ENS 49083: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 05/31/2013 EDT
| event date = 05/31/2013 EDT
| last update date = 05/31/2013
| last update date = 05/31/2013
| title = Part-21 Interim Report - Incorrect Pressurizer Support Loads For Ap1000
| title = Part-21 Interim Report - Incorrect Pressurizer Support Loads for Ap1000
| event text = The deviation being evaluated is an identified inconsistency between the applied design loads for the AP1000 plant pressurizer support columns and embedments and the calculated actual loads. As a result, certified for construction drawings have been delivered to customers of the AP 1000 plant new build projects with an incorrect pressurizer support column embedment design configuration.  The planned changes to the embedments to correct this deviation for the pressurizer support columns will be reflected on revised certified for construction drawings but do not require changes to the current licensing basis.  The certified for construction drawings have been delivered to U.S. AP1000 plant new build customers, V.C. Summer Units 2 and 3, and A.W. Vogtle Units 3 and 4.
| event text = The deviation being evaluated is an identified inconsistency between the applied design loads for the AP1000 plant pressurizer support columns and embedments and the calculated actual loads. As a result, certified for construction drawings have been delivered to customers of the AP 1000 plant new build projects with an incorrect pressurizer support column embedment design configuration.  The planned changes to the embedments to correct this deviation for the pressurizer support columns will be reflected on revised certified for construction drawings but do not require changes to the current licensing basis.  The certified for construction drawings have been delivered to U.S. AP1000 plant new build customers, V.C. Summer Units 2 and 3, and A.W. Vogtle Units 3 and 4.
| URL = http://www.nrc.gov/reading-rm/doc-collections/event-status/event/2013/20130603en.html#en49083
| URL = http://www.nrc.gov/reading-rm/doc-collections/event-status/event/2013/20130603en.html#en49083

Latest revision as of 22:00, 1 March 2018

ENS 49083 +/-
Where
Westinghouse Electric Company
Cranberry Township, Pennsylvania (NRC Region 1)
Organization: Westinghouse Electric Company
Reporting
10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component
Time - Person (Reporting Time:+8.15 h0.34 days <br />0.0485 weeks <br />0.0112 months <br />)
Opened: James Gresham
12:09 May 31, 2013
NRC Officer: Mark Abramovitz
Last Updated: May 31, 2013
49083 - NRC Website