Sheet 4 of 5 Status: YZ NI] U--
'A' LOOP DH CLR Note: Anchorage Note: Overhead Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 546 of 560 Sheet I of 5 Status: Y[ NE U--Seismic Walkdown Checklist (SWC) SWELl-109 Equipment ID No. E-35B Equip. Class, 21 -Tanks and Heat Exchangers Equipment Description  
Seismic Walkdown Checklist (SWC)       SWELl-108 Equipment ID No. E-35A             Equip. Class 21 - Tanks and Heat Exchangers Equipment Description 'A' LOOP DH CLR Photographs Note: General Overview                             Note: Concrete Pedastel
'B' LOOP DH CLR Location:
 
Bldg. RAB Floor El. 317 Room, Area 11 Manufacturer, Model, Etc. (optional but recommended)
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 545 of 560 Sheet 5 of 5 Status: YE NrD UI-Seismic Walkdown Checklist (SWC)       SWELl-108 Equipment ID No. E-35A             Equip. Class 21 - Tanks and Heat Exchanqers Equipment Description 'A' LOOP DH CLR Note: Anchorage                                   Note: Overhead
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
 
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YE NO of the 50% of SWEL items requiring such verification)?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 546 of 560 Sheet I of 5 Status: Y[   NE U--
This equipment is anchored to two concrete pedestals.
Seismic Walkdown Checklist (SWC)                   SWELl-109 Equipment ID No.         E-35B                     Equip. Class, 21 - Tanks and Heat Exchangers Equipment Description 'B' LOOP DH CLR Location: Bldg. RAB                 Floor El. 317           Room, Area 11 Manufacturer, Model, Etc. (optional but recommended)
Anchorage configuration verification is required for this equipment.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Y[ N[] U- N/A-]Anchorage appears to be free from the conditions stated above.3. Is the anchorage free of corrosion that is more than mild surface YN NE] Ul N/AZ--oxidation?
: 1. Is the anchorage configuration verification required (i.e., is the item one   YE NO of the 50% of SWEL items requiring such verification)?
This equipment is anchored to two concrete pedestals. Anchorage configuration verification is requiredfor this equipment.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               Y[   N[] U-   N/A-]
Anchorage appearsto be free from the conditions stated above.
: 3. Is the anchorage free of corrosion that is more than mild surface               YN NE] Ul N/AZ--
oxidation?
No signs of any type of corrosion have been found on the anchorage of the component.
No signs of any type of corrosion have been found on the anchorage of the component.
: 4. Is the anchorage free of visible cracks in the concrete near the YZ NEI U[- N/A--anchors?No cracks were observed in the concrete piers in the vicinity of the anchor bolts. Concrete piers (3ft high) appeared to be in sound condition.
: 4. Is the anchorage free of visible cracks in the concrete near the               YZ NEI     U[- N/A--
anchors?
No cracks were observed in the concrete piers in the vicinity of the anchorbolts. Concrete piers (3ft high) appearedto be in sound condition.
1 Enter the equipment class name from Appendix B: Classes of Equipment.
1 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. CALC-ANO 1-CS-12-00002 Attachment C Rev. 0 Page 547 of 560 Sheet 2 of 5 Status: YN N-- Ur-Seismic Walkdown Checklist (SWC) SWELl-109 Equipment ID No. E-35B Equip. Class 21 -Tanks and Heat Exchangers Equipment Description  
 
'B' LOOP DH CLR 5. Is the anchorage configuration consistent with plant documentation?
Engineering Report No. CALC-ANO 1-CS-12-00002 Attachment C Rev. 0 Page 547 of 560 Sheet 2 of 5 Status: YN N-- Ur-Seismic Walkdown Checklist (SWC)               SWELl-109 Equipment ID No. E-35B                   Equip. Class 21 - Tanks and Heat Exchangers Equipment Description 'B' LOOP DH CLR
Y'] NEI UEr N/A--(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 5. Is the anchorage configuration consistent with plant documentation?         Y'] NEI UEr N/A--
The anchorage configuration that has been found during the inspection complied with the specifications stated in the documentation (CALC-94-SQ-1001-21, page 25 and Drawing C-261, Sht. 1, Rev. 15).6. Based on the above anchorage evaluations, is the anchorage free of YZ N[] U[E]potentially adverse seismic conditions?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
All anchorage supporting the system was found to be free from adverse seismic conditions.
The anchorage configurationthat has been found during the inspection complied with the specifications stated in the documentation (CALC       SQ-1001-21, page 25 and Drawing C-261, Sht. 1, Rev. 15).
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 6. Based on the above anchorage evaluations, is the anchorage free of         YZ N[] U[E]
potentially adverse seismic conditions?
All anchoragesupportingthe system was found to be free from adverse seismic conditions.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YN N[E] UE- N/A--
None of the soft targets found in the equipment have been shown to potentially suffer impact by nearby equipment.
None of the soft targets found in the equipment have been shown to potentially suffer impact by nearby equipment.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NE-] UE1 N/AZ--
Overhead equipment near Item E-35B appeared to be properly secured so as to avoid any collapse during a seismic hazard.9. Do attached lines have adequate flexibility to avoid damage?All attached lines have been ruled to have adequate flexibility.
and masonry block walls not likely to collapse onto the equipment?
YN N[E] UE- N/A--YZ NE-] UE1 N/AZ--'(Y NE-1 U[-] N/AZl 10. Based on the above seismic interaction evaluations, is equipment free YZ NE] UEl of potentially adverse seismic interaction effects?Equipment appears to be free from seismic interaction effects.
Overhead equipment near Item E-35B appearedto be properlysecured so as to avoid any collapse during a seismic hazard.
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 548 of 560 Sheet 3 of 5 Status: YN NEI Ui Seismic Walkdown Checklist (SWC) SWELl-109 Equipment ID No. E-35B Equip. Class 21 -Tanks and Heat Exchangers Equipment Description  
: 9. Do attached lines have adequate flexibility to avoid damage?               '(Y   NE-1 U[-] N/AZl All attached lines have been ruled to have adequate flexibility.
'B' LOOP DH CLR Other Adverse Conditions
: 10. Based on the above seismic interaction evaluations, is equipment free       YZ     NE] UEl of potentially adverse seismic interaction effects?
: 11. Have you looked for and found no other seismic conditions that could YN( N[i] UE adversely affect the safety functions of the equipment?
Equipment appears to be free from seismic interaction effects.
 
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 548 of 560 Sheet 3 of 5 Status: YN NEI       Ui Seismic Walkdown Checklist (SWC)               SWELl-109 Equipment ID No. E-35B                   Equip. Class 21 - Tanks and Heat Exchangers Equipment Description 'B' LOOP DH CLR Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       YN( N[i] UE adversely affect the safety functions of the equipment?
No other seismic conditions were found to affect the equipment's integrity.
No other seismic conditions were found to affect the equipment's integrity.
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
The anchorage found in the system appeared to be in very good conditions.
The anchoragefound in the system appeared to be in very good conditions. Anchor bolts did not show any signs of oxidation, nor were cracks in the concrete piers detected. No tag ID was found for this component, but it was clear to determine the identity of this equipment item due to its description and large size.
Anchor bolts did not show any signs of oxidation, nor were cracks in the concrete piers detected.
Evaluated by: DanielAndoh _       __ _     _     _       _     _       _       Date:   10/4/2012 Michael E. Perez /                                                         10/4/20.12 101412012
No tag ID was found for this component, but it was clear to determine the identity of this equipment item due to its description and large size._ _ _ _ _ _ _ _ _ Date: 10/4/2012 Evaluated by: Daniel Andoh Michael E. Perez / 10/4/20.12 101412012 Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 549 of 560 Sheet 4 of 5 Status: Y[ NI- U --Seismic Walkdown Checklist (SWC) SWELl-109 Equipment ID No. E-35B Equipment Description
 
'B' LOOP DH CLR Equip. Class 21 -Tanks and Heat Exchangers Photographs Note: The anchorage of this component appears to be in adequate conditions.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 549 of 560 Sheet 4 of 5 Status: Y[   NI-   U --
No corrosion was observed in the anchor bolts, nor cracks in the concrete piers in the vicinity of the anchor bolts.Note: Anchorage on the other side of the component also appears to be in adequate conditions.
Seismic Walkdown Checklist (SWC)           SWELl-109 Equipment ID No. E-35B                 Equip. Class 21 - Tanks and Heat Exchangers Equipment Description 'B' LOOP DH CLR Photographs Note: The anchorageof this component                   Note: Anchorage on the other side of the appearsto be in adequate conditions. No               component also appears to be in adequate corrosion was observed in the anchorbolts,             conditions.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 550 of 560 Sheet 5 of 5 Status: Yo No-] U--Seismic Walkdown Checklist (SWC)-SWELl-109 Equipment ID No. E-35B Equipment Description
nor cracks in the concrete piers in the vicinity of the anchorbolts.
'B' LOOP DH CLR Equip. Class 21 -Tanks and Heat Exchanqiers Note: Overhead equipment appears to be in adequate conditions.
 
Therefore, it is unlikely that it would collapse onto Item E-35B. And if these were to ever collapse, the likelihood of damaging the equipment is very minimal.Note:
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 550 of 560 Sheet 5 of 5 Status: Yo No-] U--
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 551 of 560 Sheet 1 of 5 Status: YZ NE] UrI Seismic Walkdown Checklist (SWC) SWELl-110 Equipment ID No. P-107B Equip. Class' 5- Horizontal Pumps Equipment Description LUBE OIL SCAVENGING PUMP Location:
Seismic Walkdown Checklist (SWC)-         SWELl-109 Equipment ID No. E-35B                 Equip. Class 21 - Tanks and Heat Exchanqiers Equipment Description 'B' LOOP DH CLR Note: Overhead equipment appearsto be in               Note:
Bldg. RAB Floor El. 369 Room, Area 86 Manufacturer, Model, Etc. (optional but recommended)
adequate conditions. Therefore, it is unlikely that it would collapse onto Item E-35B. And if these were to ever collapse, the likelihood of damaging the equipment is very minimal.
Electro-Motive 645E4B Turbocharcqed Diesel Engine Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
 
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YE NZ of the 50% of SWEL items requiring such verification)?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 551 of 560 Sheet 1 of 5 Status: YZ NE]     UrI Seismic Walkdown Checklist (SWC)                     SWELl-110 Equipment ID No.         P-107B                   Equip. Class' 5- Horizontal Pumps Equipment Description LUBE OIL SCAVENGING PUMP Location: Bldg. RAB                   Floor El. 369           Room, Area 86 Manufacturer, Model, Etc. (optional but recommended)               Electro-Motive 645E4B TurbocharcqedDiesel Engine Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Items is not part of the 50% anchorage configuration verification.
Anchorage
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 1. Is the anchorage configuration verification required (i.e., is the item one       YE NZ of the 50% of SWEL items requiring such verification)?
YZ NEi UiE N/AE]The anchorage is free of bent, broken, missing and loose hardware.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Items is not partof the 50% anchorage configuration verification.
The anchorage is free of corrosion.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                 YZ NEi UiE N/AE]
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Component mounted to EDG skid. No cracks in concrete around skid anchorage.
The anchorageis free of bent, broken, missing and loose hardware.
YZ NEI UE-1 N/AE-Y[ NEI UE- N/AE--1 Enter the equipment class name from Appendix B: Classes of Equipment.
: 3. Is the anchorage free of corrosion that is more than mild surface                 YZ NEI    UE-1 N/AE-oxidation?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 552 of 560 Sheet 2 of 5 Status: YE NL-- UL-Seismic Walkdown Checklist (SWC) SWELl-110 Equipment ID No. P-107B Equip. Class 5- Horizontal Pumps Equipment Description LUBE OIL SCAVENGING PUMP 5. Is the anchorage configuration consistent with plant documentation?
The anchorageis free of corrosion.
YE NEI U- N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 4. Is the anchorage free of visible cracks in the concrete near the                 Y[    NEI UE- N/AE--
This is not applicable since it is not part of the 50% of SWEL items requiring anchorage configuration verification.
anchors?
: 6. Based on the above anchorage evaluations, is the anchorage free of YZ NE: U--potentially adverse seismic conditions?
Component mounted to EDG skid. No cracks in concrete around skid anchorage.
Based on the above anchorage evaluations, the anchorage is free of potentially adverse seismic conditions.
1 Enter the equipment class name from Appendix B: Classes of Equipment.
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
 
The Lube Oil Scavenger Pump is bolted low at the accessory end of the diesel engine. This component is shielded by additional engine components attached above on the accessory end.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 552 of 560 Sheet 2 of 5 Status: YE NL-- UL-Seismic Walkdown Checklist (SWC)                 SWELl-110 Equipment ID No.     P-107B                   Equip. Class 5- Horizontal Pumps Equipment Description LUBE OIL SCAVENGING PUMP
There is overhead duct work that is properly secured with steel hangers.9. Do attached lines have adequate flexibility to avoid damage?Attached lines have adequate flexibility.
: 5. Is the anchorage configuration consistent with plant documentation?         YE NEI     U- N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.YM NEI UE N/AE'(Y NE UE-] N/AE-]YZ NO UE N/AE'YZ NE uE Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 553 of 560 Sheet 3 of 5 Status: YE N[-- U[-]Seismic Walkdown Checklist (SWC) SWELl-110 Equipment ID No. P-107B Equip. Class 5- Horizontal Pumps Equipment Description LUBE OIL SCAVENGING PUMP Other Adverse Conditions
This is not applicable since it is not partof the 50% of SWEL items requiringanchorageconfiguration verification.
: 11. Have you looked for and found no other seismic conditions that could Y[ NE] UE]adversely affect the safety functions of the equipment?
: 6. Based on the above anchorage evaluations, is the anchorage free of         YZ NE: U--
It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found.Comments (Additional pages may be added as necessary)
potentially adverse seismic conditions?
The Lube Oil Scavenger Pump is a critical component of the diesel engine. Every mounting bolt was observed to be in place. The entire engine appeared clean and well maintained.
Based on the above anchorageevaluations, the anchorageis free of potentially adverse seismic conditions.
There were no visible leaks or signs of previous leaks at any location were accessory components were bolted to the main engine block.ThroeQuarter Left Front View. 16-Cylinder Evaluated by: Daniel Parker Eric Dilbone Date: 10/212012 10/212012 Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 554 of 560 Sheet 4 of 5 Status: YZ No UM Seismic Walkdown Checklist (SWC) SWELl-110 Equipment ID No. P-107B Equip. Class 5- Horizontal Pumps Equipment Description LUBE OIL SCAVENGING PUMP Photographs Note: Component ID Note: Overview of Component Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 555 of 560 Sheet 5 of 5 Status: YZ N[-] UI-Seismic Walkdown Checklist (SWC) SWELl-110 Equipment ID No. P-107B Equip. Class 5- Horizontal Pumps Equipment Description LUBE OIL SCAVENGING PUMP Note: Overview of Component Note:
Interaction Effects
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 556 of 560 Sheet I of 5 Status: YZ NE] UE0 Seismic Walkdown Checklist (SWC) SWEL2-001 Equipment ID No. SW-72 Equip. Class' 7- Pneumatic-Operated Valves Equipment Description SW TO SFP EL 404' SERV CONN Location:
: 7. Are soft targets free from impact by nearby equipment or structures?       YM NEI      UE  N/AE The Lube Oil Scavenger Pump is bolted low at the accessory end of the diesel engine. This component is shielded by additionalengine components attached above on the accessoryend.
Bldg. RAB Floor El. 404 Room, Area 159 Manufacturer, Model, Etc. (optional but recommended)
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   '(Y  NE UE-] N/AE-]
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
and masonry block walls not likely to collapse onto the equipment?
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YEI NZ of the 50% of SWEL items requiring such verification)?
There is overhead duct work that is properly secured with steel hangers.
Anchorage verification is not required since this is an in-line component.
: 9. Do attached lines have adequate flexibility to avoid damage?               YZ NO UE N/AE Attached lines have adequate flexibility.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 10. Based on the above seismic interaction evaluations, is equipment free       'YZ NE uE of potentially adverse seismic interaction effects?
YE] NE] U[:] N/A[This is not applicable since this is an in-line component.
Based on the above seismic interactionevaluations, the equipment is free of potentially adverse seismic interactioneffects.
: 3. Is the anchorage free of corrosion that is more than mild surface YE] NE] UE-- N/AZ oxidation?
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 553 of 560 Sheet 3 of 5 Status: YE     N[-- U[-]
Seismic Walkdown Checklist (SWC)               SWELl-110 Equipment ID No.     P-107B                 Equip. Class 5- Horizontal Pumps Equipment Description LUBE OIL SCAVENGING PUMP Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could                     Y[   NE] UE]
adversely affect the safety functions of the equipment?
It was looked for, and no otherseismic conditions that could adversely affect the safety functions of the equipment were found.
Comments (Additional pages may be added as necessary)
The Lube Oil Scavenger Pump is a critical component of the diesel engine. Every mounting bolt was observed to be in place. The entire engine appearedclean and well maintained.There were no visible leaks or signs of previous leaks at any location were accessory components were bolted to the main engine block.
ThroeQuarter Left Front View. 16-Cylinder Evaluated by: Daniel Parker                                                                     Date: 10/212012 Eric Dilbone                                                                            10/212012
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 554 of 560 Sheet 4 of 5 Status: YZ No UM Seismic Walkdown Checklist (SWC)     SWELl-110 Equipment ID No. P-107B           Equip. Class 5- HorizontalPumps Equipment Description LUBE OIL SCAVENGING PUMP Photographs Note: Component ID                               Note: Overview of Component
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 555 of 560 Sheet 5 of 5 Status: YZ N[-] UI-Seismic Walkdown Checklist (SWC)     SWELl-110 Equipment ID No. P-107B           Equip. Class 5- Horizontal Pumps Equipment Description LUBE OIL SCAVENGING PUMP Note: Overview of Component                       Note:
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 556 of 560 Sheet I of 5 Status: YZ NE] UE0 Seismic Walkdown Checklist (SWC)                     SWEL2-001 Equipment ID No.         SW-72                     Equip. Class' 7- Pneumatic-OperatedValves Equipment Description SW TO SFP EL 404' SERV CONN Location: Bldg. RAB                   Floor El. 404           Room, Area 159 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one   YEI NZ of the 50% of SWEL items requiring such verification)?
Anchorage verification is not requiredsince this is an in-line component.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               YE] NE] U[:] N/A[
This is not applicable since this is an in-line component.
: 3. Is the anchorage free of corrosion that is more than mild surface               YE] NE] UE-- N/AZ oxidation?
This is not applicable since this is an in-line component.
: 4. Is the anchorage free of visible cracks in the concrete near the                YEI  NEI  UEi N/AZ anchors?
This is not applicable since this is an in-line component.
This is not applicable since this is an in-line component.
: 4. Is the anchorage free of visible cracks in the concrete near the YEI NEI UEi N/AZ anchors?This is not applicable since this is an in-line component.
' Enter the equipment class name from Appendix B: Classes of Equipment.
' Enter the equipment class name from Appendix B: Classes of Equipment.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 557 of 560 Sheet 2 of 5 Status: YZ Nn- UI-Seismic Walkdown Checklist (SWC) SWEL-2-OO11 Equipment ID No. SW-72 Equip. Class 7 Frii inmpnt fl,.rrintinn  
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 557 of 560 Sheet 2 of 5 Status: YZ Nn- UI-Seismic Walkdown Checklist (SWC)               SWEL-2-OO11 Equipment ID No.       SW-72                   Equip. Class 7 - Pneumatic-OperatedValves Frii inmpnt fl,.rrintinn ,&#xa3;W TO P,FP Fl 404' 5&#xa3;FRV CC)NN
,&#xa3;W TO P,FP Fl 404' 5&#xa3;FRV CC)NN-Pneumatic-Operated Valves 5. Is the anchorage configuration consistent with plant documentation?
: 5. Is the anchorage configuration consistent with plant documentation?         YEI NEI     UE] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YEI NEI UE] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
This item is not part of the 50%.
This item is not part of the 50%.6. Based on the above anchorage evaluations, is the anchorage free of YM NEI UI[]potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of         YM NEI     UI[]
The anchorage is free of potentially adverse seismic conditions.
potentially adverse seismic conditions?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
The anchorageis free of potentially adverse seismic conditions.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YN NE] UE- N/A[]
There are no soft targets to be affected by nearby equipment or structures.
There are no soft targets to be affected by nearby equipment or structures.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   Y[    NE] uE] N/AE]
and masonry block walls not likely to collapse onto the equipment?
There is a masonry block wall next to the component, but it is seismically qualified.
There is a masonry block wall next to the component, but it is seismically qualified.
: 9. Do attached lines have adequate flexibility to avoid damage?Attached lines have adequate flexibility.
: 9. Do attached lines have adequate flexibility to avoid damage?               Y[     NEI UE] N/AE]
YN NE] UE- N/A[]Y[ NE] uE] N/AE]Y[ NEI UE] N/AE]10. Based on the above seismic interaction evaluations, is equipment free Y" NE] UF]of potentially adverse seismic interaction effects?Based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.
Attached lines have adequate flexibility.
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 558 of 560 Sheet 3 of 5 Status: YN NEI U[M Seismic Walkdown Checklist (SWC) SWEL2-001 Equipment ID No. SW-72 Equip. Class 7- Pneumatic-Operated Valves Equipment Description SW TO SFP EL 404' SERV CONN Other Adverse Conditions
: 10. Based on the above seismic interaction evaluations, is equipment free       Y"   NE] UF]
: 11. Have you looked for and found no other seismic conditions that could '(Y Ni] Ui[adversely affect the safety functions of the equipment?
of potentially adverse seismic interaction effects?
It was looked for, and no other seismic conditions that could adversely affect the safety fuctions were found.Comments (Additional pages may be added as necessary)
Based on the above seismic interaction evaluations,the equipment is free of potentially adverse seismic interactioneffects.
Evaluated by: Sean Smolarek 5 Date: 10/1212012 Eric Dilbone e &1 2 1011212012 Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 559 of 560 Sheet 4 of 5 Status: Y[ NF U-Seismic Walkdown Checklist (SWC) SWEL2-001 Equipment ID No. SW-72 Equip. Class 7 -Pneumatic-Operated Valves Equipment Description SW TO SFP EL 404' SERV CONN PhotouraDhs Note: View of the component equipment ID tag.Note: General view of the component.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 560 of 560 Sheet 5 of 5 Status: YM Nn Ur-I Seismic Walkdown Checklist (SWC) SWEL2-O01 Equipment ID No. SW-72 Equip. Class 7- Pneumatic-Operated Valves Equipment Description SW TO SFP EL 404' SERV CONN Note: View of the component showing the seismic block wall behind.Note: Side view of the component.
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 558 of 560 Sheet 3 of 5 Status: YN NEI U[M Seismic Walkdown Checklist (SWC)             SWEL2-001 Equipment ID No. SW-72                   Equip. Class 7- Pneumatic-OperatedValves Equipment Description SW TO SFP EL 404' SERV CONN Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       '(Y   Ni] Ui[
adversely affect the safety functions of the equipment?
It was looked for, and no other seismic conditions that could adversely affect the safety fuctions were found.
Comments (Additional pages may be added as necessary)
Evaluated by: Sean Smolarek           5 Date: 10/1212012 Eric Dilbone   e     &1                                                   1011212012 2
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 559 of 560 Sheet 4 of 5 Status: Y[   NF U-Seismic Walkdown Checklist (SWC)       SWEL2-001 Equipment ID No. SW-72             Equip. Class 7 - Pneumatic-OperatedValves Equipment Description SW TO SFP EL 404' SERV CONN PhotouraDhs Note: View of the component equipment ID         Note: General view of the component.
tag.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 560 of 560 Sheet 5 of 5 Status: YM Nn Ur-I Seismic Walkdown Checklist (SWC)       SWEL2-O01 Equipment ID No. SW-72             Equip. Class 7- Pneumatic-OperatedValves Equipment Description SW TO SFP EL 404' SERV CONN Note: View of the component showing the           Note: Side view of the component.
seismic block wall behind.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 1 of 152 Attachment D Area Walk-By Checklists (AWCs)
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 1 of 152 Attachment D Area Walk-By Checklists (AWCs)
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 2 of 152 Sheet 1 of 5 Area Walk-By Checklist (AWC) AWC- 001 Status: Y[ NI[] ul-Location:
 
Bldg. RAB Floor El. 369 Room, Area' 87 SWEL Components:
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 2 of 152 Sheet 1 of 5 Status: Y[      NI[] ul-Area Walk-By Checklist (AWC)               AWC- 001 Location: Bldg. RAB               Floor El. 369             Room, Area' 87 SWEL Components: SWELl- 001 (M-112A), 011 (P-108A). 015 (P-104A), 016 (CV-5218), 046 (SV-5218), 056 (KMA-1). 057 (TV-7901B), 062 (F-50A), 063 (M-227A). 067 (SS-5211). 073 (LSL-5206). 101 (T-78A), 103 (E-197A)
SWELl- 001 (M-112A), 011 (P-108A).
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
015 (P-104A), 016 (CV-5218), 046 (SV-5218), 056 (KMA-1). 057 (TV-7901B), 062 (F-50A), 063 (M-227A).
Additional space is provided at the end of this checklist for documenting other comments.
067 (SS-5211).
: 1. Does anchorage of equipment in the area appear to be free of                         Y[    NEI uI] N/AI]
073 (LSL-5206). 101 (T-78A), 103 (E-197A)Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Anchorage of equipment in the area appears to be free of potentially adverse seismic conditions.
Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.
: 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
: 2. Does anchorage of equipment in the area appear to be free of                         Y[    N[D UD- N/AD-significant degraded conditions?
Anchorage of equipment in the area is free of significant degraded conditions.
Anchorage of equipment in the area is free of significantdegraded conditions.
Y[ NEI uI] N/AI]Y[ N[D UD- N/AD-3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?Y' ND- UD- N/AD-From the floor, cable/conduit raceways and HVAC ducting appears to be free of potentially adverse seismic conditions.
: 3. Based on a visual inspection from the floor, do the cable/conduit                     Y'    ND- UD- N/AD-raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
1 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
From the floor, cable/conduitraceways and HVAC ducting appearsto be free of potentially adverse seismic conditions.
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
1 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 3 of 152 Sheet 2 of 5 Status: YZ NEi] U[I Area Walk-By Checklist (AWC) AWC- 001 Location:
 
Bldg. RAB Floor El. 369 Room, Area 87 4. Does it appear that the area is free of potentially adverse seismic YZ NEI- U[I N/AD spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 3 of 152 Sheet 2 of 5 Status: YZ NEi]     U[I Area Walk-By Checklist (AWC)             AWC- 001 Location: Bldg. RAB             Floor El. 369           Room, Area 87
The area is free of potentially adverse seismic spatial interactions with other equipment in the area.5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?There is a fire water system in the room, in addition to service water piping. The room is equipped with floor drains to mitigate a release of water in the room.6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?The area appears to be free of potentially adverse seismic interactions that could cause a fire in the area.YZ NE] u- N/A[-]'(Y N- u[-] N/AF-7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 4. Does it appear that the area is free of potentially adverse seismic           YZ NEI-     U[I N/AD spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
It was noted that engineering-approved scaffolding is assembled on the North, East and West sides of the room at the time of inspection.
The area is free of potentially adverse seismic spatialinteractionswith other equipment in the area.
'(Z NEI UE] N/AE]1 Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 4 of 152 Sheet 3 of 5 Status: YZ NE UD-Area Walk-By Checklist (AWC) AWC- 001 Location:
: 5. Does it appear that the area is free of potentially adverse seismic           YZ NE]      u-  N/A[-]
Bldg. RAB Floor El. 369 Room, Area 87 8. Have you looked for and found no other seismic conditions that could YZ NEil UiF1 adversely affect the safety functions of the equipment in the area?It was looked for, and no other seismic conditions that could affect the safety functions of equipment in the area were found.Comments (Additional pages may be added as necessary)
interactions that could cause flooding or spray in the area?
Evaluated by: Daniel Parker Date: 10/11/2012 Eric Dilbone 10/11/2012 Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 5 of 152 Sheet 4 of 5 Status: Y[ N[-] UF-'1 Area Walk-By Checklist (AWC) AWC- 001 Location:
There is a fire water system in the room, in addition to service water piping. The room is equipped with floor drains to mitigate a release of water in the room.
Bldg. RAB Floor El. 369 Roo/m, Area2 87 SWEL Components:
: 6. Does it appear that the area is free of potentially adverse seismic           '(Y    N-  u[-] N/AF-interactions that could cause a fire in the area?
SWELl- 001 (M-112A), 011 (P-108A), 015 (P-104A), 016 (CV-5218), 046 (SV-5218).
The area appearsto be free of potentially adverse seismic interactions that could cause a fire in the area.
056 (KMA-1). 057 (TV-7901 B), 062 (F-50A), 063 (M-227A), 067 (SS-5211).
: 7. Does it appear that the area is free of potentially adverse seismic           '(Z    NEI  UE]  N/AE]1 interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
073 (LSL-5206). 101 (T-78A), 103 (E-197A)Photographs Note: Picture of scaffold assembled on the West wall of the room.Note: View of equipment and conduit overhead in Room 87.2 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
It was noted that engineering-approvedscaffolding is assembled on the North, East and West sides of the room at the time of inspection.
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 6 of 152 Sheet 5 of 5 Status: YZ ND] U-I Area Walk-By Checklist (AWC) AWC- 001 Location:
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 4 of 152 Sheet 3 of 5 Status: YZ NE UD-Area Walk-By Checklist (AWC)           AWC- 001 Location: Bldg. RAB           Floor El. 369           Room, Area   87
Bldg. RAB Floor El. 369 Room, Area3 87 SWEL Components:
: 8. Have you looked for and found no other seismic conditions that could       YZ   NEil UiF1 adversely affect the safety functions of the equipment in the area?
SWELl- 001 (M-112A), 011 (P-108A), 015 (P-104AL.
It was looked for, and no other seismic conditions that could affect the safety functions of equipment in the area were found.
016 (CV-5218).
Comments (Additional pages may be added as necessary)
046 (SV-5218).
Evaluated by: Daniel Parker                                                         Date: 10/11/2012 Eric Dilbone                                                               10/11/2012
056 (KMA-1). 057 (TV-7901 B), 062 (F-50A), 063 (M-227A), 067 (SS-5211).
 
073 (LSL-5206). 101 (T-78A), 103 (E-197A)Note: View of overhead equipment, lighting and conduit in Room 87.3 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 5 of 152 Sheet 4 of 5 Status: Y[     N[-] UF-'1 Area Walk-By Checklist (AWC)               AWC- 001 Location: Bldg. RAB               Floor El. 369             Roo/m, Area2 87 SWEL Components: SWELl- 001 (M-112A), 011 (P-108A), 015 (P-104A), 016 (CV-5218), 046 (SV-5218). 056 (KMA-1). 057 (TV-7901 B), 062 (F-50A), 063 (M-227A), 067 (SS-5211). 073 (LSL-5206). 101 (T-78A), 103 (E-197A)
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Photographs Note: Picture of scaffold assembled on the                         Note: View of equipment and conduit West wall of the room.                                            overhead in Room 87.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 7 of 152 Sheet I of 6 Area Walk-By Checklist (AWC) AWC- 002 Status: Y[ NE] UR Location:
2 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Bldg. RAB Floor El. 335 Room, Areal 38 (Entire Room)SWEL Components:
 
SWELl -002(K-3), 004(CV-6601 A), 01 2(P-7A). 084fPI-281 1A), 104(E-1 09).043(CV-2806).
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 6 of 152 Sheet 5 of 5 Status: YZ ND] U-I Area Walk-By Checklist (AWC)               AWC- 001 Location: Bldg. RAB               Floor El. 369             Room, Area3 87 SWEL Components: SWELl- 001 (M-112A), 011 (P-108A), 015 (P-104AL. 016 (CV-5218). 046 (SV-5218). 056 (KMA-1). 057 (TV-7901 B), 062 (F-50A), 063 (M-227A), 067 (SS-5211). 073 (LSL-5206). 101 (T-78A), 103 (E-197A)
025(CV-2800).
Note: View of overhead equipment, lighting and conduit in Room 87.
074(PIT-2812)
3 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
 
Anchorage of equipment in the area appears to be free of potentially adverse seismic conditions.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 7 of 152 Sheet I of 6 Status: Y[      NE] UR Area Walk-By Checklist (AWC)                 AWC- 002 Location: Bldg. RAB                 Floor El. 335           Room, Areal 38 (Entire Room)
YN N[I U[I- N/A[--2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
SWEL Components: SWELl - 002(K-3), 004(CV-6601 A), 01 2(P-7A). 084fPI-281 1A), 104(E-1 09).
Anchorage of equipment in the area appears to be free of significant degraded conditions.
043(CV-2806). 025(CV-2800). 074(PIT-2812)
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?All rigid electrical conduit is adequately anchored to the overhead and the walls. Overhead piping and ducts appear to be properly secured.YZ NEI U[-] N/AZ1 Y[ NEI UZ1 N/A[:]' If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Additional space is provided at the end of this checklist for documenting other comments.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 8 of 152 Sheet 2 of 6 Area Walk-By Checklist (AWC) AWC- 002 Status: YZ NE] UL-I Location:
: 1. Does anchorage of equipment in the area appear to be free of                         YN N[I      U[I- N/A[--
Bldg. RAB Floor El. 335 Room, Area 38 (Entire Room)4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
There is unique connection in a lighting fixture above Item P-7B. It seems that the support of the lighting fixture has broken and to remedy the missing piece, a metal tie was applied to tie the broken support.However, this is acceptable considering the weight of the light and since it can't be disconnected from the support.5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?The area appears to be free of potentially adverse seismic conditions that could cause flooding or spray in the area.YN NEIl ULI N/A[-]Y[ NE] U-1 N/AEr 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?One pipe has insulation which has been soaked in oil. However, this has already been acknowledged by maintenance.
Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.
A "caution" sign is placed near the insulated pipe.YZ NEI UE- N/A']7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 2. Does anchorage of equipment in the area appear to be free of                         YZ NEI U[-] N/AZ1 significant degraded conditions?
The area appears to be free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations.
Anchorage of equipment in the areaappears to be free of significant degradedconditions.
YZ NEI UM N/A[-]
: 3. Based on a visual inspection from the floor, do the cable/conduit                   Y[    NEI UZ1 N/A[:]
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 9 of 152 Status: YO NEI U[O Sheet 3 of 6 Area Walk-By Checklist (AWC) AWC- 002 Location:
raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
Bldg. RAB Floor El. 335 Room, Area 38 (Entire Room)8. Have you looked for and found no other seismic conditions that could YZ( NEI U[-adversely affect the safety functions of the equipment in the area?There are no other seismic conditions that were identified.
All rigid electricalconduit is adequatelyanchored to the overhead and the walls. Overheadpiping and ducts appearto be properly secured.
' If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 8 of 152 Sheet 2 of 6 Status: YZ NE]      UL-I Area Walk-By Checklist (AWC)             AWC- 002 Location: Bldg. RAB             Floor El. 335           Room, Area 38 (Entire Room)
: 4. Does it appear that the area is free of potentially adverse seismic           YN NEIl    ULI N/A[-]
spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
There is unique connection in a lighting fixture above Item P-7B. It seems that the support of the lighting fixture has broken and to remedy the missing piece, a metal tie was applied to tie the broken support.
However, this is acceptable considering the weight of the light and since it can't be disconnected from the support.
: 5. Does it appear that the area is free of potentially adverse seismic           Y[    NE] U-1 N/AEr interactions that could cause flooding or spray in the area?
The area appearsto be free of potentially adverse seismic conditions that could cause flooding or spray in the area.
: 6. Does it appear that the area is free of potentially adverse seismic           YZ NEI UE- N/A']
interactions that could cause a fire in the area?
One pipe has insulation which has been soaked in oil. However, this has already been acknowledged by maintenance. A "caution"sign is placed near the insulatedpipe.
: 7. Does it appear that the area is free of potentially adverse seismic           YZ NEI UM N/A[-]
interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
The area appearsto be free of potentially adverse seismic interactions associatedwith housekeeping practices,storage of portable equipment, and temporary installations.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 9 of 152 Sheet 3 of 6 Status: YO NEI     U[O Area Walk-By Checklist (AWC)               AWC- 002 Location: Bldg. RAB             Floor El. 335         Room, Area     38 (Entire Room)
: 8. Have you looked for and found no other seismic conditions that could         YZ( NEI   U[-
adversely affect the safety functions of the equipment in the area?
There are no other seismic conditions that were identified.
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Anchorages in the area are found to be in adequate conditions.
Anchorages in the area are found to be in adequate conditions. There is a fire extinguisher in the area that may come loose, but there are no credible targets. There is one overhead equipment item (VUC-6) that may potentiallyaffect the area. But because it is well supported by 2 thread rods (one on each side) as well as 4 welded angle sections, it is very unlikely for a seismic hazard to occur.
There is a fire extinguisher in the area that may come loose, but there are no credible targets. There is one overhead equipment item (VUC-6) that may potentially affect the area. But because it is well supported by 2 thread rods (one on each side) as well as 4 welded angle sections, it is very unlikely for a seismic hazard to occur.Evaluated by: Daniel Parker [Date: 10/8/2012 Michael E. Perez F -_-- 10/8/2012 Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 10 of 152 Status: YV NEI U D Sheet 4 of 6 Area Walk-By Checklist (AWC) AWC- 002 Location:
Evaluated by: Daniel Parker                                                         [Date: 10/8/2012 Michael E. Perez F     -_--                                                 10/8/2012
Bldg. RAB Floor El. 335 Room, Area 38 (Entire Room)SWEL Components:
 
SWELl-002(K-3), 004(CV-6601A), 012(P-7A), 084(PI-2811A), 104(E-109).
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 10 of 152 Sheet 4 of 6 Status: YV   NEI UD Area Walk-By Checklist (AWC)       AWC- 002 Location: Bldg. RAB       Floor El. 335     Room, Area 38 (Entire Room)
043(CV-2806).
SWEL Components: SWELl-002(K-3), 004(CV-6601A), 012(P-7A), 084(PI-2811A), 104(E-109).
025(CV-2800).
043(CV-2806). 025(CV-2800). 074(PIT-2812)
074(PIT-2812)
Photographs Note: Anchorage in the area appearsto be in   Note: Observe unusual light support, good condition.                                however, this will induce no motion during a seismic event.
Photographs Note: Anchorage in the area appears to be in good condition.
 
Note: Observe unusual light support, however, this will induce no motion during a seismic event.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 11 of 152 Sheet 5 of 6 Status: Y[I N--   U--
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 11 of 152 Sheet 5 of 6 Status: Y[I N-- U--Area Walk-By Checklist (AWC) AWC- 002 Location:
Area Walk-By Checklist (AWC)       AWC- 002 Location: Bldg. RAB       Floor El. 335     Room, Area 38 (EntireRoom)
Bldg. RAB Floor El. 335 Room, Area 38 (Entire Room)SWEL Components:
SWEL Components: SWELl - 002(K-3). 004(CV-6601A), 012(P-7A). 084(PI-281 1A). 104(E-109).
SWELl -002(K-3).
043(CV-2806). 025(CV-2800). 074(PIT-2812)
004(CV-6601A), 012(P-7A).
Note: There is a pipe whose insulationhas      Note: Drainsare present in the area, thus been soaked in oil. However, this has been     mitigating any seismic hazards that would acknowledged by maintenance and a "caution"   cause flooding.
084(PI-281 1A). 104(E-109).
sign has been placed.
043(CV-2806).
 
025(CV-2800).
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 12 of 152 Sheet 6 of 6 Status: YZ NEI     ul-l Area Walk-By Checklist (AWC)     AWC- 002 Location: Bldg. RAB     Floor El. 335     Room, Area 38 (EntireRoom)
074(PIT-2812)
SWEL Components: SWELl - 002(K-3), 004(CV-6601A), 012(P-7A). 084(PI-2811A). 104(E-109).
Note: There is a pipe whose insulation has been soaked in oil. However, this has been acknowledged by maintenance and a "caution" sign has been placed.Note: Drains are present in the area, thus mitigating any seismic hazards that would cause flooding.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 12 of 152 Status: YZ NEI ul-l Sheet 6 of 6 Area Walk-By Checklist (AWC) AWC- 002 Location:
Bldg. RAB Floor El. 335 Room, Area 38 (Entire Room)SWEL Components:
SWELl -002(K-3), 004(CV-6601A), 012(P-7A).
084(PI-2811A).
104(E-109).
043(CV-2806), 025(CV-2800), 074(PIT-2812)
043(CV-2806), 025(CV-2800), 074(PIT-2812)
Note: Overhead pipe.Note: Overhead unit (VUC-6) does not seem likely to collapse on other equipment, since there are two threaded rods as well as 4 welded angle sections that are supporting the unit.
Note: Overheadpipe.                           Note: Overhead unit (VUC-6) does not seem likely to collapse on other equipment, since there are two threadedrods as well as 4 welded angle sections that are supporting the unit.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 13 of 152 Sheet I of 5 Status: YZ NEI UFl Area Walk-By Checklist (AWC) AWC- 003 Location:
 
Bldg. RAB Floor El. 335 Room, Area' 56 SWEL Components:
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 13 of 152 Sheet I of 5 Status: YZ NEI         UFl Area Walk-By Checklist (AWC)               AWC- 003 Location: Bldg. RAB               Floor El. 335           Room, Area' 56 SWEL Components: SWEL- 003(F-57A), 030(CV-1276)
SWEL- 003(F-57A), 030(CV-1276)
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage of equipment in the area appears to be free of potentially adverse seismic conditions.
: 1. Does anchorage of equipment in the area appear to be free of                         YZ NEI      UEL N/AE!
YZ NEI UEL N/AE!2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Anchorage of equipment in the area appears to be free of significant degraded conditions.
Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.
YZ NEI U[-] N/AD-3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?YZ NEI UE] N/A[--HVAC ductwork is in good general condition.
: 2. Does anchorage of equipment in the area appear to be free of                         YZ NEI      U[-] N/AD-significant degraded conditions?
'If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
Anchorage of equipment in the area appearsto be free of significant degraded conditions.
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
: 3. Based on a visual inspection from the floor, do the cable/conduit                   YZ NEI UE] N/A[--
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment D Rev. 0 Page 14 of 152 Sheet 2 of 5 Area Walk-By Checklist (AWC) AWC- 003 Status: YZ No] U--Location:
raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
Bldg. RAB Floor El. 335 -Room, Area2 56 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
HVAC ductwork is in good general condition.
The area is free of potentially adverse seismic spatial interactions with other equipment in the area.YZ NE] U[ N/A--5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?The area appears to be free of potentially adverse seismic conditions that could cause flooding or spray in the area.YN NEI U-] N/AZ-6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?A vertical pipe near CV-1276 was wrapped in clearplastic.
'If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
YZ NEI ULI N/A[-7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
 
The area appears to be free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations.
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment D Rev. 0 Page 14 of 152 Sheet 2 of 5 Status: YZ No] U--
Y ] N[: U[--] N/AD 2 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
Area Walk-By Checklist (AWC)               AWC- 003 Location: Bldg. RAB               Floor El. 335       -   Room, Area2 56
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWFL item.
: 4. Does it appear that the area is free of potentially adverse seismic                 YZ NE] U[        N/A--
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 15 of 152 Sheet 3 of 5 Status: YZ NF- UI'-J Area Walk-By Checklist (AWC) AWC- 003 Location:
spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Bldg. RAB Floor El. 335 Room, Area3 56 8. Have you looked for and found no other seismic conditions that could YZ NEI U[I adversely affect the safety functions of the equipment in the area?It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found.Comments (Additional pages may be added as necessary)
The area is free of potentially adverse seismic spatial interactionswith other equipment in the area.
Evaluated by: Daniel Parker "J Date: 10/12/2012 Eric Dilbone 10/12/2012 3 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
: 5. Does it appear that the area is free of potentially adverse seismic                 YN NEI      U-] N/AZ-interactions that could cause flooding or spray in the area?
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
The area appearsto be free of potentially adverse seismic conditions that could cause flooding or spray in the area.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 16 of 152 Sheet 4 of 5 Status: YZ NF UFII Area Walk-By Checklist (AWC) AWC- 003 Location:
: 6. Does it appear that the area is free of potentially adverse seismic                 YZ NEI      ULI N/A[-
Bldg. RAB Floor El. 335 Room, Area4 56 SWEL Components:
interactions that could cause a fire in the area?
SWEL- 003(F-57A), 030(CV-1276)
A verticalpipe near CV-1276 was wrapped in clearplastic.
Photographs Note: Room 56 Overhead ducting.Note: Room 56 overhead insulated pipes.4 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
: 7. Does it appear that the area is free of potentially adverse seismic                 Y ] N[: U[--] N/AD interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
The area appears to be free of potentially adverse seismic interactions associatedwith housekeeping practices, storage of portableequipment, and temporaryinstallations.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 17 of 152 Sheet 5 of 5 Area Walk-By Checklist (AWC) AWC- 003_Status: YE NE] U-I Location:
2 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWFL item.
Bldg. RAB Floor El. 335 -Room, Area5 56 SWEL Components:
 
SWEL- 003(F-57A).
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 15 of 152 Sheet 3 of 5 Status: YZ NF- UI'-J Area Walk-By Checklist (AWC)               AWC- 003 Location: Bldg. RAB               Floor El. 335           Room, Area3 56
030(C V-I 276)Note: Room 56 insulated pipe with plastic wrap near component CV-1276.Note: Floor Drain in room 56.5 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
: 8. Have you looked for and found no other seismic conditions that could                 YZ NEI U[I adversely affect the safety functions of the equipment in the area?
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
It was looked for, and no otherseismic conditions that could adversely affect the safety functions of the equipment in the area were found.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 18 of 152 Sheet i of 5 Area Walk-By Checklist (AWC) AWC- 004_Status: YN N-' U[]Location:
Comments (Additional pages may be added as necessary)
Bldg. RAB Floor El. 368 -Room, Area' 104 SWEL Components:
Evaluated by: Daniel Parker "J                                                               Date: 10/12/2012 Eric Dilbone   *
SWELl- 005 (D-15), 079 (PY-2618-A1), 093 (PY-1042A), 095 (LY-4204A), 096 (PY-2667-A1), 081 (C539A)Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
* 10/12/2012 3 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Anchorage of equipment in the area appears to be free of potentially adverse seismic conditions.
 
: 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 16 of 152 Sheet 4 of 5 Status: YZ NF UFII Area Walk-By Checklist (AWC)               AWC- 003 Location: Bldg. RAB               Floor El. 335             Room, Area4 56 SWEL Components: SWEL- 003(F-57A), 030(CV-1276)
Photographs Note: Room 56 Overhead ducting.                                   Note: Room 56 overhead insulatedpipes.
4 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 17 of 152 Sheet 5 of 5 Status: YE NE] U-I Area Walk-By Checklist (AWC)               AWC- 003_
Location: Bldg. RAB               Floor El. 335       -     Room, Area5 56 SWEL Components: SWEL- 003(F-57A). 030(C V-I 276)
Note: Room 56 insulatedpipe with plastic                         Note: FloorDrain in room 56.
wrap near component CV-1276.
5 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 18 of 152 Sheet i of 5 Status: YN N-'        U[]
Area Walk-By Checklist (AWC)               AWC- 004_
Location: Bldg. RAB               Floor El. 368       -   Room, Area' 104 SWEL Components: SWELl- 005 (D-15), 079 (PY-2618-A1), 093 (PY-1042A), 095 (LY-4204A),
096 (PY-2667-A1), 081 (C539A)
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
: 1. Does anchorage of equipment in the area appear to be free of                         YZ NEI U[I N/AD1 potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.
: 2. Does anchorage of equipment in the area appear to be free of                         YZ NEI      UE] N/A[-
significant degraded conditions?
Anchorage in the area appearsto be free of significantdegraded conditions.
: 3. Based on a visual inspection from the floor, do the cable/conduit                    Y[    NEI UEl N/ADl raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill
        *conditions of cable trays appear to be inside acceptable limits)?
Based on visual inspection from the floor, the cable/conduit raceways and HVAC ducting appearto be free of potentially adverse seismic conditions.
IIf the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 19 of 152 Sheet 2 of 5 Status: YZ NEI- Ur]
Area Walk-By Checklist (AWC)            AWC- 004 Location: Bldg. RAB            Floor El. 368          Room, Area    104
: 4. Does it appear that the area is free of potentially adverse seismic            Y[    ND U[I N/AD spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
The area appearsto be free of potentially adverse seismic spatial interactions with other equipment.
: 5. Does it appear that the area is free of potentially adverse seismic            YE( NDI UD] N/AD]
interactions that could cause flooding or spray in the area?
A room cooler is present in the room. It appears to be adequately installed and will not present a source of flooding or spray. It is located far enough away from safety relatedequipment that if it were to induce spray, it would not adversely impact the safe shutdown of the plant.
Floor drains are present.
: 6. Does it appear that the area is free of potentially adverse seismic            YN N[-] UD N/AD-interactions that could cause a fire in the area?
The area appears to be free of potentially adverse seismic interactions that could cause a fire.
: 7. Does it appear that the area is free of potentially adverse seismic            YZ NED UED N/AD-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
The areais free of potentiallyadverse seismic interactions associated with housekeeping practices, storage of portable equipment and temporary installations.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 20 of 152 Sheet 3 of 5 Status: YZ NE] U[I Area Walk-By Checklist (AWC)            AWC- 004 Location: Bldg. RAB            Floor El. 368          Room, Area    104
: 8. Have you looked for and found no other seismic conditions that could        Y]    NE- UF-adversely affect the safety functions of the equipment in the area?
It was looked for and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found.
Comments (Additional pages may be added as necessary)
Evaluated by: Eric Dilbone        I                                                D Date:  10/10/2012 Daniel Parker                                                              10/10/2012
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 21 of 152 Sheet 4 of 5 Status: YZ NE] UF-1 Area Walk-By Checklist (AWC)      AWC- 004 Location: Bldg. RAB      Floor El. 368    Room, Area 104 SWEL Components: SWELl- 005 (D-15), 079 (PY-2618-A1). 093 (PY-1042A), 095 (LY-4204A),
096 (PY-2667-A1). 081 (C539A)
Photographs Note: View of the overhead space in Room      Note: View of anchorage on a component in 104.                                          Room 104.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 22 of 152 Sheet 5 of 5 Status: YZ NE]J UDl Area Walk-By Checklist (AWC)        AWC- 004 Location: Bldg. RAB        Floor El. 368      Room, Area 104 SWEL Components: SWELl- 005 (D-15). 079 (PY-2618-A1), 093 (PY-1042A), 095 (LY-4204A),
096 (PY-2667-A1). 081 (C539A)
Note: View of a drain line that runs to a floor    Note: View of cabinet C539A in Room 104.
drain.
 
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment D Rev. 0 Page 23 of 152 Sheet I of 5 Status: YZ N[I UF-Area Walk-By Checklist (AWC)                AWC- 005 Location: Bldg. RAB                Floor El. 372            Room, Area, 99 SWEL Components: SWELl- 007 (B-6)
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
: 1. Does anchorage of equipment in the area appear to be free of                        Y'    NO UD-I N/A-potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.
: 2. Does anchorage of equipment in the area appear to be free of                        YZ ND U[D1 N/AD-significant degraded conditions?
Anchorage in the area appears to be free of significant degraded conditions.
Anchorage in the area appears to be free of significant degraded conditions.
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill* conditions of cable trays appear to be inside acceptable limits)?Based on visual inspection from the floor, the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions.
: 3. Based on a visual inspection from the floor, do the cable/conduit                     YN NO UD N/AD raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
YZ NEI U[I N/AD1 YZ NEI UE] N/A[-Y[ NEI UEl N/ADl I If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
Based on visual inspection from the floor, the cable/conduitraceways and HVAC ducting appearto be free of potentiallyadverse seismic conditions.
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
1 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 19 of 152 Sheet 2 of 5 Status: YZ NEI- Ur]Area Walk-By Checklist (AWC) AWC- 004 Location:
 
Bldg. RAB Floor El. 368 Room, Area 104 4. Does it appear that the area is free of potentially adverse seismic Y[ ND U[I N/AD spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Engineering Report No. CALC-ANO1-CS- 12-00002 Attachment D Rev. 0 Page 24 of 152 Sheet 2 of 5 Status: YN NEJ UOF Area Walk-By Checklist (AWC)             AWC- 005_
The area appears to be free of potentially adverse seismic spatial interactions with other equipment.
Location: Bldg. RAB             Floor El. 372    -    Room, Area 99
: 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?A room cooler is present in the room. It appears to be adequately installed and will not present a source of flooding or spray. It is located far enough away from safety related equipment that if it were to induce spray, it would not adversely impact the safe shutdown of the plant.Floor drains are present.6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?The area appears to be free of potentially adverse seismic interactions that could cause a fire.YE( NDI UD] N/AD]YN N[-] UD N/AD-7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 4. Does it appear that the area is free of potentially adverse seismic           YN N[:] U[] N/AE--
The area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment and temporary installations.
spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
YZ NED UED N/AD-Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 20 of 152 Sheet 3 of 5 Status: YZ NE] U[I Area Walk-By Checklist (AWC) AWC- 004 Location:
The area appearsto be free of potentially adverse seismic spatial interactionswith other equipment. Lighting near sensitive equipment is mounted on unistrut, and near non-sensitive equipment is on chains and closed S-hooks.
Bldg. RAB Floor El. 368 Room, Area 104 8. Have you looked for and found no other seismic conditions that could Y] NE- UF-adversely affect the safety functions of the equipment in the area?It was looked for and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found.Comments (Additional pages may be added as necessary)
: 5. Does it appear that the area is free of potentially adverse seismic           YN( Ni[    U-I N/A[--
Evaluated by: Eric Dilbone D I Date: 10/10/2012 Daniel Parker 10/10/2012 Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 21 of 152 Sheet 4 of 5 Status: YZ NE] UF-1 Area Walk-By Checklist (AWC) AWC- 004 Location:
interactions that could cause flooding or spray in the area?
Bldg. RAB Floor El. 368 Room, Area 104 SWEL Components:
A room cooleris present in the room. It appearsto be adequately installed and will not present a source of flooding or spray. It is located far enough away from safety related equipment that if it were to induce spray, it would not adversely impact the safe shutdown of the plant.
SWELl- 005 (D-15), 079 (PY-2618-A1).
Floor drainsare present.
093 (PY-1042A), 095 (LY-4204A), 096 (PY-2667-A1).
: 6. Does it appear that the area is free of potentially adverse seismic           YZ NEI    UEl N/A[]
081 (C539A)Photographs Note: View of the overhead space in Room 104.Note: View of anchorage on a component in Room 104.
interactions that could cause a fire in the area?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 22 of 152 Sheet 5 of 5 Status: YZ NE]J UDl Area Walk-By Checklist (AWC) AWC- 004 Location:
The area appears to be free of potentially adverse seismic interactions that could cause a fire.
Bldg. RAB Floor El. 368 Room, Area 104 SWEL Components:
: 7. Does it appear that the area is free of potentially adverse seismic           YZ    NEi UE] N/A[l interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
SWELl- 005 (D-15). 079 (PY-2618-A1), 093 (PY-1042A), 095 (LY-4204A), 096 (PY-2667-A1).
The areais free of potentiallyadverse seismic interactionsassociated with housekeeping practices, storage of portable equipment and temporary installations. It was noted that a ladderin the room is stored on the floor and chained to the wall.
081 (C539A)Note: View of a drain line that runs to a floor drain.Note: View of cabinet C539A in Room 104.
 
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment D Rev. 0 Page 23 of 152 Sheet I of 5 Status: YZ N[I UF-Area Walk-By Checklist (AWC) AWC- 005 Location:
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 25 of 152 Sheet 3 of 5 Status: YZ NF U-Area Walk-By Checklist (AWC)             AWC- 005 Location: Bldg. RAB             Floor El. 372          Room, Area 99
Bldg. RAB Floor El. 372 Room, Area, 99 SWEL Components:
: 8. Have you looked for and found no other seismic conditions that could       YZ NEIUE adversely affect the safety functions of the equipment in the area?
SWELl- 007 (B-6)Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
It was looked for and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found.
Anchorage of equipment in the area appears to be free of potentially adverse seismic conditions.
Comments (Additional pages may be added as necessary)
Y' NO UD-I N/A-2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
Evaluated by: Daniel Parker                                                        Date: 10/11/2012 Eric Dilbone                                                                10/11/2012
Anchorage in the area appears to be free of significant degraded conditions.
 
YZ ND U[D1 N/AD-3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?YN NO UD N/AD Based on visual inspection from the floor, the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 26 of 152 Sheet 4 of 5 Status: YZ NFil U[]
1 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
Area Walk-By Checklist (AWC)       AWC- 005 Location: Bldg. RAB       Floor El. 372    Room, Area   99 SWEL Components: SWELl- 007 (B-6)
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Photoara~hs
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment D Rev. 0 Page 24 of 152 Status: YN NEJ UOF Sheet 2 of 5 Area Walk-By Checklist (AWC) AWC- 005_Location:
                                            -n Note: View of equipment in Room 99,           Note: Equipment ID tag of the room cooler including SWEL item, B-6.                     identified in the room.
Bldg. RAB Floor El. 372 -Room, Area 99 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
 
The area appears to be free of potentially adverse seismic spatial interactions with other equipment.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 27 of 152 Sheet 5 of 5 Status: YN NE]     UZ1 Area Walk-By Checklist (AWC)         AWC- 005 Location: Bldg. RAB         Floor El. 372      Room, Area 99 SWEL Components: SWELl- 007 (B-6)
Lighting near sensitive equipment is mounted on unistrut, and near non-sensitive equipment is on chains and closed S-hooks.5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?A room cooler is present in the room. It appears to be adequately installed and will not present a source of flooding or spray. It is located far enough away from safety related equipment that if it were to induce spray, it would not adversely impact the safe shutdown of the plant.Floor drains are present.6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?The area appears to be free of potentially adverse seismic interactions that could cause a fire.YN N[:] U[] N/AE--YN( Ni[ U-I N/A[--YZ NEI UEl N/A[]7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Note: Attachment of drain line to drip pan for the room cooler seen in the previous image.
The area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment and temporary installations.
 
It was noted that a ladder in the room is stored on the floor and chained to the wall.YZ NEi UE] N/A[l Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 25 of 152 Sheet 3 of 5 Area Walk-By Checklist (AWC) AWC- 005 Status: YZ NF U-Location:
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 28 of 152 Sheet i of 6 Status: YN NF! UI--
Bldg. RAB Floor El. 372 Room, Area 99 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?It was looked for and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found.YZ NEIUE Comments (Additional pages may be added as necessary)
Area Walk-By Checklist (AWC)               AWC- 006_
Evaluated by: Daniel Parker Date: 10/11/2012 Eric Dilbone 10/11/2012 Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 26 of 152 Sheet 4 of 5 Area Walk-By Checklist (AWC) AWC- 005 Status: YZ NFil U[]Location:
Location: Bldg. RAB               Floor El. 372       -    Room, Areal 100 SWEL Components: SWELl- 008 (X-52), 061 (Y-03)
Bldg. RAB Floor El. 372 Room, Area 99 SWEL Components:
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
SWELl- 007 (B-6)Photoara~hs-n Note: View of equipment in Room 99, including SWEL item, B-6.Note: Equipment ID tag of the room cooler identified in the room.
Additional space is provided at the end of this checklist for documenting other comments.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 27 of 152 Sheet 5 of 5 Status: YN NE] UZ1 Area Walk-By Checklist (AWC) AWC- 005 Location:
: 1. Does anchorage of equipment in the area appear to be free of                         YE NEI      U[-] N/AE[
Bldg. RAB Floor El. 372 Room, Area 99 SWEL Components:
potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
SWELl- 007 (B-6)Note: Attachment of drain line to drip pan for the room cooler seen in the previous image.
No potentially adverse seismic conditions were observed in equipment anchoragein the area.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 28 of 152 Status: YN NF! UI--Sheet i of 6 Area Walk-By Checklist (AWC) AWC- 006_Location:
: 2. Does anchorage of equipment in the area appear to be free of                         YE NEI      UJI    N/AE1 significant degraded conditions?
Bldg. RAB Floor El. 372 -Room, Areal 100 SWEL Components:
Anchor bolts in surroundingequipment were observed to be ok. No cracks in the concrete were found.
SWELl- 008 (X-52), 061 (Y-03)Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 3. Based on a visual inspection'from the floor, do the cable/conduit                   Y[    N[] uLIE] N/AE-raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
No potentially adverse seismic conditions were observed in equipment anchorage in the area.2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
HVAC and pipe supports appearedto be adequate and in good condition. Cable trays were not overfilled and appear to be adequately supported.
Anchor bolts in surrounding equipment were observed to be ok. No cracks in the concrete were found.3. Based on a visual inspection'from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?HVAC and pipe supports appeared to be adequate and in good condition.
I If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Cable trays were not overfilled and appear to be adequately supported.
 
