{{Adams
#REDIRECT [[NL-17-0516, Enclosure 2: Edwin I. Hatch Nuclear Plant, Unit 2 - Cycle 25 Core Operating Limits Report Version 1]]
| number = ML17090A145
| issue date = 03/28/2017
| title = Enclosure 2: Edwin I. Hatch Nuclear Plant, Unit 2 - Cycle 25 Core Operating Limits Report Version 1
| author name =
| author affiliation = Southern Nuclear Operating Co, Inc
| addressee name =
| addressee affiliation = NRC/NRR
| docket = 05000366
| license number =
| contact person =
| case reference number = NL-17-0516
| document report number = VSP-SNC-HV1-17-003
| package number = ML17090A142
| document type = Fuel Cycle Reload Report
| page count = 67
}}
 
=Text=
{{#Wiki_filter:Edwin I. Hatch Nuclear Plant -Unit 2 Unit 2 Cycle 25 Core Operating Limits Report Version 1 Enclosure 2 Unit 2 Cycle 25 Core Operating Limits Report NON-PROPRIETARY INFORMATION ENCLOSURE2 VSP-SNC-HVl-17-003 Edwin I. Hatch Nuclear Plant Unit 2 Cycle 25 Core Operating Limits Report Non-Proprietary Information INFORMATION NOTICE This is a non-proprietary version of Enclosure 1 of VSP-SNC-HVI-17-003, which has the proprietary information removed. Portions of the document that have been removed are indicated by white space inside open and closed bracket as shown here [[ ]].
Non-Proprietary Information SOUTHERN NUCLEAR OPERA TING COMPANY EDWIN I. HATCH NUCLEAR PLANT Unit 2 Cycle 25 CORE OPERA TING LIMITS REPORT Version 1.0 Southern Nuclear Operating Company Post Office Box 1295 Birmingham, Alabama 35242 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Edwin I. Hatch Nuclear Plant Core Operating Limits Report Version 1.0 Unit 2 Cycle 25 Core Operating Limits Report TABLE OF CONTENTS Section Title Page 1.0 Introduction 8 2.0 APLHGR Operating Limits 10 3.0 MCPR Operating Limits 14 4.0 LHGR Operating Limits 51 5.0 Operating Pressure Limits 60 6.0 PBDA Amplitude Setpoint 64 7.0 References 65 2 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Core Operating Limits Report Version 1.0 TABLES Table No. Title Page 1-1 Main Turbine Bypass System Operability 8 1-2 Equipment-Out-of-Service Limitations 9 3-1 Exposure Definitions 16 3-2 Flow-Dependent MCPR Operating Flexibility Options 17 3-3 Power-Dependent MCPR Operating Flexibility Options 17 3-4 Power-Dependent Kp Multiplier Flexibility Options 18 3-5 Rated-Power MCPR Operating Flexibility Options 19 4-1 LHGR Limits versus Peak Pellet Exposure 51 4-2 Flow-Dependent LHGR Operating Flexibility Options 52 4-3 Power-Dependent LHGR Operating Flexibility Options 52 5-1 Pressure Dependent Operating Flexibility Options 61 5-2 Maximum Thermal Limit Ratios for Equipment In Service Operation 62 5-3 Maximum Thermal Limit Ratios for EOC-RPT Out of Service Operation 62 6-1 Licensed OPRM Amplitude Setpoints 64 3 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Core Operating Limits Report Version 1.0 FIGURES Figure No. Title Page 2-1A GE14C Flow-Dependent APLHGR Multiplier (MAPFACF) versus Core Flow 11 2-18 GNF2 and GNF3 LTA Flow-Dependent APLHGR Multiplier (MAPFACF) versus Core Flow 12 2-2 APLHGR Limit Versus Average Planar Exposure 13 3-1 Flow-Dependent MCPR Limit (MCPRF) versus Core Flow 20 3-2A Power-Dependent MCPR Limit (MCPRp) versus Core Power 21 3-28 Power-Dependent MCPR Limit (MCPRp) versus Core Power (Main Turbine Bypass System Inoperable and/or Main Turbine Pressure Regulator System Status in TLCO 3. 3. 13. c) 22 3-2C Power-Dependent MCPR Limit (MCPRp) versus Core Power (High Pressure Feedwater Heaters Out of Service) 23 3-3A Power-Dependent MCPR Multiplier (Kp) versus Core Power 24 3-38 Power-Dependent MCPR Multiplier (Kp) versus Core Power (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c) 25 3-3C Power-Dependent MCPR Multiplier (Kp) versus Core Power (High Pressure Feedwater Heaters Out of Service) 26 3-4A-1 TLO MCPR Limits versus Average SCRAM Time 27 3-4A-2 TLO MCPR Limits versus Average SCRAM Time (EOC-RPT Out of Service) 28 3-4A-3 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Bypass System Inoperable) 29 4 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Core Operating Limits Report Version 1.0 Figure No. Title Page 3-4A-4 TLO MCPR Limits versus Average SCRAM Time (EOC-RPT Out of Service & Main Turbine Bypass System Inoperable) 30 3-4A-5 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c) 31 3-4A-6 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & EOC-RPT Out of Service) 32 3-4A-7 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & Main Turbine Bypass System Inoperable) 33 3-4A-8 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3. 3. 13. c & EOC-RPT Out of Service & Main Turbine Bypass System Inoperable) 34 3-4A-9 TLO MCPR Limits versus Average SCRAM Time (High Pressure Feedwater Heaters Out of Service) 35 3-4A-10 TLO MCPR Limits versus Average SCRAM Time (High Pressure Feedwater Heaters Out of Service & EOC-RPT Out of Service) 36 3-4A-11 TLO MCPR Limits versus Average SCRAM Time (High Pressure Feedwater Heaters Out of Service & Main Turbine Bypass System Inoperable) 37 3-4A-12 TLO MCPR Limits versus Average SCRAM Time (High Pressure Feedwater Heaters Out of Service & EOC-RPT Out of Service & Main Turbine Bypass System Inoperable) 38 3-48-1 SLO MCPR Limits versus Average SCRAM Time 39 3-48-2 SLO MCPR Limits versus Average SCRAM Time (EOC-RPT Out . of Service) 40 3-48-3 SLO MCPR Limits versus Average SCRAM Time (Main Turbine 5 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Core Operating Limits Report Version 1.0 Figure No. Title Page Bypass System Inoperable) 41 3-48-4 SLO MCPR Limits versus Average SCRAM Time (EOC-RPT Out of Service & Main Turbine Bypass System Inoperable) 42 3-48-5 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c) 43 3-48-6 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & EOC-RPT Out of Service) 44 3-48-7 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & Main Turbine Bypass System Inoperable) 45 3-48-8 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & EOC-RPT Out of Service & Main Turbine Bypass System Inoperable) 46 3-48-9 SLO MCPR Limits versus Average SCRAM Time (High Pressure Feedwater Heaters Out of Service) 47 3-48-10 SLO MCPR Limits versus Average SCRAM Time (High Pressure Feedwater Heaters Out of Service & EOC-RPT Out of Service) 48 3-48-11 SLO MCPR Limits versus Average SCRAM Time (High Pressure Feedwater Heaters Out of Service & Main Turbine Bypass System Inoperable) 49 3-48-12 SLO MCPR Limits versus Average SCRAM Time (High Pressure Feedwater Heaters Out of Service & EOC-RPT Out of Service & Main Turbine Bypass System Inoperable) 50 4-1A GE14C Flow-Dependent LHGR Multiplier (LHGRFACF) versus Core Flow 53 4-18 GNF2 & GNF3 LTA Flow-Dependent LHGR Multiplier 6 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Core Operating Limits Report Version 1.0 Figure No. Title Page (LHGRFACF) versus Core Flow 54 4-1C GNF2 & GNF3 LTA Flow-Dependent LHGR Multiplier (LHGRFACF) versus Core Flow (Main Turbine Bypass System Inoperable) 55 4-2A Power-Dependent LHGR Multiplier (LHGRFACp) versus Core Power 56 4-28 Power-Dependent LHGR Multiplier (LHGRFACp) versus Core Power (High Pressure Feedwater Heaters Out of Service) 57 4-3A GE14C LHGR Limit versus Peak Pellet Exposure 58 4-38 GNF2 & GNF3 LTA LHGR Limit versus Peak Pellet Exposure 59 5-1 Licensed Regions of Operating Dome Pressure versus Core Power 63 7 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Core Operating Limits Report Version 1.0
 
