ML13242A008: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[NG-13-0324, First Six-Month Status Report in Response to Letter Dated March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation]]
| number = ML13242A008
| issue date = 08/27/2013
| title = Duane Arnold - First Six-Month Status Report in Response to Letter Dated March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation
| author name = Anderson R L
| author affiliation = NextEra Energy Duane Arnold, LLC
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000331
| license number = DPR-049
| contact person =
| case reference number = EA-12-051, NG-13-0324
| document type = Letter, Status Report
| page count = 5
| project =
| stage = Other
}}
 
=Text=
{{#Wiki_filter:NEXTeraENBRG Y&. A0DUANEARNOLDNG-13-0324 10 CFR 2.202August 27, 2013U. S. Nuclear Regulatory Commission ATTN: Document Control DeskWashington, DC 20555-0001 Duane Arnold Energy CenterDocket No. 50-331Renewed Op. License No. DPR-49NextEra Enerqy Duane Arnold Energy Center, LLC's First Six-Month Status Report inResponse to March 12, 2012 Commission Order Modifying Licenses with Regardto Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
 
==References:==
: 1) Order EA-12-051, "Order to Modify Licenses with Regqard toReliable Spent Fuel Pool Instrumentation" dated March 12,2012 (ML12054A682)
: 2) Letter, R. Anderson (NextEra Energqy Duane Arnold, LLC) toU. S. NRC, "NextEra Energy Duane Arnold, LLC's OverallIntegrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent FuelPool Instrumentation (Order Number EA-12-051),"
NG-13-0086, dated February
: 28. 2013 (ML13063A014)
On March 12, 2012, the Nuclear Regulatory Commission (NRC) issuedReference 1, an immediately effective Order to all licensees including NextEraEnergy Duane Arnold, LLC (hereafter NextEra Energy Duane Arnold).
InReference 2, NextEra Energy Duane Arnold submitted an Overall Integrated Planfor the implementation of this Order. The Order required Licensees to provideperiodic status reports for the Overall Integrated Plan. The purpose of this letteris to provide the first six-month status report pursuant to Section IV, Condition C.2, of Reference 1, that delineates progress made in implementing therequirements of Reference
: 1. The enclosure to this letter provides an update ofmilestone accomplishments since the last status report, including any changes tothe compliance method, schedule, or need for relief and the basis, if any.If you have any questions or require additional information contact Ken Putnamat 319-851-7238.
ACC INextEra Energy Duane Arnold, LLC, 3277 DAEC Road, Palo, IA 52324 Document Control DeskNG-1 3-0324Page 2 of 2I declare under penalty of perjury that the foregoing is true and correct.Executed on August 27, 2013Richard L. AndernVice President, Duane Arnold Energy CenterNextEra Energy Duane Arnold, LLCEnclosure cc: Regional Administrator, USNRC, Region IIIResident Inspector, USNRC, Duane Arnold Energy CenterProject Manager, USNRC, Duane Arnold Energy Center Attachment to NG-13-0324 NextEra Energy Duane Arnold, LLC's First Six Month Status Report for theImplementation of Order EA-12-051, Order Modifying Licenses with Re-gard toReliable Spent Fuel Pool Instrumentation 2 pages follow NextEra Energy Duane Arnold, LLC's first Six Month Status Report for theImplementation of Order EA-12-051, Order Modifying Licenses with Regard toReliable Spent Fuel Pool Instrumentation
: 1. Introduction NextEra Energy Duane Arnold, LLC (hereafter NextEra Energy Duane Arnold),developed an Overall Integrated Plan (Reference 1), documenting the plannedmodification with regard to Reliable Spent Fuel Pool Instrumentation in response toReference
: 2. This attachment provides an update of milestone accomplishments sincesubmittal of the Overall Integrated Plan, including any changes to the compliance method, schedule, or need for relief/relaxation and the basis, if any.2. Milestone Accomplishments No Milestones have been completed since the submittal of the Integrated Plan onFebruary 28, 2013.3. Milestone Schedule StatusThere are no changes to the status of the milestones insubmitted on February 28, 2013.the integrated plan that wasTarget ARevisedMilestone Completion Activity TargetDate Status Completion DateCommence Engineering and Design In Progress Started N/AComplete Design 4Q 2015 Started N/AComplete Procurement of SFP Started N/AInstruments 2Q 2016Complete Installation of SFP Not Started N/AInstruments 4Q 2016Instruments Operational and Not Started N/ATraining Complete 4Q 20164. Changes to Compliance MethodThere are no changes to the compliance method as documented in the OverallIntegrated Plan (Reference 1).5. Need for Relief/Relaxation and Basis for the Relief/Relaxation NextEra Energy Duane Arnold expects to comply with the order implementation dateand no relief/relaxation is required at this time.Page 1 of 2
: 6. Open Requests for additional Information The following table provides a summary of the open RAts items that were received as ofJuly 31, 2013 in response to the sites initial Integrated Plan submittal.
Open RAts StatusNo requests for additional information have been Awaiting NRC requestreceived as of July 31, 20137. References The following references support the updates to the Overall Integrated Plan described inthis enclosure.
: 1. NextEra Energy Duane Arnold, LLC's Overall Integrated Plan in Response toMarch 12, 2012 Commission Order Modifying Licenses with Regard to ReliableSpent Fuel Pool Instrumentation (Order Number EA-12-051),"
dated February 28,2013.2. NRC Order Number EA-12-051, "Order Modifying Licenses with Regard to ReliableSpent Fuel Pool Instrumentation,"
dated March 12, 2012.Page 2 of 2}}