YE NEI U[-] N/AE[YE NEI UJI N/AE1 Y[ N[] uLIE] N/AE-I If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 29 of 152 Sheet 2 of 6 Status: YZ NIF U-Area Walk-By Checklist (AWC)             AWC- 006_
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Location: Bldg. RAB             Floor El. 372     -   Room, Area   100
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 29 of 152 Sheet 2 of 6 Area Walk-By Checklist (AWC) AWC- 006_Status: YZ NIF U-Location:
: 4. Does it appear that the area is free of potentially adverse seismic           YM NEI      U[_ N/AE]
Bldg. RAB Floor El. 372 -Room, Area 100 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
The area appears to be free of potentially adverse spatial interactions with other equipment in the area.5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?The area appears to be free of potentially adverse seismic interactions that could cause flooding or spray in the area.YM NEI U[_ N/AE]YZ NEI Ur- N/A--6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?The area appears to be free of potentially adverse seismic interactions that could cause a fire in the area.Y[ NE- U[-] N/Ar-7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
The area appears to be free of potentially adverse spatialinteractions with other equipment in the area.
No potentially adverse seismic interactions were observed.YZ NEI uE] N/AZ-Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 30 of 152 Sheet 3 of 6 Area Walk-By Checklist (AWC) AWC- 006 Location:
: 5. Does it appear that the area is free of potentially adverse seismic           YZ NEI      Ur- N/A--
Bldg. RAB Floor El. 372 Room, Area 100 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?No other adverse seismic conditions were observed.Status: YZ NF UF'(Z N [: U E Comments (Additional pages may be added as necessary)
interactions that could cause flooding or spray in the area?
In general the area was observed to be free of degraded conditions.
The area appearsto be free of potentially adverse seismic interactions that could cause flooding or spray in the area.
Anchorage appears to be in good condition.
: 6. Does it appear that the area is free of potentially adverse seismic           Y[    NE- U[-] N/Ar-interactions that could cause a fire in the area?
Evaluated by: Daniel Andoh [Date: 10/12/2012 Genaro Barraan Jr. 10/12/2012 Engineering Report No. CALC-ANOI-CS-12-00002 Attachment D Rev. 0 Page 31 of 152 Sheet 4 of 6 Status: Y[ NF U-Area Walk-By Checklist (AWC) AWC- 006 Location:
The area appearsto be free of potentially adverse seismic interactions that could cause a fire in the area.
Bldg. RAB Floor El. 372 Room, Area 100 SWEL Components:
: 7. Does it appear that the area is free of potentially adverse seismic            YZ NEI    uE] N/AZ-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
SWELl- 008 (X-52). 061 (Y-03)Photographs Note: Overhead supports Note: Surrounding conditions Engineering Report No. CALC-ANO 1-C S- 12-00002 Attachment D Rev. 0 Page 32 of 152 Status: YE NO UI--Sheet 5 of 6 Area Walk-By Checklist (AWC) AWC- 006_Location:
No potentiallyadverse seismic interactions were observed.
Bldg. RAB Floor El. 372 -Room, Area 100 SWEL Components:
 
SWEILl- 008 (X-52). 061 (Y-03)!1 Note: Overhead supports Note: Overhead supports Engineering Report No. CALC-ANO 1-CS-i12-00002 Attachment D Rev. 0 Page 33 of 152 Sheet 6 of 6 Status: YZ NE] U --Area Walk-By Checklist (AWC) AWC- 006 Location:
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 30 of 152 Sheet 3 of 6 Status: YZ NF UF Area Walk-By Checklist (AWC)             AWC- 006 Location: Bldg. RAB           Floor El. 372           Room, Area   100
Bldg. RAB Floor El. 372 Room, Area 100 SWEL Components:
: 8. Have you looked for and found no other seismic conditions that could         '(Z    N[: U E adversely affect the safety functions of the equipment in the area?
SWELl- 008 (X-52). 061 (Y-03)Note: Overhead supports Note: Adjacent floor anchorages Engineering Report No. CALC-ANO1-CS-12-00002 Attachment D Rev. 0 Page 34 of 152 Sheet I of 5 Status: YZ NE] UD Area Walk-By Checklist (AWC) AWC- 007 Location:
No other adverse seismic conditions were observed.
Bldg. DSB Floor El. YARD Room, Area' 252 SWEL Components:
Comments (Additional pages may be added as necessary)
SWELl- 010 (P-16A)Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
In general the area was observed to be free of degraded conditions. Anchorage appearsto be in good condition.
No potential adverse anchorage issues.2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
Evaluated by: Daniel Andoh                                                          [Date: 10/12/2012 Genaro BarraanJr.                                                            10/12/2012
Anchor bolts below FO-IOA have significant degradation.
 
CR-ANO-1-2012-1536 is initiated.
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment D Rev. 0 Page 31 of 152 Sheet 4 of 6 Status: Y[    NF U-Area Walk-By Checklist (AWC)     AWC- 006 Location: Bldg. RAB     Floor El. 372     Room, Area 100 SWEL Components: SWELl- 008 (X-52). 061 (Y-03)
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?Y[ NI U-EI N/AD-YE- N[N UE1 N/AD Y[ NEI U[1 N/A--There is no tray in room, conduit supports and HVAC ducting are supported well.'If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
Photographs Note: Overhead supports                      Note: Surrounding conditions
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 35 of 152 Sheet 2 of 5 Area Walk-By Checklist (AWC) AWC- 007 Status: YZ NE] U-]Location:
Engineering Report No. CALC-ANO 1-C S- 12-00002 Attachment D Rev. 0 Page 32 of 152 Sheet 5 of 6 Status: YE NO      UI--
Bldg. DSB Floor El. YARD Room, Area2 252 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Area Walk-By Checklist (AWC)     AWC- 006_
No tiles in room, lights are supported well.5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?Large tank is a source of potential flooding also fire suppresion system.6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?The only fire source is the tank in room.7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Location: Bldg. RAB     Floor El. 372 Room, Area 100 SWEL Components: SWEILl- 008 (X-52). 061 (Y-03)
#18 rebar laying on ground. Hose in room is secured. No other housekeeping issues identified.
                                            !1 Note: Overhead supports                        Note: Overhead supports
YZ NEI U[-I N/A-I YZ NE-I U[] N/A[l-Y" N[E- UE' N/Ar"I YM NEI UI-1 N/A-2 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
 
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Engineering Report No. CALC-ANO 1-CS-i12-00002 Attachment D Rev. 0 Page 33 of 152 Sheet 6 of 6 Status: YZ NE] U --
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 36 of 152 Sheet 3 of 5 Status: YN N[-] UDl Area Walk-By Checklist (AWC) AWC- 007 Location:
Area Walk-By Checklist (AWC)     AWC- 006 Location: Bldg. RAB     Floor El. 372     Room, Area 100 SWEL Components: SWELl- 008 (X-52). 061 (Y-03)
DSB Floor El. YARD Room, Area3 252 Bldg.8. Have you looked for and found no other seismic conditions that could YEI NEI ULi adversely affect the safety functions of the equipment in the area?Rust on pipe support for fire suppression system.Comments (Additional pages may be added as necessary)
Note: Overhead supports                      Note: Adjacent floor anchorages
Degradation has been found for the anchor bolts within Item FO-I OA, which needs further inspection.
 
Housekeeping appeared to be adequate in the area.Nuts on a personnel platform were loose. CR-ANO-1-2012-01537 initiated Evaluated by: Roy Bernrman -.Date: 10/10/2012 Michael E. Perez 7 10/10/2012 3 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment D Rev. 0 Page 34 of 152 Sheet I of 5 Status: YZ NE]          UD Area Walk-By Checklist (AWC)                AWC- 007 Location: Bldg. DSB                Floor El. YARD          Room, Area' 252 SWEL Components: SWELl- 010 (P-16A)
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 37 of 152 Sheet 4 of 5 Area Walk-By Checklist (AWC) AWC- 007 Status: YN NO U[-D Location:
Additional space is provided at the end of this checklist for documenting other comments.
Bldg. DSB Floor El. YARD Room, Area4 252 SWEL Components:
: 1. Does anchorage of equipment in the area appear to be free of                         Y[    NI U-EI N/AD-potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
SWELl- 010 (P-16A)Photographs Note: Anchorages in the area have been shown to be in adequate conditions.
No potential adverse anchorageissues.
Note: HVAC ducting and conduits are properly secured and free from adverse seismic conditions.
: 2. Does anchorage of equipment in the area appear to be free of                         YE- N[N UE1 N/AD significant degraded conditions?
4 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
Anchor bolts below FO-IOA have significantdegradation.CR-ANO          2012-1536 is initiated.
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
: 3. Based on a visual inspection from the floor, do the cable/conduit                   Y[    NEI  U[1 N/A--
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 38 of 152 Sheet 5 of 5 Status: Y[ NEI UDl Area Walk-By Checklist (AWC) AWC- 007 Location:
raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
Bldg. DSB Floor El. YARD Room, Areas 252 SWEL Components:
There is no tray in room, conduit supports and HVAC ducting are supported well.
SWELl- 010 (P-16A)Note: Lighting appeared to be adequately secured in the area.Note: Fire suppression system, as well as the conduit appears to be properly secured.Because there is a fire suppression system in the area, it is very unlikely that a fire hazard would cause significant damage in the area.5 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
'If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 39 of 152 Sheet I of 5 Status: YZ ND] UDr-1 Area Walk-By Checklist (AWC) AWC- 008 Location:
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 35 of 152 Sheet 2 of 5 Status: YZ NE] U-]
Bldg. DSB Floor El. YARD Room, Area, 251 SWEL Components:
Area Walk-By Checklist (AWC)               AWC- 007 Location: Bldg. DSB                Floor El. YARD          Room, Area2 252
SWELl- 014 (P-16B)Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 4. Does it appear that the area is free of potentially adverse seismic                 YZ NEI U[-I N/A-I spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Tank equipment ID T-57B in room has an anchor bolt that appears to be bent and is not tightened fully. No other anchorage issues identified.
No tiles in room, lights are supported well.
: 5. Does it appear that the area is free of potentially adverse seismic                 YZ NE-I U[] N/A[l-interactions that could cause flooding or spray in the area?
Large tank is a source of potentialflooding also fire suppresion system.
: 6. Does it appear that the area is free of potentially adverse seismic                 Y"    N[E- UE' N/Ar"I interactions that could cause a fire in the area?
The only fire source is the tank in room.
: 7. Does it appear that the area is free of potentially adverse seismic                 YM NEI UI-1 N/A-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
          #18 rebarlaying on ground. Hose in room is secured. No other housekeeping issues identified.
2 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 36 of 152 Sheet 3 of 5 Status: YN N[-] UDl Area Walk-By Checklist (AWC)               AWC- 007 Location:       DSB          Floor El. YARD            Room, Area3 252 Bldg.
: 8. Have you looked for and found no other seismic conditions that could                 YEI    NEI  ULi adversely affect the safety functions of the equipment in the area?
Rust on pipe supportfor fire suppression system.
Comments (Additional pages may be added as necessary)
Degradationhas been found for the anchor bolts within Item FO-IOA, which needs further inspection.
Housekeeping appeared to be adequatein the area.
Nuts on a personnel platform were loose. CR-ANO-1-2012-01537 initiated Evaluated by:          Roy Bernrman                      -.                                        Date: 10/10/2012 Michael E. Perez 7                                                                    10/10/2012 3 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 37 of 152 Sheet 4 of 5 Status: YN NO U[-D Area Walk-By Checklist (AWC)               AWC- 007 Location: Bldg. DSB              Floor El. YARD            Room, Area4 252 SWEL Components: SWELl- 010 (P-16A)
Photographs Note: Anchorages in the area have been                            Note: HVAC ducting and conduits are shown to be in adequate conditions.                               properly secured and free from adverse seismic conditions.
4 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 38 of 152 Sheet 5 of 5 Status: Y[      NEI  UDl Area Walk-By Checklist (AWC)               AWC- 007 Location: Bldg. DSB           Floor El. YARD           Room, Areas 252 SWEL Components: SWELl- 010 (P-16A)
Note: Lighting appearedto be adequately                            Note: Fire suppression system, as well as the secured in the area.                                               conduit appears to be properly secured.
Because there is a fire suppressionsystem in the area,it is very unlikely that a fire hazard would cause significant damage in the area.
5 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 39 of 152 Sheet I of 5 Status: YZ ND] UDr-1 Area Walk-By Checklist (AWC)              AWC- 008 Location: Bldg. DSB              Floor El. YARD          Room, Area, 251 SWEL Components: SWELl- 014 (P-16B)
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
: 1. Does anchorage of equipment in the area appear to be free of                        YEI NO uD- N/AD-potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Tank equipment ID T-57B in room has an anchorbolt that appearsto be bent and is not tightened fully. No other anchorageissues identified.
CR-ANO-1-2012-1537 has been initiated.
CR-ANO-1-2012-1537 has been initiated.
YEI NO uD- N/AD-2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
: 2. Does anchorage of equipment in the area appear to be free of                         Y-    NO U["] N/AD'-
Anchor bolts below FO-I OB have significant degradation.
significant degraded conditions?
2 anchor bolts have significant degradation on tank (T-57B). CR-ANO-1-2012-1536 is initiated.
Anchor bolts below FO-IOB have significantdegradation.2 anchor bolts have significantdegradation on tank (T-57B). CR-ANO-1-2012-1536 is initiated.
Y- NO U["] N/AD'-3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?YZ N[D UD-' N/AD-There is no tray in room, conduit supports and HVAC ducting are supported well.'If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
: 3. Based on a visual inspection from the floor, do the cable/conduit                   YZ N[D UD-'        N/AD-raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
There is no tray in room, conduit supports and HVAC ducting are supported well.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 40 of 152 Sheet 2 of 5 Status: YZ NE] U[--1 Area Walk-By Checklist (AWC) AWC- 008 Location:
'If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Bldg. DSB Floor El. YARD Room, Area2 251 4. Does it appear that the area is free of potentially adverse seismic YZ NEI U[-1 N/A[-spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
 
No tiles in room, lights are supported well.5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?Large tank is a source of potential flooding also fire suppresion system.YM NEI ULI N/A--6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?The only fire source is the tank in room.YZ NEI iJE! N/AE!7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 40 of 152 Sheet 2 of 5 Status: YZ NE] U[--1 Area Walk-By Checklist (AWC)               AWC- 008 Location: Bldg. DSB               Floor El. YARD           Room, Area2 251
No portable equipment in room. No other housekeeping issues identified.
: 4. Does it appear that the area is free of potentially adverse seismic                 YZ NEI     U[-1 N/A[-
YZ NEI UE- N/A['-2 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
No tiles in room, lights are supported well.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 41 of 152 Sheet 3 of 5 Status: YZ NI] U[-1 Area Walk-By Checklist (AWC) AWC- 008 Location:
: 5. Does it appear that the area is free of potentially adverse seismic                 YM NEI      ULI N/A--
DSB Floor El. YARD Room, Area3 251 Bldg.8. Have you looked for and found no other seismic conditions that could YEJ NI] ULI adversely affect the safety functions of the equipment in the area?No other adverse seismic conditions were identified.
interactions that could cause flooding or spray in the area?
Large tank is a source of potentialflooding also fire suppresion system.
: 6. Does it appear that the area is free of potentially adverse seismic                 YZ NEI iJE! N/AE!
interactions that could cause a fire in the area?
The only fire source is the tank in room.
: 7. Does it appear that the area is free of potentially adverse seismic                 YZ NEI      UE- N/A['-
interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
No portableequipment in room. No other housekeeping issues identified.
2 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 41 of 152 Sheet 3 of 5 Status: YZ NI] U[-1 Area Walk-By Checklist (AWC)               AWC- 008 Location:       DSB         Floor El. YARD             Room, Area3 251 Bldg.
: 8. Have you looked for and found no other seismic conditions that could                 YEJ NI] ULI adversely affect the safety functions of the equipment in the area?
No other adverse seismic conditions were identified.
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Most of the issues in the area occur at the anchorage of the tank. The first issue is that there is one anchor bolt that appears to be slightly bent. This may need to be adjusted (Ref. CR-ANO-1-2012-1536). The second issue is that for two anchor bolts for this fuel tank, there is significant degradation for both the steel plate and the concrete below that that is evident. All other items in the area appear to be free from potentially adverse seismic conditions.
Most of the issues in the area occur at the anchorageof the tank. The first issue is that there is one anchor bolt that appearsto be slightly bent. This may need to be adjusted (Ref. CR-ANO-1-2012-1536). The second issue is that for two anchor bolts for this fuel tank, there is significant degradationfor both the steel plate and the concrete below that that is evident. All other items in the area appearto be free from potentially adverse seismic conditions.
Evaluated___
Evaluated___                                   __
__by: Roy Berryman Date: 10/102012 Michael E. Perez -- 10/10/2012 3 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
by:           Roy Berryman                                                                 Date: 10/102012 Michael E. Perez       --                                                           10/10/2012 3 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 42 of 152 Status: YZ NE] U[--Sheet 4 of 5 Area Walk-By Checklist (AWC) AWC- 008 Location:
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 42 of 152 Sheet 4 of 5 Status: YZ NE]         U[--
Bldg. DSB Floor El. YARD Room, Area4 251 SWEL Components:
Area Walk-By Checklist (AWC)               AWC- 008 Location: Bldg. DSB               Floor El. YARD           Room, Area4 251 SWEL Components: SWELl- 014 (P-16B)
SWELl- 014 (P-16B)Photographs Note: There is one anchor bolt supporting the tank in the room that is slightly bent and is also not tightened fully.Note: Significant degradation has been observed on two anchor bolts supporting the tank in the area. The degradation is evident in the steel plate below it.4 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
Photographs Note: There is one anchorbolt supporting the                     Note: Significant degradationhas been tank in the room that is slightly bent and is also               observed on two anchorbolts supporting the not tightened fully.                                              tank in the area. The degradationis evident in the steel plate below it.
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
4 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 43 of 152 Sheet 5 of 5 Area Walk-By Checklist (AWC) AWC- 008_Status: YN ND- UD Location:
 
Bldg. DSB Floor El. YARD Room, Area5 251 SWEL Components:
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 43 of 152 Sheet 5 of 5 Status: YN ND- UD Area Walk-By Checklist (AWC)               AWC- 008_
SWELl- 014 (P-16B)Note: Some degradation in the bolts for Item FO-IOB is evident.Note: Lighting supports in the area are properly installed.
Location: Bldg. DSB               Floor El. YARD           Room, Area5 251 SWEL Components: SWELl- 014 (P-16B)
5 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
Note: Some degradationin the bolts for Item                       Note: Lighting supports in the area are FO-IOB is evident.                                                properly installed.
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
5 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 44 of 152 Sheet I of 5 Status: YN NElI Ur-1 Area Walk-By Checklist (AWC) AWC- 009 Location:
 
Bldg. RAB Floor El. 404 Room, Area, 170 (Entire Room)SWEL Components:
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 44 of 152 Sheet I of 5 Status: YN NElI Ur-1 Area Walk-By Checklist (AWC)                 AWC- 009 Location: Bldg. RAB                 Floor El. 404           Room, Area, 170 (Entire Room)
SWELl- 017 (PSV-2684)
SWEL Components: SWELl- 017 (PSV-2684)
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Anchorage of equipment in the area appears to be free of potentially adverse seismic conditions.
Additional space is provided at the end of this checklist for documenting other comments.
YV N[D1 ULI N/A--2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
: 1. Does anchorage of equipment in the area appear to be free of                         YV N[D1 ULI N/A--
Anchorage of equipment in the area appears to be free of significant degraded conditions.
potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
YZ NEI UD- N/A--3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?All rigid electrical conduit is adequately anchored to the overhead and the walls. Overhead piping and ducts appear to be properly secured.YN ND1 UD- N/AD-]I If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
: 2. Does anchorage of equipment in the area appear to be free of                         YZ NEI UD- N/A--
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment D Rev. 0 Page 45 of 152 Status: YZ NF UD Sheet 2 of 5 Area Walk-By Checklist (AWC) AWC- 009 Location:
significant degraded conditions?
Bldg. RAB Floor El. 404 Room, Area 170 (Entire Room)4. Does it appear that the area is free of potentially adverse seismic YZ ND UD N/AD spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Anchorage of equipment in the area appearsto be free of significant degraded conditions.
The area appears to be free of potentially adverse seismic spatial interactions with other equipment.
: 3. Based on a visual inspection from the floor, do the cable/conduit                     YN ND1 UD- N/AD-]
: 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?The area appears to be free of potentially adverse seismic conditions that could cause flooding or spray in the area.YE NEI U[ N/A-6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?The area appears to be free of potentially adverse seismic interactions that could cause a fire in the area.YZ NO U" N/Ar 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
All rigid electrical conduit is adequately anchoredto the overhead and the walls. Overheadpiping and ducts appearto be properly secured.
I If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
 
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment D Rev. 0 Page 45 of 152 Sheet 2 of 5 Status: YZ NF UD Area Walk-By Checklist (AWC)             AWC- 009 Location: Bldg. RAB             Floor El. 404         Room, Area 170 (Entire Room)
: 4. Does it appear that the area is free of potentially adverse seismic           YZ ND UD N/AD spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
The area appears to be free of potentiallyadverse seismic spatial interactionswith other equipment.
: 5. Does it appear that the area is free of potentially adverse seismic           YE NEI    U[  N/A-interactions that could cause flooding or spray in the area?
The areaappears to be free of potentially adverse seismic conditions that could cause flooding or spray in the area.
: 6. Does it appear that the area is free of potentially adverse seismic           YZ NO U" N/Ar interactions that could cause a fire in the area?
The area appearsto be free of potentiallyadverse seismic interactions that could cause a fire in the area.
: 7. Does it appear that the area is free of potentially adverse seismic           Y'    NEI  UD_ N/AD-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
The area appears to be free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations.
The area appears to be free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations.
Y' NEI UD_ N/AD-Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 46 of 152 Sheet 3 of 5 Status: Y[ NEI U[--1 Area Walk-By Checklist (AWC) AWC- 009 Location:
 
Bldg. RAB Floor El. 404 Room, Area 170 (Entire Room)8. Have you looked for and found no other seismic conditions that could YE NI" urL adversely affect the safety functions of the equipment in the area?It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found.Comments (Additional pages may be added as necessary)
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 46 of 152 Sheet 3 of 5 Status: Y[     NEI U[--1 Area Walk-By Checklist (AWC)             AWC- 009 Location: Bldg. RAB             Floor El. 404         Room, Area   170 (Entire Room)
Room 170 was found to be in appropriate conditions.
: 8. Have you looked for and found no other seismic conditions that could         YE NI"     urL adversely affect the safety functions of the equipment in the area?
There was no issue with housekeeping practices and only mild surface oxidation was observed on the valves. The temperature in the room was high, but only due to the normal operating condition of the system.Evaluated by: Genaro Barracqan Jr. Date: 10/9/2012 Eric Dilbone 6 10/9/2012 Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 47 of 152 Sheet 4 of 5 Status: Y[ NE] U--Area Walk-By Checklist (AWC) AWC- 009 Location:
It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found.
Bldg. RAB Floor El. 404 Room, Area 170 (Entire Room)SWEL Components:
Comments (Additional pages may be added as necessary)
SWELl- 017 (PSV-2684)
Room 170 was found to be in appropriateconditions. There was no issue with housekeeping practices and only mild surface oxidation was observed on the valves. The temperature in the room was high, but only due to the normal operating condition of the system.
Photographs Note: General image of the anchorage in the area.Note: General image of the anchorage in the area.
Evaluated by: Genaro BarracqanJr.                                                   Date: 10/9/2012 Eric Dilbone 6
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 48 of 152 Sheet 5 of 5 Area Walk-By Checklist (AWC) AWC- 009 Status: YE NEI U--Location:
* 10/9/2012
Bldg. RAB Floor El. 404 Room, Area 170 (Entire Room)SWEL Components:
 
SWELl- 017 (PSV-2684)
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 47 of 152 Sheet 4 of 5 Status: Y[   NE] U--
Note: This image shows the different valves in the room.Note: This is a general image of the area. No housekeeping concerns were observed.
Area Walk-By Checklist (AWC)       AWC- 009 Location: Bldg. RAB       Floor El. 404     Room, Area 170 (EntireRoom)
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 49 of 152 Sheet I of 5 Status: YZ No UDl Area Walk-By Checklist (AWC) AWC- 010 Location:
SWEL Components: SWELl- 017 (PSV-2684)
Bldg. RAB Floor El. 317 Room, Area' 11 SWEL Components:
Photographs Note: General image of the anchorage in the   Note: General image of the anchorage in the area.                                          area.
SWELl- 018 (CV-1 432), 109 (E-35B), 033 (CV-14437)
 
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 48 of 152 Sheet 5 of 5 Status: YE NEI    U--
Anchorage of equipment in the area appears to be free of potentially adverse seismic conditions.
Area Walk-By Checklist (AWC)     AWC- 009 Location: Bldg. RAB     Floor El. 404         Room, Area 170 (EntireRoom)
YN N[E] U[-] N/A["]2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
SWEL Components: SWELl- 017 (PSV-2684)
Anchorage of equipment in the area appears to be free of significant degraded conditions.
Note: This image shows the different valves in   Note: This is a general image of the area. No the room.                                        housekeeping concerns were observed.
YZ N" UI-I N/A[]3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?Y[ NEI Ur- N/AD-All rigid electrical conduit is adequately anchored to the overhead and the walls. Overhead piping and ducts appear to be properly secured.1 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
 
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 49 of 152 Sheet I of 5 Status: YZ No UDl Area Walk-By Checklist (AWC)                 AWC- 010 Location: Bldg.       RAB           Floor El. 317           Room, Area' 11 SWEL Components: SWELl- 018 (CV-1 432), 109 (E-35B), 033 (CV-14437)
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 50 of 152 Sheet 2 of 5 Area Walk-By Checklist (AWC) AWC- 010 Status: Y[ NE] U--Location:
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Bldg. RAB Floor El. 317 Room, Area 11 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Additional space is provided at the end of this checklist for documenting other comments.
There is one lighting fixture in the area, and it is properly secured and free from spatial interactions with other nearby equipment.
: 1. Does anchorage of equipment in the area appear to be free of                         YN N[E] U[-] N/A["]
: 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?YZ NEI U[-- N/AE-Y[ NE] UEI N/A["]The area appears to be free of potentially adverse seismic conditions that could cause flooding or spray in the area.6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?The area appears to be free of potentially adverse seismic interactions that could cause a fire in the area.'YZ NEI uE- N/AE-7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
The area appears to be free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations.
Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.
YZ N[-- U[-1 N/AI-Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 51 of 152 Sheet 3 of 5 Status: YZ NF-] U["l Area Walk-By Checklist (AWC) AWC- 010 Location:
: 2. Does anchorage of equipment in the area appear to be free of                         YZ N"      UI-I N/A[]
Bldg. RAB Floor El. 317 Room, Area 11 8. Have you looked for and found no other seismic conditions that could YZ NEi U0i adversely affect the safety functions of the equipment in the area?It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found.Comments (Additional pages may be added as necessary)
significant degraded conditions?
Equipment in the area is found to be in adequate conditions.
Anchorage of equipment in the area appearsto be free of significant degradedconditions.
Anchorage is free from corrosion and concrete cracks. Cables and conduits are properly installed on walls and ceilings.
: 3. Based on a visual inspection from the floor, do the cable/conduit                     Y[    NEI Ur- N/AD-raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
The temporary scaffolding found in the area has an engineering-approved tag. Good housekeeping is evident throughout the room. Overall, all items in the area are free from seismic conditions that could affect their safety functions.
All rigid electrical conduit is adequately anchoredto the overhead and the walls. Overheadpiping and ducts appearto be properly secured.
Evaluated by: Daniel Andoh Date: 10/04/2012 Michael E. Perez / 10/04/2012 Engineering Report No. CALC-ANOI-CS-12-00002 Attachment D Rev. 0 Page 52 of 152 Sheet 4 of 5 Area Walk-By Checklist (AWC) AWC- 010 Status: YZ Nr"] U--Location:
1If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Bldg. RAB Floor El. 317 Room, Area 11 SWEL Components:
 
SWELl- 018 (CV-1432).
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 50 of 152 Sheet 2 of 5 Status: Y[  NE] U--
109 (E-35B), 033 (CV-1437)Photographs Note: Anchorage in the area has been shown to be in proper conditions.
Area Walk-By Checklist (AWC)               AWC- 010 Location: Bldg. RAB             Floor El. 317           Room, Area 11
No signs of corrosion and concrete cracking have been found.Note: Cables, conduits, and pipe supports in the area are shown to be properly secured.
: 4. Does it appear that the area is free of potentially adverse seismic           YZ NEI U[-- N/AE-spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 53 of 152 Status: YE NE] UI F Sheet 5 of 5 Area Walk-By Checklist (AWC) AWC-010 Location:
There is one lighting fixture in the area, and it is properly secured and free from spatial interactionswith other nearby equipment.
Bldg. RAB Floor El. 317 Roomn,Area 11 SWEL Components:
: 5. Does it appear that the area is free of potentially adverse seismic             Y[    NE] UEI  N/A["]
SWELl- 018 (CV-1432), 109 (E-35B), 033 (CV-1437)Note: Temporary scaffolding in the area appears to be properly secured and placed in the adequate location.
interactions that could cause flooding or spray in the area?
It is also free from damaging any nearby equipment.
The area appearsto be free of potentially adverse seismic conditions that could cause flooding or spray in the area.
Note:
: 6. Does it appear that the area is free of potentially adverse seismic           'YZ NEI uE- N/AE-interactions that could cause a fire in the area?
Engineering Report No. CALC-ANO I -CS- 12-00002 Attachment D Rev. 0 Page 54 of 152 Sheet I of 5 Status: YZ ND' UD--Area Walk-By Checklist (AWC) AWC- 011 Location:
The area appearsto be free of potentiallyadverse seismic interactions that could cause a fire in the area.
Bldg. RAB Floor El. 317 Room, Area' 13 SWEL Components:
: 7. Does it appear that the area is free of potentially adverse seismic             YZ N[-- U[-1 N/AI-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
SWEL1- 019 (CV-1052)Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
The area appears to be free of potentially adverse seismic interactions associatedwith housekeepingpractices, storageof portable equipment, and temporary installations.
Anchorage of equipment in the area appears to be free of potentially adverse seismic conditions.
 
'(Y NEJ ULI N/AD 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 51 of 152 Sheet 3 of 5 Status: YZ     NF-] U["l Area Walk-By Checklist (AWC)             AWC- 010 Location: Bldg. RAB             Floor El. 317         Room, Area     11
Anchorage of equipment in the area appears to be free of significant degraded conditions.
: 8. Have you looked for and found no other seismic conditions that could         YZ NEi     U0i adversely affect the safety functions of the equipment in the area?
Y' ND-] UD-] N/AD1 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?Y[ ND UD- N/AD All rigid electrical conduit is adequately anchored to the overhead and the walls. Overhead piping and ducts appear to be properly secured.1 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found.
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Comments (Additional pages may be added as necessary)
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 55 of 152 Status: YZ NEr] UO]Sheet 2 of 5 Area Walk-By Checklist (AWC) AWC- 011_Location:
Equipment in the area is found to be in adequate conditions. Anchorage is free from corrosion and concrete cracks. Cables and conduits are properlyinstalled on walls and ceilings. The temporary scaffolding found in the area has an engineering-approvedtag. Good housekeeping is evident throughout the room. Overall, all items in the area are free from seismic conditions that could affect their safety functions.
Bldg. RAB Floor El. 317 -Room, Area 13 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Evaluated by: DanielAndoh                                                            Date: 10/04/2012 Michael E. Perez /                                                           10/04/2012
There several lighting fixtures in the area and they appear to be properly secured.5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?There is a drain present in the room, making it highly unlikely that flooding would to occur in the area.Y[K NE] ULI N/AZ!YO NEI U[-] N/AD--6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?The area appears to be free of potentially adverse seismic interactions that could cause a fire in the area.YN NEI U[I N/A[!7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
 
The area appears to be free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations.
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment D Rev. 0 Page 52 of 152 Sheet 4 of 5 Status: YZ Nr"] U--
YO NE]I U[_ N/AL]
Area Walk-By Checklist (AWC)         AWC- 010 Location: Bldg. RAB         Floor El. 317     Room, Area 11 SWEL Components: SWELl- 018 (CV-1432). 109 (E-35B), 033 (CV-1437)
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 56 of 152 Status: YV NEIl UFl Sheet 3 of 5 Area Walk-By Checklist (AWC) AWC- 011 Location:
Photographs Note: Anchorage in the area has been shown       Note: Cables, conduits, and pipe supports in to be in properconditions. No signs of          the area are shown to be properly secured.
Bldg. RAB Floor El. 317 -Room, Area 13 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found.Y~N NIU0 Comments (Additional pages may be added as necessary)
corrosion and concrete cracking have been found.
Equipment in the area is found to be in adequate conditions.
 
Anchorage is free from corrosion and concrete cracks. Cables and conduits are properly installed on walls and ceilings.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 53 of 152 Sheet 5 of 5 Status: YE NE]     UIF Area Walk-By Checklist (AWC)           AWC-010 Location: Bldg. RAB           Floor El. 317   Roomn,Area 11 SWEL Components: SWELl- 018 (CV-1432), 109 (E-35B), 033 (CV-1437)
Good housekeeping is evident throughout the room. Overall, all items in the area are free from seismic conditions that could affect their safety functions.
Note: Temporary scaffolding in the area           Note:
Evaluated by: Daniel Andoh Date: 10/4/2012 Michael E. Perez 10/4/2012 Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 57 of 152 Sheet 4 of 5 Status: YZ NE] U[II Area Walk-By Checklist (AWC) AWC- 011 Location:
appearsto be properly secured and placed in the adequate location. It is also free from damaging any nearby equipment.
Bldg. RAB Floor El. 317 Room, Area 13 SWEL Components:
 
SWELl- 019 (CV-1052)Photographs Note: Anchorage in the area appears to be in good condition.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 54 of 152 Sheet I of 5 Status: YZ ND' UD--
No signs of corrosion and concrete cracking have been found.Note: Cables, conduits, and pipe supports in the area appear to be properly secured.Lighting fixtures appear to be properly anchored.
Area Walk-By Checklist (AWC)                 AWC- 011 Location: Bldg. RAB                 Floor El. 317           Room, Area' 13 SWEL Components: SWEL1- 019 (CV-1052)
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 58 of 152 Sheet 5 of 5 Area Walk-By Checklist (AWC) AWC- 011_Status: YZ NE] U[--Location:
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Bldg. RAB Floor El. 317 Room, Area 13 SWEL Components:
Additional space is provided at the end of this checklist for documenting other comments.
SWEILl- 019 (CV-1 052)Note: Floor drains are present to the area in order to mitigate flooding hazards, if they were ever to occur. This would not be the case here since all equipment items in the area do not show signs that promote these hazards.Note: Good housekeeping is evident in the area.
: 1. Does anchorage of equipment in the area appear to be free of                         '(Y    NEJ ULI N/AD potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 59 of 152 Sheet I of 5 Status: Y] NE] U-i Area Walk-By Checklist (AWC) AWC- 012 Location:
Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.
Bldg. RAB Floor El. 356 Room, Area' 77 (Entire Room)SWEL Components:
: 2. Does anchorage of equipment in the area appear to be free of                         Y'    ND-] UD-] N/AD1 significant degraded conditions?
SWELl- 020(CV-2214), 021 (CV-2233), 022(CV-2234), 036(CV-2235), 047(SV-2243B), 048(SV-2233A), 049(SV-2234B).106(T-208)
Anchorage of equipment in the area appearsto be free of significant degradedconditions.
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 3. Based on a visual inspection from the floor, do the cable/conduit                   Y[    ND UD- N/AD raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
Anchorage of equipment in the area appears to be free of potentially adverse seismic conditions.
All rigid electrical conduit is adequatelyanchored to the overhead and the walls. Overheadpiping and ducts appearto be properlysecured.
Y[K NEI U[I N/A[]2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
1If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Anchorage of equipment in the area appears to be free of significant degraded conditions.
 
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?All rigid electrical conduit is adequately anchored to the overhead and the walls. Overhead piping and ducts appear to be properly secured.Y[ N[-] U[D N/A[: YZ NEI ur- N/AD-i I If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 55 of 152 Sheet 2 of 5 Status: YZ NEr]     UO]
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Area Walk-By Checklist (AWC)             AWC- 011_
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 60 of 152 Sheet 2 of 5 Area Walk-By Checklist (AWC) AWC- 012 Status: YZ No U[--Location:
Location: Bldg. RAB             Floor El. 317     -   Room, Area 13
Bldg. RAB Floor El. 356 Room, Area 77 (Entire Room)4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 4. Does it appear that the area is free of potentially adverse seismic           Y[K NE] ULI N/AZ!
The area appears to be free of potentially adverse seismic spatial interactions with other equipment.
spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Y[ N[I] ULI N/All 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?The area appears to be free of potentially adverse seismic conditions that could cause flooding or spray in the area.YZ{ NEI UEW N/A[Z 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?The area appears to be free of potentially adverse seismic interactions that could cause a fire in the area.YZ N[:] UEI N/A[:]7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
There several lighting fixtures in the area and they appearto be properly secured.
: 5. Does it appear that the area is free of potentially adverse seismic           YO NEI      U[-] N/AD--
interactions that could cause flooding or spray in the area?
There is a drain present in the room, making it highly unlikely that flooding would to occur in the area.
: 6. Does it appear that the area is free of potentially adverse seismic           YN NEI    U[I N/A[!
interactions that could cause a fire in the area?
The area appearsto be free of potentially adverse seismic interactions that could cause a fire in the area.
: 7. Does it appear that the area is free of potentially adverse seismic           YO NE]I U[_    N/AL]
interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
The area appearsto be free of potentiallyadverse seismic interactions associatedwith housekeeping practices,storage of portable equipment, and temporaryinstallations.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 56 of 152 Sheet 3 of 5 Status: YV     NEIl UFl Area Walk-By Checklist (AWC)             AWC- 011 Location: Bldg. RAB             Floor El. 317     -   Room, Area 13
: 8. Have you looked for and found no other seismic conditions that could         Y~NNIU0 adversely affect the safety functions of the equipment in the area?
It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found.
Comments (Additional pages may be added as necessary)
Equipment in the area is found to be in adequateconditions. Anchorage is free from corrosionand concrete cracks. Cables and conduits are properlyinstalled on walls and ceilings. Good housekeeping is evident throughout the room. Overall, all items in the area are free from seismic conditions that could affect their safety functions.
Evaluated by: Daniel Andoh                                                         Date: 10/4/2012 Michael E. Perez                                                           10/4/2012
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 57 of 152 Sheet 4 of 5 Status: YZ NE] U[II Area Walk-By Checklist (AWC)         AWC- 011 Location: Bldg. RAB         Floor El. 317     Room, Area   13 SWEL Components: SWELl- 019 (CV-1052)
Photographs Note: Anchorage in the area appearsto be in      Note: Cables, conduits, and pipe supports in good condition. No signs of corrosion and       the area appearto be properly secured.
concrete cracking have been found.               Lighting fixtures appearto be properly anchored.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 58 of 152 Sheet 5 of 5 Status: YZ NE] U[--
Area Walk-By Checklist (AWC)         AWC- 011_
Location: Bldg. RAB          Floor El. 317       Room, Area 13 SWEL Components: SWEILl- 019 (CV-1 052)
Note: Floordrains are present to the area in       Note: Good housekeeping is evident in the order to mitigate flooding hazards, if they were   area.
ever to occur. This would not be the case here since all equipment items in the area do not show signs that promote these hazards.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 59 of 152 Sheet I of 5 Status: Y] NE]         U-i Area Walk-By Checklist (AWC)               AWC- 012 Location: Bldg. RAB               Floor El. 356           Room, Area' 77 (EntireRoom)
SWEL Components: SWELl- 020(CV-2214), 021 (CV-2233), 022(CV-2234), 036(CV-2235),
047(SV-2243B), 048(SV-2233A), 049(SV-2234B).106(T-208)
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
: 1. Does anchorage of equipment in the area appear to be free of                         Y[K NEI    U[I N/A[]
potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.
: 2. Does anchorage of equipment in the area appear to be free of                         Y[    N[-] U[D N/A[:
significant degraded conditions?
Anchorage of equipment in the area appearsto be free of significant degradedconditions.
: 3. Based on a visual inspection from the floor, do the cable/conduit                   YZ NEI ur-        N/AD-i raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
All rigid electricalconduit is adequately anchoredto the overhead and the walls. Overheadpiping and ducts appearto be properly secured.
I If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 60 of 152 Sheet 2 of 5 Status: YZ No U[--
Area Walk-By Checklist (AWC)             AWC- 012 Location: Bldg. RAB             Floor El. 356           Room, Area   77 (EntireRoom)
: 4. Does it appear that the area is free of potentially adverse seismic           Y[    N[I] ULI N/All spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
The area appearsto be free of potentiallyadverse seismic spatial interactionswith other equipment.
: 5. Does it appear that the area is free of potentially adverse seismic           YZ{ NEI UEW N/A[Z interactions that could cause flooding or spray in the area?
The area appears to be free of potentially adverse seismic conditions that could cause flooding or spray in the area.
: 6. Does it appear that the area is free of potentially adverse seismic           YZ N[:] UEI N/A[:]
interactions that could cause a fire in the area?
The area appears to be free of potentially adverse seismic interactions that could cause a fire in the area.
: 7. Does it appear that the area is free of potentially adverse seismic           YM NEI      uE1 N/A[E]
interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
No adverse conditions were observed related to housekeeping practices.
No adverse conditions were observed related to housekeeping practices.
YM NEI uE1 N/A[E]
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 61 of 152 Sheet 3 of 5 Status: YZ NI-' U--Area Walk-By Checklist (AWC) AWC- 012 Location:
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 61 of 152 Sheet 3 of 5 Status: YZ NI-' U--
Bldg. RAB Floor El. 356 Room, Area 77 (Entire Room)8. Have you looked for and found no other seismic conditions that could Y[ N[i U[I-adversely affect the safety functions of the equipment in the area?It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found.Comments (Additional pages may be added as necessary)
Area Walk-By Checklist (AWC)             AWC- 012 Location: Bldg. RAB           Floor El. 356         Room, Area   77 (Entire Room)
Evaluated by: Genaro BarraQan Jr. SDate: 10/03/12 Michael E. Perez 0 10/03/12 Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 62 of 152 Sheet 4 of 5 Status: Y[ NO UZ'-Area Walk-By Checklist (AWC) AWC- 012 Location:
: 8. Have you looked for and found no other seismic conditions that could         Y[   N[i   U[I-adversely affect the safety functions of the equipment in the area?
Bldg. RAB Floor El. 356 Room, Area 77 (Entire Room)SWEL Components:
It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found.
SWELl- 020(CV-2214).
Comments (Additional pages may be added as necessary)
021 (CV-2233).
Evaluated by: Genaro BarraQanJr.             SDate:                                       10/03/12 Michael E. Perez     0                                                     10/03/12
022(CV-2234).
 
036(CV-2235).
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 62 of 152 Sheet 4 of 5 Status: Y[   NO UZ'-
Area Walk-By Checklist (AWC)     AWC- 012 Location: Bldg. RAB      Floor El. 356    Room, Area  77 (EntireRoom)
SWEL Components: SWELl- 020(CV-2214). 021 (CV-2233). 022(CV-2234). 036(CV-2235).
047(SV-2243B), 048(SV-2233A), 049(SV-2234B),106(T-208)
Photographs Note: FeedwaterIsolation Valve had a minor    Note: Image of the area with rust colored leak.                                        water from the feedwater valve overhead.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 63 of 152 Sheet 5 of 5 Status: YE NEI-'  U-I Area Walk-By Checklist (AWC)          AWC- 012 Location: Bldg. RAB         Floor El. 356     Room, Area 77 (Entire Room)
SWEL Components: SWELl- 020(CV-2214). 021 (CV-2233), 022(CV-2234). 036(CV-2235),
047(SV-2243B), 048(SV-2233A), 049(SV-2234B),106(T-208)
047(SV-2243B), 048(SV-2233A), 049(SV-2234B),106(T-208)
Photographs Note: Feedwater Isolation Valve had a minor leak.Note: Image of the area with rust colored water from the feedwater valve overhead.
Note: Image shows the pipingin the end of the room that had some minor corrosion. This would not affect the safety functions of the system in case of seismic event.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 63 of 152 Sheet 5 of 5 Status: YE NEI-' U-I Area Walk-By Checklist (AWC) AWC- 012 Location:
 
Bldg. RAB Floor El. 356 Room, Area 77 (Entire Room)SWEL Components:
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 64 of 152 Sheet I of 5 Status: YN NF U-Area Walk-By Checklist (AWC)               AWC- 013 Location: Bldg. RAB               Floor El. 335           Room, Area' 46 SWEL Components: SWELl- 024 (CV-2620)
SWELl- 020(CV-2214).
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
021 (CV-2233), 022(CV-2234).
Additional space is provided at the end of this checklist for documenting other comments.
036(CV-2235), 047(SV-2243B), 048(SV-2233A), 049(SV-2234B),106(T-208)
: 1. Does anchorage of equipment in the area appear to be free of                         YEI NZ UEW NIAE potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Note: Image shows the pipingin the end of the room that had some minor corrosion.
This would not affect the safety functions of the system in case of seismic event.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 64 of 152 Sheet I of 5 Status: YN NF U-Area Walk-By Checklist (AWC) AWC- 013 Location:
Bldg. RAB Floor El. 335 Room, Area' 46 SWEL Components:
SWELl- 024 (CV-2620)Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Nearby support (PI-3812A) was observed to be missing two anchor bolts. CR-ANO-1-2012-01611 initiated.
Nearby support (PI-3812A) was observed to be missing two anchor bolts. CR-ANO-1-2012-01611 initiated.
YEI NZ UEW NIAE 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
: 2. Does anchorage of equipment in the area appear to be free of                         YZ NEI      UW] N/A[-
significant degraded conditions?
Anchorage present appears to be in good condition.
Anchorage present appears to be in good condition.
YZ NEI UW] N/A[-3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?YN NEIZ UEI N/AEl HVAC in corner of room. Appears to be in general conformance.
: 3. Based on a visual inspection from the floor, do the cable/conduit                   YN NEIZ    UEI N/AEl raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
'If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
HVAC in cornerof room. Appears to be in general conformance.
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
'If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 65 of 152 Sheet 2 of 5 Area Walk-By Checklist (AWC) AWC- 013 Status: YZ NF UF Location:
 
Bldg. RAB Floor El. 335 Room, Area 46 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 65 of 152 Sheet 2 of 5 Status: YZ NF UF Area Walk-By Checklist (AWC)             AWC- 013 Location: Bldg. RAB             Floor El. 335           Room, Area 46
Lights observed may sway. However, they would impact piping insulation, absorbing the impact. Additionally, the piping is inherently rugged when compared to the light.5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?Floor drains present. No sources of flood or spray were observed.6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?The area appears to be free of potentially adverse seismic interactions that could cause a fire.7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 4. Does it appear that the area is free of potentially adverse seismic           YZ NW] Uil N/AD]
No scaffolding present. Ladders observed to be secured. See image below.YZ NW] Uil N/AD]Y" N[W UWJ N/AE]YZ NEI U[- N/AD--YZ N[-- U-- N/AD-Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 66 of 152 Sheet 3 of 5 Area Walk-By Checklist (AWC) AWC-013 Location:
spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Bldg. RAB Floor El. 335 Room, Area 46 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?No other seismic conditions that could adversely affect the safety functions of the equipment in the area were found.Status: YZ NEI U[I YN NEI UE1 Comments (Additional pages may be added as necessary)
Lights observed may sway. However, they would impact piping insulation, absorbingthe impact. Additionally, the piping is inherently rugged when compared to the light.
Anchorage for support for Item PI-3812A was observed to be missing a bolt.Evaluated by: Michael E. Perez Date: 10/10/2012 Sean Smolarek Z 10/10/2012 Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 67 of 152 Status: Y[ NE] Uor-1 Sheet 4 of 5 Area Walk-By Checklist (AWC) AWC- 013 Photographs Location:
: 5. Does it appear that the area is free of potentially adverse seismic           Y"    N[W UWJ N/AE]
Bldg. RAB Floor El. 335 -Room, Area 46 SWEL Components:
interactions that could cause flooding or spray in the area?
SWELl- 024 (0V-2620)Photographs Note: General area overview.Note: Ladder adequately secured.
Floordrains present. No sources of flood or spray were observed.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 68 of 152 Sheet 5 of 5 Status: Y[ NrI U-IZ Area Walk-By Checklist (AWC) AWC- 013 Location:
: 6. Does it appear that the area is free of potentially adverse seismic           YZ NEI    U[- N/AD--
Bldg. RAB Floor El. 335 Room, Area 46 SWEL Components:
interactions that could cause a fire in the area?
SWELl- 024 (CV-2620)Note: Support Missing Anchor Bolt Note: Component with Support Missing Anchor Bolt Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 69 of 152 Status: YN NE] Uo1 Sheet I of 4 Area Walk-By Checklist (AWC) AWC-014 Location:
The area appears to be free of potentially adverse seismic interactions that could cause a fire.
Bldg. RAB Floor El. 335 Room, Area' 35 (Entire Room)SWEL Components:
: 7. Does it appear that the area is free of potentially adverse seismic           YZ N[-- U-- N/AD-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
SWELl- 026 (CV-2646)Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
No scaffolding present. Ladders observed to be secured. See image below.
Anchorage of equipment in the area appears to be free of potentially adverse seismic conditions.
 
Y[ N[: UEr N/A--2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 66 of 152 Sheet 3 of 5 Status: YZ NEI    U[I Area Walk-By Checklist (AWC)           AWC-013 Location: Bldg. RAB           Floor El. 335           Room, Area 46
: 8. Have you looked for and found no other seismic conditions that could         YN NEI UE1 adversely affect the safety functions of the equipment in the area?
No other seismic conditions that could adversely affect the safety functions of the equipment in the area were found.
Comments (Additional pages may be added as necessary)
Anchorage for support for Item PI-3812A was observed to be missing a bolt.
Evaluated by: Michael E. Perez                                                     Date: 10/10/2012 Sean Smolarek Z                                                             10/10/2012
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 67 of 152 Sheet 4 of 5 Status: Y[   NE] Uor-1 Area Walk-By Checklist (AWC)       AWC- 013 Location: Bldg. RAB       Floor El. 335 - Room, Area 46 SWEL Components: SWELl- 024 (0V-2620)
Photographs Photographs Note: General area overview.                   Note: Ladder adequatelysecured.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 68 of 152 Sheet 5 of 5 Status: Y[   NrI U-IZ Area Walk-By Checklist (AWC)     AWC- 013 Location: Bldg. RAB     Floor El. 335     Room, Area 46 SWEL Components: SWELl- 024 (CV-2620)
Note: Support Missing Anchor Bolt             Note: Component with Support Missing Anchor Bolt
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 69 of 152 Sheet I of 4 Status: YN     NE] Uo1 Area Walk-By Checklist (AWC)                 AWC-014 Location: Bldg. RAB                 Floor El. 335           Room, Area' 35 (Entire Room)
SWEL Components: SWELl- 026 (CV-2646)
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
: 1. Does anchorage of equipment in the area appear to be free of                         Y[    N[:  UEr    N/A--
potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.
: 2. Does anchorage of equipment in the area appear to be free of                         YZ NEI      U-1    N/AE-significant degraded conditions?
Anchorage of equipment in the area appears to be free of significant degraded conditions.
Anchorage of equipment in the area appears to be free of significant degraded conditions.
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?All rigid electrical conduit is adequately anchored to the overhead and the walls. Overhead piping and ducts appear to be properly secured.YZ NEI U-1 N/AE-YZ NEI] U[] N/A[-1 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
: 3. Based on a visual inspection from the floor, do the cable/conduit                     YZ NEI] U[] N/A[-
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 70 of 152 Status: YZ NF UO Sheet 2 of 4 Area Walk-By Checklist (AWC) AWC- 014 Location:
All rigid electrical conduit is adequately anchored to the overhead and the walls. Overheadpiping and ducts appearto be properly secured.
Bldg. RAB Floor El. 335 Room, Area 35 (Entire Room)4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
1 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Overhead fluorescent lighting was secured with chain supports.
 
No open S hooks were observed.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 70 of 152 Sheet 2 of 4 Status: YZ NF UO Area Walk-By Checklist (AWC)             AWC- 014 Location: Bldg. RAB             Floor El. 335         Room, Area 35 (Entire Room)
Nylon zip ties were present to take up excess chain.5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?The area appears to be free of potentially adverse seismic conditions that could cause flooding or spray in the area.Y[K NEI I UE N/AE[YZ NEI UE- N/A[E 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?The area appears to be free of potentially adverse seismic interactions that could cause a fire in the area.Y'( NEI UE[ N/AE-7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 4. Does it appear that the area is free of potentially adverse seismic           Y[K NEI IUE N/AE[
The area appears to be free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations.
spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
YN NEI u[E] N/AE-1 Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 71 of 152 Sheet 3 of 4 Status: Y[ NE] U[--Area Walk-By Checklist (AWC) AWC- 014 Location:
Overhead fluorescent lighting was secured with chain supports. No open S hooks were observed. Nylon zip ties were present to take up excess chain.
Bldg. RAB Floor El. 335 Room, Area 35 (Entire Room)8. Have you looked for and found no other seismic conditions that could Y[ NE] U-adversely affect the safety functions of the equipment in the area?It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found.Comments (Additional pages may be added as necessary)
: 5. Does it appear that the area is free of potentially adverse seismic           YZ NEI      UE- N/A[E interactions that could cause flooding or spray in the area?
Room 35 was found to be in great housekeeping practices.
The area appears to be free of potentiallyadverse seismic conditions that could cause flooding or spray in the area.
Area was clean and well organized.
: 6. Does it appear that the area is free of potentially adverse seismic           Y'( NEI UE[ N/AE-interactions that could cause a fire in the area?
Evaluated by: Genaro Barraqan Jr. -' Date: 10/9/2012 Eric Dilbone 10/9/2012 Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 72 of 152 Sheet 4 of 4 Status: Y[ NE[] U[]Area Walk-By Checklist (AWC) AWC- 014 Location:
The area appearsto be free of potentially adverse seismic interactions that could cause a fire in the area.
Bldg. RAB Floor El. 335 Room, Area 35 (Entire Room)SWEL Components:
: 7. Does it appear that the area is free of potentially adverse seismic           YN NEI u[E] N/AE-1 interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
SWELl- 026 (CV-2646)Photographs Note: General image of the area. This room was exceptional in house-keeping practices.
The area appearsto be free of potentially adverse seismic interactions associatedwith housekeeping practices,storage of portable equipment, and temporary installations.
Note:
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 73 of 152 Status: Y[ NIF- UE-I Sheet 1 of 6 Area Walk-By Checklist (AWC) AWC- 015_Location:
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 71 of 152 Sheet 3 of 4 Status: Y[     NE] U[--
Bldg. RAB Floor El. 354 Room, Area, 63 (35'Radius)
Area Walk-By Checklist (AWC)             AWC- 014 Location: Bldg. RAB             Floor El. 335         Room, Area 35 (Entire Room)
SWEL Components:
: 8. Have you looked for and found no other seismic conditions that could         Y[   NE] U-adversely affect the safety functions of the equipment in the area?
SWELl- 027 (C V-I 407)Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found.
Anchorage of equipment in the area appears to be free of potentially adverse seismic conditions.
Comments (Additional pages may be added as necessary)
: 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
Room 35 was found to be in great housekeeping practices.Area was clean and well organized.
Anchorage of equipment in the area appears to be free of significant degraded conditions.
Evaluated by: Genaro BarraqanJr.           -'                                       Date: 10/9/2012 Eric Dilbone                                                               10/9/2012
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?HVAC ductwork is in good condition.
 
YZ NEI UE- N/AE-YZ NEI UEr N/A[--YV NEI UM N/A[:]' If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 72 of 152 Sheet 4 of 4 Status: Y[   NE[] U[]
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Area Walk-By Checklist (AWC)       AWC- 014 Location: Bldg. RAB       Floor El. 335     Room, Area 35 (EntireRoom)
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 74 of 152 Status: YN N[-] UM Sheet 2 of 6 Area Walk-By Checklist (AWC) AWC- 015_Location:
SWEL Components: SWELl- 026 (CV-2646)
Bldg. RAB Floor El. 354 -Room, Area 63 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Photographs Note: General image of the area. This room     Note:
Open S-hooks on light over 1A3-1101 next to GCH-43. Open S-hooks were observed above cabinet C1 15. This must be corrected to meet the IPEEE commitments.
was exceptional in house-keeping practices.
CR-ANO- 1-2012-01613 initiated.
 