==1.0 INTRODUCTION==
The Core Operating Limits Report (COLR) for Plant Hatch Unit 2 Cycle 25 is prepared in accordance with the requirements of Technical Specification 5.6.5. The core operating limits presented herein were developed using NRG-approved methods (References 1 through 6). Results from the reload analyses for the fuel in Unit 2 Cycle 25 are documented in References 2 through 4. The following core operating limits are included in this report: a. Average Planar Linear Heat Generation Rate (APLHGR) -Technical Specification 3.2.1 b. Minimum Critical Power Ratio (MCPR) -Technical Specification 3.2.2 c. Linear Heat Generation Rate (LHGR) -Technical Specification 3.2.3 This report includes reduced thermal limit ratios which may be used in conjunction with the standard core operating limits to allow operation with dome pressure down to 40 psi below nominal. Also included in this report are the licensed scram setpoints for the Period Based Detection Algorithm (PBDA) in the Oscillation Power Range Monitor (OPRM). Based upon the reload analyses for this cycle, the following operability requirement is defined for Unit 2 operation. TABLE 1-1 Main Turbine Bypass System Operability .. *sysiern . ! . . "Operability . .. ., .. . . Main Turbine .Bypass System Operable At least two bypass valves must be operable (Technical Specification 3.7.7) 8 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Core Operating Limits Report Version 1.0 From a fuel thermal limits perspective, the following limitations are placed on Unit 2 operation. TABLE 1-2 Equipment-Out-of-Service Limitations * ** << *.' *, . *:'.: . * * !=quip_rn_enf/ ____ '( ;_ , _ Single-Loop Operation (SLO) Any 41h stage feedwater heater configuration off-normal OPRM System Inoperable Main Turbine Bypass System Inoperable OR Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c High Pressure Feedwater Heaters Out of Service !/,_ "-"*' ( * ---* :t..:in1itatid1:r * "" " '* ., ' ' :'---* Core Power must be :::; 2000 MWth
* Core Flow must be :::; 56% of Rated High Pressure Feedwater Heaters Out of Service limits must be applied, unless the standard LFWH analysis is demonstrated to remain applicable by BWR Fuel Engineering Dome Pressure must be within +/-10 psi of nominal, as defined in Figure 5-1 High Pressure Feedwater Heaters Out of Service No Core Operating Limits available (Technical and Main Turbine Pressure Regulator System Specifications RAS 3.2.2 and 3.2.3 must be Status in TLCO 3.3.13.c simultaneously entered) 9 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Core Operating Limits Report Version 1.0 2.0 APLHGR OPERATING LIMITS (Technical Specification 3.2.1) For both two loop operation (TLO) and single loop operation (SLO), the APLHGR limit for each six inch axial segment of each fuel assembly in the core is the applicable fuel-type-specific APLHGR limit in Figure 2-2 multiplied by the fuel-type-specific flow-dependent multiplier, MAPFACF, taken from either: a. Figure 2-1A for GE14C fuel b. Figure 2-1 B for GNF2 fuel c. Figure2-1BforGNF3LTAs 10 Plant Hatch Unit 2 Cycle 25 1.00 i 0.90 0.86 .9! ii .. 0.80 :l 2 a:: (!) J: 0.70 < ..... c GI "C c :g_ 0.60 GI c u: 0.50 0.40 30 I 40 Flow TLO 30.0::;; F::;; 61.0 61.0 < F 30.0::;; F I Non-Proprietary Information 50 SlO'/ TLO TLO TLO SLO I I I I I I I I I I I I 601 61 70 Core Flow (% of Rated) MAPFACF 0.86 1.00 0.80 I 80 F = Percent of Rated Core Flow FIGURE 2-1A I TLO SLO Core Operating Limits Report Version 1.0 I ' I 90 100 110 GE14C Flow-Dependent APLHGR Multiplier (MAPFACF) versus Core Flow 11 Plant Hatch Unit 2 Cycle 25 1.0 0.9 .. * !l! ii :g 0.8 a 0:: (!) :c 0.7 <( c Cl) "C c [ 0.6 Cl) c u: 0.5 0.4 30 40 Flow " 30.0::; F 30.0::; F Non-Proprietary Information I TLO I I SLO I 50 60 70 80 Core Flow (% of Rated) SLO/TLC MAPFACF TLO 1.00 SLO 0.80 F = Percent of Rated Core Flow FIGURE 2-18 Core Operating Limits Report Version 1.0 90 100 110 GNF2 and GNF3 L TA Flow-Dependent APLHGR Multiplier (MAPFACF) versus Core Flow 12 Plant Hatch Unit 2 Cycle 25 Average GE14C **Planar <** APL.:HGR Exposure .Ljmif" (GWd/ST) (kW/ft) 0.00 12.82 14.51 12.82 19.13 12.82 57.61 8.00 63.50 5.00 . Average GNF2
* Planar APLHGR Exposure ' Liinit CGWd/ST) (kW/ft) 0.00 13.78 17.15 13.78 60.78 6.87 63.50 5.50 . Average GNF3 LTA Planar* APLHGR Exposure Limit CGWd/ST) .(kW/ft) 0.00 13.78 17.15 13.78 60.78 6.87 63.50 5.50 15.0 14.0 13.0 12.0 11.0 g 3: 10.0 .. .E :J 9.0 a:: (!) :i: ...J B.O a. ci: 7.0 6.0 5.0 4.0 Non-Proprietary Information Core Operating Limits Report Version 1.0 ' I GNF2 I N I & GNF3 LTA I -j GE14C , .. ' ' ' 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 55.0 60.0 65.0 Average Planar Exposure (GWd/ST) FIGURE 2-2 APLHGR Limit Versus Average Planar Exposure 13 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Core Operating Limits Report Version 1.0 3.0 MCPR OPERA TING LIMITS (Technical Specification 3.2.2) The MCPR operating limits (OLMCPR) for each fuel type are a function of core power, core flow, average scram time, number of operating recirculation loops, EOC-RPT system status, operability of the main turbine bypass system, the status of the main turbine pressure regulator system, status of the high pressure feedwater heaters, and cycle exposure. Cycle exposures are defined in Table 3-1. The OLMCPRs for both two loop operation (TLO) and single loop operation (SLO) are determined as follows: a. For 24% ::; core power::; 45%, the greater of either: 1) The flow-dependent MCPR limit, MCPRF, as determined by Table 3-2, 2) The power-dependent MCPR limit, MCPRp, as determined by Table 3-3. b. For core power> 45%, the greater of either: 1) MCPRF, as determined by Table 3-2, 2) The product of the power-dependent multiplier, Kp, as determined by Table 3-4, and the rated-power OLMCPR, as determined by Table 3-5. These limits apply to all operating conditions with normal feedwater temperature, as well as with feedwater temperature reduction. These limits apply to operation with vessel dome pressure within +/-1 O psi of nominal pressure, as defined by the Region I pressure band shown in Figure 5-1. With all equipment in service or with the EOC-RPT system out of service, operation with vessel dome pressure down to 40 psi below nominal is licensed provided the additional restrictions identified in Section 5.0 are applied with the MCPR operating limit defined in this section. 