{{#Wiki_filter:A Connecticut Yankee Atomic Power Company Date of Distribution:
{{#Wiki_filter:A Connecticut Yankee Atomic Power Company Date of Distribution: 8-19-10 Notice of Receipt of ISFSI Emergency Operating Procedures Change No       10-01 To:              Document Control Desk     (code Z)
8-19-10 Notice of Receipt of ISFSI Emergency Operating Procedures Change No To: Copy No.: Please revis 10-01 Document Control Desk (code Z)US NRC Washington, DC 20555 Copy #1-40 e your controlled copy per instructions below: INSERT: Index page 1 of 1, dated 8/20/10 EO-2, Rev. 3 effective 8/20/10 EO-3, Rev.. 3 effective 8/20/10 EO-4, Rev. 3 effective 8/20/10 ATTACH: REMOVE: REPLACE This acknowledges receipt of the revisions listed above. In addition, all superseded pages have been removed and destroyed.
US NRC Copy No.:        Washington, DC 20555 Copy #1-40 Please revis e your controlled copy per instructions below:
Signature:
INSERT:         Index page 1 of 1, dated 8/20/10 EO-2, Rev. 3 effective 8/20/10 EO-3, Rev.. 3 effective 8/20/10 EO-4, Rev. 3 effective 8/20/10 ATTACH:
Date: Please Return This Sheet to the Administrative Office, Connecticut Yankee Within Thirty (30) Days.
REMOVE:
ISFSI Master Document Index (MDI)Emergency Operating Procedures (EO series) 08-20-10 No. Rev. : Title :50.59: 72.48: ISR : QA : RP : Review Date : Effective Date:EmergnyPaig EO-1i 6 genc Planning .No No No Yes Yes 08-19-08 09-19-08.-.Administration
REPLACE This acknowledges receipt of the revisions listed above. In addition, all superseded pages have been removed and destroyed.
.:Response to Of-ora EO-2 : 3 'to Off-Normal Yes Yes :Yes No Yes 08-16-10 08-20-10 EO-3 3 :Response to Accidents Yes Yes Yes No j Yes 08-17-10 08-20-10: Response to Natural E4 iPhenomena Yes Yes Yes No :Yes 08-17-10 08-20-10 I -- -------- -------- --.... .t ........ i........
Signature:                                                               Date:
I" ------- -I.... .........." .........Em ergency Plan---------------------------------7 EO-5 4 m yNo No Yes No :Yes 05-27-08 : 08-20-08-.......:Implementation
Please Return This Sheet to the Administrative Office, Connecticut Yankee Within Thirty (30) Days.
..:Non-Emergency Event EO-6 10 ,s : No No Yes No No 07-22-08 08-06-08:Assessment:
Page I of I ISFSI Administrative AUG 2 0 2010 AD-4 Rev. 3 ATTACHMENT B CONNECTICUT YANKEE ATOMIC POWER COMPANY ISFSI PROCEDURE Response to Off-Normal Operations EO-2 Rev. 3 Preparer: Date: 1-/s/J 10CFR50.59 I 10CFR72.48 ASSESSMENT 1OCFR50.59 SCREEN REQUIRED?
YES M NO 1OCFR50.59 EVALUATION REQUIRED (NO. []YES El NO 10CFR72.48 SCREEN REQUIRED?
EYES ENO 1OCFR72.48 EVALUATION REQUIRED (NO. nl YES El NO REVIEWER SECTION QUALITY ASSURANCE REVIEW: SIGNATURE VIA DATE: i//A RADIATION PROTECTION REVIEW: SIGNATURE -DATE: 6,//.,j TECHNICAL REVIEW: SIGNATURE_______
DATE: __INDEPENDENT SAFTY REVAEW: (Asjpp1icble)
SIGNATJRE--.
-) -DATE: APPROVAL SECTION ISFSI MANAGER/DESIGNEE SIGNATURE/DATE:
Page 9 of 12 ISFSI Emergency Operating EO-2 Rev. 3 SResponse to Off-Normal Operations 1.0 PURPOSE This procedure provides the actions to be taken by ISFSI personnel in response to Off-Normal Conditions affecting a fuel loaded Vertical Concrete Cask (VCC) at the ISFSI.2.0 SCOPE 2.1 The ISFSI Response to Off-Normal Conditions applies to those supporting the operation of the CY ISFSI.2.2 Off-Normal Conditions addressed by this procedure include: 2.2.1 Blockage of Half of the Air Inlets on a Vertical Concrete Cask [NAC-MPC FSAR 11.1.1 ]2.2.2 Failure of Instrumentation on a Vertical Concrete Cask [NAC-MPC FSAR 11.1.3]2.2.3 Severe Environmental Conditions (Ambient Air Temperature
<-40'F or>100 0 F) [NAC-MPC FSAR 11.1.4]2.2.4 Small Release of Radioactive Particulate from the Canister Exterior[NAC-MPC FSAR 11.1.5]2.2.5 Degraded VCC Thermal Performance (AT > 1 10&deg;F)3.0 DEFINITIONS 3.1 Average Ambient Temperature
-The average ambient temperature is the average value of the temperature monitoring device(s) monitoring the ambient air temperature in the area around a fuel loaded VCC.3.2 Operable -The CONCRETE CASK heat removal system is OPERABLE if the difference between the average ISFSI ambient temperature and the average outlet air temperature is < 1 10&deg;F (AT < 1100 F ) or if all four air inlet and outlet screens are visually verified to be unobstructed for the CY-MPC. Failing this the CY-MPC may be declared OPERABLE if an engineering evaluation determines the CONCRETE CASK has adequate heat transfer capabilities to assure continued spent fuel CANISTER and CONCRETE CASK integrity
[CofC Appendix A, A1.I]Page 1 of 13 ISFSI Emergency Operating EO-2 Rev. 3


==4.0 REFERENCES==
ISFSI Master Document Index (MDI)
Emergency Operating Procedures (EO series)                                                          08-20-10 No. Rev. :              Title            :50.59: 72.48: ISR : QA : RP : Review Date : Effective Date
:EmergnyPaig EO-1i  6            genc Planning .            No            No              No    Yes          Yes      08-19-08              09-19-08
* .        -.Administration            .
:Response      to Of-ora EO-2 :  3    'to                Off-Normal      Yes          Yes :Yes                No          Yes      08-16-10              08-20-10 EO-3    3    :Response to Accidents            Yes          Yes            Yes      No j Yes              08-17-10              08-20-10
:Response to Natural E4          iPhenomena                        Yes          Yes            Yes      No :Yes                08-17-10              08-20-10 I--  - - - - - -  -- - - - - - -  --  -.....- t ........ i........ I"------- -I....    . . . . .  . . . . ."  . .  . . . . . . .
Em ergency Plan---------------------------------7 EO-5    4       m        yNo                                  No          Yes      No :Yes                05-27-08        :    08-20-08
            -.......
:Implementation                              .        .
:Non-Emergency Event EO-6    10 ,s                                : No              No            Yes      No          No        07-22-08              08-06-08
:Assessment:
Page I of I


4.1 NAC-MPC Final Safety Analysis Report for the NAC-Multi-Purpose Canister System, amendment for Connecticut Yankee Atomic Power Company, Docket 72-1025.4.2 NRC Certificate of Compliance for Spent Fuel Storage Casks, Certificate Number 1025, issued to NAC for the NAC-MPC System.4.3 AD-4, ISFSI Procedure Control Program.4.4 AD-5, ISFSI Work Control Program.4.5 AD-7, Corrective Action Program.4.6 AD-16, ISFSI Personnel Training and Qualifications.
ISFSI Administrative                                    AUG 2 0 2010    AD-4 Rev. 3 ATTACHMENT B CONNECTICUT YANKEE ATOMIC POWER COMPANY ISFSI PROCEDURE Response to Off-Normal Operations EO-2 Rev. 3 Preparer:
4.7 AD-2 1, Trouble Reports (TR) / Work Requests (WR).4.8 OP-1, ISFSI Temperature Monitoring Program.4.9 OP-2, ISFSI Routine Surveillances.
* Date:      1-/s/J 10CFR50.59 I 10CFR72.48 ASSESSMENT 10CFR50.59 SCREEN REQUIRED?                                        YES            M NO 10CFR50.59 EVALUATION REQUIRED (NO.                            []YES              El NO 10CFR72.48 SCREEN REQUIRED?                                    EYES              ENO 10CFR72.48 EVALUATION REQUIRED (NO.                            nl YES            El NO REVIEWER SECTION QUALITY ASSURANCE REVIEW:    SIGNATURE              VIA          DATE:      i//A RADIATION PROTECTION REVIEW: SIGNATURE                            -DATE:            6,//.,j TECHNICAL REVIEW:            SIGNATURE_______                    DATE:            __
4.10 SP-8, Personnel Access Control.4.11 RP-4, Personnel Radiation Monitoring.
INDEPENDENT SAFTY REVAEW: (Asjpp1icble)
4.12 RP-5, Radiation Work Permits.5.0 RESPONSIBILITIES 5.1 ISFSI Shift Supervisor is responsible for ensuring the requirements of this procedure are implemented.
SIGNATJRE--.            -)            -        DATE:
5.2 ISFSI Shift Supervisor shall be responsible for the operational command functions.
APPROVAL SECTION ISFSI MANAGER/DESIGNEE SIGNATURE/DATE:
5.3 ISFSI personnel are responsible for performing the actions described in this procedure.
Page 9 of 12
5.4 Radiation Protection Manager (or designee) is responsible for maintaining the Radiation Protection Procedures and providing guidance during emergency events.Page 2 of 13 ISFSI Emergency Operating EO-2 Rev. 3 6.0 PROCEDURE 6.1 Notes 6.1.1 Partial procedure performance  
 
-As identified in ISFSI Procedure Control Program, specific sections, portions of a section, series-of-steps, partial valve lineups or equipment checklist performance is allowed provided the ISFSI Shift Supervisor has reviewed and approved the omissions.
ISFSI Emergency Operating                                                                EO-2 Rev. 3 SResponse to Off-Normal Operations 1.0    PURPOSE This procedure provides the actions to be taken by ISFSI personnel in response to Off-Normal Conditions affecting a fuel loaded Vertical Concrete Cask (VCC) at the ISFSI.
Such partial performance will be documented using the N/A process. Other sections (e.g., precautions, prerequisites) must be reviewed for applicability to the evolution being performed.
2.0    SCOPE 2.1    The ISFSI Response to Off-Normal Conditions applies to those supporting the operation of the CY ISFSI.
6.1.2 Steps may be marked as "N/A" if the step provides an option for not completing the step.6.1.3 Only personnel meeting the requirements of ISFSI Personnel Training and Qualifications shall perform inspections and data collection.
2.2    Off-Normal Conditions addressed by this procedure include:
6.2 IDENTIFY the applicable Off-Normal Condition and the Attachment that addresses the required actions: Off-Normal Condition Attachment Blockage of Half of the Air Inlets on a Vertical Concrete Cask A Failure of Instrumentation on a Vertical Concrete Cask B Ambient Air Temperature
2.2.1        Blockage of Half of the Air Inlets on a Vertical Concrete Cask [NAC-MPC FSAR 11.1.1 ]
(<-40'F or > 100&deg;F) C Small Release of Radioactive Particulate from the Canister Exterior D Degraded VCC Thermal Performance (AT > 11 0IF) E CAUTION The Off-Normal events of Failure of Instrumentation on a Vertical Concrete Cask and Severe Environmental Conditions have NAC CofC requirements for actions to be completed within a prescribed time period of 4 hours.6.3 PERFORM the required actions of the applicable Attachment for the Off-Normal Condition identified.
2.2.2        Failure of Instrumentation on a Vertical Concrete Cask [NAC-MPC FSAR 11.1.3]
7.0  
2.2.3        Severe Environmental Conditions (Ambient Air Temperature <-40'F or
                            >1000 F) [NAC-MPC FSAR 11.1.4]
2.2.4        Small Release of Radioactive Particulate from the Canister Exterior
[NAC-MPC FSAR 11.1.5]
2.2.5        Degraded VCC Thermal Performance (AT > 110&deg;F) 3.0    DEFINITIONS 3.1    Average Ambient Temperature - The average ambient temperature is the average value of the temperature monitoring device(s) monitoring the ambient air temperature in the area around a fuel loaded VCC.
3.2    Operable - The CONCRETE CASK heat removal system is OPERABLE if the difference between the average ISFSI ambient temperature and the average outlet air temperature is < 1 10&deg;F (AT < 1100 F ) or if all four air inlet and outlet screens are visually verified to be unobstructed for the CY-MPC. Failing this the CY-MPC may be declared OPERABLE if an engineering evaluation determines the CONCRETE CASK has adequate heat transfer capabilities to assure continued spent fuel CANISTER and CONCRETE CASK integrity [CofC Appendix A, A1.I]
Page 1 of 13
 
ISFSI Emergency Operating                                                            EO-2 Rev. 3
 
==4.0    REFERENCES==
 
4.1   NAC-MPC Final Safety Analysis Report for the NAC-Multi-Purpose Canister System, amendment for Connecticut Yankee Atomic Power Company, Docket 72-1025.
4.2   NRC Certificate of Compliance for Spent Fuel Storage Casks, Certificate Number 1025, issued to NAC for the NAC-MPC System.
4.3   AD-4, ISFSI Procedure Control Program.
4.4   AD-5, ISFSI Work Control Program.
4.5   AD-7, Corrective Action Program.
4.6   AD-16, ISFSI Personnel Training and Qualifications.
4.7   AD-2 1, Trouble Reports (TR) / Work Requests (WR).
4.8   OP-1, ISFSI Temperature Monitoring Program.
4.9   OP-2, ISFSI Routine Surveillances.
4.10 SP-8, Personnel Access Control.
4.11 RP-4, Personnel Radiation Monitoring.
4.12 RP-5, Radiation Work Permits.
5.0   RESPONSIBILITIES 5.1   ISFSI Shift Supervisor is responsible for ensuring the requirements of this procedure are implemented.
5.2   ISFSI Shift Supervisor shall be responsible for the operational command functions.
5.3   ISFSI personnel are responsible for performing the actions described in this procedure.
5.4   Radiation Protection Manager (or designee) is responsible for maintaining the Radiation Protection Procedures and providing guidance during emergency events.
Page 2 of 13
 
ISFSI Emergency Operating                                                                 EO-2 Rev. 3 6.0   PROCEDURE 6.1     Notes 6.1.1   Partial procedure performance - As identified in ISFSI Procedure Control Program, specific sections, portions of a section, series-of-steps, partial valve lineups or equipment checklist performance is allowed provided the ISFSI Shift Supervisor has reviewed and approved the omissions. Such partial performance will be documented using the N/A process. Other sections (e.g.,
precautions, prerequisites) must be reviewed for applicability to the evolution being performed.
6.1.2   Steps may be marked as "N/A" if the step provides an option for not completing the step.
6.1.3   Only personnel meeting the requirements of ISFSI Personnel Training and Qualifications shall perform inspections and data collection.
6.2     IDENTIFY the applicable Off-Normal Condition and the Attachment that addresses the required actions:
Off-Normal Condition                             Attachment Blockage of Half of the Air Inlets on a Vertical Concrete Cask                 A Failure of Instrumentation on a Vertical Concrete Cask                         B Ambient Air Temperature (<-40'F or > 100&deg;F)                                     C Small Release of Radioactive Particulate from the Canister Exterior           D Degraded VCC Thermal Performance (AT > 11 0IF)                                 E CAUTION The Off-Normal events of Failure of Instrumentation on a Vertical Concrete Cask and Severe Environmental Conditions have NAC CofC requirements for actions to be completed within a prescribed time period of 4 hours.
6.3     PERFORM the required actions of the applicable Attachment for the Off-Normal Condition identified.
7.0  