: 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?Fire Piping is present. Drains are on the adjacent concrete, but grating is below the component such that any water released would flow down to the lower levels.'(N NE] U[:] N/A[J YZ N[1 ULI N/AEI 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?The area appears to be free of potentially adverse seismic interactions that could cause a fire.YN NEIl UI- N/AE1 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 73 of 152 Sheet 1 of 6 Status: Y[       NIF- UE-I Area Walk-By Checklist (AWC)                 AWC- 015_
Location: Bldg. RAB               Floor El. 354             Room, Area, 63 (35'Radius)
SWEL Components: SWELl- 027 (CV-I 407)
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
: 1. Does anchorage of equipment in the area appear to be free of                         YZ NEI      UE- N/AE-potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.
: 2. Does anchorage of equipment in the area appear to be free of                         YZ NEI UEr N/A[--
significant degraded conditions?
Anchorage of equipment in the area appearsto be free of significant degradedconditions.
: 3. Based on a visual inspection from the floor, do the cable/conduit                   YV NEI UM N/A[:]
raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
HVAC ductwork is in good condition.
' If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 74 of 152 Sheet 2 of 6 Status: YN N[-] UM Area Walk-By Checklist (AWC)             AWC- 015_
Location: Bldg. RAB             Floor El. 354     -   Room, Area 63
: 4. Does it appear that the area is free of potentially adverse seismic           '(N  NE] U[:] N/A[J spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Open S-hooks on light over 1A3-1101 next to GCH-43. Open S-hooks were observed above cabinet C1 15. This must be corrected to meet the IPEEEcommitments. CR-ANO- 1-2012-01613 initiated.
: 5. Does it appear that the area is free of potentially adverse seismic           YZ N[1 ULI N/AEI interactions that could cause flooding or spray in the area?
Fire Pipingis present. Drainsare on the adjacent concrete, but grating is below the component such that any waterreleased would flow down to the lower levels.
: 6. Does it appear that the area is free of potentially adverse seismic           YN NEIl UI- N/AE1 interactions that could cause a fire in the area?
The area appearsto be free of potentially adverse seismic interactions that could cause a fire.
: 7. Does it appear that the area is free of potentially adverse seismic           Y[    NEIl ULI N/A[Z interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Ladder was secured. Computer stored nearby, but could not fall onto safety related equipment.
Ladder was secured. Computer stored nearby, but could not fall onto safety related equipment.
Y[ NEIl ULI N/A[Z Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 75 of 152 Status: YZ NE] UI Sheet 3 of 6 Area Walk-By Checklist (AWC) AWC- 015 Location:
 
Bldg. RAB Floor El. 354 Room, Area 63 8. Have you looked for and found no other seismic conditions that could YN NEI U-I adversely affect the safety functions of the equipment in the area?It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found.Comments (Additional pages may be added as necessary)
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 75 of 152 Sheet 3 of 6 Status: YZ NE]     UI Area Walk-By Checklist (AWC)             AWC- 015 Location: Bldg. RAB             Floor El. 354         Room, Area 63
Seismic block walls (6-B-45 and 6-B-49) were observed in the area.Evaluated by: Michael E. Perez Date: 10/10/2012 Sean Smolarek 10/10/2012 Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 76 of 152 Status: YZ NE] U[]Sheet 4 of 6 Area Walk-By Checklist (AWC) AWC- 015 Location:
: 8. Have you looked for and found no other seismic conditions that could       YN   NEI U-I adversely affect the safety functions of the equipment in the area?
Bldg. RAB Floor El. 354 -Room, Area 63 SWEL Components:
It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found.
SWELhs- 027 (CV-I 407)Photographs Note: General Area Note: There appear to be some open S-hooks on some of the lighting fixtures in the area.
Comments (Additional pages may be added as necessary)
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment D Rev. 0 Page 77 of 152 Sheet 5 of 6 Area Walk-By Checklist (AWC) AWC- 015_Status: YE NE] U-Location:
Seismic block walls (6-B-45 and 6-B-49) were observed in the area.
Bldg. RAB Floor El. 354 -Room, Area 63 SWEL Components:
Evaluated by: Michael E. Perez                                                     Date: 10/10/2012 Sean Smolarek                                                               10/10/2012
SWELl -027 (CV-1 407)Note: There is an open S-hook for one lighting fixture that is above Cabinet Cl 15 in the area.This can easily collapse onto the cabinet during a seismic hazard.Note: Computer stored in area Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 78 of 152 Status: YE NEI UI-Sheet 6 of 6 Area Walk-By Checklist (AWC) AWC- 015_Location:
 
Bldg. RAB Floor El. 354 -Room, Area 63 SWEL Components:
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 76 of 152 Sheet 4 of 6 Status: YZ NE] U[]
SWEILl- 027 (CV-1407)Note: HVAC ducts and fire piping Note:
Area Walk-By Checklist (AWC)     AWC- 015 Location: Bldg. RAB     Floor El. 354 - Room, Area 63 SWEL Components: SWELhs-027 (CV-I 407)
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 79 of 152 Sheet 1 of 5 Status: YZ ND] UDl Area Walk-By Checklist (AWC) AWC- 016 Location:
Photographs Note: GeneralArea                            Note: There appearto be some open S-hooks on some of the lighting fixtures in the area.
Bldg. RAB Floor El. 372 Room, Area' 94 SWEL Components:
 
SWELl- 028 (CV-1300)Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment D Rev. 0 Page 77 of 152 Sheet 5 of 6 Status: YE NE] U-Area Walk-By Checklist (AWC)         AWC- 015_
No adverse seismic conditions were observed in anchorage 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
Location: Bldg. RAB         Floor El. 354     - Room, Area 63 SWEL Components: SWELl - 027 (CV-1 407)
No significant degraded conditions were observed in the area 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?HVAC and conduit appear to be in good condition Y; NEI U[-] N/A--Y] NDI UD_ N/AD']Y[ NEI UD- N/A[D 1 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
Note: There is an open S-hook for one lighting     Note: Computer stored in area fixture that is above Cabinet Cl 15 in the area.
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
This can easily collapse onto the cabinet during a seismic hazard.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 80 of 152 Sheet 2 of 5 Status: YM NIl] UI-I Area Walk-By Checklist (AWC) AWC- 016 Location:
 
Bldg. RAB Floor El. 372 Room, Area 94 4. Does it appear that the area is free of potentially adverse seismic YZ NEI ULI N/AEl spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 78 of 152 Sheet 6 of 6 Status: YE NEI     UI-Area Walk-By Checklist (AWC)       AWC- 015_
An open S-hook was observed.
Location: Bldg. RAB       Floor El. 354 -   Room, Area 63 SWEL Components: SWEILl- 027 (CV-1407)
However, if this light were to fall, it would fall to a Unistrut support.5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?No fire piping observed.YE NEI u[:] N/A--6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?No sources of fire were observed.YZ NEj UE1 N/AZ-7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Note: HVAC ducts and fire piping               Note:
No temporary installations were observed.YZ N[E U[-] N/A-Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 81 of 152 Sheet 3 of 5 Status: YZ NO U-iJ Area Walk-By Checklist (AWC) AWC- 016 Location:
 
Bldg. RAB Floor El. 372 Room, Area 94 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?No other adverse seismic conditions were observed YZNEIULI Comments (Additional pages may be added as necessary)
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 79 of 152 Sheet 1 of 5 Status: YZ ND] UDl Area Walk-By Checklist (AWC)                 AWC- 016 Location: Bldg. RAB               Floor El. 372             Room, Area' 94 SWEL Components: SWELl- 028 (CV-1300)
Evaluated by: Michael Date: 10/10/2012 Sean Smolarek 10/10/2012 Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 82 of 152 Status: YN NF UI-I Sheet 4 of 5 Area Walk-By Checklist (AWC) AWC- 016 Location:
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Bldg. RAB Floor El. 372 Room, Area 94 SWEL Components:
Additional space is provided at the end of this checklist for documenting other comments.
SWELl- 028 (CV-1300)Photographs Note: CV-1300 Note: Approximate area of AWC Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 83 of 152 Sheet 5 of 5 Status: YE NE]- U'Area Walk-By Checklist (AWC) AWC-016 Location:
: 1. Does anchorage of equipment in the area appear to be free of                         Y;    NEI  U[-] N/A--
Bldg. RAB Floor El. 372 Room, Area 94 SWEL Components:
potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
SWELl- 028 (CV-1300)Note: Observe anchorage in good condition Note: Observe overhead Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 84 of 152 Sheet I of 4 Status: YZ NEi] ULI Area Walk-By Checklist (AWC) AWC- 017 Location:
No adverse seismic conditions were observed in anchorage
Bldg. RAB Floor El. 360 Room, Area' 79 (Entire Room)SWEL Components:
: 2. Does anchorage of equipment in the area appear to be free of                         Y] NDI      UD_    N/AD']
SWELl- 029 (CV-1220), 042 (CV-1206).
significant degraded conditions?
051 (SV-1 118). 034 (1227)Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
No significantdegradedconditions were observed in the area
Anchorage of equipment in the area appears to be free of potentially adverse seismic conditions.
: 3. Based on a visual inspection from the floor, do the cable/conduit                     Y[    NEI UD- N/A[D raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
YZ NEI UE- N/AE:-2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
HVAC and conduit appear to be in good condition 1 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Anchorage of equipment in the area appears to be free of significant degraded conditions.
 
Y[ NEI uEr N/A[-]3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?All rigid electrical conduit is adequately anchored to the overhead and the walls. Overhead piping and ducts appear to be properly secured.Y[ NEI UE1 N/AE1 I If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 80 of 152 Sheet 2 of 5 Status: YM NIl] UI-I Area Walk-By Checklist (AWC)             AWC- 016 Location: Bldg. RAB             Floor El. 372         Room, Area   94
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
: 4. Does it appear that the area is free of potentially adverse seismic           YZ NEI     ULI N/AEl spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 85 of 152 Sheet 2 of 4 Status: YZ NEI] UL-Area Walk-By Checklist (AWC) AWC-017 Location:
An open S-hook was observed. However, if this light were to fall, it would fall to a Unistrut support.
Bldg. RAB Floor El. 360 Room, Area 79 (Entire Room)4. Does it appear that the area is free of potentially adverse seismic Y-] NZ UE] N/A--]spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic           YE NEI      u[:] N/A--
Light above CV-1206 has an open S-hook. This hook must be closed to meet an IPEEE commitment.
interactions that could cause flooding or spray in the area?
CR-ANO-1-2012-01613 initiated.
No fire piping observed.
: 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?The area appears to be free of potentially adverse seismic conditions that could cause flooding or spray in the area.YN N[-] uE] N/A[-]6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?The area appears to be free of potentially adverse seismic interactions that could cause a fire in the area.YER NEI UEI N/A[]7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 6. Does it appear that the area is free of potentially adverse seismic           YZ NEj UE1 N/AZ-interactions that could cause a fire in the area?
The area appears to be free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations.
No sources of fire were observed.
Y' NE] UE- N/A-I Engineering Report No. CALC-ANOI-CS-12-00002 Attachment D Rev. 0 Page 86 of 152 Sheet 3 of 4 Area Walk-By Checklist (AWC) AWC- 017 Status: YN NEI UD-Location:
: 7. Does it appear that the area is free of potentially adverse seismic           YZ N[E U[-] N/A-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Bldg. RAB Floor El. 360 Room, Area 79 (Entire Room)8. Have you looked for and found no other seismic conditions that could YE N[l U" adversely affect the safety functions of the equipment in the area?It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found.Comments (Additional pages may be added as necessary)
No temporary installationswere observed.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 81 of 152 Sheet 3 of 5 Status: YZ NO U-iJ Area Walk-By Checklist (AWC)           AWC- 016 Location: Bldg. RAB           Floor El. 372           Room, Area 94
: 8. Have you looked for and found no other seismic conditions that could         YZNEIULI adversely affect the safety functions of the equipment in the area?
No other adverse seismic conditions were observed Comments (Additional pages may be added as necessary)
Evaluated by: Michael Perez"*-.                                                    Date: 10/10/2012 Sean Smolarek                                                               10/10/2012
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 82 of 152 Sheet 4 of 5 Status: YN NF UI-I Area Walk-By Checklist (AWC)     AWC- 016 Location: Bldg. RAB     Floor El. 372     Room, Area 94 SWEL Components: SWELl- 028 (CV-1300)
Photographs Note: CV-1300                                 Note: Approximate area of AWC
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 83 of 152 Sheet 5 of 5 Status: YE NE]- U' Area Walk-By Checklist (AWC)     AWC-016 Location: Bldg. RAB     Floor El. 372   Room, Area 94 SWEL Components: SWELl- 028 (CV-1300)
Note: Observe anchorage in good condition   Note: Observe overhead
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 84 of 152 Sheet I of 4 Status: YZ NEi] ULI Area Walk-By Checklist (AWC)                 AWC- 017 Location: Bldg. RAB                 Floor El. 360           Room, Area'     79 (Entire Room)
SWEL Components: SWELl- 029 (CV-1220), 042 (CV-1206). 051 (SV-1 118). 034 (1227)
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
: 1. Does anchorage of equipment in the area appear to be free of                         YZ NEI      UE- N/AE:-
potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.
: 2. Does anchorage of equipment in the area appear to be free of                         Y[    NEI uEr    N/A[-]
significant degraded conditions?
Anchorage of equipment in the area appearsto be free of significant degraded conditions.
: 3. Based on a visual inspection from the floor, do the cable/conduit                     Y[    NEI UE1 N/AE1 raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
All rigid electrical conduit is adequately anchoredto the overhead and the walls. Overheadpiping and ducts appearto be properly secured.
I If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 85 of 152 Sheet 2 of 4 Status: YZ   NEI] UL-Area Walk-By Checklist (AWC)             AWC-017 Location: Bldg. RAB             Floor El. 360         Room, Area   79 (Entire Room)
: 4. Does it appear that the area is free of potentially adverse seismic           Y-] NZ UE] N/A--]
spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Light above CV-1206 has an open S-hook. This hook must be closed to meet an IPEEE commitment. CR-ANO-1-2012-01613 initiated.
: 5. Does it appear that the area is free of potentially adverse seismic           YN N[-] uE] N/A[-]
interactions that could cause flooding or spray in the area?
The area appears to be free of potentially adverse seismic conditions that could cause flooding or spray in the area.
: 6. Does it appear that the area is free of potentially adverse seismic           YER NEI    UEI N/A[]
interactions that could cause a fire in the area?
The area appearsto be free of potentially adverse seismic interactions that could cause a fire in the area.
: 7. Does it appear that the area is free of potentially adverse seismic           Y'    NE] UE- N/A-I interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
The area appearsto be free of potentially adverse seismic interactions associatedwith housekeeping practices,storage of portable equipment, and temporaryinstallations.
 
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment D Rev. 0 Page 86 of 152 Sheet 3 of 4 Status: YN NEI    UD-Area Walk-By Checklist (AWC)             AWC- 017 Location: Bldg. RAB             Floor El. 360         Room, Area   79 (EntireRoom)
: 8. Have you looked for and found no other seismic conditions that could       YE N[l U" adversely affect the safety functions of the equipment in the area?
It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found.
Comments (Additional pages may be added as necessary)
The only finding was an open S-hook right above CV- 1206. The rest of the area is in appropriate condition.
The only finding was an open S-hook right above CV- 1206. The rest of the area is in appropriate condition.
Evaluated by: Genaro Barracan Jr. Date: 10/9/2012 Eric Dilbone 6e01 0/9/2012 Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 87 of 152 Sheet 4 of 4 Status: YZ NE] UFI-1 Area Walk-By Checklist (AWC) AWC- 017 Location:
Evaluated by: Genaro BarracanJr.                                                   Date: 10/9/2012 Eric Dilbone 6e01                                                           0/9/2012
Bldg. RAB Floor El. 360 Room, Area 79 (Entire Room)SWEL Components:
 
SWELl- 029 (CV-1220).
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 87 of 152 Sheet 4 of 4 Status: YZ NE]     UFI-1 Area Walk-By Checklist (AWC)     AWC- 017 Location: Bldg. RAB     Floor El. 360     Room, Area 79 (Entire Room)
042 (CV-1206).
SWEL Components: SWELl- 029 (CV-1220). 042 (CV-1206). 051 (SV-1818). 034 (1227)
051 (SV-1818).
Photographs Note: Liaht above CV-1206 has an open S-hook.
034 (1227)Photographs Note: Liaht above CV-1206 has an open S-hook.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 88 of 152 Sheet I of 7 Status: YZ N[I] U[--Area Walk-By Checklist (AWC) AWC- 018 Location:
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 88 of 152 Sheet I of 7 Status: YZ N[I] U[--
Bldg. INTAKE Floor El. 354 Room, Area' 241(Entire Room)BLDG SWEL Components:
Area Walk-By Checklist (AWC)               AWC- 018 Location: Bldg. INTAKE           Floor El. 354           Room, Area' 241(Entire Room)
SWELl- 040 (CV-3646)Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
BLDG SWEL Components: SWELl- 040 (CV-3646)
No adverse anchorage conditions were observed in the area YE N[-- u[-- N/AE-2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Minor corrosion was identified in the lower level on several components.
Additional space is provided at the end of this checklist for documenting other comments.
The conduits attached to the WEST wall (near the floor)had minor corrosion.
: 1. Does anchorage of equipment in the area appear to be free of                         YE N[-- u[-- N/AE-potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Also in the lower level, the anchorage for component HBD-14-H49 had signs of minor corrosion.
No adverse anchorageconditions were observed in the area
See images in Sheet 4.3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?YN NEI uEr N/AD'YN NEI UEr N/AD-No adverse seismic conditions were observed for cable/conduit raceways and HVAC.If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
: 2. Does anchorage of equipment in the area appear to be free of                         YN NEI uEr        N/AD' significant degraded conditions?
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Minor corrosion was identified in the lower level on several components. The conduits attachedto the WEST wall (nearthe floor) had minor corrosion. Also in the lower level, the anchoragefor component HBD-14-H49 had signs of minor corrosion.See images in Sheet 4.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 89 of 152 Sheet 2 of 7 Status: YZ NE] U-]Area Walk-By Checklist (AWC) AWC- 018 Location:
: 3. Based on a visual inspection from the floor, do the cable/conduit                   YN NEI UEr        N/AD-raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
Bldg. INTAKE Floor El. 354 Room, Area 241(Entire Room)BLDG 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
No adverse seismic conditions were observed for cable/conduit raceways and HVAC.
If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 89 of 152 Sheet 2 of 7 Status: YZ   NE] U-]
Area Walk-By Checklist (AWC)             AWC- 018 Location: Bldg. INTAKE         Floor El. 354           Room, Area 241(Entire Room)
BLDG
: 4. Does it appear that the area is free of potentially adverse seismic           YZ NE]I    UE  N/AE]
spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
There is no other equipment in the area that could cause potentially adverse seismic spatial interactions.
There is no other equipment in the area that could cause potentially adverse seismic spatial interactions.
: 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?Located in the intake structure.
: 5. Does it appear that the area is free of potentially adverse seismic           Y'    NEI  UE] N/AE--
Water is present below the structure and within components in the structure.
interactions that could cause flooding or spray in the area?
These do not represent credible sources.YZ NE]I UE N/AE]Y' NEI UE] N/AE--6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?Area heaters were observed to be approximately 6 ft above the slab.No sources of ignition were present YN NEI U[] N/AE]7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Located in the intake structure. Water is present below the structure and within components in the structure. These do not represent credible sources.
No conditions were observed YN NEI U[] N/AE[]
: 6. Does it appear that the area is free of potentially adverse seismic           YN NEI U[] N/AE]
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment D Rev. 0 Page 90 of 152 Sheet 3 of 7 Status: YZ NF UD Area Walk-By Checklist (AWC) AWC- 018 Location:
interactions that could cause a fire in the area?
Bldg. INTAKE Floor El. 354 Room, Area 241(Entire Room)BLDG 8. Have you looked for and found no other seismic conditions that could YZ NM UF-adversely affect the safety functions of the equipment in the area?No other seismic conditions were observed Comments (Additional pages may be added as necessary)
Area heaters were observed to be approximately 6 ft above the slab.
Two components in the lower level of the intake building were found to have minor issues with corrosion.
No sources of ignition were present
The anchorage for the conduit on the WEST wall near the floor was corroded.
: 7. Does it appear that the area is free of potentially adverse seismic           YN NEI U[] N/AE[]
Also, the anchorage for equipment item HBD-14-H49 had corrosion.
interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
The corroded anchorages for the conduit and equipment item HBD-14-H49 are believed to not be a current seismic concern.The light in the upper level of the intake building near P-4A service water pump contained an open S-hook.Evaluated by: Genaro Barraqan Jr. Date: 10/9/2012 Eric Dilbone 10/9/2012 Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 91 of 152 Sheet 4 of 7 Area Walk-By Checklist (AWC) AWC- 018 Status: YZ N[-] UM Location:
No conditions were observed
Bldg. INTAKE Floor El. 354 Room, Area 241(Entire Room)BLDG SWEL Components:
 
SWELl- 046 (CV-3646)Photographs Note: This image shows the conduits anchored to the WEST wall near the floor. It is evident through this image that there is a corrosion issue on this anchorage.
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment D Rev. 0 Page 90 of 152 Sheet 3 of 7 Status: YZ NF UD Area Walk-By Checklist (AWC)             AWC- 018 Location: Bldg. INTAKE           Floor El. 354           Room, Area   241(Entire Room)
This conduit is found in the lower level of the intake building.Note: The anchorage for component HBD-14-H49 had signs of corrosion.
BLDG
This item is found in the lower level of the intake building.
: 8. Have you looked for and found no other seismic conditions that could         YZ NM UF-adversely affect the safety functions of the equipment in the area?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 92 of 152 Sheet 5 of 7 Status: YEJ NM ULIM Area Walk-By Checklist (AWC) AWC- 018 Location:
No other seismic conditions were observed Comments (Additional pages may be added as necessary)
Bldg. INTAKE Floor El. 354 Room, Area 241(Entire Room)BLDG SWEL Components:
Two components in the lower level of the intake building were found to have minor issues with corrosion. The anchoragefor the conduit on the WEST wall near the floor was corroded.Also, the anchoragefor equipment item HBD-14-H49 had corrosion. The corrodedanchoragesfor the conduit and equipment item HBD-14-H49 are believed to not be a current seismic concern.
SWELl- 046 (CV-3646)Note: General image of the lower level. All other anchorage in the area was identified to be free of potentially adverse seismic conditions.
The light in the upper level of the intake building near P-4A service waterpump contained an open S-hook.
Note: General image of the lower level of the intake building.
Evaluated by: Genaro BarraqanJr.                                                     Date: 10/9/2012 Eric Dilbone                                                                 10/9/2012
Area was free of adverse seismic conditions associated with house-keeping practices.
 
Room was clean and well maintained.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 91 of 152 Sheet 4 of 7 Status: YZ N[-] UM Area Walk-By Checklist (AWC)           AWC- 018 Location: Bldg. INTAKE       Floor El. 354     Room, Area 241(Entire Room)
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 93 of 152 Sheet 6 of 7 Area Walk-By Checklist (AWC) AWC- 018 Status: YN NE[-I UL-Location:
BLDG SWEL Components: SWELl- 046 (CV-3646)
Bldg. INTAKE Floor El. 354 Room, Area 241(Entire Room)BLDG SWEL Components:
Photographs Note: This image shows the conduits               Note: The anchoragefor component anchoredto the WEST wall near the floor. It is     HBD-14-H49 had signs of corrosion. This item evident through this image that there is a         is found in the lower level of the intake corrosion issue on this anchorage. This conduit    building.
SWELl- 046 (CV-3646)7!Note: General image showing a crack in the grout pad. Item is found in upper level of the intake building, below P-4A service water pump. Ruled to not be a seismic concern.Note: General image showing a crack in a ceiling-wall intersection.
is found in the lower level of the intake building.
Found in the upper level near southwest wall. This crack does not pose any seismic concerns.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 94 of 152 Sheet 7 of 7 Area Walk-By Checklist (AWC) AWC-018 Status: YE NE] U[IZ Location:
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 92 of 152 Sheet 5 of 7 Status: YEJ NM     ULIM Area Walk-By Checklist (AWC)         AWC- 018 Location: Bldg. INTAKE       Floor El. 354     Room, Area 241(Entire Room)
Bldg. INTAKE Floor El. 354 Room, Area 241(Entire Room)BLDG SWEL Components:
BLDG SWEL Components: SWELl- 046 (CV-3646)
SWELl- 046 (CV-3646)Note: Image shows an open S-hook near the P-4A service water pump.Note: General image of the upper level of the intake building.
Note: General image of the lower level. All       Note: General image of the lower level of the other anchoragein the area was identified to      intake building. Area was free of adverse be free of potentially adverse seismic            seismic conditions associated with house-conditions.                                      keeping practices. Room was clean and well maintained.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 95 of 152 Status: YZ NE] UOi Sheet I of 5 Area Walk-By Checklist (AWC) AWC-019 Location:
 
Bldg. RAB Floor El. 335 Room, Area' 34 (Entire Room)SWEL Components:
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 93 of 152 Sheet 6 of 7 Status: YN NE[-I UL-Area Walk-By Checklist (AWC)         AWC- 018 Location: Bldg. INTAKE       Floor El. 354     Room, Area 241(Entire Room)
SWELl- 041 (CV-3850), 044 (CV-3851)Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
BLDG SWEL Components: SWELl- 046 (CV-3646) 7!
Note: General image showing a crack in the       Note: General image showing a crack in a grout pad. Item is found in upper level of the   ceiling-wall intersection. Found in the upper intake building, below P-4A service water         level near southwest wall. This crack does not pump. Ruled to not be a seismic concern.         pose any seismic concerns.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 94 of 152 Sheet 7 of 7 Status: YE NE]    U[IZ Area Walk-By Checklist (AWC)     AWC-018 Location: Bldg. INTAKE   Floor El. 354   Room, Area 241(Entire Room)
BLDG SWEL Components: SWELl- 046 (CV-3646)
Note: Image shows an open S-hook near the   Note: General image of the upper level of the P-4A service water pump.                    intake building.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 95 of 152 Sheet I of 5 Status: YZ NE]         UOi Area Walk-By Checklist (AWC)               AWC-019 Location: Bldg. RAB               Floor El. 335           Room, Area' 34 (EntireRoom)
SWEL Components: SWELl- 041 (CV-3850), 044 (CV-3851)
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
: 1. Does anchorage of equipment in the area appear to be free of                         YM NEI U[-1 N/AD--
potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Anchorage of equipment in the area appears to be free of potentially adverse seismic conditions.
Anchorage of equipment in the area appears to be free of potentially adverse seismic conditions.
YM NEI U[-1 N/AD--2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
: 2. Does anchorage of equipment in the area appear to be free of                         YZ NEI      Ur1 N/A[-]
Anchorage of equipment in the area appears to be free of significant degraded conditions.
significant degraded conditions?
YZ NEI Ur1 N/A[-]3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?YZ NEI UE1 N/ArI All rigid electrical conduit is adequately anchored to the overhead and the walls. Overhead piping and ducts appear to be properly secured.,If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
Anchorage of equipment in the area appearsto be free of significant degradedconditions.
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
: 3. Based on a visual inspection from the floor, do the cable/conduit                   YZ NEI UE1 N/ArI raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 96 of 152 Status: Y[ NEI LIU Sheet 2 of 5 Area Walk-By Checklist (AWC) AWC- 019 Location:
All rigid electrical conduit is adequatelyanchored to the overhead and the walls. Overheadpiping and ducts appearto be properly secured.
Bldg. RAB Floor El. 335 Room, Area 34 (Entire Room)4. Does it appear that the area is free of potentially adverse seismic YN N[D U[:I N/A[D]spatial interactions with other equipment ih the area (e.g., ceiling tiles and lighting)?
,If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
I There was a light near valve CV-3851 & CV-3050 (right around the corner-SOUTH) that was attached with zip-ties.
 
There was also a free rigid support on the ceiling, as well as a miscellaneous rod coming out of the ceiling (discovered near the entrance to room 34). Lighting appeared to have closed s-hooks in all observed cases.5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?The area appears to be free of potentially adverse seismic conditions that could cause flooding or spray in the area.YN NI I UD1 N/AD-1 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?The area appears to be free of potentially adverse seismic interactions that could cause a fire in the area.YZ NDI UD- N/AD']7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 96 of 152 Sheet 2 of 5 Status: Y[     NEI   LIU Area Walk-By Checklist (AWC)             AWC- 019 Location: Bldg. RAB             Floor El. 335         Room, Area 34 (Entire Room)
The area appears to be free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations.
: 4. Does it appear that the area is free of potentially adverse seismic           YN N[D U[:I N/A[D]
YZ NDl ULID N/AD--
spatial interactions with other equipment ih the area (e.g., ceiling tiles and lighting)?                             I There was a light near valve CV-3851 & CV-3050 (right around the corner-SOUTH) that was attached with zip-ties. There was also a free rigid support on the ceiling, as well as a miscellaneous rod coming out of the ceiling (discoverednear the entrance to room 34). Lighting appearedto have closed s-hooks in all observed cases.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 97 of 152 Sheet 3 of 5 Area Walk-By Checklist (AWC) AWC- 01'9 Status: YE]- N-- U-Location:
: 5. Does it appear that the area is free of potentially adverse seismic           YN NI      IUD1 N/AD-1 interactions that could cause flooding or spray in the area?
Bldg. RAB Floor El. 335 Room, Area 34 (Entire Room)8. Have you looked for and found no other seismic conditions that could Y[ NR U[adversely affect the safety functions of the equipment in the area?It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found.Comments (Additional pages may be added as pecessary)
The area appears to be free of potentially adverse seismic conditions that could cause flooding or spray in the area.
To summarize the findings in this room:* Light attached with zip-ties near SOUTH side of room.* Free rigid support hanging from ceiling See images below.Evaluated by: Genaro Barragan Jr. Date: 10/9/2012 Eric Dilbone 10/9/2012 Engineering Report No. CALC-ANO I-C S- 12-00002 Attachment D Rev. 0 Page 98 of 152 Sheet 4 of 5 Status: NEI u[--Area Walk-By Checklist (AWC) AWC- 019 Location:
: 6. Does it appear that the area is free of potentially adverse seismic           YZ NDI      UD- N/AD']
Bldg. RAB Floor El. 335 Room, Area 34 (Entire Room)SWEL Components:
interactions that could cause a fire in the area?
SWELl- 041 (CV-3850).
The area appearsto be free of potentially adverse seismic interactions that could cause a fire in the area.
044 (CV-3851)Photographs Note: This light near the SOUTH side of room was making contact with the insulation on the pipe shown.Note: Image shows the light that was supported with zip-ties near the SOUTH side of room 34.
: 7. Does it appear that the area is free of potentially adverse seismic           YZ NDl ULID N/AD--
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment D Rev. 0 Page 99 of 152 Status: YZ NE] UOF Sheet 5 of 5 Area Walk-By Checklist (AWC) AWC- 019_Location:
interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Bldg. RAB Floor El. 335 1 Room, Area 34 (Entire Room)SWEL Components:
The area appearsto be free of potentially adverse seismic interactions associatedwith housekeeping practices,storage of portable equipment, and temporary installations.
SWELl -041 (CV-3850).
 
044 (CV-3851)Note: Light above 2F-295 S-hook.Note: Image shows the free rigid support hanging from the ceiling. Although this is not a seismic hazard, it is not supporting any equipment.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 97 of 152 Sheet 3 of 5 Status: YE]- N-- U-Area Walk-By Checklist (AWC)             AWC- 01'9 Location: Bldg. RAB             Floor El. 335         Room, Area 34 (EntireRoom)
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment D Rev. 0 Page 100 of 152 Sheet 1 of 5 Area Walk-By Checklist (AWC) AWC- 020 Status: YM NF U-Location:
: 8. Have you looked for and found no other seismic conditions that could       Y[   NR U[
Bldg. RAB Floor El. 386 Room, Area, 258 SWEL Components:
adversely affect the safety functions of the equipment in the area?
SWELl -052 (VEF-24 A)Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found.
No adverse seismic conditions were observed.YN NEI UD-- N/A[-1 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
Comments (Additional pages may be added as pecessary)
Mild cracks and spalling concrete was observed at the opening around the exhaust pipe. This is judged not to be an adverse seismic condition as the conditions are minor.3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?Y' NEI UD-- N/AD--YZ ND-- UD- N/AD-Conduits appear to be adequately supported.
To summarize the findings in this room:
Steel supports for grating above appear to be in good condition.
* Light attached with zip-ties near SOUTH side of room.
'If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
* Free rigid support hanging from ceiling See images below.
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Evaluated by: Genaro Barragan Jr.                                                 Date: 10/9/2012 Eric Dilbone                                                               10/9/2012
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 101 of 152 Status: YZ NFD Ur--Sheet 2 of 5 Area Walk-By Checklist (AWC) AWC- 020 Location:
 
Bldg. RAB Floor El. 386 Room, Area 258 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Engineering Report No. CALC-ANO I-C S-12-00002 Attachment D Rev. 0 Page 98 of 152 Sheet 4 of 5 Status: Y[* NEI   u[--
No adverse seismic spatial interactions were observed.5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?No source of flooding was observed.
Area Walk-By Checklist (AWC)         AWC- 019 Location: Bldg. RAB         Floor El. 335     Room, Area 34 (Entire Room)
A floor drain was observed in the vicinity.6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?No credible sources of fire located within the area.7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
SWEL Components: SWELl- 041 (CV-3850). 044 (CV-3851)
No adverse seismic interactions associated with temporary installations were identified.
Photographs Note: This light near the SOUTH side of room     Note: Image shows the light that was was making contact with the insulationon the    supported with zip-ties near the SOUTH side of pipe shown.                                      room 34.
YZ NEI UM N/A[--YE N[I U[-] N/AD-YZ NEI uMI N/A[-D Y" NEI Ur1 N/A-1 Engineering Report No. CALC-ANOI-CS-12-00002 Attachment D Rev. 0 Page 102 of 152 Sheet 3 of 5 Status: YZ NF UW Area Walk-By Checklist (AWC) AWC- 020 Location:
 
Bldg. RAB Floor El. 386 Room, Area 258 8. Have you looked for and found no other seismic conditions that could YZ NW- UW-adversely affect the safety functions of the equipment in the area?No other adverse seismic conditions were observed.Comments (Additional pages may be added as necessary)
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment D Rev. 0 Page 99 of 152 Sheet 5 of 5 Status: YZ NE]     UOF Area Walk-By Checklist (AWC)       AWC- 019_
Evaluated by: Daniel Andoh & _ &#xfd;&#xfd; a Date: 10/10/2012 Genaro Barracan Jr. 10/10/2012 Engineering Report No. CALC-ANO1 -CS- 12-00002 Attachment D Rev. 0 Page 103 of 152 Sheet 4 of 5 Status: YZ NR U--Area Walk-By Checklist (AWC) AWC- 020 Location:
Location: Bldg. RAB       Floor El. 335   1 Room, Area 34 (Entire Room)
Bldg. RAB Floor El. 386 Room, Area 258 SWEL Components:
SWEL Components: SWELl - 041 (CV-3850). 044 (CV-3851)
SWELl- 052 (VEF-24A)Photographs Note: Concrete spalling onto floor from deteriorated conditions at penetration above.Note: Flame arrestor with oil spray marks on wall.
Note: Light above 2F-295 S-hook.               Note: Image shows the free rigid support hanging from the ceiling. Although this is not a seismic hazard,it is not supporting any equipment.
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment D Rev. 0 Page 104 of 152 Status: YE NEI UO Sheet 5 of 5 Area Walk-By Checklist (AWC) AWC- 020_Location:
 
Bldg. RAB Floor El. 386 -Room, Area 258 SWEL Components:
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment D Rev. 0 Page 100 of 152 Sheet 1 of 5 Status: YM NF U-Area Walk-By Checklist (AWC)               AWC- 020 Location: Bldg. RAB               Floor El. 386           Room, Area, 258 SWEL Components: SWELl - 052 (VEF-24 A)
SWEI-l- 052 (VEF-24A)7 Note: Grating support.Note: Floor drain.
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 105 of 152 Status: YZ NEI UOF Sheet 1 of 4 Area Walk-By Checklist (AWC) AWC- 021 Location:
Additional space is provided at the end of this checklist for documenting other comments.
Bldg. RAB Floor El. 372 Room, Area' 95 SWEL Components:
: 1. Does anchorage of equipment in the area appear to be free of                       YN NEI      UD-- N/A[-1 potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
SWELl- 059 (RA-2)Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
No adverse seismic conditions were observed.
: 2. Does anchorage of equipment in the area appear to be free of                       Y'    NEI UD-- N/AD--
significant degraded conditions?
Mild cracks and spalling concrete was observed at the opening around the exhaust pipe. This is judged not to be an adverse seismic condition as the conditions are minor.
: 3. Based on a visual inspection from the floor, do the cable/conduit                   YZ ND-- UD- N/AD-raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
Conduits appearto be adequately supported. Steel supports for grating above appearto be in good condition.
'If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 101 of 152 Sheet 2 of 5 Status: YZ NFD Ur--
Area Walk-By Checklist (AWC)             AWC- 020 Location: Bldg. RAB             Floor El. 386         Room, Area 258
: 4. Does it appear that the area is free of potentially adverse seismic           YZ NEI UM N/A[--
spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
No adverse seismic spatial interactionswere observed.
: 5. Does it appear that the area is free of potentially adverse seismic           YE N[I      U[-] N/AD-interactions that could cause flooding or spray in the area?
No source of flooding was observed. A floor drain was observed in the vicinity.
YZ NEI uMI      N/A[-D
: 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
No credible sources of fire located within the area.
: 7. Does it appear that the area is free of potentially adverse seismic           Y"  NEI  Ur1 N/A-1 interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
No adverse seismic interactionsassociated with temporary installations were identified.
 
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment D Rev. 0 Page 102 of 152 Sheet 3 of 5 Status: YZ NF UW Area Walk-By Checklist (AWC)             AWC- 020 Location: Bldg. RAB           Floor El. 386           Room, Area 258
: 8. Have you looked for and found no other seismic conditions that could       YZ NW-     UW-adversely affect the safety functions of the equipment in the area?
No other adverse seismic conditions were observed.
Comments (Additional pages may be added as necessary)
Evaluated by: DanielAndoh &         _ &#xfd;&#xfd;   a                                       Date: 10/10/2012 Genaro BarracanJr.                                                           10/10/2012
 
Engineering Report No. CALC-ANO1 -CS- 12-00002 Attachment D Rev. 0 Page 103 of 152 Sheet 4 of 5 Status: YZ NR U--
Area Walk-By Checklist (AWC)         AWC- 020 Location: Bldg. RAB         Floor El. 386     Room, Area 258 SWEL Components: SWELl- 052 (VEF-24A)
Photographs Note: Concrete spalling onto floor from         Note: Flame arrestorwith oil spray marks on deterioratedconditions at penetration above. wall.
 
Engineering Report No. CALC-ANO1-CS-12-00002 Attachment D Rev. 0 Page 104 of 152 Sheet 5 of 5 Status: YE NEI     UO Area Walk-By Checklist (AWC)     AWC- 020_
Location: Bldg. RAB     Floor El. 386 -   Room, Area 258 SWEL Components: SWEI-l- 052 (VEF-24A) 7 Note: Gratingsupport.                         Note: Floordrain.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 105 of 152 Sheet 1 of 4 Status: YZ NEI UOF Area Walk-By Checklist (AWC)               AWC- 021 Location: Bldg. RAB               Floor El. 372             Room, Area' 95 SWEL Components: SWELl- 059 (RA-2)
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
: 1. Does anchorage of equipment in the area appear to be free of                         '([    NEi  UL- N/ADl potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Anchorage of equipment in the area appears to be free of potentially adverse seismic conditions.
Anchorage of equipment in the area appears to be free of potentially adverse seismic conditions.
: 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
: 2. Does anchorage of equipment in the area appear to be free of                        YZ NEI U[-D N/AD-significant degraded conditions?
Anchorage of equipment in the area appears to be free of significant degraded conditions.
Anchorage of equipment in the areaappears to be free of significant degraded conditions.
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?All rigid electrical conduit is adequately anchored to the overhead and the walls. Overhead piping and ducts appear to be properly secured.'([ NEi UL- N/ADl YZ NEI U[-D N/AD-YZ NEI U[- N/AD--1 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
: 3. Based on a visual inspection from the floor, do the cable/conduit                    YZ NEI U[- N/AD--
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 106 of 152 Status: Y ] N--I Ul--Sheet 2 of 4 Area Walk-By Checklist (AWC) AWC-
All rigid electricalconduit is adequately anchored to the overhead and the walls. Overheadpiping and ducts appearto be properlysecured.
1 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 106 of 152 Sheet 2 of 4 Status: Y ] N--I Ul--
Area Walk-By Checklist (AWC)              AWC- 021 Location: Bldg. RAB              Floor El. 372          Room, Area 95
: 4. Does it appear that the area is free of potentially adverse seismic          YZ NE] U[-' N/A[l spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
There were no ceiling tiles in the room, and lighting is supported with chains and closed S-hooks.
: 5. Does it appear that the area is free of potentially adverse seismic          Y"    NEI U[-  N/AZ-interactions that could cause flooding or spray in the area?
It was observed that there was a room cooler mounted overhead in the room. The room cooler has chilled water running through it, and contains a drip pan and drain line to a floor drain.
: 6. Does it appear that the area is free of potentially adverse
Operability Review: This condition report describes a condition of an SSC that is not within the scope of the Operability Determination Process. An Operability Determination is NOT REQUIRED for the stated condition.
Operability Review: This condition report describes a condition of an SSC that is not within the scope of the Operability Determination Process. An Operability Determination is NOT REQUIRED for the stated condition.
N/A SWC- During Fukushima Seismic walkdowns, an S- Condition entered Initial Action: CR-ANO-1-2012-01613 initiated and WR-286917 initiated CR-ANO-1-2012-01613 SWELl-040 hook supporting an overhead light fixture was directly into CAP closed.identified to be open over CV-3646 in the Engineering Report No. CALC-ANO I -CS- 12-00002 Attachment E Rev. 0 Page 3 of 3 Table 1 -Potentially Adverse Seismic Conditions Intake Structure, EL 354, Room 241. CR Action: WR-286917 initiated WR-286917 initiated Operability Review: The condition was reviewed by the CR process and it was determined that uplifting forces under DBE conditions would be less than the dead load of the fixture. Therefore, all identified safety related equipment remains operable.N/A AWC-015 During Fukushima Seismic walkdowns, an S- Condition entered Initial Action: CR-ANO-1-2012-01613 initiated and WR-286917 initiated CR-ANO-1-2012-01613 hook supporting an overhead light fixture was directly into CAP closed.identified to be open over 1A3-1 101 next to GCH-43 in the Aux Bldg, EL 354, Room 63. CR Action: WR-286917 initiated WR-286917 initiated Operability Review: The condition was reviewed by the CR process and it was determined that uplifting forces under DBE conditions would be less than the dead load of the fixture. Therefore, all identified safety related equipment remains operable.N/A AWC-015 During Fukushima Seismic walkdowns, an S- Condition entered Initial Action: CR-ANO-1-2012-01613 initiated and WR-286917 initiated CR-ANO-1-2012-01613 hook supporting an overhead light fixture was directly into CAP closed.identified to be open over Cl 15 in the Aux Bldg, EL 354, Room 63. CR Action: WR-286917 initiated WR-28691 7 initiated Operability Review: The condition was reviewed by the CR process and it was determined that uplifting forces under DBE conditions would be less than the dead load of the fixture. Therefore, all identified safety related equipment remains operable.N/A AWC-017 During Fukushima Seismic walkdowns, an S- Condition entered Initial Action: CR-ANO-1-2012-01613 initiated and WR-286917 initiated CR-ANO-1-2012-01613 hook supporting an overhead light fixture was directly into CAP closed.identified to be open over CV-1206 in the Aux CR Action: WR-286917 initiated Bldg, EL 360, Room 79. WR-286917 initiated Operability Review: The condition was reviewed by the CR process and it was determined that uplifting forces under DBE conditions would be less than the dead load of the fixture. Therefore, all identified safety related equipment remains operable.N/A AWC-013 During Fukushima Seismic walkdowns, a Condition entered Initial Action: CR-ANO-1-2012-01611 initiated and WR-289091 initiated CR-ANO-1-2012-01611 steel support for PI-3812A is missing an directly into CAP closed.anchor bolt into the concrete watl in Room 46, Elevation 335 in the Aux Building.
N/A     SWC-         During Fukushima Seismic walkdowns, an S-     Condition entered Initial Action: CR-ANO-1-2012-01613 initiated and WR-286917 initiated                                                       CR-ANO-1-2012-01613 SWELl-040   hook supporting an overhead light fixture was directly into CAP                                                                                                                             closed.
CR Action: WR-289091 initiatedinitiated Operability Review: The condition was reviewed by the CR process and it was determined that PI-3812A is isolated from the Service Water System by normally closed isolation valve SW-3812A.
identified to be open over CV-3646 in the
SW-3812A is maintained in the closed position.
 
Therefore, the integrity of the Service Water System boundary is maintained.
Engineering Report No. CALC-ANO I -CS- 12-00002 Attachment E Rev. 0 Page 3 of 3 Table 1 - Potentially Adverse Seismic Conditions Intake Structure, EL 354, Room 241.                             CR Action: WR-286917 initiated WR-286917 initiated Operability Review: The condition was reviewed by the CR process and it was determined that uplifting forces under DBE conditions would be less than the dead load of the fixture. Therefore, all identified safety related equipment remains operable.
Therefore, the Service Water System and the Emergency Cooling Pond remain Operable.Prepared by: Reviewed by: Sean Smolarek Eric Dilbone Date: 11/15/2012 Date: 11/15/2012 Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment F Rev. 0 Page 1 of 1 Attachment F Licensing Basis Evaluation Forms (NOT USED)
N/A     AWC-015     During Fukushima Seismic walkdowns, an S-     Condition entered   Initial Action: CR-ANO-1-2012-01613 initiated and WR-286917 initiated                                                     CR-ANO-1-2012-01613 hook supporting an overhead light fixture was directly into CAP                                                                                                                             closed.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment G Rev. 0 Page 1 of 4 Attachment G Peer Review Checklist for SWIEL Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment G Rev. 0 Page 2 of 4 Peer Review Checklist for SWEL Instructions for Completing Checklist This peer review checklist may be used to document the review of the Seismic Walkdown Equipment List (SWEL) in accordance with Section 6: Peer Review. The space below each question in this checklist should be used to describe any findings identified during the peer review process and how the SWEL may have changed to address those findings.
identified to be open over 1A3-1 101 next to GCH-43 in the Aux Bldg, EL 354, Room 63.                         CR Action: WR-286917 initiated                                                                                             WR-286917 initiated Operability Review: The condition was reviewed by the CR process and it was determined that uplifting forces under DBE conditions would be less than the dead load of the fixture. Therefore, all identified safety related equipment remains operable.
Additional space is provided at the end of this checklist for documenting other comments.1. Were the five safety functions adequately represented in the SWEL 1 selection?
N/A     AWC-015     During Fukushima Seismic walkdowns, an S-     Condition entered Initial Action: CR-ANO-1-2012-01613 initiated and WR-286917 initiated                                                     CR-ANO-1-2012-01613 hook supporting an overhead light fixture was directly into CAP                                                                                                                             closed.
YO N--]The SWEL1 contains components which address all five safety functions.
identified to be open over Cl 15 in the Aux Bldg, EL 354, Room 63.                                           CR Action: WR-286917 initiated WR-28691 7 initiated Operability Review: The condition was reviewed by the CR process and it was determined that uplifting forces under DBE conditions would be less than the dead load of the fixture. Therefore, all identified safety related equipment remains operable.
Many components provide safety functions for multiple systems, and/or are part of frontline support systems. All five safety functions discussed in EPRI Report 1025286 are well represented in the SWEL.2. Does SWEL 1 include an appropriate representation of items having the following sample selection attributes:
N/A     AWC-017     During Fukushima Seismic walkdowns, an S-     Condition entered Initial Action: CR-ANO-1-2012-01613 initiated and WR-286917 initiated                                                     CR-ANO-1-2012-01613 hook supporting an overhead light fixture was directly into CAP                                                                                                                             closed.
: a. Various types of systems? YO NEI Items included on the SWEL comprise a variety of ESF systems such as Emergency Diesel Generators and Auxiliaries, Service Water System, Component Cooling Water System, Residual Heat Removal System, and vital electrical systems.b. Major new and replacement equipment?
identified to be open over CV-1206 in the Aux                   CR Action: WR-286917 initiated Bldg, EL 360, Room 79.                                                                                                                                                                     WR-286917 initiated Operability Review: The condition was reviewed by the CR process and it was determined that uplifting forces under DBE conditions would be less than the dead load of the fixture. Therefore, all identified safety related equipment remains operable.
Y[[ NZ Based on input from plant personnel and EC searches, equipment selection personnel identified no "major" changes to safety-related equipment and components made to the plant in the past 15 years.c. Various types of equipment?
N/A     AWC-013     During Fukushima Seismic walkdowns, a         Condition entered Initial Action: CR-ANO-1-2012-01611 initiated and WR-289091 initiated                                                     CR-ANO-1-2012-01611 steel support for PI-3812A is missing an     directly into CAP                                                                                                                             closed.
Y[ NLI SWEL 1 includes at least one example of each of the 21 classes of equipment, except class 3 and 6. Two class 3 components were contained on Base List 1;however, both were energized 4160 KV switchgear and access was not recommended for safety reasons. As such, no class 3 components were suitable for inclusion in the SWEL. Class 6 was also minimally represent on Base List I and inaccessible.
anchor bolt into the concrete watl in Room 46, Elevation 335 in the Aux Building.                           CR Action: WR-289091 initiatedinitiated Operability Review: The condition was reviewed by the CR process and it was determined that PI-3812A is isolated from the Service Water System by normally closed isolation valve SW-3812A. SW-3812A is maintained in the closed position. Therefore, the integrity of the Service Water System boundary is maintained. Therefore, the Service Water System and the Emergency Cooling Pond remain Operable.
Note also that several classes (11 and 12) are not on Base List 1. As such, they are also not represented on the SWEL 1. All of the other equipment classes are well represented.
Prepared by:                                                                                                                                                             Date:             11/15/2012 Sean Smolarek Reviewed by:                                                                                                                                                              Date:             11/15/2012 Eric Dilbone
: d. Various environments?
 
Y[ NF-1 The SWEL contains components in mild, harsh, and outdoor environments.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment F Rev. 0 Page 1 of 1 Attachment F Licensing Basis Evaluation Forms (NOT USED)
The components are located in different buildings, rooms, and/or on different builidng elevations.
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment G Rev. 0 Page 3 of 4 Peer Review Checklist for SWEL e. Equipment enhanced based on the findings of the IPEEE (or equivalent) program? YO NEI The SWEL includes components that were identified during the IPEEE as being potentially vulnerable to a seismic event. A sample of these components are included in the SWEL 1.f. Were risk insights considered in the development of SWEL 1? YZ NEI SWEL I includes high risk components based on risk significance in the plant probabilistic risk assessment (PRA) models.3. For SWEL 2: a. Were spent fuel pool related items considered, and if applicable included in YZI NEI SWEL 2?The walkdown team identified only a small population of SFP components that are Seismic Category I. These components are included on SWEL 2.b. Was an appropriate justification documented for spent fuel pool related items not YE NE!included in SWEL 2?There were no components that could contribute to rapid SFP draindown that were identified.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment G Rev. 0 Page 1 of 4 Attachment G Peer Review Checklist for SWIEL
There are no penetrations in the SFP wall below 10 ft above the top of the fuel assemblies, and all piping that communicate with the pool was installed along the refuel floor the top of the pool and then turns down into the pool 4. Provide any other comments related to the peer review of the SWELs.The peer review team reviewed the initial SWEL 1 and SWEL 2, and provided comments and suggestions for modification of the SWEL. Comments included suggestions to remove equipment mounted to panels and cabinets because they are qualified as a whole (ie; handswtiches), and to include the Letdown heat exchangers.
 
The peer reviewers ensured the SWELs met the requirements of EPRI Report 1025286.Required changes to the SWEL necessary during the walkdown due to inaccessibility were reviewed by the peer reviewers to verify that the changes did not impact the level of compliance to the EPRI report.5. Have all peer review comments been adequately addressed in the final SWEL? YN NE!
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment G Rev. 0 Page 2 of 4 Peer Review Checklist for SWEL Instructions for Completing Checklist This peer review checklist may be used to document the review of the Seismic Walkdown Equipment List (SWEL) in accordance with Section 6: Peer Review. The space below each question in this checklist should be used to describe any findings identified during the peer review process and how the SWEL may have changed to address those findings. Additional space is provided at the end of this checklist for documenting other comments.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment G Rev. 0 Page 4 of 4 Peer Review Checklist for SWEL Peer Reviewer #1: Frank Cobb K2LZ- K&-Z Date: 10/22/2012 A Peer Reviewer #2: Rodney Carter Date: 10/29/2012 Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment H Rev. 0 Page 1 of 6 Attachment H Peer Review Comment Form Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment H Rev. 0 Page 2 of 6 Seismic Walkdown Submittal Report-"Entergy Review Comments and Resolutions Form Engineering CALC-ANOI-CS-12-00002 Rev. 0 Title Report Number ANO-1 Seismic Walkdown Report -SWCs and AWCs Quality Related: E] Yes Z No Special Notes or Instructions:
: 1. Were the five safety functions adequately represented in the SWEL 1 selection?                     YO N--]
Comment Section/Page No. Review Comment Response/Resolution Reviewer's Number Accept Initials General, Several of the SWCs reviewed note mild surface Explicit statements included for these BDK SWC+AWC oxidation or other minor condition observations where situations.
The SWEL1 contains components which address all five safety functions. Many components provide safety functions for multiple systems, and/or are part of frontline support systems. All five safety functions discussed in EPRI Report 1025286 are well representedin the SWEL.
CRs generated are noted on the question has been marked "Y". In these situations, the SWCs and AWCs, regardless of the SWC should also include an explicit judgment from whether it represents a seismic condition the SWEs stating that the observation is not a seismic or not.concern. Where these seismically unrelated observations require correction, it would be useful to also include the CR number generated even if not reported as a seismic concern in the NTTF 2.3: Seismic program.General, Where potential conditions are identified, it would be CRs and WRs written have been BDK SWC+AWC highly beneficial to include CR numbers generated (as included in all SWCs and AWCs.available).
: 2. Does SWEL 1 include an appropriate representation of items having the following sample selection attributes:
This assists with cross-referencing.
: a. Various types of systems?                                                                     YO NEI Items included on the SWEL comprise a variety of ESF systems such as Emergency Diesel Generatorsand Auxiliaries, Service Water System, Component Cooling Water System, Residual Heat Removal System, and vital electricalsystems.
General, Anytime "N/A is marked, a brief explanation/justification All N/A items now have an explanation of BDK SWC+AWC should be provided. (For line-mounted items with why it has been marked that way.common justification for anchorage questions, can be provided once on SWC). This includes anchorage, flexibility of lines, etc.General, Generally, consistency between the justification text, The checklists have been cleaned up BDK SWC+AWC question responses, and CRs initiated should be from hand-written notes, and the final improved, copies have improved consistency.
: b. Major new and replacement equipment?                                                           Y[[ NZ Based on input from plantpersonnel and EC searches, equipment selection personnel identified no "major"changes to safety-related equipment and components made to the plant in the past 15 years.
General, Additional detail regarding observed block walls should Identified block walls are seismically BDK SWC+AWC be included on the checklists to confirm they were designed, and are noted on the considered appropriately, checklists where relevant.General, The initial sample of checklists reviewed has not Seismic interaction concerns such as the BDK SWC+AWC identified potentially adverse seismic conditions related examples described in the EPRI to interaction.
: c. Various types of equipment?                                                                   Y[   NLI SWEL 1 includes at least one example of each of the 21 classes of equipment, except class 3 and 6. Two class 3 components were containedon Base List 1; however, both were energized 4160 KV switchgearand access was not recommended for safety reasons. As such, no class 3 components were suitable for inclusion in the SWEL. Class 6 was also minimally represent on Base List I and inaccessible. Note also that several classes (11 and 12) are not on Base List 1. As such, they are also not representedon the SWEL 1. All of the other equipment classes are well represented.
Please confirm that seismic interaction Guidance and in EPRI SWE training Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment H Rev. 0 Page 3 of 6 concerns are considered during walkdowns and area were being considered during walk-bys.
: d. Various environments?                                                                         Y[   NF-1 The SWEL contains components in mild, harsh, and outdoor environments. The components are located in different buildings, rooms, and/oron different builidng elevations.
walkdowns and area walk-bys.
 
Peer review confirmed this during observation walkdowns.
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment G Rev. 0 Page 3 of 4 Peer Review Checklist for SWEL
Expanded sample of checklists included examples where seismic interaction concerns were noted, where appropriate.
: e. Equipment enhanced based on the findings of the IPEEE (or equivalent) program?                 YO NEI The SWEL includes components that were identified during the IPEEE as being potentially vulnerable to a seismic event. A sample of these components are included in the SWEL 1.
General, For items requiring anchorage configuration verification, All walkdowns where an anchorage BDK SWC it is useful to note the document #s used for comparison configuration verification check is with the configuration observed in the field. performed now includes basis document numbers.General, Please confirm that all cabinet/panel doors were opened Confirmed.
: f. Were risk insights considered in the development of SWEL 1?                                   YZ NEI SWEL I includes high risk components based on risk significancein the plant probabilisticrisk assessment (PRA) models.
Additional clarification is now BDK SWC (i.e., MCC cubicles).
: 3. For SWEL 2:
If not, the SWC should include included on SWC forms where useful.justification for how the goals of the inspection are still being met without opening the cabinet (see supplemental NRC FAQ dated 9-18-12), or should be marked as incomplete pending deferral to when the cabinets will be able to be opened (i.e., outagle).General, Additional clarification is recommended to explain what General description of how non- BDK SWC the anchorage question responses mean for in-line anchored components were treated is components that have no formal anchorage.
: a. Were spent fuel pool related items considered, and if applicable included in                   YZI NEI SWEL 2?
included in the body of the report.General, It would be useful to indicate the equipment class Equipment class names are on each BDK SWC name/description on the SWCs, not just the number. SWC.General, Several SWEL items appear to be described using Corrections made to SWCs, Base List 1, BDK SWC incorrect/inappropriate equipment class designations.
The walkdown team identified only a small population of SFP components that are Seismic Category I. These components are included on SWEL 2.
and SWEL 1. Each SWC includes the Please revisit the classes assigned and correct where proper equipment class.necessary.
: b. Was an appropriate justification documented for spent fuel pool related items not             YE NE!
I General, Several of the AWCs reviewed were somewhat unclear Where an area considered was less than BDK AWC about what "Area" around the SWEL item(s) is the entire room, a brief description has considered.
included in SWEL 2?
Recall that an acceptable "Area" is an been included on the AWC.approximate 35' radius from the SWEL item. Consider including a more general photo of the area and/or include brief statement of area considered (i.e., if entire room looked at, say so).
There were no components that could contribute to rapid SFP draindown that were identified. There are no penetrationsin the SFP wall below 10 ft above the top of the fuel assemblies, and all piping that communicate with the pool was installed along the refuel floor the top of the pool and then turns down into the pool
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment H Rev. 0 Page 4 of 6 General, Include a photo on the AWC of each seismic condition Photos are included wherever conditions BDK AWC identified during that area walk-by. were identified, as well as a general photo of the area in most cases.General, Need to discuss why the block wall will remain stable Additional information is provided on PAM SWC+AWC during a seismic event block walls. Note that ANO has painted all of their seismically qualified block walls with a blue stripe.General, List the anchorage dwgs in the SWC if a configuration Drawings/calculations/plant PAM SWC verification is performed documentation is now referenced in all SWCs where an anchorage configuration verification is performed.
: 4. Provide any other comments related to the peer review of the SWELs.
General, Must justify that minor corrosion/surface oxidation does Added a statement justifying any noted PAM SWC+AWC not adversely impact seismic qualification, mild corrosion or surface oxidation.
The peer review team reviewed the initial SWEL 1 and SWEL 2, and provided comments and suggestions for modification of the SWEL. Comments included suggestions to remove equipment mounted to panels and cabinets because they are qualifiedas a whole (ie; handswtiches), and to include the Letdown heat exchangers.
Reviewed By: Paul A. Miktus Date 10/11/12 Site/Department:
The peer reviewers ensured the SWELs met the requirementsof EPRI Report 1025286.
ENERCON/PM Ph. 770-792-6972 Reviewed By: Benjamin D. Kosbab Date 10/11/12 Resolved By: Sean Smolarek Site/Department:
Required changes to the SWEL necessary during the walkdown due to inaccessibilitywere reviewed by the peer reviewers to verify that the changes did not impact the level of compliance to the EPRI report.
ENERCON/Civil Ph. 770-590-2179 Date: 10/25/2012 Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment H Rev. 0 Page 5 of 6 I nt Seismic Walkdown Submittal Report Review Comments and Resolutions Form Engineering CALC-ANOI-CS-12-00002 Rev. 0 Title: ANO-1 Fukushima Seismic -SWC & AWC Review Report Number II Quality Related: E] Yes Z No Special Notes or Instructions:
: 5. Have all peer review comments been adequately addressed in the final SWEL?                         YN NE!
Comment Section/Page Review Comment Response/Resolution Reviewer's Number No. SWELl COMMENTS Accept Initials 1 SWELl Remove Hand Switches from SWEL as the mounting will Removed Hand Switches FC likely not be visible (even with the cabinet opened) and the switches will be evaluated with the panel as a whole 2 SWELl Ensure any items identified to be inaccessible on A preliminary walkdown was performed FC/RC preliminary walkdowns are swapped out with equivalent to identify any inaccessible items or items (class, environment, etc) components.
 
These items were swapped out by Equipment Selection Personnel and sent back to the SWEL peer reviewer for concurrence.
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment G Rev. 0 Page 4 of 4 Peer Review Checklist for SWEL Peer Reviewer #1: Frank Cobb K2LZ- K&-Z                 Date: 10/22/2012 A
3 SWELl Verify each class of component is adequately represented.
Peer Reviewer #2: Rodney Carter                           Date: 10/29/2012
It appears a few do not show up in the SWEL.Two class 3 components were contained on Base List 1; however, both were energized 4160 KV switchgear and access was not recommended for safety reasons. As such, no class 3 components were suitable for inclusion in the SWEL.Class 6 was also minimally represented on Base List 1 and inaccessible.
 
