05000302/LER-1984-023, Advises That Suppl to LER 84-023 Re Low Temp Overpressure Protection (LTOP) Will Be Submitted by 860210 Instead of 851115.Investigation Resulted in Complete Reassessment of Administrative Controls for LTOP: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 1: Line 1:
{{Adams
#REDIRECT [[05000302/LER-1984-023-01]]
| number = ML20140D014
| issue date = 01/24/1986
| title = Advises That Suppl to LER 84-023 Re Low Temp Overpressure Protection (LTOP) Will Be Submitted by 860210 Instead of 851115.Investigation Resulted in Complete Reassessment of Administrative Controls for LTOP
| author name = Westafer G
| author affiliation = FLORIDA POWER CORP.
| addressee name =
| addressee affiliation = NRC OFFICE OF ADMINISTRATION (ADM)
| docket = 05000302
| license number =
| contact person =
| document report number = 3F0186-23, 3F186-23, NUDOCS 8601290053
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 1
}}
{{LER
| Title = Advises That Suppl to LER 84-023 Re Low Temp Overpressure Protection (LTOP) Will Be Submitted by 860210 Instead of 851115.Investigation Resulted in Complete Reassessment of Administrative Controls for LTOP
| Plant =
| Reporting criterion =
| Power level =
| Mode =
| Docket = 05000302
| LER year = 1984
| LER number = 23
| LER revision = 0
| Event date =
| Report date =
| ENS =
| abstract =
}}
 
=text=
{{#Wiki_filter:,e **
g-o; s o.
OT**
bb Power C O R POR ATIO N January 24, 1986 3F0186-23 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Subj ect:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Licensee Event Report No. 84-023-00
 
==Dear Sir:==
Licensee Event Report 84-023-00 reported deviations discovered with respect to Florida Power Corporation's compliance with commitments made regarding low temperature overpressure protection (LTOP). The report described a continuing investigation and committed to a supplemental report by November 15, 1985.
A letter dated November 15, 1985 indicated the supplement would not be submitted until January 15, 1986.
This investigation is complete and has resulted in a complete reassessment of the administrative controls for LTOP at Crystal River 3.
A revised LTOP program has been drafted and is currently receiving management review.
The new program, along with the reasons for the changes from the old program, will be described in the supplement to LER 84-023 which we now expect to issue by February 10, 1986.
Sincerely, e
G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/ feb xc:
Dr. J. Nelson Grace Regional Administrator, Region II Office of Inspection and Enforcement p
U.S. Nuclear Regulatory Conmission 101 Marietta Street N.W., Suite 2900 p
Atlanta, GA 30323 e601290053 e60124 PDR ADOCK 0500 2
S GEN ERAL OFFICE 3201 Thirty fourth Street South e P.O. Box 14042, St. Petersburg, Florida 33733 e 813-866-5151
}}
 
{{LER-Nav}}

Latest revision as of 00:04, 25 May 2025