ML13107A544: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:TRM UPDATE INSTRUCTIONS Manual Holder REGIONAL LIBRARY TRM Copy # 14 NRC REGION III TRM Rev. # N/A Responsible Licensing Engineer/Specialist Tony Browning This update is to correct a typographical error in the current TRM (Ref. AR01 859645).This update becomes effective on the following date: 3/29/13 Please update your TRM manual as indicated below: REMOVE INSERT Pg 4.0-36 Pg 4.0-36 NOTICE OF RECEIPT OF TECHNICAL REQUIREMENTS MANUAL UPDATE This acknowledges receipt of this TRM update. Please sign and return this form, along with the sheets removed from the TRM, to the responsible Licensing Engineer/Specialist within 10 days of the effective date of this TRM update.TRM Copy # 14 NRC REGION III TRM Revision # N/A Signature DATE 0 DAEC Technical Requirements Manual Chapter 4.0 (Technical Specification Surveillance Frequency Control Program)Table 4.0-8 (Electrical Systems)TS SR # Subject TS SSC/Function STP # Frequency SR AR#Frequency Note?3.8.1.1 Verify Breaker Alignment  
{{#Wiki_filter:TRM UPDATE INSTRUCTIONS Manual Holder     REGIONAL LIBRARY TRM Copy #     14 NRC REGION III                       TRM Rev. #   N/A Responsible Licensing Engineer/Specialist       Tony Browning This update is to correct a typographical error in the current TRM (Ref. AR01 859645).
& Power Offsite AC Sources 3.8.1-01 7 Days No Availability 3.8.1.2 Verify Start (Slow) -Output EDGs 3.8.1-04 31 Days No Voltage & Frequency 3.8.1-05 3.8.1-06 3.8.1.3 60 Minute Load Test EDGs 3.8.1-04 31 Days Yes 3.8.1-05 3.8.1-06 3.8.1.4 Verify Day Tank Volume EDGs 3.8.1-04 31 Days No 3.8.1-05 3.8.1-06 3.8.1.5. Day Tank Presence of Water Check EDGs 3.8.1-08 31 Days No 3.8.1-09 3.8.1.6 Fuel Oil Transfer Operational Test EDGs 3.8.1-04 31 Days No 3.8.1-05 3.8.1-06 3.8.1.7 Timed (Fast) Start- Voltage & EDGs 3.8.1-06 184 Days No Frequency Check 3.8.1.8 Verify Slow Transfer Between Offsite AC Sources 3.8.1-07 24 Months Yes Start-up & Stand-by Transformers 3.8.1.9 Load Reject Test EDGs 3.8.1-07 24 Months Yes 3.8.1.10 Verify Automatic Trip Bypass EDGs 3.8.1-07 24 Months Yes 3.8.1.11 Verify Manual Control for EDGs 3.8.1-07 24 Months Yes Transferring Loads to Offsite Power 3.8.1.12 Verify Load Sequence Separation EDGs 3.8.1-07 24 Months Yes DAEC 4.0-36 TRMCR-035 Rev. 21}}
This update becomes effective on the following date: 3/29/13 Please update your TRM manual as indicated below:
REMOVE                                         INSERT Pg 4.0-36                                     Pg 4.0-36 NOTICE OF RECEIPT OF TECHNICAL REQUIREMENTS MANUAL UPDATE This acknowledges receipt of this TRM update. Please sign and return this form, along with the sheets removed from the TRM, to the responsible Licensing Engineer/Specialist within 10 days of the effective date of this TRM update.
TRM Copy #     14 NRC REGION III                       TRM Revision #   N/A Signature                                                     DATE
 