Note also that several classes (11 and 12) are not on Base List 1. As such, they are also not represented on the SWELl.FC/RC SWELl Are there any major new or replacement components Plant personnel as well as the electronic FC included?
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment H Rev. 0 Page 1 of 6 Attachment H Peer Review Comment Form
database were consulted to find new and replacement items. Many items were identified on the SWEL to be new or have been replaced since the IPEEE report.However, the Guidance defines the new and replacement classification as "major",
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment H Rev. 0 Page 6 of 6 of which none of the components fit.5 SWELl Suggest expanding representation of equipment class 21 Decay Heat coolers were added. FC with some of the major heat removal equipment (i.e., heat Letdown Heat Exchanger was not added exchangers).
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment H Rev. 0 Page 2 of 6 Seismic Walkdown Submittal Report
at the request of RP -this heat exchanger is in a significant dose area.SWEL 2 COMMENTS 6 SWEL2 Verify Safety Classification of SFP Cooling System Per the Upper Level Document on the FC Spent Fuel Pool, The SFP Cooling System is Non-Safety and Non-Seismic.
    -"Entergy                                                   Review Comments and Resolutions Form Engineering       CALC-ANOI-CS-12-00002                       Rev. 0   Title Report Number                                                           ANO-1 Seismic Walkdown Report - SWCs and AWCs Quality Related: E] Yes     Z No                               Special Notes or Instructions:
Safety-related service water to SFP connection valve is included on SWEL 2.Reviewed By: Rodney Carter/Frank Cobb Date 10/24/12 Resolved By: I Sean Smolarek Site/Department:
Comment     Section/Page No. Review Comment                                             Response/Resolution                         Reviewer's Number                                                                                                                                 Accept Initials General,           Several of the SWCs reviewed note mild surface             Explicit statements included for these           BDK SWC+AWC           oxidation or other minor condition observations where       situations. CRs generated are noted on the question has been marked "Y". In these situations,     the SWCs and AWCs, regardless of the SWC should also include an explicit judgment from       whether it represents a seismic condition the SWEs stating that the observation is not a seismic     or not.
OPS/Mech Date: 10/25/12 Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment I Rev. 0 Page 1 of 19 Attachment I Seismic Walkdown Engineering Training Certificates Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment I Rev. 0 Page 2 of 19 Seismic Walkdown Engineers Sean Smolarek Eric Dilbone.Daniel Andoh Roy Berryman Genaro Barragan Michael Perez Daniel Parker Chris Johnson Ojaswi Shrestha Engineenng Report No CALC-ANO 1-CS- 12-00002 E n i e r na e o t N A tt ach n ien t I* Rev. 0~ 4 '~ 11 &#xfd;Pge 3of 19*E. N, E,.Excellence-Every project. Every day.Certificate-of Completion is hereby granted to Sean. Srnoiark for. successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 23.PLANT SEISMIC WALKDOWNS August 22, 2012 -Kennesaw, GA " "7"5J/' A:/" Date -Location Kursat Kinali, PhD P.E.EPRI Certified Seismic Walkdown Engineer Alexandria.
concern. Where these seismically unrelated observations require correction, it would be useful to also include the CR number generated even if not reported as a seismic concern in the NTTF 2.3: Seismic program.
VA -7/27/2012:
General,           Where potential conditions are identified, it would be     CRs and WRs written have been                   BDK SWC+AWC           highly beneficial to include CR numbers generated (as       included in all SWCs and AWCs.
Engineering Report No. CALC-ANO 1 -CS- 12-00002 Attachment I Rev. 0 Page 4 of 19 NE ERCO N Excellence-Every project. Every doy.Certificate of Completion is hereby granted to Eric Dilbone for successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 2.3 PLANT SEISMIC WALKDOWNS Awarded: 7/11/2012 in Kennesaw, GA Kevin Bessell Certified Seismic Walkdown Engineer Palo Alto, CA -6/13/2012 Kenneth Whitmore Certified Seismic Walkdown Engineer Alexandria, VA -6/20/2012 Engineering Report No. CALC-ANO1-CS-12-00002
available). This assists with cross-referencing.
.... .: ,A t ach m en t I~22 Page 5of 19 TV,1 Excellence-Every project. Every day.Certificate of Completion is hereby granted to Daniel Andoh D .'a. n , ;"~for successful completion of TRAINING ON NEAR TERM TASK FORCE, RECOMMENDATION 2.3 : PLANT: SEISMIC WALKDOWNS.
General,           Anytime "N/A is marked, a brief explanation/justification   All N/A items now have an explanation of         BDK SWC+AWC           should be provided. (For line-mounted items with           why it has been marked that way.
August 22, 2012 -Kennesaw, GA 2 Date -Location Kursat Kinali, Ph.D., P.E.EPRI Certified Seismic Walkdown Engineer Alexandria,.VA  
common justification for anchorage questions, can be provided once on SWC). This includes anchorage, flexibility of lines, etc.
-7/27/2012 Engineering Report No. CALC-ANO!-CS-!2-00002 Attachment I Rev. 0~ Page 6 of 19 CerTtificate o-)f Completion  
General,           Generally, consistency between the justification text,     The checklists have been cleaned up             BDK SWC+AWC           question responses, and CRs initiated should be             from hand-written notes, and the final improved,                                                   copies have improved consistency.
;*is hereby granted to Roy914m Beryma for successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 2.3 PLA N TSEISMI C WA LKDO0WNS Awarded: 7/11/20 12 in Kennesaw, GA.... ' , : :: : .-.....' : .. .. ..... ... !:, ; -: ...........  
General,           Additional detail regarding observed block walls should     Identified block walls are seismically         BDK SWC+AWC           be included on the checklists to confirm they were         designed, and are noted on the considered appropriately,                                   checklists where relevant.
........ ...... ...' ..... ...... .... .- -- --Kevin Bessell Kenneth Whitmore Certified Seismic Walkdown Engineer Certified Seismic Walkdown Engineer Palo Alto, CA -6/13/2012 Alexandria, VA -6/20/2012 Engineering Report No. CALC-ANO I-CS-12-00002 Attachment I Rev. 0 i1w7of19 StructuraIntegrty Associates, Inc!Certificate of Completion G1.ENARO BARR-IA&#xfd;GAN Training on Near Term Task Force Recommendation 2.3-Plant Seismic Walkdowns 9- D 3- H7_Date ao Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment I I'.0 Page 19 W NT~ POWE Certificate of Completion Michael Perez Training on Near Term Task Force Recommendation 2.3-Plant Seismic Walkdowns July 27, 2012 Date if / K44CA474&#xfd;Robert K. Kassawara EPRI Manager, Structural Reliability  
General,           The initial sample of checklists reviewed has not           Seismic interaction concerns such as the       BDK SWC+AWC           identified potentially adverse seismic conditions related   examples described in the EPRI to interaction. Please confirm that seismic interaction     Guidance and in EPRI SWE training
& Integrity Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment I V. 0 Page f 19 Certificate of Completion D)an Parker Training on Near Term Task Force Recommendation 2.3 Plant Seismic Walkdowns July2?7, 2012 Date Robert K. Kassawara EPRI Manager, Structural Reliability  
 
& Integrity Engineering Report No. CALC-ANO 1-CS- 12-00002 LWL, # I IIN t Ke Page 1001&#xfd;U 9 IELECTRIC POWER~I2IR ESEARCH INTTT Certificate of Completion Chris Johnson Training on Near Term Task Force Recommendation 2.3-Plant Seismic Walkdowns R'Ie ., .44&#xfd;&#xfd;June 13, 2012 Date Robert K. Kassawara EPRI Manager, Structural Reliability  
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment H Rev. 0 Page 3 of 6 concerns are considered during walkdowns and area         were being considered during walk-bys.                                                   walkdowns and area walk-bys. Peer review confirmed this during observation walkdowns. Expanded sample of checklists included examples where seismic interaction concerns were noted, where appropriate.
& Integrity Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment I Pa e .U ae fof19 1z ELECTRIC POWER~~IS~I jRESEARCH INSTITUTE Certificate of Completion Ojaswi Shrestha Training on Near Term Task Force Recommendation 2.3-Plant Seismic Walkdowns July 11,2012 Robert K. Kassawara EPRI Manager, Structural Reliability  
General, For items requiring anchorage configuration verification, All walkdowns where an anchorage               BDK SWC       it is useful to note the document #s used for comparison   configuration verification check is with the configuration observed in the field.               performed now includes basis document numbers.
& Integrity Date Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment I Rev. 0 Page 12 of 19 Seismic Walkdown Peer Reviewers Paul Miktus Ben Kosbab S:?:QU f t: of Ac1~frtvcznrnit UU~1is is TIP fiiriff-`14&#xfd;alt 4.M .P." f,~t~oun rrcnIn~l~tt~b ~7A~j sxnir ~t U~itinn ~fr ~inir~q~hxn~ 2~-2~ i9qa C60-U-T.SIP Neil. P.)Smith, Commonwealth Edison-: Robert P- Kassawara, EPRI.SQUG, Program n:,Manager David A. Freed. MPR Associates SSQUG:Training Coordinator n~in rin Repo No CALC-ANO1-CS-12-00002 W two V2~~~~~71 YI2LI%,2YM YY* , _ .Wo -EPR I~~ Electric Power.Research Institute~ctificzztc ufel Ad~irn~cmwt Qt41zi is to 'vi 4 at~jt PtiuJl A. Aik!us 1JUS (Gomptet-eb t4c~ismi K1P A tq a7729, 199a (G 0 U r's -V Robert P. Kassawara, EPRI SQUG Program Manager David A. Freed, MPR Associates SQUG Training Coordinator Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment I Rev. 0 Page 15 of 19 Excellence -Every poiecL Every May Certificate of Completion is hereby granted to Ben1-wjaomin Kosba-;&#xfd;b for successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 2.3 PLANT SEISMIC WALKDOWNS Awarded: 7/11/2012 in Kennesaw, GA K yin Bessell Kenneth Whitmore fied Seismic Walkdown Engineer Certified Seismic Walkdown Engineer Palo Alto, CA- 6/13/2012 Alexandria, VA -6/20/2012 Certi Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment I Rev. 0 Page 16 of 19 EPRI-Qualified SWE Trainers Kevin Bessell Kursat Kinali Ken Whitmore Engineering Report No. CALC-ANO 1-CS-12-00002 Attachment I D Page 17 19 a rI aI2 RESEARCHINTUE Certificate.of Completion Kevin Bessell Training on Near Term Task Force Recommendation 2.3-Plant Seismic Walkdowns June 13, 2012 Date .Robert K. Kassawara EPRI Manager,.Structural Reliability  
General, Please confirm that all cabinet/panel doors were opened     Confirmed. Additional clarification is now     BDK SWC     (i.e., MCC cubicles). If not, the SWC should include       included on SWC forms where useful.
& Integrity Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment I Pagel18 ,f19 a f= fa I I yz' E'&#xfd;E A R C H IN 5 T V r'Certificate of Completion Kursat Kinali Training on Near Term Task Force Recommendation 2.3 Plant Seismic Walkdowns July 27, 2012 Date Robert K. Kassawara EPRI Manager, Structural Reliability  
justification for how the goals of the inspection are still being met without opening the cabinet (see supplemental NRC FAQ dated 9-18-12), or should be marked as incomplete pending deferral to when the cabinets will be able to be opened (i.e., outagle).
& Integrity 2 T'Engineering Report No. CALC-ANO 1-CS- 12-00002-Rev.a-r -1r ani RjIev. 0 Page of 19 Certificate of Completion IT' is enneth Willtmore Training on Near Term Task Force Recommendation 2.3-Plant Seismic Walkdowns III III Iii til III June 21, 2012 Date Robert K. Kassawara EPRI Manager, Structural ReliabUity  
General, Additional clarification is recommended to explain what     General description of how non-               BDK SWC     the anchorage question responses mean for in-line           anchored components were treated is components that have no formal anchorage.                   included in the body of the report.
& Integrity LI. --}}
General, It would be useful to indicate the equipment class         Equipment class names are on each             BDK SWC     name/description on the SWCs, not just the number.         SWC.
General, Several SWEL items appear to be described using             Corrections made to SWCs, Base List 1,         BDK SWC     incorrect/inappropriate equipment class designations.       and SWEL 1. Each SWC includes the Please revisit the classes assigned and correct where       proper equipment class.
necessary.                                                                                                           I General, Several of the AWCs reviewed were somewhat unclear         Where an area considered was less than         BDK AWC     about what "Area" around the SWEL item(s) is               the entire room, a brief description has considered. Recall that an acceptable "Area" is an         been included on the AWC.
approximate 35' radius from the SWEL item. Consider including a more general photo of the area and/or include brief statement of area considered (i.e., if entire room looked at, say so).
 
Engineering Report No. CALC-ANOI-CS-12-00002 Attachment H Rev. 0 Page 4 of 6 General,       Include a photo on the AWC of each seismic condition       Photos are included wherever conditions           BDK AWC           identified during that area walk-by.                       were identified, as well as a general photo of the area in most cases.
General,       Need to discuss why the block wall will remain stable     Additional information is provided on             PAM SWC+AWC       during a seismic event                                     block walls. Note that ANO has painted all of their seismically qualified block walls with a blue stripe.
General,       List the anchorage dwgs in the SWC if a configuration     Drawings/calculations/plant                       PAM SWC           verification is performed                                 documentation is now referenced in all SWCs where an anchorage configuration verification is performed.
General,       Must justify that minor corrosion/surface oxidation does   Added a statement justifying any noted           PAM SWC+AWC       not adversely impact seismic qualification,               mild corrosion or surface oxidation.
Reviewed By:         Paul A. Miktus                               Date       10/11/12 Site/Department:     ENERCON/PM             Ph. 770-792-6972 Reviewed By:         Benjamin D. Kosbab                           Date       10/11/12 Resolved By:         Sean Smolarek Site/Department:     ENERCON/Civil           Ph. 770-590-2179                         Date: 10/25/2012
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment H Rev. 0 Page 5 of 6 I       nt                 Seismic Walkdown Submittal Report Review Comments and Resolutions Form Engineering       CALC-ANOI-CS-12-00002                       Rev. 0   Title: ANO-1 Fukushima Seismic - SWC &AWC Review Report Number II Quality Related: E] Yes   Z No                                 Special Notes or Instructions:
Comment     Section/Page                         Review Comment                                     Response/Resolution               Reviewer's Number           No.                           SWELl COMMENTS                                                                         Accept Initials 1           SWELl       Remove Hand Switches from SWEL as the mounting will           Removed Hand Switches                               FC likely not be visible (even with the cabinet opened) and the switches will be evaluated with the panel as a whole 2           SWELl       Ensure any items identified to be inaccessible on             A preliminary walkdown was performed             FC/RC preliminary walkdowns are swapped out with equivalent         to identify any inaccessible items or items (class, environment, etc)                               components. These items were swapped out by Equipment Selection Personnel and sent back to the SWEL peer reviewer for concurrence.
3           SWELl     Verify each class of component is adequately represented.     Two class 3 components were contained            FC/RC It appears a few do not show up in the SWEL.                 on Base List 1; however, both were energized 4160 KV switchgear and access was not recommended for safety reasons. As such, no class 3 components were suitable for inclusion in the SWEL.
Class 6 was also minimally represented on Base List 1 and inaccessible. Note also that several classes (11 and 12) are not on Base List 1. As such, they are also not represented on the SWELl.
SWELl     Are there any major new or replacement components             Plant personnel as well as the electronic           FC included?                                                     database were consulted to find new and replacement items. Many items were identified on the SWEL to be new or have been replaced since the IPEEE report.
However, the Guidance defines the new and replacement classification as "major",
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment H Rev. 0 Page 6 of 6 of which none of the components fit.
5         SWELl     Suggest expanding representation of equipment class 21     Decay Heat coolers were added.                     FC with some of the major heat removal equipment (i.e., heat   Letdown Heat Exchanger was not added exchangers).                                               at the request of RP - this heat exchanger is in a significant dose area.
SWEL 2 COMMENTS 6         SWEL2     Verify Safety Classification of SFP Cooling System         Per the Upper Level Document on the               FC Spent Fuel Pool, The SFP Cooling System is Non-Safety and Non-Seismic.
Safety-related service water to SFP connection valve is included on SWEL 2.
Reviewed By: Rodney Carter/Frank Cobb                       Date   10/24/12 Resolved By: I Sean Smolarek Site/Department: OPS/Mech                                                       Date: 10/25/12
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment I Rev. 0 Page 1 of 19 Attachment I Seismic Walkdown Engineering Training Certificates
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment I Rev. 0 Page 2 of 19 Seismic Walkdown Engineers Sean Smolarek Eric Dilbone.
Daniel Andoh Roy Berryman Genaro Barragan Michael Perez Daniel Parker Chris Johnson Ojaswi Shrestha
 
Engineenng Report No CALC-ANO 1-CS- 12-00002 En i e r na e o t N           Att achnien t I
* Rev. 0
                      ~   4   '~                                                                                     11&#xfd;Pge 3of 19
          *E.                       N,     E,.
Excellence-Everyproject. Every day.
Certificate- of Completion is hereby granted to Sean. Srnoiark for.successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 23.
PLANT SEISMIC WALKDOWNS August 22, 2012 - Kennesaw, GA         "                                    A:/"                                   "7"5J/'
Date - Location                                             Kursat Kinali, PhD P.E.
EPRI Certified Seismic Walkdown Engineer Alexandria. VA -7/27/2012:
 
Engineering Report No. CALC-ANO 1 -CS- 12-00002 Attachment I Rev. 0 Page 4 of 19 NEERCO N Excellence-Every project. Every doy.
Certificate of Completion is hereby granted to Eric Dilbone for successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 2.3 PLANT SEISMIC WALKDOWNS Awarded: 7/11/2012 in Kennesaw, GA Kevin Bessell                                                 Kenneth Whitmore Certified Seismic Walkdown Engineer                              Certified Seismic Walkdown Engineer Palo Alto, CA - 6/13/2012                                       Alexandria, VA - 6/20/2012
 
Engineering Report No. CALC-ANO1-CS-12-00002
                                                                                                                  . ... .: ,A t ach men t I
                                                                                ~22                                         Page 5of 19 TV,1 Excellence-Every project. Every day.
Certificate of Completion is hereby granted to Daniel Andoh D .'a. n       , ;"~
for successful completion of TRAINING ON NEAR TERM TASK FORCE, RECOMMENDATION 2.3 :
PLANT: SEISMIC WALKDOWNS.
August 22, 2012 - Kennesaw, GA                                                                                                     2 Date - Location                                             Kursat Kinali, Ph.D., P.E.
EPRI Certified Seismic Walkdown Engineer Alexandria,.VA - 7/27/2012
 
Engineering Report No. CALC-ANO!-CS-!2-00002 Attachment I Rev. 0
                                                                      ~                                                                         Page 6 of 19 CerTtificate o-)f Completion                                                                                         ;*
is hereby granted to
:* *: * ' :
                        ' , 'i*
            . ::. :..*: .-.....
Roy914m
                                          .. ..
Beryma
                                                    !:, .;....
                                                            ...              . !!!*; -: ......
                                                                                .......                 * *r .. . .. .. .-
                                                                                                      '. ...........       ...... ----                   ....
for successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 2.3 PLAN TSEISMI C WA LKDO0WNS Awarded: 7/11/20 12 in Kennesaw, GA Kevin Bessell                                                                  Kenneth Whitmore Certified Seismic Walkdown Engineer                                                 Certified Seismic Walkdown Engineer Palo Alto, CA - 6/13/2012                                                         Alexandria, VA - 6/20/2012
 
Engineering Report No. CALC-ANO I-CS-12-00002 Attachment I Rev. 0 i1w7of19 StructuraIntegrtyAssociates, Inc!
Certificate of Completion G1.ENARO BARR-IA&#xfd;GAN Training on Near Term Task Force Recommendation 2.3
    - Plant Seismic Walkdowns 9- 3-D Date                    ao H7_
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment I I'.0 Page 1;*f 19 NT~
W POWE Certificateof Completion Michael Perez Training on Near Term Task Force Recommendation 2.3
  - Plant Seismic Walkdowns July 27, 2012           if K44CA474&#xfd;
                                    /
Date                Robert K. Kassawara EPRI Manager, Structural Reliability & Integrity
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment I V. 0 Page   f 19 Certificate of Completion D)an Parker Training on Near Term Task Force Recommendation 2.3 Plant Seismic Walkdowns July2?7, 2012 Date         Robert K. Kassawara EPRI Manager, Structural Reliability &Integrity
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 LWL, #KeI IIN tU Page 1001&#xfd; 9 IELECTRIC POWER
                    ~I2IR   ESEARCH INTTT Certificateof Completion Chris Johnson Training on Near Term Task Force Recommendation 2.3
  - Plant Seismic Walkdowns June 13, 2012 Date R'Ie, . 44&#xfd;&#xfd; .
Robert K. Kassawara EPRI Manager, Structural Reliability & Integrity
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment I Pa e . U 1z   aefof19 ELECTRICPOWER~
                  ~IS~I jRESEARCH INSTITUTE Certificateof                  Completion Ojaswi Shrestha Training on Near Term Task Force Recommendation 2.3
  - Plant Seismic Walkdowns July 11,2012 Date                              Robert K. Kassawara EPRI Manager, Structural Reliability & Integrity
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment I Rev. 0 Page 12 of 19 Seismic Walkdown Peer Reviewers Paul Miktus Ben Kosbab
 
S:?:QU f           t:         of Ac1~frtvcznrnit UU~1is is     TIP fiiriff-`14&#xfd;alt 4.M .P." f,                                     ~t~oun               rrcnIn~l
~tt~b ~7A~j sxnir       ~t     U~itinn ~fr ~inir~q                   C60-U-T.SIP
                        ~hxn~ 2~-2~ i9qa Neil. P.)Smith,   Commonwealth Edison-:
David A. Freed. MPR Associates              Robert P- Kassawara, EPRI.
SQUG, Program n:,Manager SSQUG:Training Coordinator
 
n~in rin Repo No CALC-ANO1-CS-12-00002 W           two V2~~~~~71     YI2LI%,2YM                                             YY                   * , -_ .Wo EPR I
                                          ~~ Electric Power.
Research Institute
        ~ctificzztc ufel Ad~irn~cmwt Qt41zi is to       'vi     4 at~jt PtiuJl     A. Aik!us 1JUS     (Gomptet-eb t4c
          ~ismi               K1P A                                               (G0 Ur's -V tq a7729, 199a David A. Freed, MPR Associates                                     Robert P. Kassawara, EPRI SQUG Training Coordinator                                         SQUG Program Manager
 
Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment I Rev. 0 Page 15 of 19 Excellence -Every poiecL Every May Certificate of Completion is hereby granted to                                                       "*;
Ben1-wjaomin Kosba-;&#xfd;b for successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 2.3 PLANT SEISMIC WALKDOWNS Awarded: 7/11/2012 in Kennesaw, GA K yin Bessell                                                 Kenneth Whitmore Certi fied Seismic Walkdown Engineer                               Certified Seismic Walkdown Engineer Palo Alto, CA- 6/13/2012                                         Alexandria, VA - 6/20/2012
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment I Rev. 0 Page 16 of 19 EPRI-Qualified SWE Trainers Kevin Bessell Kursat Kinali Ken Whitmore
 
Engineering Report No. CALC-ANO 1-CS-12-00002 Attachment I D
Page 17   19 a rI aI2 RESEARCHINTUE Certificate.ofCompletion Kevin Bessell Training on Near Term Task Force Recommendation 2.3
  - Plant Seismic Walkdowns June 13, 2012 Date .                           Robert K. Kassawara EPRI Manager,.
Structural Reliability & Integrity
 
Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment I Pagel18 ,f19 a f= fa     E'&#xfd;EA RC H IN 5 I I yz'              TV r' Certificateof Completion Kursat Kinali Training on Near Term Task Force Recommendation 2.3 Plant Seismic Walkdowns July 27, 2012 Date                                       Robert K. Kassawara EPRI Manager, Structural Reliability & Integrity
 
2 T'
Engineering Report No. CALC-ANO 1-CS- 12-00002
                                                                                                                -
* Rev.
RjIev. 0 Page    of 19 a-r-1r ani Certificateof Completion IT'                           is enneth Willtmore Training on Near Term Task Force Recommendation 2.3
        - Plant Seismic Walkdowns III III Iii June 21, 2012 til                Date                     Robert K. Kassawara EPRI Manager, Structural ReliabUity & Integrity III LI.         -                         -}}

Revision as of 18:05, 11 November 2019

Engineering Report CALC-ANO1-CS-12-00002, Rev. 0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Pages 332 Through 560
ML12342A221
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 11/16/2012
From: Smolarek S
Entergy Nuclear
To:
Office of Nuclear Reactor Regulation
References
1CAN111201 CALC-ANO1-CS-12-00002, Rev 0
Download: ML12342A221 (414)


Text

{{#Wiki_filter:Engineering Report No. CALC-ANO I-CS-i12-00002 Attachment C Rev. 0 Page 332 of 560 Sheet I of 5 Status: YZ NEI UF-Seismic Walkdown Checklist (SWC) SWELl-065 Equipment ID No. F-52B Equip. Class' 17- ENGINE GENERATORS Equipment Description DG2 ENGINE MOUNTED TURBO FILTER Location: Bldg. RAB Floor El. 369 Room, Area 86 Manufacturer, Model, Etc. (optional but recommended) Electro-Motive Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE] No of the 50% of SWEL items requiring such verification)?

No anchorage configuration verification required.

2. Is the anchorage free of bent, broken, missing or loose hardware? YE NEI UE] N/AE-The anchorageis free of bent, broken, missing and loose hardware.
3. Is the anchorage free of corrosion that is more than mild surface Y'Z NEI uE- N/AE oxidation?

The anchorage is free of corrosion.

4. Is the anchorage free of visible cracks in the concrete near the YZ NEI UE1 N/AE-anchors?

This component is anchored directly to the EDG skid. No cracks in concrete around skid observed. I Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 333 of 560 Sheet 2 of 5 Status: Y[ NO UI-Seismic Walkdown Checklist (SWC) SWELl-065 Equipment ID No. F-52B Equip. Class2 17- ENC INE GENERA TORS Fv-iinmp.nt 1l3c..rintinn /f)(2FN(INF MOIJNTFfl TUJRRO FILTF-R

5. Is the anchorage configuration consistent with plant documentation? Y[-- NEI ULI N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

This is not applicablesince it is not part of the 50% of SWEL items requiringanchorage configuration verification.

6. Based on the above anchorage evaluations, is the anchorage free of YE N[W U[I potentially adverse seismic conditions?

Based on the above anchorage evaluations, the anchorage is free of potentiallyadverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI UEIZ N/AEl The turbochargerfilter is bolted at the rearend of the diesel engine.

There were no major structures or equipment that could have any significantinteraction with the filter.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NO UEL N/AEZ and masonry block walls not likely to collapse onto the equipment?

There is overhead duct work that is properlysecured with steel hangers.

9. Do attached lines have adequate flexibility to avoid damage? '(Y NEI UED N/AL[

Attached lines have adequate flexibility.

10. Based on the above seismic interaction evaluations, is equipment free Y[( NE] UFl of potentially adverse seismic interaction effects?

Based on the above seismic interactionevaluations, the equipment is free of potentiallyadverse seismic interactioneffects. 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 334 of 560 Sheet 3 of 5 Status: YZ NE] U[- Seismic Walkdown Checklist (SWC) SWELl-065 Equipment ID No. F-52B Equip. Class3 17- ENGINE GENERATORS Equipment Description DG2 ENGINE MOUNTED TURBO FILTER Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NE] UZý adversely affect the safety functions of the equipment?

It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found. Comments (Additional pages may be added as necessary) The TurbochargerFilteris a criticalcomponent of the diesel engine. Every mounting bolt was observed to be in place. The entire engine appearedclean and well maintained. There were no visible leaks or signs of previous leaks at any location were accessorycomponents were bolted to the main engine block. TW ug. Vh.R-V- IOC0Isn6" Evaluated by: DanielParker %', { -- Date: 10/03/2012 Eric Dilbone 10/03/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 335 of 560 Sheet 4 of 5 Status: Y[ NEI U-Seismic Walkdown Checklist (SWC) SWELl-065 Equipment ID No. F-52B Equip. Class4 17- ENGINE GENERATORS Equipment Description DG2 ENGINE MOUNTED TURBO FILTER Photographs Note: Note: Top of Component 4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS-12-00002 Attachment C Rev. 0 Page 336 of 560 Sheet 5 of 5 Status: YZ NE U-Seismic Walkdown Checklist (SWC) SWELl-065 Equipment ID No. F-52B Equip. Class5 17- ENGINE GENERATORS Equipment Description DG2 ENGINE MOUNTED TURBO FILTER Note: Component Attachment 5 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 337 of 560 Sheet I of 5 Status: YZ Nil UL] Seismic Walkdown Checklist (SWC) SWELl-066 Equipment ID No. M-225B Equip. Class, 17- Engine Generators Equipment Description DIESEL GENERATOR TURBOCHARGER Location: Bldg. RAB Floor El. 369 Room, Area 86 Manufacturer, Model, Etc. (optional but recommended) Electro-Motive T2001 Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YD NZ of the 50% of SWEL items requiring such verification)?

No anchorage configuration verification required.

2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI U[- N/A[D The anchorageis free of bent, broken, missing and loose hardware.
3. Is the anchorage free of corrosion that is more than mild surface YZ N[I UD N/A[]

oxidation? The anchorageis free of corrosion.

4. Is the anchorage free of visible cracks in the concrete near the Y; NEI U[1 N/A[-

anchors? This component is anchored directly to the EDG skid. 1 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 338 of 560 Sheet 2 of 5 Status: YZ NF UI-Seismic Walkdown Checklist (SWC) SWELl-066 Equipment ID No. M-225B - Equip. Class2 17- Engine Generators Equipment Description DIESEL GENERATOR TURBOCHARGER

5. Is the anchorage configuration consistent with plant documentation? YE NE-' uEF N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

This is not applicable since it is not part of the 50% of SWEL items requiringanchorage configurationverification.

6. Based on the above anchorage evaluations, is the anchorage free of Y[ NI-] ULI potentially adverse seismic conditions?

Based on the above anchorageevaluations, the anchorage is free of potentiallyadverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[ NEI UE1 N/A[-]

The turbochargeris bolted at the rearend of the diesel engine. There were no significantstructures or equipment that could have any significantinteraction with the turbocharger.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NE'] UE N/AE-and masonry block walls not likely to collapse onto the equipment?

There is overhead duct work that is properlysecured with steel hangers.

9. Do attached lines have adequate flexibility to avoid damage? Y' NEi UEi N/A['-

Attached lines have adequate flexibility.

10. Based on the above seismic interaction evaluations, is equipment free YZ NEI UEJ of potentially adverse seismic interaction effects?

Based on the above seismic interactionevaluations, the equipment is free of potentially adverse seismic interaction effects. 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 339 of 560 Sheet 3 of 5 Status: YZ NEI Ur-1 Seismic Walkdown Checklist (SWC) SWELl -066 Equipment ID No. M-225B -Equip. ClaSS3 17 -Engine Generators Enuinment Descrintion DEISEL GENERATOR TURBOCHARGER Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y' NIZ U[-

adversely affect the safety functions of the equipment? It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found. Comments (Additional pages may be added as necessary) The turbochargeris a critical component of the diesel engine. Every mounting bolt was observed to be in place. The entire engine appearedclean and well maintained. There were no visible leaks or signs of previous leaks at any location were accessorycomponents were bolted to the main engine block. Three-Ouwtrr Right Rear View, I6.Cylnftr Evaluated by: Daniel Parker Date: 10/22012 Eric Dilbone 10/2/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 340 of 560 Sheet 4 of 5 Status: YE NF- U-- Seismic Walkdown Checklist (SWC) SWELl-066 Equipment ID No. M-225B Equip. CIass4 17- Engine Generators Equipment Description DEISEL GENERATOR TURBOCHARGER Photociraphs Note: Component Overview Note: Component Overview 4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 341 of 560 Sheet 5 of 5 Status: YE NF U-Seismic Walkdown Checklist (SWC) SWELl-066 Equipment ID No. M-225B Equip. Class5 17- Enqine Generators Equipment Description DEISEL GENERATOR TURBOCHARGER Note: Close up of Component from underside Note: Close up of component from underside 5 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 342 of 560 Sheet I of 5 Status: YZ No UI-Seismic Walkdown Checklist (SWC) SWELl- 067 Equipment ID No. SS-5211 Equip. Class' 18 - Instrument Racks Equipment Description DG1 OVERSPEED TRIP SWITCH Location: Bldg. RAB Floor El. 369 Room, Area 87 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZI NO of the 50% of SWEL items requiring such verification)?

Item is not part of the 50%.

2. Is the anchorage free of bent, broken, missing or loose hardware? YO N[il U[:] N/A[:l The bolts anchoring the switch to the EDG skid are free of bent, broken, missing and loose hardware.
3. Is the anchorage free of corrosion that is more than mild surface YZ NDl UD N/ADl oxidation?

The anchorage had very mild surface oxidation, but is free of corrosion otherwise. No adverse seismic conditions exist because of this.

4. Is the anchorage free of visible cracks in the concrete near the YZ NDI UiD N/AED anchors?

The switch is anchoredto the EDG. No cracks around EDG skid were observed. 1 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 343 of 560 Sheet 2 of 5 Status: YE NEI UE-- Seismic Walkdown Checklist (SWC) SWELl- 067 Equipment ID No. SS-5211 Equip. Class 1*8 - Instrument Racks Equipment Description DG1 OVERSPEED TRIP SWITCH

5. Is the anchorage configuration consistent with plant documentation? YE N[E UEi N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

This does not apply since this item is not part of the 50% requiring anchorageconfiguration verification.

6. Based on the above anchorage evaluations, is the anchorage free of Y] NEI UE-potentially adverse seismic conditions?

All visible anchorage was free of potentially adverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YEr NEi UEi N/AE There are no soft targets that could be impacted by nearby equipment or structures.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NE UEI N/AE and masonry block walls not likely to collapse onto the equipment?

There are no masonry block walls or ceiling tiles in the room. The lights are in good condition, and do not present an interaction effect.

9. Do attached lines have adequate flexibility to avoid damage? YO NEI UEi N/AE-The attached lines have adequate flexibility.
10. Based on the above seismic interaction evaluations, is equipment free Y[ NE] UEJ of potentially adverse seismic interaction effects?

Based on the above evaluation, the switch is free of potentially adverse seismic interaction effects.

Engineering Report No. CALC-ANO I-CS-i12-00002 Attachment C Rev. 0 Page 344 of 560 Sheet 3 of 5 Status: Y[I NR U[F] Seismic Walkdown Checklist (SWC) SWELl- 067 Equipment ID No. SS-5211 Equip. Class 18- Instrument Racks Equipment Description DG1 OVERSPEED TRIP SWITCH Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO N[il ULI adversely affect the safety functions of the equipment?

It was looked for, and no other seismic conditions,that could adversely affect the safety functions were found. Comments (Additional pages may be added as necessary) SS-5211 is not immediately identifiable using the primary equipment ID tag. A tag of "S 23" is visible on the component, and this is listed in Asset Suite as a ComponentAlternate Tag for SS-5211. Evaluated by: DanielParker t,, - Date: 10/11/2012 Eric Dilbone 6* 10/11/2012

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 345 of 560 Sheet 4 of 5 Status: YE NEI UI-Seismic Walkdown Checklist (SWC) SWELl- 067 Equipment ID No. SS-5211 Equip. Class 18 - Instrument Racks Equipment Description DGI OVERSPEED TRIP SWITCH Photographs Note: Altemate tag showing S 23 identifies Note: Overspeed trip switch is shown the component SS-521 1. mounted to the EDG.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 346 of 560 Sheet 5 of 5 Status: YEI NEI UI-1 Seismic Walkdown Checklist (SWC) SWELl- 067 Equipment ID No. SS-5211 Equip. Class 18 - Instrument Racks Equipment Description DG1 OVERSPEED TRIP SWITCH Note: The manufacturertao is shown for the Note: overspeed trip switch.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 347 of 560 Sheet I of 4 Status: YZ Nr I Url Seismic Walkdown Checklist (SWC) SWELl-068 Equipment ID No. SE-5220 Equip. Class' 18- INSTRUMENT RACKS Equipment Description SPEED DETECTOR FOR K-4B Location: Bldg. RAB Floor El. 369 Room, Area 86 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[-] NZ of the 50% of SWEL items requiring such verification)?

Anchorage configuration verification is not requiredfor this component.

2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI U[] N/A'-

The anchoragehardware is free of bent, broken, missing and loose hardware.

3. Is the anchorage free of corrosion that is more than mild surface YZ N[:] Ur- N/A-oxidation?

The anchorageis free of corrosion.

4. Is the anchorage free of visible cracks in the concrete near the Y[-] N[l U[I- N/AZ anchors?

The component is not anchored into concrete; therefore, this question is not applicable. I Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 348 of 560 Sheet 2 of 4 Status: YZ N[-- U[- Seismic Walkdown Checklist (SWC) SWELl-068 Equipment ID No. SE-5220 - Equip. Class 18- INSTRUMENT RACKS Equipment Description SPEED DETECTOR FOR K-4B

5. Is the anchorage configuration consistent with plant documentation? YEI NEI UE- N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage configuration verification is not required for this component; therefore, this question is not applicable.

6. Based on the above anchorage evaluations, is the anchorage free of YE NE:] UEr potentially adverse seismic conditions?

Based on the above anchorageevaluation, the anchorageis free of potentially adverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEi U[E- N/A[E]

The primarysoft target in the area is the electrical cable connected to SE-5220. The cable is free from impact by any nearby equipment or structures.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NEI UE[ N/AE-and masonry block walls not likely to collapse onto the equipment?

There are no potentialinteractionswith overhead equipment, lighting or masonry block walls.

9. Do attached lines have adequate flexibility to avoid damage? YZ NEI uE1 N/AEr The attachedlines have adequateflexibility to avoid damage.
10. Based on the above seismic interaction evaluations, is equipment free YE NE- UEi of potentially adverse seismic interaction effects?

Based on the above seismic interactionevaluations, the equipment is free of potentially adverse seismic interaction effects.

Engineering Report No. CALC-ANO 1-CS-12-00002 Attachment C Rev. 0 Page 349 of 560 Sheet 3 of 4 Status: YZ N] UI-I Seismic Walkdown Checklist (SWC) SWELl-068 Equipment ID No. SE-5220 Equip. Class 18-INSTRUMENT RACKS Equipment Description SPEED DETECTOR FOR K-4B Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN N[:] U-adversely affect the safety functions of the equipment?

It was looked for, and no seismic conditions that could adversely affect the safety function of the equipment was found. Comments (Additional pages may be added as necessary) SE-5220, Speed Detector for K-4B does not have an equipment tag; the component location was positively identified on design drawings and field verified by the Unit 1 Emergency Diesel GeneratorsSystem Engineer. The Speed Detectoris very well anchored. Evaluated by: Chris Johnson Date: 11/08/12 Oiaswi Shrestha 4 -LA 11081 11108112

Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 350 of 560 Sheet 4 of 4 Status: YZ NE]I- UE-Seismic Walkdown Checklist (SWC) SWELl-068 Equipment ID No. SE-5220 Equip. Class 18- INSTRUMENT RACKS Equipment Description SPEED DETECTOR FOR K-4B Photographs Note: This photo shows the relative location of Note: SE-5220 is mounted next the flywheel SE-5220 on K-4B. as indicated by the yellow arrow.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 351 of 560 Sheet I of 5 Status: YE NEI UD-Seismic Walkdown Checklist (SWC) SWELI-069 Equipment ID No. PS-5284 Equip. Class' 18- INSTRUMENT RACKS Equipment Description K4B CRANKCASE PRESS HI Location: Bldg. RAB Floor El. 369 Room, Area 86 Manufacturer, Model, Etc. (optional but recommended) Electro-Motive 645E4B TurbocharqedDiesel Enqine Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE- NO of the 50% of SWEL items requiring such verification)?

No anchorage configuration verification required.

2. Is the anchorage free of bent, broken, missing or loose hardware? Y] NEI UEi N/A--

The anchorage is free of bent, broken, missing and loose hardware.

3. Is the anchorage free of corrosion that is more than mild surface YO NEI U-- N/AD oxidation?

The anchorageis free of corrosion.

4. Is the anchorage free of visible cracks in the concrete near the Y[ NDI UD- N/A[D-anchors?

This component is anchored directly to the EDG skid. No cracks in the concrete aroundthe anchorageof the skid were observed. I Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 352 of 560 Sheet 2 of 5 Status: YZ NEI U-- Seismic Walkdown Checklist (SWC) SWELl-069 Equipment ID No. PS-5284 Equip. Class2 18-INSTRUMENT RACKS Equipment Description K4B CRANKCASE PRESS HI

5. Is the anchorage configuration consistent with plant documentation? YrI NE] U[-] N/As (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

This is not applicable since it is not part of the 50% of SWEL items requiringanchorage configuration verification.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NE] ULi potentially adverse seismic conditions?

Based on the above anchorageevaluations, the anchorage is free of potentiallyadverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? '(Y NEI U[I N/AZl Soft targets are free from impact by nearby equipment and structures.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, '(N NEI U-1 N/AZl and masonry block walls not likely to collapse onto the equipment?

Overhead equipment, distributionsystems and lighting are not likely to collapse onto the equipment.

9. Do attached lines have adequate flexibility to avoid damage? YS( NEl uL1 N/A'-

Attached lines have adequate flexibility.

10. Based on the above seismic interaction evaluations, is equipment free YZ NEI UM of potentially adverse seismic interaction effects?

Based on the above seismic interactionevaluations, the equipment is free of potentially adverse seismic interaction effects. 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 353 of 560 Sheet 3 of 5 Status: YZ NEI U[-] Seismic Walkdown Checklist (SWC) SWELl-069 Equipment ID No. PS-5284 Equip. Class3 18- INSTRUMENT RACKS Eauinment Description K4B CRANKCASE PRESS HI Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y( NED U[-I adversely affect the safety functions of the equipment?

It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found. Comments (Additional pages may be added as necessary) The Crankcase PressureDetector is a criticalcomponent of the diesel engine. Every mounting bolt was observed to be in place. The entire engine appeared clean and well maintained. There were no visible leaks or signs of previous leaks at any location were accessory components were bolted to the main engine block. Croankcose Presure Detectcr TWree.uarter Left Fr*nt View, 16-C¥!i1der Evaluated by: Daniel Parker Date: 10/2/2012 Eric Dilbone 10/2/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 354 of 560 Sheet 4 of 5 Status: Y[I NEI UD-Seismic Walkdown Checklist (SWC) SWELl-069 Equipment ID No. PS-5284 Equip. Class4 18-INSTRUMENT RACKS Equipment Description K4B CRANKCASE PRESS HI Photographs Note: Front of PS-5284 Note: Upper Mounting Bolts of PS-5284 4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 355 of 560 Sheet 5 of 5 Status: YZ N[i] U--i Seismic Walkdown Checklist (SWC) SWELl-069 Equipment ID No. PS-5284 Equip. Classs 18-INSTRUMENT RACKS Equipment Description K4B CRANKCASE PRESS HI Note: Lower Mounting Bolts of PS-5284 Note: 5 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 356 of 560 Sheet 1 of 5 Status: YZ NEI U-- Seismic Walkdown Checklist (SWC) SWELl- 070 Equipment ID No. D14 Equip. Class' 18 - Instrument Racks Equipment Description D06 MANUAL DISCONNECT Location: Bldg. RAB Floor El. 372 Room, Area 98 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NEI of the 50% of SWEL items requiring such verification)?

This item is partof the 50%.

2. Is the anchorage free of bent, broken, missing or loose hardware? Y[ NE] U'- N/A['1 No bent broken or missing hardware was found.
3. Is the anchorage free of corrosion that is more than mild surface YN NEI UEl N/A[-

oxidation? No corrosion was observed.

4. Is the anchorage free of visible cracks in the concrete near the YZ NEI UiE N/AD--

anchors? Concrete around anchors in support frame base plates were observed to be free of cracks. I Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 357 of 560 Sheet 2 of 5 Status: YE NEI U-iJ Seismic Walkdown Checklist (SWC) SWELl- 070 Equipment ID No. D14 Equip. Class 18 - Instrument Racks Eauinment Descrintion DO6 MANUAL DISCONNECT

5. Is the anchorage configuration consistent with plant documentation? YZ NDi UD- N/AD-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage configurationwas determined to be consistent with CALC-94-SQ-1001-18, pages 19-29.

6. Based on the above anchorage evaluations, is the anchorage free of Y' NDI U[D potentially adverse seismic conditions?

Anchorage was determined to be free from adverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YM NDi UD N/ADl No soft targets were observed.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NDI UDi N/AD'-

and masonry block walls not likely to collapse onto the equipment? Overheadsupport conditions appearedto be adequate.

9. Do attached lines have adequate flexibility to avoid damage? YZ NDI uDl N/ADl Attached lines appearto be ok (both flexible and rigid conduits)
10. Based on the above seismic interaction evaluations, is equipment free YZ ND] UD1 of potentially adverse seismic interaction effects?

No adverse seismic interaction conditions were observed.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 358 of 560 Sheet 3 of 5 Status: YN NIEI U[-i Seismic Walkdown Checklist (SWC) SWELl- 070 Equipment ID No. 014 Equip. Class 18 - Instrument Racks Eauipment Description D06 MANUAL DISCONNECT Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN N[] Ur adversely affect the safety functions of the equipment?

No other adverse seismic conditions were observed. Comments (Additional pages may be added as necessary) No adverse seismic conditions were observed. Evaluated by: DanielAndoh Date: 10/10/2012 Genaro BarraqanJr. " 'f 10/10/2012

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 359 of 560 Sheet 4 of 5 Status: YZ NO-- U-Seismic Walkdown Checklist (SWC) SWELl- 070 Equipment ID No. D14 Equip. Class 18 - InstrumentRacks Equipment Description D06 MANUAL DISCONNECT Photographs Note: Equipment Tag Note: Support frame base plate

Engineering Report No. CALC-ANO 1-CS-i12-00002 Attachment C Rev. 0 Page 360 of 560 Sheet 5 of 5 Status: YZ NO ULI Seismic Walkdown Checklist (SWC) SWELl- 070 Equipment ID No. D14 Equip. Class 18 - Instrument Racks Equipment Description D06 MANUAL DISCONNECT connection to wall Note: Panel support to frame

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 361 of 560 Sheet I of 5 Status: Y] NE-- U-- Seismic Walkdown Checklist (SWC) SWELl-071 Equipment ID No. PT-2667A Equip. Class' 18 - Instrument Racks Equipment Description E24B MAIN STM PRESS-MSLI Location: Bldg. RAB Floor El. 386 Room, Area 144 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YM NE!

of the 50% of SWEL items requiring such verification)? Yes, this is one of the 50% of SWEL items requiringanchorage configuration verification.

2. Is the anchorage free of bent, broken, missing or loose hardware? Y'( NE] UE- N/AE!

The anchorageis free of the conditions listed above.

3. Is the anchorage free of corrosion that is more than mild surface Y( NE[-] UE- N/A[-]

oxidation? The anchorage is free of corrosion.

4. Is the anchorage free of visible cracks in the concrete near the Y; NE! UE] N/A[!

anchors? The anchoragefor the plate was inspected and there were no visible cracks in the concrete. I Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 362 of 560 Sheet 2 of 5 Status: YZ N-- U[- Seismic Walkdown Checklist (SWC) SWELl-071 Equipment ID No. PT-2667A Equip. Class 18 - Instrument Racks Equipment Description E24B MAIN STM PRESS-MSLI

5. Is the anchorage configuration consistent with plant documentation? Y[ NE] UE- N/Ar (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes, anchorageconfigurationis consistent with CALC-94-SQ-1001-18, pages 202-206.

6. Based on the above anchorage evaluations, is the anchorage free of Y[ NE] uLI potentially adverse seismic conditions?

Yes, the anchorage is free of potentiallyadverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? "'Y NE] U[-] N/AEI-All soft targets are free from impact by nearby equipment.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y* NEJ U[E N/AEl and masonry block walls not likely to collapse onto the equipment?

Overhead equipment is not likely to collapse onto the pressure transmitter.This room is not crowded and items are well dispersed throughout the room.

9. Do attached lines have adequate flexibility to avoid damage? YZ NEl UE1 N/A[-]

All attachedlines appearto have adequateflexibility.

10. Based on the above seismic interaction evaluations, is equipment free Y' NEI ur-1 of potentially adverse seismic interaction effects?

Equipment is free of potentially adverse interactioneffects.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 363 of 560 Sheet 3 of 5 Status: YE NEI UM Seismic Walkdown Checklist (SWC) SWELl-071 Equipment ID No. PT-2667A Equip. Class 18 - Instrument Racks Equipment Description E24B MAIN STM PRESS-MSLI Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ NEi UFJ adversely affect the safety functions of the equipment?

Yes, no other seismic conditions that could adversely affect the safety functions of the equipment were identified. Comments (Additional pages may be added as necessary) Anchorage was consistent with the plant documentation. The anchorage of concem was the 16 x 30 x 1/4 inch plate anchored to the wall. The pressure transmitter(PT-2667A) was bolted to this plate. The plate was bolted to the wall with a pairof Unistruts. Each Unistrut was anchored with two expansion anchors. See SEWS package, PT-2667A (Rev.0) for more details. Evaluated by: Genaro BarraqanJr.i Date: 10/9/2012 Eric Dilbone 6U I 10/9/2012

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 364 of 560 Sheet 4 of 5 Status: YE Nn-l U[] Seismic Walkdown Checklist (SWC) SWELl-071 Equipment ID No. PT-2667A Equip. Class 18 - Instrument Racks Equipment Description E24B MAIN STM PRESS-MSLI Photographs Note: General image of the equipment Note: Generalimage of the Pressure tag, PT-2667A. Transmitteranchored to the plate in the wall.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 365 of 560 Sheet 5 of 5 Status: YZ Nn U-I Seismic Walkdown Checklist (SWC) SWELl-071 Equipment ID No. PT-2667A Equip. Class 18 - Instrument Racks Equipment Description E24B MAIN STM PRESS-MSLI I Note: General image of the PT-2667A. Note: General image of the PT-2667A.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 366 of 560 Sheet I of 5 Status: YWI NFi- U-I Seismic Walkdown Checklist (SWC) SWELl-072 Equipment ID No. N/A Equip. Class' N/A Equipment Description NOT USED Location: Bldg. N/A Floor El. N/A Room, Area N/A Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[:] N[]

of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? Y-I NE:] U[] N/AZ
3. Is the anchorage free of corrosion that is more than mild surface YE] NE] UI- N/AZ--

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the YE] NE] UEJ N/A-anchors?

IEnter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS-12-00002 Attachment C Rev. 0 Page 367 of 560 Sheet 2 of 5 Status: YEJ NEI ULI Seismic Walkdown Checklist (SWC) SWELl-072 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED

5. Is the anchorage configuration consistent with plant documentation? YE] NE-1 U[E N/AE[

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YE] NEI UE potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[-E NEi UE N/AE
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NE UE1 N/AE-and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YF- NE- UE[ N/AE1
10. Based on the above seismic interaction evaluations, is equipment free YE- NEi UE of potentially adverse seismic interaction effects?

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 368 of 560 Sheet 3 of 5 Status: YEl- NO UL-Seismic Walkdown Checklist (SWC) SWELl-072 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y-l N il UIM adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: Date:

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 369 of 560 Sheet 4 of 5 Status: Y-I NEI U-- Seismic Walkdown Checklist (SWC) SWELl -072 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Photographs Note: Note:

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 370 of 560 Sheet 5 of 5 Status: Y-- NDý Ur-1 Seismic Walkdown Checklist (SWC) SWELl-072 Equipment ID No, N/A Equip. Class N/A Equipment Description NOT USED Note: Note:

Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 371 of 560 Sheet I of 5 Status: YZ NE- U El Seismic Walkdown Checklist (SWC) SWELl- 073 Equipment ID No. LSL-5206 Equip. Class' 18- Instrument Racks Equipment Description LOW LEVEL DIESEL SWITCH Location: Bldg. RAB Floor El. 369 Room, Area 87 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE-] N[

of the 50% of SWEL items requiring such verification)? Item is not part of the 50%.

2. Is the anchorage free of bent, broken, missing or loose hardware? Y" NEI UEJ N/AE3 The bolts anchoring the switch to the EDG skid are free of bent, broken, missing and loose hardware.
3. Is the anchorage free of corrosion that is more than mild surface YZ NE] UE-] N/AE[

oxidation? The anchorage had very mild surface oxidation, but is free of corrosion otherwise.

4. Is the anchorage free of visible cracks in the concrete near the YZ NE-] UEJ N/AE*

anchors? The switch is anchored to the EDG skid. No cracks in concrete were observed around the skid anchorage. I Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 372 of 560 Sheet 2 of 5 Status: YZ N] U[I] Seismic Walkdown Checklist (SWC) SWELl- 073 Equipment ID No. LSL-5206 Equip. Class2 18 - Instrument Racks Equipment Description LOW LEVEL DIESEL SWITCH

5. Is the anchorage configuration consistent with plant documentation? YO- N[! UE! N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

This does not apply since this item is not part of the 50% requiring anchorageconfiguration

6. Based on the above anchorage evaluations, is the anchorage free of YZ N[! ULI potentially adverse seismic conditions?

All anchorage was free of potentially adverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[ NE! UE- N/A[-]

There are no soft targets that could be impacted by nearby equipment or structures.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NE!I UE! N/AD-and masonry block walls not likely to collapse onto the equipment?

There are no masonry block walls or ceiling tiles in the room. The lights are in good condition, and do not present an interaction effect.

9. Do attached lines have adequate flexibility to avoid damage? YED N[E] UE- N/A[D The attachedlines have adequate flexibility.
10. Based on the above seismic interaction evaluations, is equipment free Y" NEI UD1 of potentially adverse seismic interaction effects?

Based on the above evaluation, the component is free of potentially adverse seismic interactioneffects. 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 373 of 560 Sheet 3 of 5 Status: YZ NEI U[-1 Seismic Walkdown Checklist (SWC) SWELl- 073 Equipment ID No. LSL-5206 Equip. Class3 18 - Instrument Racks Equipment Description LOW LEVEL DIESEL SWITCH Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NE] Ur--

adversely affect the safety functions of the equipment? It was looked for, and no other seismic conditions that could adversely affect the safety functions were found. Comments (Additional pages may be added as necessary) n' Evaluated by: Daniel Parker O-- Date: 10/11/2012 Eric Dilbone

  • 5 10/11/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 374 of 560 Sheet 4 of 5 Status: YZ NO U -- Seismic Walkdown Checklist (SWC) SWELl- 073 Equipment ID No. LSL-5206 Equip. Class4 18 - Instrument Racks Equipment Description LOW LEVEL DIESEL SWITCH Photographs Note: View of the level switch with the Note: Side view of the switch showing the equipment ID tag. anchorageto the skid. 4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 375 of 560 Sheet 5 of 5 Status: YZ NEI UI-Seismic Walkdown Checklist (SWC) SWELl- 073 Equipment ID No. LSL-5206 Equip. Class5 18 - Instrument Racks Equipment Description LOW LEVEL DIESEL SWITCH Note: Overhead view of the switch showing Note: General view of the level switch the anchorbolt not visible in the previous showing attached lines. image. 5 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 376 of 560 Sheet I of 5 Status: YE NE-I UD Seismic Walkdown Checklist (SWC) SWELl-074 Equipment ID No. PT-2812 Equip. Class' 18-INSTRUMENT RACKS Equipment Description EFWP P-7B DISCHARGE PRESSURE Location: Bldg. RAB Floor El. 335 Room, Area 38 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE] NZ of the 50% of SWEL items requiring such verification)?

No anchorage configuration verification required.

2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NE- U[-] N/AE--

The observed anchorageis free of bent, broken, missing and loose hardware.

3. Is the anchorage free of corrosion that is more than mild surface YZ N[-] UE] N/A[E]

oxidation? The observed anchorageis free of corrosion.

4. Is the anchorage free of visible cracks in the concrete near the YE] NE[ UE- N/AZ anchors?

The component is anchored by a bracket to a clamp on a pipe, so concrete near the anchorage is not applicable. 1 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 377 of 560 Sheet 2 of 5 Status: YZ NF U-I Seismic Walkdown Checklist (SWC) SWELl-074 Equipment ID No. PT-2812 Equip. Class2 18- INSTRUMENT RACKS Equipment Description EFWP P-7B DISCHARGE PRESSURE

5. Is the anchorage configuration consistent with plant documentation? YE] NE] UE- N/A[9 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

This is not part of the 50%.

6. Based on the above anchorage evaluations, is the anchorage free of Y[9 NWI U[--

potentially adverse seismic conditions? Based on the above anchorageevaluations, the anchorageis free of potentially adverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[Z NEI U[L N/AZ-All adjacent equipment are adequately spaced apart from each other where this component is mounted.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y( NE- UL] N/A--

and masonry block walls not likely to collapse onto the equipment? All overhead piping systems and electrical conduit are adequately secured.

9. Do attached lines have adequate flexibility to avoid damage? YN N[' U-] N/Ar-Attached lines have adequate flexibility.
10. Based on the above seismic interaction evaluations, is equipment free YZ NEI UWl of potentially adverse seismic interaction effects?

Based on the above seismic interactionevaluations, the equipment is free of potentially adverse seismic interaction effects. 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 378 of 560 Sheet 3 of 5 Status: YZ NOI U-Seismic Walkdown Checklist (SWC) SWELl-074 Equipment ID No. PT-2812 Equip. Class3 18- INSTRUMENT RACKS Equipment Description EFWP P-7B DISCHARGE PRESSURE Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Yo NEJ U--

adversely affect the safety functions of the equipment? A fire extinguisher is mounted on the wall near this component. Comments (Additional pages may be added as necessary) The PT-2812 component is clamped to an ~I Y2 "diameterpipe support bolted into the adjacentRC wall. This pipe support and clamp appearto be adequately secure to support the equipment during a seismic event. Evaluated by: Michael E Perez Date: 10/8/2012 Daniel Parker _ -,_ _Q1 10/8/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 379 of 560 Sheet 4 of 5 Status: YN NEI U-] Seismic Walkdown Checklist (SWC) SWELl-074 Equipment ID No. PT-2812 Equip. Class4 18-INSTRUMENT RACKS Equipment Description EFWP P-7B DISCHARGE PRESSURE Photographs Note: PT-2812 with equipment identification tag. 4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 380 of 560 Sheet 5 of 5 Status: YE NRI U-Seismic Walkdown Checklist (SWC) SWELl-074 Equipment ID No. PT-2812 Equip. Class5 18-INSTRUMENT RACKS Equipment Description EFWP P-7B DISCHARGE PRESSURE Note: Pipe anchorageto RC wall. 5 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 381 of 560 Sheet 1 of 5 Status: YEI NEI U-Seismic Walkdown Checklist (SWC) SWELl-075 Equipment ID No. N/A Equip. Class' N/A Equipment Description NOT USED Location: Bldg. N/A Floor El. N/A Room, Area N/A Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE NE UE:] N/AE"]
3. Is the anchorage free of corrosion that is more than mild surface YE NE:] UE- N/AE-oxidation?
4. Is the anchorage free of visible cracks in the concrete near the YE- NE UE- N/AE-1 anchors?

1 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 382 of 560 Sheet 2 of 5 Status: YE] NE] UE] Seismic Walkdown Checklist (SWC) SWELl-075 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED

5. Is the anchorage configuration consistent with plant documentation? YEI NEi UE: N/AEl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YE] NE] UE]

potentially adverse seismic conditions? Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y(E-- NEI UE- N/AE1
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y(E NEI UEi N/AE-and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y-E NEI UEi N/AEl
10. Based on the above seismic interaction evaluations, is equipment free YE- NEI UM of potentially adverse seismic interaction effects?

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 383 of 560 Sheet 3 of 5 Status: Yr-L NI1 UZI Seismic Walkdown Checklist (SWC) SWELl-075 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[-- NEl UEI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: Date:

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 384 of 560 Sheet 4 of 5 Status: YE-- NEI UDý Seismic Walkdown Checklist (SWC) SWELl-075 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Photographs Note: Note:

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 385 of 560 Sheet 5 of 5 Status: YLI NEI U-- Seismic Walkdown Checklist (SWC) SWELl-075 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 386 of 560 Sheet I of 5 Status: Y-I NE UI-Seismic Walkdown Checklist (SWC) SWELl-076 Equipment ID No. TE-1139 Equip. Class' 19- Temperature Sensors Equipment Description 'B'LOOP TH TEMP Location: Bldg. RB Floor El. 410 Room, Area 150 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[I NZ of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y[-] N[I] UN N/A[D
3. Is the anchorage free of corrosion that is more than mild surface YE] NEI] U N/A-]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Y-I NEI U[ N/A--

anchors? I Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 387 of 560 Sheet 2 of 5 Status: YOI NZ UD Seismic Walkdown Checklist (SWC) SWELl-076 Equipment ID No. TE-1139 Equip. Class 19- Temperature Sensors Equipment Description 'B' LOOP TH TEMP

5. Is the anchorage configuration consistent with plant documentation? YD- NDI UZ N/AD-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Yil NEI U[

potentially adverse seismic conditions? Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YDI ND-' UZ N/AD--
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y-I ND- UZ N/AD-and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YD- NDI UZ N/AD-
10. Based on the above seismic interaction evaluations, is equipment free YD-NEI UZ of potentially adverse seismic interaction effects?

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 388 of 560 Sheet 3 of 5 Status: YE[ NE U[-- Seismic Walkdown Checklist (SWC) SWELl-076 Equipment ID No. TE-1139 Equip. Class 19- Temperature Sensors Equipment Description 'B'LOOP TH TEMP Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NEIl US adversely affect the safety functions of the equipment?

