ENS 53238: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 21: | Line 21: | ||
Note: On 03/01/18, at approximately 1100 PST, SRPD notified the licensee that they had recovered the gauge near the job site. The licensee is enroute to recover the gauge from SRPD. RHB will be following up on this incident. | Note: On 03/01/18, at approximately 1100 PST, SRPD notified the licensee that they had recovered the gauge near the job site. The licensee is enroute to recover the gauge from SRPD. RHB will be following up on this incident. | ||
California Report No.: 5010-022818 | California Report No.: 5010-022818 | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2018/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2018/20180312en.html#en53238 | ||
}} | }} | ||
{{ENS-Nav}} | {{ENS-Nav}} |
Latest revision as of 07:01, 12 March 2018
Where | |
---|---|
Engeo Incorporated San Ramon, California (NRC Region 4) | |
License number: | 3016-07 |
Organization: | California Radiation Control Prgm |
Reporting | |
Agreement State | |
Time - Person (Reporting Time:+31.57 h1.315 days <br />0.188 weeks <br />0.0432 months <br />) | |
Opened: | Kamani Hewadikaram 15:34 Mar 1, 2018 |
NRC Officer: | Howie Crouch |
Last Updated: | Mar 1, 2018 |
53238 - NRC Website | |