ML090160190: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 3: | Line 3: | ||
| issue date = 06/01/2006 | | issue date = 06/01/2006 | ||
| title = Email: Gentleman, Rai'S | | title = Email: Gentleman, Rai'S | ||
| author name = Murphy A | | author name = Murphy A | ||
| author affiliation = NRC/RES/DE | | author affiliation = NRC/RES/DE | ||
| addressee name = | | addressee name = | ||
Line 20: | Line 20: | ||
==Subject:== | ==Subject:== | ||
Andrew Murphy aph@nei.org; Cij@nei.org 06/01/2006 3:17:08 PM Gentlemen, Gentlemen, Please find attached to this email a file containing a complete compilation of the Requests for Additional Information (RAIs) generated by SITAG and its consultants concerning the series of Task Reports submitted by NEI to inform the staff workng on a new seismic siting and design regulatory guide. The attached compilation includes all the RAls previously sent, as well as, new ones developed for the S Task Reports and, for completeness, the RAIs developed during the October, 2005 public meeting.If you have any questions about the content, please call or email me.The file is in pdf format.At the May public meeting there was discussion of the potential need for an in-depth rejustification of the definition and derivation of the Cumulative Absolute Velocity, the CAV. The NRC staff took it as an action to review the issue. SITAG has decided that additional justification beyond the RAIs for G1.2 (See RAI 2.2b as a specific example.) | Andrew Murphy aph@nei.org; Cij@nei.org 06/01/2006 3:17:08 PM Gentlemen, Gentlemen, Please find attached to this email a file containing a complete compilation of the Requests for Additional Information (RAIs) generated by SITAG and its consultants concerning the series of Task Reports submitted by NEI to inform the staff workng on a new seismic siting and design regulatory guide. The attached compilation includes all the RAls previously sent, as well as, new ones developed for the S Task Reports and, for completeness, the RAIs developed during the October, 2005 public meeting.If you have any questions about the content, please call or email me.The file is in pdf format.At the May public meeting there was discussion of the potential need for an in-depth rejustification of the definition and derivation of the Cumulative Absolute Velocity, the CAV. The NRC staff took it as an action to review the issue. SITAG has decided that additional justification beyond the RAIs for G1.2 (See RAI 2.2b as a specific example.) | ||
is not warranted for this effort.Best regards, Dr. Andrew J. Murphy Chairman of NRC Seismic Issues Technical Advisory Group CC: Anthony Hsia; Bret Tegeler; Gene Imbro; Michele Evans; Rebecca Karas; SITAG2 Mail Envelope Properties (447F3D2E.FBI | is not warranted for this effort.Best regards, Dr. Andrew J. Murphy Chairman of NRC Seismic Issues Technical Advisory Group CC: Anthony Hsia; Bret Tegeler; Gene Imbro; Michele Evans; Rebecca Karas; SITAG2 Mail Envelope Properties (447F3D2E.FBI | ||
: 16 : 9472) | : 16 : 9472) | ||
Revision as of 03:25, 12 July 2019
ML090160190 | |
Person / Time | |
---|---|
Issue date: | 06/01/2006 |
From: | Murphy A NRC/RES/DE |
To: | Nuclear Energy Institute |
References | |
FOIA/PA-2009-0035 | |
Download: ML090160190 (2) | |
Text
a- *.~-From: To: Date:
Subject:
Andrew Murphy aph@nei.org; Cij@nei.org 06/01/2006 3:17:08 PM Gentlemen, Gentlemen, Please find attached to this email a file containing a complete compilation of the Requests for Additional Information (RAIs) generated by SITAG and its consultants concerning the series of Task Reports submitted by NEI to inform the staff workng on a new seismic siting and design regulatory guide. The attached compilation includes all the RAls previously sent, as well as, new ones developed for the S Task Reports and, for completeness, the RAIs developed during the October, 2005 public meeting.If you have any questions about the content, please call or email me.The file is in pdf format.At the May public meeting there was discussion of the potential need for an in-depth rejustification of the definition and derivation of the Cumulative Absolute Velocity, the CAV. The NRC staff took it as an action to review the issue. SITAG has decided that additional justification beyond the RAIs for G1.2 (See RAI 2.2b as a specific example.)
is not warranted for this effort.Best regards, Dr. Andrew J. Murphy Chairman of NRC Seismic Issues Technical Advisory Group CC: Anthony Hsia; Bret Tegeler; Gene Imbro; Michele Evans; Rebecca Karas; SITAG2 Mail Envelope Properties (447F3D2E.FBI
- 16 : 9472)
Subject:
Creation Date From: Created By: Gentlemen, 06/01/2006 3:17:02 PM Andrew Murphy, AJMI @nrc.gov Recipients nei.org aph (aph@nei.org) cij (Cij@nei.org) nrc.gov OWGWPO01 .HQGWDO01 GXB 1 CC (Goutam Bagchi)SAA3 CC (Syed Ali) nrc.gov OWGWPO02.HQGWD01 AHH CC (Anthony Hsia)DGH CC (Donald Harrison)EXI CC (Gene Imbro)HLGI CC (Herman Graves)MGE CC (Michele Evans)RLK CC (Rebecca Karas)nrc.gov TWGWPOO I.HQGWDOOI AJM1 CC (Andrew Murphy)CGM1 CC (Clifford Munson)YXLI CC (Yong Li)nrc.gov TWGWPO02.HQGWDOO1 BATI CC (Bret Tegeler)MJS3 CC (Mahendra Shah)VXT CC (Vaughn Thomas)Post Office Route nei.org OWGWPO01 .HQG WDO0I nrc.gov OWGWPO02.HQGWDO0I nrc.gov TWGWPOO I.HQGWDOO1 nrc.gov TWGWPO02.HQGWDO0I nrc.gov Files Size Date & Time MESSAGE 1665 06/01/2006 3:17:02 PM Combined RAIs from Task Reports 1 June 06.pdf 1317716 06/01/2006 2:57:52 PM Options Expiration Date: None Priority:
Standard ReplyRequested:
No Return Notification:
None Concealed
Subject:
No Security:
Standard