ENS 41934: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 08/19/2005 EDT | | event date = 08/19/2005 EDT | ||
| last update date = 09/02/2005 | | last update date = 09/02/2005 | ||
| title = Violation | | title = Violation of Maximum Core Power Level Per Operating License Requirements | ||
| event text = Pursuant to the reporting requirements of Item 2.H of the [Vogtle Electric Generating Plant] VEGP Unit 1 and Unit 2 operating licenses, [Southern Nuclear Company] SNC is notifying the NRC of overpower events in violation of the maximum core power level of 3565 MWt authorized by Item 2.C.(1) of the licenses. | | event text = Pursuant to the reporting requirements of Item 2.H of the [Vogtle Electric Generating Plant] VEGP Unit 1 and Unit 2 operating licenses, [Southern Nuclear Company] SNC is notifying the NRC of overpower events in violation of the maximum core power level of 3565 MWt authorized by Item 2.C.(1) of the licenses. | ||
Based on a review of operating data dating back to January 2, 2002, SNC has identified occurrences where the daily average core power exceeded 3565 MWt by as much as 0.4 MWt for Unit 1 and 0.9 MWt for Unit 2. | Based on a review of operating data dating back to January 2, 2002, SNC has identified occurrences where the daily average core power exceeded 3565 MWt by as much as 0.4 MWt for Unit 1 and 0.9 MWt for Unit 2. |
Latest revision as of 22:20, 1 March 2018
Where | |
---|---|
Vogtle ![]() Georgia (NRC Region 2) | |
Reporting | |
Other Unspec Reqmnt | |
Time - Person (Reporting Time:+16.53 h0.689 days <br />0.0984 weeks <br />0.0226 months <br />) | |
Opened: | David Vineyard 20:32 Aug 19, 2005 |
NRC Officer: | John Knoke |
Last Updated: | Sep 2, 2005 |
41934 - NRC Website
| |