ENS 45512: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 11/21/2009 05:00 EST
| event date = 11/21/2009 05:00 EST
| last update date = 11/22/2009
| last update date = 11/22/2009
| title = Technical Support Center Out Of Service Due To Planned Electrical Maintenance
| title = Technical Support Center Out of Service Due to Planned Electrical Maintenance
| event text = On November 21, 2009, Fermi 2 [removed] the Technical Support Center (TSC) from operation to facilitate maintenance on the facilities' 480-volt AC power supply. This work affects TSC lighting, computers, and ventilation. During this work, which is expected to last over 8 hours, the TSC will be unavailable. In the event TSC activation is necessary, the Emergency Operations Facility (EOF) will be used for the TSC function. Activation and use of the EOF as a backup for the TSC is included in Fermi 2's Radiological Emergency Response Preparedness Plan. The Emergency Call Out System (ECOS) is designed to facilitate contacting TSC personnel to respond directly to the EOF in the event of an emergency. Fermi 2 is making this notification in accordance with 10 CFR 50.72(b)(3)(xiii). Fermi 2 will notify the NRC upon completion of this work. Fermi 2 will notify the NRC Resident Inspector.
| event text = On November 21, 2009, Fermi 2 [removed] the Technical Support Center (TSC) from operation to facilitate maintenance on the facilities' 480-volt AC power supply. This work affects TSC lighting, computers, and ventilation. During this work, which is expected to last over 8 hours, the TSC will be unavailable. In the event TSC activation is necessary, the Emergency Operations Facility (EOF) will be used for the TSC function. Activation and use of the EOF as a backup for the TSC is included in Fermi 2's Radiological Emergency Response Preparedness Plan. The Emergency Call Out System (ECOS) is designed to facilitate contacting TSC personnel to respond directly to the EOF in the event of an emergency. Fermi 2 is making this notification in accordance with 10 CFR 50.72(b)(3)(xiii). Fermi 2 will notify the NRC upon completion of this work. Fermi 2 will notify the NRC Resident Inspector.
* * * UPDATE FROM GREG MILLER TO VINCE KLCO ON 11/22/2009 AT 0036 EST * * *  
* * * UPDATE FROM GREG MILLER TO VINCE KLCO ON 11/22/2009 AT 0036 EST * * *  

Latest revision as of 21:10, 1 March 2018

ENS 45512 +/-
Where
Fermi DTE Energy icon.png
Michigan (NRC Region 3)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-4.03 h-0.168 days <br />-0.024 weeks <br />-0.00552 months <br />)
Opened: Gregg Miller
05:58 Nov 21, 2009
NRC Officer: Vince Klco
Last Updated: Nov 22, 2009
45512 - NRC Website
Loading map...