ML22118A890: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1
{{#Wiki_filter:1 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION  
 
+ + + + +
UNITED STATES OF AMERICA
34TH REGULATORY INFORMATION CONFERENCE (RIC)  
 
+ + + + +
NUCLEAR REGULATORY COMMISSION
TECHNICAL SESSION - W15 REGIONAL SESSION-REACTOR INSPECTION PROGRAM:
 
LEAVING TOMORROW BEHIND  
+ + + + +
+ + + + +
 
WEDNESDAY, MARCH 9, 2022  
34TH REGULATORY INFORMATION CONFERENCE (RIC)
+ + + + +
 
The Technical Session met via Video-Teleconference, at 1:00 p.m. EST, Jeff Baran, Commissioner, Nuclear Regulatory Commission, presiding.
+ + + + +
 
TECHNICAL SESSION - W15
 
REGIONAL SESSION-REACTOR INSPECTION PROGRAM:
 
LEAVING TOMORROW BEHIND
 
+ + + + +
 
WEDNESDAY,
 
MARCH 9, 2022
 
+ + + + +
 
The Technical Session met via Video-
 
Teleconference, at 1:00 p.m. EST, Jeff Baran,
 
Commissioner, Nuclear Regulatory Commission,
 
presiding.
 
PRESENT:
PRESENT:
THE HONORABLE JEFF BARAN, Commissioner, NRC KELVIN HENDERSON, Senior Vice President & Chief Nuclear Officer, Duke Energy RAYMOND LORSON, Deputy Regional Administrator, RI/NRC MARIA LACAL, Executive Vice President and Chief


THE HONORABLE JEFF BARAN, Commissioner, NRC
2 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com Nuclear Officer, Arizona Public Service - Palo Verde Nuclear Generating Station LAURA DUDES, Regional Administrator, RII/NRC EDWIN LYMAN, Director of Nuclear Power Safety, Union of Concerned Scientists JACK GIESSNER, Regional Administrator, RIII/NRC JEFF SEMANCIK, Director, Radiation Division, Connecticut Department of Energy and Environmental Protection SCOTT MORRIS, Regional Administrator, RIV/NRC  
 
KELVIN HENDERSON, Senior Vice President & Chief
 
Nuclear Officer, Duke Energy
 
RAYMOND LORSON, Deputy Regional Administrator,
 
RI/NRC
 
MARIA LACAL, Executive Vice President and Chief
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 2
 
Nuclear Officer, Arizona Public Service - Palo
 
Verde Nuclear Generating Station
 
LAURA DUDES, Regional Administrator, RII/NRC
 
EDWIN LYMAN, Director of Nuclear Power Safety, Union
 
of Concerned Scientists
 
JACK GIESSNER, Regional Administrator, RIII/NRC
 
JEFF SEMANCIK, Director, Radiation Division,
 
Connecticut Department of Energy and
 
Environmental Protection
 
SCOTT MORRIS, Regional Administrator, RIV/NRC
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 3
 
P R O C E E D I N G S
 
1:01 p.m.
 
COMMISSIONER BARAN: Good afternoon,
 
everyone, and welcome to the regional session. I'm
 
Commissioner Jeff Baran and I'll be moderating
 
today's session. One of the best things about this
 
session is there are no opening statements or long
 
presentations.
 
It will be 100 percent Q&A with the panel
 
so we can focus on the issues that you're most
 
interested in. As you think of questions, please
 
submit them through the RIC platform. We'll work
 
hard to get through as many questions and topics as
 
we can.
 
To get things started we have some
 
prepared questions but we're counting on the audience
 
to come up with questions to sustain a great
 
discussion.
 
Because it's a big panel, in most cases
 
I'll ask one of the regional administrators to
 
respond and invite the other panelists to weigh in if
 
they have thoughts they want to share on the topic.
 
But every panelist should always feel
 
free to jump in with a different perspective or a
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 4
 
point they want to make.
 
Let me start by introducing our terrific
 
panel, first our four NRC regional panelists from our
 
Region 1 Office outside Philadelphia we have Ray
 
Larson, from Region 2 in Atlanta we have Laura Dudes,
 
Jack Giessner is here from our Region 3 Office outside
 
of Chicago, and Scott Morris is our Region 4
 
administrator from Arlington, Texas.
 
We're also lucky to have executives from
 
two of our licensees join us, Duke's Chief Nuclear
 
Officer, Kelvin Henderson, and Maria Lacal, Executive
 
Vice President and Chief Nuclear Officer for the
 
Arizona Public Service Company.
 
For the first time, one of our state
 
partners is joining us on the panel, Jeff Semancik,
 
Director of the Radiation Division of the Connecticut
 
Department of Energy and Environmental Protection.
 
Rounding out the panel, we have Ed Lyman,
 
Director of Nuclear Power Safety at the Union of
 
Concerned Scientists. I know we're all looking
 
forward to hearing their views on a range of topics
 
so let's get started with the first question.
 