==SUMMARY==
==SUMMARY==
OF CHANGES 7.1 Added requirements from new Amendments of the FSAR (Ref. 4.1) and CoC (Ref.4.2)7.2 Changed term "ISFSI Pad Area" to "ISFSI Protected Area".7.3 Added references to entry requirements into the ISFSI Protected Area.7.4 Modified actions throughout to better define response and meet requirements.
OF CHANGES 7.1     Added requirements from new Amendments of the FSAR (Ref. 4.1) and CoC (Ref.
Page 3 of 13 ISFSI Emergency Operating EO-2 Rev. 3.8.0 ATTACHMENTS 8.1 Attachment A -Blockage of Half of the Air Inlets on a Vertical Concrete Cask 8.2 Attachment B -Failure of Instrumentation on a Vertical concrete Cask 8.3 Attachment C -Severe Environmental Conditions 8.4 Attachment D -Small Release of Radioactive Particulate from the Canister Exterior 8.5 Attachment E -Degraded VCC Thermal Performance (AT > I1 0&deg;F)Page 4 of 13 ISFSI Emergency Operating EO-2 Rev. 3 ATTACHMENT A BLOCKAGE OF HALF OF THE AIR INLETS ON A VERTICAL CONCRETE CASK (Page 1 of 2)A. 1 AUTOMATIC ACTIONS None A.2 IMMEDIATE ACTIONS A.2.1 NOTIFY the ISFSI Shift Supervisor.
4.2) 7.2     Changed term "ISFSI Pad Area" to "ISFSI Protected Area".
A.2.2 NOTIFY the ISFSI Manager or designee.A.3 SUBSEOUENT ACTIONS WARNING Some Off-Normal, Accident and Natural Phenomena Events may cause damage to a loaded VCC. Therefore a loss of shielding may not be visually evident.CAUTION Due to the potential radiation hazard near the surface of the concrete cask and radiation streaming from the air inlets and outlets, personnel should practice ALARA principles: " Maximize distance from the air vents and minimize stay time around the concrete cask.* Do NOT remove the VCC inlets or outlets screens without qualified RP personnel present.INITIALS A.3.1 OBTAIN permission from ISFSI Shift Supervisor to enter the ISFSI Protected Area.A.3. 1.1 RP-4.Enter the ISFSI Protected Area in accordance with SP-8 and A.3.2 Within 4 hours of the event, MEASURE and RECORD the temperatures of the air outlets of each VCC, OR INSPECT and VERIFY all air inlets and outlets of each affected VCC are not blocked or obstructed, in accordance with ISFSI Temperature Monitoring Program. [CofC Appendix A, A5.3]A.3.2.1 At least one-half of the inlets and outlets on each affected cask must be cleared of blockage and debris within 24 hours.Page 5 of 13 ISFSI Emergency Operating EO-2 Rev. 3 ATTACHMENT A BLOCKAGE OF HALF OF THE AIR INLETS ON A VERTICAL CONCRETE CASK (Page 2 of 2)INITIALS A.3.3 INSPECT the air inlet screens.A.3.4 REMOVE any debris on the outside of the air inlet screens using a broom or other long handled tool.A.3.5 IF debris is not easily accessible and the screens need to be removed, perform the following:
7.3     Added references to entry requirements into the ISFSI Protected Area.
A.3.4.1 GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-21, and Work Order in accordance with AD-5, ISFSI Work Control Program.A.3.4.2 GENERATE a new RWP in accordance with RP-5, Radiation Work Permits.A.3.6 IF damage is noted GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-2 1, and a Work Order in accordance with AD-5, ISFSI Work Control Program.A.3.7 GENERATE a Condition Report in accordance with Corrective Action Program to document the condition.
7.4     Modified actions throughout to better define response and meet requirements.
Page 6 of 13 ISFSI Emergency Operating EO-2 Rev. 3 ATTACHMENT B FAILURE OF INSTRUMENTATION ON A VERTICAL CONCRETE CASK (Page 1 of 1)B.1 AUTOMATIC ACTIONS None B.2 IMMEDIATE ACTIONS B.2.1 NOTIFY the ISFSI Shift Supervisor.
Page 3 of 13
B.2.2 NOTIFY the ISFSI Manager or designee.B.3 SUBSEQUENT ACTIONS WARNING Some Off-Normal, Accident and Natural Phenomena Events may cause damage to a loaded VCC. Therefore a loss of shielding may not be visually evident.CAUTION Due to the potential radiation hazard near the surface of the concrete cask and radiation streaming from the air inlets and outlets, personnel should practice ALARA principles:
 
* Maximize distance from the air vents and minimize stay time around the concrete cask.* Do NOT remove the VCC inlets or outlets screens without qualified RP personnel present.INITIALS B.3.1 B.3.2 Within 4 hours of the event, MEASURE and RECORD the temperatures of the air outlets of each VCC, OR INSPECT and VERIFY all air inlets and outlets of each affected VCC are not blocked or obstructed, in accordance with ISFSI Temperature Monitoring Program. [CofC Appendix A, A5.3]Enter the ISFSI Protected Area in accordance with SP-8 and RP-4 and PERFORM another means of verifying the VCC heat removal system is operable in accordance with OP-1, Temperature Monitoring Program.B.3.2 GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-2 1, and a Work Order in accordance with AD-5 to initiate repair of the failed instrument.
ISFSI Emergency Operating                                                         EO-2 Rev. 3 ATTACHMENTS
B.3.3 GENERATE a Condition Report in accordance with Corrective Action Program to document the condition.
. 8.0 8.1   Attachment A - Blockage of Half of the Air Inlets on a Vertical Concrete Cask 8.2   Attachment B - Failure of Instrumentation on a Vertical concrete Cask 8.3   Attachment C - Severe Environmental Conditions 8.4   Attachment D - Small Release of Radioactive Particulate from the Canister Exterior 8.5   Attachment E - Degraded VCC Thermal Performance (AT > I10&deg;F)
Page 7 of 13 ISFSI Emergency Operating EO-2 Rev. 3 ATTACHMENT C SEVERE ENVIRONMENTAL CONDITIONS Ambient Air Temperature
Page 4 of 13
(<-401F or >100 0 F)-(Page 1 of 1)C. 1 AUTOMATIC ACTIONS None C.2 IMMEDIATE ACTIONS C.2.1 NOTIFY the ISFSI Shift Supervisor.
 
C.2.2 NOTIFY the ISFSI Manager or designee.C.3 SUBSEQUENT ACTIONS WARNING Some Off-Normal, Accident and Natural Phenomena Events may cause damage to a loaded VCC. Therefore a loss of shielding may not be visually evident.CAUTION Due to the potential radiation hazard near the surface of the concrete cask and radiation streaming from the air inlets and outlets, personnel should practice ALARA principles: " Maximize distance from the air vents and minimize stay time around the concrete cask.* Do NOT remove the VCC inlets or outlets screens without qualified RP personnel present.INITIALS C.3.1 C.3.2 Within 4 hours of the event, MEASURE and RECORD the temperatures of the air outlets of each VCC, OR INSPECT and VERIFY all air inlets and outlets of each affected VCC are not blocked or obstructed, in accordance with ISFSI Temperature Monitoring Program. [CofC Appendix A, A5.3]GENERATE a Condition Report in accordance with Corrective Action Program to document the condition.
ISFSI Emergency Operating                                                                 EO-2 Rev. 3 ATTACHMENT A BLOCKAGE OF HALF OF THE AIR INLETS ON A VERTICAL CONCRETE CASK (Page 1 of 2)
Page 8 of 13 ISFSI Emergency Operating EO-2 Rev. 3 ATTACHMENT D SMALL RELEASE OF RADIOACTIVE PARTICULATE FROM THE CANISTER EXTERIOR (Page 1 of 2)D.1 AUTOMATIC ACTIONS None D.2 IMMEDIATE ACTIONS D.2.1 NOTIFY the ISFSI Shift Supervisor.
A. 1   AUTOMATIC ACTIONS None A.2     IMMEDIATE ACTIONS A.2.1   NOTIFY the ISFSI Shift Supervisor.
D.2.2 NOTIFY the ISFSI Manager or designee.D.3 SUBSEQUENT ACTIONS WARNING Some Off-Normal, Accident and Natural Phenomena Events may cause damage to a loaded VCC. Therefore a loss of shielding may not be visually evident.CAUTION Due to the potential radiation hazard near the surface of the concrete cask and radiation streaming from the air inlets and outlets, personnel should practice ALARA principles: " Maximize distance from the air vents and minimize stay time around the concrete cask.* Do NOT remove the VCC inlets or outlets screens without qualified RP personnel present.INITIALS D.3.1 Do not allow entry to the ISFSI Protected Area until a contamination survey has been performed.
A.2.2   NOTIFY the ISFSI Manager or designee.
D.3.1.1 Entry into the ISFSI Protected Area is completed in accordance with SP-8 and RP-4.D.3.2 Qualified RP personnel shall PERFORM a detailed radiological contamination survey in accordance with Radiological Surveys to determine the extent of contamination.
A.3     SUBSEOUENT ACTIONS WARNING Some Off-Normal, Accident and Natural Phenomena Events may cause damage to a loaded VCC. Therefore a loss of shielding may not be visually evident.
D.3.3 ISOLATE the area where contamination was found to minimize the spread of contamination.
CAUTION Due to the potential radiation hazard near the surface of the concrete cask and radiation streaming from the air inlets and outlets, personnel should practice ALARA principles:
Page 9 of 13 ISFSI Emergency Operating EO-2 Rev. 3 ATTACHMENT D SMALL RELEASE OF RADIOACTIVE PARTICULATE FROM THE CANISTER EXTERIOR (Page 2 of 2).INITIALS D.3.4 REMEDIATE any contamination in the area in accordance with the Radiation Protection Manager's (or designee) instructions.
    " Maximize distance from the air vents and minimize stay time around the concrete cask.
D.3.5 GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-2 1, and a Work Order in accordance with AD-5 to effect repairs.D.3.6 GENERATE a Condition Report in accordance with Corrective Action Program to document the event.Page 10 of 13 ISFSI Emergency Operating EO-2 Rev. 3 ATTACHMENT E DEGRADED VCC THERMAL PERFORMANCE (Page 1 of 3)E. 1 AUTOMATIC ACTIONS None E.2 IMMEDIATE ACTIONS E.2.1 NOTIFY the ISFSI Shift Supervisor.
* Do NOT remove the VCC inlets or outlets screens without qualified RP personnel present.
E.2.2 NOTIFY the ISFSI Manager or designee.E.3 SUBSEOUENT ACTIONS WARNING Some Off-Normal, Accident and Natural Phenomena Events may cause damage to a loaded VCC. Therefore-a loss of shielding may not be visually evident.CAUTION Due to the potential radiation hazard near the surface of the concrete cask and radiation streaming from the air inlets and outlets, personnel should practice ALARA principles:
INITIALS A.3.1       OBTAIN permission from ISFSI Shift Supervisor to enter the ISFSI Protected Area.
* Maximize distance from the air vents and minimize stay time around the concrete cask.* Do NOT remove the VCC inlets or outlets screens without qualified RP personnel present.INITIALS E.3.1 Within 4 hours of the event, MEASURE and RECORD the temperatures of the air outlets of each VCC, OR INSPECT and VERIFY all air inlets and outlets of each affected VCC are not blocked or obstructed, in accordance with ISFSI Temperature Monitoring Program. [CofC Appendix A, A5.3]E.3.2 E.3.1.1 At least one-half of the inlets and outlets on each affected cask must be cleared of blockage and debris within 24 hours.[CofC Appendix A, A5.3]Within 8 hours restore the VCC heat removal system to operable status.[CofC Apendix A, LCO 3.1.6 A. 1].E.3.2.1 If unable to restore within the allotted time, perform step E.3.7 of this Attachment.
A.3. 1.1   Enter the ISFSI Protected Area in accordance with SP-8 and RP-4.
Page 11 of 13 ISFSI Emergency Operating EO-2 Rev. 3 ATTACHMENT E DEGRADED VCC THERMAL PERFORMANCE (Page 2 of 3)INITIALS E.3.3 INSPECT the air inlet screens.E.3.4 REMOVE any debris on the outside of the air inlet screens using a broom or other long handled tool.E.3.5 IF debris is not easily accessible and the screens need to be removed, perform the following:
A.3.2       Within 4 hours of the event, MEASURE and RECORD the temperatures of the air outlets of each VCC, OR INSPECT and VERIFY all air inlets and outlets of each affected VCC are not blocked or obstructed, in accordance with ISFSI Temperature Monitoring Program. [CofC Appendix A, A5.3]
E.3.5.1 GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-21, and Work Order in accordance with AD-5, ISFSI Work Control Program.E.3.5.2 GENERATE a new RWP in accordance with RP-5, Radiation Work Permits.E.3.6 IF damage is noted GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-2 1, and a Work Order in accordance with AD-5, ISFSI Work Control Program.E.3.7 If the VCC Heat Removal System is not restored to an operable (AT <l110'F OR unblocked, unobstructed air inlets and outlets) status within 8 hours of the event, PERFORM the following on the affected VCC immediately and every 6 hours thereafter
A.3.2.1     At least one-half of the inlets and outlets on each affected cask must be cleared of blockage and debris within 24 hours.
[CofC Apendix A, LCO 3.1.6 B.1].(Perform both E.3.7.1 and E.3.7.2)E.3.7.1 MEASURE and RECORD the ISFSI ambient air and temperatures of the air outlets of each affected VCC in accordance with ISFSI Temperature Monitoring Program and CONFIRM that the difference between the average VCC air outlet temperature and average ISFSI ambient temperature is not greater than 110 'F (AT < 110 'F)OR INSPECT and VERIFY all air inlets and outlets of each VCC are not blocked or obstructed in accordance with ISFSI Temperature Monitoring Program.Page 12 of 13 ISFSI Emergency Operating EO-2 Rev. 3 ATTACHMENT E DEGRADED VCC THERMAL PERFORMANCE (Page 3 of 3)INITIALS E.3.7.2. Within 12 hours, PERFORM the following:
Page 5 of 13
: a. PERFORM an engineering evaluation to determine that the concrete heat removal system is operable (Action B.2.1 of LCO 3.1.6 Cof C, Appendix A).OR b. PLACE the NAC-MPC SYSTEM in a Safe Condition (Action B.2.2 of LCO 3.1.6 Cof C, Appendix A).1. Perform the engineering evaluation and/or verify a safe condition by contacting NAC International.
 
