ML19100A424: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 3: | Line 3: | ||
| issue date = 04/10/2019 | | issue date = 04/10/2019 | ||
| title = Columba - Notification of NRC Design Bases Assurance Inspection Report (Teams) (05000397/2019011) and Initial Request for Information | | title = Columba - Notification of NRC Design Bases Assurance Inspection Report (Teams) (05000397/2019011) and Initial Request for Information | ||
| author name = Gaddy V | | author name = Gaddy V | ||
| author affiliation = NRC/RGN-IV/DRS/EB-1 | | author affiliation = NRC/RGN-IV/DRS/EB-1 | ||
| addressee name = Sawatzke B J | | addressee name = Sawatzke B J | ||
Revision as of 08:11, 12 June 2019
| ML19100A424 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 04/10/2019 |
| From: | Vincent Gaddy Region 4 Engineering Branch 1 |
| To: | Sawatzke B J Energy Northwest |
| References | |
| IR 2019011 | |
| Download: ML19100A424 (8) | |
See also: IR 05000397/2019011
Text
/RA Gerond A. George Acting for/
I. Information Requested Prior to Information Gathering Visit (July 16, 2019)
II. Information Requested to be provided throughout the inspection.
/2019011
/RA/ /RA/ GAG for