During the 2019 health emergency, summary
 
actor inspections need to be performed remotely.
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 5
 
What lessons has the NRC learned about the
 
effectiveness of remote inspections compared to
 
in-person inspections?
 
What did we learn about technologies that
 
could be used to supplement or enhance in-person
 
inspections, and what do the non-NRC panelists think
 
about the relative narrative remote and in-person
 
inspection?
 
Scott, do you want to start off on this
 
one?


MR. MORRIS: Yes, sure I'm happy to. Can
3 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com Proceedings 1:01 p.m.
COMMISSIONER BARAN: Good afternoon, everyone, and welcome to the regional session. I'm Commissioner Jeff Baran and I'll be moderating today's session. One of the best things about this session is there are no opening statements or long presentations.
It will be 100 percent Q&A with the panel so we can focus on the issues that you're most interested in. As you think of questions, please submit them through the RIC platform. We'll work hard to get through as many questions and topics as we can.
To get things started we have some prepared questions but we're counting on the audience to come up with questions to sustain a great discussion.
Because it's a big panel, in most cases I'll ask one of the regional administrators to respond and invite the other panelists to weigh in if they have thoughts they want to share on the topic.
But every panelist should always feel free to jump in with a different perspective or a


you hear me okay?
4 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com point they want to make.
Let me start by introducing our terrific panel, first our four NRC regional panelists from our Region 1 Office outside Philadelphia we have Ray Larson, from Region 2 in Atlanta we have Laura Dudes, Jack Giessner is here from our Region 3 Office outside of Chicago, and Scott Morris is our Region 4 administrator from Arlington, Texas.
We're also lucky to have executives from two of our licensees join us, Duke's Chief Nuclear Officer, Kelvin Henderson, and Maria Lacal, Executive Vice President and Chief Nuclear Officer for the Arizona Public Service Company.
For the first time, one of our state partners is joining us on the panel, Jeff Semancik, Director of the Radiation Division of the Connecticut Department of Energy and Environmental Protection.
Rounding out the panel, we have Ed Lyman, Director of Nuclear Power Safety at the Union of Concerned Scientists. I know we're all looking forward to hearing their views on a range of topics so let's get started with the first question.
During the 2019 health emergency, summary actor inspections need to be performed remotely.


5 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com What lessons has the NRC learned about the effectiveness of remote inspections compared to in-person inspections?
What did we learn about technologies that could be used to supplement or enhance in-person inspections, and what do the non-NRC panelists think about the relative narrative remote and in-person inspection?
Scott, do you want to start off on this one?
MR. MORRIS: Yes, sure I'm happy to. Can you hear me okay?
COMMISSIONER BARAN: Yes.
COMMISSIONER BARAN: Yes.
MR. MORRIS: This is a really interesting and important question.
Obviously, because of the public health emergency we out of necessity had to do a lot more remote inspections in order to complete the nominal or at least the minimum set of samples for our baseline inspection program at all operating power reactors. And I think, well, I don't think, we were successful, it was challenging but we learned a lot and we're still learning.
We talk about this all the time, it's an


MR. MORRIS: This is a really interesting
6 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com important issue that I know that NRR and the other regions are actively focused on in looking for ways to enhance our guidance.
 
But I'll say this, I think we were successful in large measure over the last couple years doing remote inspections because we started with a set of highly qualified inspectors to begin with.
and important question.
These are folks who are seasoned inspectors who have been in the field and done most of these inspection procedures I'll call live and in person. And so it was a little bit easier of a transition for them to go remote in the first place because they knew the right questions to ask and who to talk to.
 
That becomes less impactful the more and more people that we lose through attrition and the more new people we hire. So, that elevates the importance of in-person inspections.
Obviously, because of the public health
But I will say I personally believe and I'm sure others will weigh in here, there is a role for some remote inspections going forward. It's not the end all be all. Yes, we can get some efficiencies out of doing it.  
 
emergency we out of necessity had to do a lot more
 
remote inspections in order to complete the nominal
 
or at least the minimum set of samples for our
 
baseline inspection program at all operating power
 
reactors. And I think, well, I don't think, we were
 
successful, it was challenging but we learned a lot
 
and we're still learning.
 
We talk about this all the time, it's an
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 6
 
important issue that I know that NRR and the other
 
regions are actively focused on in looking for ways
 
to enhance our guidance.


But I'll say this, I think we were
7 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com For example, we can do document reviews, corrective action program looks, we can look at self-assessments, we can conduct some interviews.
And as a consequence, the time that we do spend on site I think can be more sharply focused on things that really do require in-person inspection.
So, again, I think there's a role for remote inspection. I think in part it can also help supplement team inspections. We do a number of team inspections and we've had cases where we've got one or two folks who are back in the office so to speak and some guys in the field, and there's still mutual support that happens that way.
That's something we've done for years by the way. It also is unfortunately not the end all be all. I think most of us would agree that on-site inspection, in-person inspection is more appropriate, more effective for a lot of reasons.
I think about remote inspections, it's almost like looking through a straw. You can only see what's on the other end of the screen in some cases. You don't necessarily get all the other contextual things that you would get by walking around a plant listening, hearing, smelling, all


