|
|
(3 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML15279A251 | | | number = ML15279A251 |
| | issue date = 09/11/2015 | | | issue date = 09/11/2015 |
| | title = Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 2.4 - Hydrologic Engineering, Pages 2.4-144 - 2.4-157 | | | title = Amendment 114 to Final Safety Analysis Report, Section 2.4 - Hydrologic Engineering, Pages 2.4-144 - 2.4-157 |
| | author name = | | | author name = |
| | author affiliation = Tennessee Valley Authority | | | author affiliation = Tennessee Valley Authority |
Line 17: |
Line 17: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:2.4-144HYDROLOGIC ENGINEERINGWATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Chickamauga Dam (Sheet 1 of 13)Figure 2.4-11 (Sheet 1 of 13)WATTS BAR NUCLEAR PLANTFINAL SAFETYANALYSIS REPORTDischarge Rating Curve,Chickamauga Dam HYDROLOGIC ENGINEERING2.4-145WATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Watts Bar Dam (Sheet 2 of 13) | | {{#Wiki_filter:2.4-144 HYDROLOGIC ENGINEERINGWATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Chickamauga Dam (Sheet 1 of 13) |
| | Figure 2.4-11 (Sheet 1 of 13) |
| | WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Discharge Rating Curve, Chickamauga Dam |
| | |
| | HYDROLOGIC ENGINEERING2.4-145WATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Watts Bar Dam (Sheet 2 of 13) |
| HYDROLOGIC ENGINEERING2.4-146WATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Fort Loudoun Dam (Sheet 3 of 13) | | HYDROLOGIC ENGINEERING2.4-146WATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Fort Loudoun Dam (Sheet 3 of 13) |
| HYDROLOGIC ENGINEERING2.4-147WATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Tellico Dam (Sheet 4 of 13) 2.4-148HYDROLOGIC ENGINEERINGWATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Boone Dam (Sheet 5 of 13)Figure 2.4-11 (Sheet 5 of 13)Discharge Rating Curve, Boone DamWATTS BAR NUCLEAR PLANTFINAL SAFETYANALYSIS REPORT HYDROLOGIC ENGINEERING2.4-149WATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Cherokee Dam (Sheet 6 of 13) 2.4-150HYDROLOGIC ENGINEERINGWATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Douglas Dam (Sheet 7 of 13)Figure 2.4-11 (Sheet 7 of 13)Discharge Rating Curve, Douglas DamWATTS BAR NUCLEAR PLANTFINAL SAFETYANALYSIS REPORT HYDROLOGIC ENGINEERING2.4-151WATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Fontana Dam (Sheet 8 of 13)Figure 2.4-11 (Sheet 8 of 13)Discharge Rating Curve, Fontana DamWATTS BAR NUCLEAR PLANTFINAL SAFETYANALYSIS REPORT 2.4-152HYDROLOGIC ENGINEERINGWATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Fort Patrick Henry Dam (Sheet 9 of 13)Figure 2.4-11 (Sheet 9 of 13)Discharge Rating Curve,WATTS BAR NUCLEAR PLANTFINAL SAFETYANALYSIS REPORTFort Patrick Henry Dam HYDROLOGIC ENGINEERING2.4-153WATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Melton Hill Dam (Sheet 10 of 13)Figure 2.4-11 (Sheet 10 of 13)Discharge Rating Curve, Melton Hill DamWATTS BAR NUCLEAR PLANTFINAL SAFETYANALYSIS REPORT 2.4-154HYDROLOGIC ENGINEERINGWATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Norris Dam (Sheet 11 of 13)Figure 2.4-11 (Sheet 11 of 13)Discharge Rating Curve, Norris DamWATTS BAR NUCLEAR PLANTFINAL SAFETYANALYSIS REPORT HYDROLOGIC ENGINEERING2.4-155WATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, South Holston Dam (Sheet 12 of 13)Figure 2.4-11 (Sheet 12 of 13)Discharge Rating Curve, WATTS BAR NUCLEAR PLANTFINAL SAFETYANALYSIS REPORTSouth Holston Dam 2.4-156HYDROLOGIC ENGINEERINGWATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Watauga Dam (Sheet 13 of 13)Figure 2.4-11 (Sheet 13 of 13)Discharge Rating Curve, Watauga DamWATTS BAR NUCLEAR PLANTFINAL SAFETYANALYSIS REPORT 2.4-157HYDROLOGIC ENGINEERINGWATTS BARWBNP-114THIS PAGE INTENTIONALLY LEFT BLANK}} | | HYDROLOGIC ENGINEERING2.4-147WATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Tellico Dam (Sheet 4 of 13) 2.4-148 HYDROLOGIC ENGINEERINGWATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Boone Dam (Sheet 5 of 13) |
| | Figure 2.4-11 (Sheet 5 of 13) |
| | Discharge Rating Curve, Boone Dam WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT HYDROLOGIC ENGINEERING2.4-149WATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Cherokee Dam (Sheet 6 of 13) 2.4-150 HYDROLOGIC ENGINEERINGWATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Douglas Dam (Sheet 7 of 13) |
| | Figure 2.4-11 (Sheet 7 of 13) |
| | Discharge Rating Curve, Douglas Dam WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT HYDROLOGIC ENGINEERING2.4-151WATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Fontana Dam (Sheet 8 of 13) |
| | Figure 2.4-11 (Sheet 8 of 13) |
| | Discharge Rating Curve, Fontana Dam WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT 2.4-152 HYDROLOGIC ENGINEERINGWATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Fort Patrick Henry Dam (Sheet 9 of 13) |
