ENS 49952: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 03/24/2014 13:27 EDT
| event date = 03/24/2014 13:27 EDT
| last update date = 03/24/2014
| last update date = 03/24/2014
| title = Stack Radiation Monitor Removed From Service For Pre-Planned Maintenance
| title = Stack Radiation Monitor Removed from Service for Pre-Planned Maintenance
| event text = The Millstone Station Stack Radiation Monitor, RM-8169 was removed from service for pre-planned maintenance.  This is reportable as a loss of assessment capability in accordance with 10 CFR 50.72 (b)(3)(xiii).
| event text = The Millstone Station Stack Radiation Monitor, RM-8169 was removed from service for pre-planned maintenance.  This is reportable as a loss of assessment capability in accordance with 10 CFR 50.72 (b)(3)(xiii).
RM-8169 was restored at 1539 EDT.
RM-8169 was restored at 1539 EDT.

Latest revision as of 20:51, 1 March 2018

ENS 49952 +/-
Where
Millstone Dominion icon.png
Connecticut (NRC Region 1)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-0.88 h-0.0367 days <br />-0.00524 weeks <br />-0.00121 months <br />)
Opened: John Claire
16:34 Mar 24, 2014
NRC Officer: Donald Norwood
Last Updated: Mar 24, 2014
49952 - NRC Website
Loading map...