ML15141A152: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[CNS-15-048, Transmittal of 2014 Annual Radiological Environmental Operating Report]]
| number = ML15141A152
| issue date = 05/14/2015
| title = Catawba, Units 1 and 2 - Transmittal of 2014 Annual Radiological Environmental Operating Report
| author name = Henderson K
| author affiliation = Duke Energy Carolinas, LLC
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000413, 05000414
| license number =
| contact person =
| case reference number = CNS-15-048
| package number = ML15141A154
| document type = Letter
| page count = 2
}}
 
=Text=
{{#Wiki_filter:DUKEENERGY,Kelvin HendersonVice PresidentCatawba Nuclear StationDuke EnergyCNO1VP I 4800 Concord RoadYork, SC 29745CNS-15-048o:803.701.4251f:803.701.3221May 14, 2015U.S. Nuclear Regulatory CommissionAttn: Document Control DeskWashington, D.C. 20555-0001
 
==Subject:==
Duke Energy Carolinas, LLCCatawba Nuclear Station, Units 1 and 2Docket Nos. 50-413 and 50-4142014 Annual Radiological Environmental Operating ReportPursuant to Catawba Nuclear Station Technical Specification 5.6.2 and Selected LicenseeCommitment 16.11-16, please find enclosed the 2014 Annual Radiological EnvironmentalOperating Report. This report covers operation of Catawba Units 1 and 2 during the 2014calendar year.Any questions concerning this report should be directed to Cecil A. Fletcher II at (803) 701-3622.Sincerely,Kelvin HendersonVice President, Catawba Nuclear StationEnclosurewww.duke-energy.com U.S. Nuclear Regulatory Commission2014 Annual Radiological Environmental Operating ReportMay 14, 2015Page 2xc (with enclosure):V. M. McCreeRegional AdministratorU.S. Nuclear Regulatory Commission -Region IIMarquis One Tower245 Peachtree Center Ave., NE Suite 1200Atlanta, GA 30303-1257G. Edward MillerNRC Project Manager (CNS)U.S. Nuclear Regulatory CommissionOne White Flint NorthMail Stop 8 G9ARockville, MD 20852G. A. Hutto, IlI, Senior Resident InspectorU.S. Nuclear Regulatory CommissionCatawba Nuclear Station}}

Latest revision as of 12:43, 7 April 2019