ENS 53762: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 22: Line 22:
   
   
No news release by CNS is planned. Notifications are planned to the South Carolina Division of Occupational Safety and Health.  
No news release by CNS is planned. Notifications are planned to the South Carolina Division of Occupational Safety and Health.  
This is a four hour notification, non-emergency for a notification of other government agency. This event is reportable in accordance with 10 CFR 50.72(b)(2)(xi). The NRC Resident Inspector has been notified."
This is a four hour notification, non-emergency for a notification of other government agency. This event is reportable in accordance with 10 CFR 50.72(b)(2)(xi). The NRC Resident Inspector has been notified.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2018/20181203en.html#en53762
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2018/20181203en.html#en53762
}}{{unit info
}}{{unit info

Latest revision as of 23:58, 23 February 2020

ENS 53762 +/-
Where
Catawba Duke Energy icon.png
South Carolina (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release
Time - Person (Reporting Time:+-0.63 h-0.0263 days <br />-0.00375 weeks <br />-8.62974e-4 months <br />)
Opened: Steven Andrews
04:22 Nov 30, 2018
NRC Officer: Thomas Kendzia
Last Updated: Nov 30, 2018
53762 - NRC Website
Loading map...