HNP-15-064, Submits 90-day Inservice Inspection Summary Report: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
#REDIRECT [[HNP-15-064, Shearon Harris, Unit 1 - Submits 90-day Inservice Inspection Summary Report]]
| number = ML15217A561
| issue date = 08/05/2015
| title = Submits 90-day Inservice Inspection Summary Report
| author name = Brewer H D
| author affiliation = Duke Energy Progress, Inc
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000400
| license number = NPF-063
| contact person =
| case reference number = HNP-15-064
| document type = Inservice/Preservice Inspection and Test Report, Letter type:HNP
| page count = 6
}}
 
=Text=
{{#Wiki_filter:HNP-15-064 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/RENEWED LICENSE NO. NPF-63 Enclosure 90-day Inservice Inspection Summary Report (5 pages including cover) 1  Summary The Shearon Harris Nuclear Power Plant Unit 1 Third Ten Year Inservice Inspection (ISI) Plan complies with 10CFR50.55a(g), which implements, by reference, the American Society of Mechanical Engineers (ASME) Bo iler and Pressure Vessel Code, Section XI, 2001 Edition with 2003 Addenda.
This summary report is being submitted pursuant to the reporting requirements of ASME Section XI as amended by ASME Code Ca se N-532-4, "Repair/Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission Section XI, Division 1".
 
Contained within this summary report are the fo rm OAR-1 (Owner's Activity Report) and Tables 1 and 2 of Code Case N-532-4 for Harris Nuclea r Plant during cycle 19 and Refueling Outage 19 (RFO-19). RFO-19 is the first of two outages of the third period in the third inspection interval and includes the Repair/Replacement activities from February 12, 2014 to May 15, 2015.}}