14 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Core Operating Limits Report Version 1.0 In the 3-4A and 3-48 figures, Option A scram time OLMCPRs correspond to 't = 1.0, where 't is determined from scram time measurements performed in accordance with Technical Specifications Surveillance Requirements 3.1.4.1 and 3.1.4.2. Option B values correspond to 't = 0.0. For scram times between Option A and Option B, the rated-power OLMCPR corresponds to 't. If 't has not been determined, Option A limits must be used. The average scram time of the control rods, 't , is defined as: = 0, OR , whichever is greater. where: '!A = 1.08 sec (Technical Specification 3.1.4, Table 3.1.4-1, scram time limit to notch 36). I -2 = &#xb5;+ 1.65* (j
* N, 'ts n I Ni i=l where: &#xb5; = 0.822 sec (mean scram time used in the transient analysis). (j = 0.018 sec (standard deviation of&#xb5;). N, = total number of active rods measured in Technical Specifications Surveillance Requirement 3.1.4.1. n = number of surveillance tests performed to date in the cycle. Ni = number of active control rods measured in the i1h surveillance test. n INi'ti = i=l 't ave n I Ni i=l where: 'ti = average scram time to notch 36 of all rods in the i1h surveillance test. 15 Plant Hatch Unit 2 Cycle 25 Exposure Label BOC MOC1 MOC2 EOR EOC Non-Proprietary Information TABLE 3-1 Exposure Definitions Definition Beginning of Cycle Exposure First Middle of Cycle Exposure Second Middle of Cycle Exposure End of Rated Exposure End of Cycle Exposure 16 Core Operating Limits Report Version 1.0 Cycle Exposure 0 MWd/ST EOR -7978 MWd/ST EOR -3278 MWd/ST Projected exposure at end of rated power with all control rods out, rated core flow, and rated feedwater temperature Exposure at cycle shutdown Plant Hatch Unit 2 Cycle 25 '; (, EOC-RPT Svstem In Service Yes/No Yes/No Yes/No ... ,,,' .>>"'* *" '; EOC-RPT Svstem In Service Yes/No Yes/No Yes/No Yes/No Yes/No Non-Proprietary Information Core Operating Limits Report Version 1.0 TABLE 3-2 Flow-Dependent MCPR Operating Flexibility Options ,, ;, '.*.,'. Equipment In or Out of Service Main Turbine Bvpass Svstem Operable* Yes/No Yes/No Yes/No Main Turbine Pressure Regulator Svstem Status TLCO 3.3.13.a or b TLCO 3.3.13.c TLCO 3.3.13.c TABLE 3-3 High Pressure Feedwater Heaters In Service Yes/No Yes No Power-Dependent MCPR Operating Flexibility Options *: . ** ,*:McPR.,.from .=:: .. to s of " Equipment In or Out of Service Main Turbine Main Turbine High Pressure B'tQass S'f.stem Pressure Regulator Feedwater Heaters Operable* S't,stem Status In Service Yes TLCO 3.3.13.a or b Yes No TLCO 3.3.13.a or b Yes Yes/No TLCO 3.3.13.c Yes Yes/No TLCO 3.3.13.a or b No Yes/No TLCO 3.3.13.c No Figure# 3-1 3-1 Not Licensed ';'.,; ',,' .:*>.;,,, Figure# 3-2A 3-28 3-28 3-2C Not Licensed *At least two bypass valves must be operable 17 Plant Hatch Unit 2 Cycle 25 EOC-RPT System In Service Yes/No Yes/No Yes/No Yes/No Non-Proprietary Information Core Operating Limits Report Version 1.0 TABLE 3-4 Power-Dependent KP Multiplier Flexibility Options KP for Core Power :> 45% of Rated Equipment In or Out of Service Main Turbine Main Turbine High Pressure Figure# Bw.ass System Pressure Regulator Feedwater Heaters OQ.erable* System Status In Service Yes/No TLCO 3.3.13.a orb Yes 3-3A Yes/No TLCO 3.3.13.c Yes 3-38 Yes/No TLCO 3.3.13.a orb No 3-3C Yes/No TLCO 3.3.13.c No Not Licensed *At least two bypass valves must be operable 18 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information TABLE 3-5 Core Operating Limits Report Version 1.0 . Rated-Power MCPR Operating Flexibility Options ! -; ' -: . -,--. . . . *. ... .. .: . .. :. ...... : ....... . / '"-: . *. : * . .,: * . .> .... . .. . ._:_;\ .. ,::, Figure# Equipment In/Out of Service TLO SLO Equipment In Service 3-4A-1 3-4B-1 EOC-RPT Out of Service 3-4A-2 3-4B-2 Main Turbine Bypass System Inoperable 3-4A-3 3-4B-3 EOC-RPT Out of Service AND Main Turbine Bypass 3-4A-4 3-4B-4. System Inoperable Main Turbine Pressure Regulator System Status 3-4A-5 3-4B-5 in TLCO 3.3.13.c
* EOC-RPT Out of Service 3-4A-6 3-4B-6 Main Turbine Bypass 3-4A-7 3-4B-7 Main Turbine Pressure System Inoperable Regulator System Status AND in TLCO 3.3.13.c EOC-RPT Out of Service AND 3-4A-8 3-4B-8 Main Turbine Bypass System Inoperable High Pressure Feedwater Heaters Out of Service
* 3-4A-9 3-4B-9 EOC-RPT Out of Service 3-4A-10 3-4B-10 Main Turbine Bypass 3-4A-11 3-4B-11 High Pressure Feedwater System Inoperable Heaters Out of Service AND EOC-RPT Out of Service AND 3-4A-12 3-4B-12 Main Turbine Bypass System Inoperable " High Pressure Feedwater Heaters Out of Service in combination with Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c is not a licensed operating condition. 19 I ---------
Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Core Operating Limits Report Version 1.0 1.6 1.5 'U: 0:: a. (..) e .... . E :i 1.4 0:: a. (..) .... c: Q) "C c: 1.3 Q) c. Q) c 0 u::: 1.2 1.1 "' "' ' ' "' ' "" 30 40 50 60 70 Core Flow(% of Rated) MCPRF(TLO) = A+ B*F MCPRF(SLO) = MCPRF(TLO) + 0.04 Flow A *. e* 30.0 F < 80.0 1.7444 -0.00603 80.0 F < 90.0 1.4967 -0.00293 90.0 F 1.2330 0.00000 F = Percent of Rated Core Flow FIGURE 3-1 80 90 Flow-Dependent MCPR Limit (MCPRF) versus Core Flow 20 100 110 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information 2.8 2.6 0.. 0:: 2.4 ... '&sect; :J g: 2.2 u ::ii!: ... c: Q) 'C 2.0 c. Q) c D. 1.8 1.6 I 60% Flow I -.............. ......._ """"""""' -I 60% Flow . I I < 60% Flow I I < 60% Flow I 24 26 28 30 32 34 36 Core Power(% of Rated) MCPRp(TLO) = A+ B*P MCPRp(SLO) = MCPRp(TLO) + 0.04 Flow Power F 60.0 24.0 :::; p :::; 28.0 F 60.0 28.0 < p :::; 45.0 F < 60.0 24.0 :::; p:::; 28.0 F < 60.0 28.0 < p :::; 45.0 P = Percent of Rated Core Power F = Percent of Rated Core Flow A* 3.4100 2.5424 2.2100 2.0353 FIGURE 3-2A 38 Core Operating Limits Report Version 1.0 -40 42 44 45 B -0.03000 -0.01294 0.00000 -0.00412 Power-Dependent MCPR Limit (MCPRp) versus Core Power 21 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Core Operating Limits Report Version 1.0 2.8 2.6 0.. D:: 2.4 ... "&sect; :J g: 2.2 u 2 ... c: Q) "O 5i 2.0 c. Q) 9 ll. 1.8 1.6 f