successful in large measure over the last couple
8 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com those other sensory inputs.
We add a lot of value I think as an agency and most licensees that I speak to would agree, just are walking around with our inspectors, leaders and managers during site visits, seeing, touching, doing is helpful because we see things that licensees don't necessarily see, many of which are not particularly significant.
But they're observations that we make and we can share those with licensees in real time and bring them to their awareness.
We wouldn't see through remote inspection and I think we add a lot of value as an agency by sharing what I'll call those low-level observations with licensees that never find their way into inspection reports, never find their way into assessment documents.
But a lot has been learned, we're still learning, there is a role for remote inspection but at the end of the day, I think we have much more effective and meaningful engagements and learnings through onsite inspection.
And if we have enough time, I can share some examples to help illustrate that, but I'll stop


years doing remote inspections because we started
9 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com there and let others weigh in.
COMMISSIONER BARAN: Any other panelists want to weigh in on this issue of remote inspections versus in-person inspections and the relative merits?
MS. LACAL: Sure, Commissioner, I'll weigh in if that's okay.
I think we've proven that we can continue to have very effective inspections remotely. I know that we immediately provided our resident inspectors with technology, computers.
They've had access to anything and everything that they wanted access to, whether it was parameters and being able to monitor our plants remotely to being able to participate in all kinds of meetings.
I think it's also really helped us focus on our resources, less time in airport and on airplanes and a lot more time doing the inspection activities.
We've also really homed in on our communications and making sure that we kept our residents in the region involved and engaged, communicated at all times. And I think we've learned a lot through these past two years.


with a set of highly qualified inspectors to begin
10 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com I know at APS we're transitioning to a hybrid workforce. We're not necessarily all going to come back to the site but it will be more of a hybrid where it will be on site and some folks where it makes sense to be at home.
I think the NRC can do the same when it comes to inspections.
We'll continue to review documents remotely, use Teams meetings, et cetera, and then we've got our resident inspectors so if there's anything that needs to be observed or any sort of activity that needs to happen on site, the resident inspectors are here and can certainly do that for an inspection team.
I'll say we had a great example of that during this timeframe. We had a RAD material control inspection where there was a lot of question around a particular aspect about our storage facility.
And so our senior resident walked down, took photos, and provided that information directly to the inspection team and we were able to resolve the inspection team's questions without necessarily having them come to the site.
So, I think this hybrid approach, we've


with.
11 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com learned a lot and we can continue to think about that going forward beyond hybrid and really try to manage our costs and our precious resources.
COMMISSIONER BARAN: Thanks, Maria. Any other thoughts on this issue?
MR. LORSON: If I could just add one thought related to remote inspections? With respect to some of the technology and the tools, there has been a benefit for us, particularly when it comes to off-hours event response.
In some cases, we've seen situations where the plant may trip in the middle of the night.
In the past, the resident inspector might leave his house and drive in the plant early in the morning whereas now we can use our remote tools to determine whether or not we need to go in immediately or if we can wait a little while.
So, we have achieved some of the benefits but I would also echo what Scott talked about, there's really no substitute for direct onsite visual inspection.
COMMISSIONER BARAN: Thanks, Ray. Ed, you have something you want to add as well?
MR. SEMANCIK: Yes, just as an outsider,


These are folks who are seasoned
12 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com first of all, I think what the inspections teams have done is amazing to deal with this crisis. And certainly at the height of the pandemic, there was very good reason to move to that remote posture.
But certainly, going forward I
am impressed by the anecdotes that I have been hearing that there is no substituting for the onsite inspection.
I would submit that rather than remote tools be used in lieu of critical inspection functions, they be used to augment and supplement those.
And moving forward, once hopefully the public health emergency resolves, there should be the resumption of a more normal posture. That's my view, thank you.
COMMISSIONER BARAN: Jeff, do you have something you want to add as well?
MR. SEMANCIK: Yes, I'll just also echo Ed. The presence of NRC resident inspectors on the site during the height of the pandemic was pretty quickly a public interest item that we got engaged in at the state level.
And I thought at least regionally here


inspectors who have been in the field and done most
13 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com they did a great job of keeping us informed of what was going on onsite, what was going on offsite, what was being done hybrid.
And I think also a good common focus on maintaining safety and integrity for the operators at the plant to make sure we weren't putting them at any additional risk that wasn't necessary for it.
But on the whole, I think it went very well and communication was good on it. So, thank you.
COMMISSIONER BARAN: Let's move to another question.
What impacts has the public health emergency had on nuclear power-plant sites and plant safety and what effect has it had on your organization's planning and staffing?
Jack, do you want to take the lead on this one?
MR. GIESSNER: Yes. When I think of this question I break it into two parts. I break it into the impact and safety on the people, the people who running the plant and the oversight, and I also base it on plant safety.
They are not mutually exclusive, nor does


of these inspection procedures I'll call live and in
14 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com one guarantee the other. So, when we work on looking at this issue, let's face it, this is a huge challenge and continues to be a huge challenge to the families, to the people.
 
