ENS 49198: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 07/17/2013 13:35 EDT
| event date = 07/17/2013 13:35 EDT
| last update date = 07/17/2013
| last update date = 07/17/2013
| title = Planned Testing Of Stack Radiation Monitors
| title = Planned Testing of Stack Radiation Monitors
| event text = Millstone Unit 2 loss of assessment capability due to pre-planned maintenance of the Millstone Station stack radiation monitor RM-8169 at 1335 EDT on 7/17/13. This event is reportable pursuant to 10 CFR 50.72(b)(3)(xiii) as any event that results in a major loss of emergency assessment capability. During the maintenance, Unit 2 was at 100% power, Mode 1. We informed the State of Connecticut, Waterford dispatch, and the NRC Resident Inspector.
| event text = Millstone Unit 2 loss of assessment capability due to pre-planned maintenance of the Millstone Station stack radiation monitor RM-8169 at 1335 EDT on 7/17/13. This event is reportable pursuant to 10 CFR 50.72(b)(3)(xiii) as any event that results in a major loss of emergency assessment capability. During the maintenance, Unit 2 was at 100% power, Mode 1. We informed the State of Connecticut, Waterford dispatch, and the NRC Resident Inspector.
| URL = http://www.nrc.gov/reading-rm/doc-collections/event-status/event/2013/20130718en.html#en49198
| URL = http://www.nrc.gov/reading-rm/doc-collections/event-status/event/2013/20130718en.html#en49198

Latest revision as of 22:00, 1 March 2018

ENS 49198 +/-
Where
Millstone Dominion icon.png
Connecticut (NRC Region 1)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-2.5 h-0.104 days <br />-0.0149 weeks <br />-0.00342 months <br />)
Opened: Todd Perkins
15:05 Jul 17, 2013
NRC Officer: Daniel Mills
Last Updated: Jul 17, 2013
49198 - NRC Website
Loading map...