* 60% Flow f -.............. --....... " -f 60% Flow f f < 60% Flow I < 60% Flow I 24 26 28 30 32 34 36 Core Power (% of Rated) MCPRp(TLO) = A + B*P MCPRp(SLO) = MCPRp(TLO) + 0.04 Flow *Power F;:: 60.0 24.0 :::; p :::; 28.0 F;:: 60.0 28.0 < p :::; 45.0 F < 60.0 24.0 :::; p :::; 28.0 F < 60.0 28.0 < p :::; 45.0 P = Percent of Rated Core Power F = Percent of Rated Core Flow A 3.4100 2.5424 3.1200 2.0353 FIGURE 3-28 38 40 42 .. B -0.03000 -0.01294 -0.03250 -0.00412 Power-Dependent MCPR Limit (MCPRp) versus Core Power (Main Turbine Bypass System Inoperable and/or Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c) 22 -44 45 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Core Operating Limits Report Version 1.0 2.8 2.6 0. 0::: 2.4 ... *e :J g: 2.2 (.) 2 ... c Cll "C a; 2.0 c. Cll c .!. 1.8 1.6 I 60% Flow I -.............. ......._ -......... " -I > 60% Flow I < 60% Flow I ----...;;;;;; r---.;:::: r-------------I < 60% Flow I r----r------24 26 28 30 32 34 36 Core Power (% of Rated) MCPRp(TLO) = A+ B*P MCPRp(SLO) = MCPRp(TLO) + 0.04 '* :. Flow* *' . Power F;:: 60.0 24.0 :5 p :5 28.0 F;:: 60.0 28.0 < p :5 45.0 F < 60.0 24.0 :5 p :5 28.0 F < 60.0 28.0 < p :5 45.0 P = Percent of Rated Core Power F = Percent of Rated Core Flow *,A.* 3.4100 2.5424 3.1200 2.6706 FIGURE 3-2C 38 40 42 B -0.03000 -0.01294 -0.03250 -0.01824 Power-Dependent MCPR Limit (MCPRp) versus Core Power (High Pressure Feedwater Heaters Out of Service) 23 44 45 Plant Hatch Unit 2 Cycle 25 1.30 1.25 "' "'"it 1.20 c. :;::; 3 2 0::: '"" Non-Proprietary Information Core Operating Limits Report Version 1.0 1.15 2 c I'"' ' Cl> "C c: :g_ 1.10 Cl> c 0 D. 1.05 1.00 '-. ...... ' ' ....... .............. ' 45 50 55 60 65 70 75 80 85 90 95 100 Core Power(% of Rated) Kp =A+ B*P ... *Power ... A .. B 45.0 < p s 60.0 1.6700 -0.00867 60.0 < p s 85.0 1.3708 -0.00368 85.0 < p s 100.0 1.3867 -0.00387 P = Percent of Rated Core Power FIGURE 3-3A Power-Dependent MCPR Multiplier (Kp) versus Core Power 24 J Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Core Operating Limits Report Version 1.0 1.30 1.25 1.20 i :; :2= a:: 1.15 :2= ... c: Q) "'C c: Q) C.1.10 Q) c Q. 1.05 1.00 "' "" --............. ""' '""' 45 50 55 60 65 70 75 80 85 90 Core Power(% of Rated) Kp =A+ B*P Power, A ' B 45.0 < p s 60.0 1.5320 -0.00560 60.0 < p s 85.0 1.3808 -0.00308 85.0 < p s 100.0 1.3867 -0.00387 P = Percent of Rated Core Power FIGURE 3-38 Power-Dependent MCPR Multiplier (Kp) versus Core Power (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c) 25 95 100 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Core Operating Limits Report Version 1.0 1.30 1.25 ll. 1.20 3 a D:: f; 1.15 a .... c: Q) "C c: Q) C..1.10 Q) c c.. 1.05 1.00 ' -.............. ..........__ --............. " "" '"" 45 50 55 60 65 70 75 BO BS 90 Core Power(% of Rated) Kp =A+ B*P Power A B 45.0 < p :5 60.0 1.6700 -0.00867 60.0 < p :5 85.0 1.3012 -0.00252 85.0 < p :5 100.0 1.5800 -0.00580 P = Percent of Rated Core Power FIGURE 3-3C Power-Dependent MCPR Multiplier (Kp) versus Core Power (High Pressure Feedwater Heaters Out of Service) 26 95 100 Plant Hatch Unit 2 Cycle 25 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 ..... 1.56 .E 1.54 :J 0:: 1.52 1.50 2 1.48 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 ---0.0 * <
* Non-Proprietary Information 0.3 0.5 Range .QLMCPR1Twi , ' " ... 't,,,; 0.0 't = 1.0 BOC-MOC1 1.31 1.42 MOC1 -MOC2 1.41 1.52 MOC2-EOC 1.43 1.54 FIGURE 3-4A-1 Core Operating Limits Report Version 1.0 I MOC2-EOC I 1 MOC1 -MOC2 t-I BOC-MOC1 I 0.8 1.0 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 ..... 1.54 .E :J 1.52 0:: 1.50 1.48 2 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 TLO MCPR Limits versus Average SCRAM Time 27 Plant Hatch Unit 2 Cycle 25 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 -1.56 .E 1.54 ::i 1.52 1.50 2 1.48 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 ----------------------------0.0 0.3 Range BOC-MOC1 MOC1 -MOC2 MOC2-EOC Non-Proprietary Information Core Operating Limits Report Version 1.0 I MOC2-EOC 1-:: I ----------1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 -1.54 .E ---------I MOC1 -MOC2 ---------------------------------I BOC -MOC1 I------I -----0.5 0.8 1.0 . OLMCPR(rLo) .
* i= 0.0 .. . 1.0 1.32 1.45 1.42 1.55 1.54 1.67 FIGURE 3-4A-2 ::i 1.52 1.50 1.48 2 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 TLO MCPR Limits versus Average SCRAM Time (EOC-RPT Out of Service) 28 Plant Hatch Unit 2 Cycle 25 1.76 1.74 1.72 1.7a 1.68 1.66 1.64 1.62 1.6a 1.58 .... 1.56 . E 1.54 :J 0:: 1.52 1.5a :a: 1.48 1.46 1.44 1.42 1.4a 1.38 1.36 1.34 1.32 1.3a --a.a Non-Proprietary Information a.3 a.5 Core Operating Limits Report Version 1.0 I MOC2-EOC I 1 MOC1 -MOC2 t-I BOC-MOC1 I a.8 1.a 1.76 1.74 1.72 1.7a 1.68 1.66 1.64 1.62 1.6a 1.58 1.56 .... 1.s4 .E :J 1.52 0:: 1.5a 1.48 :a: 1.46 1.44 1.42 1.4a 1.38 1.36 1.34 1.32 1.3a Exposure Range OLMCPRcrLO) -r=O.O 't = 1.0 BOC-MOC1 1.34 1.44 MOC1 -MOC2 1.43 1.54 MOC2-EOC 1.45 1.56 FIGURE 3-4A-3 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Bypass System Inoperable) 29 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Core Operating Limits Report Version 1.0 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 .... 1.56 .E 1.54 :::i 0:: 1.52 1.50 a 1.48 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 I MOC2-EOC l -----------------------: MOC1 -MOC2 I------------------------------------------I BOC-MOC1 I--0.0 ----I ---------0.3 0.5 0.8 Exposure.Range OLMCPR(TLO) . -r.=0.Q* ; k" 't = 1.0 BOC -MOC1 1.35 1.49 MOC1 -MOC2 1.44 1.58 MOC2-EOC 1.57 1.71 FIGURE 3-4A-4 TLO MCPR Limits versus Average SCRAM Time (EOC-RPT Out of Service & Main Turbine Bypass System Inoperable) 30 1.0 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 .... 1.54 .E :::i 1.52 0:: 1.50 1.48 a 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 Plant Hatch Unit 2 Cycle 25 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 .... 1.56 .E 1.54 :::i 0:: 1.52 1.50 a 1.48 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 -0.0 Non-Proprietary Information 0.3 0.5 Exposure Range OLMCPR(TLOl 't'=O.O I . 't' =1.0 BOC-EOC 1.43 I 1.54 FIGURE 3-4A-5 Core Operating Limits Report Version 1.0 I BOC-EOC I 0.8 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 1.48 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 1.0 .... . E :::i 0:: c.. () a TLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c) 31 Plant Hatch Unit 2 Cycle 25 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 -----Non-Proprietary Information Core Operating Limits Report Version 1.0 I MOC2-EOC I ------------------I MOC1 -MOC2 .. 1.56 .E 1.54 :J ----I-1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 .. 1.54 .E 0::: 1.52 1.50 a 1.40 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 -0.0 I BOC-MOC1 I 0.3 0.5 0.8 Exposure Range . OLMCPR(TLO) . . . *** .1" =*0.0 . . . 1"=*1.0 ...
