ENS 49311: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 08/28/2013 01:48 EDT
| event date = 08/28/2013 01:48 EDT
| last update date = 08/28/2013
| last update date = 08/28/2013
| title = Technical Support Center Ventilation System Out Of Service Due To Planned Maintenance
| title = Technical Support Center Ventilation System Out of Service Due to Planned Maintenance
| event text = This is a non-emergency eight hour notification for a loss of Emergency Assessment Capability.  This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the work activity affects the functionality of an emergency response facility.  Planned maintenance activities are being performed on 08/28/13 in the Technical Support Center (TSC) HVAC.
| event text = This is a non-emergency eight hour notification for a loss of Emergency Assessment Capability.  This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the work activity affects the functionality of an emergency response facility.  Planned maintenance activities are being performed on 08/28/13 in the Technical Support Center (TSC) HVAC.
The work includes performance of planned outside air intake valve electrical troubleshooting.  The planned work activity duration is approximately 16 hours.
The work includes performance of planned outside air intake valve electrical troubleshooting.  The planned work activity duration is approximately 16 hours.

Latest revision as of 22:00, 1 March 2018

ENS 49311 +/-
Where
Catawba Duke Energy icon.png
South Carolina (NRC Region 2)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-2.47 h-0.103 days <br />-0.0147 weeks <br />-0.00338 months <br />)
Opened: Thomas Garrison
03:20 Aug 28, 2013
NRC Officer: John Shoemaker
Last Updated: Aug 28, 2013
49311 - NRC Website