| event date = 08/08/2004 22:00 EDT | | event date = 08/08/2004 22:00 EDT | ||
| last update date = 08/08/2004 | | last update date = 08/08/2004 | ||
| title = Tech Spec Shut Down Due | | title = Tech Spec Shut Down Due to Emergency Diesel Generator Failure | ||
| event text = On August 2, 2004, at 0200, Emergency Diesel Generator (EDG) 12 was removed from service for scheduled maintenance. During surveillance testing, the EDG scavenging air blower failed on this Fairbanks Morse diesel. Repairs will not be completed within the 7 day LCO, which expires at 0200 on August 9, 2004. A plant shutdown commenced at 2200 hours on August 8, 2004, per TS 3.8.1, Condition C.1. | | event text = On August 2, 2004, at 0200, Emergency Diesel Generator (EDG) 12 was removed from service for scheduled maintenance. During surveillance testing, the EDG scavenging air blower failed on this Fairbanks Morse diesel. Repairs will not be completed within the 7 day LCO, which expires at 0200 on August 9, 2004. A plant shutdown commenced at 2200 hours on August 8, 2004, per TS 3.8.1, Condition C.1. | ||
The Licensee notified the NRC Resident Inspector. | The Licensee notified the NRC Resident Inspector. |
Latest revision as of 22:23, 1 March 2018
Where | |
---|---|
Fermi ![]() Michigan (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown | |
LER: | 05000341/LER-2004-001 |
Time - Person (Reporting Time:+-3.75 h-0.156 days <br />-0.0223 weeks <br />-0.00514 months <br />) | |
Opened: | Kevin Dahm 22:15 Aug 8, 2004 |
NRC Officer: | Bill Gott |
Last Updated: | Aug 8, 2004 |