* BOC -MOC1 1.43 1.54 MOC1 -MOC2 1.43 1.55 MOC2-EOC 1.54 1.67 FIGURE 3-4A-6 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & EOC-RPT Out of Service) 32 I-1.0 :J 1.52 0::: 1.50 1.4a a 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 Plant Hatch Unit 2 Cycle 25 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 ... 1.56 *e 1.54 ::i 0::: 1.52 1.50 a 1.40 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 --0.0 Non-Proprietary Information 0.3 0.5 Core Operating Limits Report Version 1.0 I MOC2-EOC I I BOC-MOC2 I 0.8 r-r-1.0 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 ... 1.54 *e ::i 1.52 0::: 1.50 1.40 a 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 " Expo$ure Range * :
* OLMCF'R(TLO). * .. _'. -r"= 0.0 't = 1.0 BOC-MOC2 1.43 1.54 MOC2-EOC 1.45 1.56 FIGURE 3-4A-7 TLC MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & Main Turbine Bypass System Inoperable) 33 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information ----------------Core Operating Limits Report Version 1.0 I MOC2-EOC I ---------1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 -----: MOC1 -MOC2 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 .... 1.54 .E .... 1.56 .E 1.54 :::i 0:: 1.52 r; 1.50 2 1.48 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 i-------------------I BOC-MOC1 f-I -------0.0 .. 0.3 0.5 0.8 Ex:posure Range . ' '' OL,MCPRcrLO) ,,_ ,_ '; . *-r= 0.0 ' " . 't = 1.0 BOC -MOC1 1.43 1.54 MOC1 -MOC2 1.44 1.58 MOC2-EOC 1.57 1.71 FIGURE 3-4A-8 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & EOC-RPT Out of Service & Main Turbine Bypass System Inoperable) 34 1.0 :::i 1.52 0:: 1.50 r; 1.48 2 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 Plant Hatch Unit 2 Cycle 25 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 .... 1.56 .E 1.54 :J 0::: 1.52 1.50 a 1.48 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 --0.0 Non-Proprietary Information 0.3 0.5 Core Operating Limits Report Version 1.0 I I I I I I 0.8 MOC2-EOC f-MOC1 -MOC2 f-BOC -MOC1 f-1.0 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 .... 1.54 .E :J 1.52 0::: 1.50 1.48 a 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 Exposure OLMCPR(TLO)' 't = 0.0 ; 't = 1.0 .. *:, BOC-MOC1 1.31 1.42 MOC1 -MOC2 1.41 1.52 MOC2-EOC 1.44 1.54 FIGURE 3-4A-9 TLO MCPR Limits versus Average SCRAM Time (High Pressure Feedwater Heaters Out of Service) 35 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Core Operating Limits Report Version 1.0 1.76 1.74 1.72 1.7a 1.68 1.66 1.64 1.62 1.6a 1.58 ..... 1.56 .E 1.54 :J 0::: 1.52 1.5a 2 1.48 1.46 1.44 1.42 1.4a 1.38 1.36 1.34 1.32 1.3a a.a I MOC2-EOC f-I ---------------------I ----I MOC1 -MOC2 -----------------------------------I BOC-MOC1 -------I ---------a.3 a.5 a.8 Expos.ure Range OLMCPR(TLO) , 't =.0.0 . ; 't = 1.0 BOC-MOC1 1.32 1.45 MOC1 -MOC2 1.42 1.55 MOC2-EOC 1.54 1.67 FIGURE 3-4A-10 TLO MCPR Limits versus Average SCRAM Time (High Pressure Feedwater Heaters Out of Service & EOC-RPT Out of Service) 36 f-1.a 1.76 1.74 1.72 1.7a 1.68 1.66 1.64 1.62 1.6a 1.58 1.56 ..... 1.54 .E :J 1.52 0::: 1.5a 1.48 2 1.46 1.44 1.42 1.4a 1.38 1.36 1.34 1.32 1.3a Plant Hatch Unit 2 Cycle 25 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 .... 1.56 '&sect; 1.54 ::i 0::: 1.52 1.50 :a: 1.48 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 --0.0 Non-Proprietary Information 0.3 0.5 Core Operating Limits Report Version 1.0 I I I I I 0.8 MOC2-EOC MOC1 -MOC2 BOC-MOC1 I-1.0 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 .... 1.54 '&sect; ::i 1.52 0::: 1.50 1.48 ::?! 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 . Exposure Range . OLMCPR(TLO) ' . -r= 0.0 't = 1.0 BOC -MOC1 1.34 1.44 MOC1 -MOC2 1.43 1.54 MOC2-EOC 1.45 1.56 FIGURE 3-4A-11 TLC MCPR Limits versus Average SCRAM Time (High Pressure Feedwater Heaters Out of Service & Main Turbine Bypass System Inoperable) 37 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Core Operating Limits Report Version 1.0 1.76 1.74 1.72 1.7a 1.68 1.66 1.64 1.62 1.6a 1.58 .... 1.56 .E 1.54 :i 0::: 1.52 1.5a 1.48 1.46 1.44 1.42 1.4a 1.38 1.36 1.34 1.32 1.3a I MOC2-EOC I-I ----------------------: MOC1 -MOC2 ------....-----------------------.---------------...... ---------------I BOC-MOC1 .........-a.a ------I ------------___......-a.3 a.5 a.8
* Exposure Range OLMCPR(TLO) *. 't = 0.0 't = 1.0 BOC-MOC1 1.35 1.49 MOC1 -MOC2 1.44 1.58 MOC2-EOC 1.57 1.71 FIGURE 3-4A-12 TLO MCPR Limits versus Average SCRAM Time (High Pressure Feedwater Heaters Out of Service & EOC-RPT Out of Service & Main Turbine Bypass System Inoperable) 38 1.a 1.76 1.74 1.72 1.7a 1.68 1.66 1.64 1.62 1.6a 1.58 1.56 .... 1.54 .E :i 1.52 0::: 1.5a 1.48 1.46 1.44 1.42 1.4a 1.38 1.36 1.34 1.32 1.3a Plant Hatch Unit 2 Cycle 25 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 ... 1.56 .E 1.54 :.J 0:: 1.52 1.50 2 1.48 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 -0.0 Non-Proprietary Information 0.3 0.5 't Exposure Range .. OLMCPRcsLO)' .. -r = o;o 't = 1.6 BOC -MOC1 1.46 1.46 MOC1 -MOC2 1.46 1.56 MOC2-EOC 1.47 1.58 FIGURE 3-48-1 Core Operating Limits Report Version 1.0 I I I I I 0.8 MOC2-EOC I-MOC1 -MOC2 I-BOC -MOC1 1---1.0 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 ... 1.54 .E :.J 1.52 0:: 1.50 1.48 2 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 SLO MCPR Limits versus Average SCRAM Time 39 Plant Hatch Unit 2 Cycle 25 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 ... 1.56 *e 1.54 :J 0:: 1.52 1.50 2 1.48 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 0.0 ----------0.3 Exposure Range BOC-MOC1 MOC1 -MOC2 MOC2-EOC Non-Proprietary Information Core Operating Limits Report Version 1.0 I MOC2-EOC I ----1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 ... 1.54 *e -----------I MOC1 -MOC2 I------------------------I I-I BOC-MOC1 0.5 0.8 1.0 OLMCPR1sLoJ* '. '.'t = 0.0 .'t = 1.0 1.46 1.49 1.46 1.59 1.58 1.71 FIGURE 3-48-2 :J 1.52 0:: 1.50 1.48 :iii: 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 SLO MCPR Limits versus Average SCRAM Time (EOC-RPT Out of Service) 40 Plant Hatch Unit 2 Cycle 25 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 ..... 