Press Release-IV-07-023 - NRC Issues Confirmatory Action Letter on Palo Verde Nuclear Plant, Press Release-IV-07-023 - NRC Issues Confirmatory Action Letter on Palo Verde Nuclear Plant: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[Press Release-IV-07-023, - NRC Issues Confirmatory Action Letter on Palo Verde Nuclear Plant]]
| number = ML071760539
| issue date = 06/21/2007
| title = Press Release-IV-07-023 - NRC Issues Confirmatory Action Letter on Palo Verde Nuclear Plant
| author name =
| author affiliation = NRC/OPA/RGN-IV/FO
| addressee name =
| addressee affiliation =
| docket = 05000528, 05000529, 05000530
| license number =
| contact person =
| document report number = Press Release-IV-07-032
| document type = Press Release
| page count = 3
| newsletter region = NRC Region Press Release-IV-07-023 - NRC Issues Confirmatory Action Letter on Palo Verde Nuclear Plant
| newsletter year = 20Press Release-IV-07-023 - NRC Issues Confirmatory Action Letter on Palo Verde Nuclear Plant
| newsletter integer = Press Release-IV-07-023 - NRC Issues Confirmatory Action Letter on Palo Verde Nuclear Plant
}}
 
=Text=
{{#Wiki_filter:NRC NEWS                      U. S. NUCLEAR REGULATORY COMMISSION                            Office of Public Affairs Region IV                            611 Ryan Plaza Drive - Suite 400 Arlington, TX  76011-4005No. IV-07-023June 21, 2007Contact: Victor Dricks                                                                        E-Mail: opa4@nrc.gov Phone: 817-860-8128NRC ISSUES CONFIRMATORY ACTION LETTER                                            ON PALO VERDE NUCLEAR PLANTThe Nuclear Regulatory Commission staff has issued a Confirmatory Action Letter(CAL) to Arizona Public Service Co. confirming the company's commitments regarding actions
 
it will take to improve performan ce at the Palo Verde Nuclear Generating Station.
APS operatesthe plant located in Wintersburg, Ariz."Palo Verde is being operated safely, but performance impr ovements are needed,"  NRCRegion IV Administrator Bruce S. Mallett said.  "We intend to hold APS accountable to performa thorough evaluation of the causes of the performance problems at Palo Verde and to complete actions to correct them. The letter will serve as a roadmap for performance improvement."The letter confirms commitments the company has made to the NRC to:
: 1. Complete actions to address root and contributing causes identified in its evaluations in response to performance probl ems associated with the voided containment sump suctionpiping for all three units, and associated with the Unit 3 emergency diesel generator electrical relay problems, including:*Ineffective resolution of emerging technical issues, including thoroughness of technical evaluations and  troubleshooting*Failure to routinely question the validity of engineering assumptions usedto support operability decisions for degraded equipment *Lack of consistently notifying operations pers onnel of immediateoperability concerns*Inadequate performance monitoring measures necessary to fully assess theeffectiveness of the corrective actions.
: 2. Complete corrective actions that result in measurable improvement in the crosscutting areas of human performance and problem identif ication and resolution.
Specific areas to address are:*Palo Verde operability determination process; timeliness and thoroughnessfor evaluations of conditions/significant conditions adverse to quality; and engineering quality. 3.Complete an independent (third party) safety culture assessment by September 15.4.Incorporate the results of their in-depth evaluations and safety culture assessments into a modified improvement plan.
5.Submit to the NRC portions of the modified improvement plans that impact theReactor Safety strategic performance area, including safety culture improvement initiatives by November 30.Issuance of the CAL does not preclude subsequent issuance of an order formalizing thecommitments requiring other actions on the part of the company.
Palo Verde has been under increased NRC oversight since the fourth quarter of 2004following a finding for a substantial safety issue. Inspectors found that APS had incorrectly leftair pockets in portions of the emergency core cooling system for each reactor that could havehindered the system's operation during certain types of accidents. The finding remains openbecause APS has not effectively addressed performance problems.
Those problems include a lack of questioning attitude, lack of technical rigor and pooroperability determinations by workers - factors which contributed to a more recent finding issuedby the NRC for problems with a emergency diesel generator at Unit 3, moving Palo Verde into ahigher level of NRC oversight.Two substantive cross-cutting issues in the areas of human performance and problem identification and resolution have also remained open since the NRC's 2004 end-of-cycle assessment. Palo Verde has also had numerous operational challenges since 2004, including multiple  reactor trips and unplanned shutdowns.
##NRC news releases are available through a free list serve subscription at the following Web address: http://www.nrc.gov/public-involve/listserver.html . The NRC homepage at www.nrc.gov also offers a SUBSCRIBElink. E-mail notifications are sent to subscribers when news releases are posted to NRC's Web site.}}