ENS 49500: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 11/05/2013 01:00 CST
| event date = 11/05/2013 01:00 CST
| last update date = 11/05/2013
| last update date = 11/05/2013
| title = Technical Support Center Out Of Service For Planned Maintenance
| title = Technical Support Center Out of Service for Planned Maintenance
| event text = A planned maintenance activity at Cooper Nuclear Station [CNS] will remove the TSC [Technical Support Center] ventilation system from service. The TSC ventilation system will be rendered non-functional during this maintenance period. The maintenance activity on the TSC ventilation is expected to last less than one day.
| event text = A planned maintenance activity at Cooper Nuclear Station [CNS] will remove the TSC [Technical Support Center] ventilation system from service. The TSC ventilation system will be rendered non-functional during this maintenance period. The maintenance activity on the TSC ventilation is expected to last less than one day.
If an emergency is declared requiring TSC activation during this period, the TSC will be staffed and activated using existing emergency planning procedures unless uninhabitable due to ambient temperature, radiological, or other conditions. CNS Station procedures provide appropriate monitoring and compensatory measures to ensure habitability of the TSC and, if necessary, instructions for relocation of TSC personnel to alternate TSC facilities, should the need arise. Both of these alternate facilities are equipped with emergency ventilation systems and are currently fully functional. In the event of TSC activation, maintenance will be expedited to restore ventilation to service.
If an emergency is declared requiring TSC activation during this period, the TSC will be staffed and activated using existing emergency planning procedures unless uninhabitable due to ambient temperature, radiological, or other conditions. CNS Station procedures provide appropriate monitoring and compensatory measures to ensure habitability of the TSC and, if necessary, instructions for relocation of TSC personnel to alternate TSC facilities, should the need arise. Both of these alternate facilities are equipped with emergency ventilation systems and are currently fully functional. In the event of TSC activation, maintenance will be expedited to restore ventilation to service.

Latest revision as of 20:52, 1 March 2018

ENS 49500 +/-
Where
Cooper Entergy icon.png
Nebraska (NRC Region 4)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-13.98 h-0.583 days <br />-0.0832 weeks <br />-0.0191 months <br />)
Opened: David Nelson Madsen
17:01 Nov 4, 2013
NRC Officer: Howie Crouch
Last Updated: Nov 5, 2013
49500 - NRC Website
Loading map...