1.56 . E 1.54 ::i 0:: 1.52 1.50 2 1.48 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 --0.0 Non-Proprietary Information 0.3 0.5 Core Operating Limits Report Version 1.0 I I I I I I 0.8 MOC2-EOC I-MOC1 -MOC2 I-BOC-MOC1 f-1.0 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 ..... 1.54 .E ::i 1.52 0:: 1.50 1.48 2 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 Exposure Range . " OLMCPRcsLOl -.= 0.0 't = 1.0 BOC-MOC1 1.46 1.48 MOC1 -MOC2 1.47 1.58 MOC2-EOC 1.49 1.60 FIGURE 3-48-3 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Bypass System Inoperable) 41 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Core Operating Limits Report Version 1.0 1--------- --------+----------+-----,c=--=----1 _i.----1.58 1.58 .... 1.56 1.56 .... . E 1.54 ___ ,,,,_...... 1.54 .E :J -----:J 0:: 1.52 1.52 0:: 1.50 -----: BOC -MOC1 f-1.50 :a: 1.48 1.48 :a: 1.46 1.46 1.<< 1M 1.42 1.42 1.40 1.40 1.38 1.38 1.34 1.34 1.32 1.32 1.30 1.30 0.0 0.3 0.5 0.8 1.0 :Exposure Range OLMCPR(sLo) -r=O.O . .t = 1.0 .. e .* BOC-MOC1 1.46 1.53 MOC1 -MOC2 1.48 1.62 MOC2-EOC 1.61 1.75 FIGURE 3-48-4 SLO MCPR Limits versus Average SCRAM Time (EOC-RPT Out of Service & Main Turbine Bypass System Inoperable) 42 Plant Hatch Unit 2 Cycle 25 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 ... 1.56 *e 1.54 :J 0:: 1.52 1.50 a 1.48 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 -0.0 Non-Proprietary Information 0.3 0.5 Core Operating Limits Report Version 1.0 I BOC-EOC I 0.8 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 1.48 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 1.0 ... *e :J 0:: c.. (.) a Exposure Rani:ie .OLMCPR(sLof .. ,_,, <t=*o.o I . *<t=1.0*' BOC-EOC 1.47 I 1.58 FIGURE 3-48-5 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c) 43 Plant Hatch Unit 2 Cycle 25 -Non-Proprietary Information Core Operating Limits Report Version 1.0 I MOC2-EOC I-:: I ------------------I MOC1 -MOC2 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 -----I-1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 .... 1.54 .E .... 1.56 .E 1.54 :J 1.52 1.50 :iii: 1.48 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 --0.0 I BOC -MOC1 I 0.3 0.5 0.8 Exposure Range .* OLMCf)R(sLOJ . -r= 0.0 't = 1.0 BOC -MOC1 1.47 1.58 MOC1 -MOC2 1.47 1.59 MOC2-EOC 1.58 1.71 FIGURE 3-48-6 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & EOC-RPT Out of Service) 44 1.0 :J 1.52 1.50 1.48 :iii: 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 Plant Hatch Unit 2 Cycle 25 1.76 1.74 1.72 1.7a 1.68 1.66 1.64 1.62 1.6a 1.58 ... 1.56 *e 1.54 :::i 0::: 1.52 1.5a a 1.48 1.46 1.44 1.42 1.4a 1.38 1.36 1.34 1.32 1.3a --a.a Non-Proprietary Information Core Operating Limits Report Version 1.0 I MOC2-EOC [-I BOC -MOC2 f-I a.3 a.5 a.8 Exposure Range OLMCPR1sLOJ -r.=0.0 -r= 1.0 BOC-MOC2 1.47 1.58 MOC2-EOC 1.49 1.60 FIGURE 3-48-7 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & Main Turbine Bypass System Inoperable) 45 1.a 1.76 1.74 1.72 1.7a 1.68 1.66 1.64 1.62 1.6a 1.58 1.56 ... 1.54 *e :::i 1.52 0::: 1.5a 1.48 :ii!! 1.46 1.44 1.42 1.4a 1.38 1.36 1.34 1.32 1.3a Plant Hatch Unit 2 Cycle 25 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 .... 1.56 .E 1.54 ::i 0:: 1.52 -------------Non-Proprietary Information --------------------__,,,,,. --t -----....... Core Operating Limits Report Version 1.0 __,,,,,. ------I MOC2-EOC I-I I MOC1 -MOC2 I-I -----------I-I BOC-MOC1 I 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 .... 1.54 .E ::i 1.52 0:: 1.50 :2: 1.48 -----== 1.50 1.48 :2: 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 -0.0 0.3 0.5 0.8 Exposure Range OLMCPRcsLo) .. , , ' . 't = 0.0 ,c-, -r =J.O BOC -MOC1 1.47 1.58 MOC1 -MOC2 1.48 1.62 MOC2-EOC 1.61 1.75 FIGURE 3-48-8 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & EOC-RPT Out of Service & Main Turbine Bypass System Inoperable) 46 1.0 Plant Hatch Unit 2 Cycle 25 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 .... 1.56 .E 1.54 :J 0:: 1.52 1.50 :a: 1.48 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 0.0 Non-Proprietary Information 0.3 0.5 Core Operating Limits Report Version 1.0 I I I I I I 0.8 MOC2-EOC MOC1 -MOC2 f-BOC-MOC1 I-1.0 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 .... 1.54 .E :J 1.52 0:: 1.50 1.48 :a: 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 .* Exposure OLMCPR(sLO) ';/ *,. =.o:o. **. .. ::::*1.o BOC -MOC1 1.46 1.46 MOC1 -MOC2 1.46 1.56 MOC2-EOC 1.48 1.58 FIGURE 3-48-9 SLO MCPR Limits versus Average SCRAM Time (High Pressure Feedwater Heaters Out of Service) I 47 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Core Operating Limits Report Version 1.0 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 ... 1.56 "&sect; 1.54 :J 0:: 1.52 1.50 2 1.48 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 0.0 I MOC2-EOC I ---------------------------I ----I MOC1 -MOC2 -------------------------------I .. ** I BOC -MOC1 0.3 0.5 0.8 OLMCPRcsLO) i-:::*a.a .. 1.a .. BOC-MOC1 1.46 1.49 MOC1 -MOC2 1.46 1.59 MOC2-EOC 1.58 1.71 FIGURE 3-48-1 O SLO MCPR Limits versus Average SCRAM Time (High Pressure Feedwater Heaters Out of Service & EOC-RPT Out of Service) 48 I-: 1.0 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 ... 1.54 "&sect; :J 1.52 0:: 1.50 1.48 2 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Core Operating Limits Report Version 1.0 1.76 1.74 1.72 1.7a 1.68 1.66 1.64 1.62 1.6a 1.58 ... 1.56 . E 1.54 ::i 0:: 1.52 1.5a 2 1.48 1.46 1.44 1.42 1.4a 1.38 1.36 1.34 1.32 1.3a .----------.--------,.---------.-----------. 1.76 1.74 t----------+---------+----------+-----------i 1.72 1.7a 1.68 1.66 r----------t----------t--------1;:============::::;-1 1.64 t---------+---------+--------H: MOC2 -EOC 1.62 : MOC1 -MOC2 I--1.6a 1.58 1.56 ... 1.54 .E ::i 1.52 0:: 1.5a 1.48 2 -: BOC -MOC1 I-1.46 1.44 1.42 1.4a 1.38 1.36 1.34 o----------+---------+----------+-----------i 1.32 1.3a a.a a.3 a.5 a.8 ,. '*' OLMCPRcsLO)* J:xposure ' i-= 0.0 i-= .1.0: ' ' ' ,, BOC-MOC1 1.46 1.48 MOC1 -MOC2 1.47 1.58 MOC2-EOC 1.49 1.60 FIGURE 3-48-11 SLO MCPR Limits versus Average SCRAM Time (High Pressure Feedwater Heaters Out of Service & Main Turbine Bypass System Inoperable) 49 1.a Plant Hatch Unit 2 Cycle 25 -Non-Proprietary Information -------------Core Operating Limits Report Version 1.0 --------I MOC2-EOC I I 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 ----I MOC1 -MOC2 I-1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 ... 