E.3.8 INITIATE a Condition Report in accordance with Corrective Action Program to document the event.Page 13 of 13 ISFSI Administrative AD-4 AUG 2 0 2010 Rev. 3 ATTACHMENT B CONNECTICUT YANKEE ATOMIC POWER COMPANY ISFSI PROCEDURE Response to Accidents EO-3 Rev. 3 Preparer: 'Date: //o 10CFR50.59
ISFSI Emergency Operating                                                           EO-2 Rev. 3 ATTACHMENT A BLOCKAGE OF HALF OF THE AIR INLETS ON A VERTICAL CONCRETE CASK (Page 2 of 2)
/ 10CFR72.48 ASSESSMENT I0CFR50.59 SCREEN REQUIRED?
INITIALS A.3.3     INSPECT the air inlet screens.
.D&#xfd; YES El NO IOCFR50.59 EVALUATION REQUIRED (NO.) ] YES [] NO IOCFR72.48 SCREEN REQUIRED?
A.3.4     REMOVE any debris on the outside of the air inlet screens using a broom or other long handled tool.
Oq YES E] NO IOCFR72.48 EVALUATION REQUIRED (NO. El YES E] NO REVIEWER SECTION QUALITY ASSURANCE REVIEW: SIGNATURE PIA DATE: N/IA RADIATION PROTECTION REVIEW: SIGNADATE:
A.3.5     IF debris is not easily accessible and the screens need to be removed, perform the following:
TECHNICAL REVIEW: __________
A.3.4.1     GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-21, and Work Order in accordance with AD-5, ISFSI Work Control Program.
_DATE:/INDEPENDENT SAFnE EW: (As Applicable)
A.3.4.2     GENERATE a new RWP in accordance with RP-5, Radiation Work Permits.
SIGNATURE:_
A.3.6     IF damage is noted GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-2 1, and a Work Order in accordance with AD-5, ISFSI Work Control Program.
__I__-_ DATE: i -V AO APPROVAL SECTION ISFSI MANAGER/DESIGNEE SIGNATURE/DATE: (u'- I Page 9 of 12 ISFSI Emergency Operating EO-3 Rev. 3 Response to Accidents 1.0 PURPOSE This procedure provides the actions to be taken in response to accidents affecting the Connecticut Yankee (CY) Independent Spent Fuel Storage Installation (ISFSI).2.0 SCOPE 2.1 The ISFSI Response to Accidents applies to those supporting the operation of the CY ISFSI.2.2 Accidents addressed by this procedure include: (Reference 4.2)2.2.1 Explosion
A.3.7     GENERATE a Condition Report in accordance with Corrective Action Program to document the condition.
[NAC-MPC FSAR 11.2.3]2.2.2 Fire Accident [NAC-MPC FSAR 11.2.5]2.2.3 Full Blockage of Air Inlets and Outlets on a Vertical Concrete Cask (VCC)[NAC-MPC FSAR 11.2.8]2.2.4 Storage Cask 6-inch Drop [NAC-MPC FSAR 11.2.11]2.2.5 Tip Over of the VCC [NAC-MPC FSAR 11.2.12]3.0 DEFINITIONS 3.1 Average Ambient Temperature
Page 6 of 13
-The average ambient temperature is the average value of the temperature monitoring device(s), monitoring the ambient air temperature in the area around a fuel loaded VCC.3.2 Operable -The CONCRETE CASK heat removal system is OPERABLE if the difference between the average ISFSI ambient temperature and the average outlet air temperature is < 1107F (AT < 1100 F ) or if all four air inlet and outlet screens are visually verified to be unobstructed for the CY-MPC. Failing this the CY-MPC may be declared OPERABLE if an engineering evaluation determines the CONCRETE CASK has adequate heat transfer capabilities to assure continued spent fuel CANISTER and CONCRETE CASK integrity
 
[CofC Appendix A, Al.1 ].
ISFSI Emergency Operating                                                               EO-2 Rev. 3 ATTACHMENT B FAILURE OF INSTRUMENTATION ON A VERTICAL CONCRETE CASK (Page 1 of 1)
B.1   AUTOMATIC ACTIONS None B.2   IMMEDIATE ACTIONS B.2.1   NOTIFY the ISFSI Shift Supervisor.
B.2.2   NOTIFY the ISFSI Manager or designee.
B.3   SUBSEQUENT ACTIONS WARNING Some Off-Normal, Accident and Natural Phenomena Events may cause damage to a loaded VCC. Therefore a loss of shielding may not be visually evident.
CAUTION Due to the potential radiation hazard near the surface of the concrete cask and radiation streaming from the air inlets and outlets, personnel should practice ALARA principles:
* Maximize distance from the air vents and minimize stay time around the concrete cask.
* Do NOT remove the VCC inlets or outlets screens without qualified RP personnel present.
INITIALS B.3.1       Within 4 hours of the event, MEASURE and RECORD the temperatures of the air outlets of each VCC, OR INSPECT and VERIFY all air inlets and outlets of each affected VCC are not blocked or obstructed, in accordance with ISFSI Temperature Monitoring Program. [CofC Appendix A, A5.3]
B.3.2        Enter the ISFSI Protected Area in accordance with SP-8 and RP-4 and PERFORM another means of verifying the VCC heat removal system is operable in accordance with OP-1, Temperature Monitoring Program.
B.3.2       GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-2 1, and a Work Order in accordance with AD-5 to initiate repair of the failed instrument.
B.3.3       GENERATE a Condition Report in accordance with Corrective Action Program to document the condition.
Page 7 of 13
 
ISFSI Emergency Operating                                                               EO-2 Rev. 3 ATTACHMENT C SEVERE ENVIRONMENTAL CONDITIONS Ambient Air Temperature (<-401F or >1000 F)
                                              -(Page 1 of 1)
C. 1   AUTOMATIC ACTIONS None C.2   IMMEDIATE ACTIONS C.2.1   NOTIFY the ISFSI Shift Supervisor.
C.2.2 NOTIFY the ISFSI Manager or designee.
C.3   SUBSEQUENT ACTIONS WARNING Some Off-Normal, Accident and Natural Phenomena Events may cause damage to a loaded VCC. Therefore a loss of shielding may not be visually evident.
CAUTION Due to the potential radiation hazard near the surface of the concrete cask and radiation streaming from the air inlets and outlets, personnel should practice ALARA principles:
    " Maximize distance from the air vents and minimize stay time around the concrete cask.
* Do NOT remove the VCC inlets or outlets screens without qualified RP personnel present.
INITIALS C.3.1       Within 4 hours of the event, MEASURE and RECORD the temperatures of the air outlets of each VCC, OR INSPECT and VERIFY all air inlets and outlets of each affected VCC are not blocked or obstructed, in accordance with ISFSI Temperature Monitoring Program. [CofC Appendix A, A5.3]
C.3.2        GENERATE a Condition Report in accordance with Corrective Action Program to document the condition.
Page 8 of 13
 
ISFSI Emergency Operating                                                               EO-2 Rev. 3 ATTACHMENT D SMALL RELEASE OF RADIOACTIVE PARTICULATE FROM THE CANISTER EXTERIOR (Page 1 of 2)
D.1   AUTOMATIC ACTIONS None D.2   IMMEDIATE ACTIONS D.2.1   NOTIFY the ISFSI Shift Supervisor.
D.2.2 NOTIFY the ISFSI Manager or designee.
D.3   SUBSEQUENT ACTIONS WARNING Some Off-Normal, Accident and Natural Phenomena Events may cause damage to a loaded VCC. Therefore a loss of shielding may not be visually evident.
CAUTION Due to the potential radiation hazard near the surface of the concrete cask and radiation streaming from the air inlets and outlets, personnel should practice ALARA principles:
    " Maximize distance from the air vents and minimize stay time around the concrete cask.
* Do NOT remove the VCC inlets or outlets screens without qualified RP personnel present.
INITIALS D.3.1       Do not allow entry to the ISFSI Protected Area until a contamination survey has been performed.
D.3.1.1     Entry into the ISFSI Protected Area is completed in accordance with SP-8 and RP-4.
D.3.2       Qualified RP personnel shall PERFORM a detailed radiological contamination survey in accordance with Radiological Surveys to determine the extent of contamination.
D.3.3       ISOLATE the area where contamination was found to minimize the spread of contamination.
Page 9 of 13
 
ISFSI Emergency Operating                                                         EO-2 Rev. 3 ATTACHMENT D SMALL RELEASE OF RADIOACTIVE PARTICULATE FROM THE CANISTER EXTERIOR (Page 2 of 2).
INITIALS D.3.4     REMEDIATE any contamination in the area in accordance with the Radiation Protection Manager's (or designee) instructions.
D.3.5     GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-2 1, and a Work Order in accordance with AD-5 to effect repairs.
D.3.6     GENERATE a Condition Report in accordance with Corrective Action Program to document the event.
Page 10 of 13
 
ISFSI Emergency Operating                                                                   EO-2 Rev. 3 ATTACHMENT E DEGRADED VCC THERMAL PERFORMANCE (Page 1 of 3)
E. 1   AUTOMATIC ACTIONS None E.2   IMMEDIATE ACTIONS E.2.1   NOTIFY the ISFSI Shift Supervisor.
E.2.2   NOTIFY the ISFSI Manager or designee.
E.3   SUBSEOUENT ACTIONS WARNING Some Off-Normal, Accident and Natural Phenomena Events may cause damage to a loaded VCC. Therefore-a loss of shielding may not be visually evident.
CAUTION Due to the potential radiation hazard near the surface of the concrete cask and radiation streaming from the air inlets and outlets, personnel should practice ALARA principles:
* Maximize distance from the air vents and minimize stay time around the concrete cask.
* Do NOT remove the VCC inlets or outlets screens without qualified RP personnel present.
INITIALS E.3.1       Within 4 hours of the event, MEASURE and RECORD the temperatures of the air outlets of each VCC, OR INSPECT and VERIFY all air inlets and outlets of each affected VCC are not blocked or obstructed, in accordance with ISFSI Temperature Monitoring Program. [CofC Appendix A, A5.3]
E.3.1.1     At least one-half of the inlets and outlets on each affected cask must be cleared of blockage and debris within 24 hours.
[CofC Appendix A, A5.3]
E.3.2      Within 8 hours restore the VCC heat removal system to operable status.
[CofC Apendix A, LCO 3.1.6 A. 1].
E.3.2.1     If unable to restore within the allotted time, perform step E.3.7 of this Attachment.
Page 11 of 13
 
ISFSI Emergency Operating                                                           EO-2 Rev. 3 ATTACHMENT E DEGRADED VCC THERMAL PERFORMANCE (Page 2 of 3)
INITIALS E.3.3     INSPECT the air inlet screens.
E.3.4     REMOVE any debris on the outside of the air inlet screens using a broom or other long handled tool.
E.3.5     IF debris is not easily accessible and the screens need to be removed, perform the following:
E.3.5.1     GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-21, and Work Order in accordance with AD-5, ISFSI Work Control Program.
E.3.5.2     GENERATE a new RWP in accordance with RP-5, Radiation Work Permits.
E.3.6     IF damage is noted GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-2 1, and a Work Order in accordance with AD-5, ISFSI Work Control Program.
E.3.7     If the VCC Heat Removal System is not restored to an operable (AT <
l110'F OR unblocked, unobstructed air inlets and outlets) status within 8 hours of the event, PERFORM the following on the affected VCC immediately and every 6 hours thereafter [CofC Apendix A, LCO 3.1.6 B.1].
(Perform both E.3.7.1 and E.3.7.2)
E.3.7.1   MEASURE and RECORD the ISFSI ambient air and temperatures of the air outlets of each affected VCC in accordance with ISFSI Temperature Monitoring Program and CONFIRM that the difference between the average VCC air outlet temperature and average ISFSI ambient temperature is not greater than 110 'F (AT < 110 'F)
OR INSPECT and VERIFY all air inlets and outlets of each VCC are not blocked or obstructed in accordance with ISFSI Temperature Monitoring Program.
Page 12 of 13
 
ISFSI Emergency Operating                                                         EO-2 Rev. 3 ATTACHMENT E DEGRADED VCC THERMAL PERFORMANCE (Page 3 of 3)
INITIALS E.3.7.2. Within 12 hours, PERFORM the following:
: a. PERFORM an engineering evaluation to determine that the concrete heat removal system is operable (Action B.2.1 of LCO 3.1.6 Cof C, Appendix A).
OR
: b. PLACE the NAC-MPC SYSTEM in a Safe Condition (Action B.2.2 of LCO 3.1.6 Cof C, Appendix A).
: 1. Perform the engineering evaluation and/or verify a safe condition by contacting NAC International.
E.3.8     INITIATE a Condition Report in accordance with Corrective Action Program to document the event.
Page 13 of 13


==4.0 REFERENCES==
AD-4 ISFSI Administrative AUG 2 0 2010    Rev. 3 ATTACHMENT B CONNECTICUT YANKEE ATOMIC POWER COMPANY ISFSI PROCEDURE Response to Accidents EO-3 Rev. 3 Preparer:                *"                        'Date:                //o 10CFR50.59 / 10CFR72.48 ASSESSMENT I0CFR50.59 SCREEN REQUIRED?.                                      D&#xfd; YES          El NO IOCFR50.59 EVALUATION REQUIRED (NO.)                                ] YES          [] NO IOCFR72.48 SCREEN REQUIRED?                                        Oq YES          E] NO IOCFR72.48 EVALUATION REQUIRED (NO.                              El YES          E] NO REVIEWER SECTION QUALITY ASSURANCE REVIEW:      SIGNATURE              PIA          DATE:    N/IA RADIATION PROTECTION REVIEW: SIGNADATE:
TECHNICAL REVIEW:                      __________                    _DATE:/
INDEPENDENT SAFnE        EW: (As Applicable)
SIGNATURE:_            __I__-_                  DATE:    i  -V AO APPROVAL SECTION ISFSI MANAGER/DESIGNEE SIGNATURE/DATE:
                                            '- I (u
Page 9 of 12


