ML14218A483: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
#REDIRECT [[PNO-II-14-006]]
| number = ML14218A483
| issue date = 08/06/2014
| title = PNO-II-14-006A - Shutdown Greater than 72 Hours Due to Increased Primary Coolant Leakage
| author name = Bartley J H, Kontz C R
| author affiliation = NRC/RGN-II/DRP/RPB6
| addressee name =
| addressee affiliation =
| docket = 05000260
| license number = DPR-052
| contact person =
| document report number = PNO-II-14-006A
| document type = NRC Preliminary Notification of Event/Occurrence
| page count = 1
}}
 
=Text=
{{#Wiki_filter:August 6, 2014 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE - PNO-II-14-006A
 
This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. Some of the information may not yet be fully verified or evaluated by the Region II staff (Atlanta, GA)
 
Facility      Licensee Emergency Classification Browns Ferry Unit 2      ___ Notification of Unusual Event Tennessee Valley Authority (TVA)    ___ Alert Athens, AL      ___ Site Area Emergency Docket: 50-260      ___ General Emergency
_X_ Not Applicable
 
==SUBJECT:==
SHUTDOWN GREATER THAN 72 HOURS DUE TO INCREASED PRIMARY COOLANT LEAKAGE This preliminary notification (PN) provides an update to PNO-II-14-006 which addressed an August 3, 2014, Unit 2 shutdown due to indications of increased primary leakage. 
 
The licensee repaired the two leaks in the Unit 2 drywell that caused an increase in unidentified leakage and required a unit shutdown for their repair. The licensee performed a code class repair on the residual heat removal (RHR) shutdown cooling 2" chemical injection socket weld. The licensee also replaced the piping for the reactor building closed cooling water (RBCCW) cooling lines to the 'A' Recirculation pump. As a part of their extent of condition for these leaks, they replaced the RBCCW cooling lines to the 'B' Recirculation pump. Unit 2 startup is scheduled for August 6, 2014.
 
This preliminary notification is issued for information only. 
 
Region II received initial notification of this occurrence through the resident inspectors who had been monitoring licensee actions. The information presented herein has been discussed with the licensee and is current as of 10:30 a.m. August 6, 2014.
 
ADAMS Accession Number: ML14218A483 Contact: Craig Kontz Jonathan Bartley (404) 997-4715  (404) 997-4607  Craig.kontz@nrc.gov Jonathan.Bartley@nrc.gov}}