1.54 .E ... 1.56 .E 1.54 ::i 1.52 1.50 2 1.48 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 i------------------------------------I BOC-MOC1 I-------I 0.0 0.3 0.5 0.8 T Exposure Range OLMCPRtsLO) i-="0.0 T = f.0. BOC-MOC1 1.46 1.53 MOC1 -MOC2 1.48 1.62 MOC2-EOC 1.61 1.75 FIGURE 3-48-12 SLO MCPR Limits versus Average SCRAM Time (High Pressure Feedwater Heaters Out of Service & EOC-RPT Out of Service & Main Turbine Bypass System Inoperable) 50 1.0 ::i 1.52 1.50 1.48 2 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Core Operating Limits Report Version 1.0 4.0 LHGR OPERA TING LIMITS (Technical Specification 3.2.3) For both two loop operation (TLO) and single loop operation (SLO), the LHGR operating limit for each six inch axial segment of each fuel rod in the core is the applicable rated-power, rated-flow LHGR limit taken from Table 4-1 multiplied by the smaller of either: a. The flow-dependent multiplier, LHGRFACF, as determined by Table 4-2, b. The power-dependent multiplier, LHGRFACp, as determined by Table 4-3. Table 4-1 shows the exposure-dependent LHGR limits for all fuel types in the core, as a function of initial gadolinium concentration in a six inch segment of a fuel rod. For exposures between the values shown in Table 4-1, the LHGR limit is based on linear interpolation. For illustration purposes, Figures 4-3A and 4-38 show the LHGR limits for fuel segments with the lowest (U02) and highest (U02+Gd203) initial Gd concentrations. These limits apply to operation with vessel dome pressure within +/-10 psi of nominal pressure, as defined by the Region I pressure band shown in Figure 5-1. With all equipment in service or with the EOC-RPT system out of service, operation with vessel dome pressure down to 40 psi below nominal is licensed provided the. additional restrictions identified in Section 5.0 are applied with the LHGR operating limit defined in this section. TABLE 4-1 LHGR Limits versus Peak Pellet Exposure [[ ]] 51 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information TABLE 4-2 Core Operating Limits Report Version 1.0 Flow-Dependent LHGR Operating Flexibility Options . , . . .... . LHGRFAC ., . .. *,* .... ',, ,* ; ' ' .. ; . ;'. :::* ..... -.. F .. *.:; .... *, '' , ,*' . .. Equipment In or Out of Service Fuel Type EOC-RPT Main Turbine Main Turbine Hig_h Pressure Figure# S't_stem B't_Q.ass S't_stem Pressure Reg_ulator Feedwater In Service OQ.erable* S't_stem Status Heaters In Service Yes/No Yes/No TLCO 3.3.13.a orb Yes/No 4-1A GE14C Yes/No Yes/No TLCO 3.3.13.c Yes 4-1A Yes/No Yes/No TLCO 3.3.13.c No Not Licensed Yes/No Yes. TLCO 3.3.13.a or b Yes/No 4-18 GNF2 Yes/No Yes TLCO 3.3.13.c Yes 4-18 & Yes/No No TLCO 3.3.13.a orb Yes/No 4-1C GNF3 LTA Yes/No No TLCO 3.3.13.c Yes 4-1C Yes/No Yes/No TLCO 3.3.13.c No Not Licensed TABLE 4-3 Power-Dependent LHGR Operating Flexibility Options '"* *' :-** .. .. .. ,
* LHGRFACi> ,. * . ' , . ... ... ... '" .. . . . . .. . .. . .. ' Equipment In or Out of Service Fuel Type EOC-RPT Main Turbine Main Turbine Hig_h Pressure Figure# S't_stem B"t.Q.ass S't_stem Pressure Reg_ulator Feedwater In Service OQ.erable* S't_stem Status Heaters In Service GE14C Yes/No Yes/No TLCO 3.3.13.a or b Yes 4-2A & Yes/No Yes/No TLCO 3.3.13.c Yes 4-2A GNF2 & Yes/No Yes/No TLCO 3.3.13.a or b No 4-28 GNF3 LTA Yes/No Yes/No TLCO 3.3.13.c No Not Licensed *At least two bypass valves must be operable 52 Plant Hatch Unit 2 Cycle 25 1.0 0.9 Non-Proprietary Information I TLO I / / u.. 0::: C) :I: _J i 0.8 / V" :i a 0::: 0.7 C) :I: _J ... c: Q) -g 0.6 Q) c. Q) c ii: 0.5 0.4 / V'" 30 40 50 LHGRFACF =A+ B*F Flow. 30.0 ::;; F < 80.3 80.3::;; F 30.0::;; F < 50.7 50.7::;; F F = Percent of Rated Core Flow I SLO 60 70 80 Core Flow (% of Rated) TLO/SLO A TLO 0.4574 TLO 1.0000 SLO 0.4574 SLO 0.8000 FIGURE 4-1A Core Operating Limits Report Version 1.0 I < 90 100 110 B -0.006758 0.000000 0.006758 0.000000 GE14C Flow-Dependent LHGR Multiplier (LHGRFACF) versus Core Flow 53 Plant Hatch Unit 2 Cycle 25 1.0 0.9 Non-Proprietary Information v I TLO I / LI.. 0::: C) J: ..J 0.8 / V" :; :2E 0::: 0.7 C) J: ..J c Cl 0.6 Cl Cl. Cl 0 0.5 0.4 I TLO/SLO 1/ / v / v 30 40 50 LHGRFACF= A+ B*F Flow 30.0 :;;; F < 50.0 50.0 :;;; F < 80.0 80.0 :;;; F < 90.0 90.0:;;; F 50.0:;;; F < 50.7 50.7s;F F = Percent of Rated Core Flow I SLO 60 70 80 Core Flow (% of Rated) TLO/SLO A TLO/SLO 0.2000 TLO 0.4567 TLO 0.9820 TLO 1.0000 SLO 0.4567 SLO 0.8000 FIGURE 4-18 Core Operating Limits Report Version 1.0 I 90 100 110 B 0.01190 0.00677 0.00020 0.00000 0.00677 0.00000 GNF2 & GNF3 L TA Flow-Dependent LHGR Multiplier (LHGRFACF) versus Core Flow 54 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Core Operating Limits Report Version 1.0 1.0 0.9 ll. 0:: (!) :r: ..J 0.8 c. :;::; :i :a I 0:: 0.7 (!) :r: ..J c Q) v I TLO/SLO I -g 0.6 Q) c. Q) c ii: 0.5 v 0.4 30 40 50 LHGRFACF = A + B*F , ;," *Flow . , , 30.0 s F < 50.0 50.0 s F < 60.0 60.0 s F < 90.0 90.0 s F < 100.0 100.0 s F 60.0 s F < 61.2 61.2 s F F = Percent of Rated Core Flow 60 , , v I TLO I / / v I SLO I 70 80 90 100 110 Core Flow(% of Rated) JLO/SLO .A '*", ,, . e*: , " TLO/SLO 0.3800 0.00490 TLO/SLO -0.2100 0.01670 TLO 0.3900 0.00670 TLO 0.9300 0.00070 TLO 1.0000 0.00000 SLO 0.3900 0.00670 SLO 0.8000 0.00000 FIGURE 4-1C GNF2 & GNF3 L TA Flow-Dependent LHGR Multiplier (LHGRFACF) versus Core Flow (Main Turbine Bypass System Inoperable) 55 Plant Hatch Unit 2 Cycle 25 1.1 0: 1.0 u. 0:: Cl :r: 0.9 ::::!.. ... . !!! c. :;::; '5 0.8 :2i 0:: Cl :r: ..J ... 0.7 c: GI "C c: GI c. ,.,,,. ,.,,,. GI c 0.6 r! GI --:: 0 I < 60% Flow I ll. 0.5 I I I <: 60% Flow 0.4 Non-Proprietary Information / / _/ v I Core Operating Limits Report Version 1.0 ,.,,,. / 'ti"' << M n n M M 00 100 Core Power (% of Rated) LHGRFACp= A+ B*P Flow Power. A F;:: 60 24.0 :::; p :::; 28.0 0.4000 F < 60 24.0 :::; p :::; 28.0 0.3400 All 28.0 < p :::; 45.0 0.4774 All 45.0 < p :::; 60.0 0.6320 All 60.0 < p :::; 85.0 0.3032 All 85.0 < p:::; 100.0 0.4800 P = Percent of Rated Core Power F = Percent of Rated Core Flow FIGURE 4-2A 8 0.00250 0.00500 0.00524 0.00180 0.00728 0.00520 Power-Dependent LHGR Multiplier (LHGRFACp) versus Core Power 56 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Core Operating Limits Report Version 1.0 1.1 Et 1.0 LL a:: (!) :c 0.9 :::::!. .. . !!! :; 0.8 :::ii a:: (!) :c ...J .... 