ML15152A407: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[Press Release-IV-15-013, NRC to Discuss Performance Assessment for Diablo Canyon Nuclear Power Plant]]
| number = ML15152A407
| issue date = 06/01/2015
| title = Press Release-IV-15-013: NRC to Discuss Performance Assessment for Diablo Canyon Nuclear Power Plant
| author name =
| author affiliation = NRC/OPA/RGN-IV/FO
| addressee name =
| addressee affiliation =
| docket = 05000275, 05000323
| license number =
| contact person =
| document report number = Press Release-IV-15-013
| document type = Press Release
| page count = 1
}}
 
=Text=
{{#Wiki_filter:No: IV-15-013 June 1, 2015 CONTACT: Victor Dricks (817) 200-1128                      Lara Uselding (817) 200-1519    NRC to Discuss Performance Assessment For Diablo Canyon Nuclear Power Plant  The Nuclear Regulatory Commission staff will hold public meetings in San Luis Obispo, Calif., on June 24 Diablo Canyon, located near San Luis Obispo, is operated by Pacific Gas & Electric Co. An open house will be held from 2:00 to 5:00 p.m. followed by a meeting between NRC staff and PG&E officials from 6:00 to 9:00 p.m. at the Embassy Suites, 333 Madonna Road, San Luis Obispo. At the evening meeting, in addition to the performance assessment, the NRC staff will be available to answer questions from the public on Diablo Canyon-related topics. While the plant performed safely in 2014, it will receive an additional inspection beyond the extensive baseline inspections due to an emergency preparedness finding. house and extensive question and answer period following the meeting will provide local officials and the public ample opportunity to engage the NRC on our regulatory oversight activities at Diablo  The NRC uses color-coded inspection findings and performance indicators to assess nuclear plant performance. The colors start with green and then increase to white, yellow, or red, commensurate with the safety significance of the issues involved. Performance indicators are statistical measurements of plant and equipment performance. Thagency response. There are five columns in the matrix with Column 1 requiring a baseline level of inspections. Diablo Canyon is in Column 2 because of an emergency preparedness- related white finding and will receive a follow-up inspection in addition to the baseline inspections. Inspections are performed by two NRC Resident Inspectors assigned to the plant and inspection specialists from the Region IV office in Arlington, Texas. A letter sent from the NRC Region IV office to plant officials addresses the performance of the plant during 2014. It is available on the NRC website.}}

Latest revision as of 08:36, 18 July 2018