But the processes and the procedures and the contingencies that the utilities built and the processes and procedures and contingencies the NRC built and frankly, the exemptions that provided that temporary flexibility by the program office at Headquarters ensured the plants continued to operate safely.
person. And so it was a little bit easier of a
I don't want to underestimate the impact to the people. When we initially started the protocols, generally more than what was implemented by the federal outlines, we as good neighbors at the NRC followed those, whether it was masking, social distancing, and testing, we were able to provide that framework.
 
The resident inspectors went in periodically, every couple days, and some inspections were continued. Our operator licensing needed to continue, it was a mission-critical function.
transition for them to go remote in the first place
So, I
 
wanted to make sure folks understand there's a huge challenge to the people but  
because they knew the right questions to ask and who
 
to talk to.
 
That becomes less impactful the more and
 
more people that we lose through attrition and the
 
more new people we hire. So, that elevates the
 
importance of in-person inspections.
 
But I will say I personally believe and
 
I'm sure others will weigh in here, there is a role
 
for some remote inspections going forward. It's not
 
the end all be all. Yes, we can get some efficiencies
 
out of doing it.
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 7
 
For example, we can do document reviews,
 
corrective action program looks, we can look at self-
 
assessments, we can conduct some interviews.
 
And as a consequence, the time that we do
 
spend on site I think can be more sharply focused on
 
things that really do require in-person inspection.
 
So, again, I think there's a role for
 
remote inspection. I think in part it can also help
 
supplement team inspections. We do a number of team
 
inspections and we've had cases where we've got one
 
or two folks who are back in the office so to speak
 
and some guys in the field, and there's still mutual
 
support that happens that way.
 
That's something we've done for years by
 
the way. It also is unfortunately not the end all
 
be all. I think most of us would agree that on-site
 
inspection, in-person inspection is more appropriate,
 
more effective for a lot of reasons.
 
I think about remote inspections, it's
 
almost like looking through a straw. You can only
 
see what's on the other end of the screen in some
 
cases. You don't necessarily get all the other
 
contextual things that you would get by walking
 
around a plant listening, hearing, smelling, all
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 8
 
those other sensory inputs.
 
We add a lot of value I think as an agency
 
and most licensees that I speak to would agree, just
 
are walking around with our inspectors, leaders and
 
managers during site visits, seeing, touching, doing
 
is helpful because we see things that licensees don't
 
necessarily see, many of which are not particularly
 
significant.
 
But they're observations that we make and
 
we can share those with licensees in real time and
 
bring them to their awareness.
 
We wouldn't see through remote inspection
 
and I think we add a lot of value as an agency by
 
sharing what I'll call those low-level observations
 
with licensees that never find their way into
 
inspection reports, never find their way into
 
assessment documents.
 
But a lot has been learned, we're still
 
learning, there is a role for remote inspection but
 
at the end of the day, I think we have much more
 
effective and meaningful engagements and learnings
 
through onsite inspection.
 
And if we have enough time, I can share
 
some examples to help illustrate that, but I'll stop
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 9
 
there and let others weigh in.
 
COMMISSIONER BARAN: Any other panelists
 
want to weigh in on this issue of remote inspections
 
versus in-person inspections and the relative merits?
 
MS. LACAL: Sure, Commissioner, I'll
 
weigh in if that's okay.
 
I think we've proven that we can continue
 
to have very effective inspections remotely. I know
 
that we immediately provided our resident inspectors
 
with technology, computers.
 
They've had access to anything and
 
everything that they wanted access to, whether it was
 
parameters and being able to monitor our plants
 
remotely to being able to participate in all kinds of
 
meetings.
 
I think it's also really helped us focus
 
on our resources, less time in airport and on
 
airplanes and a lot more time doing the inspection
 
activities.
 
We've also really homed in on our
 
communications and making sure that we kept our
 
residents in the region involved and engaged,
 
communicated at all times. And I think we've learned
 
a lot through these past two years.
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 10
 
I know at APS we're transitioning to a
 
hybrid workforce. We're not necessarily all going
 
to come back to the site but it will be more of a
 
hybrid where it will be on site and some folks where
 
it makes sense to be at home.
 
I think the NRC can do the same when it
 
comes to inspections.
 
We'll continue to review documents
 
remotely, use Teams meetings, et cetera, and then
 
we've got our resident inspectors so if there's
 
anything that needs to be observed or any sort of
 
activity that needs to happen on site, the resident
 
inspectors are here and can certainly do that for an
 
inspection team.
 
I'll say we had a great example of that
 
during this timeframe. We had a RAD material control
 
inspection where there was a lot of question around
 
a particular aspect about our storage facility.
 
And so our senior resident walked down,
 
took photos, and provided that information directly
 
to the inspection team and we were able to resolve
 
the inspection team's questions without necessarily
 
having them come to the site.
 
So, I think this hybrid approach, we've
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 11
 
learned a lot and we can continue to think about that
 
going forward beyond hybrid and really try to manage
 
our costs and our precious resources.
 