4.1 NAC-MPC Final Safety Analysis Report for the NAC-Multi-Purpose Canister System, amendment for Connecticut Yankee Atomic Power Company, Docket 72-1025.Page 1 of 6 ISFSI Emergency Operating EO-3 Rev. 3 4.2 NRC Certificate of Compliance for Spent Fuel Storage Casks, Certificate Number 1025, issued to NAC for the NAC-MPC System, Amendment 5, Dated July 24, 2007.4.3 AD-4, ISFSI Procedure Control Program.4.4 AD-5, ISFSI Work Control Program.4.5 AD-7, Corrective Action Program.4.6 AD-16, ISFSI Personnel Training and Qualifications.
ISFSI Emergency Operating                                                                EO-3 Rev. 3 Response to Accidents 1.0    PURPOSE This procedure provides the actions to be taken in response to accidents affecting the Connecticut Yankee (CY) Independent Spent Fuel Storage Installation (ISFSI).
4.7 AD-2 1, Trouble Reports (TR) / Work Requests (WR).4.8 EO-5, Emergency Plan Implementation.
2.0    SCOPE 2.1   The ISFSI Response to Accidents applies to those supporting the operation of the CY ISFSI.
4.9 OP-1, ISFSI Temperature Monitoring Program.4.10 OP-2, ISFSI Routine Surveillances.
2.2   Accidents addressed by this procedure include: (Reference 4.2) 2.2.1  Explosion [NAC-MPC FSAR 11.2.3]
4.11 OP-7, ISFSI VCC and ISFSI Pad Inspection Program.4.12 SP-8, Personnel Access Control.4.13 SP-18, Contingencies.
2.2.2  Fire Accident [NAC-MPC FSAR 11.2.5]
4.13 RP-4, Personnel Radiation Monitoring.
2.2.3  Full Blockage of Air Inlets and Outlets on a Vertical Concrete Cask (VCC)
4.14 RP-5, Radiation Work Permits.5.0 RESPONSIBILITIES 5.1 ISFSI Manager is responsible for ensuring the requirements of this procedure are implemented.
[NAC-MPC FSAR 11.2.8]
5.2 ISFSI Shift Supervisor shall be responsible for the operational command functions.
2.2.4   Storage Cask 6-inch Drop [NAC-MPC FSAR 11.2.11]
5.3 ISFSI personnel are responsible for performing the actions described in this procedure.
2.2.5  Tip Over of the VCC [NAC-MPC FSAR 11.2.12]
5.4 Radiation Protection Manager (or designee) is responsible for maintaining the Radiation Protection Procedures and providing guidance during emergency events.Page 2 of 6 ISFSI Emergency Operating EO-3 Rev. 3 6.0 PROCEDURE 6.1 Notes 6.1.1 Partial procedure performance
3.0    DEFINITIONS 3.1    Average Ambient Temperature - The average ambient temperature is the average value of the temperature monitoring device(s), monitoring the ambient air temperature in the area around a fuel loaded VCC.
-As identified in the ISFSI Procedure Control Program, specific sections, portions of a section, series-of-steps, partial valve lineups or equipment checklist performance is allowed provided the ISFSI Shift Supervisor has reviewed and approved the omissions.
3.2    Operable - The CONCRETE CASK heat removal system is OPERABLE if the difference between the average ISFSI ambient temperature and the average outlet air temperature is < 1107F (AT < 1100 F ) or if all four air inlet and outlet screens are visually verified to be unobstructed for the CY-MPC. Failing this the CY-MPC may be declared OPERABLE if an engineering evaluation determines the CONCRETE CASK has adequate heat transfer capabilities to assure continued spent fuel CANISTER and CONCRETE CASK integrity [CofC Appendix A, Al.1 ].
Such partial performance will be documented using the N/A process. Other sections (e.g., precautions, prerequisites) must be reviewed for applicability to the evolution being performed.
 
6.1.2 Steps may be marked as "N/A" if the step provides an option for not completing the step.6.1.3 Only personnel meeting the requirements of ISFSI Personnel Training and Qualification shall perform inspections and data collection.
==4.0    REFERENCES==
6.2 NOTIFY the ISFSI Shift Supervisor in the event of the following:
 
6.2.1 Explosion
4.1    NAC-MPC Final Safety Analysis Report for the NAC-Multi-Purpose Canister System, amendment for Connecticut Yankee Atomic Power Company, Docket 72-1025.
[NAC-MPC FSAR 11.2.3]6.2.2 Fire Accident [NAC-MPC FSAR 11.2.5]6.2.3 Full Blockage of Air Inlets and Outlets on a Vertical Concrete Cask [NAC-MPC FSAR 11.2.8]6.2.4 Storage Cask Drop [NAC-MPC FSAR 11.2.11]6.2.5 Tip Over of the Loaded VCC [NAC-MPC FSAR 11.2.12]WARNING Some Off-Normal, Accident and Natural Phenomena Events may cause damage to a loaded VCC. Therefore a loss of shielding may not be visually evident.6.3 Enter the ISFSI Protected Area in accordance with SP-8 and RP-4.6.4 CONDUCT a radiation dose rate survey and restrict access accordingly.
Page 1 of 6
6.5 ESTABLISH a controlled area around the VCC.Page 3 of 6 ISFSI Emergency Operating EO-3 Rev. 3 6.6 Perform the following subsequent actions: CAUTION Due to the potential radiation hazard near the surface of the VCC and radiation streaming from the air inlets and outlets and the exposed bottom of the VCC, personnel should practice ALARA principles:
 
* Maximize distance from the air vents and minimize time around the concrete cask.* Do NOT remove the air vent screens without qualified HP personnel present.INITIALS 6.6.1 Within 4 hours of the event, INSPECT and VERIFY all air inlets and outlets of each affected VCC are not blocked or obstructed in accordance with ISFSI Temperature Monitoring Program. [CofC Appendix A, A5.3]a. At least one-half of the inlets and outlets on each affected cask must be cleared of blockage and debris within 24 hours. [CofC Appendix A, A5.3]6.6.2 PERFORM initial characterization of the extent of damage to the VCCs by visual inspection, which may be accomplished by the use of remote tools (e.g., cameras, binoculars, etc.).6.6.3 DOCUMENT the observed VCC conditions in accordance with the requirements of procedure OP-7.6.6.4 IF damage is noted perform the following:
ISFSI Emergency Operating                                                          EO-3 Rev. 3 4.2   NRC Certificate of Compliance for Spent Fuel Storage Casks, Certificate Number 1025, issued to NAC for the NAC-MPC System, Amendment 5, Dated July 24, 2007.
: a. PERFORM actions in accordance with SP-l18, Attachment M.b. GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-2 1.c. GENERATE a Work Order in accordance with AD-5, ISFSI Work Control Program.6.6.5 REMOVE any debris on the outside of the air inlet screens using a broom or other long handled tool.6.6.6 IF debris is not easily accessible and the screens need to be removed, perform the following:
4.3  AD-4, ISFSI Procedure Control Program.
: a. Notify Radiation Protection Services.Page 4 of 6 ISFSI Emergency Operating EO-3 Rev. 3.INITIALS b. GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-21, and Work Order in accordance with AD-5, ISFSI Work Control Program.c. GENERATE a new RWP in accordance with RP-5, Radiation Work Permits.6.6.7 IF any VCC is inoperable (AT > 110 'F), restore the affected VCCs heat removal system to operable status within 8 hours. [CofC Apendix A, LCO 3.1.6 A.1].6.6.8 If the VCC Heat Removal System is not restored to an operable (AT < 1 10F OR unblocked, unobstructed air inlets and outlets) status within 8 hours of the event, PERFORM the following on the affected VCC immediately and every 6 hours thereafter
4.4  AD-5, ISFSI Work Control Program.
[CofC Apendix A, LCO 3.1.6 B.1].(Perform both A and B)a. MEASURE and RECORD the ISFSI ambient air and temperatures of the air outlets of each affected VCC in accordance with ISFSI Temperature Monitoring Program and CONFIRM that the difference between the average VCC air outlet temperature and average ISFSI ambient temperature is not greater than 110 'F (AT _< 110 'F)OR INSPECT and VERIFY all air inlets and outlets of each VCC are not blocked or obstructed in accordance with ISFSI Temperature Monitoring Program.b. Within 12 hours, PERFORM the following:
4.5  AD-7, Corrective Action Program.
: 1. PERFORM an engineering evaluation to determine that the concrete heat removal system is operable (Action B.2.1 of LCO 3.1.6 Cof C, Appendix A).OR 2. PLACE the NAC-MPC SYSTEM in a Safe Condition (Action B.2.2 of LCO 3.1.6 Cof C, Appendix A).3. Perform the engineering evaluation and/or verify a safe condition by bcontacting NAC International.
4.6  AD-16, ISFSI Personnel Training and Qualifications.
Page 5 of 6 ISFSI Emergency Operating EO-3 Rev. 3.INITIALS 6.6.9 REFER to EO-5, Emergency Plan Implementation, for further guidance.
4.7  AD-2 1, Trouble Reports (TR) / Work Requests (WR).
4.8  EO-5, Emergency Plan Implementation.
4.9  OP-1, ISFSI Temperature Monitoring Program.
4.10  OP-2, ISFSI Routine Surveillances.
4.11  OP-7, ISFSI VCC and ISFSI Pad Inspection Program.
4.12  SP-8, Personnel Access Control.
4.13  SP-18, Contingencies.
4.13  RP-4, Personnel Radiation Monitoring.
4.14  RP-5, Radiation Work Permits.
5.0    RESPONSIBILITIES 5.1  ISFSI Manager is responsible for ensuring the requirements of this procedure are implemented.
5.2   ISFSI Shift Supervisor shall be responsible for the operational command functions.
5.3   ISFSI personnel are responsible for performing the actions described in this procedure.
5.4  Radiation Protection Manager (or designee) is responsible for maintaining the Radiation Protection Procedures and providing guidance during emergency events.
Page 2 of 6
 
ISFSI Emergency Operating                                                                EO-3 Rev. 3 6.0    PROCEDURE 6.1    Notes 6.1.1  Partial procedure performance - As identified in the ISFSI Procedure Control Program, specific sections, portions of a section, series-of-steps, partial valve lineups or equipment checklist performance is allowed provided the ISFSI Shift Supervisor has reviewed and approved the omissions. Such partial performance will be documented using the N/A process. Other sections (e.g.,
precautions, prerequisites) must be reviewed for applicability to the evolution being performed.
6.1.2  Steps may be marked as "N/A" if the step provides an option for not completing the step.
6.1.3   Only personnel meeting the requirements of ISFSI Personnel Training and Qualification shall perform inspections and data collection.
6.2    NOTIFY the ISFSI Shift Supervisor in the event of the following:
6.2.1  Explosion [NAC-MPC FSAR 11.2.3]
6.2.2  Fire Accident [NAC-MPC FSAR 11.2.5]
6.2.3  Full Blockage of Air Inlets and Outlets on a Vertical Concrete Cask [NAC-MPC FSAR 11.2.8]
6.2.4  Storage Cask Drop [NAC-MPC FSAR 11.2.11]
6.2.5  Tip Over of the Loaded VCC [NAC-MPC FSAR 11.2.12]
WARNING Some Off-Normal, Accident and Natural Phenomena Events may cause damage to a loaded VCC. Therefore a loss of shielding may not be visually evident.
6.3    Enter the ISFSI Protected Area in accordance with SP-8 and RP-4.
6.4   CONDUCT a radiation dose rate survey and restrict access accordingly.
6.5    ESTABLISH a controlled area around the VCC.
Page 3 of 6
 
ISFSI Emergency Operating                                                                  EO-3 Rev. 3 6.6      Perform the following subsequent actions:
CAUTION Due to the potential radiation hazard near the surface of the VCC and radiation streaming from the air inlets and outlets and the exposed bottom of the VCC, personnel should practice ALARA principles:
* Maximize distance from the air vents and minimize time around the concrete cask.
* Do NOT remove the air vent screens without qualified HP personnel present.
INITIALS 6.6.1  Within 4 hours of the event, INSPECT and VERIFY all air inlets and outlets of each affected VCC are not blocked or obstructed in accordance with ISFSI Temperature Monitoring Program. [CofC Appendix A, A5.3]
: a.       At least one-half of the inlets and outlets on each affected cask must be cleared of blockage and debris within 24 hours. [CofC Appendix A, A5.3]
6.6.2  PERFORM initial characterization of the extent of damage to the VCCs by visual inspection, which may be accomplished by the use of remote tools (e.g., cameras, binoculars, etc.).
6.6.3  DOCUMENT the observed VCC conditions in accordance with the requirements of procedure OP-7.
6.6.4  IF damage is noted perform the following:
: a.       PERFORM actions in accordance with SP-l18, Attachment M.
: b.      GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-2 1.
: c.      GENERATE a Work Order in accordance with AD-5, ISFSI Work Control Program.
6.6.5  REMOVE any debris on the outside of the air inlet screens using a broom or other long handled tool.
6.6.6 IF debris is not easily accessible and the screens need to be removed, perform the following:
: a.      Notify Radiation Protection Services.
Page 4 of 6
 
ISFSI Emergency Operating                                                          EO-3 Rev. 3
. INITIALS
: b.        GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-21, and Work Order in accordance with AD-5, ISFSI Work Control Program.
: c.        GENERATE a new RWP in accordance with RP-5, Radiation Work Permits.
6.6.7 IF any VCC is inoperable (AT > 110 'F), restore the affected VCCs heat removal system to operable status within 8 hours. [CofC Apendix A, LCO 3.1.6 A.1].
6.6.8 If the VCC Heat Removal System is not restored to an operable (AT < 1 10F OR unblocked, unobstructed air inlets and outlets) status within 8 hours of the event, PERFORM the following on the affected VCC immediately and every 6 hours thereafter [CofC Apendix A, LCO 3.1.6 B.1].
(Perform both A and B)
: a. MEASURE and RECORD the ISFSI ambient air and temperatures of the air outlets of each affected VCC in accordance with ISFSI Temperature Monitoring Program and CONFIRM that the difference between the average VCC air outlet temperature and average ISFSI ambient temperature is not greater than 110 'F (AT _<110 'F)
OR INSPECT and VERIFY all air inlets and outlets of each VCC are not blocked or obstructed in accordance with ISFSI Temperature Monitoring Program.
: b. Within 12 hours, PERFORM the following:
: 1. PERFORM an engineering evaluation to determine that the concrete heat removal system is operable (Action B.2.1 of LCO 3.1.6 Cof C, Appendix A).
OR
: 2. PLACE the NAC-MPC SYSTEM in a Safe Condition (Action B.2.2 of LCO 3.1.6 Cof C, Appendix A).
: 3. Perform the engineering evaluation and/or verify a safe condition by bcontacting                                NAC International.
Page 5 of 6
 
ISFSI Emergency Operating                                                          EO-3 Rev. 3
. INITIALS 6.6.9  REFER to EO-5, Emergency Plan Implementation, for further guidance. N/A if there is no damage or the damage does not affect shielding capabilities.
6.6.10 REFER to EO-6, Non-Emergency Event Assessment, for further guidance.
N/A if there is no damage or the damage does not affect shielding capabilities.
N/A if there is no damage or the damage does not affect shielding capabilities.
6.6.10 REFER to EO-6, Non-Emergency Event Assessment, for further guidance.N/A if there is no damage or the damage does not affect shielding capabilities.
6.6.11 INITIATE ISFSI Pad survey to VERIFY dose rates.
6.6.11 INITIATE ISFSI Pad survey to VERIFY dose rates.6.6.12 INITIATE a Condition Report in accordance with Corrective Action Program.7.0  
6.6.12 INITIATE a Condition Report in accordance with Corrective Action Program.
7.0  


