ML15205A179: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 07/13/2012 | | issue date = 07/13/2012 | ||
| title = TVA Submittal of Central Emergency Control Center Emergency Plan Implementing Procedure Revisions | | title = TVA Submittal of Central Emergency Control Center Emergency Plan Implementing Procedure Revisions | ||
| author name = Shea J | | author name = Shea J | ||
| author affiliation = Tennessee Valley Authority | | author affiliation = Tennessee Valley Authority | ||
| addressee name = | | addressee name = | ||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 July 13, 2012 10 CFR 50, Appendix E, Section V ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 Watts Bar Nuclear Plant, Unit 1 Facility Operating License No. NPF-90 NRC Docket No. 50-390 | {{#Wiki_filter:Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 July 13, 2012 10 CFR 50, Appendix E, Section V ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 Watts Bar Nuclear Plant, Unit 1 Facility Operating License No. NPF-90 NRC Docket No. 50-390 | ||
==Subject:== | ==Subject:== | ||
Central Emergency Control Center -Emergency Plan Implementing Procedure Revisions In accordance with the requirements of 10 CFR Part 50, Appendix E, Section V, this submittal provides the revised Central Emergency Control Center (CECC) Emergency Plan Implementing Procedure (EPIP) as listed below.EPIP Revision Title CECC EPIP-1 CECC EPIP-2 CECC EPIP-3 54 40 41 Central Emergency Control Center (CECC) Operations Operations Duty Specialist Procedure for Notification of Unusual Event Operations Duty Specialist Procedure for Alert Effective Date 06/15/2012 06/15/2012 06/15/2012 hNL~ | Central Emergency Control Center - Emergency Plan Implementing Procedure Revisions In accordance with the requirements of 10 CFR Part 50, Appendix E, Section V, this submittal provides the revised Central Emergency Control Center (CECC) Emergency Plan Implementing Procedure (EPIP) as listed below. | ||
EPIP Revision Title CECC EPIP-1 CECC EPIP-2 CECC EPIP-3 54 40 41 Central Emergency Control Center (CECC) Operations Operations Duty Specialist Procedure for Notification of Unusual Event Operations Duty Specialist Procedure for Alert Effective Date 06/15/2012 06/15/2012 06/15/2012 hNL~L5 Printed on recycled paper | |||
U.S. Nuclear Regulatory Commission Page 2 July 13, 2012 EPIP Revision Title Effective Date CECC EPIP-4 42 Operations Duty Specialist 06/15/2012 Procedure for Site Area Emergency CECC EPIP-5 46 Operations Duty Specialist 06/15/2012 Procedure for General Emergency CECC EPIP-6 34 CECC Plant Assessment Staff 06/15/2012 Procedure for Alert, Site Area Emergency, and General Emergency CECC EPIP-7 33 CECC Radiological Assessment 06/15/2012 Staff Procedure for Alert, Site Area Emergency, and General Emergency provides a description of the changes and a summary of the analysis performed that concluded the changes do not affect the outcome, results, functions, processes, responsibilities, or requirements of the performance of the EPIP. Enclosures 2 through 8 provide a copy of the revised EPIPs. | |||
There are no new regulatory commitments in this letter. If you have any questions regarding this submittal, please contact Terry Cribbe at (423) 751-3850. | |||
Respectfully, J. | |||
. Shea | |||
-Vice President, Nuclear Licensing | |||
==Enclosures:== | ==Enclosures:== | ||
: 1. Summary of Changes and Analysis 2. CECC EPIP-1, Central Emergency Control Center (CECC) Operations, Revision 54 3. CECC EPIP-2, Operations Duty Specialist Procedure for Notification of Unusual Event, Revision 40 4. CECC EPIP-3, Operations Duty Specialist Procedure for Alert, Revision 41 5. CECC EPIP-4, Operations Duty Specialist Procedure for Site Area Emergency, Revision 42 6. CECC EPIP-5, Operations Duty Specialist Procedure for General Emergency, Revision 46 7. CECC EPIP-6, CECC Plant Assessment Staff Procedure for Alert, Site Area Emergency, and General Emergency, Revision 34 8. CECC EPIP-7, CECC Radiological Assessment Staff Procedure for Alert, Site Area Emergency, and General Emergency, Revision 33 cc: See Page 3 U.S. Nuclear Regulatory Commission Page 3 July 13, 2012 cc (Enclosures): | : 1. Summary of Changes and Analysis | ||
