| number = ML15029A433
| issue date = 01/29/2015
| title = PNO-I-15-001 - Pilgrim: Shutdown Greater than 72 Hours Due to Reactor Scram Following a Partial Loss of Offsite Power
| author name = McKinley R R
| author affiliation = NRC/RGN-I/DRP/PB5
| addressee name =
| addressee affiliation =
| docket = 05000293
| license number = DPR-035
| contact person = McKinley R R
| document report number = PNO-I-15-001
| document type = NRC Preliminary Notification of Event/Occurrence
| page count = 2
}}
{{#Wiki_filter:Date: January 29, 2015
 
PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE
  - PNO-I-15-001 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. Some of the information may not yet be fully verified or evaluated by the Region I staff. 
 
Facility      Licensee Emergency Classification Entergy Nuclear Operations, Inc. __    Notification of Unusual Event Pilgrim Nuclear Power Station    ___  Alert  Plymouth, MA      ___  Site Area Emergency  Docket No. 50-293    ___  General Emergency  License No. DPR-35    X    Not Applicable 
 
==SUBJECT:==
PILGRIM NUCLEAR POWER STATION:  SHUTDOWN GREATER THAN 72 HOURS DUE TO REACTOR SCRAM FOLLOWING A PARTIAL LOSS OF OFFSITE POWER 
 
On January 27, 2015, Pilgrim Nuclear Power Station experienced an automatic scram following a turbine trip due to a partial loss of offsite power. The station was experiencing high winds and heavy snowfall during a severe winter storm when the station began experiencing degrading switchyard conditions. The station had already transferred the emergency busses onto their respective emergency diesel generators and was downpowering to 20% power to take the turbine offline. At 4:02 a.m. with the reactor at 52% power, the second offsite line was lost and the station experienced a load reject.
 
The station experienced equipment issues while cooling down after the scram including: the station diesel air compressor failed to start, one of four safety relief valves could not be operated manually from the control room, and high pressure coolant injection had to be secured due to failure of the gland seal motor.
The station is currently in cold shutdown, the safety buses are being powered by their respective emergency diesel generators, and all safety-related equipment required for safe plant shutdown are available. The licensee is working on restoring their 345kV lines.
 
Resident inspectors and region-based inspectors are providing oversight and performing  follow-up inspections.
 
This preliminary notification is issued for information only.
 
The information presented herein has been discussed with the licensee and is current as of 1:00 p.m. on January 29, 2015. Commonwealth of Massachusetts officials have been kept
 
informed.
ADAMS Accession Number:  ML15029A433 CONTACT: Raymond McKinley, Projects Branch 5 (610) 337-5150 Raymond.McKinley@nrc.gov
 
ML15029A433 SUNSI Review Non-Sensitive  Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/PAO  RI/SLO  RI/ORA NAME    RMcKinley/RRM  HNieh/HKN DScrenci/DS  NMcNamara/NM DLew/DCL DATE 1/29/15 1/29/15 1/29/15 1/29/15 1/29/15}}
 