0.7 c: Q) 'C c: Q) c. Q) 0 0.6 .!. Q) :s: 0 D.. 0.5 0.4 / / / v v ,,..---I < 60% Flow I I I I <! 60% Flow I M M n n M M % 100 Core Power(% of Rated) LHGRFACp= A+ B*P Flow Power* A F;:: 60 24.0::; p::; 28.0 0.4000 F < 60 24.0 ::; p ::; 28.0 0.3400 All 28.0 < p ::; 45.0 0.4774 All 45.0 < p ::; 60.0 0.6320 All 60.0 < p ::; 80.0 0.7130 All 80.0 < p::; 100.0 -0.2550 P = Percent of Rated Core Power F = Percent of Rated Core Flow FIGURE 4-28 B 0.00250 0.00500 0.00524 0.00180 0.00045 0.01255 Power-Dependent LHGR Multiplier (LHGRFACp) versus Core Power (High Pressure Feedwater Heaters Out of Service) 57 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information FIGURE 4-3A Core Operating Limits Report Version 1.0 ]] GE14C LHGR Limit versus Peak Pellet Exposure 58 Plant Hatch Unit 2 Cycle 25 [[ Non-Proprietary Information FIGURE 4-38 Core Operating Limits Report Version 1.0 ]] GNF2 & GNF3 LTA LHGR Limit versus Peak Pellet Exposure 59 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Core Operating Limits Report Version 1.0 5.0 OPERA TING PRESSURE LIMITS For both two loop operation (TLO) and single loop operation (SLO), reactor dome pressure must be maintained within the licensed pressure bands defined by Figure 5-1. For operation in each of these regions, the following restrictions apply: a. For Region I operation: The core operating limits from Sections 2.0 through 4.0 are applicable. b. For Region II and Region Ill operation: 1) The OPRM System must be operable 2) The core operating limits from Sections 2.0 are applicable 3) The MFLCPR and MFLPD thermal limit ratios must remain below the maximum values determined by Table 5-1. The MFLCPR and MFLPD thermal limit ratios are defined in terms of the core operating limits defined in Section 3.0 and Section 4.0. The MFLCPR thermal limit ratio is the most limiting (maximum) value of the Fraction of Limiting Critical Power Ratio (FLCPR) in the core. The FLCPR is defined for each fuel assembly in the core as: FLCPR MCPRumit = Fuel Assembly Minimum Critical Power Ratio where: MCPRumit = MCPR operating limit defined in Section 3.0 60 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Core Operating Limits Report Version 1.0 The MFLPD thermal limit ratio is the most limiting (maximum) value of the Fraction of Limiting Power Density (FLPD) in the core. The FLPD is defined for each six inch axial segment of each fuel rod in the core as: FLPD = Peak kW/ft power generated in a fuel rod segment LHGRumit where: LHGRumit = LHGR operating limit defined in Section 4.0 The licensed equipment conditions for operation with dome pressures in Region 11 and Region Ill of Figure 5-1 are defined in Table 5-1. TABLE 5-1 Pressure Dependent Operating Flexibility Options .. .. .. Thermal LlrriitRatic>s for . . ;' '. . '-, ... ,*, '*' l* : \ .*. ".i"* *; .. ,, ., Equipment In or Out of Service EOC-RPT Main Turbine Main Turbine Hig_h Pressure Table# Svstem B'f.eass S'f.sfem Pressure Regulator Feedwater Heaters In Service Oeerable* S'f.stem Status In Service Yes Yes TLCO 3.3.13.a orb Yes 5-2 No Yes TLCO 3.3.13.a orb Yes 5-3 Yes/No No TLCO 3.3.13.a orb Yes Flexibility Option Not Licensed Yes/No Yes/No TLCO 3.3.13.c Yes Flexibility Option Not Licensed Yes/No Yes/No TLCO 3.3.13.a or b No Flexibility Option Not Licensed Yes/No Yes/No TLCO 3.3.13.c No Flexibility Option Not Licensed *At least two bypass valves must be operable 61 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information TABLE 5-2 Core Operating Limits Report Version 1.0 Maximum Thermal Limit Ratios for Equipment In Service Operation '* '* <: '' *: "" ,. ,' ,, ; . , Dome frt,lin FigVrn > :* .. * ,, :. *"' ,* *... << "'. Limit Ratio Reg_ion I Reg_ion II Reg_ion Ill MFLCPR 1.00 1.00 0.95 MFLPD 1.00 0.95 0.84 TABLE 5-3 Maximum Thermal Limit Ratios for EOC-RPT Out of Service Operation * .
* oc>m.e from . '. .:i, Limit Ratio Reg_ion I Reg_ion II Reg_ion /ff MFLCPR 1.00 1.00 0.92 MFLPD 1.00 0.95 0.84 62 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information Core Operating Limits Report Version 1.0 1058.0 1058.0 1040.0 Ci 1020.0 *c;; E: 1000.0 VJ VJ a.. 980.0 0 0 960.0 940.0 920.0 20 :25 30 35 40 45 50 55 60 65 70 75 24 Core Power(% of Rated) P = A+ B*(CP) + C*(CP)2 Dome Pressure Curves Core Power Nominal Dome Pressure (Pnom) 24 :5 CP :5 100 Region I Upper Boundary (Pnom+10) 24 :5 CP :5100 Region I Lower Boundary (Pnom-10) 24 :5 CP :5100 Region II Lower Boundary (Pnom-20) 24 :5 CP :5 100 Region Ill Lower Boundary (Pnom-4o) 24 :5 CP :5 100 GP = Percent of Rated Core Power P = Reactor Dome Pressure (psig) FIGURE 5-1 80 85 90 95 100 105 A B c 958.30 0.300 0.0057 968.30 0.300 0.0057 948.30 0.300 0.0057 938.30 0.300 0.0057 918.30 0.300 0.0057 Licensed Regions of Operating Dome Pressure versus Core Power 63 Plant Hatch Unit 2 Cycle 25 Non-Proprietary Information 6.0 PBDA AMPLITUDE SETPOINT Core Operating Limits Report Version 1.0 The amplitude trip setpoint in the Period Based Detection Algorithm in the OPRM system must be set equal to one of the licensed values reported in Table 6-1. This applies to instruments 2C51 K615 A, B, C, and D. TABLE 6-1 Licensed OPRM Amplitude Setpoints OpRM Setpoint 1.12 1.15 64 Plant Hatch Unit 2 Cycle 25 7 .0 REFERENCES Non-Proprietary Information Core Operating Limits Report Version 1.0 1. Global Nuclear Fuel Document NEDE-24011-P-A-22, "General Electric Standard Application for Reactor Fuel," November 2015, and the US Supplement, NEDE-24011-P-A-22-US, November 2015. 2. Southern Nuclear Operating Company Document NFD-H-16-407 "Hatch-2 Cycle 25 Reload Licensing Analysis Report," Version 1.0, December 2016. 3. Global Nuclear Fuel Document 002N6847, "Supplemental Reload Licensing Report for Hatch 2, Reload 24, Cycle 25," Revision 1, November 2016. 4. Global Nuclear Fuel Document 002N6848, "Fuel Bundle Information Report for Hatch 2, Reload 24, Cycle 25," Revision 0, November 2016. 5. Global Nuclear Fuel Document NEDC-32868P, "GE14 Compliance with Amendment 22 of NEDE-24011-P-A (GESTAR //)," Revision 6, March 2016. 6. Global Nuclear Fuel Document NEDC-33270P, "GNF2 Advantage Generic Compliance with NEDE-24011-P-A (GESTAR //),"Revision 6, March 2016. 65 
}}

Latest revision as of 11:11, 6 April 2019