NRC Regional Administrator | : 2. CECC EPIP-1, Central Emergency Control Center (CECC) Operations, Revision 54 | ||
-Region II NRC Senior Resident Inspector | : 3. CECC EPIP-2, Operations Duty Specialist Procedure for Notification of Unusual Event, Revision 40 | ||
-Browns Ferry Nuclear Plant NRC Senior Resident Inspector | : 4. CECC EPIP-3, Operations Duty Specialist Procedure for Alert, Revision 41 | ||
-Sequoyah Nuclear Plant NRC Senior Resident Inspector | : 5. CECC EPIP-4, Operations Duty Specialist Procedure for Site Area Emergency, Revision 42 | ||
-Watts Bar Nuclear Plant}} | : 6. CECC EPIP-5, Operations Duty Specialist Procedure for General Emergency, Revision 46 | ||
: 7. CECC EPIP-6, CECC Plant Assessment Staff Procedure for Alert, Site Area Emergency, and General Emergency, Revision 34 | |||
: 8. CECC EPIP-7, CECC Radiological Assessment Staff Procedure for Alert, Site Area Emergency, and General Emergency, Revision 33 cc: See Page 3 | |||
U.S. Nuclear Regulatory Commission Page 3 July 13, 2012 cc (Enclosures): | |||
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRC Senior Resident Inspector - Sequoyah Nuclear Plant NRC Senior Resident Inspector - Watts Bar Nuclear Plant}} | |||
Latest revision as of 10:19, 10 January 2025
| ML15205A179 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry, Watts Bar, Sequoyah |
| Issue date: | 07/13/2012 |
| From: | James Shea Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML15205A179 (3) | |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 July 13, 2012 10 CFR 50, Appendix E, Section V ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 Watts Bar Nuclear Plant, Unit 1 Facility Operating License No. NPF-90 NRC Docket No. 50-390
Subject:
Central Emergency Control Center - Emergency Plan Implementing Procedure Revisions In accordance with the requirements of 10 CFR Part 50, Appendix E, Section V, this submittal provides the revised Central Emergency Control Center (CECC) Emergency Plan Implementing Procedure (EPIP) as listed below.
EPIP Revision Title CECC EPIP-1 CECC EPIP-2 CECC EPIP-3 54 40 41 Central Emergency Control Center (CECC) Operations Operations Duty Specialist Procedure for Notification of Unusual Event Operations Duty Specialist Procedure for Alert Effective Date 06/15/2012 06/15/2012 06/15/2012 hNL~L5 Printed on recycled paper
U.S. Nuclear Regulatory Commission Page 2 July 13, 2012 EPIP Revision Title Effective Date CECC EPIP-4 42 Operations Duty Specialist 06/15/2012 Procedure for Site Area Emergency CECC EPIP-5 46 Operations Duty Specialist 06/15/2012 Procedure for General Emergency CECC EPIP-6 34 CECC Plant Assessment Staff 06/15/2012 Procedure for Alert, Site Area Emergency, and General Emergency CECC EPIP-7 33 CECC Radiological Assessment 06/15/2012 Staff Procedure for Alert, Site Area Emergency, and General Emergency provides a description of the changes and a summary of the analysis performed that concluded the changes do not affect the outcome, results, functions, processes, responsibilities, or requirements of the performance of the EPIP. Enclosures 2 through 8 provide a copy of the revised EPIPs.
There are no new regulatory commitments in this letter. If you have any questions regarding this submittal, please contact Terry Cribbe at (423) 751-3850.
Respectfully, J.
. Shea
-Vice President, Nuclear Licensing
Enclosures:
- 1. Summary of Changes and Analysis
- 3. CECC EPIP-2, Operations Duty Specialist Procedure for Notification of Unusual Event, Revision 40
- 4. CECC EPIP-3, Operations Duty Specialist Procedure for Alert, Revision 41
- 5. CECC EPIP-4, Operations Duty Specialist Procedure for Site Area Emergency, Revision 42
- 6. CECC EPIP-5, Operations Duty Specialist Procedure for General Emergency, Revision 46
- 7. CECC EPIP-6, CECC Plant Assessment Staff Procedure for Alert, Site Area Emergency, and General Emergency, Revision 34
- 8. CECC EPIP-7, CECC Radiological Assessment Staff Procedure for Alert, Site Area Emergency, and General Emergency, Revision 33 cc: See Page 3
U.S. Nuclear Regulatory Commission Page 3 July 13, 2012 cc (Enclosures):
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRC Senior Resident Inspector - Sequoyah Nuclear Plant NRC Senior Resident Inspector - Watts Bar Nuclear Plant