==SUMMARY==
==SUMMARY==
OF CHANGES 7.1 Added requirements from new Amendments of the FSAR (Ref. 4.1) and CoC (Ref.4.2)7.2 Added reference documents.
OF CHANGES 7.1   Added requirements from new Amendments of the FSAR (Ref. 4.1) and CoC (Ref.
7.3 Added references to entry requirements into the ISFSI Protected Area.7.4 Modified actions throughout to better define response and meet requirements.
4.2) 7.2   Added reference documents.
S 8.0 ATTACHMENTS 8.1 None Page 6 of 6 ISFSI Administrative AUG 2 0 2010 Rev. 3 ATTACHMENT B CONNECTICUT YANKEE ATOMIC POWER COMPANY ISFSI PROCEDURE Response to Natural Phenomena EO-4 Rev. 3 Preparer:
7.3   Added references to entry requirements into the ISFSI Protected Area.
Date: 3/5/v 10CFR50.59
7.4   Modified actions throughout to better define response and meet requirements.
/ 10CFR72.48 ASSESSMENT IOCFR50.59 SCREEN REQUIRED?
S 8.0   ATTACHMENTS 8.1   None Page 6 of 6
R YES E] NO 1OCFR50.59 EVALUATION REQUIRED (NO.__ [] YES []NO IOCFR72.48 SCREEN REQUIRED?
El YES E] NO IOCFR72.48 EVALUATION REQUIRED (NO.__ [j YES El NO REVIEWER SECTION QUALITY ASSURANCE REVIEW: SIGNATURE A/ A DATE: t// A RADIATION PROTECTION REVIEW: SIGNAf DAE TECHNICALVW:
SR REVIW:: INDEPENDENT S TY RE;EW: ( Applicable)
SI_______GNATURE:
DATE: A/APPROVAL SECTION ISFSL MANAGER/DESIGNEE SIGNATURE/DATE:
Page 9 of 12 ISFSI Emergency Operating EO-4 Rev. 3 Responses to Natural Phenomena 1.0 PURPOSE This procedure provides the actions to be taken in response to natural phenomena events affecting the Connecticut Yankee (CY) Independent Spent Fuel Storage Installation (ISFSI).2.0 SCOPE 2.1 The Response to Natural Phenomena applies to personnel supporting the operation of the CY ISFSI.2.2 Accidents addressed by this procedure include: 2.2.1 Earthquake Event [NAC-MPC FSAR 11.2.2]2.2.2 Flood [NAC-MPC FSAR 11.2.6]2.2.3 Tornado and Tornado Driven Missiles [NAC-MPC FSAR 11.2.13]2.2.4 Maximum Anticipated Heat Load (Ambient Temperature
>125&deg;F[NAC-MPC-FSAR 11.2.10]3.0 DEFINITIONS 3.1 Operable -The CONCRETE CASK heat removal system is OPERABLE if the difference between the average ISFSI ambient temperature and the average outlet air temperature is < 11 0&deg;F (AT < 1100 F ) or if all four air inlet and outlet screens are visually verified to be unobstructed for the CY-MPC. Failing this the CY-MPC may be declared OPERABLE if an engineering evaluation determines the CONCRETE CASK has adequate heat transfer capabilities to assure continued spent fuel CANISTER and CONCRETE CASK integrity
[CofC Appendix A, A1.1]3.2 Average Ambient Temperature
-The average ambient temperature is the calculated average of the temperature monitoring device(s) monitoring the ambient air temperature in the area around a fuel loaded VCC.


==4.0 REFERENCES==
ISFSI Administrative AUG 2 0 2010      Rev. 3 ATTACHMENT B CONNECTICUT YANKEE ATOMIC POWER COMPANY ISFSI PROCEDURE Response to Natural Phenomena EO-4 Rev. 3 Preparer:                                                        Date:      3/5/v 10CFR50.59 / 10CFR72.48 ASSESSMENT IOCFR50.59 SCREEN REQUIRED?                                          R  YES            E] NO 10CFR50.59 EVALUATION REQUIRED (NO.__                                [] YES            []NO IOCFR72.48 SCREEN REQUIRED?                                          El YES            E] NO IOCFR72.48 EVALUATION REQUIRED (NO.__                                [j YES            El NO REVIEWER SECTION QUALITY ASSURANCE REVIEW:          SIGNATURE            A/ A            DATE:    t// A RADIATION PROTECTION REVIEW: SIGNAf                                      DAE TECHNICALVW:      REVIW::          SR INDEPENDENT S          TY RE;EW: ( Applicable)
SI_______GNATURE:                                  DATE:          A/
APPROVAL SECTION ISFSL MANAGER/DESIGNEE SIGNATURE/DATE:
Page 9 of 12


4.1 NAC-MPC Final Safety Analysis Report for the NAC-Multi-Purpose Canister System, amendment for Connecticut Yankee Atomic Power Company, Docket 72-1025 Page 1 of 6 ISFSI Emergency Operating EO-4 Rev. 3 4.2 NRC Certificate of Compliance for Spent Fuel Storage Casks, Certificate Number 1025, issued to NAC for the NAC-MPC System, Amendment 5, Dated July 24, 2007.4.3 AD-4, ISFSI Procedure Control Program.4.4 AD-5, ISFSI Work Control Program.4.5 AD-7, Corrective Action Program.4.6 AD- 16, ISFSI Personnel Training and Qualifications.
ISFSI Emergency Operating                                                                  EO-4 Rev. 3 Responses to Natural Phenomena 1.0    PURPOSE This procedure provides the actions to be taken in response to natural phenomena events affecting the Connecticut Yankee (CY) Independent Spent Fuel Storage Installation (ISFSI).
4.7 AD-21, Trouble Reports (TR) / Work Requests (WR).4.8 EO-5, Emergency Plan Implementation.
2.0    SCOPE 2.1     The Response to Natural Phenomena applies to personnel supporting the operation of the CY ISFSI.
4.9 OP-1, ISFSI Temperature Monitoring Program.4.10 OP-2, ISFSI Routine Surveillances.
2.2    Accidents addressed by this procedure include:
4.11 OP-7, ISFSI VCC arfd ISFSI Pad Inspection Program.4.12 SP-8, Personnel Access Control.4.13 SP-18, Contingencies.
2.2.1      Earthquake Event [NAC-MPC FSAR 11.2.2]
4.13 RP-4, Personnel Radiation Monitoring.
2.2.2      Flood [NAC-MPC FSAR 11.2.6]
4.14 RP-5, Radiation Work Permits.5.0 RESPONSIBILITIES 5.1 ISFSI Manager is responsible for ensuring the requirements of this procedure are implemented.
2.2.3      Tornado and Tornado Driven Missiles [NAC-MPC FSAR 11.2.13]
5.2 ISFSI Shift Supervisor shall be responsible for the operational command functions.
2.2.4       Maximum Anticipated Heat Load (Ambient Temperature >125&deg;F
5.3 ISFSI personnel are responsible for performing the actions described in this procedure.
[NAC-MPC-FSAR 11.2.10]
5.4 Radiation Protection Manager (or designee) is responsible for maintaining the Radiation Protection Procedures and providing guidance during emergency events.Page 2 of 6
3.0    DEFINITIONS 3.1     Operable - The CONCRETE CASK heat removal system is OPERABLE if the difference between the average ISFSI ambient temperature and the average outlet air temperature is < 11 0&deg;F (AT < 1100 F ) or if all four air inlet and outlet screens are visually verified to be unobstructed for the CY-MPC. Failing this the CY-MPC may be declared OPERABLE if an engineering evaluation determines the CONCRETE CASK has adequate heat transfer capabilities to assure continued spent fuel CANISTER and CONCRETE CASK integrity [CofC Appendix A, A1.1]
&#xfd; i. &#xfd;ISFSI Emergency Operating EO-4 Rev. 3 6.0 PROCEDURE 6.1 Notes 6.1.1 Partial procedure performance
3.2    Average Ambient Temperature - The average ambient temperature is the calculated average of the temperature monitoring device(s) monitoring the ambient air temperature in the area around a fuel loaded VCC.
-As identified in the ISFSI Procedure Control Program, specific sections, portions of a section, series-of-steps, partial valve lineups or equipment checklist performance is allowed provided the ISFSI Shift Supervisor has reviewed and approved the omissions.
 
Such partial performance will be documented using the N/A process. Other sections (e.g., precautions, prerequisites) must be reviewed for applicability to the evolution being performed.
==4.0    REFERENCES==
6.1.2 Steps may be marked as "N/A" if the step provides an option for not completing the step.6.1.3 Only personnel meeting the requirements of ISFSI Personnel Training and Qualification shall perform inspections and data collection.
 
6.2 NOTIFY the ISFSI Shift Supervisor and then the ISFSI Manager in the event of the following:
4.1    NAC-MPC Final Safety Analysis Report for the NAC-Multi-Purpose Canister System, amendment for Connecticut Yankee Atomic Power Company, Docket 72-1025 Page 1 of 6
6.2.1 Earthquake
 
[NAC-MPC FSAR 11.2.2]6.2.2 Flood [NAC-MPC FSAR 11.2.6]6.2.3 Tornado and Tornado Driven Missiles [NAC-MPC FSAR 11.2.13]6.2.4 Ambient Temperature
ISFSI Emergency Operating                                                          EO-4 Rev. 3 4.2   NRC Certificate of Compliance for Spent Fuel Storage Casks, Certificate Number 1025, issued to NAC for the NAC-MPC System, Amendment 5, Dated July 24, 2007.
>125&deg;F [NAC-MPC FSAR 11.2.10]WARNING Some Off-Normal, Accident and Natural Phenomena Events may cause damage to a loaded VCC. Therefore a loss of shielding may not be visually evident.6.3 Enter the ISFSI Protected Area in accordance with SP-8 and RP-4.6.4 CONDUCT a radiation dose rate survey and control access appropriately.
4.3  AD-4, ISFSI Procedure Control Program.
6.5 ESTABLISH a security controlled area around the ISFSI.Page 3 of 6 ISFSI Emergency Operating EO-4 Rev. 3 6.6 Perform the following subsequent actions: CAUTION The surface of the VCC and the air inlets and outlets are potential radiation hazards.Personnel should practice the following ALARA principles:
4.4  AD-5, ISFSI Work Control Program.
* Maximize distance from the air vents and minimize time around the concrete cask.* Do NOT remove the air vent screens without qualified HP personnel present.INITIALS 6.6.1 Within 4 hours of the event, INSPECT and VERIFY all air inlets and outlets of each affected VCC are not blocked or obstructed in accordance with ISFSI Temperature Monitoring Program. [CofC Appendix A, A5.3]a. At least one-half of the inlets and outlets on each affected cask must be cleared of blockage and debris within 24 hours. [CofC Appendix A, A5.3]6.6.2 PERFORM initial characterization of the extent of damage.to the VCCs by visual inspection, which may be accomplished by the use of remote tools (e.g., cameras, binoculars, etc.).6.6.3 DOCUMENT the observed VCC conditions in accordance with the requirements of procedure OP-7.6.6.4 IF damage is noted perform the following:
4.5  AD-7, Corrective Action Program.
: a. PERFORM actions in accordance with SP-l18, Attachment M.b. GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-2 1.c. GENERATE a Work Order in accordance with AD-5, ISFSI Work Control Program.6.6.5 REMOVE any debris on the outside of the air inlet screens using a broom or other long handled tool.6.6.6 IF debris is not easily accessible and the screens need to be removed, perform the following:
4.6   AD- 16, ISFSI Personnel Training and Qualifications.
: a. Notify Radiation Protection Services Page 4 of 6 ISFSI Emergency Operating EO-4 Rev. 3.INITIALS b. GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-2 1, and Work Order in accordance with AD-5, ISFSI Work Control Program.c. GENERATE a new RWP in accordance with RP-5, Radiation Work Permits.6.6.7 IF any VCC is inoperable (AT > 110 'F), restore the affected VCCs heat removal system to operable status within 8 hours. [CofC Apendix A, LCO 3.1.6 A.1].6.6.8 If the VCC Heat Removal System is not restored to an operable (AT <11 0IF OR unblocked, unobstructed air inlets and outlets) status within 8-hours of the event, PERFORM the following on the affected VCC immediately and every 6 hours thereafter
4.7  AD-21, Trouble Reports (TR) / Work Requests (WR).
[CofC Apendix A, LCO 3.1.6 B.1].(Perform both A and B)a. MEASURE and RECORD the ISFSI ambient air and temperatures of the air outlets of each affected VCC in accordance with ISFSI Temperature Monitoring Program and CONFIRM that the difference between the average VCC air outlet temperature and average ISFSI ambient temperature is not greater than 110 'F (AT < 110 'F)OR INSPECT and VERIFY all air inlets and outlets of each VCC are not blocked or obstructed in accordance with ISFSI Temperature Monitoring Program.b. Within 12 hours, PERFORM the following:
4.8  EO-5, Emergency Plan Implementation.
: 1. PERFORM an engineering evaluation to determine that the concrete heat removal system is operable (Action B.2.1 of LCO 3.1.6 Cof C, Appendix A).OR 2. PLACE the NAC-MPC SYSTEM in a Safe Condition (Action B.2.2 of LCO 3.1.6 Cof C, Appendix A).3. Perform the engineering evaluation and/or verify a safe condition by contacting NAC International.
4.9  OP-1, ISFSI Temperature Monitoring Program.
Page 5 of 6 ISFSI Emergency Operating EO-4 Rev. 3 O INITIALS 6.6.9 REFER to EO-5, Emergency Plan Implementation, for further guidance.N/A if there is no damage or the damage does not affect shielding capabilities.
4.10  OP-2, ISFSI Routine Surveillances.
6.6.10 REFER to EO-6, Non-Emergency Event Assessment, for further guidance.
4.11  OP-7, ISFSI VCC arfd ISFSI Pad Inspection Program.
4.12  SP-8, Personnel Access Control.
4.13  SP-18, Contingencies.
4.13  RP-4, Personnel Radiation Monitoring.
4.14  RP-5, Radiation Work Permits.
5.0    RESPONSIBILITIES 5.1  ISFSI Manager is responsible for ensuring the requirements of this procedure are implemented.
5.2   ISFSI Shift Supervisor shall be responsible for the operational command functions.
5.3  ISFSI personnel are responsible for performing the actions described in this procedure.
5.4  Radiation Protection Manager (or designee) is responsible for maintaining the Radiation Protection Procedures and providing guidance during emergency events.
Page 2 of 6
 
                                      &#xfd;i. &#xfd; ISFSI Emergency Operating                                                              EO-4 Rev. 3 6.0    PROCEDURE 6.1  Notes 6.1.1  Partial procedure performance - As identified in the ISFSI Procedure Control Program, specific sections, portions of a section, series-of-steps, partial valve lineups or equipment checklist performance is allowed provided the ISFSI Shift Supervisor has reviewed and approved the omissions. Such partial performance will be documented using the N/A process. Other sections (e.g., precautions, prerequisites) must be reviewed for applicability to the evolution being performed.
6.1.2  Steps may be marked as "N/A" if the step provides an option for not completing the step.
6.1.3   Only personnel meeting the requirements of ISFSI Personnel Training and Qualification shall perform inspections and data collection.
6.2  NOTIFY the ISFSI Shift Supervisor and then the ISFSI Manager in the event of the following:
6.2.1   Earthquake [NAC-MPC FSAR 11.2.2]
6.2.2  Flood [NAC-MPC FSAR 11.2.6]
6.2.3  Tornado and Tornado Driven Missiles [NAC-MPC FSAR 11.2.13]
6.2.4  Ambient Temperature >125&deg;F [NAC-MPC FSAR 11.2.10]
WARNING Some Off-Normal, Accident and Natural Phenomena Events may cause damage to a loaded VCC. Therefore a loss of shielding may not be visually evident.
6.3   Enter the ISFSI Protected Area in accordance with SP-8 and RP-4.
6.4   CONDUCT a radiation dose rate survey and control access appropriately.
6.5  ESTABLISH a security controlled area around the ISFSI.
Page 3 of 6
 