| | Figure 2.4-11 (Sheet 9 of 13) |
| | Discharge Rating Curve, WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Fort Patrick Henry Dam HYDROLOGIC ENGINEERING2.4-153WATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Melton Hill Dam (Sheet 10 of 13) |
| | Figure 2.4-11 (Sheet 10 of 13) |
| | Discharge Rating Curve, Melton Hill Dam WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT 2.4-154 HYDROLOGIC ENGINEERINGWATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Norris Dam (Sheet 11 of 13) |
| | Figure 2.4-11 (Sheet 11 of 13) |
| | Discharge Rating Curve, Norris Dam WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT HYDROLOGIC ENGINEERING2.4-155WATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, South Holston Dam (Sheet 12 of 13) |
| | Figure 2.4-11 (Sheet 12 of 13) |
| | Discharge Rating Curve, WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT South Holston Dam 2.4-156 HYDROLOGIC ENGINEERINGWATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Watauga Dam (Sheet 13 of 13) |
| | Figure 2.4-11 (Sheet 13 of 13) |
| | Discharge Rating Curve, Watauga Dam WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT 2.4-157 HYDROLOGIC ENGINEERINGWATTS BARWBNP-114THIS PAGE INTENTIONALLY LEFT BLANK}} |
|
---|
Category:Final Safety Analysis Report (FSAR)
MONTHYEARWBL-23-053, Updated Final Safety Analysis Report (UFSAR) Amendment 5, Redacted Version2023-11-0808 November 2023 Updated Final Safety Analysis Report (UFSAR) Amendment 5, Redacted Version ML23312A1462023-11-0808 November 2023 Updated Final Safety Analysis Report (UFSAR) Amendment 5 - Table of Contents ML20323A3182020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Table of Contents WBL-20-047, Amendment 3 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (Redacted)2020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (Redacted) ML20323A3082020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML20323A3142020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Table of Contents to Sec 3.7 ML20323A3192020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML20323A3172020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Division of Responsibility (Dor), Abbreviations ML20323A3112020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML20323A3222020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML21123A2262020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Sections 3.8 to 3.12 (Redacted) ML20323A3152020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML20323A3032020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary System ML20323A3052020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 10, Main Steam and Power Conversion Systems ML20323A3002020-10-29029 October 2020 Submittal of Amendment 3 to Updated Final Safety Analysis Report ML20323A3202020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System ML21123A2252020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Table of Contents to Sec 2.4 (Redacted) ML20323A3012020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML20323A3092020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML20323A3162020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses ML20323A3102020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 2, Sec 2.5, Geology, Seismology, and Geotechnical Engineering Summary of Foundation Conditions ML20323A3062020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML20323A3122020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML20142A3892020-05-21021 May 2020 Wbnp PSAR, Chapter 12, Conduct of Operations L-19-022, Amendment 2 to Updated Final Safety Analysis Report, Chapter 8, Electric Power - Redacted2019-03-18018 March 2019 Amendment 2 to Updated Final Safety Analysis Report, Chapter 8, Electric Power - Redacted ML19060A1472019-02-19019 February 2019 Amendment 1 to USAR Chapter 2 Auxiliary System NRC Additional Redactions 2 of 5 ML19060A1762019-02-18018 February 2019 Amendment 1 to USAR Chapter 2 Auxiliary System NRC Additional Redactions 3 of 5 ML19060A1822019-02-18018 February 2019 Amendment 1 to USAR Chapter 2 Auxiliary System NRC Additional Redactions 5 of 5 ML19039A1042019-02-0808 February 2019 Amendment 1 to USAR Chapter 2 Auxiliary System NRC Additional Redactions 1 of 5 ML19060A1492019-02-0808 February 2019 Amendment 1 to USAR Chapter 2 Auxiliary System NRC Additional Redactions 4 of 5 ML17334A1602017-11-0202 November 2017 Amendment 1 to Updated Safety Analysis Report, Chapter 13, Conduct of Operations ML17334A1732017-11-0202 November 2017 Amendment 1 to Updated Safety Analysis Report, Chapter 8, Electric Power (Redacted) ML17334A1622017-11-0202 November 2017 Amendment 1 to Updated Safety Analysis Report, Chapter 14, Initial Test Program ML17334A1692017-11-0202 November 2017 Amendment 1 to Updated Safety Analysis Report, Chapter 