. Comments (Additional pages may be added as necessary) Evaluated by: Date:

Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 389 of 560 Sheet 4 of 5 Status: YDI NE U-Seismic Walkdown Checklist (SWC) SWELl-076 Equipment ID No. TE-1139 Equip. Class 19- Temperature Sensors Equipment Description 'B' LOOP TH TEMP Photographs

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 390 of 560 Sheet 5 of 5 Status: Y-I NZ U'I Seismic Walkdown Checklist (SWC) SWELl-076 Equipment ID No. TE-1139 Equip. Class 19- Temperature Sensors Equipment Description 'B' LOOP TH TEMP

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 391 of 560 Sheet 1 of 5 Status: YZ Nr I UrD Seismic Walkdown Checklist (SWC) SWELl-077 Equipment ID No. TS-7904 Equip. Class, 19- TEMPERATURE SENSORS Equipment Description H&V EMGCY D-G RM FAN D Location: Bldg. RAB Floor El. 369 Room, Area 86 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[ ND]

of the 50% of SWEL items requiring such verification)? This item is part of the 50% configuration check.

2. Is the anchorage free of bent, broken, missing or loose hardware? Y" NEI UD- N/AD-The anchorageis free of bent, broken, missing and loose hardware.
3. Is the anchorage free of corrosion that is more than mild surface YN NDI U-- N/AD-oxidation?

The anchorageis free of corrosion.

4. Is the anchorage free of visible cracks in the concrete near the YZ NDI UiJ N/AFD anchors?

Mounted to Unistrut. Unistrut anchorage to concrete. Concrete is free of cracks. 'Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 392 of 560 Sheet 2 of 5 Status: YZ N-- U--] Seismic Walkdown Checklist (SWC) SWELl-077 Equipment ID No. TS-7904 - Equip. Clas S2 19 - TEMPERA TURE SENSORS Equipment Description H&V EMGCY D-G RM FAN D

5. Is the anchorage configuration consistent with plant documentation? YZ NEI Ur- N/AE-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

TS-7904 temperaturesensoris mounted to piece of Unistrut which is adequately anchoredto the north wall near the center of the room. The anchorageconfiguration is consistent with CALC-94-SQ-1001-19, page 32.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UE potentially adverse seismic conditions?

Based on the above anchorageevaluations, the anchorage is free of potentially adverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN N[-] U[-1 N/A[:]

All components mounted on the wall near TS-7904 are mounted similarly on anchored uni-strut. Overhead fluorescent lighting fixtures are adequately secured to prevent falling during a seismic event.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NEI U[-1 N/AZ1 and masonry block walls not likely to collapse onto the equipment?

All rigid electricalconduit, piping, and exhaust ducts overhead are adequatelysecured to prevent any seismic interaction with the component.

9. Do attached lines have adequate flexibility to avoid damage? YN NEI U-I N/A--

Attached lines have adequate flexibility.

10. Based on the above seismic interaction evaluations, is equipment free Y" NEM U--

of potentially adverse seismic interaction effects? Based on the above seismic interactionevaluations, the equipment is free of potentially adverse seismic interactioneffects. 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 393 of 560 Sheet 3 of 5 Status: YE NIZ U-- Seismic Walkdown Checklist (SWC) SWELl-077 Equipment ID No. TS-7904 Equip. Class3 19- TEMPERATURE SENSORS Equipment Description H&VEMGCYD-G RM FAN D Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ N[- UI-adversely affect the safety functions of the equipment?

It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found. Comments (Additional pages may be added as necessary) The component was mounted to a piece of uni-strut anchoredto the RC wall. The anchorage was judged to be adequate and sufficient as perANO documentation, 6030.113 Seismic Raceway Supports, Attachment 3, Support Mounting Details, Attachment 10, Box Supports. Evaluated by: Eric Dilbone 6

  • Date: 10/2/2012 Daniel Parker 10/2/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 394 of 560 Sheet 4 of 5 Status: YZ NEI U[-- Seismic Walkdown Checklist (SWC) SWELl-077 Equipment ID No. TS-7904 Equip. Class4 19- TEMPERATURE SENSORS Equipment Description H&VEMGCYD-G RM FAN D Photographs Note: TS-7904 Temperature Sensor Note: TS-7904 Temperature Sensor, Uni-Strut Anchorage to Wall. 4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 395 of 560 Sheet 5 of 5 Status: YZ NEI U-il Seismic Walkdown Checklist (SWC) SWELl-077 Equipment ID No. TS-7904 Equip. Cla Ss5 19- TEMPERATURE SENSORS Equipment Description H&V EMGCY D-G RM FAN D Note: TS-7904 Temperature Sensor, Uni-Strut Note: Above TS-7904 Temperature Sensor. Anchorage to Wall. 5 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 396 of 560 Sheet I of 5 Status: YZ ND UD Seismic Walkdown Checklist (SWC) SWELl-078 Equipment ID No. C10 Equip. Class' 20 - Instrumentationand Control Panels Equipment Description VERT BD- ELEC AUX Location: Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YD] NZ of the 50% of SWEL items requiring such verification)?

This item is not part of the 50%.

2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NDI UDl N/AD3 Visual confirmation of 7 welds on front of cabinet in good condition. It was confirmed that 2 anchorbolts in the front of the cabinet are in good shape. The 2 corresponding anchorbolts in the rearof the cabinet were not visible due to wires on floor.
3. Is the anchorage free of corrosion that is more than mild surface YZ NDI UDl N/A[D]

oxidation? No mild surface oxidation present.

4. Is the anchorage free of visible cracks in the concrete near the YZ ND-] UDI N/AD-anchors?

Cabinet is welded to an embedded steel channel, but the concrete surroundingthe channel was free of cracks. 1 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 397 of 560 Sheet 2 of 5 Status: YZ ND] UI Seismic Walkdown Checklist (SWC) SWELl-078 Equipment ID No. CIO Equip. Class2 20 - Instrumentation and Control Panels Equipment Description VERT BD- ELEC AUX

5. Is the anchorage configuration consistent with plant documentation? Y[-] ND] ULI N/A[

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) All anchorage that was visible was confirmed against CALC-94-SW-1001-20, pages 39-52, but not all anchoragecould be seen.

6. Based on the above anchorage evaluations, is the anchorage free of YE ND-- UD-potentially adverse seismic conditions?

All visible anchoragewas free of potentially adverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y] NDI UD] N/AD-There are no soft targetsthat could be impacted by nearby equipment or structures.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ N[D UD- N/AD-and masonry block walls not likely to collapse onto the equipment?

Masonry block walls in the room are seismically qualified, and painted with a qualification number. Ceiling tiles and lights are all in good condition, and are adequatelysupported.

9. Do attached lines have adequate flexibility to avoid damage? YZ NDl UDl N/AD The attachedlines have adequate flexibility.
10. Based on the above seismic interaction evaluations, is equipment free YZ NDJ UD-of potentially adverse seismic interaction effects?

Based on the above evaluation, the cabinet is free of potentially adverse seismic interaciton effects. 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 398 of 560 Sheet 3 of 5 Status: YZ NEI U-I Seismic Walkdown Checklist (SWC) SWELl-078 Equipment ID No. C10 Equip. Class3 20 - Instrumentationand Control Panels Equipment Description VERT BD- ELEC AUX Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[( Ni[ UIM adversely affect the safety functions of the equipment?

It was looked for, and no other seismic conditions that could adversely affect the safety functions were found. Comments (Additional pages may be added as necessary) Evaluated by: Roy Berryman Date: 10/4/2012 Eric Dilbone 6U.:- " 10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 399 of 560 Sheet 4 of 5 Status: YZ NEI] ULI Seismic Walkdown Checklist (SWC) SWELl-078 Equipment ID No. C10 Equip. Class4 20- Instrumentationand Control Panels Equipment Description VERT BD- ELEC AUX Photographs Note: Cabinet CIO tag from the back. Note: View inside the cabinet. Some of the steel channel anchor bolts were covered by wires that could not be moved for inspection. 4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 400 of 560 Sheet 5 of 5 Status: Y[ NE] UD-Seismic Walkdown Checklist (SWC) SWELl--078 Equipment ID No. C10 Equip. Class5 20 - Instrumentationand Control Panels Equipment Description VERT BD- ELEC AUX Note: A representativeweld on the front of the Note: Cabinet CIO from the front. cabinet to the steel channel. 5 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 401 of 560 Sheet I of 5 Status: YN NEI U-Seismic Walkdown Checklist (SWC) SWELl- 079 Equipment ID No. PY-2618-A1 Equip. Class' 20 - Instrumentation and Control Panels Equipment Description IW CONVERTER STM GEN A PRESS Location: Bldg. RAB Floor El. 368 Room, Area 104 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Yil NZ of the 50% of SWEL items requiring such verification)?

This item is not part of the 50%.

2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI ur-D N/Ar-This component is located in a nest in cabinet C539A. No bent, broken, missing or loose hardware was observed.
3. Is the anchorage free of corrosion that is more than mild surface Y[ NEI U[1 N/AFD oxidation?

No corrosion was observed.

4. Is the anchorage free of visible cracks in the concrete near the 'YZ N[:] UIE] N/AEl anchors?

The component is located in a nest of cabinet C539A. No cracks in the concrete were observed around the panel anchorage IEnter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 402 of 560 Sheet 2 of 5 Status: YE NIZ U[-- Seismic Walkdown Checklist (SWC) SWELl- 079 Equipment ID No. PY-2618-Al Equip. Class2 20 - Instrumentation and Control Panels Equipment Description IN CONVERTER STM GEN A PRESS

5. Is the anchorage configuration consistent with plant documentation? YE- NEJ ULI N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

This item is not part of the 50%.

6. Based on the above anchorage evaluations, is the anchorage free of YE NEJ U[I potentially adverse seismic conditions?

Based on the above anchorageevaluations, the anchorageis free of potentially adverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI UE1 N/A[E]

Soft targets are free from impact since they are in a cabinet that is latched closed.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, 'Y[] NE:] UE1 N/AZ and masonry block walls not likely to collapse onto the equipment?

This does not apply since the component is located inside of a cabinet.

9. Do attached lines have adequate flexibility to avoid damage? YZ NEI U- N/AE1 Attached lines have adequateflexibility.
10. Based on the above seismic interaction evaluations, is equipment free YZ NE] UM of potentially adverse seismic interaction effects?

Based on the above seismic interaction evaluations, the equipment is free of potentiallyadverse seismic interactioneffects. 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 403 of 560 Sheet 3 of 5 Status: YZ NOI U-I Seismic Walkdown Checklist (SWC) SWELl- 079 Equipment ID No. PY-2618-A1 Equip. Class3 20 - Instrumentationand Control Panels Equipment Description I/V CONVERTER STM GEN A PRESS Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ N[] Ur-adversely affect the safety functions of the equipment?

It was looked for, and no other seismic conditions that could adversely affect the safety functions were found. Comments (Additional pages may be added as necessary) Evaluated by: Eric Dilbone 6u &- Date: 10/10/2012 Daniel Parker 10/10/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 404 of 560 Sheet 4 of 5 Status: YE NE] UI] Seismic Walkdown Checklist, (SWC) SWELl- 079 Equipment ID No. PY-2618-A1 Equip. Class4 20- Instrumentation and Control Panels Equipment Description I/V CONVERTER STM GEN A PRESS Photographs Note: Front view of component. Note: Sign on cabinet door. 4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 405 of 560 Sheet 5 of 5 Status: YZ NE] UM Seismic Walkdown Checklist (SWC) SWELl- 079 Equipment ID No. PY-2618-Al Equip. CIass5 20 - Instrumentation and Control Panels Equipment Description IW CONVERTER STM GEN A PRESS Note: Wingnut and washerare used to keep Note: the metal plate over the door to keep it from swinging open. As the nameplate reads, this is necessary to maintain seismic qualificationsfor the cabinet. Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 406 of 560 Sheet I of 4 Status: YZ NiF ULI-Seismic Walkdown Checklist (SWC) SWELl-080 Equipment ID No. PB-0144 Equip. Class, 20 - Instrumentation and Control Panels Equipment Description START BUTTON FOR DIESEL GENERATOR #1 Location: Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE- No of the 50% of SWEL items requiring such verification)?

This item is not part of the 50%.

2. Is the anchorage free of bent, broken, missing or loose hardware? Y' NEi UEJ N/AE[-

This component is face mounted to a cabinet. No bent, broken, missing or loose hardware was observed.

3. Is the anchorage free of corrosion that is more than mild surface YZ NEI uEr N/AE-1 oxidation?

This component is face mounted to a cabinet. No corrosion was observed.

4. Is the anchorage free of visible cracks in the concrete near the YZ NEI UE- N/AE-1 anchors?

This component is face mounted to a cabinet. No cracks in concrete were observed. IEnter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 407 of 560 Sheet 2 of 4 Status: YZ NF1 U-Seismic Walkdown Checklist (SWC) SWELl-080 Equipment ID No. PB-0144 Equip. Class2 20 - Instrumentationand Control Panels Equipment Description START BUTTON FOR DIESEL GENERATOR #1

5. Is the anchorage configuration consistent with plant documentation? YEI NEI U[] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

This item is not part of the 50%.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NE]I UE potentially adverse seismic conditions?

The anchorageis not visible since it is mounted in the face of a panel. The cabinet could not be opened due to Control Room Operations. However, the button appearsto be installedproperly and there is no apparentreason why it would be adversely affected in a seismic event. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[ NEI UE] N/AE]

There are no soft targetsthat could be impacted by nearby equipment or structures.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[ NE] UEI N/AE]

and masonry block walls not likely to collapse onto the equipment? Masonry block walls in the room are seismically qualified, and painted with a qualificationnumber. Ceiling tiles and lights are all in good condition, and are adequatelysupported.

9. Do attached lines have adequate flexibility to avoid damage? '(Y NEI UE] N/AE]

There are no visible attachedlines, since the button is mounted on the face of a panel.

10. Based on the above seismic interaction evaluations, is equipment free Y0 NEI UE]

of potentially adverse seismic interaction effects? Based on the above evaluation, the button is free of potentially adverse seismic interacitoneffects. 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 408 of 560 Sheet 3 of 4 Status: YZ NF U-Seismic Walkdown Checklist (SWC) SWELl-080 Equipment ID No. PB-0144 Equip. Class3 20 - Instrumentationand Control Panels Equipment Description START BUTTON FOR DIESEL GENERATOR #1 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ N[] UM adversely affect the safety functions of the equipment?

It was looked for, and no other seismic conditions that could adversely affect the safety functions were found. Comments (Additional pages may be added as necessary) Evaluated by: Roy Berryman Date: 10/4/2012 Eric flbohnse 6z41 10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 409 of 560 Sheet 4 of 4 Status: YZ NEi] UF-1 Seismic Walkdown Checklist (SWC) SWELl-080 Equipment ID No. PB-0144 Equip. Class4 20 - Instrumentationand Control Panels Equipment Description START BUTTON FOR DIESEL GENERATOR #1 Photographs Note: PB-0144 is shown mounted in the face Note: of a panel 4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 410 of 560 Sheet I of 5 Status: YZ NEI UDE-Seismic Walkdown Checklist (SWC) SWELl- 081 Equipment ID No. C539A Equip. Class' 20 - Instrumentationand Control Panels Equipment Description EFIC SIGNAL CONDITIONING CABINET Location: Bldg. RAB Floor El. 368 Room, Area 104 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[I- NZ of the 50% of SWEL items requiring such verification)?

This is not part of the 50%.

2. Is the anchorage free of bent, broken, missing or loose hardware? Y' NEi ULi N/A-'

The visible anchorage is free of bent, broken and loose hardware. However, only half of the anchoragewas visible.

3. Is the anchorage free of corrosion that is more than mild surface YZ N[i U[i] N/A[--

oxidation? The visible anchorage is free of corrosion.

4. Is the anchorage free of visible cracks in the concrete near the YZ NEI U[I N/A--

anchors? The cabinet anchorageis free of cracks in the concrete near the anchors. Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 411 of 560 Sheet 2 of 5 Status: YZ No] U' Seismic Walkdown Checklist (SWC) SWELl- 081 Equipment ID No. C539A Equip. Class 20 - Instrumentation and Control Panels Equipment Description EFIC SIGNAL CONDITIONING CABINET

5. Is the anchorage configuration consistent with plant documentation? YE] NE] UE] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

This item is not part of the 50%. However, visible anchorage is consistent with CALC-94-SQ-1001-20, pages 235-246.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UE]

potentially adverse seismic conditions? All visible anchoragewas free of potentially adverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEi UIE] N/AE1 Soft targets are free from impact by nearby equipment and structures.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, 'Y[Z NE] UE-] N/AE]

and masonry block walls not likely to collapse onto the equipment? There are no masonry block walls or ceiling tiles in the room. The lights are in good condition, and do not present an interaction effect.

9. Do attached lines have adequate flexibility to avoid damage? Y[ NEI UE1 N/A[-]

The attachedlines have adequate flexibility.

10. Based on the above seismic interaction evaluations, is equipment free Y[ NE] UE]

of potentially adverse seismic interaction effects? Based on the above evaluation, the cabinet is free of potentially adverse seismic interactioneffects.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 412 of 560 Sheet 3 of 5 Status: YZ NEI' U-Seismic Walkdown Checklist (SWC) SWELl- 081 Equipment ID No. C539A Equip. Class 20 - Instrumentation and Control Panels Equipment Description EFIC SIGNAL CONDITIONING CABINET Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN N[: Uij adversely affect the safety functions of the equipment?

It was looked for, and no other seismic conditions that could adversely affect the safety functions were found. Comments (Additional pages may be added as necessary) Evaluated by: Eric Dilbone Date: 10/10/2012 Daniel Parker 10/10/2012

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 413 of 560 Sheet 4 of 5 Status: YE NF Ur Seismic Walkdown Checklist (SWC) SWELl- 081 Equipment ID No. C539A Equip. Class 20 - Instrumentation and Control Panels Equipment Description EFIC SIGNAL CONDITIONING CABINET Photographs m Note: (* Note: View of the inside of the front of C A.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 414 of 560 Sheet 5 of 5 Status: YZ NF U-Seismic Walkdown Checklist (SWC) SWELl- 081 Equipment ID No. C539A - Equip. Class 20 - Instrumentation and Control Panels Equipment Description EFIC SIGNAL CONDITIONING CABINET Note: View of bottom of C539A from the rear. Note: View of C5 taken off.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 415 of 560 Sheet I of 5 Status: Y-I NE] U-I Seismic Walkdown Checklist (SWC) SWELl-082 Equipment ID No. N/A Equip. Class, N/A Equipment Description NOT USED Location: Bldg. N/A Floor El. N/A Room, Area N/A Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[-- NE of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE-] NEl UEi N/AEl
3. Is the anchorage free of corrosion that is more than mild surface YE-] NE] UEi N/AEl oxidation?
4. Is the anchorage free of visible cracks in the concrete near the YE NEl UE-] N/AE--

anchors? 1 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 416 of 560 Sheet 2 of 5 Status: YE- NI- U-Seismic Walkdown Checklist (SWC) SWELl-082 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED

5. Is the anchorage configuration consistent with plant documentation? YE NEI UE N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Y[- NE UE-1 potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NE uE N/AE-1
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE] NE UE:] N/AE:

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YE NE UE N/A[-]
10. Based on the above seismic interaction evaluations, is equipment free YE- NEI U--

of potentially adverse seismic interaction effects?

Engineering Report No. CALC-ANO I-C S- 12-00002 Attachment C Rev. 0 Page 417 of 560 Sheet 3 of 5 Status: YE[- NF] U-] Seismic Walkdown Checklist (SWC) SWELl-082 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[-] NE ULI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: Date:

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 418 of 560 Sheet 4 of 5 Status: YEr- NEI U -] Seismic Walkdown Checklist (SWC) SWELl-082 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Photographs Note: Note:

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 419 of 560 Sheet 5 of 5 Status: Y[-- NEI Uni-Seismic Walkdown Checklist (SWC) SWELl-082 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Note: Note:

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 420 of 560 Sheet I of 5 Status: YEI NF ULI Seismic Walkdown Checklist (SWC) SWELl-083 Equipment ID No. N/A Equip. Class, N/A Equipment Description NOT USED Location: Bldg. N/A Floor El. N/A Room, Area N/A Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[--W NEW of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YW-] N[l U- N/A-
3. Is the anchorage free of corrosion that is more than mild surface Y[-- NEI UW- N/A[--

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Y-I NWJ U-- N/A[]

anchors? 1 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 421 of 560 Sheet 2 of 5 Status: Y-- Nn Ur Seismic Walkdown Checklist (SWC) SWELl-083 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED

5. Is the anchorage configuration consistent with plant documentation? Y[-- NWi UW3 N/A'-

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YLI NEI ULI potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? *YEI Nn UW N/A[-]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[-] NW] UW-1 N/Ar-and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y-I NE] UWJ N/A[:
10. Based on the above seismic interaction evaluations, is equipment free YEJ NEJ Un of potentially adverse seismic interaction effects?

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 422 of 560 Sheet 3 of 5 Status: YO-] NE] U[-] Seismic Walkdown Checklist (SWC) SWELl-083 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO-- N[-] U[-]

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) Evaluated by: Date:

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 423 of 560 Sheet 4 of 5 Status: YO- No U[D Seismic Walkdown Checklist (SWC) SWELl-083 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Photographs Note: Note:

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 424 of 560 Sheet 5 of 5 Status: YO NF U[- Seismic Walkdown Checklist (SWC) SWELl-083 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Note: Note:

Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 425 of 560 Sheet I of 5 Status: YZ NE-] U-Seismic Walkdown Checklist (SWC) SWELl- 084 Equipment ID No. PI-2811A Equip. Class' 20 - Instrumentation and Control Panels Equipment Description EFWP P-7A DISCH PRESS Location: Bldg. RAB Floor El. 335 Room, Area 38 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ N[-

of the 50% of SWEL items requiring such verification)? Verification is requiredfor this item. There are four anchorbolts in the item, and thus, this item is partof the 50%.

2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI ULI N/AZ!

Anchorage in the item appears to be free from the conditions stated above.

3. Is the anchorage free of corrosion that is more than mild surface YZ NEI] Ur- N/AF-oxidation?

There was no sign of corrosion found anywhere in the item.

4. Is the anchorage free of visible cracks in the concrete near the YZ NEI UEl N/AZ!

anchors? No visible cracks have been found. ' Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 426 of 560 Sheet 2 of 5 Status: YZ ND] UFD Seismic Walkdown Checklist (SWC) SWELl- 084 Equipment IDNo. PI-2811A Equip. Class 20 - Instrumentation and Control Panels Equipment Description EFWP P-7A DISCH PRESS

5. Is the anchorage configuration consistent with plant documentation? 'YZ ND] UD- N/AD-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

The anchorageconfigurationmatches with the description specified in CALC-94-SQ-1001-20, pages 1048 to 1051.

6. Based on the above anchorage evaluations, is the anchorage free of Y( ND- UD potentially adverse seismic conditions?

No potentially adverse seismic conditions have been found. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y" NDI uD-] N/AD-1 All soft targets appearto be free from any impact by nearby equipment and structures.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, "Y NDI UD1 N/AD-and masonry block walls not likely to collapse onto the equipment?

Overheadequipment is properlyplaced. Therefore, it is very unlikely that they would collapse onto this item.

9. Do attached lines have adequate flexibility to avoid damage? YZ ND-1 UD- N/AD-All attachedlines appearto have adequateflexibility.
10. Based on the above seismic interaction evaluations, is equipment free YZ N[:D UM of potentially adverse seismic interaction effects?

Because all the mass is found near the anchor,it is very unlikely that it will seismically interactwith other equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 427 of 560 Sheet 3 of 5 Status: YZ NE] UW-- Seismic Walkdown Checklist (SWC) SWELl- 084 Equipment ID No. PI-2811A Equip. Class 20 - Instrumentation and Control Panels Equipment Description EFWP P-7A DISCH PRESS Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ NEJ UFJ adversely affect the safety functions of the equipment?

No other seismic conditions were found in the area to affect the equipment's safety functions. Comments (Additional pages may be added as necessary) Component is found to be in adequateconditions with respect to anchorage,soft targets,overhead equipment, flexibility in attachedlines, and seismic interaction. No severe issues have been found to affect the component's integrity. Evaluated by: Daniel Parker Date: 10/8/2012 Michael E. Perez / 10/8/2012

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 428 of 560 Sheet 4 of 5 Status: YZ NEI UL-I Seismic Walkdown Checklist (SWC) SWELl- 084 Equipment ID No. PI-2811A Equip. Class 20 - Instrumentation and Control Panels Equipment Description EFWP P-7A DISCH PRESS Photographs Note: Equipment ID tag for Item PI-281 IA. Note: Equipment is mounted on a pipe rack that is anchored by 4 M*" bolts, as specified in the SEWS. As can be seen, the anchorageis in adequate conditions.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 429 of 560 Sheet 5 of 5 Status: YZ NO UI' Seismic Walkdown Checklist (SWC) SWELl- 084 Equipment ID No. PI-2811A Equip. Class 20 - Instrumentation and Control Panels Equipment Description EFWP P-7A DISCH PRESS Note: Note that the additionalanchors found Note: within the component are free from any signs of corrosion.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 430 of 560 Sheet 1 of 5 Status: YE No UD-Seismic Walkdown Checklist (SWC) SWELl-085 Equipment ID No. C88 Equip. Class, 20 - Instrumentation and Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. 1 Location: Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y5 ND-of the 50% of SWEL items requiring such verification)?

Not part of the 50% anchorageconfiguration verification.

2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI UD-- N/AD-]

All anchorageis visible, and is free of bent, broken, missing and loose hardware.

3. Is the anchorage free of corrosion that is more than mild surface YN ND-] U[-] N/Ar oxidation?

There was no observablecorrosion,or even mild surface oxidation on the anchorage.

4. Is the anchorage free of visible cracks in the concrete near the YN ND-I U'- N/AD-'

anchors? The anchorageis free of visible cracks in the concrete near the anchors. 1 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 431 of 560 Sheet 2 of 5 Status: Y[ NEI UrD Seismic Walkdown Checklist (SWC) SWELl-085 Equipment ID No. C88 Equip. Class2 20 - Instrumentation and Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. I

5. Is the anchorage configuration consistent with plant documentation? YZ N[1 UE" N/AD--

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) The anchorageconfiguration is consistent with plant documentation. The anchorageis in accordancewith the description in CALC-94-SQ-1001-20, page 299. Additionally, the configurationis consistent with Drawing C-264, Detail 4.

6. Based on the above anchorage evaluations, is the anchorage free of Y[ N[-] U[]

potentially adverse seismic conditions? Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI U[:] N/A-There are no soft targets that are susceptible to impact by nearby equipment or structures. All soft targets are containedwithin the cabinet, and the cabinet is latched closed.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[ N[-] U[-] N/A[D-and masonry block walls not likely to collapse onto the equipment?

None of the overhead equipment, ceiling tiles or lighting are likely to collapse onto the equipment. The masonry block walls in the room are seismically qualified.

9. Do attached lines have adequate flexibility to avoid damage? YZ NDI U[-D N/AD1 Attached lines have adequate flexibility to avoid damage.
10. Based on the above seismic interaction evaluations, is equipment free YN NDI UD of potentially adverse seismic interaction effects?

Based on the above seismic interactionevaluations, the equipment is free of potentially adverse seismic interaction effects. 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 432 of 560 Sheet 3 of 5 Status: YZ NEI U[- Seismic Walkdown Checklist (SWC) SWELl-085 Equipment ID No. C88 Equip. Class3 20 - Instrumentation and Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. 1 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ NE] U[-

adversely affect the safety functions of the equipment? It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found. It was observed that neighboring cabinets were appropriatelybolted together to avoid interactioneffects. Comments (Additional pages may be added as necessary) Evaluated by: Roy Berryman Date: 10/4/2012 Eric Dilbone 6 A &1F.--. - 10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 433 of 560 Sheet 4 of 5 Status: YM N- UF-I Seismic Walkdown Checklist (SWC) SWELl-085 Equipment ID No. C88 Equip. CIass4 20 - Instrumentationand Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. 1 Photographs V Expansion anchors Note: Equipment ID tag identifying the Note: View inside the? bottom of the front of cabinet. the cabinet with the door open. Two of the four expansion anchors are visible. 4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 434 of 560 Sheet 5 of 5 Status: Y[ NEI UrD Seismic Walkdown Checklist (SWC) SWELl-085 Equipment ID No. C88 Equip. Classs 20 - Instrumentation and Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. 1 I Expansion anchor Note: View of one of the expansion anchors in Note: View of the bottom of the cabinet from the rearof the cabinet, as seen from the front the outside. Consistent with plant with the door open. documentation,no anchorage is visible without opening the cabinet. 5 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 435 of 560 Sheet I of 5 Status: YE NIh U[-- Seismic Walkdown Checklist (SWC) SWELl-086 Equipment ID No. C89 Equip. Class' 20 - Instrumentation and Control Panels Equipment Description ESAS ANALOG SUBSYSTEM No. 2 Location: Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y" NEI of the 50% of SWEL items requiring such verification)?

This item is part of the 50%.

2. Is the anchorage free of bent, broken, missing or loose hardware? YN NEI U[L N/A[--

All anchorageis visible, and is free of bent, broken, missing and loose hardware.

3. Is the anchorage free of corrosion that is more than mild surface YZ NEI UI1 N/AZI oxidation?

There was no observable corrosion, or even mild surface oxidation on the anchorage.

4. Is the anchorage free of visible cracks in the concrete near the YZ NEil UI1 N/A-'

anchors? The anchorageis free of visible cracks in the concrete near the anchors. 1 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-C S- 12-00002 Attachment C Rev. 0 Page 436 of 560 Sheet 2 of 5 Status: YE ND UD-1 Seismic Walkdown Checklist (SWC) SWELl-086 Equipment ID No. C89 Equip. Class2 20 - Instrumentation and Control Panels Equipment Description ESAS ANALOG SUBSYSTEM No. 2

5. Is the anchorage configuration consistent with plant documentation? YZ NDI UD- N/AD-'

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) The anchorage configurationis consistent with plant documentation. The anchorageis in accordance with the description in CALC-94-SQ-1001-20, page 303. Additionally, the configurationis consistent with Drawing C-264, Detail4.

6. Based on the above anchorage evaluations, is the anchorage free of Y" ND-] u[--

potentially adverse seismic conditions? Based on the above anchorage evaluations, the anchorageis free of potentially adverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NDJ U[-D N/A[D There are no soft targets that are susceptible to impact by nearby equipment or structures. All soft targets are containedwithin the cabinet, and the cabinet is latched closed.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NDI UD1 N/ADl and masonry block walls not likely to collapse onto the equipment?

None of the overhead equipment, ceiling tiles or lighting are likely to collapse onto the equipment. The masonry block walls in the room are seismically qualified.

9. Do attached lines have adequate flexibility to avoid damage? Y' NDJ UD- N/AD-Attached lines have adequateflexibility to avoid damage.
10. Based on the above seismic interaction evaluations, is equipment free Y' NDi UD-of potentially adverse seismic interaction effects?

Based on the above seismic interactionevaluations, the equipment is free of potentially adverse seismic interaction effects. 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 437 of 560 Sheet 3 of 5 Status: YZ NE] U-Seismic Walkdown Checklist (SWC) SWELl-086 Equipment ID No. C89 Equip. Class3 20 - Instrumentationand Control Panels Equipment Description ESAS ANALOG SUBSYSTEM No. 2 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y' N] UMi adversely affect the safety functions of the equipment?

It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found. It was observed that neighboringcabinets were appropriatelybolted together to avoid interaction effects. Comments (Additional pages may be added as necessary) Evaluated by: Roy Berryman Date: 10/4/2012 Eric Dilbone 2 10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 438 of 560 Sheet 4 of 5 Status: Y[ NEI U[- Seismic Walkdown Checklist (SWC) SWELl-086 Equipment ID No. C89 Equip. Class4 20 - Instrumentationand ControlPanels Equipment Description ESAS ANALOG SUBSYSTEM No. 2 Photographs Note: Equipment ID tag identifying the Note: View inside the bottom of the front of cabinet. the cabinet. 4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 439 of 560 Sheet 5 of 5 Status: Y[ NR-- U-Seismic Walkdown Checklist (SWC) SWELl-086 Equipment ID No. C89 Equip. CIass5 20 - Instrumentation and Control Panels Equipment Description ESAS ANALOG SUBSYSTEM No. 2 COl Note: View of the side of the cabinet with the Note: Closer view inside the bottom of the door open. The cabinet is bolted to the cabinet from the front with the door open. neighboring cabinet as shown. 5 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 440 of 560 Sheet 1 of 5 Status: YE NE] U[Ij Seismic Walkdown Checklist (SWC) SWELl-087 Equipment ID No. C90 Equip. Class' 20 - Instrumentation and Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. 3 Location: Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YN ND]

of the 50% of SWEL items requiring such verification)? This item is partof the 50%.

2. Is the anchorage free of bent, broken, missing or loose hardware? Y[ NEI UD- N/A[D]

All anchorageis visible, and is free of bent, broken, missing and loose hardware.

3. Is the anchorage free of corrosion that is more than mild surface Y[ NDI ULI N/AD-oxidation?

There was no observable corrosion, or even mild surface oxidation on the anchorage.

4. Is the anchorage free of visible cracks in the concrete near the Y[ NDI U[-- N/AD--

anchors? The anchorage is free of visible cracks in the concrete near the anchors. I Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-C S- 12-00002 Attachment C Rev. 0 Page 441 of 560 Sheet 2 of 5 Status: YZ NE] U[I Seismic Walkdown Checklist (SWC) SWELl-087 Equipment ID No. C90 Equip. Class2 20 - Instrumentationand Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. 3

5. Is the anchorage configuration consistent with plant documentation? YZ NE] UEL N/AZ1 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

The anchorageconfiguration is consistent with plant documentation. The anchorageis in accordance with the description in CALC-94-SQ-1001-20, page 307. Additionally, the configuration is consistent with Drawing C-264, Detail 4.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UEJ potentially adverse seismic conditions?

Based on the above anchorageevaluations, the anchorage is free of potentially adverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[ NEI UE] N/AE]

There are no soft targets that are susceptible to impact by nearby equipment or structures. All soft targets are containedwithin the cabinet, and the cabinet is latched closed.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI UE] N/A[-]

and masonry block walls not likely to collapse onto the equipment? None of the overhead equipment, ceiling tiles or lighting are likely to collapse onto the equipment. The masonry block walls in the room are seismically qualified.

9. Do attached lines have adequate flexibility to avoid damage? YZ NE] uE] N/AE]

Attached lines have adequateflexibility to avoid damage.

10. Based on the above seismic interaction evaluations, is equipment free YZ N[:] UE]

of potentially adverse seismic interaction effects? Based on the above seismic interaction evaluations, the equipment is free of potentiallyadverse seismic interactioneffects. 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 442 of 560 Sheet 3 of 5 Status: YZ No U-- Seismic Walkdown Checklist (SWC) SWELl-087 Equipment ID No. C90 - Equip. Class3 20 - Instrumentation and Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. 3 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ Nil U[I adversely affect the safety functions of the equipment?

It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found. It was observed that neighboringcabinets were appropriatelybolted together to avoid interactioneffects. Comments (Additional pages may be added as necessary) Evaluated by: Roy Berryman Date: 10/4/2012 Eric Dilbone "" `,'c - 10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 443 of 560 Sheet 4 of 5 Status: YE NEI UL-I Seismic Walkdown Checklist (SWC) SWELl-087 Equipment ID No. C90 Equip. Class4 20 - Instrumentationand Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. 3 Photographs Note: Equipment ID tag identifying the Note: View inside the bottom of the cabinet cabinet. with the front door open. 4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 444 of 560 Sheet 5 of 5 Status: YZ NDI U in Seismic Walkdown Checklist (SWC) SWELl-087 Equipment ID No. C90 Equip. Class5 20 - Instrumentationand Control Panels Equipment Description ESAS CABINET ANALOG SUBSYSTEM No. 3 Note: View of the side of the cabinet with the Note: front door open. The bolting to the neighboring cabinet is visible along the side. 5 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 445 of 560 Sheet I of 4 Status: YZ NL- U-Seismic Walkdown Checklist (SWC) SWELl-088 Equipment ID No. PWR-2406 Equip. Class' 20 - Instrumentation and Control Panels Equipment Description REACTOR BLDG SPRAY ENG SAFEG'D POWER SUPPLY Location: Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YDi NZ of the 50% of SWEL items requiring such verification)?

This item is not part of the 50%.

2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI UEI N/AD1 Item is mounted in a cabinet. No adverse hardware conditions were observed.
3. Is the anchorage free of corrosion that is more than mild surface YZ N[I- U-I N/AD-oxidation?

Item is mounted in a cabinet. No oxidation was observed

4. Is the anchorage free of visible cracks in the concrete near the YZ NEI UED N/AD--

anchors? Item is mounted in a cabinet. No cracks in concrete were observed I Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 446 of 560 Sheet 2 of 4 Status: YZ ND ULI Seismic Walkdown Checklist (SWC) SWELl-088 Equipment ID No. PWR-2406 Equip. Class2 20 - Instrumentationand Control Panels Equipment Description REACTOR BLDG SPRAY ENG SAFEG'D POWER SUPPLY

5. Is the anchorage configuration consistent with plant documentation? YOI ND UIl N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

This item is not part of the 50%.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI U[D potentially adverse seismic conditions?

Based on the above anchorageevaluations, the anchorage is free of potentially adverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NDI UDl N/AD There are no soft targets that could be impacted by nearby equipment or structures.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NDI UD N/AD and masonry block walls not likely to collapse onto the equipment?

Masonry block walls in the room are seismically qualified, and painted with a qualificationnumber. Ceiling tiles and lights are all in good condition, and are adequately supported.

9. Do attached lines have adequate flexibility to avoid damage? YO ND U[-] N/A--

There are no visible attachedlines, since the power supply is rack-mounted in a cabinet that can only be opened from the front without disassembling the cabinet.

10. Based on the above seismic interaction evaluations, is equipment free YE ND Uil of potentially adverse seismic interaction effects?

Based on the above evaluation, the power supply is free of potentially adverse seismic interaciton effects. 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 447 of 560 Sheet 3 of 4 Status: YZ NEI UI-Seismic Walkdown Checklist (SWC) SWELl-088 Equipment ID No. PWR-2406 Equip. Class3 20 - Instrumentationand Control Panels Equipment Description REACTOR BLDG SPRAY ENG SAFEG'D POWER SUPPLY Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y' NiZ U[

adversely affect the safety functions of the equipment? It was looked for, and no other seismic conditions that could adversely affect the safety functions were found. Comments (Additional pages may be added as necessary) Evaluated by: Roy Berryman Date: 10/4/2012 Eric Dilbone 6 _ _ _ _ 10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 448 of 560 Sheet 4 of 4 Status: YO NEI U[- Seismic Walkdown Checklist (SWC) SWELl-088 Equipment ID No. PWR-2406 Equip. CIass4 20 - Instrumentation and Control Panels Equipment Description REACTOR BLDG SPRAY ENG SAFEG'D POWER SUPPLY Photographs Note: PWR-2406 as seen from the front with Note: View inside the cabinet door. The power the cabinet door open. supply is identified as the top two rack positions, as seen in the previous image (upper). Also, a zoomed in version of the section in the rectangle is shown (lower). 4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 449 of 560 Sheet I of 5 Status: YZ NE] UD-- Seismic Walkdown Checklist (SWC) SWELl-089 Equipment ID No. C14 Equip. Class, 20 - Instrumentation and Control Panels Equipment Description VERTICAL BOARD, PRIMARY COOLANT Location: Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[-- NZ of the 50% of SWEL items requiring such verification)?

This item is not partof the 50%.

2. Is the anchorage free of bent, broken, missing or loose hardware? YZ N[1 ULI N/A[-]

There were no missing bolts or welds.

3. Is the anchorage free of corrosion that is more than mild surface YZ NEI ur- N/AD-oxidation?

There were no signs of oxidation on hardware.

4. Is the anchorage free of visible cracks in the concrete near the YZ NEI UD- N/AD-]

anchors? The concrete was free of cracks near anchors.

' Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 450 of 560 Sheet 2 of 5 Status: YZ NE U-Seismic Walkdown Checklist (SWC) SWELl-089 Equipment ID No. C14 Equip. Class2 20 - Instrumentation and Control Panels Equipment Description VERTICAL BOARD, PRIMARY COOLANT

5. Is the anchorage configuration consistent with plant documentation? YE NE] UE- N/As (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

There was sufficient plant documentation to perform an anchorage verification, but one of the anchors was not visible due to cables on the ground.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NE: UE:

potentially adverse seismic conditions? Based on the above anchorageevaluation,the anchorage is free of potentiallyadverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI UE1 N/AE1 There were no soft targets to be impacted by equipment in the area.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEJ UE- N/A[-]

and masonry block walls not likely to collapse onto the equipment? Masonry block walls in the room are seismically qualified, and painted with a qualificationnumber. Ceiling tiles and lights are all in good condition, and are adequately supported.

9. Do attached lines have adequate flexibility to avoid damage? YZ N[E] UE- N/AEJ The attached lines have adequateflexibility.
10. Based on the above seismic interaction evaluations, is equipment free YZ NEI UE-of potentially adverse seismic interaction effects?

Based on the above evaluation, the cabinet is free of potentially adverse seismic interaciton effects. 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 451 of 560 Sheet 3 of 5 Status: Y[ NEI U[-- Seismic Walkdown Checklist (SWC) SWELl-089 Equipment ID No. C14 Equip. Class3 20 - Instrumentationand Control Panels Equipment Description VERTICAL BOARD, PRIMARY COOLANT Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ NI-] U-I adversely affect the safety functions of the equipment?

It was looked for, and no other seismic conditions that could adversely affect the safety functions were found. Comments (Additional pages may be added as necessary) Evaluated by: Roy Berryman Date: 10/4/2012 Eric Dilbone 6e-. - -- 10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 452 of 560 Sheet 4 of 5 Status: YZ NO U-- Seismic Walkdown Checklist (SWC) SWELl-089 Equipment ID No. C14 Equip. Class4 20 - Instrumentationand Control Panels Equipment Description VERTICAL BOARD, PRIMARY COOLANT Photographs Note: Cabinet C14 from the front. Note: Bottom of cabinet C14 as viewed from the back. The cables in the far left corner obscured the view of the last anchor bolt. 4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 453 of 560 Sheet 5 of 5 Status: YZ N[-I U-] Seismic Walkdown Checklist (SWC) SWELl-089 Equipment ID No. C14 Equ ip. Classs 20 - Instrumentationand Control Panels Equipment Description VERTICAL BOARD, PRIMARY COOLANT Note: View of a weld to the embedded steel Note: View of anchorbolt for the embedded channel,and an anchorbolt for the embedded steel channel. steel channel. 5 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 454 of 560 Sheet 1 of 5 Status: YN NE U-- Seismic Walkdown Checklist (SWC) SWELl-090 Equipment ID No. C42 Equip. Class, 20 - Instrumentationand Control Panels Equipment Description NI & RPS SYSTEM B Location: Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE] NZ of the 50% of SWEL items requiring such verification)?

Anchorage configuration verification is not possible because only two of the four documented anchors are visible due to fireboard covering.

2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI UE- N/AE-All hardware visible was present, tight and in good condition.
3. Is the anchorage free of corrosion that is more than mild surface "Z NEI UE- N/AE-oxidation?

Mild surface oxidation was observed on some of the anchorage in the bottom of the cabinet. There is no adverse conditions as a result

4. Is the anchorage free of visible cracks in the concrete near the "Z N[1 U[E] N/AE' anchors?

No cracks in concrete were observed. 1 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 455 of 560 Sheet 2 of 5 Status: YE NEI U-] Seismic Walkdown Checklist (SWC) SWELl-090 Equipment ID No. C42 Equip. Class2 20 - Instrumentationand Control Panels Equipment Description NI & RPS SYSTEM B

5. Is the anchorage configuration consistent with plant documentation? Y--] N[l U[-] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

This cabinet was not partof the 50%, so this is not applicable.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEl ULi potentially adverse seismic conditions?

Based on the above anchorage evaluations, the anchorage is free of potentiallyadverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[] NEJ U[i N/A[-]

Soft targets are free from impact by nearby equipment and structures.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI UEi N/AF and masonry block walls not likely to collapse onto the equipment?

The masonry block wall in the room is seismically qualified. The ceiling tiles and lighting in the room are in good condition, and are not likely to collapse onto the cabinet.

9. Do attached lines have adequate flexibility to avoid damage? YZ N[-] U[i- N/A[--

Attached lines have adequateflexibility.

10. Based on the above seismic interaction evaluations, is equipment free YE NE! Uif-of potentially adverse seismic interaction effects?

Based on the above seismic interactionevaluations, the equipment is free of potentiallyadverse seismic interactioneffects. 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 456 of 560 Sheet 3 of 5 Status: Y[ NIE] U-Seismic Walkdown Checklist (SWC) SWELl-090 Equipment ID No. C42 Equip. Class3 20 - Instrumentation and Control Panels Equipment Description NI & RPS SYSTEM B Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ N[- U[

adversely affect the safety functions of the equipment? It was looked for, and no other seismic conditions that could adversely affect the safety funcitons of the equipment were found. Comments (Additional pages may be added as necessary) Evaluated by: Roy Berryman Date: 10/4/2012 Eric Dilbone 6z4-. 10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 457 of 560 Sheet 4 of 5 Status: YZ NEI UM Seismic Walkdown Checklist (SWC) SWELl-090 Equipment ID No. C42 Equip. Class4 20 - Instrumentationand Control Panels Equipment Description NI & RPS SYSTEM B Photoqraphs Note: Equipment ID tag identifying the Note: View into the bottom of the cabinet with cabinet. the door open on the front. 4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 458 of 560 Sheet 5 of 5 Status: YZ N- UI-Seismic Walkdown Checklist (SWC) SWELl-090 Equipment ID No. C42 - Equip. CIass5 20 - Instrumentation and Control Panels Equipment Description NI & RPS SYSTEM B Note: Closer front view of the bottom and side Note: View of the bottom of the rearof the of the cabinet with the door open. cabinet with the door open. 5 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 459 of 560 Sheet I of 5 Status: YZ NE] UI1 Seismic Walkdown Checklist (SWC) SWELl-091 Equipment ID No. C44 Equip. Class' 20 - Instrumentation and Control Panels Equipment Description NI & RPS SYSTEM D Location: Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[-1 NZ of the 50% of SWEL items requiring such verification)?

Anchorage configuration verification is not possible because only two of the four documented anchors are visible due to fireboard covering.

2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI ur N/AD' All hardware visible was present, tight and in good condition.
3. Is the anchorage free of corrosion that is more than mild surface YZ N[D] UD1 N/A-1 oxidation?

Mild surface oxidation was observed on some of the anchorage in the bottom of the cabinet.

4. Is the anchorage free of visible cracks in the concrete near the Y[ NDl U[:] N/A[D anchors?

No cracks in concrete were observed. 1 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS-12-00002 Attachment C Rev. 0 Page 460 of 560 Sheet 2 of 5 Status: YZ NE] U-] Seismic Walkdown Checklist (SWC) SWELl-091 Equipment ID No. C44 Equip. Class2 20 - Instrumentation and Control Panels Equipment Description NI & RPS SYSTEM D

5. Is the anchorage configuration consistent with plant documentation? YE] NEI UI' N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

This cabinet was not part of the 50%, so this is not applicable.

6. Based on the above anchorage evaluations, is the anchorage free of YE Nn- UI-potentially adverse seismic conditions?

Based on the above anchorageevaluations, the anchorageis free of potentially adverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NE] u[-] NIAE-Soft targets are free from impact by nearby equipment and structures.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, 'Y[Z N[il U[--] N/A[--]

and masonry block walls not likely to collapse onto the equipment? The masonry block wall in the room is seismically qualified. The ceiling 'Y[ NE-] UE-] NIAE-] tiles and lighting in the room are in good condition, and are not likely to collapse onto the cabinet.

9. Do attached lines have adequate flexibility to avoid damage? Y[ NEI uE] N/AEu Attached lines have adequate flexibility.
10. Based on the above seismic interaction evaluations, is equipment free YZNEI UE]

of potentially adverse seismic interaction effects? Based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects. 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 461 of 560 Sheet 3 of 5 Status: YZ NEI-I U-Seismic Walkdown Checklist (SWC) SWELl-091 Equipment ID No. C44 Equip. Class3 20 - Instrumentation and Control Panels Equipment Description NI & RPS SYSTEM D Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[N NE] ULi adversely affect the safety functions of the equipment?

It was looked for, and no other seismic conditions that could adversely affect the safety funcitons of the equipment were found. Comments (Additional pages may be added as necessary) It was noted that a bolt on top of the cabinet was not screwed in all the way. This bolt is not part of the cabinet anchorage,and was tightened at the time of inspection by Operationspersonnel. See image below.

                                   ,42 Evaluated by: Roy Berryman                                                               Date: 10/4/2012 Eric Dilbone &eA,            -                                                10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-C S- 12-00002 Attachment C Rev. 0 Page 462 of 560 Sheet 4 of 5 Status: YZ NEI UF--I Seismic Walkdown Checklist (SWC) SWELl-091 Equipment ID No. C44 Equip. Class4 20 - Instrumentationand Control Panels Equipment Description NI & RPS SYSTEM D Photographs Note: Equipment ID tag identifying cabinet. Note: View inside the bottom of the cabinet with the front door open. Anchorage is not visible. 4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 463 of 560 Sheet 5 of 5 Status: YZ NEI] U-- Seismic Walkdown Checklist (SWC) SWELl-091 Equipment ID No. C44 Equip. CIass5 20 - Instrumentationand Control Panels Equipment Description NI & RPS SYSTEM D LooseI bolt Note: View of the front of the cabinet with the Note: A loose bolt is shown on top of cabinet doors closed. The anchorage is not visible, C44. The bolt was tightened at the time of since it is contained within the cabinet. inspection by Operationspersonnel. 5 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 464 of 560 Sheet 1 of 5 Status: YZ NEI UDý Seismic Walkdown Checklist (SWC) SWELl-092 Equipment ID No. C26 Equip. Class, 20 - Instrumentationand Control Panels Equipment Description VERT BD- SUP ENGR SFGO Location: Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NZ of the 50% of SWEL items requiring such verification)?

Not part of the 50%.

2. Is the anchorage free of bent, broken, missing or loose hardware? YO NE:l ULI N/A[]

The welds on the underside of the front of the cabinet are all in good condition, and are consistent with plant documentation. The back cabinet doors were opened, but the rearwelds were not visible without crossing the plane of the cabinet.

3. Is the anchorage free of corrosion that is more than mild surface YN NEI uJE N/AZ oxidation?

There were no signs of any oxidation on the visible anchorage.

4. Is the anchorage free of visible cracks in the concrete near the YN N[:] UL N/AEJ anchors?

There were no visible cracks in the concrete near the vicinity of the cabinet. I Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 465 of 560 Sheet 2 of 5 Status: YM NO Ur Seismic Walkdown Checklist (SWC) SWELl-092 Equipment ID No. C26 Equip. Class2 20 - Instrumentation and Control Panels Equipment Description VERT BD- SUP ENGR SFGO

5. Is the anchorage configuration consistent with plant documentation? Y' NEI U[-E N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

All visible anchorage is consistent with plant documentation. However, not all anchoragecould be verified without extensive cabinet disassembly.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI U[E potentially adverse seismic conditions?

Based on the above anchorageevaluations, all visible anchorage is free of potentially adverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[ NEI uE1 N/A-There are no soft targets that could potentially be impacted by nearby equipment or structures.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI UE- N/AE1 and masonry block walls not likely to collapse onto the equipment?

Masonry block walls in the room are seismically qualified,and painted with a qualificationnumber. Ceiling tiles and lights are all in good condition, and are adequately supported.

9. Do attached lines have adequate flexibility to avoid damage? YZ NEJ UE] N/AE:

The attached lines have adequateflexibility.

10. Based on the above seismic interaction evaluations, is equipment free YZ NEI uE-of potentially adverse seismic interaction effects?

Based on the above evaluation, the cabinet is free of potentially adverse seismic interaciton effects. 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-C S- 12-00002 Attachment C Rev. 0 Page 466 of 560 Sheet 3 of 5 Status: Y[ NI 1 U-- Seismic Walkdown Checklist (SWC) SWELl-092 Equipment ID No. C26 Equip. Class3 20 - Instrumentationand Control Panels Equipment Description VERT BD- SUP ENGR SFGO Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NE] U[-

adversely affect the safety functions of the equipment? It was looked for, and no other seismic conditions that could adversely affect the safety functions were found. Comments (Additional pages may be added as necessary) Additionally, it was noted that there were four emergency respiratoryprotective equipment cases that were stacked upon one anotherand were not secured. The cases were deemed far enough from the cabinet not to present an interactioneffect. Evaluated by: Roy Berryman Date: 10/4/2012 Eric Dilbone 6Z41- 10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 467 of 560 Sheet 4 of 5 Status: YE NF U-- Seismic Walkdown Checklist (SWC) SWELl-092 Equipment ID No. C26 Equip. CIass4 20 - Instrumentationand Control Panels Equipment Description VERT BD- SUP ENGR SFGO Photographs Note: View of front of C-26. Note: View of welds on the font, bottom edge of cabinet C-26. 4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 468 of 560 Sheet 5 of 5 Status: YZ NE] U-Seismic Walkdown Checklist (SWC) SWELl-092 Equipment ID No. C26 Equip. CIass5 20 - Instrumentation and Control Panels Equipment Description VERT BD- SUP ENGR SFGO Note: Shown above are the louvers on the Note: reardoors of cabinet C-26. No anchorage is visible from the rearof the cabinet. 5 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 469 of 560 Sheet I of 5 Status: YE NEI Ur-Seismic Walkdown Checklist (SWC) SWELl- 093 Equipment ID No. PY-1042A Equip. Class, 20 - Instrumentationand Control Panels Equipment Description RCS PRESSURE Location: Bldg. RAB Floor El. 368 Room, Area 104 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YJ- NO of the 50% of SWEL items requiring such verification)?

This item is not partof the 50%.

2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NiD U[-] N/ADJ This component is located in a nest in cabinet C539A. No bent, broken, missing or loose hardware was observed.
3. Is the anchorage free of corrosion that is more than mild surface YO NDl U[-- N/AD--

oxidation? No corrosion was observed

4. Is the anchorage free of visible cracks in the concrete near the YO ND-' U['] N/AD-]

anchors? No cracks in concrete were observed near cabinet

' Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 470 of 560 Sheet 2 of 5 Status: YZ N[- UL] Seismic Walkdown Checklist (SWC) SWELl- 093 Equipment ID No. PY-1042A Equip. Class2 20 - Instrumentationand Control Panels Equipment Description RCS PRESSURE

5. Is the anchorage configuration consistent with plant documentation? Y[I NWi ULI N/A[

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) This item is not partof the 50%.

6. Based on the above anchorage evaluations, is the anchorage free of 'YE Nn U[I potentially adverse seismic conditions?

Based on the above anchorage evaluations,the anchorage is free of potentially adverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y" NW'- UW- N/AD" Soft targets are free from impact since they are in a cabinet that is latched closed.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YEI NWI UW1 N/AZ and masonry block walls not likely to collapse onto the equipment?

This does not apply since the component is located inside of a cabinet.

9. Do attached lines have adequate flexibility to avoid damage? YZ NW-] UW1 N/AW1 Attached lines have adequate flexibility.
10. Based on the above seismic interaction evaluations, is equipment free YZ NEI UW1 of potentially adverse seismic interaction effects?

Based on the above seismic interaction evaluations,the equipment is free of potentially adverse seismic interactioneffects. 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 471 of 560 Sheet 3 of 5 Status: YN NEI- U-- Seismic Walkdown Checklist (SWC) SWELl- 093 Equipment ID No. PY-1042A Equip. Class3 20 - Instrumentation and Control Panels Equipment Description RCS PRESSURE Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NEI Ui adversely affect the safety functions of the equipment?

It was looked for, and no other seismic conditions that could adversely affect the safety functions were found. Comments (Additional pages may be added as necessary) Evaluated by: Eric Dilbone 6 6 Date: 10/110/2012 Daniel Parker % O'ý Y"-Q," 10/10/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 472 of 560 Sheet 4 of 5 Status: Y[ ND UD-- Seismic Walkdown Checklist (SWC) SWELl- 093 Equipment ID No. PY-1042A Equip. Class4 20 - Instrumentationand Control Panels Equipment Description RCS PRESSURE Photographs

                          /

Note: Front view of component. Note: Sign on cabinet door. 4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 473 of 560 Sheet 5 of 5 Status: YE NF U-Seismic Walkdown Checklist (SWC) SWELl- 093 Equipment ID No. PY-1042A Equip. CIasss 20 - Instrumentationand Control Panels Equipment Description RCS PRESSURE Note: Wingnut and washer are used to keep Note: the metal plate over the door to keep it from swinging open. As the nameplate reads, this is necessary to maintain seismic qualificationsfor the cabinet. 5 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO l-CS- 12-00002 Attachment C Rev. 0 Page 474 of 560 Sheet I of 5 Status: YZ NEI U-i Seismic Walkdown Checklist (SWC) SWELl-094 Equipment IDeNo. LY-1411A Equip. Class' 20 - Instruments and Control Panels Equipment Description BWST LEVEL #1 Location: Bldg. RAB Floor El. 374 Room, Area 96 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NZ of the 50% of SWEL items requiring such verification)?

This item is not part of the 50%.

2. Is the anchorage free of bent, broken, missing or loose hardware? YN NOi ULII N/A-The bolts holding the component into the cabinet are free of all of the above conditions.
3. Is the anchorage free of corrosion that is more than mild surface YZ ND U- N/AD oxidation?

The bolts holding the component into the cabinet are free of corrosion.

4. Is the anchorage free of visible cracks in the concrete near the Y' NDI U[-] N/A[-D anchors?

No cracks in concrete were observed near anchorage of cabinet. 1 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 475 of 560 Sheet 2 of 5 Status: YZ NE] U-- Seismic Walkdown Checklist (SWC) SWELl-094 Equipment ID No. LY-1411A Equip. Class2 20 - Instruments and Control Panels Friiinm*.nt flp.cerintinn RWqTILEVEI #1

5. Is the anchorage configuration consistent with plant documentation? YEI NEI U[-I NIAED (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Item is not partof the 50%.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEi UEi potentially adverse seismic conditions?

Component mounted inside cabinet C543. Located in "grey"nest box 3. All mounting bolts for component and support box were identified and adequate. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NEi U[E N/A--

Soft targets are free from impact since the component is located inside of a cabinet.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI UEI N/AF-and masonry block walls not likely to collapse onto the equipment?

The component is located in cabinet C543. It is protected from any intrusion from adjacent equipment when the doorpanel is in the normal closed and locked position.

9. Do attached lines have adequate flexibility to avoid damage? YZ NEI UE- N/A--

Attached lines have adequate flexibility.

10. Based on the above seismic interaction evaluations, is equipment free YE NEI U[--

of potentially adverse seismic interaction effects? Based on the above seismic interaction evaluations, the equipment is free of potentiallyadverse seismic interaction effects. 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 476 of 560 Sheet 3 of 5 Status: YZ NEI U-I Seismic Walkdown Checklist (SWC) SWELl-094 Equipment ID No. LY-1411A Equip. Class3 20- Instruments and Control Panels Equipment Description BWST LEVEL #1 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ Nr-I U[M adversely affect the safety functions of the equipment?

It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found. Comments (Additional pages may be added as necessary) Evaluated by: Daniel Parker 2:QN-Y -* Date: 10/10/2012 Eric Dilbone

  • _ 10/10/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 477 of 560 Sheet 4 of 5 Status: YZ N[-] U-- Seismic Walkdown Checklist (SWC) SWELl-094 Equipment ID No. LY-1411A Equip. CIass4 20- Instruments and Control Panels Equipment Description BWST LEVEL #1 Photographs Note: Component LY-1411A inside nested Note: Component LY-1411A inside nested panel box. panel box. 4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 478 of 560 Sheet 5 of 5 Status: YZ NEI U' Seismic Walkdown Checklist (SWC) SWELl-094 Equipment ID No. LY-1411A Equip. Class5 20- Instruments and Control Panels Equipment Description BWST LEVEL #1 Note: Cabinet containing LY-1411A. s Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 479 of 560 Sheet I of 5 Status: YN NEI UE Seismic Walkdown Checklist (SWC) SWELl- 095 Equipment ID No. LY-4204A Equip. Class' 20 - Instrumentationand Control Panels Equipment Description CST T41B LEVEL RED// Location: Bldg. RAB Floor El. 368 Room, Area 104 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[E] NZ of the 50% of SWEL items requiring such verification)?

This item is not part of the 50%.

2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NE] U[] N/AE-No adverse hardware conditions were observed.
3. Is the anchorage free of corrosion that is more than mild surface YZ N[E] UE N/AE-oxidation?

No corrosion observed.