0 DAEC Technical Requirements Manual Chapter 4.0 (Technical Specification Surveillance Frequency Control Program)
Table 4.0-8 (Electrical Systems)
TS SR #                 Subject                   TS SSC/Function               STP #       Frequency       SR   AR#
Frequency Note?
3.8.1.1 Verify Breaker Alignment & Power     Offsite AC Sources             3.8.1-01         7 Days       No Availability 3.8.1.2 Verify Start (Slow) - Output         EDGs                           3.8.1-04       31 Days       No Voltage & Frequency                                                 3.8.1-05 3.8.1-06 3.8.1.3 60 Minute Load Test                   EDGs                           3.8.1-04       31 Days       Yes 3.8.1-05 3.8.1-06 3.8.1.4 Verify Day Tank Volume               EDGs                           3.8.1-04       31 Days         No 3.8.1-05 3.8.1-06 3.8.1.5. Day Tank Presence of Water Check       EDGs                           3.8.1-08       31 Days         No 3.8.1-09 3.8.1.6 Fuel Oil Transfer Operational Test     EDGs                         3.8.1-04       31 Days         No 3.8.1-05 3.8.1-06 3.8.1.7 Timed (Fast) Start- Voltage &         EDGs                           3.8.1-06       184 Days       No Frequency Check 3.8.1.8 Verify Slow Transfer Between           Offsite AC Sources             3.8.1-07     24 Months       Yes Start-up & Stand-by Transformers 3.8.1.9 Load Reject Test                       EDGs                           3.8.1-07     24 Months       Yes 3.8.1.10 Verify Automatic Trip Bypass           EDGs                           3.8.1-07     24 Months       Yes 3.8.1.11 Verify Manual Control for             EDGs                           3.8.1-07     24 Months       Yes Transferring Loads to Offsite Power 3.8.1.12 Verify Load Sequence Separation       EDGs                           3.8.1-07     24 Months       Yes DAEC                                     4.0-36                           TRMCR-035 Rev. 21}}

Latest revision as of 20:33, 4 November 2019

Correction of a Typographical Error to the TRM Manual: Technical Requirements Manual Chapter 4.0 (Technical Specification Surveillance Frequency Control Program) Table 4.0-8 (Electrical Systems)
ML13107A544
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 03/29/2013
From: Browning T
BWR Owners Group, Duane Arnold
To:
Office of Nuclear Reactor Regulation
References
TRMCR-035, Rev 21
Download: ML13107A544 (2)


Text

TRM UPDATE INSTRUCTIONS Manual Holder REGIONAL LIBRARY TRM Copy # 14 NRC REGION III TRM Rev. # N/A Responsible Licensing Engineer/Specialist Tony Browning This update is to correct a typographical error in the current TRM (Ref. AR01 859645).

This update becomes effective on the following date: 3/29/13 Please update your TRM manual as indicated below:

REMOVE INSERT Pg 4.0-36 Pg 4.0-36 NOTICE OF RECEIPT OF TECHNICAL REQUIREMENTS MANUAL UPDATE This acknowledges receipt of this TRM update. Please sign and return this form, along with the sheets removed from the TRM, to the responsible Licensing Engineer/Specialist within 10 days of the effective date of this TRM update.

TRM Copy # 14 NRC REGION III TRM Revision # N/A Signature DATE

0 DAEC Technical Requirements Manual Chapter 4.0 (Technical Specification Surveillance Frequency Control Program)

Table 4.0-8 (Electrical Systems)

TS SR # Subject TS SSC/Function STP # Frequency SR AR#

Frequency Note?

3.8.1.1 Verify Breaker Alignment & Power Offsite AC Sources 3.8.1-01 7 Days No Availability 3.8.1.2 Verify Start (Slow) - Output EDGs 3.8.1-04 31 Days No Voltage & Frequency 3.8.1-05 3.8.1-06 3.8.1.3 60 Minute Load Test EDGs 3.8.1-04 31 Days Yes 3.8.1-05 3.8.1-06 3.8.1.4 Verify Day Tank Volume EDGs 3.8.1-04 31 Days No 3.8.1-05 3.8.1-06 3.8.1.5. Day Tank Presence of Water Check EDGs 3.8.1-08 31 Days No 3.8.1-09 3.8.1.6 Fuel Oil Transfer Operational Test EDGs 3.8.1-04 31 Days No 3.8.1-05 3.8.1-06 3.8.1.7 Timed (Fast) Start- Voltage & EDGs 3.8.1-06 184 Days No Frequency Check 3.8.1.8 Verify Slow Transfer Between Offsite AC Sources 3.8.1-07 24 Months Yes Start-up & Stand-by Transformers 3.8.1.9 Load Reject Test EDGs 3.8.1-07 24 Months Yes 3.8.1.10 Verify Automatic Trip Bypass EDGs 3.8.1-07 24 Months Yes 3.8.1.11 Verify Manual Control for EDGs 3.8.1-07 24 Months Yes Transferring Loads to Offsite Power 3.8.1.12 Verify Load Sequence Separation EDGs 3.8.1-07 24 Months Yes DAEC 4.0-36 TRMCR-035 Rev. 21