ISFSI Emergency Operating                                                                EO-4 Rev. 3 6.6    Perform the following subsequent actions:
CAUTION The surface of the VCC and the air inlets and outlets are potential radiation hazards.
Personnel should practice the following ALARA principles:
* Maximize distance from the air vents and minimize time around the concrete cask.
* Do NOT remove the air vent screens without qualified HP personnel present.
INITIALS 6.6.1  Within 4 hours of the event, INSPECT and VERIFY all air inlets and outlets of each affected VCC are not blocked or obstructed in accordance with ISFSI Temperature Monitoring Program. [CofC Appendix A, A5.3]
: a.     At least one-half of the inlets and outlets on each affected cask must be cleared of blockage and debris within 24 hours. [CofC Appendix A, A5.3]
6.6.2  PERFORM initial characterization of the extent of damage.to the VCCs by visual inspection, which may be accomplished by the use of remote tools (e.g., cameras, binoculars, etc.).
6.6.3  DOCUMENT the observed VCC conditions in accordance with the requirements of procedure OP-7.
6.6.4  IF damage is noted perform the following:
: a.      PERFORM actions in accordance with SP-l18, Attachment M.
: b.       GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-2 1.
: c.       GENERATE a Work Order in accordance with AD-5, ISFSI Work Control Program.
6.6.5  REMOVE any debris on the outside of the air inlet screens using a broom or other long handled tool.
6.6.6  IF debris is not easily accessible and the screens need to be removed, perform the following:
: a.     Notify Radiation Protection Services Page 4 of 6
 
ISFSI Emergency Operating                                                            EO-4 Rev. 3
. INITIALS
: b.       GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-2 1, and Work Order in accordance with AD-5, ISFSI Work Control Program.
: c.      GENERATE a new RWP in accordance with RP-5, Radiation Work Permits.
6.6.7  IF any VCC is inoperable (AT > 110 'F), restore the affected VCCs heat removal system to operable status within 8 hours. [CofC Apendix A, LCO 3.1.6 A.1].
6.6.8  If the VCC Heat Removal System is not restored to an operable (AT <
11 0IF OR unblocked, unobstructed air inlets and outlets) status within 8
                    -hours of the event, PERFORM the following on the affected VCC immediately and every 6 hours thereafter [CofC Apendix A, LCO 3.1.6 B.1].
(Perform both A and B)
: a. MEASURE and RECORD the ISFSI ambient air and temperatures of the air outlets of each affected VCC in accordance with ISFSI Temperature Monitoring Program and CONFIRM that the difference between the average VCC air outlet temperature and average ISFSI ambient temperature is not greater than 110 'F (AT < 110 'F)
OR INSPECT and VERIFY all air inlets and outlets of each VCC are not blocked or obstructed in accordance with ISFSI Temperature Monitoring Program.
: b. Within 12 hours, PERFORM the following:
: 1. PERFORM an engineering evaluation to determine that the concrete heat removal system is operable (Action B.2.1 of LCO 3.1.6 Cof C, Appendix A).
OR
: 2. PLACE the NAC-MPC SYSTEM in a Safe Condition (Action B.2.2 of LCO 3.1.6 Cof C, Appendix A).
: 3. Perform the engineering evaluation and/or verify a safe condition by contacting NAC International.
Page 5 of 6
 
ISFSI Emergency Operating                                                            EO-4 Rev. 3 O INITIALS 6.6.9  REFER to EO-5, Emergency Plan Implementation, for further guidance.
N/A if there is no damage or the damage does not affect shielding capabilities.
N/A if there is no damage or the damage does not affect shielding capabilities.
6.6.11 INITIATE ISFSI Pad survey to VERIFY dose rates.6.6.12 INITIATE an ISFSI pad inspection to verify casks have not been repositioned.
6.6.10 REFER to EO-6, Non-Emergency Event Assessment, for further guidance. N/A if there is no damage or the damage does not affect shielding capabilities.
6.6.13 INITIATE a Condition Report in accordance with Corrective Action Program.7.0  
6.6.11 INITIATE ISFSI Pad survey to VERIFY dose rates.
6.6.12 INITIATE an ISFSI pad inspection to verify casks have not been repositioned.
6.6.13 INITIATE a Condition Report in accordance with Corrective Action Program.
7.0  


==SUMMARY==
==SUMMARY==
OF CHANGES 7.1 Added requirements from new Amendments of the FSAR (Ref. 4.1) and CoC (Ref. 4.2)7.2 Added reference documents.
OF CHANGES 7.1   Added requirements from new Amendments of the FSAR (Ref. 4.1) and CoC (Ref. 4.2) 7.2   Added reference documents.
7.3 Added references to entry requirements into the ISFSI Protected Area.7.4 Modified actions throughout to better define response and meet requirements.
7.3   Added references to entry requirements into the ISFSI Protected Area.
8.0 ATTACHMENTS 8.1 None Page 6 of 6}}
7.4   Modified actions throughout to better define response and meet requirements.
8.0   ATTACHMENTS 8.1   None Page 6 of 6}}

Revision as of 14:04, 13 November 2019

Connecticut Yankee Atomic Power Company, Notice of Receipt of ISFSI Emergency Operating Procedures
ML102380031
Person / Time
Site: Haddam Neck  File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 08/19/2010
From:
Connecticut Yankee Atomic Power Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
EO-2, Rev 3, EO-3, Rev 3, EO-4, Rev 3
Download: ML102380031 (30)


Text

A Connecticut Yankee Atomic Power Company Date of Distribution: 8-19-10 Notice of Receipt of ISFSI Emergency Operating Procedures Change No 10-01 To: Document Control Desk (code Z)

US NRC Copy No.: Washington, DC 20555 Copy #1-40 Please revis e your controlled copy per instructions below:

INSERT: Index page 1 of 1, dated 8/20/10 EO-2, Rev. 3 effective 8/20/10 EO-3, Rev.. 3 effective 8/20/10 EO-4, Rev. 3 effective 8/20/10 ATTACH:

REMOVE:

REPLACE This acknowledges receipt of the revisions listed above. In addition, all superseded pages have been removed and destroyed.

Signature: Date:

Please Return This Sheet to the Administrative Office, Connecticut Yankee Within Thirty (30) Days.

ISFSI Master Document Index (MDI)

Emergency Operating Procedures (EO series) 08-20-10 No. Rev. : Title :50.59: 72.48: ISR : QA : RP : Review Date : Effective Date

EmergnyPaig EO-1i 6 genc Planning . No No No Yes Yes 08-19-08 09-19-08
  • . -.Administration .
Response to Of-ora EO-2 : 3 'to Off-Normal Yes Yes :Yes No Yes 08-16-10 08-20-10 EO-3 3 :Response to Accidents Yes Yes Yes No j Yes 08-17-10 08-20-10
Response to Natural E4 iPhenomena Yes Yes Yes No :Yes 08-17-10 08-20-10 I-- - - - - - - -- - - - - - - -- -.....- t ........ i........ I"------- -I.... . . . . . . . . . ." . . . . . . . . .

Em ergency Plan---------------------------------7 EO-5 4 m yNo No Yes No :Yes 05-27-08  : 08-20-08

-.......

Implementation . .
Non-Emergency Event EO-6 10 ,s  : No No Yes No No 07-22-08 08-06-08
Assessment:

Page I of I

ISFSI Administrative AUG 2 0 2010 AD-4 Rev. 3 ATTACHMENT B CONNECTICUT YANKEE ATOMIC POWER COMPANY ISFSI PROCEDURE Response to Off-Normal Operations EO-2 Rev. 3 Preparer:

  • Date: 1-/s/J 10CFR50.59 I 10CFR72.48 ASSESSMENT 10CFR50.59 SCREEN REQUIRED? YES M NO 10CFR50.59 EVALUATION REQUIRED (NO. []YES El NO 10CFR72.48 SCREEN REQUIRED? EYES ENO 10CFR72.48 EVALUATION REQUIRED (NO. nl YES El NO REVIEWER SECTION QUALITY ASSURANCE REVIEW: SIGNATURE VIA DATE: i//A RADIATION PROTECTION REVIEW: SIGNATURE -DATE: 6,//.,j TECHNICAL REVIEW: SIGNATURE_______ DATE: __

INDEPENDENT SAFTY REVAEW: (Asjpp1icble)

SIGNATJRE--. -) - DATE:

APPROVAL SECTION ISFSI MANAGER/DESIGNEE SIGNATURE/DATE:

Page 9 of 12

ISFSI Emergency Operating EO-2 Rev. 3 SResponse to Off-Normal Operations 1.0 PURPOSE This procedure provides the actions to be taken by ISFSI personnel in response to Off-Normal Conditions affecting a fuel loaded Vertical Concrete Cask (VCC) at the ISFSI.

2.0 SCOPE 2.1 The ISFSI Response to Off-Normal Conditions applies to those supporting the operation of the CY ISFSI.

2.2 Off-Normal Conditions addressed by this procedure include:

2.2.1 Blockage of Half of the Air Inlets on a Vertical Concrete Cask [NAC-MPC FSAR 11.1.1 ]

2.2.2 Failure of Instrumentation on a Vertical Concrete Cask [NAC-MPC FSAR 11.1.3]

2.2.3 Severe Environmental Conditions (Ambient Air Temperature <-40'F or

>1000 F) [NAC-MPC FSAR 11.1.4]

2.2.4 Small Release of Radioactive Particulate from the Canister Exterior

[NAC-MPC FSAR 11.1.5]

2.2.5 Degraded VCC Thermal Performance (AT > 110°F) 3.0 DEFINITIONS 3.1 Average Ambient Temperature - The average ambient temperature is the average value of the temperature monitoring device(s) monitoring the ambient air temperature in the area around a fuel loaded VCC.

3.2 Operable - The CONCRETE CASK heat removal system is OPERABLE if the difference between the average ISFSI ambient temperature and the average outlet air temperature is < 1 10°F (AT < 1100 F ) or if all four air inlet and outlet screens are visually verified to be unobstructed for the CY-MPC. Failing this the CY-MPC may be declared OPERABLE if an engineering evaluation determines the CONCRETE CASK has adequate heat transfer capabilities to assure continued spent fuel CANISTER and CONCRETE CASK integrity [CofC Appendix A, A1.I]

Page 1 of 13

ISFSI Emergency Operating EO-2 Rev. 3

4.0 REFERENCES

4.1 NAC-MPC Final Safety Analysis Report for the NAC-Multi-Purpose Canister System, amendment for Connecticut Yankee Atomic Power Company, Docket 72-1025.

4.2 NRC Certificate of Compliance for Spent Fuel Storage Casks, Certificate Number 1025, issued to NAC for the NAC-MPC System.

4.3 AD-4, ISFSI Procedure Control Program.

4.4 AD-5, ISFSI Work Control Program.

4.5 AD-7, Corrective Action Program.

4.6 AD-16, ISFSI Personnel Training and Qualifications.

4.7 AD-2 1, Trouble Reports (TR) / Work Requests (WR).

4.8 OP-1, ISFSI Temperature Monitoring Program.

4.9 OP-2, ISFSI Routine Surveillances.

4.10 SP-8, Personnel Access Control.

4.11 RP-4, Personnel Radiation Monitoring.

4.12 RP-5, Radiation Work Permits.

5.0 RESPONSIBILITIES 5.1 ISFSI Shift Supervisor is responsible for ensuring the requirements of this procedure are implemented.

5.2 ISFSI Shift Supervisor shall be responsible for the operational command functions.

5.3 ISFSI personnel are responsible for performing the actions described in this procedure.

5.4 Radiation Protection Manager (or designee) is responsible for maintaining the Radiation Protection Procedures and providing guidance during emergency events.

Page 2 of 13

ISFSI Emergency Operating EO-2 Rev. 3 6.0 PROCEDURE 6.1 Notes 6.1.1 Partial procedure performance - As identified in ISFSI Procedure Control Program, specific sections, portions of a section, series-of-steps, partial valve lineups or equipment checklist performance is allowed provided the ISFSI Shift Supervisor has reviewed and approved the omissions. Such partial performance will be documented using the N/A process. Other sections (e.g.,

precautions, prerequisites) must be reviewed for applicability to the evolution being performed.

6.1.2 Steps may be marked as "N/A" if the step provides an option for not completing the step.

6.1.3 Only personnel meeting the requirements of ISFSI Personnel Training and Qualifications shall perform inspections and data collection.

6.2 IDENTIFY the applicable Off-Normal Condition and the Attachment that addresses the required actions:

Off-Normal Condition Attachment Blockage of Half of the Air Inlets on a Vertical Concrete Cask A Failure of Instrumentation on a Vertical Concrete Cask B Ambient Air Temperature (<-40'F or > 100°F) C Small Release of Radioactive Particulate from the Canister Exterior D Degraded VCC Thermal Performance (AT > 11 0IF) E CAUTION The Off-Normal events of Failure of Instrumentation on a Vertical Concrete Cask and Severe Environmental Conditions have NAC CofC requirements for actions to be completed within a prescribed time period of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

6.3 PERFORM the required actions of the applicable Attachment for the Off-Normal Condition identified.

7.0

SUMMARY

OF CHANGES 7.1 Added requirements from new Amendments of the FSAR (Ref. 4.1) and CoC (Ref.

4.2) 7.2 Changed term "ISFSI Pad Area" to "ISFSI Protected Area".

7.3 Added references to entry requirements into the ISFSI Protected Area.

7.4 Modified actions throughout to better define response and meet requirements.

Page 3 of 13

ISFSI Emergency Operating EO-2 Rev. 3 ATTACHMENTS

. 8.0 8.1 Attachment A - Blockage of Half of the Air Inlets on a Vertical Concrete Cask 8.2 Attachment B - Failure of Instrumentation on a Vertical concrete Cask 8.3 Attachment C - Severe Environmental Conditions 8.4 Attachment D - Small Release of Radioactive Particulate from the Canister Exterior 8.5 Attachment E - Degraded VCC Thermal Performance (AT > I10°F)

Page 4 of 13

ISFSI Emergency Operating EO-2 Rev. 3 ATTACHMENT A BLOCKAGE OF HALF OF THE AIR INLETS ON A VERTICAL CONCRETE CASK (Page 1 of 2)

A. 1 AUTOMATIC ACTIONS None A.2 IMMEDIATE ACTIONS A.2.1 NOTIFY the ISFSI Shift Supervisor.

A.2.2 NOTIFY the ISFSI Manager or designee.

A.3 SUBSEOUENT ACTIONS WARNING Some Off-Normal, Accident and Natural Phenomena Events may cause damage to a loaded VCC. Therefore a loss of shielding may not be visually evident.

CAUTION Due to the potential radiation hazard near the surface of the concrete cask and radiation streaming from the air inlets and outlets, personnel should practice ALARA principles:

" Maximize distance from the air vents and minimize stay time around the concrete cask.

  • Do NOT remove the VCC inlets or outlets screens without qualified RP personnel present.

INITIALS A.3.1 OBTAIN permission from ISFSI Shift Supervisor to enter the ISFSI Protected Area.