4, Reactor ML17334A1562017-11-0202 November 2017 Amendment 1 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (Redacted) ML17334A1722017-11-0202 November 2017 Amendment 1 to Updated Safety Analysis Report, Chapter 7, Instrumentation and Controls ML17334A1582017-11-0202 November 2017 Amendment 1 to Updated Safety Analysis Report, Chapter 11, Radioactive Waste Management ML17334A1592017-11-0202 November 2017 Amendment 1 to Updated Safety Analysis Report, Chapter 12, Radiation Protection (Redacted) ML17334A1652017-11-0202 November 2017 Amendment 1 to Updated Safety Analysis Report, Chapter 17, Quality Assurance ML17334A1702017-11-0202 November 2017 Amendment 1 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System ML17334A1632017-11-0202 November 2017 Amendment 1 to Updated Safety Analysis Report, Chapter 15, Accident Analyses ML17334A1572017-11-0202 November 2017 Amendment 1 to Updated Safety Analysis Report, Chapter 10, Main Steam and Power Conversion Systems ML17334A1642017-11-0202 November 2017 Amendment 1 to Updated Safety Analysis Report, Chapter 16, Technical Specifications ML15279A3042015-09-11011 September 2015 Amendment 114 to Final Safety Analysis Report, Section 2.0 - Site Characteristics, Figure 2.5-554. Sheet 1 of 2 ML15279A3072015-09-11011 September 2015 Amendment 114 to Final Safety Analysis Report, Section 2.0 - Site Characteristics, Figure 2.5-556 ML15279A3182015-09-11011 September 2015 Amendment 114 to Final Safety Analysis Report, Section 2.0 - Site Characteristics, Figure 2.5-579 ML15279A3192015-09-11011 September 2015 Amendment 114 to Final Safety Analysis Report, Section 2.0 - Site Characteristics, Figure 2.5-583 ML15279A3082015-09-11011 September 2015 Amendment 114 to Final Safety Analysis Report, Section 2.0 - Site Characteristics, Figure 2.5-571. Sheet 1 of 4 ML15279A3052015-09-11011 September 2015 Amendment 114 to Final Safety Analysis Report, Section 2.0 - Site Characteristics, Figure 2.5-554. Sheet 2 of 2 ML15279A3252015-09-11011 September 2015 Amendment 114 to Final Safety Analysis Report, Section 2.0 - Site Characteristics, Figure 2.5-597 2023-11-08
[Table view] |
Text
2.4-144 HYDROLOGIC ENGINEERINGWATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Chickamauga Dam (Sheet 1 of 13)
Figure 2.4-11 (Sheet 1 of 13)
WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Discharge Rating Curve, Chickamauga Dam
HYDROLOGIC ENGINEERING2.4-145WATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Watts Bar Dam (Sheet 2 of 13)
HYDROLOGIC ENGINEERING2.4-146WATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Fort Loudoun Dam (Sheet 3 of 13)
HYDROLOGIC ENGINEERING2.4-147WATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Tellico Dam (Sheet 4 of 13) 2.4-148 HYDROLOGIC ENGINEERINGWATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Boone Dam (Sheet 5 of 13)
Figure 2.4-11 (Sheet 5 of 13)
Discharge Rating Curve, Boone Dam WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT HYDROLOGIC ENGINEERING2.4-149WATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Cherokee Dam (Sheet 6 of 13) 2.4-150 HYDROLOGIC ENGINEERINGWATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Douglas Dam (Sheet 7 of 13)
Figure 2.4-11 (Sheet 7 of 13)
Discharge Rating Curve, Douglas Dam WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT HYDROLOGIC ENGINEERING2.4-151WATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Fontana Dam (Sheet 8 of 13)
Figure 2.4-11 (Sheet 8 of 13)
Discharge Rating Curve, Fontana Dam WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT 2.4-152 HYDROLOGIC ENGINEERINGWATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Fort Patrick Henry Dam (Sheet 9 of 13)
Figure 2.4-11 (Sheet 9 of 13)
Discharge Rating Curve, WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Fort Patrick Henry Dam HYDROLOGIC ENGINEERING2.4-153WATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Melton Hill Dam (Sheet 10 of 13)
Figure 2.4-11 (Sheet 10 of 13)
Discharge Rating Curve, Melton Hill Dam WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT 2.4-154 HYDROLOGIC ENGINEERINGWATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Norris Dam (Sheet 11 of 13)
Figure 2.4-11 (Sheet 11 of 13)
Discharge Rating Curve, Norris Dam WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT HYDROLOGIC ENGINEERING2.4-155WATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, South Holston Dam (Sheet 12 of 13)
Figure 2.4-11 (Sheet 12 of 13)
Discharge Rating Curve, WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT South Holston Dam 2.4-156 HYDROLOGIC ENGINEERINGWATTS BARWBNP-114Figure 2.4-11 Discharge Rating Curve, Watauga Dam (Sheet 13 of 13)
Figure 2.4-11 (Sheet 13 of 13)
Discharge Rating Curve, Watauga Dam WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT 2.4-157 HYDROLOGIC ENGINEERINGWATTS BARWBNP-114THIS PAGE INTENTIONALLY LEFT BLANK