4. Is the anchorage free of visible cracks in the concrete near the YZ NEI UIE N/AE-1 anchors?

No cracks in concrete observed 1 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 480 of 560 Sheet 2 of 5 Status: YZ NF] U-] Seismic Walkdown Checklist (SWC) SWELl- 095 Equipment ID No. LY-4204A Equip. Class2 20 - Instrumentation and Control Panels Equipment Description CST T41B LEVEL REDI/V

5. Is the anchorage configuration consistent with plant documentation? Y-I NEi UI- N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

This item is not part of the 50%.

6. Based on the above anchorage evaluations, is the anchorage free of YE NoJ UrI potentially adverse seismic conditions?

Based on the above anchorageevaluations, the anchorage is free of potentially adverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ N[:] UE] N/All Soft targets are free from impact since they are in a cabinet that is latched closed.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YiE NEI UE] N/AZ and masonry block walls not likely to collapse onto the equipment?

This does not apply since the component is located inside of a cabinet.

9. Do attached lines have adequate flexibility to avoid damage? YM NE:] ur- N/AE-Attached lines have adequate flexibility.
10. Based on the above seismic interaction evaluations, is equipment free YN NEI UE]

of potentially adverse seismic interaction effects? Based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects. 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 481 of 560 Sheet 3 of 5 Status: YE No' UD-Seismic Walkdown Checklist (SWC) SWELl- 095 Equipment ID No. LY-4204A Equip. Class3 20 - Instrumentationand Control Panels Equipment Description CST T41B LEVEL REDIN Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NDI U[-]

adversely affect the safety functions of the equipment? It was looked for, and no other seismic conditions that could adversely affect the safety functions were found. Comments (Additional pages may be added as necessary) Evaluated by: Eric Dilbone Date: 10/10/2012 Daniel Parker < , - 10/10/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 482 of 560 Sheet 4 of 5 Status: Y[ NF U[- Seismic Walkdown Checklist (SWC) SWELl- 095 Equipment ID No. LY-4204A Equip. Class4 20 - Instrumentation and Control Panels Equipment Description CST T41B LEVEL REDI/V Photographs

                          /

Note: View of equipment ID tag identifying the component. 4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 483 of 560 Sheet 5 of 5 Status: YE NEI Ur-Seismic Walkdown Checklist (SWC) SWELl- 095 Equipment ID No. LY-4204A Equip. CIasss 20 - Instrumentation and Control Panels Equipment Description CST T41B LEVEL REDIN Note: Wingnut and washerare used to keep Note: the metal plate over the door to keep it from swinging open. As the nameplate reads, this is necessary to maintain seismic qualificationsfor the cabinet. 5 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 484 of 560 Sheet 1 of 5 Status: YZ NEI Ur-- Seismic Walkdown Checklist (SWC) SWELl- 096 Equipment ID No. PY-2667-Al Equip. Class' 20 - Instrumentation and Control Panels Equipment Description I/V CONVERTER STM GEN B PRESS Location: Bldg. RAB Floor El. 368 Room, Area 104 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

This item is not part of the 50%.

2. Is the anchorage free of bent, broken, missing or loose hardware? YN NE- UE- N/A[]

No adverse hardware conditions were observed.

3. Is the anchorage free of corrosion that is more than mild surface YZ N[E UE- N/A--

oxidation? No corrosion observed.

4. Is the anchorage free of visible cracks in the concrete near the YZ NEI U N/AR-anchors?

No cracks in concrete observed

'Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 485 of 560 Sheet 2 of 5 Status: YZ NEI ULI Seismic Walkdown Checklist (SWC) SWELl- 096 Equipment ID No. PY-2667-A1 Equip. Class 20- Instrumentation and Control Panels Equipment Description IN CONVERTER STM GEN B PRESS

5. Is the anchorage configuration consistent with plant documentation? Y-I NWI U[1 N/A2 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

This item is not part of the 50%.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NWi UW-potentially adverse seismic conditions?

Based on the above anchorageevaluations, the anchorageis free of potentially adverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN N[-] UW' N/AWl Soft targets are free from impact since they are in a cabinet that is latched closed.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[-- NWJ U-- N/AZ and masonry block walls not likely to collapse onto the equipment?

This does not apply since the component is located inside of a cabinet.

9. Do attached lines have adequate flexibility to avoid damage? YO NWI U-- N/A[-]

Attached lines have adequate flexibility.

10. Based on the above seismic interaction evaluations, is equipment free YN NWI Uil of potentially adverse seismic interaction effects?

Based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 486 of 560 Sheet 3 of 5 Status: YZ No U[-- Seismic Walkdown Checklist (SWC) SWELl- 096 Equipment ID No. PY-2667-A1 Equip. Class 20 - Instrumentation and Control Panels Equipment Description IW CONVERTER STM GEN B PRESS Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YM No UEI]

adversely affect the safety functions of the equipment? It was looked for, and no other seismic conditions that could adversely affect the safety functions were found. Comments (Additional pages may be added as necessary) Evaluated by: Eric Dilbone 6 1 Date: 10/10/2012 Daniel ParkerDaniel Parker 10/10/20 12 1011012012

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 487 of 560 Sheet 4 of 5 Status: YN NO] U-I Seismic Walkdown Checklist (SWC) SWELl- 096 Equipment ID No. PY-2667-A1 Equip. Class 20 - Instrumentation and Control Panels Equipment Description I/V CONVERTER STM GEN B PRESS Photoqraphs i/ Note: View of equipment ID tag identifying the component. Note: Alternate view of the component.

Engineering Report No. CALC-ANO I-C S- 12-00002 Attachment C Rev. 0 Page 488 of 560 Sheet 5 of 5 Status: YZ NE] UI-Seismic Walkdown Checklist (SWC) SWELl- 096 Equipment ID No. PY-2667-A1 Equip. Class 20- Instrumentation and Control Panels Equipment Description IV CONVERTER STM GEN B PRESS Note: Wingnut and washerare used to keep Note: the metal plate over the door to keep it from swinging open. As the nameplate reads, this is necessary to maintain seismic qualificationsfor the cabinet.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 489 of 560 Sheet I of 4 Status: YZ No uID Seismic Walkdown Checklist (SWC) SWELl-097 Equipment ID No. PB-2670 Equip. Class' 20 - Instrumentation and Control Panels Equipment Description EMERG EW TO SG A FROM P7B VLV CV-2670 Location: Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO N Z of the 50% of SWEL items requiring such verification)?

This item is not part of the 50%.

2. Is the anchorage free of bent, broken, missing or loose hardware? Y[( NI ULI N/A[Z No adverse hardwareconditions were observed.
3. Is the anchorage free of corrosion that is more than mild surface YZ NI UL] N/AZý oxidation?

No corrosion observed.

4. Is the anchorage free of visible cracks in the concrete near the Y[ NO UrI N/AZ anchors?

No cracks in concrete observed Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 490 of 560 Sheet 2 of 4 Status: YZ NE] UW-Seismic Walkdown Checklist (SWC) SWELl -097 Equipment ID No. PB-2670 Equip. Class2 20 - Instrumentationand Control Panels Equipment Description EMERG EW TO SG A FROM P7B VLV CV-2670

5. Is the anchorage configuration consistent with plant documentation? YEI NEI UIZ N/An (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

This item is not partof the 50%.

6. Based on the above anchorage evaluations, is the anchorage free of YN NEI ULI potentially adverse seismic conditions?

The anchorageis not visible since it is mounted in the face of a panel. The cabinet could not be opened due to Control Room Operations. However, the button appearsto be installed properly and there is no apparentreason why it would be adversely affected in a seismic event. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NiE U[-] N/AI' There are no soft targets that could be impacted by nearby equipment or structures.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y" N[-- U-I N/AI-]

and masonry block walls not likely to collapse onto the equipment? Masonry block walls in the room are seismically qualified, and painted with a qualification number. Ceiling tiles and lights are all in good condition, and are adequatelysupported.

9. Do attached lines have adequate flexibility to avoid damage? YE NEI UW1 N/A[]

There are no visible attachedlines, since the button is mounted on the face of a panel.

10. Based on the above seismic interaction evaluations, is equipment free YZ N[- UED of potentially adverse seismic interaction effects?

Based on the above evaluation, the button is free of potentially adverse seismic interaciton effects. 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 491 of 560 Sheet 3 of 4 Status: YZ NEIl UD Seismic Walkdown Checklist (SWC) SWELl-097 Equipment ID No. PB-2670 Equip. Class3 20 - Instrumentationand Control Panels Equipment Description EMERG EW TO SG A FROM P7B VLV CV-2670 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ Nil Ur-adversely affect the safety functions of the equipment?

It was looked for, and no other seismic conditions that could adversely affect the safety functions were found. Comments (Additional pages may be added as necessary) Evaluated by: Roy Berryman Date: 10/4/2012 Frir D~ilhnnto&e, 10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 492 of 560 Sheet 4 of 4 Status: YE NEI U-- Seismic Walkdown Checklist (SWC) SWELl-097 Equipment ID No. PB-2670 Equip. CIass4 20 - Instrumentationand Control Panels Equipment Description EMERG EW TO SG A FROM P7B VLV CV-2670 Photographs Note: PB-2670 is shown mounted in the face Note: -oomec in version or me previous of a panel image. 4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-C S- 12-00002 Attachment C Rev. 0 Page 493 of 560 Sheet I of 4 Status: YZ NIJ UF Seismic Walkdown Checklist (SWC) SWELl-098 Equipment ID No. SS-1220 Equip. Class' 20 - Instrumentation and Control Panels Equipment Description HPI ISO VV CV 1220 Location: Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NO of the 50% of SWEL items requiring such verification)?

This item is not partof the 50%.

2. Is the anchorage free of bent, broken, missing or loose hardware? YO NEi U[I: N/A[D No adverse hardware conditions were observed.
3. Is the anchorage free of corrosion that is more than mild surface YZ NDl U[l N/AF-]

oxidation? No corrosion observed.

4. Is the anchorage free of visible cracks in the concrete near the YZ N[D U-- N/A[-

anchors? No cracks in concrete observed I Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 494 of 560 Sheet 2 of 4 Status: YZ NO UDý Seismic Walkdown Checklist (SWC) SWELl-098 Equipment ID No. SS-1220 Equip. Class2 20 - Instrumentationand Control Panels Equipment Description HPI ISO VV CV 1220

5. Is the anchorage configuration consistent with plant documentation? 'Y[E NE] U[-] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not part of the 50%.

6. Based on the above anchorage evaluations, is the anchorage free of YZ N[EI UE-potentially adverse seismic conditions?

The cabinet was opened from the back, and no adverse seismic conditions were observed. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NEI UE1 N/AEl There are no soft targets that could be impacted by nearby equipment or structures.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y' NEI uE1 N/AE-]

and masonry block walls not likely to collapse onto the equipment? Masonry block walls in the room are seismically qualified, and painted with a qualification number. Ceiling tiles and lights are all in good condition, and are adequatelysupported.

9. Do attached lines have adequate flexibility to avoid damage? YN NEI UE1 N/AE--

The attachedlines have adequate flexibility.

10. Based on the above seismic interaction evaluations, is equipment free Y[ NEI UE--

of potentially adverse seismic interaction effects? Based on the above evaluation, the switch is free of potentially adverse seismic interaciton effects. 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 495 of 560 Sheet 3 of 4 Status: YN NO UDý Seismic Walkdown Checklist (SWC) SWELl-098 Equipment ID No. SS-1220 Equip. Class3 20 - Instrumentationand Control Panels Equipment Description HPI ISO VV CV 1220 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI UI-]

adversely affect the safety functions of the equipment? It was looked for, and no other seismic conditions that could adversely affect the safety functions were found. Comments (Additional pages may be added as necessary) Evaluated by: Roy Berryman Date: 10/4/2012 Eric Dilbone 10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 496 of 560 Sheet 4 of 4 Status: YZ NEI U-- Seismic Walkdown Checklist (SWC) SWELl-09 8 Equipment ID No. SS-1220 Equip. Class4 20 - Instrumentation and Control Panels Equipment Description HPI ISO VV CV 1220 Photographs Note: View of the front of cabinet C18, which Note: Zoomed version of the previous image, contains SS-1220. detailing SS-1220. 4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 497 of 560 Sheet 1 of 4 Status: YZ Nn U-Seismic Walkdown Checklist (SWC) SWELl-099 Equipment ID No. TR-1139 Equip. Class, 20 - Instrumentation and Control Panels Equipment Description RC LOOP B WR HOT LEG TEMP Location: Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[] N[Z of the 50% of SWEL items requiring such verification)?

This item is not partof the 50%.

2. Is the anchorage free of bent, broken, missing or loose hardware? Y" NEI UE] N/AEl No adverse hardware conditions were observed.
3. Is the anchorage free of corrosion that is more than mild surface YZ NE-] UE N/AE-]

oxidation? No corrosion observed.

4. Is the anchorage free of visible cracks in the concrete near the Y[ NE] UIE-I N/AEl anchors?

No cracks in concrete observed

' Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS-i12-00002 Attachment C Rev. 0 Page 498 of 560 Sheet 2 of 4 Status: YE NE U-Seismic Walkdown Checklist (SWC) SWELl-099 Equipment ID No. TR-1139 Equip. Class2 20 - Instrumentationand Control Panels Equipment Description RC LOOP B WR HOT LEG TEMP

5. Is the anchorage configuration consistent with plant documentation? Y[] NE] UE] N/A2 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not part of the 50%.

6. Based on the above anchorage evaluations, is the anchorage free of YN NE] ULI potentially adverse seismic conditions?

No other adverse seismic conditions were observed. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[Z NEI UE1 N/AE-There are no soft targets that could be impacted by nearby equipment or structures.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, '(Y NEJ UE[ N/AEl and masonry block walls not likely to collapse onto the equipment?

Masonry block walls in the room are seismically qualified, and painted with a qualificationnumber. Ceiling tiles and lights are all in good condition, and are adequately supported.

9. Do attached lines have adequate flexibility to avoid damage? '(Y NEI UE: N/A[-1 The attachedlineshave adequate flexibility.
10. Based on the above seismic interaction evaluations, is equipment free 1 NEl U --

of potentially adverse seismic interaction effects? Based on the above evaluation, the temperaturerecorderis free of potentiallyadverse seismic interaciton effects. 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 499 of 560 Sheet 3 of 4 Status: YZ NI U[--I Seismic Walkdown Checklist (SWC) SWELl-099 Equipment ID No. TR-1139 Equip. Class3 20 - Instrumentation and Control Panels Equipment Description RC LOOP B WR HOT LEG TEMP Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ Nil U--

adversely affect the safety functions of the equipment? It was looked for, and no other seismic conditions that could adversely affect the safety functions were found. Comments (Additional pages may be added as necessary) Evaluated by: Roy Berryman Date: 10/4/2012 Eric Dilbone ,,*. . 10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 500 of 560 Sheet 4 of 4 Status: YO NF-- UL-Seismic Walkdown Checklist (SWC) SWELl-099 Equipment ID No. TR-1139 Equip. Class4 20- Instrumentationand Control Panels Equipment Description RC LOOP B WR HOT LEG TEMP Photographs TR-1139 Note: View of the panel containing TR-1 139. Note: Zoomed view of the previous image. 4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 501 of 560 Sheet I of 5 Status: YZ NE] UDF-Seismic Walkdown Checklist (SWC) SWELl-100 Equipment ID No. LIS-1421 Equip. Class' 20 - Instrumentationand Control Panels Equipment Description BWST LEVEL No. 2 Location: Bldg. RAB Floor El. 386 Room, Area 129 Manufacturer, Model, Etc. (optional but recommended) _ Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[] N[

of the 50% of SWEL items requiring such verification)? This item is not part of the 50%.

2. Is the anchorage free of bent, broken, missing or loose hardware? YN NEI UDJ N/A[:D The level indicatoris mounted in cabinet C18, and the hardware is visible from inside the rearof the cabinet. The anchorageis free of bent, broken and loose hardware.
3. Is the anchorage free of corrosion that is more than mild surface YZ NEI UI[I N/A[-]

oxidation? No mild surface oxidation present on anchorage.

4. Is the anchorage free of visible cracks in the concrete near the YZ NDl U-1 N/AD1 anchors?

The level indicatoris mounted in the front face of the cabinet. No cracks in concrete aroundcabinet anchorage. 1 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 502 of 560 Sheet 2 of 5 Status: YE NR U-Seismic Walkdown Checklist (SWC) SWELl-100 Equipment ID No. LIS-1421 E-quip. Class2 20 - Instrumentationand Control Panels Pnauinment Descrintinn RWS;T LFVFI No_ 2

5. Is the anchorage configuration consistent with plant documentation? Y[] NE-- UE' N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

This item is not part of the 50%.

6. Based on the above anchorage evaluations, is the anchorage free of Y[ NE] U[-]

potentially adverse seismic conditions? All visible anchoragewas free of potentially adverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI UE- N/AE--

There are no soft targets that could be impacted by nearby equipment or structures.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[ NE-1 UE[ N/AE-and masonry block walls not likely to collapse onto the equipment?

Masonry block walls in the room are seismically qualified, and painted with a qualificationnumber. Ceiling tiles and lights are all in good condition, and are adequately supported.

9. Do attached lines have adequate flexibility to avoid damage? YZ NE] UEi N/AE--

The attached lines have adequate flexibility.

10. Based on the above seismic interaction evaluations, is equipment free YE N[-E UE-of potentially adverse seismic interaction effects?

Based on the above evaluation, the level indicatorin the cabinet is free of potentiallyadverse seismic interacitoneffects. 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 503 of 560 Sheet 3 of 5 Status: Y[ NEI Ur-Seismic Walkdown Checklist (SWC) SWELI-1O0 Equipment ID No. LIS-1421 Equip. Class3 20 - Instrumentation and Control Panels Equipment Description BWST LEVEL No. 2 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ NE] UDJ adversely affect the safety functions of the equipment?

It was looked for, and no other seismic conditions that could adversely affect the safety functions were found. Comments (Additional pages may be added as necessary) Evaluated by: Roy Berryman Date: 10/4/2012 Eric Dilbone 10/4/2012 3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-C S- 12-00002 Attachment C Rev. 0 Page 504 of 560 Sheet 4 of 5 Status: YE NOI UD-Seismic Walkdown Checklist (SWC) SWELl-1O0 Equipment ID No. LIS-1421 Equip. Class4_ 20 - Instrumentation and Control Panels Equipment Description BWST LEVEL No. 2 Photoqraphs LIS-1421 from rear Note: LIS-1421 equipment ID tag. Note: View inside the back of cabinet C18, containingLIS-1421. 4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 505 of 560 Sheet 5 of 5 Status: YZ Nn U-Seismic Walkdown Checklist (SWC) SWELl-100 Equipment ID No. LIS-1421 Equip. CIass5 20 - Instrumentationand Control Panels Equipment Description BWST LEVEL No. 2 LIS-1421 from rear Note: General view of the back of cabinet Note: C18. 5 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 506 of 560 Sheet I of 5 Status: YZ NE] U-Seismic Walkdown Checklist (SWC) SWELl- 101 Equipment ID No. T-78A Equip. Class' 21 - Tanks and Heat Exchangers Equipment Description EMERG. DIESEL GEN (K4A) COOLING WATER EXP TANK Location: Bldg. RAB Floor El. 369 Room, Area 87 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[ NE]

of the 50% of SWEL items requiring such verification)? Item is part of the 50%.

2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI UDl N/ADl The bolts anchoringthe tank to the EDG skid are free of bent, broken, missing and loose hardware.Additionally, the welds were all in good condition.
3. Is the anchorage free of corrosion that is more than mild surface YZ NDI UD1 N/AD-oxidation?

The anchorageis free of corrosion and is paintedblue without any chipped paint.

4. Is the anchorage free of visible cracks in the concrete near the YZ NEI UDl N/ADl anchors?

The tank is anchored to a steel frame on the EDG skid. No cracks around EDG skid anchorage I Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I -CS- 12-00002 Attachment C Rev. 0 Page 507 of 560 Sheet 2 of 5 Status: YZ NEI U[-I Seismic Walkdown Checklist (SWC) SWELl- 101 Equipment ID No. T-78A Equip. Class 21 - Tanks and Heat Exchanqers Equipment Description EMERG. DIESEL GEN (K4A) COOLING WATER EXP T4NK

5. Is the anchorage configuration consistent with plant documentation? YN N[-] UI- N/A[-]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Anchorage is consistent with calculation 6600-M12AC-117-1.

6. Based on the above anchorage evaluations, is the anchorage free of YZ Nil U[-I potentially adverse seismic conditions?

All visible anchoragewas free of potentially adverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[ NEI ur- N/A[-

There are no soft targets that could be impacted by nearby equipment or structures.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NEI UEl N/A[--

and masonry block walls not likely to collapse onto the equipment? There are no masonry block walls or ceiling tiles in the room. The lights are in good condition, and do not present an interaction effect.

9. Do attached lines have adequate flexibility to avoid damage? YZ NEI UE-- N/AEl The attachedlines have adequateflexibility.
10. Based on the above seismic interaction evaluations, is equipment free YN NEl UM-of potentially adverse seismic interaction effects?

Based on the above evaluation, the level switch is free of potentially adverse seismic interaction effects.

Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 508 of 560 Sheet 3 of 5 Status: YE NEI U[- Seismic Walkdown Checklist (SWC) SWELl- 101 Equipment ID No. T-78A Equip. Class 21 - Tanks and Heat Exchanqers Enuinment Description EMERG. DIESEL GEN (K4A) COOLING WATER EXP TANK Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE N[- UI--

adversely affect the safety functions of the equipment? It was looked for, and no other seismic conditions that could adversely affect the safety functions were found. Comments (Additional pages may be added as necessary) Evaluated by: Daniel Parker " , - Date: 10/11/2012 Eric Dilbone 6 u & l- 10/11/2012

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 509 of 560 Sheet 4 of 5 Status: YN NO U-Seismic Walkdown Checklist (SWC) SWELl- 101 Equipment ID No. T-78A Equip. Class 21 - Tanks and Heat Exchanqers Equipment Description EMERG. DIESEL GEN (K4A) COOLING WATER EXP TANK Photographs Note: Close-up view of T-78A welded to Note: Tank T-78A welded to bracket that is bracket used to bolt to steel frame on skid. bolted to steel frame on K4A skid. View from View from North side of skid. North side of skid.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 510 of 560 Sheet 5 of 5 Status: YM N[-- U-- Seismic Walkdown Checklist (SWC) SWELl- 101 Equipment ID No. T-78A - Equip. Class 21 - Tanks and Heat Exchangers Equipment Description EMERG. DIESEL GEN (K4A) COOLING WATER EXP TANK Note: View from North side of skid showing Note: View from South side of skid showing attachedlines, the steel frame used to mount bracket welded to T-78A (top of picture).

Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 511 of 560 Sheet I of 4 Status: YZ NDI UD-1 Seismic Walkdown Checklist (SWC) SWELl-102 Equipment ID No. T-78B Equip. Class' 21 - Tanks and Heat Exchangers Equipment Description EMERG. DIESEL GEN (K4B) COOLING WATER EXP. TANK Location: Bldg. RAB Floor El. 369 Room, Area 86 Manufacturer, Model, Etc. (optional but recommended) Electro-Motive Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NDJ of the 50% of SWEL items requiring such verification)?

Item is part of the 50% configuration.

2. Is the anchorage free of bent, broken, missing or loose hardware? Y[ NDJ UD-- N/AD-The anchorageis free of bent, broken, missing and loose hardware.
3. Is the anchorage free of corrosion that is more than mild surface YN NDJ UD- N/AD-oxidation?

The anchorageis free of corrosion.

4. Is the anchorage free of visible cracks in the concrete near the YZ NDl UD- N/AD anchors?

Component mounted to EDG skid. No cracks around skid anchorage. ' Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-C S- 12-00002 Attachment C Rev. 0 Page 512 of 560 Sheet 2 of 4 Status: YZ NF U-I Seismic Walkdown Checklist (SWC) SWELl-102 Equipment ID No. T-78B Equip. Class2 21 - Tanks and Heat Exchangers Equipment Description EMERG. DIESEL GEN (K4B) COOLING WATER EXP. TANK

5. Is the anchorage configuration consistent with plant documentation? YE NE] U[-] N/A--

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Anchorage is consistent with calculation 6600-M12AC-1 17-1.

6. Based on the above anchorage evaluations, is the anchorage free of 'YE NE] UEi potentially adverse seismic conditions?

Based on the above anchorageevaluations, the anchorage is free of potentially adverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[D NEi UE- N/A[E The water expansion tank was mounted to the accessory end of the diesel generator.A large air-ductmounted overhead adequately supported with steel hangers. There is no other equipment overhead or nearby that could have a credible significant interaction with the tank during a seismic event.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[ NEI UEI N/AE--

and masonry block walls not likely to collapse onto the equipment? There is overhead duct work that is properly secured with steel hangers.

9. Do attached lines have adequate flexibility to avoid damage? Y[N NE] U[-- N/AE[-

Attached lines have adequate flexibility.

10. Based on the above seismic interaction evaluations, is equipment free Y[ NEI UEl of potentially adverse seismic interaction effects?

Based on the above seismic interactionevaluations, the equipment is free of potentially adverse seismic interaction effects. 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 513 of 560 Sheet 3 of 4 Status: YN NEI Ui' Seismic Walkdown Checklist (SWC) SWELl-102 Equipment ID No. T-78B Equip. Class3 21 - Tanks and Heat Exchanqers Equipment Description EMERG. DIESEL GEN (K4B) COOLING WATER EXP. TANK Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y' N[i ULI adversely affect the safety functions of the equipment?

It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment were found. Comments (Additional pages may be added as necessary) The cooling water expansion tank was mounted horizontally at the accessory end of the diesel generator.The tank was welded directly to support brackets on either side of the tanks. The supportbrackets were bolted directly to the structuralframe of the diesel engine. Evaluated by: Eric Dilbone 6 1 '-" Date: 10/212012 Daniel Parker *j 10/212012 3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 514 of 560 Sheet 4 of 4 Status: YZ NE] UI-Seismic Walkdown Checklist (SWC) SWELl-102 Equipment ID No. T-78B Equip. Class4 21 - Tanks and Heat Exchanqers Equipment Description EMERG. DIESEL GEN (K4B) COOLING WATER EXP. TANK Photographs Note: Component ID Note: Component Overview 4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-C S- 12-00002 Attachment C Rev. 0 Page 515 of 560 Sheet I of 5 Status: YE NEIl U[- Seismic Walkdown Checklist (SWC) SWELl-103 Equipment ID No. E-197A Equip. Class' 21 - Tanks and Exchangers Equipment Description A EDG LUBE OIL HEAT EXCHANGER Location: Bldg. RAB Floor El. 369 Room, Area 87 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[ NZ of the 50% of SWEL items requiring such verification)?

Item is not part of the 50%.

2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NO ulfl N/A[:]

The bolts anchoringthe heat exchanger to the EDG skid are free of bent, broken, missing and loose hardware.

3. Is the anchorage free of corrosion that is more than mild surface YZ NO U-1 N/A[-]

oxidation? Some of the blue paint is cracked, but there are no signs of corrosion.

4. Is the anchorage free of visible cracks in the concrete near the Y' NEI ur N/AD-1 anchors?

The heat exchanger is anchored to a steel frame on the EDG skid. No cracks in concrete aroundskid observed. IEnter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 516 of 560 Sheet 2 of 5 Status: YZ N[:] U[- Seismic Walkdown Checklist (SWC) SWELl- 103 Equipment ID No. E-197A Equip. Class 21 - Tanks and Exchangers Equipment Description A EDG LUBE OIL HEAT EXCHANGER

5. Is the anchorage configuration consistent with plant documentation? Y[-E NEI U- N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

This does not apply since this item is not part of the 50% requiring anchorageconfiguration.

6. Based on the above anchorage evaluations, is the anchorage free of YN NEi U-"

potentially adverse seismic conditions? All visible anchoragewas free of potentially adverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI UD N/AD There are no soft targets that could be impacted by nearby equipment or structures.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ ND uF-I N/AD-'

and masonry block walls not likely to collapse onto the equipment? There are no masonry block walls or ceiling tiles in the room. The lights are in good condition, and do not present an interaction effect.

9. Do attached lines have adequate flexibility to avoid damage? YZ ND UD N/A[D]

The attachedlines have adequate flexibility.

10. Based on the above seismic interaction evaluations, is equipment free Y' NM uDU of potentially adverse seismic interaction effects?

Based on the above evaluation, the heat exchanger is free of potentially adverse seismic interaction effects.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 517 of 560 Sheet 3 of 5 Status: Y[ N- U--1 Seismic Walkdown Checklist (SWC) SWELl- 103 Equipment ID No. E-197A Equip. Class 21 - Tanks and Exchangers Equipment Description A EDG LUBE OIL HEAT EXCHANGER Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NiE U-I adversely affect the safety functions of the equipment?

It was looked for, and no other seismic conditions that could adversely affect the safety functions were found. Comments (Additional pages may be added as necessary) Evaluated by: Daniel Parker Date: 10/11/2012 Eric Dilbone 1/20 1011112012

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 518 of 560 Sheet 4 of 5 Status: YZ NI- ULID Seismic Walkdown Checklist (SWC) SWELl- 103 Equipment ID No. E-197A Equip. Class 21 - Tanks and Exchangers Equipment Description A EDG LUBE OIL HEAT EXCHANGER Photographs Note: Close-up view of equipment ID tag and Note: Side view from South side of skid bolts anchoring heat exchanger to the steel showing diagonalorientation of heat frame. exchanger.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 519 of 560 Sheet 5 of 5 Status: YZ NEI] Uil Seismic Walkdown Checklist (SWC) SWELl- 103 Equipment ID No. E-197A Equip. Class 21 - Tanks and Exchangers Equipment Description A EDG LUBE OIL HEAT EXCHANGER Note: View of anchor bolts along the upper Note: View of anchorbolts used to mount the (top) and lower (bottom) edges of the heat heat exchanger to the steel frame located on exchanger. the K4A skid.

Engineering Report No. CALC-ANO I-C S- 12-00002 Attachment C Rev. 0 Page 520 of 560 Sheet 1 of 5 Status: Y] NF UI-Seismic Walkdown Checklist (SWC) SWELl- 104 Equipment ID No. E-109 Equip. Class' 21 - Tanks and Heat Exchanqers Equipment Description OIL COOLER Location: Bldg. RAB Floor El. 335 Room, Area 38 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ N[-

of the 50% of SWEL items requiring such verification)? This equipment item is part of the 50% of SWEL items requiring anchorageconfiguration verification.

2. Is the anchorage free of bent, broken, missing or loose hardware? YN NEIl U[-] N/A--

All anchorage was free of the conditions listed above.

3. Is the anchorage free of corrosion that is more than mild surface YX NE] U[-- N/A-1 oxidation?

No corrosion was observed.

4. Is the anchorage free of visible cracks in the concrete near the YZ NEI UD- N/AE-anchors?

No visible cracks were observed in the concrete.

' Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 521 of 560 Sheet 2 of 5 Status: YN NEI UI Seismic Walkdown Checklist (SWC) SWELl- 104 Equipment ID No. E-109 Equip. Class 21 - Tanks and Heat Exchanqers Equipment Description OIL COOLER

5. Is the anchorage configuration consistent with plant documentation? YE NI U[EI N/AD-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Information for anchorage configurationwas taken from CR-ANO-I-2008-01239 pg. 103. The anchorageconfiguration consists of four bolts, two per angle beam support and each .625 inch in diameter. The anchorageconfiguration in the equipment drawing was consistent with what was evident in the seismic inspection.

6. Based on the above anchorage evaluations, is the anchorage free of YE NEI UM potentially adverse seismic conditions?

All anchorage is free of adverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ ND] UD] N/AD]

All soft targets are free from impact by nearby equipment.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YM N[-] UD1 N/AD-and masonry block walls not likely to collapse onto the equipment?

Overheadequipment is not likely to collapse onto the equipment item.

9. Do attached lines have adequate flexibility to avoid damage? YZ NDl UD] N/AD:

All attachedlines have adequate flexibility.

10. Based on the above seismic interaction evaluations, is equipment free YZ NEI UD-1 of potentially adverse seismic interaction effects?

Equipment is free of potentially adverse seismic interaction effects. Item is well anchored to the floor.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 522 of 560 Sheet 3 of 5 Status: Y] NO U-Seismic Walkdown Checklist (SWC) SWELl- 104 Equipment ID No. E-109 Equip. Class 21 - Tanks and Heat Exchanqers Equipment Description OIL COOLER Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y" NMi UMi adversely affect the safety functions of the equipment?

Yes, no other seismic conditions that could affect the safety functions of the equipment were discovered. Comments (Additional pages may be added as necessary) Equipment item, E-109, had no clear visible tag number. Although this was evident in the inspection, the oil cooler was clearly identified through an image in the SEWS package and also through the tag on the component feeding into the Oil Cooler. Date: 1 2 Evaluated by: Genaro BarraqanJr. Date: 101912012 Eric Dilbone '10//2 1 101912012

Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 523 of 560 Sheet 4 of 5 Status: YZ NEi-] UI-Seismic Walkdown Checklist (SWC) SWELl- 104 Equipment ID No. E-109 Equip. Class 21 - Tanks and Heat Exchanqers Equipment Description OIL COOLER Photographs

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 524 of 560 Sheet 5 of 5 Status: YZ ND U[7 Seismic Walkdown Checklist (SWC) SWELl- 104 Equipment ID No. E-109 Equip. Class 21 - Tanks and Heat Exchangers Equipment Description OIL COOLER Note: Generalimage of Oil Cooler (E-109). Note: General image of Oil Cooler (E-109).

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 525 of 560 Sheet I of 5 Status: Y- NF U-Seismic Walkdown Checklist (SWC) SWELl-105 Equipment ID No. N/A Equip. Class, Equipment Description NOT USED Location: Bldg. N/A Floor El. N/A Room, Area N/A Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE"] Nn of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YEJ NEJ UE[ N/AE[
3. Is the anchorage free of corrosion that is more than mild surface YE- NFE UE- N/AE--

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the YE] NE: UEJ N/AE[-

anchors? I Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 526 of 560 Sheet 2 of 5 Status: YE] NI] U-- Seismic Walkdown Checklist (SWC) SWELl-105 Equipment ID No. N/A Equip. I Equipment Description NOT USED

5. Is the anchorage configuration consistent with plant documentation? YEI- NE] UE] N/A[]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YE] NE-] UE]

potentially adverse seismic conditions? Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YE] NEi UE] N/AE]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YEI NEI UE] N/AE-]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YEI NE] UE]1 N/AE]
10. Based on the above seismic interaction evaluations, is equipment free YEI NE[:] UE]-

of potentially adverse seismic interaction effects?

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 527 of 560 Sheet 3 of 5 Status: YO] NO] Ut] Seismic Walkdown Checklist (SWC) SWE Equipment ID No. N/A Equip. Equipment Description NOT USED Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[L]NE]UFJ adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: Date:

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 528 of 560 Sheet 4 of 5 Status: Y-- NE] Ur-1 Seismic Walkdown Checklist (SWC) SWELl-105 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Photographs

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 529 of 560 Sheet 5 of 5 Status: YW-- Nil Ur-1 Seismic Walkdown Checklist (SWC) SWELl-105 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Note: Note:

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 530 of 560 Sheet 1 of 6 Status: YZ NE] UE1 Seismic Walkdown Checklist (SWC) SWELl-106 Equipment ID No. T-208 - Equip. Class' 21-Tanks and Heat Exchangers Equipment Description ACCUM TANK FOR CV-2234 AIR OPERATOR Location: Bldg. RAB Floor El. 356 Room, Area 77 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[] NZ of the 50% of SWEL items requiring such verification)?

This item is anchored to Item CV-2234 using steel frames. This item is also not partof the 50%.

2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI UE- N/AE-It appears that one of the anchored bolts is slightly loose. However, there are no signs for this being an adverse seismic condition for the equipment item. Other than this minor issue, all other anchorageis free of the conditionslisted above.
3. Is the anchorage free of corrosion that is more than mild surface Y' N[E uE-l N/AE-oxidation?

No corrosion was observed.

4. Is the anchorage free of visible cracks in the concrete near the YE- NE] UEi N/AZ anchors?

Equipment is attachedto a metal frame in Item CV-2234. I Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 531 of 560 Sheet 2 of 6 Status: Y[ NEiI UDl Seismic Walkdown Checklist (SWC) SWELl-106 Equipment ID No. T-208 Equip. Class 21-Tanks and Heat Exchangers Equipment Description ACCUM TANK FOR CV-2234 AIR OPERATOR

5. Is the anchorage configuration consistent with plant documentation? Y-- NF] U' N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Item is not partof the 50%.

6. Based on the above anchorage evaluations, is the anchorage free of YN NI] U[]

potentially adverse seismic conditions? Anchorage is free of potentially adverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEi ULI N/A[--

Soft targets are free from impact by nearby equipment.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NEil UZI' N/A[--

and masonry block walls not likely to collapse onto the equipment? Steel frame protects the tank from overhead hazards.

9. Do attached lines have adequate flexibility to avoid damage? Y' NEI uLI N/A--

Lines appearto have adequate flexibility.

10. Based on the above seismic interaction evaluations, is equipment free YZ NE- U '-1 of potentially adverse seismic interaction effects?

Equipment has enough space in its surroundingsto avoid negative interactioneffects.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 532 of 560 Sheet 3 of 6 Status: Y[ NEIl U[- Seismic Walkdown Checklist (SWC) SWELl-106 Equipment ID No. T-208 Equip. Class 21-Tanks and Heat Exchangers Equipment Description ACCUM TANK FOR CV-2234 AIR OPERATOR Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NoI UF-adversely affect the safety functions of the equipment?

No other seismic conditions that could adversely affect the safety functions of the equipment were observed. Comments (Additional pages may be added as necessary) Accumulator tank did not have an equipment ID tag. Tank ID was noted on the tee fitting directly above the tank. Also, one of the anchored bolts was slightly loose; there are no signs of it being a seismic concern for the accumulator.See images below. Evaluated by: Genaro BarraqanJr. . ' Date: 10/3/2012 Michael E. Perez 10//2-101312012

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 533 of 560 Sheet 4 of 6 Status: YZ NEI UD-] Seismic Walkdown Checklist (SWC) SWELl-106 Equipment ID No. T-208 Equip. Class 21-Tanks and Heat Exchangers Equipment Description ACCUM TANK FOR CV-2234 AIR OPERATOR Photographs Note: Image shows the Accumulator tank ID Note: It seems that there is one bolt that T-208. appears to be slightly loose. Although this may not show signs of an adverse seismic condition, it is advised that the bolt should be checked for tightness.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 534 of 560 Sheet 5 of 6 Status: YZ NEI-] UI-Seismic Walkdown Checklist (SWC) SWELl-106 Equipment ID No. T-208 Equip. Class 21-Tanks and Heat Exchangers Equipment Description ACCUM TANK FOR CV-2234 AIR OPERATOR Note: General image of Accumulator Tank. Note: Image shows the anchorage configuration of the accumulatortank.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 535 of 560 Sheet 6 of 6 Status: YZ N[-] U-I Seismic Walkdown Checklist (SWC) SWELl-106 Equipment ID No. T-208 Equip. Class 21-Tanks and Heat Exchangers Equipment Description ACCUM TANK FOR CV-2234 AIR OPERATOR Note: General image showing the top section Note: of the tank.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 536 of 560 Sheet 1 of 5 Status: YLI NR U-Seismic Walkdown Checklist (SWC) SWELl-107 Equipment ID No. N/A Equip. I Equipment Description NOT USED Location: Bldg. N/A Floor El. N/A Room, Area N/A Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one 'Y[-E NE-]

of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? Y[E] NEJ U[-E N/AE-
3. Is the anchorage free of corrosion that is more than mild surface YE- NEI UE-' N/AE--

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the 'YE NE:] UEJ N/A[E]

anchors? 1 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 537 of 560 Sheet 2 of 5 Status: YEI Nn- U-Seismic Walkdown Checklist (SWC) SWELl -107 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED

5. Is the anchorage configuration consistent with plant documentation? YE- NE- U[:] N/Ar]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YE- NE UE]

potentially adverse seismic conditions? Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YEI NEi UE- N/AE-
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YEI NEI UE1 N/AE1 and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y[I NEI UE- N/AE-
10. Based on the above seismic interaction evaluations, is equipment free YEI NEI UE of potentially adverse seismic interaction effects?

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 538 of 560 Sheet 3 of 5 Status: YD-- NE] U-- Seismic Walkdown Checklist (SWC) SWELl-107 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE]" Nil uD-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: Date: Date: Evaluated by:

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 539 of 560 Sheet 4 of 5 Status: YD-- No-- ULII Seismic Walkdown Checklist (SWC) SWELl-107 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Photographs

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 540 of 560 Sheet 5 of 5 Status: YDI NEI U-- Seismic Walkdown Checklist (SWC) SWELl-107 Equipment ID No. N/A Equip. Class N/A Equipment Description NOT USED Note: Note:

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 541 of 560 Sheet I of 5 Status: YZ N[:] UM Seismic Walkdown Checklist (SWC) SWELl-108 Equipment ID No. E-35A Equip. Class' 21 - Tanks and Heat Exchanqers Equipment Description 'A' LOOP DH CLR Location: Bldg. RAB Floor El. 317 Room, Area 14 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ N[E of the 50% of SWEL items requiring such verification)?

This equipment is anchoredto two concrete pedestals. Anchorage configuration verification is requiredfor this equipment.

2. Is the anchorage free of bent, broken, missing or loose hardware? YE N[: UE- N/AE"]

Anchorage appears to be free from the conditions stated above.

3. Is the anchorage free of corrosion that is more than mild surface YZ N[: UE- N/AEl oxidation?

No signs of any type of corrosion have been found on the anchorageof the component.

4. Is the anchorage free of visible cracks in the concrete near the YZ NEl U[-] N/A[--

anchors? No cracks were observed in the concrete piers in the vicinity of the anchor bolts. Concrete piers (3ft high) appearedto be in sound condition. 1 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 542 of 560 Sheet 2 of 5 Status: Y[ NE] U[] Seismic Walkdown Checklist (SWC) SWELl-108 Equipment ID No. E-35A Equip. Class 21 - Tanks and Heat Exchangers Equipment Description A' LOOP DH CLR

5. Is the anchorage configuration consistent with plant documentation? Y[ NEI U[- N/AD-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

The anchorageconfiguration that has been found during the inspection complied with the specificationsstated in the documentation (CALC SQ-1001-21, page 25 and Drawing C-261, Sht. 1, Rev. 15).

6. Based on the above anchorage evaluations, is the anchorage free of YZ NE] UD-]

potentially adverse seismic conditions? All anchoragesupporting the system was found to be free from adverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[N ND-] UD- N/AD-None of the soft targets found in the equipment have been shown to potentiallysuffer impact by nearby equipment.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[D ND:] UD- N/AD-and masonry block walls not likely to collapse onto the equipment?

Overheadequipment near Item E-35B appeared to be properlysecured so as to avoid any collapse during a seismic hazard.

9. Do attached lines have adequate flexibility to avoid damage? Y' NDI UD- N/AD-All attachedlines have been ruled to have adequate flexibility.
10. Based on the above seismic interaction evaluations, is equipment free YN ND"] U[-D of potentially adverse seismic interaction effects?

Equipment appears to be free from seismic interaction effects.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 543 of 560 Sheet 3 of 5 Status: Y[ NIF U-] Seismic Walkdown Checklist (SWC) SWELl-108 Equipment ID No. E-35A Equip. Class 21 - Tanks and Heat Exchangers Equipment Description 'A'LOOP OH CLR Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NEI UD1 adversely affect the safety functions of the equipment?

No other seismic conditions were found to affect the equipment's integrity. Comments (Additional pages may be added as necessary) The anchoragefound in the system appeared to be in very good condition. There was no sign of oxidation. Additionally, no cracks in the concrete were observed. Evaluated by: Michael Perez - - Date: 10/11/2012 Sean Smolarek Z/122 1011112012

Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 544 of 560 Sheet 4 of 5 Status: YZ NI] U-- Seismic Walkdown Checklist (SWC) SWELl-108 Equipment ID No. E-35A Equip. Class 21 - Tanks and Heat Exchangers Equipment Description 'A' LOOP DH CLR Photographs Note: General Overview Note: Concrete Pedastel

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 545 of 560 Sheet 5 of 5 Status: YE NrD UI-Seismic Walkdown Checklist (SWC) SWELl-108 Equipment ID No. E-35A Equip. Class 21 - Tanks and Heat Exchanqers Equipment Description 'A' LOOP DH CLR Note: Anchorage Note: Overhead

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 546 of 560 Sheet I of 5 Status: Y[ NE U-- Seismic Walkdown Checklist (SWC) SWELl-109 Equipment ID No. E-35B Equip. Class, 21 - Tanks and Heat Exchangers Equipment Description 'B' LOOP DH CLR Location: Bldg. RAB Floor El. 317 Room, Area 11 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE NO of the 50% of SWEL items requiring such verification)?

This equipment is anchored to two concrete pedestals. Anchorage configuration verification is requiredfor this equipment.

2. Is the anchorage free of bent, broken, missing or loose hardware? Y[ N[] U- N/A-]

Anchorage appearsto be free from the conditions stated above.

3. Is the anchorage free of corrosion that is more than mild surface YN NE] Ul N/AZ--

oxidation? No signs of any type of corrosion have been found on the anchorage of the component.

4. Is the anchorage free of visible cracks in the concrete near the YZ NEI U[- N/A--

anchors? No cracks were observed in the concrete piers in the vicinity of the anchorbolts. Concrete piers (3ft high) appearedto be in sound condition. 1 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS-12-00002 Attachment C Rev. 0 Page 547 of 560 Sheet 2 of 5 Status: YN N-- Ur-Seismic Walkdown Checklist (SWC) SWELl-109 Equipment ID No. E-35B Equip. Class 21 - Tanks and Heat Exchangers Equipment Description 'B' LOOP DH CLR

5. Is the anchorage configuration consistent with plant documentation? Y'] NEI UEr N/A--

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) The anchorage configurationthat has been found during the inspection complied with the specifications stated in the documentation (CALC SQ-1001-21, page 25 and Drawing C-261, Sht. 1, Rev. 15).

6. Based on the above anchorage evaluations, is the anchorage free of YZ N[] U[E]

potentially adverse seismic conditions? All anchoragesupportingthe system was found to be free from adverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN N[E] UE- N/A--

None of the soft targets found in the equipment have been shown to potentially suffer impact by nearby equipment.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NE-] UE1 N/AZ--

and masonry block walls not likely to collapse onto the equipment? Overhead equipment near Item E-35B appearedto be properlysecured so as to avoid any collapse during a seismic hazard.

9. Do attached lines have adequate flexibility to avoid damage? '(Y NE-1 U[-] N/AZl All attached lines have been ruled to have adequate flexibility.
10. Based on the above seismic interaction evaluations, is equipment free YZ NE] UEl of potentially adverse seismic interaction effects?

Equipment appears to be free from seismic interaction effects.

Engineering Report No. CALC-ANOI-CS-12-00002 Attachment C Rev. 0 Page 548 of 560 Sheet 3 of 5 Status: YN NEI Ui Seismic Walkdown Checklist (SWC) SWELl-109 Equipment ID No. E-35B Equip. Class 21 - Tanks and Heat Exchangers Equipment Description 'B' LOOP DH CLR Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN( N[i] UE adversely affect the safety functions of the equipment?

No other seismic conditions were found to affect the equipment's integrity. Comments (Additional pages may be added as necessary) The anchoragefound in the system appeared to be in very good conditions. Anchor bolts did not show any signs of oxidation, nor were cracks in the concrete piers detected. No tag ID was found for this component, but it was clear to determine the identity of this equipment item due to its description and large size. Evaluated by: DanielAndoh _ __ _ _ _ _ _ _ Date: 10/4/2012 Michael E. Perez / 10/4/20.12 101412012

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 549 of 560 Sheet 4 of 5 Status: Y[ NI- U -- Seismic Walkdown Checklist (SWC) SWELl-109 Equipment ID No. E-35B Equip. Class 21 - Tanks and Heat Exchangers Equipment Description 'B' LOOP DH CLR Photographs Note: The anchorageof this component Note: Anchorage on the other side of the appearsto be in adequate conditions. No component also appears to be in adequate corrosion was observed in the anchorbolts, conditions. nor cracks in the concrete piers in the vicinity of the anchorbolts.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 550 of 560 Sheet 5 of 5 Status: Yo No-] U-- Seismic Walkdown Checklist (SWC)- SWELl-109 Equipment ID No. E-35B Equip. Class 21 - Tanks and Heat Exchanqiers Equipment Description 'B' LOOP DH CLR Note: Overhead equipment appearsto be in Note: adequate conditions. Therefore, it is unlikely that it would collapse onto Item E-35B. And if these were to ever collapse, the likelihood of damaging the equipment is very minimal.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 551 of 560 Sheet 1 of 5 Status: YZ NE] UrI Seismic Walkdown Checklist (SWC) SWELl-110 Equipment ID No. P-107B Equip. Class' 5- Horizontal Pumps Equipment Description LUBE OIL SCAVENGING PUMP Location: Bldg. RAB Floor El. 369 Room, Area 86 Manufacturer, Model, Etc. (optional but recommended) Electro-Motive 645E4B TurbocharcqedDiesel Engine Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE NZ of the 50% of SWEL items requiring such verification)?

Items is not partof the 50% anchorage configuration verification.

2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEi UiE N/AE]

The anchorageis free of bent, broken, missing and loose hardware.

3. Is the anchorage free of corrosion that is more than mild surface YZ NEI UE-1 N/AE-oxidation?

The anchorageis free of corrosion.

4. Is the anchorage free of visible cracks in the concrete near the Y[ NEI UE- N/AE--

anchors? Component mounted to EDG skid. No cracks in concrete around skid anchorage. 1 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 552 of 560 Sheet 2 of 5 Status: YE NL-- UL-Seismic Walkdown Checklist (SWC) SWELl-110 Equipment ID No. P-107B Equip. Class 5- Horizontal Pumps Equipment Description LUBE OIL SCAVENGING PUMP

5. Is the anchorage configuration consistent with plant documentation? YE NEI U- N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

This is not applicable since it is not partof the 50% of SWEL items requiringanchorageconfiguration verification.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NE: U--

potentially adverse seismic conditions? Based on the above anchorageevaluations, the anchorageis free of potentially adverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YM NEI UE N/AE The Lube Oil Scavenger Pump is bolted low at the accessory end of the diesel engine. This component is shielded by additionalengine components attached above on the accessoryend.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, '(Y NE UE-] N/AE-]

and masonry block walls not likely to collapse onto the equipment? There is overhead duct work that is properly secured with steel hangers.

9. Do attached lines have adequate flexibility to avoid damage? YZ NO UE N/AE Attached lines have adequate flexibility.
10. Based on the above seismic interaction evaluations, is equipment free 'YZ NE uE of potentially adverse seismic interaction effects?

Based on the above seismic interactionevaluations, the equipment is free of potentially adverse seismic interactioneffects.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 553 of 560 Sheet 3 of 5 Status: YE N[-- U[-] Seismic Walkdown Checklist (SWC) SWELl-110 Equipment ID No. P-107B Equip. Class 5- Horizontal Pumps Equipment Description LUBE OIL SCAVENGING PUMP Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ NE] UE]

adversely affect the safety functions of the equipment? It was looked for, and no otherseismic conditions that could adversely affect the safety functions of the equipment were found. Comments (Additional pages may be added as necessary) The Lube Oil Scavenger Pump is a critical component of the diesel engine. Every mounting bolt was observed to be in place. The entire engine appearedclean and well maintained.There were no visible leaks or signs of previous leaks at any location were accessory components were bolted to the main engine block. ThroeQuarter Left Front View. 16-Cylinder Evaluated by: Daniel Parker Date: 10/212012 Eric Dilbone 10/212012

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 554 of 560 Sheet 4 of 5 Status: YZ No UM Seismic Walkdown Checklist (SWC) SWELl-110 Equipment ID No. P-107B Equip. Class 5- HorizontalPumps Equipment Description LUBE OIL SCAVENGING PUMP Photographs Note: Component ID Note: Overview of Component

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 555 of 560 Sheet 5 of 5 Status: YZ N[-] UI-Seismic Walkdown Checklist (SWC) SWELl-110 Equipment ID No. P-107B Equip. Class 5- Horizontal Pumps Equipment Description LUBE OIL SCAVENGING PUMP Note: Overview of Component Note:

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 556 of 560 Sheet I of 5 Status: YZ NE] UE0 Seismic Walkdown Checklist (SWC) SWEL2-001 Equipment ID No. SW-72 Equip. Class' 7- Pneumatic-OperatedValves Equipment Description SW TO SFP EL 404' SERV CONN Location: Bldg. RAB Floor El. 404 Room, Area 159 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YEI NZ of the 50% of SWEL items requiring such verification)?

Anchorage verification is not requiredsince this is an in-line component.

2. Is the anchorage free of bent, broken, missing or loose hardware? YE] NE] U[:] N/A[

This is not applicable since this is an in-line component.

3. Is the anchorage free of corrosion that is more than mild surface YE] NE] UE-- N/AZ oxidation?

This is not applicable since this is an in-line component.

4. Is the anchorage free of visible cracks in the concrete near the YEI NEI UEi N/AZ anchors?

This is not applicable since this is an in-line component.

' Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 557 of 560 Sheet 2 of 5 Status: YZ Nn- UI-Seismic Walkdown Checklist (SWC) SWEL-2-OO11 Equipment ID No. SW-72 Equip. Class 7 - Pneumatic-OperatedValves Frii inmpnt fl,.rrintinn ,£W TO P,FP Fl 404' 5£FRV CC)NN

5. Is the anchorage configuration consistent with plant documentation? YEI NEI UE] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

This item is not part of the 50%.

6. Based on the above anchorage evaluations, is the anchorage free of YM NEI UI[]

potentially adverse seismic conditions? The anchorageis free of potentially adverse seismic conditions. Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NE] UE- N/A[]

There are no soft targets to be affected by nearby equipment or structures.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[ NE] uE] N/AE]

and masonry block walls not likely to collapse onto the equipment? There is a masonry block wall next to the component, but it is seismically qualified.

9. Do attached lines have adequate flexibility to avoid damage? Y[ NEI UE] N/AE]

Attached lines have adequate flexibility.

10. Based on the above seismic interaction evaluations, is equipment free Y" NE] UF]

of potentially adverse seismic interaction effects? Based on the above seismic interaction evaluations,the equipment is free of potentially adverse seismic interactioneffects.

Engineering Report No. CALC-ANO1-CS-12-00002 Attachment C Rev. 0 Page 558 of 560 Sheet 3 of 5 Status: YN NEI U[M Seismic Walkdown Checklist (SWC) SWEL2-001 Equipment ID No. SW-72 Equip. Class 7- Pneumatic-OperatedValves Equipment Description SW TO SFP EL 404' SERV CONN Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could '(Y Ni] Ui[

adversely affect the safety functions of the equipment? It was looked for, and no other seismic conditions that could adversely affect the safety fuctions were found. Comments (Additional pages may be added as necessary) Evaluated by: Sean Smolarek 5 Date: 10/1212012 Eric Dilbone e &1 1011212012 2

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment C Rev. 0 Page 559 of 560 Sheet 4 of 5 Status: Y[ NF U-Seismic Walkdown Checklist (SWC) SWEL2-001 Equipment ID No. SW-72 Equip. Class 7 - Pneumatic-OperatedValves Equipment Description SW TO SFP EL 404' SERV CONN PhotouraDhs Note: View of the component equipment ID Note: General view of the component. tag.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment C Rev. 0 Page 560 of 560 Sheet 5 of 5 Status: YM Nn Ur-I Seismic Walkdown Checklist (SWC) SWEL2-O01 Equipment ID No. SW-72 Equip. Class 7- Pneumatic-OperatedValves Equipment Description SW TO SFP EL 404' SERV CONN Note: View of the component showing the Note: Side view of the component. seismic block wall behind.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 1 of 152 Attachment D Area Walk-By Checklists (AWCs)

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 2 of 152 Sheet 1 of 5 Status: Y[ NI[] ul-Area Walk-By Checklist (AWC) AWC- 001 Location: Bldg. RAB Floor El. 369 Room, Area' 87 SWEL Components: SWELl- 001 (M-112A), 011 (P-108A). 015 (P-104A), 016 (CV-5218), 046 (SV-5218), 056 (KMA-1). 057 (TV-7901B), 062 (F-50A), 063 (M-227A). 067 (SS-5211). 073 (LSL-5206). 101 (T-78A), 103 (E-197A) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of Y[ NEI uI] N/AI]

potentially adverse seismic conditions (if visible without necessarily opening cabinets)? Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of Y[ N[D UD- N/AD-significant degraded conditions?

Anchorage of equipment in the area is free of significantdegraded conditions.

3. Based on a visual inspection from the floor, do the cable/conduit Y' ND- UD- N/AD-raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

From the floor, cable/conduitraceways and HVAC ducting appearsto be free of potentially adverse seismic conditions. 1 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 3 of 152 Sheet 2 of 5 Status: YZ NEi] U[I Area Walk-By Checklist (AWC) AWC- 001 Location: Bldg. RAB Floor El. 369 Room, Area 87

4. Does it appear that the area is free of potentially adverse seismic YZ NEI- U[I N/AD spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

The area is free of potentially adverse seismic spatialinteractionswith other equipment in the area.

5. Does it appear that the area is free of potentially adverse seismic YZ NE] u- N/A[-]

interactions that could cause flooding or spray in the area? There is a fire water system in the room, in addition to service water piping. The room is equipped with floor drains to mitigate a release of water in the room.

6. Does it appear that the area is free of potentially adverse seismic '(Y N- u[-] N/AF-interactions that could cause a fire in the area?

The area appearsto be free of potentially adverse seismic interactions that could cause a fire in the area.

7. Does it appear that the area is free of potentially adverse seismic '(Z NEI UE] N/AE]1 interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

It was noted that engineering-approvedscaffolding is assembled on the North, East and West sides of the room at the time of inspection.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 4 of 152 Sheet 3 of 5 Status: YZ NE UD-Area Walk-By Checklist (AWC) AWC- 001 Location: Bldg. RAB Floor El. 369 Room, Area 87

8. Have you looked for and found no other seismic conditions that could YZ NEil UiF1 adversely affect the safety functions of the equipment in the area?

It was looked for, and no other seismic conditions that could affect the safety functions of equipment in the area were found. Comments (Additional pages may be added as necessary) Evaluated by: Daniel Parker Date: 10/11/2012 Eric Dilbone 10/11/2012

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 5 of 152 Sheet 4 of 5 Status: Y[ N[-] UF-'1 Area Walk-By Checklist (AWC) AWC- 001 Location: Bldg. RAB Floor El. 369 Roo/m, Area2 87 SWEL Components: SWELl- 001 (M-112A), 011 (P-108A), 015 (P-104A), 016 (CV-5218), 046 (SV-5218). 056 (KMA-1). 057 (TV-7901 B), 062 (F-50A), 063 (M-227A), 067 (SS-5211). 073 (LSL-5206). 101 (T-78A), 103 (E-197A) Photographs Note: Picture of scaffold assembled on the Note: View of equipment and conduit West wall of the room. overhead in Room 87. 2 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 6 of 152 Sheet 5 of 5 Status: YZ ND] U-I Area Walk-By Checklist (AWC) AWC- 001 Location: Bldg. RAB Floor El. 369 Room, Area3 87 SWEL Components: SWELl- 001 (M-112A), 011 (P-108A), 015 (P-104AL. 016 (CV-5218). 046 (SV-5218). 056 (KMA-1). 057 (TV-7901 B), 062 (F-50A), 063 (M-227A), 067 (SS-5211). 073 (LSL-5206). 101 (T-78A), 103 (E-197A) Note: View of overhead equipment, lighting and conduit in Room 87. 3 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 7 of 152 Sheet I of 6 Status: Y[ NE] UR Area Walk-By Checklist (AWC) AWC- 002 Location: Bldg. RAB Floor El. 335 Room, Areal 38 (Entire Room) SWEL Components: SWELl - 002(K-3), 004(CV-6601 A), 01 2(P-7A). 084fPI-281 1A), 104(E-1 09). 043(CV-2806). 025(CV-2800). 074(PIT-2812) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YN N[I U[I- N/A[--

potentially adverse seismic conditions (if visible without necessarily opening cabinets)? Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of YZ NEI U[-] N/AZ1 significant degraded conditions?

Anchorage of equipment in the areaappears to be free of significant degradedconditions.

3. Based on a visual inspection from the floor, do the cable/conduit Y[ NEI UZ1 N/A[:]

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)? All rigid electricalconduit is adequatelyanchored to the overhead and the walls. Overheadpiping and ducts appearto be properly secured.