A.3. 1.1 Enter the ISFSI Protected Area in accordance with SP-8 and RP-4.

A.3.2 Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> of the event, MEASURE and RECORD the temperatures of the air outlets of each VCC, OR INSPECT and VERIFY all air inlets and outlets of each affected VCC are not blocked or obstructed, in accordance with ISFSI Temperature Monitoring Program. [CofC Appendix A, A5.3]

A.3.2.1 At least one-half of the inlets and outlets on each affected cask must be cleared of blockage and debris within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Page 5 of 13

ISFSI Emergency Operating EO-2 Rev. 3 ATTACHMENT A BLOCKAGE OF HALF OF THE AIR INLETS ON A VERTICAL CONCRETE CASK (Page 2 of 2)

INITIALS A.3.3 INSPECT the air inlet screens.

A.3.4 REMOVE any debris on the outside of the air inlet screens using a broom or other long handled tool.

A.3.5 IF debris is not easily accessible and the screens need to be removed, perform the following:

A.3.4.1 GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-21, and Work Order in accordance with AD-5, ISFSI Work Control Program.

A.3.4.2 GENERATE a new RWP in accordance with RP-5, Radiation Work Permits.

A.3.6 IF damage is noted GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-2 1, and a Work Order in accordance with AD-5, ISFSI Work Control Program.

A.3.7 GENERATE a Condition Report in accordance with Corrective Action Program to document the condition.

Page 6 of 13

ISFSI Emergency Operating EO-2 Rev. 3 ATTACHMENT B FAILURE OF INSTRUMENTATION ON A VERTICAL CONCRETE CASK (Page 1 of 1)

B.1 AUTOMATIC ACTIONS None B.2 IMMEDIATE ACTIONS B.2.1 NOTIFY the ISFSI Shift Supervisor.

B.2.2 NOTIFY the ISFSI Manager or designee.

B.3 SUBSEQUENT ACTIONS WARNING Some Off-Normal, Accident and Natural Phenomena Events may cause damage to a loaded VCC. Therefore a loss of shielding may not be visually evident.

CAUTION Due to the potential radiation hazard near the surface of the concrete cask and radiation streaming from the air inlets and outlets, personnel should practice ALARA principles:

  • Maximize distance from the air vents and minimize stay time around the concrete cask.
  • Do NOT remove the VCC inlets or outlets screens without qualified RP personnel present.

INITIALS B.3.1 Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> of the event, MEASURE and RECORD the temperatures of the air outlets of each VCC, OR INSPECT and VERIFY all air inlets and outlets of each affected VCC are not blocked or obstructed, in accordance with ISFSI Temperature Monitoring Program. [CofC Appendix A, A5.3]

B.3.2 Enter the ISFSI Protected Area in accordance with SP-8 and RP-4 and PERFORM another means of verifying the VCC heat removal system is operable in accordance with OP-1, Temperature Monitoring Program.

B.3.2 GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-2 1, and a Work Order in accordance with AD-5 to initiate repair of the failed instrument.

B.3.3 GENERATE a Condition Report in accordance with Corrective Action Program to document the condition.

Page 7 of 13

ISFSI Emergency Operating EO-2 Rev. 3 ATTACHMENT C SEVERE ENVIRONMENTAL CONDITIONS Ambient Air Temperature (<-401F or >1000 F)

-(Page 1 of 1)

C. 1 AUTOMATIC ACTIONS None C.2 IMMEDIATE ACTIONS C.2.1 NOTIFY the ISFSI Shift Supervisor.

C.2.2 NOTIFY the ISFSI Manager or designee.

C.3 SUBSEQUENT ACTIONS WARNING Some Off-Normal, Accident and Natural Phenomena Events may cause damage to a loaded VCC. Therefore a loss of shielding may not be visually evident.

CAUTION Due to the potential radiation hazard near the surface of the concrete cask and radiation streaming from the air inlets and outlets, personnel should practice ALARA principles:

" Maximize distance from the air vents and minimize stay time around the concrete cask.

  • Do NOT remove the VCC inlets or outlets screens without qualified RP personnel present.

INITIALS C.3.1 Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> of the event, MEASURE and RECORD the temperatures of the air outlets of each VCC, OR INSPECT and VERIFY all air inlets and outlets of each affected VCC are not blocked or obstructed, in accordance with ISFSI Temperature Monitoring Program. [CofC Appendix A, A5.3]

C.3.2 GENERATE a Condition Report in accordance with Corrective Action Program to document the condition.

Page 8 of 13

ISFSI Emergency Operating EO-2 Rev. 3 ATTACHMENT D SMALL RELEASE OF RADIOACTIVE PARTICULATE FROM THE CANISTER EXTERIOR (Page 1 of 2)

D.1 AUTOMATIC ACTIONS None D.2 IMMEDIATE ACTIONS D.2.1 NOTIFY the ISFSI Shift Supervisor.

D.2.2 NOTIFY the ISFSI Manager or designee.

D.3 SUBSEQUENT ACTIONS WARNING Some Off-Normal, Accident and Natural Phenomena Events may cause damage to a loaded VCC. Therefore a loss of shielding may not be visually evident.

CAUTION Due to the potential radiation hazard near the surface of the concrete cask and radiation streaming from the air inlets and outlets, personnel should practice ALARA principles:

" Maximize distance from the air vents and minimize stay time around the concrete cask.

  • Do NOT remove the VCC inlets or outlets screens without qualified RP personnel present.

INITIALS D.3.1 Do not allow entry to the ISFSI Protected Area until a contamination survey has been performed.

D.3.1.1 Entry into the ISFSI Protected Area is completed in accordance with SP-8 and RP-4.

D.3.2 Qualified RP personnel shall PERFORM a detailed radiological contamination survey in accordance with Radiological Surveys to determine the extent of contamination.

D.3.3 ISOLATE the area where contamination was found to minimize the spread of contamination.

Page 9 of 13

ISFSI Emergency Operating EO-2 Rev. 3 ATTACHMENT D SMALL RELEASE OF RADIOACTIVE PARTICULATE FROM THE CANISTER EXTERIOR (Page 2 of 2).

INITIALS D.3.4 REMEDIATE any contamination in the area in accordance with the Radiation Protection Manager's (or designee) instructions.

D.3.5 GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-2 1, and a Work Order in accordance with AD-5 to effect repairs.

D.3.6 GENERATE a Condition Report in accordance with Corrective Action Program to document the event.

Page 10 of 13

ISFSI Emergency Operating EO-2 Rev. 3 ATTACHMENT E DEGRADED VCC THERMAL PERFORMANCE (Page 1 of 3)

E. 1 AUTOMATIC ACTIONS None E.2 IMMEDIATE ACTIONS E.2.1 NOTIFY the ISFSI Shift Supervisor.

E.2.2 NOTIFY the ISFSI Manager or designee.

E.3 SUBSEOUENT ACTIONS WARNING Some Off-Normal, Accident and Natural Phenomena Events may cause damage to a loaded VCC. Therefore-a loss of shielding may not be visually evident.

CAUTION Due to the potential radiation hazard near the surface of the concrete cask and radiation streaming from the air inlets and outlets, personnel should practice ALARA principles:

  • Maximize distance from the air vents and minimize stay time around the concrete cask.
  • Do NOT remove the VCC inlets or outlets screens without qualified RP personnel present.

INITIALS E.3.1 Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> of the event, MEASURE and RECORD the temperatures of the air outlets of each VCC, OR INSPECT and VERIFY all air inlets and outlets of each affected VCC are not blocked or obstructed, in accordance with ISFSI Temperature Monitoring Program. [CofC Appendix A, A5.3]

E.3.1.1 At least one-half of the inlets and outlets on each affected cask must be cleared of blockage and debris within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

[CofC Appendix A, A5.3]

E.3.2 Within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> restore the VCC heat removal system to operable status.

[CofC Apendix A, LCO 3.1.6 A. 1].

E.3.2.1 If unable to restore within the allotted time, perform step E.3.7 of this Attachment.

Page 11 of 13

ISFSI Emergency Operating EO-2 Rev. 3 ATTACHMENT E DEGRADED VCC THERMAL PERFORMANCE (Page 2 of 3)

INITIALS E.3.3 INSPECT the air inlet screens.

E.3.4 REMOVE any debris on the outside of the air inlet screens using a broom or other long handled tool.

E.3.5 IF debris is not easily accessible and the screens need to be removed, perform the following:

E.3.5.1 GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-21, and Work Order in accordance with AD-5, ISFSI Work Control Program.

E.3.5.2 GENERATE a new RWP in accordance with RP-5, Radiation Work Permits.

E.3.6 IF damage is noted GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-2 1, and a Work Order in accordance with AD-5, ISFSI Work Control Program.

E.3.7 If the VCC Heat Removal System is not restored to an operable (AT <

l110'F OR unblocked, unobstructed air inlets and outlets) status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of the event, PERFORM the following on the affected VCC immediately and every 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> thereafter [CofC Apendix A, LCO 3.1.6 B.1].

(Perform both E.3.7.1 and E.3.7.2)

E.3.7.1 MEASURE and RECORD the ISFSI ambient air and temperatures of the air outlets of each affected VCC in accordance with ISFSI Temperature Monitoring Program and CONFIRM that the difference between the average VCC air outlet temperature and average ISFSI ambient temperature is not greater than 110 'F (AT < 110 'F)

OR INSPECT and VERIFY all air inlets and outlets of each VCC are not blocked or obstructed in accordance with ISFSI Temperature Monitoring Program.

Page 12 of 13

ISFSI Emergency Operating EO-2 Rev. 3 ATTACHMENT E DEGRADED VCC THERMAL PERFORMANCE (Page 3 of 3)

INITIALS E.3.7.2. Within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, PERFORM the following:

a. PERFORM an engineering evaluation to determine that the concrete heat removal system is operable (Action B.2.1 of LCO 3.1.6 Cof C, Appendix A).

OR

b. PLACE the NAC-MPC SYSTEM in a Safe Condition (Action B.2.2 of LCO 3.1.6 Cof C, Appendix A).
1. Perform the engineering evaluation and/or verify a safe condition by contacting NAC International.

E.3.8 INITIATE a Condition Report in accordance with Corrective Action Program to document the event.

Page 13 of 13

AD-4 ISFSI Administrative AUG 2 0 2010 Rev. 3 ATTACHMENT B CONNECTICUT YANKEE ATOMIC POWER COMPANY ISFSI PROCEDURE Response to Accidents EO-3 Rev. 3 Preparer: *" 'Date: //o 10CFR50.59 / 10CFR72.48 ASSESSMENT I0CFR50.59 SCREEN REQUIRED?. Dý YES El NO IOCFR50.59 EVALUATION REQUIRED (NO.) ] YES [] NO IOCFR72.48 SCREEN REQUIRED? Oq YES E] NO IOCFR72.48 EVALUATION REQUIRED (NO. El YES E] NO REVIEWER SECTION QUALITY ASSURANCE REVIEW: SIGNATURE PIA DATE: N/IA RADIATION PROTECTION REVIEW: SIGNADATE:

TECHNICAL REVIEW: __________ _DATE:/

INDEPENDENT SAFnE EW: (As Applicable)

SIGNATURE:_ __I__-_ DATE: i -V AO APPROVAL SECTION ISFSI MANAGER/DESIGNEE SIGNATURE/DATE:

'- I (u

Page 9 of 12

ISFSI Emergency Operating EO-3 Rev. 3 Response to Accidents 1.0 PURPOSE This procedure provides the actions to be taken in response to accidents affecting the Connecticut Yankee (CY) Independent Spent Fuel Storage Installation (ISFSI).

2.0 SCOPE 2.1 The ISFSI Response to Accidents applies to those supporting the operation of the CY ISFSI.

2.2 Accidents addressed by this procedure include: (Reference 4.2) 2.2.1 Explosion [NAC-MPC FSAR 11.2.3]

2.2.2 Fire Accident [NAC-MPC FSAR 11.2.5]

2.2.3 Full Blockage of Air Inlets and Outlets on a Vertical Concrete Cask (VCC)

[NAC-MPC FSAR 11.2.8]

2.2.4 Storage Cask 6-inch Drop [NAC-MPC FSAR 11.2.11]

2.2.5 Tip Over of the VCC [NAC-MPC FSAR 11.2.12]

3.0 DEFINITIONS 3.1 Average Ambient Temperature - The average ambient temperature is the average value of the temperature monitoring device(s), monitoring the ambient air temperature in the area around a fuel loaded VCC.

3.2 Operable - The CONCRETE CASK heat removal system is OPERABLE if the difference between the average ISFSI ambient temperature and the average outlet air temperature is < 1107F (AT < 1100 F ) or if all four air inlet and outlet screens are visually verified to be unobstructed for the CY-MPC. Failing this the CY-MPC may be declared OPERABLE if an engineering evaluation determines the CONCRETE CASK has adequate heat transfer capabilities to assure continued spent fuel CANISTER and CONCRETE CASK integrity [CofC Appendix A, Al.1 ].

4.0 REFERENCES

4.1 NAC-MPC Final Safety Analysis Report for the NAC-Multi-Purpose Canister System, amendment for Connecticut Yankee Atomic Power Company, Docket 72-1025.

Page 1 of 6

ISFSI Emergency Operating EO-3 Rev. 3 4.2 NRC Certificate of Compliance for Spent Fuel Storage Casks, Certificate Number 1025, issued to NAC for the NAC-MPC System, Amendment 5, Dated July 24, 2007.

4.3 AD-4, ISFSI Procedure Control Program.

4.4 AD-5, ISFSI Work Control Program.

4.5 AD-7, Corrective Action Program.

4.6 AD-16, ISFSI Personnel Training and Qualifications.

4.7 AD-2 1, Trouble Reports (TR) / Work Requests (WR).

4.8 EO-5, Emergency Plan Implementation.

4.9 OP-1, ISFSI Temperature Monitoring Program.

4.10 OP-2, ISFSI Routine Surveillances.

4.11 OP-7, ISFSI VCC and ISFSI Pad Inspection Program.

4.12 SP-8, Personnel Access Control.

4.13 SP-18, Contingencies.

4.13 RP-4, Personnel Radiation Monitoring.

4.14 RP-5, Radiation Work Permits.

5.0 RESPONSIBILITIES 5.1 ISFSI Manager is responsible for ensuring the requirements of this procedure are implemented.

5.2 ISFSI Shift Supervisor shall be responsible for the operational command functions.

5.3 ISFSI personnel are responsible for performing the actions described in this procedure.

5.4 Radiation Protection Manager (or designee) is responsible for maintaining the Radiation Protection Procedures and providing guidance during emergency events.

Page 2 of 6

ISFSI Emergency Operating EO-3 Rev. 3 6.0 PROCEDURE 6.1 Notes 6.1.1 Partial procedure performance - As identified in the ISFSI Procedure Control Program, specific sections, portions of a section, series-of-steps, partial valve lineups or equipment checklist performance is allowed provided the ISFSI Shift Supervisor has reviewed and approved the omissions. Such partial performance will be documented using the N/A process. Other sections (e.g.,

precautions, prerequisites) must be reviewed for applicability to the evolution being performed.