COMMISSIONER BARAN: Thanks, Maria. Any
 
other thoughts on this issue?
 
MR. LORSON: If I could just add one
 
thought related to remote inspections? With respect
 
to some of the technology and the tools, there has
 
been a benefit for us, particularly when it comes to
 
off-hours event response.
 
In some cases, we've seen situations
 
where the plant may trip in the middle of the night.
 
In the past, the resident inspector might
 
leave his house and drive in the plant early in the
 
morning whereas now we can use our remote tools to
 
determine whether or not we need to go in immediately
 
or if we can wait a little while.
 
So, we have achieved some of the benefits
 
but I would also echo what Scott talked about, there's
 
really no substitute for direct onsite visual
 
inspection.
 
COMMISSIONER BARAN: Thanks, Ray. Ed,
 
you have something you want to add as well?
 
MR. SEMANCIK: Yes, just as an outsider,
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 12
 
first of all, I think what the inspections teams have
 
done is amazing to deal with this crisis. And
 
certainly at the height of the pandemic, there was
 
very good reason to move to that remote posture.
 
But certainly, going forward I am
 
impressed by the anecdotes that I have been hearing
 
that there is no substituting for the onsite
 
inspection.
 
I would submit that rather than remote
 
tools be used in lieu of critical inspection
 
functions, they be used to augment and supplement
 
those.
 
And moving forward, once hopefully the
 
public health emergency resolves, there should be the
 
resumption of a more normal posture. That's my view,
 
thank you.
 
COMMISSIONER BARAN: Jeff, do you have
 
something you want to add as well?
 
MR. SEMANCIK: Yes, I'll just also echo
 
Ed. The presence of NRC resident inspectors on the
 
site during the height of the pandemic was pretty
 
quickly a public interest item that we got engaged in
 
at the state level.
 
And I thought at least regionally here
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 13
 
they did a great job of keeping us informed of what
 
was going on onsite, what was going on offsite, what
 
was being done hybrid.
 
And I think also a good common focus on
 
maintaining safety and integrity for the operators at
 
the plant to make sure we weren't putting them at any
 
additional risk that wasn't necessary for it.
 
But on the whole, I think it went very
 
well and communication was good on it. So, thank
 
you.
 
COMMISSIONER BARAN: Let's move to
 
another question.
 
What impacts has the public health
 
emergency had on nuclear power-plant sites and plant
 
safety and what effect has it had on your
 
organization's planning and staffing?
 
Jack, do you want to take the lead on
 
this one?
 
MR. GIESSNER: Yes. When I think of this
 
question I break it into two parts. I break it into
 
the impact and safety on the people, the people who
 
running the plant and the oversight, and I also base
 
it on plant safety.
 
They are not mutually exclusive, nor does
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 14
 
one guarantee the other. So, when we work on looking
 
at this issue, let's face it, this is a huge challenge
 
and continues to be a huge challenge to the families,
 
to the people.
 
But the processes and the procedures and
 
the contingencies that the utilities built and the
 
processes and procedures and contingencies the NRC
 
built and frankly, the exemptions that provided that
 
temporary flexibility by the program office at
 
Headquarters ensured the plants continued to operate
 
safely.
 
I don't want to underestimate the impact
 
to the people. When we initially started the
 
protocols, generally more than what was implemented
 
by the federal outlines, we as good neighbors at the
 
NRC followed those, whether it was masking, social
 
distancing, and testing, we were able to provide that
 
framework.
 
The resident inspectors went in
 
periodically, every couple days, and some inspections
 
were continued. Our operator licensing needed to
 
continue, it was a mission-critical function.
 
So, I wanted to make sure folks
 
understand there's a huge challenge to the people but
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 15
 
that balance of ensuring safety of our inspectors,
 
safety of the utility folks, we needed to meet and
 
ensure we could oversee correctly and also ensure the
 
safe operations of the plant continued.
 
We came up with a methodology and looked
 
at yourself, looked at the outside community, looked
 
at the site, and then we looked at the risk.
 
Ray mentioned we might not have gone in
 
for a trip, but if it was a complex evolution, it
 
could have been a difficult item in an outage,
 
incident response, especially on the SIT teams, we
 
would send those out. They would take the appropriate
 
precautions.
 
So, in short, we did ensure plants
 
operated safely. Big challenges continue with the
 
Staff and we continue to work through the processes
 
that we have with the help from our folks in the
 
program office.


15 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com that balance of ensuring safety of our inspectors, safety of the utility folks, we needed to meet and ensure we could oversee correctly and also ensure the safe operations of the plant continued.
We came up with a methodology and looked at yourself, looked at the outside community, looked at the site, and then we looked at the risk.
Ray mentioned we might not have gone in for a trip, but if it was a complex evolution, it could have been a difficult item in an outage, incident response, especially on the SIT teams, we would send those out. They would take the appropriate precautions.
So, in short, we did ensure plants operated safely. Big challenges continue with the Staff and we continue to work through the processes that we have with the help from our folks in the program office.
That's all I had, Commissioner.
That's all I had, Commissioner.
COMMISSIONER BARAN: Jeff, did you have anything to add on this one?
MR. SEMANCIK: There's a couple of things I would say from the local perspective.
The first part is early in the pandemic


COMMISSIONER BARAN: Jeff, did you have
16 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com we worked with plant staff at the local power-plant to do things like get them priority access to offsite testing when that was running scarce, get them on vaccine lists for critical workers and in the right phases of those.
 
