ENS 44943: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 03/29/2009 18:25 EDT
| event date = 03/29/2009 18:25 EDT
| last update date = 03/29/2009
| last update date = 03/29/2009
| title = Potentially Contaminated Person Sent Offsite For Hospital Evaluation
| title = Potentially Contaminated Person Sent Offsite for Hospital Evaluation
| event text = A worker performing U2 outage activities was exhibiting signs of heat stress and dizziness when exiting the U2 drywell access control point.  Offsite medical assistance was requested and the worker was transported to the Pottstown Memorial Medical Facility as a potentially contaminated person.  The ambulance left the site at 1825 hours 3-29-09.  At 1845 hours while at the Pottstown Memorial Medical Facility it was determined that the worker was NOT contaminated.  This report being submitted via the requirements of 10CFR50.72 (b)(3)(xii).
| event text = A worker performing U2 outage activities was exhibiting signs of heat stress and dizziness when exiting the U2 drywell access control point.  Offsite medical assistance was requested and the worker was transported to the Pottstown Memorial Medical Facility as a potentially contaminated person.  The ambulance left the site at 1825 hours 3-29-09.  At 1845 hours while at the Pottstown Memorial Medical Facility it was determined that the worker was NOT contaminated.  This report being submitted via the requirements of 10CFR50.72 (b)(3)(xii).
The individual was performing routine valve operations and was a plant employee.
The individual was performing routine valve operations and was a plant employee.

Latest revision as of 22:12, 1 March 2018

ENS 44943 +/-
Where
Limerick Constellation icon.png
Pennsylvania (NRC Region 1)
Reporting
10 CFR 50.72(b)(3)(xii), Transport of a Contaminated Person Offsite
Time - Person (Reporting Time:+-2.12 h-0.0883 days <br />-0.0126 weeks <br />-0.0029 months <br />)
Opened: Nora Graneto
20:18 Mar 29, 2009
NRC Officer: Mark Abramovitz
Last Updated: Mar 29, 2009
44943 - NRC Website
Loading map...