' If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 8 of 152 Sheet 2 of 6 Status: YZ NE] UL-I Area Walk-By Checklist (AWC) AWC- 002 Location: Bldg. RAB Floor El. 335 Room, Area 38 (Entire Room)

4. Does it appear that the area is free of potentially adverse seismic YN NEIl ULI N/A[-]

spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)? There is unique connection in a lighting fixture above Item P-7B. It seems that the support of the lighting fixture has broken and to remedy the missing piece, a metal tie was applied to tie the broken support. However, this is acceptable considering the weight of the light and since it can't be disconnected from the support.

5. Does it appear that the area is free of potentially adverse seismic Y[ NE] U-1 N/AEr interactions that could cause flooding or spray in the area?

The area appearsto be free of potentially adverse seismic conditions that could cause flooding or spray in the area.

6. Does it appear that the area is free of potentially adverse seismic YZ NEI UE- N/A']

interactions that could cause a fire in the area? One pipe has insulation which has been soaked in oil. However, this has already been acknowledged by maintenance. A "caution"sign is placed near the insulatedpipe.

7. Does it appear that the area is free of potentially adverse seismic YZ NEI UM N/A[-]

interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)? The area appearsto be free of potentially adverse seismic interactions associatedwith housekeeping practices,storage of portable equipment, and temporary installations.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 9 of 152 Sheet 3 of 6 Status: YO NEI U[O Area Walk-By Checklist (AWC) AWC- 002 Location: Bldg. RAB Floor El. 335 Room, Area 38 (Entire Room)

8. Have you looked for and found no other seismic conditions that could YZ( NEI U[-

adversely affect the safety functions of the equipment in the area? There are no other seismic conditions that were identified. Comments (Additional pages may be added as necessary) Anchorages in the area are found to be in adequate conditions. There is a fire extinguisher in the area that may come loose, but there are no credible targets. There is one overhead equipment item (VUC-6) that may potentiallyaffect the area. But because it is well supported by 2 thread rods (one on each side) as well as 4 welded angle sections, it is very unlikely for a seismic hazard to occur. Evaluated by: Daniel Parker [Date: 10/8/2012 Michael E. Perez F -_-- 10/8/2012

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 10 of 152 Sheet 4 of 6 Status: YV NEI UD Area Walk-By Checklist (AWC) AWC- 002 Location: Bldg. RAB Floor El. 335 Room, Area 38 (Entire Room) SWEL Components: SWELl-002(K-3), 004(CV-6601A), 012(P-7A), 084(PI-2811A), 104(E-109). 043(CV-2806). 025(CV-2800). 074(PIT-2812) Photographs Note: Anchorage in the area appearsto be in Note: Observe unusual light support, good condition. however, this will induce no motion during a seismic event.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 11 of 152 Sheet 5 of 6 Status: Y[I N-- U-- Area Walk-By Checklist (AWC) AWC- 002 Location: Bldg. RAB Floor El. 335 Room, Area 38 (EntireRoom) SWEL Components: SWELl - 002(K-3). 004(CV-6601A), 012(P-7A). 084(PI-281 1A). 104(E-109). 043(CV-2806). 025(CV-2800). 074(PIT-2812) Note: There is a pipe whose insulationhas Note: Drainsare present in the area, thus been soaked in oil. However, this has been mitigating any seismic hazards that would acknowledged by maintenance and a "caution" cause flooding. sign has been placed.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 12 of 152 Sheet 6 of 6 Status: YZ NEI ul-l Area Walk-By Checklist (AWC) AWC- 002 Location: Bldg. RAB Floor El. 335 Room, Area 38 (EntireRoom) SWEL Components: SWELl - 002(K-3), 004(CV-6601A), 012(P-7A). 084(PI-2811A). 104(E-109). 043(CV-2806), 025(CV-2800), 074(PIT-2812) Note: Overheadpipe. Note: Overhead unit (VUC-6) does not seem likely to collapse on other equipment, since there are two threadedrods as well as 4 welded angle sections that are supporting the unit.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 13 of 152 Sheet I of 5 Status: YZ NEI UFl Area Walk-By Checklist (AWC) AWC- 003 Location: Bldg. RAB Floor El. 335 Room, Area' 56 SWEL Components: SWEL- 003(F-57A), 030(CV-1276) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YZ NEI UEL N/AE!

potentially adverse seismic conditions (if visible without necessarily opening cabinets)? Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of YZ NEI U[-] N/AD-significant degraded conditions?

Anchorage of equipment in the area appearsto be free of significant degraded conditions.

3. Based on a visual inspection from the floor, do the cable/conduit YZ NEI UE] N/A[--

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)? HVAC ductwork is in good general condition. 'If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO1-CS-12-00002 Attachment D Rev. 0 Page 14 of 152 Sheet 2 of 5 Status: YZ No] U-- Area Walk-By Checklist (AWC) AWC- 003 Location: Bldg. RAB Floor El. 335 - Room, Area2 56

4. Does it appear that the area is free of potentially adverse seismic YZ NE] U[ N/A--

spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)? The area is free of potentially adverse seismic spatial interactionswith other equipment in the area.

5. Does it appear that the area is free of potentially adverse seismic YN NEI U-] N/AZ-interactions that could cause flooding or spray in the area?

The area appearsto be free of potentially adverse seismic conditions that could cause flooding or spray in the area.

6. Does it appear that the area is free of potentially adverse seismic YZ NEI ULI N/A[-

interactions that could cause a fire in the area? A verticalpipe near CV-1276 was wrapped in clearplastic.

7. Does it appear that the area is free of potentially adverse seismic Y ] N[: U[--] N/AD interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

The area appears to be free of potentially adverse seismic interactions associatedwith housekeeping practices, storage of portableequipment, and temporaryinstallations. 2 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWFL item.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 15 of 152 Sheet 3 of 5 Status: YZ NF- UI'-J Area Walk-By Checklist (AWC) AWC- 003 Location: Bldg. RAB Floor El. 335 Room, Area3 56

8. Have you looked for and found no other seismic conditions that could YZ NEI U[I adversely affect the safety functions of the equipment in the area?

It was looked for, and no otherseismic conditions that could adversely affect the safety functions of the equipment in the area were found. Comments (Additional pages may be added as necessary) Evaluated by: Daniel Parker "J Date: 10/12/2012 Eric Dilbone *

  • 10/12/2012 3 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 16 of 152 Sheet 4 of 5 Status: YZ NF UFII Area Walk-By Checklist (AWC) AWC- 003 Location: Bldg. RAB Floor El. 335 Room, Area4 56 SWEL Components: SWEL- 003(F-57A), 030(CV-1276) Photographs Note: Room 56 Overhead ducting. Note: Room 56 overhead insulatedpipes. 4 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 17 of 152 Sheet 5 of 5 Status: YE NE] U-I Area Walk-By Checklist (AWC) AWC- 003_ Location: Bldg. RAB Floor El. 335 - Room, Area5 56 SWEL Components: SWEL- 003(F-57A). 030(C V-I 276) Note: Room 56 insulatedpipe with plastic Note: FloorDrain in room 56. wrap near component CV-1276. 5 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 18 of 152 Sheet i of 5 Status: YN N-' U[] Area Walk-By Checklist (AWC) AWC- 004_ Location: Bldg. RAB Floor El. 368 - Room, Area' 104 SWEL Components: SWELl- 005 (D-15), 079 (PY-2618-A1), 093 (PY-1042A), 095 (LY-4204A), 096 (PY-2667-A1), 081 (C539A) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YZ NEI U[I N/AD1 potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of YZ NEI UE] N/A[-

significant degraded conditions? Anchorage in the area appearsto be free of significantdegraded conditions.

3. Based on a visual inspection from the floor, do the cable/conduit Y[ NEI UEl N/ADl raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill
        *conditions of cable trays appear to be inside acceptable limits)?

Based on visual inspection from the floor, the cable/conduit raceways and HVAC ducting appearto be free of potentially adverse seismic conditions. IIf the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 19 of 152 Sheet 2 of 5 Status: YZ NEI- Ur] Area Walk-By Checklist (AWC) AWC- 004 Location: Bldg. RAB Floor El. 368 Room, Area 104

4. Does it appear that the area is free of potentially adverse seismic Y[ ND U[I N/AD spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

The area appearsto be free of potentially adverse seismic spatial interactions with other equipment.

5. Does it appear that the area is free of potentially adverse seismic YE( NDI UD] N/AD]

interactions that could cause flooding or spray in the area? A room cooler is present in the room. It appears to be adequately installed and will not present a source of flooding or spray. It is located far enough away from safety relatedequipment that if it were to induce spray, it would not adversely impact the safe shutdown of the plant. Floor drains are present.

6. Does it appear that the area is free of potentially adverse seismic YN N[-] UD N/AD-interactions that could cause a fire in the area?

The area appears to be free of potentially adverse seismic interactions that could cause a fire.

7. Does it appear that the area is free of potentially adverse seismic YZ NED UED N/AD-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

The areais free of potentiallyadverse seismic interactions associated with housekeeping practices, storage of portable equipment and temporary installations.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 20 of 152 Sheet 3 of 5 Status: YZ NE] U[I Area Walk-By Checklist (AWC) AWC- 004 Location: Bldg. RAB Floor El. 368 Room, Area 104

8. Have you looked for and found no other seismic conditions that could Y] NE- UF-adversely affect the safety functions of the equipment in the area?

It was looked for and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found. Comments (Additional pages may be added as necessary) Evaluated by: Eric Dilbone I D Date: 10/10/2012 Daniel Parker 10/10/2012

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 21 of 152 Sheet 4 of 5 Status: YZ NE] UF-1 Area Walk-By Checklist (AWC) AWC- 004 Location: Bldg. RAB Floor El. 368 Room, Area 104 SWEL Components: SWELl- 005 (D-15), 079 (PY-2618-A1). 093 (PY-1042A), 095 (LY-4204A), 096 (PY-2667-A1). 081 (C539A) Photographs Note: View of the overhead space in Room Note: View of anchorage on a component in 104. Room 104.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 22 of 152 Sheet 5 of 5 Status: YZ NE]J UDl Area Walk-By Checklist (AWC) AWC- 004 Location: Bldg. RAB Floor El. 368 Room, Area 104 SWEL Components: SWELl- 005 (D-15). 079 (PY-2618-A1), 093 (PY-1042A), 095 (LY-4204A), 096 (PY-2667-A1). 081 (C539A) Note: View of a drain line that runs to a floor Note: View of cabinet C539A in Room 104. drain.

Engineering Report No. CALC-ANO1-CS-12-00002 Attachment D Rev. 0 Page 23 of 152 Sheet I of 5 Status: YZ N[I UF-Area Walk-By Checklist (AWC) AWC- 005 Location: Bldg. RAB Floor El. 372 Room, Area, 99 SWEL Components: SWELl- 007 (B-6) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of Y' NO UD-I N/A-potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of YZ ND U[D1 N/AD-significant degraded conditions?

Anchorage in the area appears to be free of significant degraded conditions.

3. Based on a visual inspection from the floor, do the cable/conduit YN NO UD N/AD raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

Based on visual inspection from the floor, the cable/conduitraceways and HVAC ducting appearto be free of potentiallyadverse seismic conditions. 1 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO1-CS- 12-00002 Attachment D Rev. 0 Page 24 of 152 Sheet 2 of 5 Status: YN NEJ UOF Area Walk-By Checklist (AWC) AWC- 005_ Location: Bldg. RAB Floor El. 372 - Room, Area 99

4. Does it appear that the area is free of potentially adverse seismic YN N[:] U[] N/AE--

spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)? The area appearsto be free of potentially adverse seismic spatial interactionswith other equipment. Lighting near sensitive equipment is mounted on unistrut, and near non-sensitive equipment is on chains and closed S-hooks.

5. Does it appear that the area is free of potentially adverse seismic YN( Ni[ U-I N/A[--

interactions that could cause flooding or spray in the area? A room cooleris present in the room. It appearsto be adequately installed and will not present a source of flooding or spray. It is located far enough away from safety related equipment that if it were to induce spray, it would not adversely impact the safe shutdown of the plant. Floor drainsare present.

6. Does it appear that the area is free of potentially adverse seismic YZ NEI UEl N/A[]

interactions that could cause a fire in the area? The area appears to be free of potentially adverse seismic interactions that could cause a fire.

7. Does it appear that the area is free of potentially adverse seismic YZ NEi UE] N/A[l interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

The areais free of potentiallyadverse seismic interactionsassociated with housekeeping practices, storage of portable equipment and temporary installations. It was noted that a ladderin the room is stored on the floor and chained to the wall.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 25 of 152 Sheet 3 of 5 Status: YZ NF U-Area Walk-By Checklist (AWC) AWC- 005 Location: Bldg. RAB Floor El. 372 Room, Area 99

8. Have you looked for and found no other seismic conditions that could YZ NEIUE adversely affect the safety functions of the equipment in the area?

It was looked for and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found. Comments (Additional pages may be added as necessary) Evaluated by: Daniel Parker Date: 10/11/2012 Eric Dilbone 10/11/2012

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 26 of 152 Sheet 4 of 5 Status: YZ NFil U[] Area Walk-By Checklist (AWC) AWC- 005 Location: Bldg. RAB Floor El. 372 Room, Area 99 SWEL Components: SWELl- 007 (B-6) Photoara~hs

                                           -n Note: View of equipment in Room 99,            Note: Equipment ID tag of the room cooler including SWEL item, B-6.                      identified in the room.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 27 of 152 Sheet 5 of 5 Status: YN NE] UZ1 Area Walk-By Checklist (AWC) AWC- 005 Location: Bldg. RAB Floor El. 372 Room, Area 99 SWEL Components: SWELl- 007 (B-6) Note: Attachment of drain line to drip pan for the room cooler seen in the previous image.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 28 of 152 Sheet i of 6 Status: YN NF! UI-- Area Walk-By Checklist (AWC) AWC- 006_ Location: Bldg. RAB Floor El. 372 - Room, Areal 100 SWEL Components: SWELl- 008 (X-52), 061 (Y-03) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YE NEI U[-] N/AE[

potentially adverse seismic conditions (if visible without necessarily opening cabinets)? No potentially adverse seismic conditions were observed in equipment anchoragein the area.

2. Does anchorage of equipment in the area appear to be free of YE NEI UJI N/AE1 significant degraded conditions?

Anchor bolts in surroundingequipment were observed to be ok. No cracks in the concrete were found.

3. Based on a visual inspection'from the floor, do the cable/conduit Y[ N[] uLIE] N/AE-raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

HVAC and pipe supports appearedto be adequate and in good condition. Cable trays were not overfilled and appear to be adequately supported. I If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 29 of 152 Sheet 2 of 6 Status: YZ NIF U-Area Walk-By Checklist (AWC) AWC- 006_ Location: Bldg. RAB Floor El. 372 - Room, Area 100

4. Does it appear that the area is free of potentially adverse seismic YM NEI U[_ N/AE]

spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)? The area appears to be free of potentially adverse spatialinteractions with other equipment in the area.

5. Does it appear that the area is free of potentially adverse seismic YZ NEI Ur- N/A--

interactions that could cause flooding or spray in the area? The area appearsto be free of potentially adverse seismic interactions that could cause flooding or spray in the area.

6. Does it appear that the area is free of potentially adverse seismic Y[ NE- U[-] N/Ar-interactions that could cause a fire in the area?

The area appearsto be free of potentially adverse seismic interactions that could cause a fire in the area.

7. Does it appear that the area is free of potentially adverse seismic YZ NEI uE] N/AZ-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

No potentiallyadverse seismic interactions were observed.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 30 of 152 Sheet 3 of 6 Status: YZ NF UF Area Walk-By Checklist (AWC) AWC- 006 Location: Bldg. RAB Floor El. 372 Room, Area 100

8. Have you looked for and found no other seismic conditions that could '(Z N[: U E adversely affect the safety functions of the equipment in the area?

No other adverse seismic conditions were observed. Comments (Additional pages may be added as necessary) In general the area was observed to be free of degraded conditions. Anchorage appearsto be in good condition. Evaluated by: Daniel Andoh [Date: 10/12/2012 Genaro BarraanJr. 10/12/2012

Engineering Report No. CALC-ANOI-CS-12-00002 Attachment D Rev. 0 Page 31 of 152 Sheet 4 of 6 Status: Y[ NF U-Area Walk-By Checklist (AWC) AWC- 006 Location: Bldg. RAB Floor El. 372 Room, Area 100 SWEL Components: SWELl- 008 (X-52). 061 (Y-03) Photographs Note: Overhead supports Note: Surrounding conditions

Engineering Report No. CALC-ANO 1-C S- 12-00002 Attachment D Rev. 0 Page 32 of 152 Sheet 5 of 6 Status: YE NO UI-- Area Walk-By Checklist (AWC) AWC- 006_ Location: Bldg. RAB Floor El. 372 - Room, Area 100 SWEL Components: SWEILl- 008 (X-52). 061 (Y-03)

                                           !1 Note: Overhead supports                        Note: Overhead supports

Engineering Report No. CALC-ANO 1-CS-i12-00002 Attachment D Rev. 0 Page 33 of 152 Sheet 6 of 6 Status: YZ NE] U -- Area Walk-By Checklist (AWC) AWC- 006 Location: Bldg. RAB Floor El. 372 Room, Area 100 SWEL Components: SWELl- 008 (X-52). 061 (Y-03) Note: Overhead supports Note: Adjacent floor anchorages

Engineering Report No. CALC-ANO1-CS-12-00002 Attachment D Rev. 0 Page 34 of 152 Sheet I of 5 Status: YZ NE] UD Area Walk-By Checklist (AWC) AWC- 007 Location: Bldg. DSB Floor El. YARD Room, Area' 252 SWEL Components: SWELl- 010 (P-16A) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of Y[ NI U-EI N/AD-potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

No potential adverse anchorageissues.

2. Does anchorage of equipment in the area appear to be free of YE- N[N UE1 N/AD significant degraded conditions?

Anchor bolts below FO-IOA have significantdegradation.CR-ANO 2012-1536 is initiated.

3. Based on a visual inspection from the floor, do the cable/conduit Y[ NEI U[1 N/A--

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)? There is no tray in room, conduit supports and HVAC ducting are supported well.

'If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 35 of 152 Sheet 2 of 5 Status: YZ NE] U-] Area Walk-By Checklist (AWC) AWC- 007 Location: Bldg. DSB Floor El. YARD Room, Area2 252

4. Does it appear that the area is free of potentially adverse seismic YZ NEI U[-I N/A-I spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

No tiles in room, lights are supported well.

5. Does it appear that the area is free of potentially adverse seismic YZ NE-I U[] N/A[l-interactions that could cause flooding or spray in the area?

Large tank is a source of potentialflooding also fire suppresion system.

6. Does it appear that the area is free of potentially adverse seismic Y" N[E- UE' N/Ar"I interactions that could cause a fire in the area?

The only fire source is the tank in room.

7. Does it appear that the area is free of potentially adverse seismic YM NEI UI-1 N/A-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
         #18 rebarlaying on ground. Hose in room is secured. No other housekeeping issues identified.

2 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 36 of 152 Sheet 3 of 5 Status: YN N[-] UDl Area Walk-By Checklist (AWC) AWC- 007 Location: DSB Floor El. YARD Room, Area3 252 Bldg.

8. Have you looked for and found no other seismic conditions that could YEI NEI ULi adversely affect the safety functions of the equipment in the area?

Rust on pipe supportfor fire suppression system. Comments (Additional pages may be added as necessary) Degradationhas been found for the anchor bolts within Item FO-IOA, which needs further inspection. Housekeeping appeared to be adequatein the area. Nuts on a personnel platform were loose. CR-ANO-1-2012-01537 initiated Evaluated by: Roy Bernrman -. Date: 10/10/2012 Michael E. Perez 7 10/10/2012 3 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 37 of 152 Sheet 4 of 5 Status: YN NO U[-D Area Walk-By Checklist (AWC) AWC- 007 Location: Bldg. DSB Floor El. YARD Room, Area4 252 SWEL Components: SWELl- 010 (P-16A) Photographs Note: Anchorages in the area have been Note: HVAC ducting and conduits are shown to be in adequate conditions. properly secured and free from adverse seismic conditions. 4 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 38 of 152 Sheet 5 of 5 Status: Y[ NEI UDl Area Walk-By Checklist (AWC) AWC- 007 Location: Bldg. DSB Floor El. YARD Room, Areas 252 SWEL Components: SWELl- 010 (P-16A) Note: Lighting appearedto be adequately Note: Fire suppression system, as well as the secured in the area. conduit appears to be properly secured. Because there is a fire suppressionsystem in the area,it is very unlikely that a fire hazard would cause significant damage in the area. 5 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 39 of 152 Sheet I of 5 Status: YZ ND] UDr-1 Area Walk-By Checklist (AWC) AWC- 008 Location: Bldg. DSB Floor El. YARD Room, Area, 251 SWEL Components: SWELl- 014 (P-16B) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YEI NO uD- N/AD-potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Tank equipment ID T-57B in room has an anchorbolt that appearsto be bent and is not tightened fully. No other anchorageissues identified. CR-ANO-1-2012-1537 has been initiated.

2. Does anchorage of equipment in the area appear to be free of Y- NO U["] N/AD'-

significant degraded conditions? Anchor bolts below FO-IOB have significantdegradation.2 anchor bolts have significantdegradation on tank (T-57B). CR-ANO-1-2012-1536 is initiated.

3. Based on a visual inspection from the floor, do the cable/conduit YZ N[D UD-' N/AD-raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

There is no tray in room, conduit supports and HVAC ducting are supported well. 'If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 40 of 152 Sheet 2 of 5 Status: YZ NE] U[--1 Area Walk-By Checklist (AWC) AWC- 008 Location: Bldg. DSB Floor El. YARD Room, Area2 251

4. Does it appear that the area is free of potentially adverse seismic YZ NEI U[-1 N/A[-

spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)? No tiles in room, lights are supported well.

5. Does it appear that the area is free of potentially adverse seismic YM NEI ULI N/A--

interactions that could cause flooding or spray in the area? Large tank is a source of potentialflooding also fire suppresion system.

6. Does it appear that the area is free of potentially adverse seismic YZ NEI iJE! N/AE!

interactions that could cause a fire in the area? The only fire source is the tank in room.

7. Does it appear that the area is free of potentially adverse seismic YZ NEI UE- N/A['-

interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)? No portableequipment in room. No other housekeeping issues identified. 2 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 41 of 152 Sheet 3 of 5 Status: YZ NI] U[-1 Area Walk-By Checklist (AWC) AWC- 008 Location: DSB Floor El. YARD Room, Area3 251 Bldg.

8. Have you looked for and found no other seismic conditions that could YEJ NI] ULI adversely affect the safety functions of the equipment in the area?

No other adverse seismic conditions were identified. Comments (Additional pages may be added as necessary) Most of the issues in the area occur at the anchorageof the tank. The first issue is that there is one anchor bolt that appearsto be slightly bent. This may need to be adjusted (Ref. CR-ANO-1-2012-1536). The second issue is that for two anchor bolts for this fuel tank, there is significant degradationfor both the steel plate and the concrete below that that is evident. All other items in the area appearto be free from potentially adverse seismic conditions. Evaluated___ __ by: Roy Berryman Date: 10/102012 Michael E. Perez -- 10/10/2012 3 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 42 of 152 Sheet 4 of 5 Status: YZ NE] U[-- Area Walk-By Checklist (AWC) AWC- 008 Location: Bldg. DSB Floor El. YARD Room, Area4 251 SWEL Components: SWELl- 014 (P-16B) Photographs Note: There is one anchorbolt supporting the Note: Significant degradationhas been tank in the room that is slightly bent and is also observed on two anchorbolts supporting the not tightened fully. tank in the area. The degradationis evident in the steel plate below it. 4 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 43 of 152 Sheet 5 of 5 Status: YN ND- UD Area Walk-By Checklist (AWC) AWC- 008_ Location: Bldg. DSB Floor El. YARD Room, Area5 251 SWEL Components: SWELl- 014 (P-16B) Note: Some degradationin the bolts for Item Note: Lighting supports in the area are FO-IOB is evident. properly installed. 5 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 44 of 152 Sheet I of 5 Status: YN NElI Ur-1 Area Walk-By Checklist (AWC) AWC- 009 Location: Bldg. RAB Floor El. 404 Room, Area, 170 (Entire Room) SWEL Components: SWELl- 017 (PSV-2684) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YV N[D1 ULI N/A--

potentially adverse seismic conditions (if visible without necessarily opening cabinets)? Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of YZ NEI UD- N/A--

significant degraded conditions? Anchorage of equipment in the area appearsto be free of significant degraded conditions.

3. Based on a visual inspection from the floor, do the cable/conduit YN ND1 UD- N/AD-]

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)? All rigid electrical conduit is adequately anchoredto the overhead and the walls. Overheadpiping and ducts appearto be properly secured. I If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANOI-CS-12-00002 Attachment D Rev. 0 Page 45 of 152 Sheet 2 of 5 Status: YZ NF UD Area Walk-By Checklist (AWC) AWC- 009 Location: Bldg. RAB Floor El. 404 Room, Area 170 (Entire Room)

4. Does it appear that the area is free of potentially adverse seismic YZ ND UD N/AD spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

The area appears to be free of potentiallyadverse seismic spatial interactionswith other equipment.

5. Does it appear that the area is free of potentially adverse seismic YE NEI U[ N/A-interactions that could cause flooding or spray in the area?

The areaappears to be free of potentially adverse seismic conditions that could cause flooding or spray in the area.

6. Does it appear that the area is free of potentially adverse seismic YZ NO U" N/Ar interactions that could cause a fire in the area?

The area appearsto be free of potentiallyadverse seismic interactions that could cause a fire in the area.

7. Does it appear that the area is free of potentially adverse seismic Y' NEI UD_ N/AD-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

The area appears to be free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 46 of 152 Sheet 3 of 5 Status: Y[ NEI U[--1 Area Walk-By Checklist (AWC) AWC- 009 Location: Bldg. RAB Floor El. 404 Room, Area 170 (Entire Room)

8. Have you looked for and found no other seismic conditions that could YE NI" urL adversely affect the safety functions of the equipment in the area?

It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found. Comments (Additional pages may be added as necessary) Room 170 was found to be in appropriateconditions. There was no issue with housekeeping practices and only mild surface oxidation was observed on the valves. The temperature in the room was high, but only due to the normal operating condition of the system. Evaluated by: Genaro BarracqanJr. Date: 10/9/2012 Eric Dilbone 6

  • 10/9/2012

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 47 of 152 Sheet 4 of 5 Status: Y[ NE] U-- Area Walk-By Checklist (AWC) AWC- 009 Location: Bldg. RAB Floor El. 404 Room, Area 170 (EntireRoom) SWEL Components: SWELl- 017 (PSV-2684) Photographs Note: General image of the anchorage in the Note: General image of the anchorage in the area. area.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 48 of 152 Sheet 5 of 5 Status: YE NEI U-- Area Walk-By Checklist (AWC) AWC- 009 Location: Bldg. RAB Floor El. 404 Room, Area 170 (EntireRoom) SWEL Components: SWELl- 017 (PSV-2684) Note: This image shows the different valves in Note: This is a general image of the area. No the room. housekeeping concerns were observed.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 49 of 152 Sheet I of 5 Status: YZ No UDl Area Walk-By Checklist (AWC) AWC- 010 Location: Bldg. RAB Floor El. 317 Room, Area' 11 SWEL Components: SWELl- 018 (CV-1 432), 109 (E-35B), 033 (CV-14437) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YN N[E] U[-] N/A["]

potentially adverse seismic conditions (if visible without necessarily opening cabinets)? Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of YZ N" UI-I N/A[]

significant degraded conditions? Anchorage of equipment in the area appearsto be free of significant degradedconditions.

3. Based on a visual inspection from the floor, do the cable/conduit Y[ NEI Ur- N/AD-raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

All rigid electrical conduit is adequately anchoredto the overhead and the walls. Overheadpiping and ducts appearto be properly secured. 1If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 50 of 152 Sheet 2 of 5 Status: Y[ NE] U-- Area Walk-By Checklist (AWC) AWC- 010 Location: Bldg. RAB Floor El. 317 Room, Area 11

4. Does it appear that the area is free of potentially adverse seismic YZ NEI U[-- N/AE-spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

There is one lighting fixture in the area, and it is properly secured and free from spatial interactionswith other nearby equipment.

5. Does it appear that the area is free of potentially adverse seismic Y[ NE] UEI N/A["]

interactions that could cause flooding or spray in the area? The area appearsto be free of potentially adverse seismic conditions that could cause flooding or spray in the area.

6. Does it appear that the area is free of potentially adverse seismic 'YZ NEI uE- N/AE-interactions that could cause a fire in the area?

The area appearsto be free of potentiallyadverse seismic interactions that could cause a fire in the area.

7. Does it appear that the area is free of potentially adverse seismic YZ N[-- U[-1 N/AI-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

The area appears to be free of potentially adverse seismic interactions associatedwith housekeepingpractices, storageof portable equipment, and temporary installations.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 51 of 152 Sheet 3 of 5 Status: YZ NF-] U["l Area Walk-By Checklist (AWC) AWC- 010 Location: Bldg. RAB Floor El. 317 Room, Area 11

8. Have you looked for and found no other seismic conditions that could YZ NEi U0i adversely affect the safety functions of the equipment in the area?

It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found. Comments (Additional pages may be added as necessary) Equipment in the area is found to be in adequate conditions. Anchorage is free from corrosion and concrete cracks. Cables and conduits are properlyinstalled on walls and ceilings. The temporary scaffolding found in the area has an engineering-approvedtag. Good housekeeping is evident throughout the room. Overall, all items in the area are free from seismic conditions that could affect their safety functions. Evaluated by: DanielAndoh Date: 10/04/2012 Michael E. Perez / 10/04/2012

Engineering Report No. CALC-ANOI-CS-12-00002 Attachment D Rev. 0 Page 52 of 152 Sheet 4 of 5 Status: YZ Nr"] U-- Area Walk-By Checklist (AWC) AWC- 010 Location: Bldg. RAB Floor El. 317 Room, Area 11 SWEL Components: SWELl- 018 (CV-1432). 109 (E-35B), 033 (CV-1437) Photographs Note: Anchorage in the area has been shown Note: Cables, conduits, and pipe supports in to be in properconditions. No signs of the area are shown to be properly secured. corrosion and concrete cracking have been found.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 53 of 152 Sheet 5 of 5 Status: YE NE] UIF Area Walk-By Checklist (AWC) AWC-010 Location: Bldg. RAB Floor El. 317 Roomn,Area 11 SWEL Components: SWELl- 018 (CV-1432), 109 (E-35B), 033 (CV-1437) Note: Temporary scaffolding in the area Note: appearsto be properly secured and placed in the adequate location. It is also free from damaging any nearby equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 54 of 152 Sheet I of 5 Status: YZ ND' UD-- Area Walk-By Checklist (AWC) AWC- 011 Location: Bldg. RAB Floor El. 317 Room, Area' 13 SWEL Components: SWEL1- 019 (CV-1052) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of '(Y NEJ ULI N/AD potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of Y' ND-] UD-] N/AD1 significant degraded conditions?

Anchorage of equipment in the area appearsto be free of significant degradedconditions.

3. Based on a visual inspection from the floor, do the cable/conduit Y[ ND UD- N/AD raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

All rigid electrical conduit is adequatelyanchored to the overhead and the walls. Overheadpiping and ducts appearto be properlysecured. 1If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 55 of 152 Sheet 2 of 5 Status: YZ NEr] UO] Area Walk-By Checklist (AWC) AWC- 011_ Location: Bldg. RAB Floor El. 317 - Room, Area 13

4. Does it appear that the area is free of potentially adverse seismic Y[K NE] ULI N/AZ!

spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)? There several lighting fixtures in the area and they appearto be properly secured.

5. Does it appear that the area is free of potentially adverse seismic YO NEI U[-] N/AD--

interactions that could cause flooding or spray in the area? There is a drain present in the room, making it highly unlikely that flooding would to occur in the area.

6. Does it appear that the area is free of potentially adverse seismic YN NEI U[I N/A[!

interactions that could cause a fire in the area? The area appearsto be free of potentially adverse seismic interactions that could cause a fire in the area.

7. Does it appear that the area is free of potentially adverse seismic YO NE]I U[_ N/AL]

interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)? The area appearsto be free of potentiallyadverse seismic interactions associatedwith housekeeping practices,storage of portable equipment, and temporaryinstallations.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 56 of 152 Sheet 3 of 5 Status: YV NEIl UFl Area Walk-By Checklist (AWC) AWC- 011 Location: Bldg. RAB Floor El. 317 - Room, Area 13

8. Have you looked for and found no other seismic conditions that could Y~NNIU0 adversely affect the safety functions of the equipment in the area?

It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found. Comments (Additional pages may be added as necessary) Equipment in the area is found to be in adequateconditions. Anchorage is free from corrosionand concrete cracks. Cables and conduits are properlyinstalled on walls and ceilings. Good housekeeping is evident throughout the room. Overall, all items in the area are free from seismic conditions that could affect their safety functions. Evaluated by: Daniel Andoh Date: 10/4/2012 Michael E. Perez 10/4/2012

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 57 of 152 Sheet 4 of 5 Status: YZ NE] U[II Area Walk-By Checklist (AWC) AWC- 011 Location: Bldg. RAB Floor El. 317 Room, Area 13 SWEL Components: SWELl- 019 (CV-1052) Photographs Note: Anchorage in the area appearsto be in Note: Cables, conduits, and pipe supports in good condition. No signs of corrosion and the area appearto be properly secured. concrete cracking have been found. Lighting fixtures appearto be properly anchored.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 58 of 152 Sheet 5 of 5 Status: YZ NE] U[-- Area Walk-By Checklist (AWC) AWC- 011_ Location: Bldg. RAB Floor El. 317 Room, Area 13 SWEL Components: SWEILl- 019 (CV-1 052) Note: Floordrains are present to the area in Note: Good housekeeping is evident in the order to mitigate flooding hazards, if they were area. ever to occur. This would not be the case here since all equipment items in the area do not show signs that promote these hazards.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 59 of 152 Sheet I of 5 Status: Y] NE] U-i Area Walk-By Checklist (AWC) AWC- 012 Location: Bldg. RAB Floor El. 356 Room, Area' 77 (EntireRoom) SWEL Components: SWELl- 020(CV-2214), 021 (CV-2233), 022(CV-2234), 036(CV-2235), 047(SV-2243B), 048(SV-2233A), 049(SV-2234B).106(T-208) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of Y[K NEI U[I N/A[]

potentially adverse seismic conditions (if visible without necessarily opening cabinets)? Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of Y[ N[-] U[D N/A[:

significant degraded conditions? Anchorage of equipment in the area appearsto be free of significant degradedconditions.

3. Based on a visual inspection from the floor, do the cable/conduit YZ NEI ur- N/AD-i raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

All rigid electricalconduit is adequately anchoredto the overhead and the walls. Overheadpiping and ducts appearto be properly secured. I If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 60 of 152 Sheet 2 of 5 Status: YZ No U[-- Area Walk-By Checklist (AWC) AWC- 012 Location: Bldg. RAB Floor El. 356 Room, Area 77 (EntireRoom)

4. Does it appear that the area is free of potentially adverse seismic Y[ N[I] ULI N/All spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

The area appearsto be free of potentiallyadverse seismic spatial interactionswith other equipment.

5. Does it appear that the area is free of potentially adverse seismic YZ{ NEI UEW N/A[Z interactions that could cause flooding or spray in the area?

The area appears to be free of potentially adverse seismic conditions that could cause flooding or spray in the area.

6. Does it appear that the area is free of potentially adverse seismic YZ N[:] UEI N/A[:]

interactions that could cause a fire in the area? The area appears to be free of potentially adverse seismic interactions that could cause a fire in the area.

7. Does it appear that the area is free of potentially adverse seismic YM NEI uE1 N/A[E]

interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)? No adverse conditions were observed related to housekeeping practices.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 61 of 152 Sheet 3 of 5 Status: YZ NI-' U-- Area Walk-By Checklist (AWC) AWC- 012 Location: Bldg. RAB Floor El. 356 Room, Area 77 (Entire Room)

8. Have you looked for and found no other seismic conditions that could Y[ N[i U[I-adversely affect the safety functions of the equipment in the area?

It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found. Comments (Additional pages may be added as necessary) Evaluated by: Genaro BarraQanJr. SDate: 10/03/12 Michael E. Perez 0 10/03/12

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 62 of 152 Sheet 4 of 5 Status: Y[ NO UZ'- Area Walk-By Checklist (AWC) AWC- 012 Location: Bldg. RAB Floor El. 356 Room, Area 77 (EntireRoom) SWEL Components: SWELl- 020(CV-2214). 021 (CV-2233). 022(CV-2234). 036(CV-2235). 047(SV-2243B), 048(SV-2233A), 049(SV-2234B),106(T-208) Photographs Note: FeedwaterIsolation Valve had a minor Note: Image of the area with rust colored leak. water from the feedwater valve overhead.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 63 of 152 Sheet 5 of 5 Status: YE NEI-' U-I Area Walk-By Checklist (AWC) AWC- 012 Location: Bldg. RAB Floor El. 356 Room, Area 77 (Entire Room) SWEL Components: SWELl- 020(CV-2214). 021 (CV-2233), 022(CV-2234). 036(CV-2235), 047(SV-2243B), 048(SV-2233A), 049(SV-2234B),106(T-208) Note: Image shows the pipingin the end of the room that had some minor corrosion. This would not affect the safety functions of the system in case of seismic event.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 64 of 152 Sheet I of 5 Status: YN NF U-Area Walk-By Checklist (AWC) AWC- 013 Location: Bldg. RAB Floor El. 335 Room, Area' 46 SWEL Components: SWELl- 024 (CV-2620) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YEI NZ UEW NIAE potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Nearby support (PI-3812A) was observed to be missing two anchor bolts. CR-ANO-1-2012-01611 initiated.

2. Does anchorage of equipment in the area appear to be free of YZ NEI UW] N/A[-

significant degraded conditions? Anchorage present appears to be in good condition.

3. Based on a visual inspection from the floor, do the cable/conduit YN NEIZ UEI N/AEl raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

HVAC in cornerof room. Appears to be in general conformance.

'If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 65 of 152 Sheet 2 of 5 Status: YZ NF UF Area Walk-By Checklist (AWC) AWC- 013 Location: Bldg. RAB Floor El. 335 Room, Area 46

4. Does it appear that the area is free of potentially adverse seismic YZ NW] Uil N/AD]

spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)? Lights observed may sway. However, they would impact piping insulation, absorbingthe impact. Additionally, the piping is inherently rugged when compared to the light.

5. Does it appear that the area is free of potentially adverse seismic Y" N[W UWJ N/AE]

interactions that could cause flooding or spray in the area? Floordrains present. No sources of flood or spray were observed.

6. Does it appear that the area is free of potentially adverse seismic YZ NEI U[- N/AD--

interactions that could cause a fire in the area? The area appears to be free of potentially adverse seismic interactions that could cause a fire.

7. Does it appear that the area is free of potentially adverse seismic YZ N[-- U-- N/AD-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

No scaffolding present. Ladders observed to be secured. See image below.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 66 of 152 Sheet 3 of 5 Status: YZ NEI U[I Area Walk-By Checklist (AWC) AWC-013 Location: Bldg. RAB Floor El. 335 Room, Area 46

8. Have you looked for and found no other seismic conditions that could YN NEI UE1 adversely affect the safety functions of the equipment in the area?

No other seismic conditions that could adversely affect the safety functions of the equipment in the area were found. Comments (Additional pages may be added as necessary) Anchorage for support for Item PI-3812A was observed to be missing a bolt. Evaluated by: Michael E. Perez Date: 10/10/2012 Sean Smolarek Z 10/10/2012

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 67 of 152 Sheet 4 of 5 Status: Y[ NE] Uor-1 Area Walk-By Checklist (AWC) AWC- 013 Location: Bldg. RAB Floor El. 335 - Room, Area 46 SWEL Components: SWELl- 024 (0V-2620) Photographs Photographs Note: General area overview. Note: Ladder adequatelysecured.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 68 of 152 Sheet 5 of 5 Status: Y[ NrI U-IZ Area Walk-By Checklist (AWC) AWC- 013 Location: Bldg. RAB Floor El. 335 Room, Area 46 SWEL Components: SWELl- 024 (CV-2620) Note: Support Missing Anchor Bolt Note: Component with Support Missing Anchor Bolt

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 69 of 152 Sheet I of 4 Status: YN NE] Uo1 Area Walk-By Checklist (AWC) AWC-014 Location: Bldg. RAB Floor El. 335 Room, Area' 35 (Entire Room) SWEL Components: SWELl- 026 (CV-2646) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of Y[ N[: UEr N/A--

potentially adverse seismic conditions (if visible without necessarily opening cabinets)? Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of YZ NEI U-1 N/AE-significant degraded conditions?

Anchorage of equipment in the area appears to be free of significant degraded conditions.

3. Based on a visual inspection from the floor, do the cable/conduit YZ NEI] U[] N/A[-

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)? All rigid electrical conduit is adequately anchored to the overhead and the walls. Overheadpiping and ducts appearto be properly secured. 1 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 70 of 152 Sheet 2 of 4 Status: YZ NF UO Area Walk-By Checklist (AWC) AWC- 014 Location: Bldg. RAB Floor El. 335 Room, Area 35 (Entire Room)

4. Does it appear that the area is free of potentially adverse seismic Y[K NEI IUE N/AE[

spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)? Overhead fluorescent lighting was secured with chain supports. No open S hooks were observed. Nylon zip ties were present to take up excess chain.

5. Does it appear that the area is free of potentially adverse seismic YZ NEI UE- N/A[E interactions that could cause flooding or spray in the area?

The area appears to be free of potentiallyadverse seismic conditions that could cause flooding or spray in the area.

6. Does it appear that the area is free of potentially adverse seismic Y'( NEI UE[ N/AE-interactions that could cause a fire in the area?

The area appearsto be free of potentially adverse seismic interactions that could cause a fire in the area.

7. Does it appear that the area is free of potentially adverse seismic YN NEI u[E] N/AE-1 interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

The area appearsto be free of potentially adverse seismic interactions associatedwith housekeeping practices,storage of portable equipment, and temporary installations.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 71 of 152 Sheet 3 of 4 Status: Y[ NE] U[-- Area Walk-By Checklist (AWC) AWC- 014 Location: Bldg. RAB Floor El. 335 Room, Area 35 (Entire Room)

8. Have you looked for and found no other seismic conditions that could Y[ NE] U-adversely affect the safety functions of the equipment in the area?

It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found. Comments (Additional pages may be added as necessary) Room 35 was found to be in great housekeeping practices.Area was clean and well organized. Evaluated by: Genaro BarraqanJr. -' Date: 10/9/2012 Eric Dilbone 10/9/2012

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 72 of 152 Sheet 4 of 4 Status: Y[ NE[] U[] Area Walk-By Checklist (AWC) AWC- 014 Location: Bldg. RAB Floor El. 335 Room, Area 35 (EntireRoom) SWEL Components: SWELl- 026 (CV-2646) Photographs Note: General image of the area. This room Note: was exceptional in house-keeping practices.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 73 of 152 Sheet 1 of 6 Status: Y[ NIF- UE-I Area Walk-By Checklist (AWC) AWC- 015_ Location: Bldg. RAB Floor El. 354 Room, Area, 63 (35'Radius) SWEL Components: SWELl- 027 (CV-I 407) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YZ NEI UE- N/AE-potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of YZ NEI UEr N/A[--

significant degraded conditions? Anchorage of equipment in the area appearsto be free of significant degradedconditions.

3. Based on a visual inspection from the floor, do the cable/conduit YV NEI UM N/A[:]

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)? HVAC ductwork is in good condition.

' If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 74 of 152 Sheet 2 of 6 Status: YN N[-] UM Area Walk-By Checklist (AWC) AWC- 015_ Location: Bldg. RAB Floor El. 354 - Room, Area 63

4. Does it appear that the area is free of potentially adverse seismic '(N NE] U[:] N/A[J spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Open S-hooks on light over 1A3-1101 next to GCH-43. Open S-hooks were observed above cabinet C1 15. This must be corrected to meet the IPEEEcommitments. CR-ANO- 1-2012-01613 initiated.

5. Does it appear that the area is free of potentially adverse seismic YZ N[1 ULI N/AEI interactions that could cause flooding or spray in the area?

Fire Pipingis present. Drainsare on the adjacent concrete, but grating is below the component such that any waterreleased would flow down to the lower levels.

6. Does it appear that the area is free of potentially adverse seismic YN NEIl UI- N/AE1 interactions that could cause a fire in the area?

The area appearsto be free of potentially adverse seismic interactions that could cause a fire.

7. Does it appear that the area is free of potentially adverse seismic Y[ NEIl ULI N/A[Z interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Ladder was secured. Computer stored nearby, but could not fall onto safety related equipment.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 75 of 152 Sheet 3 of 6 Status: YZ NE] UI Area Walk-By Checklist (AWC) AWC- 015 Location: Bldg. RAB Floor El. 354 Room, Area 63

8. Have you looked for and found no other seismic conditions that could YN NEI U-I adversely affect the safety functions of the equipment in the area?

It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found. Comments (Additional pages may be added as necessary) Seismic block walls (6-B-45 and 6-B-49) were observed in the area. Evaluated by: Michael E. Perez Date: 10/10/2012 Sean Smolarek 10/10/2012

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 76 of 152 Sheet 4 of 6 Status: YZ NE] U[] Area Walk-By Checklist (AWC) AWC- 015 Location: Bldg. RAB Floor El. 354 - Room, Area 63 SWEL Components: SWELhs-027 (CV-I 407) Photographs Note: GeneralArea Note: There appearto be some open S-hooks on some of the lighting fixtures in the area.

Engineering Report No. CALC-ANOI-CS-12-00002 Attachment D Rev. 0 Page 77 of 152 Sheet 5 of 6 Status: YE NE] U-Area Walk-By Checklist (AWC) AWC- 015_ Location: Bldg. RAB Floor El. 354 - Room, Area 63 SWEL Components: SWELl - 027 (CV-1 407) Note: There is an open S-hook for one lighting Note: Computer stored in area fixture that is above Cabinet Cl 15 in the area. This can easily collapse onto the cabinet during a seismic hazard.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 78 of 152 Sheet 6 of 6 Status: YE NEI UI-Area Walk-By Checklist (AWC) AWC- 015_ Location: Bldg. RAB Floor El. 354 - Room, Area 63 SWEL Components: SWEILl- 027 (CV-1407) Note: HVAC ducts and fire piping Note:

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 79 of 152 Sheet 1 of 5 Status: YZ ND] UDl Area Walk-By Checklist (AWC) AWC- 016 Location: Bldg. RAB Floor El. 372 Room, Area' 94 SWEL Components: SWELl- 028 (CV-1300) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of Y; NEI U[-] N/A--

potentially adverse seismic conditions (if visible without necessarily opening cabinets)? No adverse seismic conditions were observed in anchorage

2. Does anchorage of equipment in the area appear to be free of Y] NDI UD_ N/AD']

significant degraded conditions? No significantdegradedconditions were observed in the area

3. Based on a visual inspection from the floor, do the cable/conduit Y[ NEI UD- N/A[D raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

HVAC and conduit appear to be in good condition 1 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 80 of 152 Sheet 2 of 5 Status: YM NIl] UI-I Area Walk-By Checklist (AWC) AWC- 016 Location: Bldg. RAB Floor El. 372 Room, Area 94

4. Does it appear that the area is free of potentially adverse seismic YZ NEI ULI N/AEl spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

An open S-hook was observed. However, if this light were to fall, it would fall to a Unistrut support.

5. Does it appear that the area is free of potentially adverse seismic YE NEI u[:] N/A--

interactions that could cause flooding or spray in the area? No fire piping observed.

6. Does it appear that the area is free of potentially adverse seismic YZ NEj UE1 N/AZ-interactions that could cause a fire in the area?

No sources of fire were observed.

7. Does it appear that the area is free of potentially adverse seismic YZ N[E U[-] N/A-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

No temporary installationswere observed.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 81 of 152 Sheet 3 of 5 Status: YZ NO U-iJ Area Walk-By Checklist (AWC) AWC- 016 Location: Bldg. RAB Floor El. 372 Room, Area 94

8. Have you looked for and found no other seismic conditions that could YZNEIULI adversely affect the safety functions of the equipment in the area?

No other adverse seismic conditions were observed Comments (Additional pages may be added as necessary) Evaluated by: Michael Perez"*-. Date: 10/10/2012 Sean Smolarek 10/10/2012

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 82 of 152 Sheet 4 of 5 Status: YN NF UI-I Area Walk-By Checklist (AWC) AWC- 016 Location: Bldg. RAB Floor El. 372 Room, Area 94 SWEL Components: SWELl- 028 (CV-1300) Photographs Note: CV-1300 Note: Approximate area of AWC

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 83 of 152 Sheet 5 of 5 Status: YE NE]- U' Area Walk-By Checklist (AWC) AWC-016 Location: Bldg. RAB Floor El. 372 Room, Area 94 SWEL Components: SWELl- 028 (CV-1300) Note: Observe anchorage in good condition Note: Observe overhead

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 84 of 152 Sheet I of 4 Status: YZ NEi] ULI Area Walk-By Checklist (AWC) AWC- 017 Location: Bldg. RAB Floor El. 360 Room, Area' 79 (Entire Room) SWEL Components: SWELl- 029 (CV-1220), 042 (CV-1206). 051 (SV-1 118). 034 (1227) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YZ NEI UE- N/AE:-

potentially adverse seismic conditions (if visible without necessarily opening cabinets)? Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of Y[ NEI uEr N/A[-]

significant degraded conditions? Anchorage of equipment in the area appearsto be free of significant degraded conditions.

3. Based on a visual inspection from the floor, do the cable/conduit Y[ NEI UE1 N/AE1 raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

All rigid electrical conduit is adequately anchoredto the overhead and the walls. Overheadpiping and ducts appearto be properly secured. I If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 85 of 152 Sheet 2 of 4 Status: YZ NEI] UL-Area Walk-By Checklist (AWC) AWC-017 Location: Bldg. RAB Floor El. 360 Room, Area 79 (Entire Room)

4. Does it appear that the area is free of potentially adverse seismic Y-] NZ UE] N/A--]

spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)? Light above CV-1206 has an open S-hook. This hook must be closed to meet an IPEEE commitment. CR-ANO-1-2012-01613 initiated.

5. Does it appear that the area is free of potentially adverse seismic YN N[-] uE] N/A[-]

interactions that could cause flooding or spray in the area? The area appears to be free of potentially adverse seismic conditions that could cause flooding or spray in the area.

6. Does it appear that the area is free of potentially adverse seismic YER NEI UEI N/A[]

interactions that could cause a fire in the area? The area appearsto be free of potentially adverse seismic interactions that could cause a fire in the area.

7. Does it appear that the area is free of potentially adverse seismic Y' NE] UE- N/A-I interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

The area appearsto be free of potentially adverse seismic interactions associatedwith housekeeping practices,storage of portable equipment, and temporaryinstallations.

Engineering Report No. CALC-ANOI-CS-12-00002 Attachment D Rev. 0 Page 86 of 152 Sheet 3 of 4 Status: YN NEI UD-Area Walk-By Checklist (AWC) AWC- 017 Location: Bldg. RAB Floor El. 360 Room, Area 79 (EntireRoom)

8. Have you looked for and found no other seismic conditions that could YE N[l U" adversely affect the safety functions of the equipment in the area?

It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found. Comments (Additional pages may be added as necessary) The only finding was an open S-hook right above CV- 1206. The rest of the area is in appropriate condition. Evaluated by: Genaro BarracanJr. Date: 10/9/2012 Eric Dilbone 6e01 0/9/2012

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 87 of 152 Sheet 4 of 4 Status: YZ NE] UFI-1 Area Walk-By Checklist (AWC) AWC- 017 Location: Bldg. RAB Floor El. 360 Room, Area 79 (Entire Room) SWEL Components: SWELl- 029 (CV-1220). 042 (CV-1206). 051 (SV-1818). 034 (1227) Photographs Note: Liaht above CV-1206 has an open S-hook.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 88 of 152 Sheet I of 7 Status: YZ N[I] U[-- Area Walk-By Checklist (AWC) AWC- 018 Location: Bldg. INTAKE Floor El. 354 Room, Area' 241(Entire Room) BLDG SWEL Components: SWELl- 040 (CV-3646) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YE N[-- u[-- N/AE-potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

No adverse anchorageconditions were observed in the area

2. Does anchorage of equipment in the area appear to be free of YN NEI uEr N/AD' significant degraded conditions?

Minor corrosion was identified in the lower level on several components. The conduits attachedto the WEST wall (nearthe floor) had minor corrosion. Also in the lower level, the anchoragefor component HBD-14-H49 had signs of minor corrosion.See images in Sheet 4.

3. Based on a visual inspection from the floor, do the cable/conduit YN NEI UEr N/AD-raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

No adverse seismic conditions were observed for cable/conduit raceways and HVAC. If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 89 of 152 Sheet 2 of 7 Status: YZ NE] U-] Area Walk-By Checklist (AWC) AWC- 018 Location: Bldg. INTAKE Floor El. 354 Room, Area 241(Entire Room) BLDG

4. Does it appear that the area is free of potentially adverse seismic YZ NE]I UE N/AE]

spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)? There is no other equipment in the area that could cause potentially adverse seismic spatial interactions.

5. Does it appear that the area is free of potentially adverse seismic Y' NEI UE] N/AE--

interactions that could cause flooding or spray in the area? Located in the intake structure. Water is present below the structure and within components in the structure. These do not represent credible sources.

6. Does it appear that the area is free of potentially adverse seismic YN NEI U[] N/AE]

interactions that could cause a fire in the area? Area heaters were observed to be approximately 6 ft above the slab. No sources of ignition were present

7. Does it appear that the area is free of potentially adverse seismic YN NEI U[] N/AE[]

interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)? No conditions were observed

Engineering Report No. CALC-ANO1-CS-12-00002 Attachment D Rev. 0 Page 90 of 152 Sheet 3 of 7 Status: YZ NF UD Area Walk-By Checklist (AWC) AWC- 018 Location: Bldg. INTAKE Floor El. 354 Room, Area 241(Entire Room) BLDG

8. Have you looked for and found no other seismic conditions that could YZ NM UF-adversely affect the safety functions of the equipment in the area?

No other seismic conditions were observed Comments (Additional pages may be added as necessary) Two components in the lower level of the intake building were found to have minor issues with corrosion. The anchoragefor the conduit on the WEST wall near the floor was corroded.Also, the anchoragefor equipment item HBD-14-H49 had corrosion. The corrodedanchoragesfor the conduit and equipment item HBD-14-H49 are believed to not be a current seismic concern. The light in the upper level of the intake building near P-4A service waterpump contained an open S-hook. Evaluated by: Genaro BarraqanJr. Date: 10/9/2012 Eric Dilbone 10/9/2012

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 91 of 152 Sheet 4 of 7 Status: YZ N[-] UM Area Walk-By Checklist (AWC) AWC- 018 Location: Bldg. INTAKE Floor El. 354 Room, Area 241(Entire Room) BLDG SWEL Components: SWELl- 046 (CV-3646) Photographs Note: This image shows the conduits Note: The anchoragefor component anchoredto the WEST wall near the floor. It is HBD-14-H49 had signs of corrosion. This item evident through this image that there is a is found in the lower level of the intake corrosion issue on this anchorage. This conduit building. is found in the lower level of the intake building.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 92 of 152 Sheet 5 of 7 Status: YEJ NM ULIM Area Walk-By Checklist (AWC) AWC- 018 Location: Bldg. INTAKE Floor El. 354 Room, Area 241(Entire Room) BLDG SWEL Components: SWELl- 046 (CV-3646) Note: General image of the lower level. All Note: General image of the lower level of the other anchoragein the area was identified to intake building. Area was free of adverse be free of potentially adverse seismic seismic conditions associated with house-conditions. keeping practices. Room was clean and well maintained.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 93 of 152 Sheet 6 of 7 Status: YN NE[-I UL-Area Walk-By Checklist (AWC) AWC- 018 Location: Bldg. INTAKE Floor El. 354 Room, Area 241(Entire Room) BLDG SWEL Components: SWELl- 046 (CV-3646) 7! Note: General image showing a crack in the Note: General image showing a crack in a grout pad. Item is found in upper level of the ceiling-wall intersection. Found in the upper intake building, below P-4A service water level near southwest wall. This crack does not pump. Ruled to not be a seismic concern. pose any seismic concerns.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 94 of 152 Sheet 7 of 7 Status: YE NE] U[IZ Area Walk-By Checklist (AWC) AWC-018 Location: Bldg. INTAKE Floor El. 354 Room, Area 241(Entire Room) BLDG SWEL Components: SWELl- 046 (CV-3646) Note: Image shows an open S-hook near the Note: General image of the upper level of the P-4A service water pump. intake building.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 95 of 152 Sheet I of 5 Status: YZ NE] UOi Area Walk-By Checklist (AWC) AWC-019 Location: Bldg. RAB Floor El. 335 Room, Area' 34 (EntireRoom) SWEL Components: SWELl- 041 (CV-3850), 044 (CV-3851) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YM NEI U[-1 N/AD--

potentially adverse seismic conditions (if visible without necessarily opening cabinets)? Anchorage of equipment in the area appears to be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of YZ NEI Ur1 N/A[-]

significant degraded conditions? Anchorage of equipment in the area appearsto be free of significant degradedconditions.

3. Based on a visual inspection from the floor, do the cable/conduit YZ NEI UE1 N/ArI raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

All rigid electrical conduit is adequatelyanchored to the overhead and the walls. Overheadpiping and ducts appearto be properly secured. ,If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 96 of 152 Sheet 2 of 5 Status: Y[ NEI LIU Area Walk-By Checklist (AWC) AWC- 019 Location: Bldg. RAB Floor El. 335 Room, Area 34 (Entire Room)

4. Does it appear that the area is free of potentially adverse seismic YN N[D U[:I N/A[D]

spatial interactions with other equipment ih the area (e.g., ceiling tiles and lighting)? I There was a light near valve CV-3851 & CV-3050 (right around the corner-SOUTH) that was attached with zip-ties. There was also a free rigid support on the ceiling, as well as a miscellaneous rod coming out of the ceiling (discoverednear the entrance to room 34). Lighting appearedto have closed s-hooks in all observed cases.

5. Does it appear that the area is free of potentially adverse seismic YN NI IUD1 N/AD-1 interactions that could cause flooding or spray in the area?

The area appears to be free of potentially adverse seismic conditions that could cause flooding or spray in the area.

6. Does it appear that the area is free of potentially adverse seismic YZ NDI UD- N/AD']

interactions that could cause a fire in the area? The area appearsto be free of potentially adverse seismic interactions that could cause a fire in the area.

7. Does it appear that the area is free of potentially adverse seismic YZ NDl ULID N/AD--

interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)? The area appearsto be free of potentially adverse seismic interactions associatedwith housekeeping practices,storage of portable equipment, and temporary installations.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 97 of 152 Sheet 3 of 5 Status: YE]- N-- U-Area Walk-By Checklist (AWC) AWC- 01'9 Location: Bldg. RAB Floor El. 335 Room, Area 34 (EntireRoom)

8. Have you looked for and found no other seismic conditions that could Y[ NR U[

adversely affect the safety functions of the equipment in the area? It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found. Comments (Additional pages may be added as pecessary) To summarize the findings in this room:

  • Light attached with zip-ties near SOUTH side of room.
  • Free rigid support hanging from ceiling See images below.

Evaluated by: Genaro Barragan Jr. Date: 10/9/2012 Eric Dilbone 10/9/2012

Engineering Report No. CALC-ANO I-C S-12-00002 Attachment D Rev. 0 Page 98 of 152 Sheet 4 of 5 Status: Y[* NEI u[-- Area Walk-By Checklist (AWC) AWC- 019 Location: Bldg. RAB Floor El. 335 Room, Area 34 (Entire Room) SWEL Components: SWELl- 041 (CV-3850). 044 (CV-3851) Photographs Note: This light near the SOUTH side of room Note: Image shows the light that was was making contact with the insulationon the supported with zip-ties near the SOUTH side of pipe shown. room 34.

Engineering Report No. CALC-ANOI-CS-12-00002 Attachment D Rev. 0 Page 99 of 152 Sheet 5 of 5 Status: YZ NE] UOF Area Walk-By Checklist (AWC) AWC- 019_ Location: Bldg. RAB Floor El. 335 1 Room, Area 34 (Entire Room) SWEL Components: SWELl - 041 (CV-3850). 044 (CV-3851) Note: Light above 2F-295 S-hook. Note: Image shows the free rigid support hanging from the ceiling. Although this is not a seismic hazard,it is not supporting any equipment.