So, we helped do our part as partners in the area. The other thing we did is we took a strong look at our offsite emergency plan for the COVID-19 pandemic, again during the early parts prior to deployment of vaccines and other measures.
anything to add on this one?
We really took a look at would we shelter in place versus aggregation of large personnel, where we could do hybrid on the offsite response teams, and how we could minimize spreads on that.
 
So, through that whole process we engaged with all the stakeholders and were able to really I think come up with some of those modifications and also to exercise those modifications by continuing to do some drills to demonstrate proficiency in those.
MR. SEMANCIK: There's a couple of things
 
I would say from the local perspective.
 
The first part is early in the pandemic
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 16
 
we worked with plant staff at the local power-plant
 
to do things like get them priority access to offsite
 
testing when that was running scarce, get them on
 
vaccine lists for critical workers and in the right
 
phases of those.
 
So, we helped do our part as partners in
 
the area. The other thing we did is we took a strong
 
look at our offsite emergency plan for the COVID-19
 
pandemic, again during the early parts prior to
 
deployment of vaccines and other measures.
 
We really took a look at would we shelter
 
in place versus aggregation of large personnel, where
 
we could do hybrid on the offsite response teams, and
 
how we could minimize spreads on that.
 
So, through that whole process we engaged
 
with all the stakeholders and were able to really I
 
think come up with some of those modifications and
 
also to exercise those modifications by continuing to
 
do some drills to demonstrate proficiency in those.
 
Thanks.
Thanks.
COMMISSIONER BARAN: Any other comments on this question?
MR.
MORRIS:
If you don't
: mind, Commissioner, I'll put in a shameless plug for a


COMMISSIONER BARAN: Any other comments
17 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com session I'll be facilitating tomorrow morning where we had a real-time opportunity to respond to a real-world
 
: event, Hurricane Ida going through Southern Louisiana right over the Waterford site and how all of us worked together to combat that in a COVID-19 public health emergency environment.
on this question?
We'll explore some of these issues related to this question during that session as well.
 
COMMISSIONER BARAN: Sounds good, let's turn to Kelvin next.
MR. MORRIS: If you don't mind,
MR. HENDERSON: So, it really did have an impact really only on how we execute our business at the plant.
 
Our key resources such as operators, maintenance, radiation protection, chemistry folks, the folks that were on the plant day in and day out, they were there from day one of the public health crisis and they were there through the end.
Commissioner, I'll put in a shameless plug for a
We learned how to operate by coaching each other from a safety standpoint. Social distancing, wearing of masks, things of that nature.
 
The people that were sent home and working remotely, they still came in for critical evolutions.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 17
So, from a plant safety standpoint, plant
 
session I'll be facilitating tomorrow morning where
 
we had a real-time opportunity to respond to a
 
real-world event, Hurricane Ida going through
 
Southern Louisiana right over the Waterford site and
 
how all of us worked together to combat that in a
 
COVID-19 public health emergency environment.
 
We'll explore some of these issues
 
related to this question during that session as well.
 
COMMISSIONER BARAN: Sounds good, let's
 
turn to Kelvin next.
 
MR. HENDERSON: So, it really did have
 
an impact really only on how we execute our business
 
at the plant.
 
Our key resources such as operators,
 
maintenance, radiation protection, chemistry folks,
 
the folks that were on the plant day in and day out,
 
they were there from day one of the public health


crisis and they were there through the end.
18 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com safety was never jeopardized or even challenged, it was just how we executed. We executed all of our refueling outages in 2020 and 2021 and we were able to do it successfully within the bounds of the allocation for those outages.
 
So, the organization really learned to adapt and we're carrying some of those learnings to how we operate today.
We learned how to operate by coaching
COMMISSIONER BARAN: It looks like Maria and Ed both have comments. Let's start with Maria and then go to Ed.
 
MS. LACAL: I think we would be remiss to not recognize the support from the NRC on exemptions to the workout rules.
each other from a safety standpoint. Social
We submitted those on the spot, very, very timely support so I just really appreciate and thank the NRC for their quick turnaround on those sorts of things.
 
Much like Kelvin said, we've got two refueling outages every year so we executed all four of our refueling outages without really any incident whatsoever.
distancing, wearing of masks, things of that nature.
I think one of the things that we quickly learned was how important it is to be intentional  
 
The people that were sent home and working remotely,
 
they still came in for critical evolutions.
 
So, from a plant safety standpoint, plant
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 18
 
safety was never jeopardized or even challenged, it
 
was just how we executed. We executed all of our
 
refueling outages in 2020 and 2021 and we were able
 
to do it successfully within the bounds of the
 
allocation for those outages.
 
