ENS 43218: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 03/05/2007 EST
| event date = 03/05/2007 EST
| last update date = 03/07/2007
| last update date = 03/07/2007
| title = Potential Defect In E7000 Relays
| title = Potential Defect in E7000 Relays
| event text = Notification of limited E7000 relay recall (CII-010).
| event text = Notification of limited E7000 relay recall (CII-010).
During our normal assembly processing of nuclear E7000 relays, Tyco Electronics experienced an issue with a component. A spring in the base assembly broke during the calibration process. An analysis of the spring revealed non-conforming heat treatment causing the spring to become brittle. Further investigation revealed that this condition was limited to one specific lot of springs.
During our normal assembly processing of nuclear E7000 relays, Tyco Electronics experienced an issue with a component. A spring in the base assembly broke during the calibration process. An analysis of the spring revealed non-conforming heat treatment causing the spring to become brittle. Further investigation revealed that this condition was limited to one specific lot of springs.

Latest revision as of 21:17, 1 March 2018

ENS 43218 +/-
Where
Tyco Electronics
Fairview, North Carolina (NRC Region 1)
Organization: Tyco Electronics
Reporting
10 CFR 21.21
Time - Person (Reporting Time:+52.5 h2.188 days <br />0.312 weeks <br />0.0719 months <br />)
Opened: Robert Villegas
09:30 Mar 7, 2007
NRC Officer: Mark Abramovitz
Last Updated: Mar 7, 2007
43218 - NRC Website