6.1.2 Steps may be marked as "N/A" if the step provides an option for not completing the step.

6.1.3 Only personnel meeting the requirements of ISFSI Personnel Training and Qualification shall perform inspections and data collection.

6.2 NOTIFY the ISFSI Shift Supervisor in the event of the following:

6.2.1 Explosion [NAC-MPC FSAR 11.2.3]

6.2.2 Fire Accident [NAC-MPC FSAR 11.2.5]

6.2.3 Full Blockage of Air Inlets and Outlets on a Vertical Concrete Cask [NAC-MPC FSAR 11.2.8]

6.2.4 Storage Cask Drop [NAC-MPC FSAR 11.2.11]

6.2.5 Tip Over of the Loaded VCC [NAC-MPC FSAR 11.2.12]

WARNING Some Off-Normal, Accident and Natural Phenomena Events may cause damage to a loaded VCC. Therefore a loss of shielding may not be visually evident.

6.3 Enter the ISFSI Protected Area in accordance with SP-8 and RP-4.

6.4 CONDUCT a radiation dose rate survey and restrict access accordingly.

6.5 ESTABLISH a controlled area around the VCC.

Page 3 of 6

ISFSI Emergency Operating EO-3 Rev. 3 6.6 Perform the following subsequent actions:

CAUTION Due to the potential radiation hazard near the surface of the VCC and radiation streaming from the air inlets and outlets and the exposed bottom of the VCC, personnel should practice ALARA principles:

  • Maximize distance from the air vents and minimize time around the concrete cask.
  • Do NOT remove the air vent screens without qualified HP personnel present.

INITIALS 6.6.1 Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> of the event, INSPECT and VERIFY all air inlets and outlets of each affected VCC are not blocked or obstructed in accordance with ISFSI Temperature Monitoring Program. [CofC Appendix A, A5.3]

a. At least one-half of the inlets and outlets on each affected cask must be cleared of blockage and debris within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. [CofC Appendix A, A5.3]

6.6.2 PERFORM initial characterization of the extent of damage to the VCCs by visual inspection, which may be accomplished by the use of remote tools (e.g., cameras, binoculars, etc.).

6.6.3 DOCUMENT the observed VCC conditions in accordance with the requirements of procedure OP-7.

6.6.4 IF damage is noted perform the following:

a. PERFORM actions in accordance with SP-l18, Attachment M.
b. GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-2 1.
c. GENERATE a Work Order in accordance with AD-5, ISFSI Work Control Program.

6.6.5 REMOVE any debris on the outside of the air inlet screens using a broom or other long handled tool.

6.6.6 IF debris is not easily accessible and the screens need to be removed, perform the following:

a. Notify Radiation Protection Services.

Page 4 of 6

ISFSI Emergency Operating EO-3 Rev. 3

. INITIALS

b. GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-21, and Work Order in accordance with AD-5, ISFSI Work Control Program.
c. GENERATE a new RWP in accordance with RP-5, Radiation Work Permits.

6.6.7 IF any VCC is inoperable (AT > 110 'F), restore the affected VCCs heat removal system to operable status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. [CofC Apendix A, LCO 3.1.6 A.1].

6.6.8 If the VCC Heat Removal System is not restored to an operable (AT < 1 10F OR unblocked, unobstructed air inlets and outlets) status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of the event, PERFORM the following on the affected VCC immediately and every 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> thereafter [CofC Apendix A, LCO 3.1.6 B.1].

(Perform both A and B)

a. MEASURE and RECORD the ISFSI ambient air and temperatures of the air outlets of each affected VCC in accordance with ISFSI Temperature Monitoring Program and CONFIRM that the difference between the average VCC air outlet temperature and average ISFSI ambient temperature is not greater than 110 'F (AT _<110 'F)

OR INSPECT and VERIFY all air inlets and outlets of each VCC are not blocked or obstructed in accordance with ISFSI Temperature Monitoring Program.

b. Within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, PERFORM the following:
1. PERFORM an engineering evaluation to determine that the concrete heat removal system is operable (Action B.2.1 of LCO 3.1.6 Cof C, Appendix A).

OR

2. PLACE the NAC-MPC SYSTEM in a Safe Condition (Action B.2.2 of LCO 3.1.6 Cof C, Appendix A).
3. Perform the engineering evaluation and/or verify a safe condition by bcontacting NAC International.

Page 5 of 6

ISFSI Emergency Operating EO-3 Rev. 3

. INITIALS 6.6.9 REFER to EO-5, Emergency Plan Implementation, for further guidance. N/A if there is no damage or the damage does not affect shielding capabilities.

6.6.10 REFER to EO-6, Non-Emergency Event Assessment, for further guidance.

N/A if there is no damage or the damage does not affect shielding capabilities.

6.6.11 INITIATE ISFSI Pad survey to VERIFY dose rates.

6.6.12 INITIATE a Condition Report in accordance with Corrective Action Program.

7.0

SUMMARY

OF CHANGES 7.1 Added requirements from new Amendments of the FSAR (Ref. 4.1) and CoC (Ref.

4.2) 7.2 Added reference documents.

7.3 Added references to entry requirements into the ISFSI Protected Area.

7.4 Modified actions throughout to better define response and meet requirements.

S 8.0 ATTACHMENTS 8.1 None Page 6 of 6

ISFSI Administrative AUG 2 0 2010 Rev. 3 ATTACHMENT B CONNECTICUT YANKEE ATOMIC POWER COMPANY ISFSI PROCEDURE Response to Natural Phenomena EO-4 Rev. 3 Preparer: Date: 3/5/v 10CFR50.59 / 10CFR72.48 ASSESSMENT IOCFR50.59 SCREEN REQUIRED? R YES E] NO 10CFR50.59 EVALUATION REQUIRED (NO.__ [] YES []NO IOCFR72.48 SCREEN REQUIRED? El YES E] NO IOCFR72.48 EVALUATION REQUIRED (NO.__ [j YES El NO REVIEWER SECTION QUALITY ASSURANCE REVIEW: SIGNATURE A/ A DATE: t// A RADIATION PROTECTION REVIEW: SIGNAf DAE TECHNICALVW: REVIW:: SR INDEPENDENT S TY RE;EW: ( Applicable)

SI_______GNATURE: DATE: A/

APPROVAL SECTION ISFSL MANAGER/DESIGNEE SIGNATURE/DATE:

Page 9 of 12

ISFSI Emergency Operating EO-4 Rev. 3 Responses to Natural Phenomena 1.0 PURPOSE This procedure provides the actions to be taken in response to natural phenomena events affecting the Connecticut Yankee (CY) Independent Spent Fuel Storage Installation (ISFSI).

2.0 SCOPE 2.1 The Response to Natural Phenomena applies to personnel supporting the operation of the CY ISFSI.

2.2 Accidents addressed by this procedure include:

2.2.1 Earthquake Event [NAC-MPC FSAR 11.2.2]

2.2.2 Flood [NAC-MPC FSAR 11.2.6]

2.2.3 Tornado and Tornado Driven Missiles [NAC-MPC FSAR 11.2.13]

2.2.4 Maximum Anticipated Heat Load (Ambient Temperature >125°F

[NAC-MPC-FSAR 11.2.10]

3.0 DEFINITIONS 3.1 Operable - The CONCRETE CASK heat removal system is OPERABLE if the difference between the average ISFSI ambient temperature and the average outlet air temperature is < 11 0°F (AT < 1100 F ) or if all four air inlet and outlet screens are visually verified to be unobstructed for the CY-MPC. Failing this the CY-MPC may be declared OPERABLE if an engineering evaluation determines the CONCRETE CASK has adequate heat transfer capabilities to assure continued spent fuel CANISTER and CONCRETE CASK integrity [CofC Appendix A, A1.1]

3.2 Average Ambient Temperature - The average ambient temperature is the calculated average of the temperature monitoring device(s) monitoring the ambient air temperature in the area around a fuel loaded VCC.

4.0 REFERENCES

4.1 NAC-MPC Final Safety Analysis Report for the NAC-Multi-Purpose Canister System, amendment for Connecticut Yankee Atomic Power Company, Docket 72-1025 Page 1 of 6

ISFSI Emergency Operating EO-4 Rev. 3 4.2 NRC Certificate of Compliance for Spent Fuel Storage Casks, Certificate Number 1025, issued to NAC for the NAC-MPC System, Amendment 5, Dated July 24, 2007.

4.3 AD-4, ISFSI Procedure Control Program.

4.4 AD-5, ISFSI Work Control Program.

4.5 AD-7, Corrective Action Program.

4.6 AD- 16, ISFSI Personnel Training and Qualifications.

4.7 AD-21, Trouble Reports (TR) / Work Requests (WR).

4.8 EO-5, Emergency Plan Implementation.

4.9 OP-1, ISFSI Temperature Monitoring Program.

4.10 OP-2, ISFSI Routine Surveillances.

4.11 OP-7, ISFSI VCC arfd ISFSI Pad Inspection Program.

4.12 SP-8, Personnel Access Control.

4.13 SP-18, Contingencies.

4.13 RP-4, Personnel Radiation Monitoring.

4.14 RP-5, Radiation Work Permits.

5.0 RESPONSIBILITIES 5.1 ISFSI Manager is responsible for ensuring the requirements of this procedure are implemented.

5.2 ISFSI Shift Supervisor shall be responsible for the operational command functions.

5.3 ISFSI personnel are responsible for performing the actions described in this procedure.

5.4 Radiation Protection Manager (or designee) is responsible for maintaining the Radiation Protection Procedures and providing guidance during emergency events.

Page 2 of 6

ýi. ý ISFSI Emergency Operating EO-4 Rev. 3 6.0 PROCEDURE 6.1 Notes 6.1.1 Partial procedure performance - As identified in the ISFSI Procedure Control Program, specific sections, portions of a section, series-of-steps, partial valve lineups or equipment checklist performance is allowed provided the ISFSI Shift Supervisor has reviewed and approved the omissions. Such partial performance will be documented using the N/A process. Other sections (e.g., precautions, prerequisites) must be reviewed for applicability to the evolution being performed.

6.1.2 Steps may be marked as "N/A" if the step provides an option for not completing the step.

6.1.3 Only personnel meeting the requirements of ISFSI Personnel Training and Qualification shall perform inspections and data collection.

6.2 NOTIFY the ISFSI Shift Supervisor and then the ISFSI Manager in the event of the following:

6.2.1 Earthquake [NAC-MPC FSAR 11.2.2]

6.2.2 Flood [NAC-MPC FSAR 11.2.6]

6.2.3 Tornado and Tornado Driven Missiles [NAC-MPC FSAR 11.2.13]

6.2.4 Ambient Temperature >125°F [NAC-MPC FSAR 11.2.10]

WARNING Some Off-Normal, Accident and Natural Phenomena Events may cause damage to a loaded VCC. Therefore a loss of shielding may not be visually evident.

6.3 Enter the ISFSI Protected Area in accordance with SP-8 and RP-4.

6.4 CONDUCT a radiation dose rate survey and control access appropriately.

6.5 ESTABLISH a security controlled area around the ISFSI.

Page 3 of 6

ISFSI Emergency Operating EO-4 Rev. 3 6.6 Perform the following subsequent actions:

CAUTION The surface of the VCC and the air inlets and outlets are potential radiation hazards.

Personnel should practice the following ALARA principles:

  • Maximize distance from the air vents and minimize time around the concrete cask.
  • Do NOT remove the air vent screens without qualified HP personnel present.

INITIALS 6.6.1 Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> of the event, INSPECT and VERIFY all air inlets and outlets of each affected VCC are not blocked or obstructed in accordance with ISFSI Temperature Monitoring Program. [CofC Appendix A, A5.3]

a. At least one-half of the inlets and outlets on each affected cask must be cleared of blockage and debris within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. [CofC Appendix A, A5.3]

6.6.2 PERFORM initial characterization of the extent of damage.to the VCCs by visual inspection, which may be accomplished by the use of remote tools (e.g., cameras, binoculars, etc.).

6.6.3 DOCUMENT the observed VCC conditions in accordance with the requirements of procedure OP-7.

6.6.4 IF damage is noted perform the following:

a. PERFORM actions in accordance with SP-l18, Attachment M.
b. GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-2 1.
c. GENERATE a Work Order in accordance with AD-5, ISFSI Work Control Program.

6.6.5 REMOVE any debris on the outside of the air inlet screens using a broom or other long handled tool.

6.6.6 IF debris is not easily accessible and the screens need to be removed, perform the following:

a. Notify Radiation Protection Services Page 4 of 6

ISFSI Emergency Operating EO-4 Rev. 3

. INITIALS

b. GENERATE a Trouble Report/Work Request (TR/WR) in accordance with AD-2 1, and Work Order in accordance with AD-5, ISFSI Work Control Program.
c. GENERATE a new RWP in accordance with RP-5, Radiation Work Permits.

6.6.7 IF any VCC is inoperable (AT > 110 'F), restore the affected VCCs heat removal system to operable status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. [CofC Apendix A, LCO 3.1.6 A.1].

6.6.8 If the VCC Heat Removal System is not restored to an operable (AT <

11 0IF OR unblocked, unobstructed air inlets and outlets) status within 8

-hours of the event, PERFORM the following on the affected VCC immediately and every 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> thereafter [CofC Apendix A, LCO 3.1.6 B.1].

(Perform both A and B)

a. MEASURE and RECORD the ISFSI ambient air and temperatures of the air outlets of each affected VCC in accordance with ISFSI Temperature Monitoring Program and CONFIRM that the difference between the average VCC air outlet temperature and average ISFSI ambient temperature is not greater than 110 'F (AT < 110 'F)

OR INSPECT and VERIFY all air inlets and outlets of each VCC are not blocked or obstructed in accordance with ISFSI Temperature Monitoring Program.

b. Within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, PERFORM the following:
1. PERFORM an engineering evaluation to determine that the concrete heat removal system is operable (Action B.2.1 of LCO 3.1.6 Cof C, Appendix A).

OR

2. PLACE the NAC-MPC SYSTEM in a Safe Condition (Action B.2.2 of LCO 3.1.6 Cof C, Appendix A).
3. Perform the engineering evaluation and/or verify a safe condition by contacting NAC International.

Page 5 of 6

ISFSI Emergency Operating EO-4 Rev. 3 O INITIALS 6.6.9 REFER to EO-5, Emergency Plan Implementation, for further guidance.

N/A if there is no damage or the damage does not affect shielding capabilities.

6.6.10 REFER to EO-6, Non-Emergency Event Assessment, for further guidance. N/A if there is no damage or the damage does not affect shielding capabilities.

6.6.11 INITIATE ISFSI Pad survey to VERIFY dose rates.

6.6.12 INITIATE an ISFSI pad inspection to verify casks have not been repositioned.

6.6.13 INITIATE a Condition Report in accordance with Corrective Action Program.

7.0

SUMMARY

OF CHANGES 7.1 Added requirements from new Amendments of the FSAR (Ref. 4.1) and CoC (Ref. 4.2) 7.2 Added reference documents.

7.3 Added references to entry requirements into the ISFSI Protected Area.

7.4 Modified actions throughout to better define response and meet requirements.

8.0 ATTACHMENTS 8.1 None Page 6 of 6