NRC Generic Letter 1978-13: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/21/1978
| issue date = 04/21/1978
| title = NRC Generic Letter 1978-013: NUREG-0219, Draft 2 Were Sent Out to All Licensees Authorized to Operate a Nuclear Power Reactor and to All Applicants with Applications for a License to Operate or Construct a Power Reactor
| title = NRC Generic Letter 1978-013: NUREG-0219, Draft 2 Were Sent Out to All Licensees Authorized to Operate a Nuclear Power Reactor and to All Applicants with Applications for a License to Operate or Construct a Power Reactor
| author name = Miller J R
| author name = Miller J
| author affiliation = NRC/NRR
| author affiliation = NRC/NRR
| addressee name =  
| addressee name =  
Line 15: Line 15:
| page count = 2
| page count = 2
}}
}}
{{#Wiki_filter:*1 ~ -UNITED STATESNUCLEAR REGULATORY COMMISSIONWASHINGTON, D. C. 20555April 21, 1978At- 2fi-(All Power Reactor Licensees and ApplicantsGentlemen:This letter and enclosed NUREG 0219, Draft 2 are being sent to'all licenseesauthorized to operate a nuclear power reactor and to all applicants withapplications for a license to operate or construct a power reactor.NUREG 0219 outlines the current position of the NRR staff on implementationof the requirement to upgrade the qualification, training and equipping ofsecurity personnel. Since this is a draft, I would appreciate your commentsby May 19, 1978 so that actual plant operating experience with securitypersonnel can be factored into the final document.
{{#Wiki_filter:UNITED STATES                  *1     ~ -
                      NUCLEAR REGULATORY COMMISSION
                            WASHINGTON, D. C. 20555 April 21, 1978 At-   2fi-(
All Power Reactor Licensees and Applicants Gentlemen:
This letter and enclosed NUREG 0219, Draft 2 are being sent to'all licensees authorized to operate a nuclear power reactor and to all applicants with applications for a license to operate or construct a power reactor.


Sincerely,;'I7-1I-IJames R. Miller, Assistant Directorfor Reactor SafeguardsDivision of Operating Reactors
NUREG 0219 outlines the current position of the NRR staff on implementation of the requirement to upgrade the qualification, training and equipping of security personnel. Since this is a draft, I would appreciate your comments by May 19, 1978 so that actual plant operating experience with security personnel can be factored into the final document.


===Enclosure:===
Sincerely,                  ;'I
NUREG 0219 V1Commonwealth Edison CompanyccMr. John W. RoweIsham, Lincoln & BealeCounselors at LawOne First National Plaza,Chicago, Illinois 6060342nd FloorMr. B. B. StephensonPlant SuperintendentDresden Nuclear Power StationRural Route #1Morris, Illinois 60450Morris Public Library604 Liberty StreetMorris, Illinois 60451}}
                                                                  7
                                                                  -1 I-
                                                            I
                                                          J
                                        ames R. Miller, Assistant Director for Reactor Safeguards Division of Operating Reactors Enclosure:
NUREG 0219
 
V1 Commonwealth Edison Company cc Mr. John W. Rowe Isham, Lincoln & Beale Counselors at Law One First National Plaza, 42nd Floor Chicago, Illinois 60603 Mr. B. B. Stephenson Plant Superintendent Dresden Nuclear Power Station Rural Route #1 Morris, Illinois 60450
  Morris Public Library
  604 Liberty Street Morris, Illinois 60451}}


{{GL-Nav}}
{{GL-Nav}}

Latest revision as of 01:58, 24 November 2019

NRC Generic Letter 1978-013: NUREG-0219, Draft 2 Were Sent Out to All Licensees Authorized to Operate a Nuclear Power Reactor and to All Applicants with Applications for a License to Operate or Construct a Power Reactor
ML031280385
Person / Time
Issue date: 04/21/1978
From: John Miller
Office of Nuclear Reactor Regulation
To:
References
NUREG-0219 GL-78-013
Download: ML031280385 (2)


UNITED STATES *1 ~ -

NUCLEAR REGULATORY COMMISSION

WASHINGTON, D. C. 20555 April 21, 1978 At- 2fi-(

All Power Reactor Licensees and Applicants Gentlemen:

This letter and enclosed NUREG 0219, Draft 2 are being sent to'all licensees authorized to operate a nuclear power reactor and to all applicants with applications for a license to operate or construct a power reactor.

NUREG 0219 outlines the current position of the NRR staff on implementation of the requirement to upgrade the qualification, training and equipping of security personnel. Since this is a draft, I would appreciate your comments by May 19, 1978 so that actual plant operating experience with security personnel can be factored into the final document.

Sincerely,  ;'I

7

-1 I-

I

J

ames R. Miller, Assistant Director for Reactor Safeguards Division of Operating Reactors Enclosure:

NUREG 0219

V1 Commonwealth Edison Company cc Mr. John W. Rowe Isham, Lincoln & Beale Counselors at Law One First National Plaza, 42nd Floor Chicago, Illinois 60603 Mr. B. B. Stephenson Plant Superintendent Dresden Nuclear Power Station Rural Route #1 Morris, Illinois 60450

Morris Public Library

604 Liberty Street Morris, Illinois 60451

Template:GL-Nav