So, the organization really learned to
 
adapt and we're carrying some of those learnings to
 
how we operate today.
 
COMMISSIONER BARAN: It looks like Maria
 
and Ed both have comments. Let's start with Maria
 
and then go to Ed.
 
MS. LACAL: I think we would be remiss
 
to not recognize the support from the NRC on
 
exemptions to the workout rules.
 
We submitted those on the spot, very,
 
very timely support so I just really appreciate and
 
thank the NRC for their quick turnaround on those
 
sorts of things.
 
Much like Kelvin said, we've got two
 
refueling outages every year so we executed all four
 
of our refueling outages without really any incident
 
whatsoever.
 
I think one of the things that we quickly
 
learned was how important it is to be intentional
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 19
 
regarding staying connected to the remote workforce
 
and making sure that we had leaders checking in on
 
them and having that heightened communication just to
 
make sure they're onsite as well.
 
Because they work here on site and we
 
want to make sure things were operating well from
 
home. That was a big learning for us as well.


19 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com regarding staying connected to the remote workforce and making sure that we had leaders checking in on them and having that heightened communication just to make sure they're onsite as well.
Because they work here on site and we want to make sure things were operating well from home. That was a big learning for us as well.
COMMISSIONER BARAN: Ed?
COMMISSIONER BARAN: Ed?
MR. LYMAN: From the public perspective, it's a little hard for us to really assess the impact of all this, so I hope the NRC will be collecting data in a form that's publicly accessible so that we can see for the usual metrics how safety may or may not have been maintained during this period.
I've been doing my own non-scientific analysis so with regards to one planner at least unplanned SCRAMS, it looks like 2021 was actually lower than it's been.
So, I can't say anything from one data-point but it doesn't look like there was a sudden explosion of operator error and deferred maintenance-related SCRAMS. So that's positive and again, I'd love to see a comprehensive analysis once the situation is settled, thank you.


MR. LYMAN: From the public perspective,
20 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com COMMISSIONER BARAN: Any other thoughts on this question before we move on to the next one?
 
A new feature of the reactor oversight process is the very low safety significance issue resolution or the LSIR process.
it's a little hard for us to really assess the impact
 
of all this, so I hope the NRC will be collecting
 
data in a form that's publicly accessible so that we
 
can see for the usual metrics how safety may or may
 
not have been maintained during this period.
 
I've been doing my own non-scientific
 
analysis so with regards to one planner at least
 
unplanned SCRAMS, it looks like 2021 was actually
 
lower than it's been.
 
So, I can't say anything from one
 
data-point but it doesn't look like there was a sudden
 
explosion of operator error and deferred
 
maintenance-related SCRAMS. So that's positive and
 
again, I'd love to see a comprehensive analysis once
 
the situation is settled, thank you.
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 20
 
COMMISSIONER BARAN: Any other thoughts
 
on this question before we move on to the next one?
 
A new feature of the reactor oversight process is the
 
very low safety significance issue resolution or the
 
LSIR process.
 
We got one question about this already.
We got one question about this already.
Ray, can you describe the process and give us a regional perspective on it? I'd also like to hear what the non-NRC panelists think about the process of how it's being implemented.
MR. LORSON: The very low safety significance issue resolution process, or VLSIR, was incorporated into our inspection program in 2019.
And what we did was we had a lot of internal discussion and we developed a process so that we could take issues that previously we might spend an awful lot of time on that we would acknowledge were very low significance, but we were trying to do further investigation to determine if there was an actual violation or not or a regulatory requirement.
And so what the VLSIR process achieved for us, and folks can refer to it, it's Manual Chapter 612, it allowed us to make a conscious decision for


Ray, can you describe the process and give us a
21 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com some issues that are of low risk significance to not expend an inordinate amount of time trying to determine if there was an underlying compliance issue or not.
 
So, it was just another tool that we had to allow us to better focus our efforts. So, that at a high level is what it is. It's been used successfully approximately a dozen times across the agency that I'm aware of so it is being used.
regional perspective on it? I'd also like to hear
It's something we routinely think about as we're pursuing issues. That's a little bit about what LSIR is, it's probably also worth talking about what it is not. And it's not a substitute for restoring compliance.
 
If we determine that there's a compliance issue and we take some type of formal action, let's say for example an enforcement action, the issue still has to be addressed and if there's a disagreement with the action we've taken, then there would be a process for contesting that.
what the non-NRC panelists think about the process of
And so that would be outside the LSIR process but it would be an avenue by which a licensee could express disagreement with a conclusion we've reached. Or if we've reached a conclusion and taken  
 
how it's being implemented.
 
MR. LORSON: The very low safety
 
significance issue resolution process, or VLSIR, was
 
incorporated into our inspection program in 2019.
 
And what we did was we had a lot of
 
internal discussion and we developed a process so
 
that we could take issues that previously we might
 
spend an awful lot of time on that we would
 
acknowledge were very low significance, but we were
 
trying to do further investigation to determine if
 
there was an actual violation or not or a regulatory
 
requirement.
 