Engineering Report No. CALC-ANOI-CS-12-00002 Attachment D Rev. 0 Page 100 of 152 Sheet 1 of 5 Status: YM NF U-Area Walk-By Checklist (AWC) AWC- 020 Location: Bldg. RAB Floor El. 386 Room, Area, 258 SWEL Components: SWELl - 052 (VEF-24 A) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YN NEI UD-- N/A[-1 potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

No adverse seismic conditions were observed.

2. Does anchorage of equipment in the area appear to be free of Y' NEI UD-- N/AD--

significant degraded conditions? Mild cracks and spalling concrete was observed at the opening around the exhaust pipe. This is judged not to be an adverse seismic condition as the conditions are minor.

3. Based on a visual inspection from the floor, do the cable/conduit YZ ND-- UD- N/AD-raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

Conduits appearto be adequately supported. Steel supports for grating above appearto be in good condition. 'If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 101 of 152 Sheet 2 of 5 Status: YZ NFD Ur-- Area Walk-By Checklist (AWC) AWC- 020 Location: Bldg. RAB Floor El. 386 Room, Area 258

4. Does it appear that the area is free of potentially adverse seismic YZ NEI UM N/A[--

spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)? No adverse seismic spatial interactionswere observed.

5. Does it appear that the area is free of potentially adverse seismic YE N[I U[-] N/AD-interactions that could cause flooding or spray in the area?

No source of flooding was observed. A floor drain was observed in the vicinity. YZ NEI uMI N/A[-D

6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?

No credible sources of fire located within the area.

7. Does it appear that the area is free of potentially adverse seismic Y" NEI Ur1 N/A-1 interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

No adverse seismic interactionsassociated with temporary installations were identified.

Engineering Report No. CALC-ANOI-CS-12-00002 Attachment D Rev. 0 Page 102 of 152 Sheet 3 of 5 Status: YZ NF UW Area Walk-By Checklist (AWC) AWC- 020 Location: Bldg. RAB Floor El. 386 Room, Area 258

8. Have you looked for and found no other seismic conditions that could YZ NW- UW-adversely affect the safety functions of the equipment in the area?

No other adverse seismic conditions were observed. Comments (Additional pages may be added as necessary) Evaluated by: DanielAndoh & _ ýý a Date: 10/10/2012 Genaro BarracanJr. 10/10/2012

Engineering Report No. CALC-ANO1 -CS- 12-00002 Attachment D Rev. 0 Page 103 of 152 Sheet 4 of 5 Status: YZ NR U-- Area Walk-By Checklist (AWC) AWC- 020 Location: Bldg. RAB Floor El. 386 Room, Area 258 SWEL Components: SWELl- 052 (VEF-24A) Photographs Note: Concrete spalling onto floor from Note: Flame arrestorwith oil spray marks on deterioratedconditions at penetration above. wall.

Engineering Report No. CALC-ANO1-CS-12-00002 Attachment D Rev. 0 Page 104 of 152 Sheet 5 of 5 Status: YE NEI UO Area Walk-By Checklist (AWC) AWC- 020_ Location: Bldg. RAB Floor El. 386 - Room, Area 258 SWEL Components: SWEI-l- 052 (VEF-24A) 7 Note: Gratingsupport. Note: Floordrain.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 105 of 152 Sheet 1 of 4 Status: YZ NEI UOF Area Walk-By Checklist (AWC) AWC- 021 Location: Bldg. RAB Floor El. 372 Room, Area' 95 SWEL Components: SWELl- 059 (RA-2) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of '([ NEi UL- N/ADl potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Anchorage of equipment in the area appears to be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of YZ NEI U[-D N/AD-significant degraded conditions?

Anchorage of equipment in the areaappears to be free of significant degraded conditions.

3. Based on a visual inspection from the floor, do the cable/conduit YZ NEI U[- N/AD--

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)? All rigid electricalconduit is adequately anchored to the overhead and the walls. Overheadpiping and ducts appearto be properlysecured. 1 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 106 of 152 Sheet 2 of 4 Status: Y ] N--I Ul-- Area Walk-By Checklist (AWC) AWC- 021 Location: Bldg. RAB Floor El. 372 Room, Area 95

4. Does it appear that the area is free of potentially adverse seismic YZ NE] U[-' N/A[l spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

There were no ceiling tiles in the room, and lighting is supported with chains and closed S-hooks.

5. Does it appear that the area is free of potentially adverse seismic Y" NEI U[- N/AZ-interactions that could cause flooding or spray in the area?

It was observed that there was a room cooler mounted overhead in the room. The room cooler has chilled water running through it, and contains a drip pan and drain line to a floor drain.

6. Does it appear that the area is free of potentially adverse seismic YO NEI UE- N/A[:]

interactions that could cause a fire in the area? The area appearsto be free of potentially adverse seismic interactions that could cause a fire in the area.

7. Does it appear that the area is free of potentially adverse seismic Y] N[-- UE- N/AE-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

The area appearsto be free of potentiallyadverse seismic interactions associatedwith housekeeping practices,storage of portable equipment, and temporary installations.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 107 of 152 Sheet 3 of 4 Status: YZ NFI U-I Area Walk-By Checklist (AWC) AWC- 021 Location: Bldg. RAB Floor El. 372 Room, Area 95

8. Have you looked for and found no other seismic conditions that could Y'( NF-] Ur-adversely affect the safety functions of the equipment in the area?

It was looked for, and there no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found. Comments (Additional pages may be added as necessary) Evaluated by: Daniel Parker 0J [)ate: 10/11/2012 Eric Dilbone 10/11/2012

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 108 of 152 Sheet 4 of 4 Status: Y[ NEI UI-] Area Walk-By Checklist (AWC) AWC- 021 Location: Bldg. RAB Floor El. 372 Room, Area 95 SWEL Components: SWELl- 059 (RA-2) Photographs m 95. Note: View of cables and conduit in the overhead.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 109 of 152 Sheet I of 5 Status: YZ NE] UO] Area Walk-By Checklist (AWC) AWC- 022 Location: Bldg. RAB Floor El. 372 Room, Area' 110 SWEL Components: SWELl- 060 (D-07) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YZ NIl UI-- N/A-potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Conduit supports on walls appearto be adequateand in good condition.

2. Does anchorage of equipment in the area appear to be free of Y; NEI! UM N/All significant degraded conditions?

No degradedconditions were observed in the anchorages.

3. Based on a visual inspection from the floor, do the cable/conduit YZ N[! UEI N/A[-]

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)? HVAC and conduit supports including light supports appearto be adequate and in good condition. 'If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 10 of 152 Sheet 2 of 5 Status: Y[Z NE]I UE Area Walk-By Checklist (AWC) AWC- 022 Location: Bldg. RAB Floor El. 372 Room, Area 110

4. Does it appear that the area is free of potentially adverse seismic 'YZ NE] UE- N/AE]

spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)? No potentially adverse seismic spatialinteractions were observed.

5. Does it appear that the area is free of potentially adverse seismic Y[ NE] U-- N/AE[

interactions that could cause flooding or spray in the area? No potentialsources of flooding were observed.

6. Does it appear that the area is free of potentially adverse seismic YZ NEI UE- N/AZI interactions that could cause a fire in the area?

No adverse seismic fire conditions were observed.

7. Does it appear that the area is free of potentially adverse seismic YH NEI uE- N/A--

interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)? The area is free of potentiallyadverse seismic interactionsassociated with housekeeping practices,storage of portable equipment and temporary installations.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 111 of 152 Sheet 3 of 5 Status: YZ NEII U-' Area Walk-By Checklist (AWC) AWC- 022 Location: Bldg. RAB Floor El. 372 Room, Area 110

8. Have you looked for and found no other seismic conditions that could Y[KNEI UD adversely affect the safety functions of the equipment in the area?

No other adverse seismic conditions were observed. Comments (Additional pages may be added as necessary) No adverse seismic conditions were observed. Evaluated by: DanielAndoh Date: 10/16/2012 Genaro BarraqanJr. ' 10/16/2012

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 112 of 152 Sheet 4 of 5 Status: YZ N[] Uor-Area Walk-By Checklist (AWC) AWC- 022 Location: Bldg. RAB Floor El. 372 Room, Area 110 SWEL Components: SWELl- 060 (D-07) Photographs Note: Overhead HVAC and conduit supports. Note, Overhead HVAC and conduit supports.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 113 of 152 Sheet 5 of 5 Status: YE Nr UI-- Area Walk-By Checklist (AWC) AWC- 022 Location: Bldg. RAB Floor El. 372 Room, Area 110 SWEL Components: SWELl- 060 (D-07) Note: HVAC steel supports. Note: Conduit supports.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 114 of 152 Sheet I of 5 Status: YN Nil ULI"- Area Walk-By Checklist (AWC) AWC- 023 Location: Bldg. RAB Floor El. 372 Room, Area' 98 SWEL Components: SWELl- 070 (D14) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of V[Z NEi U-i N/A'-

potentially adverse seismic conditions (if visible without necessarily opening cabinets)? Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of YN N[-- UI' N/A[-

significant degraded conditions? No significantdegraded conditions were observed.

3. Based on a visual inspection from the floor, do the cable/conduit YZ( NEI Ur1 N/A[D raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

Cable trays were observed to have adequate fill, and were properly supported.HVAC ducts and conduits appearedto be adequately supported. 1 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 115 of 152 Sheet 2 of 5 Status: Y[ NEI U-- Area Walk-By Checklist (AWC) AWC- 023 Location: Bldg. RAB Floor El. 372 Room, Area 98

4. Does it appear that the area is free of potentially adverse seismic YZ NEI U[: N/A[D]

spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)? No adverse seismic spatialinteractionswere observed.

5. Does it appear that the area is free of potentially adverse seismic YZ NDI UiD N/ADI interactions that could cause flooding or spray in the area?

No flooding or spray sources were observed in the area.

6. Does it appear that the area is free of potentially adverse seismic YZ NDI UDl N/AD--

interactions that could cause a fire in the area? The area appears to be free of potentially adverse seismic interactions that could cause a fire.

7. Does it appear that the area is free of potentially adverse seismic YN ND-1 uD N/AD interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

The area is free of potentially adverse seismic interactionsassociated with housekeeping practices,storage of portable equipment and temporaryinstallations.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 116 of 152 Sheet 3 of 5 Status: Y[ NF UF Area Walk-By Checklist (AWC) AWC- 023 Location: Bldg. RAB Floor El. 372 Room, Area 98

8. Have you looked for and found no other seismic conditions that could Y'( NWE] U[--

adversely affect the safety functions of the equipment in the area? No other adverse seismic conditions were observed. Comments (Additional pages may be added as necessary) Evaluated by: Daniel Andoh Date: 10/10/2012 Genaro BarraqanJr.*- 10/10/2012

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 117 of 152 Sheet 4 of 5 Status: YZ NE] U-- Area Walk-By Checklist (AWC) AWC- 023 Location: Bldg. RAB Floor El. 372 Room, Area 98 SWEL Components: SWELl- 070 (014) Photographs Note: Overhead view of area Note: Overhead view of area

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 118 of 152 Sheet 5 of 5 Status: YOI NrI U01-Area Walk-By Checklist (AWC) AWC- 023_ Location: Bldg. RAB Floor El. 372 - Room, Area 98 SWEL Components: SWEILl- 070 (D14) Note: Conduit mounted on wall Note: Overhead view, of area

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 119 of 152 Sheet I of 4 Status: YZ NE] Uor-- Area Walk-By Checklist (AWC) AWC- 024 Location: Bldg. RAB Floor El. 386 Room, Area' 144 (Entire Room) SWEL Components: SWELl- 071 (PT-2667A) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YZ NEI U[: NIA[:

potentially adverse seismic conditions (if visible without necessarily opening cabinets)? Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of YZ NI] UL"I N/A[:]

significant degraded conditions? Anchorage of equipment in the area appearsto be free of significant degradedconditions.

3. Based on a visual inspection from the floor, do the cable/conduit YZ NEI UE] NIAE]

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)? All rigid electricalconduit is adequately anchoredto the overhead and the walls. Overheadpiping and ducts appearto be properly secured. I If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 120 of 152 Sheet 2 of 4 Status: YN NIJ U"I Area Walk-By Checklist (AWC) AWC- 024 Location: Bldg. RAB Floor El. 386 Room, Area 144 (Entire Room)

4. Does it appear that the area is free of potentially adverse seismic YO NEI ULI N/A[-]

spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)? The area is free of potentially adverse seismic spatial interactionswith other equipment in the area.

5. Does it appear that the area is free of potentially adverse seismic YZ( NIl U-I N/A[--

interactions that could cause flooding or spray in the area? The area appearsto be free of potentially adverse seismic conditions that could cause flooding or spray in the area.

6. Does it appear that the area is free of potentially adverse seismic YZ N[l UE3 N/AD1 interactions that could cause a fire in the area?

The area appearsto be free of potentially adverse seismic interactions that could cause a fire in the area.

7. Does it appear that the area is free of potentially adverse seismic YZ NEI UE1 N/A-I interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

The area appears to be free of potentially adverse seismic interactions associatedwith housekeeping practices,storageof portableequipment, and temporary installations.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 121 of 152 Sheet 3 of 4 Status: YN NEI URI Area Walk-By Checklist (AWC) AWC- 024 Location: Bldg. RAB Floor El. 386 Room, Area 144 (Entire Room)

8. Have you looked for and found no other seismic conditions that could YZ N[i UI[:

adversely affect the safety functions of the equipment in the area? It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found. Comments (Additional pages may be added as necessary) Equipment in the area appearedto be well anchored.Room was a dark, but the anchorage of the equipment in the area was located using a flashlight. All components appearedto be in appropriate conditions. Evaluated by: Genaro BarraqanJr. [)ate: 10/9/2012 Eric Dilbone 6

  • 10/9/2012

Engineering Report No. CALC-ANO 1-CS-i12-00002 Attachment D Rev. 0 Page 122 of 152 Sheet 4 of 4 Status: YZ ND'1 U r-1 Area Walk-By Checklist (AWC) AWC- 024 Location: Bldg. RAB Floor El. 386 Room, Area 144 (EntireRoom) SWEL Components: SWELl- 071 (PT-2667A) Photographs Note: Anchorage of the equipment in the area Note: Close up view of anchorage. appears to be free of degraded conditions.

Engineering Report No. CALC-ANO1-CS-12-00002 Attachment D Rev. 0 Page 123 of 152 Sheet 1 of 5 Status: YZ N'-] ur-D Area Walk-By Checklist (AWC) AWC- 025_ Location: Bldg. RAB Floor El. 374 Room, Area' 96 SWEL Components: SWEI-l- 094 (LY-1 411 A) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YE NEI U['- N/AD potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

All of the electricalcabinets within the room appeared to be adequately anchoredto the floor and did not appearto pose a hazard during a seismic event.

2. Does anchorage of equipment in the area appear to be free of YE NEI UE- N/AZ significant degraded conditions?

Anchorage of equipment in the area appearsto be free of significant degraded conditions.

3. Based on a visual inspection from the floor, do the cable/conduit Y' N[-I U[- N/A[-]

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)? All rigid electrical conduit is adequatelyanchored to the overhead and the walls. Overheadpiping and ducts appearto be properly secured. 'If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANOI-CS-12-00002 Attachment D Rev. 0 Page 124 of 152 Sheet 2 of 5 Status: YZ No--I Ur Area Walk-By Checklist (AWC) AWC- 025 Location: Bldg. RAB Floor El. 374 Room, Area2 96

4. Does it appear that the area is free of potentially adverse seismic Y' NEI UE- N/A[]

spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)? The area is free of potential adverse spatial interactions. Lighting over safety-related equipment is mounted on unistrut.

5. Does it appear that the area is free of potentially adverse seismic YZ NEI ur[ NIA[-]

interactions that could cause flooding or spray in the area? A fire water system was observed and appearedto be installed to meet plant specifications. A fire extinguisher was supportedon a typical wall mount that was observed throughout the plant. During a seismic event it may bounce of the support and fall to the floor but it was judged to not be a significant hazard during a seismic event.

6. Does it appear that the area is free of potentially adverse seismic Y" NEI uEr NIAE-interactions that could cause a fire in the area?

The area appears to be free of potentially adverse seismic interactions that could cause a fire in the area.

7. Does it appear that the area is free of potentially adverse seismic YZ NEI uE- N/AE1 interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

The area was partof the protected train during the time of the inspection so there was no equipment or tools in the area that would represent a seismic hazard. 2 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 125 of 152 Sheet 3 of 5 Status: YZ No- ur] Area Walk-By Checklist (AWC) AWC- 025 Location: Bldg. RAB Floor El. 374 Room, Area3 96

8. Have you looked for and found no other seismic conditions that could YZ NE] UEý adversely affect the safety functions of the equipment in the area?

It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found. Comments (Additional pages may be added as necessary) Evaluated by: DanielParker \ Date: 10/10/2012 Eric Dilbone 10/10/2012 3 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 126 of 152 Sheet 4 of 5 Status: YZ NE] ULI Area Walk-By Checklist (AWC) AWC- 025 Location: Bldg. RAB Floor El. 374 Room, Area4 96 SWEL Components: SWELl- 094 (LY-1411A) Photographs Note: Cabinet containingLY-1411A. 4 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANOI-CS-12-00002 Attachment D Rev. 0 Page 127 of 152 Sheet 5 of 5 Status: YE NE]I U-Area Walk-By Checklist (AWC) AWC- 025 Location: Bldg. RAB Floor El. 374 Room, Areas 96 SWEL Components: SWELl- 094 (LY-1411A) Note: Overhead lighting in Room 96. Note: 5 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 128 of 152 Sheet I of 5 Status: Y[ NFJ UEI Area Walk-By Checklist (AWC) AWC- 026 Location: Bldg. RAB Floor El. 386 Room, Area' 129 SWEL Components: SWELl- 058(RS-2), 078(C1O), 080(PB-0144). 085(C88), 086(C89), 087(C90), 088(PWR-2406). 089(C14), 090(C42), 091(C44), 092(C26), 097(PB-2670), 098(SS-1220), 099(TR-1139), 100(LIS-1421) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YZ N[E ULI N/A['-

potentially adverse seismic conditions (if visible without necessarily opening cabinets)? Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of YZ NEJ UE- N/AE[-

significant degraded conditions? Anchorage in the area appearsto be free of significantdegraded conditions.

3. Based on a visual inspection from the floor, do the cable/conduit YE NEi UE- N/AE-raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

Based on visual inspectionfrom the floor, the cable/conduitraceways and HVAC ducting appearto be free of potentially adverse seismic conditions. IIf the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO1-CS-12-00002 Attachment D Rev. 0 Page 129 of 152 Sheet 2 of 5 Status: Y[ NE] UDý Area Walk-By Checklist (AWC) AWC- 026_ Location: Bldg. RAB Floor El. 386 - Room, Area 129

4. Does it appear that the area is free of potentially adverse seismic YZ N[E] U[-] N/A[-]

spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)? The lighting in the room is all secure, and ceiling tiles are in good condition as well.

5. Does it appear that the area is free of potentially adverse seismic YZ NE] UEl N/AD1 interactions that could cause flooding or spray in the area?

There are no apparentpotentially adverse seismic interacitons in the area that could cause spray. Additionally, there are floor drainsin the floor to mitigate effects of any spills that may occur.

6. Does it appear that the area is free of potentially adverse seismic YZ N[E] UE-' N/AOl interactions that could cause a fire in the area?

The area appears to be free of potentially adverse seismic interactions that could cause a fire.

7. Does it appear that the area is free of potentially adverse seismic Y" NEI U['- N/AD-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

It was observed that there are four emergency respiratoryprotection boxes stored behind cabinet C26. Though they do not present a potentially adverse seismic interacitoneffect to safety-related equipment, they may fall and impede walkways since they are not secured.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 130 of 152 Sheet 3 of 5 Status: YE NI]I U[-- Area Walk-By Checklist (AWC) AWC- 026 Location: Bldg. RAB Floor El. 386 Room, Area 129

8. Have you looked for and found no other seismic conditions that could YS~ NEIl uF1 adversely affect the safety functions of the equipment in the area?

It was looked for and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found. Comments (Additional pages may be added as necessary) It was observed that there is a cartas well as a ladder stored behind cabinet C26, however, these two items are secured to the wall: Evaluated by: Roy Berryman D.ate: 10/4/20.12 Eric Dilbone 10/4/2012

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 131 of 152 Sheet 4 of 5 Status: YN NF U'- Area Walk-By Checklist (AWC) AWC- 026 Location: Bldg. RAB Floor El. 386 Roo/m, Area2 129 SWEL Components: SWELl- 058(RS-2), 078(C 0). 080(PB-0144). 085(C88), 086(C89). 087(C90). 088(PWR-2406). 089(C14). 090(C42), 091(C44). 092(C26), 097(PB-2670)., 098(SS-1220), 099(TR-1139), 100(LIS-1421) Photographs Note: Picture shows emergency respiratory Note: Photo showing seismic block wall protection boxes stacked upon each other. located in the control room. 2 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 132 of 152 Sheet 5 of 5 Status: YE NE] U-- Area Walk-By Checklist (AWC) AWC- 026_ Location: Bldg. RAB Floor El. 386 - Room, Area3 129 SWEL Components: SWELl- 058(RS-2), 078(C1O), 080(PB-0144). 085(.88), 086(C89), 087(C90), 088(PWR-2406), 089(C14). 090(C42). 091(C44), 092(C26). 097(PB-2670), 098(SS-1220), 099(TR-1139), 100(LIS-1421) Note: View showing one of a number of Note: panels in the control room. 3 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 133 of 152 Sheet i of 5 Status: YZ NE] U-' Area Walk-By Checklist (AWC) AWC- 027_ Location: Bldg. RAB Floor El. 369 - Room, Area' 86 SWEL Components: SWELl- 110(P-107B), 069(PS-5284), 077(TS-7904), 068(SE-5220), 066(M-225B) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of '(N N[- uE] N/AE3 potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of YZ NEJ UED N/AE1 significant degraded conditions?

Anchorage of equipment in the area appearsto be free of significant degraded conditions.

3. Based on a visual inspection from the floor, do the cable/conduit Y'K N[E] U[: N/A[E raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

All rigid electricalconduit is adequately anchoredto the overhead and the walls. Overheadpiping and ducts appearto be properly secured. 1 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 134 of 152 Sheet 2 of 5 Status: YZ ND1 UD-Area Walk-By Checklist (AWC) AWC- 027_ Location: Bldg. RAB Floor El. 369 - Room, Area 86

4. Does it appear that the area is free of potentially adverse seismic Y[ N[D] U[D N/AD-spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Overheadfluorescent lighting was secured with chain supports. No open S hooks were observed. Nylon zip ties were present to take up excess chain.

5. Does it appear that the area is free of potentially adverse seismic Y' N[1 UD' N/AD-interactions that could cause flooding or spray in the area?

The area appearsto be free of potentiallyadverse seismic conditions that could cause flooding or spray in the area.

6. Does it appear that the area is free of potentially adverse seismic Y[ NEI U[i N/AD-interactions that could cause a fire in the area?

The area appears to be free of potentially adverse seismic interactions that could cause a fire in the area.

7. Does it appear that the area is free of potentially adverse seismic 'Y[ NDI UiD N/ADI interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

The area appears to be free of potentially adverse seismic interactions associatedwith housekeeping practices,storage of portableequipment, and temporary installations.

Engineering Report No. CALC-ANO1-CS-12-00002 Attachment D Rev. 0 Page 135 of 152 Sheet 3 of 5 Status: YZ NE] UOI Area Walk-By Checklist (AWC) AWC- 027 Location: Bldg. RAB Floor El. 369 Room, Area 86

8. Have you looked for and found no other seismic conditions that could 'YZ NEi ULi adversely affect the safety functions of the equipment in the area?

It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found. Comments (Additional pages may be added as necessary) The zip ties on the light fixture chain supports were used to adjust the position of the lights such that they would not trip the overheadfire/flash detectors when the diesel generatoris in operation. Evaluated by: Daniel Parker Date: 10/2/2012 [<J Eric Dilbone 10/2/2012

Engineering Report No. CALC-ANO 1-C S-12-00002 Attachment D Rev. 0 Page 136 of 152 Sheet 4 of 5 Status: Y[ NE] UF-D Area Walk-By Checklist (AWC) AWC- 027 Location: Bldg. RAB Floor El. 369 Room, Area 86 SWEL Components: SWELl- 110(P-107B), 069(PS-5284), 077(TS-79041), 068(SE-5220). 066(M-225B) Photographs Note: Overhead ventilation duct with steel Note: Example of nylon zip tie on light fixture support hanger. chain support.

Engineering Report No. CALC-ANOI-CS-12-00002 Attachment D Rev. 0 Page 137 of 152 Sheet 5 of 5 Status: Y[ NE] IOF Area Walk-By Checklist (AWC) AWC- 027 Location: Bldg. RAB Floor El. 369 Room, Area 86 SWEL Components: SWELl- 11O(P-107B), 069(PS-5284), 077(TS-7904), 068(SE-5220), 066(M-225B) Note: Overhead rigid conduit, piping, and Note: exhaust.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 138 of 152 Sheet I of 5 Status: YZ N[F U-Area Walk-By Checklist (AWC) AWC- 028_ Location: Bldg. RAB Floor El. 369 - Room, Area' 86 SWEL Components: SWELl-006(E-21), 053(VFP-26B), 050(SV-5239). 065(F-52B). 013(P-106B2), 064(F-50B), 102(T-78B) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YZ ND-] UD-- N/A"-

potentially adverse seismic conditions (if visible without necessarily opening cabinets)? Anchorage of equipment in the area appearsto be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of YN NDI UD'- N/ADl significant degraded conditions?

Anchorage of equipment in the area appearsto be free of significant degradedconditions.

3. Based on a visual inspection from the floor, do the cable/conduit YN NDI UD: N/AD:

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)? All rigid electrical conduit is adequately anchoredto the overhead and the walls. Overheadpiping and ducts appearto be properly secured. 'If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 139 of 152 Sheet 2 of 5 Status: YZ N[] Ur-Area Walk-By Checklist (AWC) AWC- 028 Location: Bldg. RAB Floor El. 369 Room, Area 86

4. Does it appear that the area is free of potentially adverse seismic YZ N[D] U[I N/AD-spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Overhead fluorescent lighting was secured with chain supports. No

      'open S hooks were observed. Nylon zip ties were present to take up excess chain.

A fire extinguisherwas mounted on a support hook near the fire door and E-21. The verticalhook mount was relatively short. During a seismic event the fire extinguishermay bounce of the support and fall to the ground. This may cause it to expel its contents. This will not have in potentially adverse seismic impact.

5. Does it appear that the area is free of potentially adverse seismic YZ NEI U[D- N/AD-interactions that could cause flooding or spray in the area?

The area appearsto be free of potentiallyadverse seismic conditions that could cause flooding or spray in the area.

6. Does it appear that the area is free of potentially adverse seismic YZ NDI UD1 N/ADI interactions that could cause a fire in the area?

The area appears to be free of potentially adverse seismic interactions that could cause a fire.

7. Does it appear that the area is free of potentially adverse seismic Y[ ND- UD1 N/ADI interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

The area appearsto be free of potentially adverse seismic interactions associatedwith housekeeping practices,storage of portable equipment, and temporary installations.

Engineering Report No. CALC-ANO 1-CS-i12-00002 Attachment D Rev. 0 Page 140 of 152 Sheet 3 of 5 Status: YZ ND UD-- Area Walk-By Checklist (AWC) AWC- 028 Location: Bldg. RAB Floor El. 369 Room, Area 86

8. Have you looked for and found no other seismic conditions that could YZ NEI U--

adversely affect the safety functions of the equipment in the area? It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found. Comments (Additional pages may be added as necessary) The zip ties on the light fixture chain supports were used to adjust the position of the lights such that they would not trip the overheadfire/flash detectors when the diesel generatoris in operation. Evaluated by: Daniel Parker Date: 10/2/2012 Eric Dilbone - 10/2/2012

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 141 of 152 Sheet 4 of 5 Status: Y[ NE] UI-] Area Walk-By Checklist (AWC) AWC- 028 Location: Bldg. RAB Floor El. 369 Room, Area 86 SWEL Components: SWELl- 006(E-21). 053(VFP-26B). 050(SV-5239), 065(F-52B), 013(P-106B2). 064(F-50B). 102(T-78B) Photographs I Note: Fire Extinguishernear door and Note: Example of nylon zip tie on light fixture electrical cabinet E-21 chain support.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 142 of 152 Sheet 5 of 5 Status: YE ND-U[-- Area Walk-By Checklist (AWC) AWC- 028 Location: Bldg. RAB Floor El. 369 Room, Area 86 SWEL Components: SWELl- 006(E-21), 053(VFP-26B), 050(SV-5239), 065(F-52B). 013(P-106B2). 064(F-50B), 102(T-78B) Note: Overhead ventilation duct with steel Note: support hanger.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 143 of 152 Sheet i of 5 Status: YZ NEI Ur-Area Walk-By Checklist (AWC) AWC-029 Location: Bldg. RAB Floor El. 404 - Room, Area 159 SWEL Components: SWEL2-001 (SW-72) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YZ N[E u[_ N/AE1 potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Anchorage of equipment in the areaare appear to be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of YZ NEI U[:] N/AE1 significant degraded conditions?

Anchorage of equipment in the area appearsto be free of significant degraded conditons.

3. Based on a visual inspection from the floor, do the cable/conduit YZ NEI U['] N/AE-raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

All rigid electrical conduit is adequatelyanchored to the overhead and the walls. Overheadpiping and ducts appearto be properly secured.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 144 of 152 Sheet 2 of 5 Status: YZ NE] U-I Area Walk-By Checklist (AWC) AWC-029 Location: Bldg. RAB Floor El. 404 Room, Area 159

4. Does it appear that the area is free of potentially adverse seismic YN NEI UDJ N/A--

spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)? The area appearsto be free of potentiallyadverse seismic spatial interactionswith other equipment in the area.

5. Does it appear that the area is free of potentially adverse seismic Y] NDI UD- N/AD-interactions that could cause flooding or spray in the area?

The area is free of potentiallyadverse seismic interactionsthat could cause flooding or spray. Drains in the floor provide a means to mitigate flooding in the event of a pipe break or release of water.

6. Does it appear that the area is free of potentially adverse seismic Y'( ND] UD N/A[D]

interactions that could cause a fire in the area? The area appearsto be free of potentially adverse seismic interactions that could cause a fire.

7. Does it appear that the area is free of potentially adverse seismic YN( NDI UD1 N/ADl interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

The area appearsto be free of potentiallyadverse seismic interactions with the items listed.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 145 of 152 Sheet 3 of 5 Status: YjZ NF UO Area Walk-By Checklist (AWC) AWC-029 Location: Bldg. RAB Floor El. 404 Room, Area 159

8. Have you looked for and found no other seismic conditions that could YN N[i U[:I adversely affect the safety functions of the equipment in the area?

It was looked for, and no other seismic conditions that could adversely affect the safety fuctions were found. Comments (Additional pages may be added as necessary) Evaluated by: Sean Smolarek Date: 10/12/2012 Eric Dilbone 10/12/2012

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 146 of 152 Sheet 4 of 5 Status: Y[ NL-' U[- Area Walk-By Checklist (AWC) AWC- 029 Location: Bldg. RAB Floor El. 404 Room, Area 159 SWEL Components: SWEL2-001 (SW-72) Photographs Note: View of the area surroundingSW-72. Note: Seismic block wall next to SW-72.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 147 of 152 Sheet 5 of 5 Status: YZ NEI U[ Area Walk-By Checklist (AWC) AWC- 029_ Location: Bldg. RAB . Floor El. 404 - Room, Area 159 SWEL Components: SWEL-2-001 (SW-72) Note: View of the area surroundingSW-72. Note:

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 148 of 152 Sheet I of 5 Status: YZ NE] U-I Area Walk-By Checklist (AWC) AWC- 030 Location: Bldg. RAB Floor El. 317 Room, Area' 14 SWEL Components: SWELl- 023 (CV-1433), 108 (E-35A) Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YZ NEI ULI N/A[:

potentially adverse seismic conditions (if visible without necessarily opening cabinets)? All components in the room appearedto be adequately anchoredto the floor and did not appearto pose a hazard during a seismic event.

2. Does anchorage of equipment in the area appear to be free of YZ NEI Ul N/A[-]

significant degraded conditions? Anchorage of equipment in the areaappears to be free of significant degradedconditions.

3. Based on a visual inspection from the floor, do the cable/conduit YZ NEI U[-E N/AI1 raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

All rigid electrical conduit is adequately anchored.to the overhead and the walls. Overheadpiping and ducts appearto be properly secured. 'If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO 1-CS-12-00002 Attachment D Rev. 0 Page 149 of 152 Sheet 2 of 5 Status: YN NF U-Area Walk-By Checklist (AWC) AWC- 030 Location: Bldg. RAB Floor El. 317 Room, Area2 14

4. Does it appear that the area is free of potentially adverse seismic YZ NE UI- N/A[:]

spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)? The area is free of potentialadverse spatialinteractions.

5. Does it appear that the area is free of potentially adverse seismic YZ NEI UE1 N/AE-interactions that could cause flooding or spray in the area?

There were floor drains installed in the floor, which would mitigate any flooding concerns. Additionally, there was nothing in the area that presented a major flooding concern as a result of seismic interactions.

6. Does it appear that the area is free of potentially adverse seismic Y[ NEI U[E N/AE-]

interactions that could cause a fire in the area? The area appearsto be free of potentiallyadverse seismic interactions that could cause a fire in the area.

7. Does it appear that the area is free of potentially adverse seismic YZ NE-] UE- N/AE-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

There was an area in the room that was roped off as a contaminated area, but this does not present a seismic concern. 2 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 150 of 152 Sheet 3 of 5 Status: YZ NF- U' Area Walk-By Checklist (AWC) AWC- 030 Location: Bldg. RAB Floor El. 317 Room, Area3 14

8. Have you looked for and found no other seismic conditions that could YZ NEI Ur-adversely affect the safety functions of the equipment in the area?

It was looked for, and no other seismic conditions that could adversely affect the safety functions of the equipment in the area were found. Comments (Additional pages may be added as necessary) Evaluated by: Sean Smolarek [Date: 10/3/2012 Michael E. Perez 10/3/2012 3 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment D Rev. 0 Page 151 of 152 Sheet 4 of 5 Status: YZ NO U'- Area Walk-By Checklist (AWC) AWC- 030 Location: Bldg. RAB Floor El. 317 Room, Area4 14 SWEL Components: SWELl- 023 (CV-1433), 108 (E-35A) Photographs 7-Note: View of overhead in Room 14. Note: View of supports anchored to wall. 4 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment D Rev. 0 Page 152 of 152 Sheet 5 of 5 Status: Y[I N[D UD Area Walk-By Checklist (AWC) AWC- 030 Location: Bldg. RAB Floor El. 317 Room, Area5 14 SWEL Components: SWELl- 023 (CV-1433). 108 (E-35A) Note: View of equipment properly anchored to Note: Seismic block wall. floor. 5 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment E Rev. 0 Page 1 of 3 Attachment E Potentially Adverse Seismic Conditions

Engineering Report No. CALC-ANO I -CS- 12-00002 Attachment E Rev. 0 Page 2 of 3 Table 1 - Potentially Adverse Seismic Conditions swC- During Fukushima Seismic walkdowns, a Condition entered Initial Action: CR-ANO-1-2012-01534 initiated CR-ANO-1-2012-01534 SWEL1-010/ concrete pedestal for items P-16A and P-16B directly into CAP closed to CR-C-2012-swC- was measured to be approximately 10 inch 2801. CR Action: Revise drawings as required SWELl-014 tall: Drawing C-48 states that this platform should be 4inch tall. Operability Review: The condition was reviewed by the CR process and it was determined that there is no adverse operability concerns since the CR describes only a minor discrepancy in documentation. N/A SWC- During Fukushima Seismic walkdowns, a Condition entered Initial Action: CR-ANO-1-2012-01535 and WR-286913 initiated CR-ANO-1-2012-01535 SWELl-010 vent is out of alignment below penetration directly into CAP closed. 252-0008 in the Diesel Vault above P-16A. CR Action: WR-286913 initiated to properly install the vent. WR-286913 initiated. Operability Review: The condition was reviewed by the CR process and it was determined that there is no adverse operability concerns since the vent is firmly attached and is not in danger of falling. Even if the vent cover were to fall, there is no equipment immediately below it, although the P-16A Diesel Fuel Oil transfer pump is in the immediate vicinity. N/A AWC-007 Anchor bolts below FO-10A have significant Condition entered Initial Action: CR-ANO-1-2012-1536 and WR-287317 initiated CR-ANO-1-2012-1536 degradation. directly into CAP closed. CR Action: WR-287317 initiated to touch up paint WR-287317 initiated. Operability Review: The condition was reviewed by the CR process and it was determined that the supports show signs of only surface corrosion (flaking paint) and light rust. As a result, the supports and FO-10A/B and the A" and "B" Diesel Fuel Oil systems remain operable. N/A AWC-008 During Fukushima Seismic walkdowns, Condition entered Initial Action: CR-ANO-1-2012-01537 initiated and WR-286915 initiated CR-ANO-1-2012-01537 anchor bolts at the base of the tank supports directly into CAP closed. for T-57B, Emergency Diesel Fuel Tank, are CR Action: WR-286g15 initiated bent and corrosion on the base plates was WR-286915 initiated. observed. Operability Review: The condition was reviewed by the CR process and it was determined that the nuts/bolts show signs of light corrosion and peeled paint. The base plate shows signs of corrosion and dirt/debris build up, but does not exhibit any signs of wastage or pitting of the base plate material. Therefore, the T-57B support and T-57B tank are considered operable. N/A AWC-007 During Fukushima inspections Nuts in Condition entered Initial Action: CR-ANO-1-2012-01538 initiated and WR-286917 initiated CR-ANO-1-2012-01538 personnel platform in room with tank T-57A in directly into CAP closed. the Diesel Vault are loose. CR Action: WR-286917 initiated WR-286917 initiated. Operability Review: This condition report describes a condition of an SSC that is not within the scope of the Operability Determination Process. An Operability Determination is NOT REQUIRED for the stated condition. N/A SWC- During Fukushima Seismic walkdowns, an S- Condition entered Initial Action: CR-ANO-1-2012-01613 initiated and WR-286917 initiated CR-ANO-1-2012-01613 SWELl-040 hook supporting an overhead light fixture was directly into CAP closed. identified to be open over CV-3646 in the

Engineering Report No. CALC-ANO I -CS- 12-00002 Attachment E Rev. 0 Page 3 of 3 Table 1 - Potentially Adverse Seismic Conditions Intake Structure, EL 354, Room 241. CR Action: WR-286917 initiated WR-286917 initiated Operability Review: The condition was reviewed by the CR process and it was determined that uplifting forces under DBE conditions would be less than the dead load of the fixture. Therefore, all identified safety related equipment remains operable. N/A AWC-015 During Fukushima Seismic walkdowns, an S- Condition entered Initial Action: CR-ANO-1-2012-01613 initiated and WR-286917 initiated CR-ANO-1-2012-01613 hook supporting an overhead light fixture was directly into CAP closed. identified to be open over 1A3-1 101 next to GCH-43 in the Aux Bldg, EL 354, Room 63. CR Action: WR-286917 initiated WR-286917 initiated Operability Review: The condition was reviewed by the CR process and it was determined that uplifting forces under DBE conditions would be less than the dead load of the fixture. Therefore, all identified safety related equipment remains operable. N/A AWC-015 During Fukushima Seismic walkdowns, an S- Condition entered Initial Action: CR-ANO-1-2012-01613 initiated and WR-286917 initiated CR-ANO-1-2012-01613 hook supporting an overhead light fixture was directly into CAP closed. identified to be open over Cl 15 in the Aux Bldg, EL 354, Room 63. CR Action: WR-286917 initiated WR-28691 7 initiated Operability Review: The condition was reviewed by the CR process and it was determined that uplifting forces under DBE conditions would be less than the dead load of the fixture. Therefore, all identified safety related equipment remains operable. N/A AWC-017 During Fukushima Seismic walkdowns, an S- Condition entered Initial Action: CR-ANO-1-2012-01613 initiated and WR-286917 initiated CR-ANO-1-2012-01613 hook supporting an overhead light fixture was directly into CAP closed. identified to be open over CV-1206 in the Aux CR Action: WR-286917 initiated Bldg, EL 360, Room 79. WR-286917 initiated Operability Review: The condition was reviewed by the CR process and it was determined that uplifting forces under DBE conditions would be less than the dead load of the fixture. Therefore, all identified safety related equipment remains operable. N/A AWC-013 During Fukushima Seismic walkdowns, a Condition entered Initial Action: CR-ANO-1-2012-01611 initiated and WR-289091 initiated CR-ANO-1-2012-01611 steel support for PI-3812A is missing an directly into CAP closed. anchor bolt into the concrete watl in Room 46, Elevation 335 in the Aux Building. CR Action: WR-289091 initiatedinitiated Operability Review: The condition was reviewed by the CR process and it was determined that PI-3812A is isolated from the Service Water System by normally closed isolation valve SW-3812A. SW-3812A is maintained in the closed position. Therefore, the integrity of the Service Water System boundary is maintained. Therefore, the Service Water System and the Emergency Cooling Pond remain Operable. Prepared by: Date: 11/15/2012 Sean Smolarek Reviewed by: Date: 11/15/2012 Eric Dilbone

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment F Rev. 0 Page 1 of 1 Attachment F Licensing Basis Evaluation Forms (NOT USED)

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment G Rev. 0 Page 1 of 4 Attachment G Peer Review Checklist for SWIEL

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment G Rev. 0 Page 2 of 4 Peer Review Checklist for SWEL Instructions for Completing Checklist This peer review checklist may be used to document the review of the Seismic Walkdown Equipment List (SWEL) in accordance with Section 6: Peer Review. The space below each question in this checklist should be used to describe any findings identified during the peer review process and how the SWEL may have changed to address those findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Were the five safety functions adequately represented in the SWEL 1 selection? YO N--]

The SWEL1 contains components which address all five safety functions. Many components provide safety functions for multiple systems, and/or are part of frontline support systems. All five safety functions discussed in EPRI Report 1025286 are well representedin the SWEL.

2. Does SWEL 1 include an appropriate representation of items having the following sample selection attributes:
a. Various types of systems? YO NEI Items included on the SWEL comprise a variety of ESF systems such as Emergency Diesel Generatorsand Auxiliaries, Service Water System, Component Cooling Water System, Residual Heat Removal System, and vital electricalsystems.
b. Major new and replacement equipment? Y[[ NZ Based on input from plantpersonnel and EC searches, equipment selection personnel identified no "major"changes to safety-related equipment and components made to the plant in the past 15 years.
c. Various types of equipment? Y[ NLI SWEL 1 includes at least one example of each of the 21 classes of equipment, except class 3 and 6. Two class 3 components were containedon Base List 1; however, both were energized 4160 KV switchgearand access was not recommended for safety reasons. As such, no class 3 components were suitable for inclusion in the SWEL. Class 6 was also minimally represent on Base List I and inaccessible. Note also that several classes (11 and 12) are not on Base List 1. As such, they are also not representedon the SWEL 1. All of the other equipment classes are well represented.
d. Various environments? Y[ NF-1 The SWEL contains components in mild, harsh, and outdoor environments. The components are located in different buildings, rooms, and/oron different builidng elevations.

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment G Rev. 0 Page 3 of 4 Peer Review Checklist for SWEL

e. Equipment enhanced based on the findings of the IPEEE (or equivalent) program? YO NEI The SWEL includes components that were identified during the IPEEE as being potentially vulnerable to a seismic event. A sample of these components are included in the SWEL 1.
f. Were risk insights considered in the development of SWEL 1? YZ NEI SWEL I includes high risk components based on risk significancein the plant probabilisticrisk assessment (PRA) models.
3. For SWEL 2:
a. Were spent fuel pool related items considered, and if applicable included in YZI NEI SWEL 2?

The walkdown team identified only a small population of SFP components that are Seismic Category I. These components are included on SWEL 2.

b. Was an appropriate justification documented for spent fuel pool related items not YE NE!

included in SWEL 2? There were no components that could contribute to rapid SFP draindown that were identified. There are no penetrationsin the SFP wall below 10 ft above the top of the fuel assemblies, and all piping that communicate with the pool was installed along the refuel floor the top of the pool and then turns down into the pool

4. Provide any other comments related to the peer review of the SWELs.

The peer review team reviewed the initial SWEL 1 and SWEL 2, and provided comments and suggestions for modification of the SWEL. Comments included suggestions to remove equipment mounted to panels and cabinets because they are qualifiedas a whole (ie; handswtiches), and to include the Letdown heat exchangers. The peer reviewers ensured the SWELs met the requirementsof EPRI Report 1025286. Required changes to the SWEL necessary during the walkdown due to inaccessibilitywere reviewed by the peer reviewers to verify that the changes did not impact the level of compliance to the EPRI report.

5. Have all peer review comments been adequately addressed in the final SWEL? YN NE!

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment G Rev. 0 Page 4 of 4 Peer Review Checklist for SWEL Peer Reviewer #1: Frank Cobb K2LZ- K&-Z Date: 10/22/2012 A Peer Reviewer #2: Rodney Carter Date: 10/29/2012

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment H Rev. 0 Page 1 of 6 Attachment H Peer Review Comment Form

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment H Rev. 0 Page 2 of 6 Seismic Walkdown Submittal Report

    -"Entergy                                                    Review Comments and Resolutions Form Engineering        CALC-ANOI-CS-12-00002                        Rev. 0   Title Report Number                                                            ANO-1 Seismic Walkdown Report - SWCs and AWCs Quality Related: E] Yes     Z No                               Special Notes or Instructions:

Comment Section/Page No. Review Comment Response/Resolution Reviewer's Number Accept Initials General, Several of the SWCs reviewed note mild surface Explicit statements included for these BDK SWC+AWC oxidation or other minor condition observations where situations. CRs generated are noted on the question has been marked "Y". In these situations, the SWCs and AWCs, regardless of the SWC should also include an explicit judgment from whether it represents a seismic condition the SWEs stating that the observation is not a seismic or not. concern. Where these seismically unrelated observations require correction, it would be useful to also include the CR number generated even if not reported as a seismic concern in the NTTF 2.3: Seismic program. General, Where potential conditions are identified, it would be CRs and WRs written have been BDK SWC+AWC highly beneficial to include CR numbers generated (as included in all SWCs and AWCs. available). This assists with cross-referencing. General, Anytime "N/A is marked, a brief explanation/justification All N/A items now have an explanation of BDK SWC+AWC should be provided. (For line-mounted items with why it has been marked that way. common justification for anchorage questions, can be provided once on SWC). This includes anchorage, flexibility of lines, etc. General, Generally, consistency between the justification text, The checklists have been cleaned up BDK SWC+AWC question responses, and CRs initiated should be from hand-written notes, and the final improved, copies have improved consistency. General, Additional detail regarding observed block walls should Identified block walls are seismically BDK SWC+AWC be included on the checklists to confirm they were designed, and are noted on the considered appropriately, checklists where relevant. General, The initial sample of checklists reviewed has not Seismic interaction concerns such as the BDK SWC+AWC identified potentially adverse seismic conditions related examples described in the EPRI to interaction. Please confirm that seismic interaction Guidance and in EPRI SWE training

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment H Rev. 0 Page 3 of 6 concerns are considered during walkdowns and area were being considered during walk-bys. walkdowns and area walk-bys. Peer review confirmed this during observation walkdowns. Expanded sample of checklists included examples where seismic interaction concerns were noted, where appropriate. General, For items requiring anchorage configuration verification, All walkdowns where an anchorage BDK SWC it is useful to note the document #s used for comparison configuration verification check is with the configuration observed in the field. performed now includes basis document numbers. General, Please confirm that all cabinet/panel doors were opened Confirmed. Additional clarification is now BDK SWC (i.e., MCC cubicles). If not, the SWC should include included on SWC forms where useful. justification for how the goals of the inspection are still being met without opening the cabinet (see supplemental NRC FAQ dated 9-18-12), or should be marked as incomplete pending deferral to when the cabinets will be able to be opened (i.e., outagle). General, Additional clarification is recommended to explain what General description of how non- BDK SWC the anchorage question responses mean for in-line anchored components were treated is components that have no formal anchorage. included in the body of the report. General, It would be useful to indicate the equipment class Equipment class names are on each BDK SWC name/description on the SWCs, not just the number. SWC. General, Several SWEL items appear to be described using Corrections made to SWCs, Base List 1, BDK SWC incorrect/inappropriate equipment class designations. and SWEL 1. Each SWC includes the Please revisit the classes assigned and correct where proper equipment class. necessary. I General, Several of the AWCs reviewed were somewhat unclear Where an area considered was less than BDK AWC about what "Area" around the SWEL item(s) is the entire room, a brief description has considered. Recall that an acceptable "Area" is an been included on the AWC. approximate 35' radius from the SWEL item. Consider including a more general photo of the area and/or include brief statement of area considered (i.e., if entire room looked at, say so).

Engineering Report No. CALC-ANOI-CS-12-00002 Attachment H Rev. 0 Page 4 of 6 General, Include a photo on the AWC of each seismic condition Photos are included wherever conditions BDK AWC identified during that area walk-by. were identified, as well as a general photo of the area in most cases. General, Need to discuss why the block wall will remain stable Additional information is provided on PAM SWC+AWC during a seismic event block walls. Note that ANO has painted all of their seismically qualified block walls with a blue stripe. General, List the anchorage dwgs in the SWC if a configuration Drawings/calculations/plant PAM SWC verification is performed documentation is now referenced in all SWCs where an anchorage configuration verification is performed. General, Must justify that minor corrosion/surface oxidation does Added a statement justifying any noted PAM SWC+AWC not adversely impact seismic qualification, mild corrosion or surface oxidation. Reviewed By: Paul A. Miktus Date 10/11/12 Site/Department: ENERCON/PM Ph. 770-792-6972 Reviewed By: Benjamin D. Kosbab Date 10/11/12 Resolved By: Sean Smolarek Site/Department: ENERCON/Civil Ph. 770-590-2179 Date: 10/25/2012

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment H Rev. 0 Page 5 of 6 I nt Seismic Walkdown Submittal Report Review Comments and Resolutions Form Engineering CALC-ANOI-CS-12-00002 Rev. 0 Title: ANO-1 Fukushima Seismic - SWC &AWC Review Report Number II Quality Related: E] Yes Z No Special Notes or Instructions: Comment Section/Page Review Comment Response/Resolution Reviewer's Number No. SWELl COMMENTS Accept Initials 1 SWELl Remove Hand Switches from SWEL as the mounting will Removed Hand Switches FC likely not be visible (even with the cabinet opened) and the switches will be evaluated with the panel as a whole 2 SWELl Ensure any items identified to be inaccessible on A preliminary walkdown was performed FC/RC preliminary walkdowns are swapped out with equivalent to identify any inaccessible items or items (class, environment, etc) components. These items were swapped out by Equipment Selection Personnel and sent back to the SWEL peer reviewer for concurrence. 3 SWELl Verify each class of component is adequately represented. Two class 3 components were contained FC/RC It appears a few do not show up in the SWEL. on Base List 1; however, both were energized 4160 KV switchgear and access was not recommended for safety reasons. As such, no class 3 components were suitable for inclusion in the SWEL. Class 6 was also minimally represented on Base List 1 and inaccessible. Note also that several classes (11 and 12) are not on Base List 1. As such, they are also not represented on the SWELl. SWELl Are there any major new or replacement components Plant personnel as well as the electronic FC included? database were consulted to find new and replacement items. Many items were identified on the SWEL to be new or have been replaced since the IPEEE report. However, the Guidance defines the new and replacement classification as "major",

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment H Rev. 0 Page 6 of 6 of which none of the components fit. 5 SWELl Suggest expanding representation of equipment class 21 Decay Heat coolers were added. FC with some of the major heat removal equipment (i.e., heat Letdown Heat Exchanger was not added exchangers). at the request of RP - this heat exchanger is in a significant dose area. SWEL 2 COMMENTS 6 SWEL2 Verify Safety Classification of SFP Cooling System Per the Upper Level Document on the FC Spent Fuel Pool, The SFP Cooling System is Non-Safety and Non-Seismic. Safety-related service water to SFP connection valve is included on SWEL 2. Reviewed By: Rodney Carter/Frank Cobb Date 10/24/12 Resolved By: I Sean Smolarek Site/Department: OPS/Mech Date: 10/25/12

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment I Rev. 0 Page 1 of 19 Attachment I Seismic Walkdown Engineering Training Certificates

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment I Rev. 0 Page 2 of 19 Seismic Walkdown Engineers Sean Smolarek Eric Dilbone. Daniel Andoh Roy Berryman Genaro Barragan Michael Perez Daniel Parker Chris Johnson Ojaswi Shrestha

Engineenng Report No CALC-ANO 1-CS- 12-00002 En i e r na e o t N Att achnien t I

  • Rev. 0
                     ~   4   '~                                                                                      11ýPge 3of 19
         *E.                        N,      E,.

Excellence-Everyproject. Every day. Certificate- of Completion is hereby granted to Sean. Srnoiark for.successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 23. PLANT SEISMIC WALKDOWNS August 22, 2012 - Kennesaw, GA " A:/" "7"5J/' Date - Location Kursat Kinali, PhD P.E. EPRI Certified Seismic Walkdown Engineer Alexandria. VA -7/27/2012:

Engineering Report No. CALC-ANO 1 -CS- 12-00002 Attachment I Rev. 0 Page 4 of 19 NEERCO N Excellence-Every project. Every doy. Certificate of Completion is hereby granted to Eric Dilbone for successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 2.3 PLANT SEISMIC WALKDOWNS Awarded: 7/11/2012 in Kennesaw, GA Kevin Bessell Kenneth Whitmore Certified Seismic Walkdown Engineer Certified Seismic Walkdown Engineer Palo Alto, CA - 6/13/2012 Alexandria, VA - 6/20/2012

Engineering Report No. CALC-ANO1-CS-12-00002

                                                                                                                 . ... .: ,A t ach men t I
                                                                               ~22                                          Page 5of 19 TV,1 Excellence-Every project. Every day.

Certificate of Completion is hereby granted to Daniel Andoh D .'a. n ,  ;"~ for successful completion of TRAINING ON NEAR TERM TASK FORCE, RECOMMENDATION 2.3 : PLANT: SEISMIC WALKDOWNS. August 22, 2012 - Kennesaw, GA 2 Date - Location Kursat Kinali, Ph.D., P.E. EPRI Certified Seismic Walkdown Engineer Alexandria,.VA - 7/27/2012

Engineering Report No. CALC-ANO!-CS-!2-00002 Attachment I Rev. 0

                                                                     ~                                                                          Page 6 of 19 CerTtificate o-)f Completion                                                                                         ;*

is hereby granted to

  • *: * ' :
                        ' , 'i*
           . ::. :..*: .-.....

Roy914m

                                         .. ..

Beryma

                                                    !:, .;....
                                                           ...              . !!!*;  -: ......
                                                                                .......                  * *r .. . .. .. .-
                                                                                                     '. ...........       ...... ----                   ....

for successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 2.3 PLAN TSEISMI C WA LKDO0WNS Awarded: 7/11/20 12 in Kennesaw, GA Kevin Bessell Kenneth Whitmore Certified Seismic Walkdown Engineer Certified Seismic Walkdown Engineer Palo Alto, CA - 6/13/2012 Alexandria, VA - 6/20/2012

Engineering Report No. CALC-ANO I-CS-12-00002 Attachment I Rev. 0 i1w7of19 StructuraIntegrtyAssociates, Inc! Certificate of Completion G1.ENARO BARR-IAýGAN Training on Near Term Task Force Recommendation 2.3

   - Plant Seismic Walkdowns 9- 3-D Date                    ao H7_

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment I I'.0 Page 1;*f 19 NT~ W POWE Certificateof Completion Michael Perez Training on Near Term Task Force Recommendation 2.3

  - Plant Seismic Walkdowns July 27, 2012           if K44CA474ý
                                    /

Date Robert K. Kassawara EPRI Manager, Structural Reliability & Integrity

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment I V. 0 Page f 19 Certificate of Completion D)an Parker Training on Near Term Task Force Recommendation 2.3 Plant Seismic Walkdowns July2?7, 2012 Date Robert K. Kassawara EPRI Manager, Structural Reliability &Integrity

Engineering Report No. CALC-ANO 1-CS- 12-00002 LWL, #KeI IIN tU Page 1001ý 9 IELECTRIC POWER

                   ~I2IR    ESEARCH INTTT Certificateof Completion Chris Johnson Training on Near Term Task Force Recommendation 2.3
  - Plant Seismic Walkdowns June 13, 2012 Date R'Ie, . 44ýý .

Robert K. Kassawara EPRI Manager, Structural Reliability & Integrity

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment I Pa e . U 1z aefof19 ELECTRICPOWER~

                  ~IS~I jRESEARCH  INSTITUTE Certificateof                   Completion Ojaswi Shrestha Training on Near Term Task Force Recommendation 2.3
  - Plant Seismic Walkdowns July 11,2012 Date                               Robert K. Kassawara EPRI Manager, Structural Reliability & Integrity

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment I Rev. 0 Page 12 of 19 Seismic Walkdown Peer Reviewers Paul Miktus Ben Kosbab

S:?:QU f t: of Ac1~frtvcznrnit UU~1is is TIP fiiriff-`14ýalt 4.M .P." f, ~t~oun rrcnIn~l ~tt~b ~7A~j sxnir ~t U~itinn ~fr ~inir~q C60-U-T.SIP

                        ~hxn~ 2~-2~ i9qa Neil. P.)Smith,   Commonwealth Edison-:

David A. Freed. MPR Associates Robert P- Kassawara, EPRI. SQUG, Program n:,Manager SSQUG:Training Coordinator

n~in rin Repo No CALC-ANO1-CS-12-00002 W two V2~~~~~71 YI2LI%,2YM YY * , -_ .Wo EPR I

                                          ~~ Electric Power.

Research Institute

       ~ctificzztc ufel Ad~irn~cmwt Qt41zi  is to        'vi     4  at~jt PtiuJl      A. Aik!us 1JUS     (Gomptet-eb t4c
          ~ismi               K1P  A                                               (G0 Ur's -V tq a7729, 199a David A. Freed, MPR Associates                                     Robert P. Kassawara, EPRI SQUG Training Coordinator                                          SQUG Program Manager

Engineering Report No. CALC-ANO I-CS- 12-00002 Attachment I Rev. 0 Page 15 of 19 Excellence -Every poiecL Every May Certificate of Completion is hereby granted to "*; Ben1-wjaomin Kosba-;ýb for successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 2.3 PLANT SEISMIC WALKDOWNS Awarded: 7/11/2012 in Kennesaw, GA K yin Bessell Kenneth Whitmore Certi fied Seismic Walkdown Engineer Certified Seismic Walkdown Engineer Palo Alto, CA- 6/13/2012 Alexandria, VA - 6/20/2012

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment I Rev. 0 Page 16 of 19 EPRI-Qualified SWE Trainers Kevin Bessell Kursat Kinali Ken Whitmore

Engineering Report No. CALC-ANO 1-CS-12-00002 Attachment I D Page 17 19 a rI aI2 RESEARCHINTUE Certificate.ofCompletion Kevin Bessell Training on Near Term Task Force Recommendation 2.3

  - Plant Seismic Walkdowns June 13, 2012 Date .                           Robert K. Kassawara EPRI Manager,.

Structural Reliability & Integrity

Engineering Report No. CALC-ANO 1-CS- 12-00002 Attachment I Pagel18 ,f19 a f= fa E'ýEA RC H IN 5 I I yz' TV r' Certificateof Completion Kursat Kinali Training on Near Term Task Force Recommendation 2.3 Plant Seismic Walkdowns July 27, 2012 Date Robert K. Kassawara EPRI Manager, Structural Reliability & Integrity

2 T' Engineering Report No. CALC-ANO 1-CS- 12-00002

                                                                                                               -
  • Rev.

RjIev. 0 Page of 19 a-r-1r ani Certificateof Completion IT' is enneth Willtmore Training on Near Term Task Force Recommendation 2.3

        - Plant Seismic Walkdowns III III Iii June 21, 2012 til                Date                      Robert K. Kassawara EPRI Manager, Structural ReliabUity & Integrity III LI.         -                          -}}