And so what the VLSIR process achieved
 
for us, and folks can refer to it, it's Manual Chapter
 
612, it allowed us to make a conscious decision for
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 21
 
some issues that are of low risk significance to not
 
expend an inordinate amount of time trying to
 
determine if there was an underlying compliance issue
 
or not.
 
So, it was just another tool that we had
 
to allow us to better focus our efforts. So, that
 
at a high level is what it is. It's been used
 
successfully approximately a dozen times across the
 
agency that I'm aware of so it is being used.
 
It's something we routinely think about
 
as we're pursuing issues. That's a little bit about
 
what LSIR is, it's probably also worth talking about
 
what it is not. And it's not a substitute for
 
restoring compliance.
 
If we determine that there's a compliance
 
issue and we take some type of formal action, let's
 
say for example an enforcement action, the issue
 
still has to be addressed and if there's a
 
disagreement with the action we've taken, then there
 
would be a process for contesting that.
 
And so that would be outside the LSIR
 
process but it would be an avenue by which a licensee
 
could express disagreement with a conclusion we've
 
reached. Or if we've reached a conclusion and taken
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 22
 
an enforcement action but we all agree it's of low
 
significance, the licensee has other means they can
 
use to remedy the issue.
 
For example, they could correct the
 
condition or they could request an exemption. To
 
that extent, a couple years ago NRR developed a
 
risk-informed process for requesting the exemption.


22 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com an enforcement action but we all agree it's of low significance, the licensee has other means they can use to remedy the issue.
For example, they could correct the condition or they could request an exemption. To that extent, a couple years ago NRR developed a risk-informed process for requesting the exemption.
That streamlines the exemption process.
That streamlines the exemption process.
 
So, all three processes all work together if you will and I think it's just important that we all recognize the importance that the VLSIR tool has provided to us to focus our time on things that are most important.
So, all three processes all work together if you will
COMMISSIONER BARAN: Thanks for that overview, Ray. Maria, do you have thoughts on this?
 
and I think it's just important that we all recognize
 
the importance that the VLSIR tool has provided to us
 
to focus our time on things that are most important.
 
COMMISSIONER BARAN: Thanks for that
 
overview, Ray. Maria, do you have thoughts on this?
 
MS. LACAL: Yes, Commissioner, thanks.
MS. LACAL: Yes, Commissioner, thanks.
I agree with Ray, this is a very effective way of using our precious resources.
I think we had a really good example recently with the use of this process during the NRC's review of an interim change that we made to Staff augmentation time due to the COVID-19 public health emergency.
This was an emergency response organization, staff augmentation time change and so


I agree with Ray, this is a very effective way of
23 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com the NRC in their review raised some questions regarding facility augmentation times that have been resolved with the NRC really decades earlier.
 
And so the NRC originally had approved our emergency response organization change to the augmentation time. Back in the early 1990s, 1994, the letters with the NRC region versus NRR and that approval letter at the time didn't have a safety evaluation.
using our precious resources.
And so even though our example didn't exactly fit into the type of cases that I think were originally believed to be part of this VLSIR process, in our case emergency plan, the team really quickly and effectively resolved and saved a lot of time and resources again due in large part to the NRC's application with this process.
 
So, it was captured on a condition report and now we've included the basis for the original approval.
I think we had a really good example
So, I agree that really focusing our time and energy on the more safety-significant issues mitigates our distraction on the lower-level things and really helps us maintain laser focus on the things that we need to.  
 
recently with the use of this process during the NRC's
 
review of an interim change that we made to Staff
 
augmentation time due to the COVID-19 public health
 
emergency.
 
This was an emergency response
 
organization, staff augmentation time change and so
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 23
 
the NRC in their review raised some questions
 
regarding facility augmentation times that have been
 
resolved with the NRC really decades earlier.
 
And so the NRC originally had approved
 
our emergency response organization change to the
 
augmentation time. Back in the early 1990s, 1994,
 
the letters with the NRC region versus NRR and that
 
approval letter at the time didn't have a safety
 
evaluation.
 
And so even though our example didn't
 
exactly fit into the type of cases that I think were
 
originally believed to be part of this VLSIR process,
 
in our case emergency plan, the team really quickly
 
and effectively resolved and saved a lot of time and
 
resources again due in large part to the NRC's
 
application with this process.
 
So, it was captured on a condition report
 
and now we've included the basis for the original
 
approval.
 
So, I agree that really focusing our time
 
and energy on the more safety-significant issues
 
mitigates our distraction on the lower-level things
 
and really helps us maintain laser focus on the things
 
that we need to.
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 24
 
And actually, at the end, it ultimately
 
improves our nuclear safety posture. So, I
 
appreciate the work that was involved in that
 
application for us.
 
COMMISSIONER BARAN: Jeff, do you have
 
thoughts on this?
 
MR. SEMANCIK: Time will tell certainly
 
on this to some extent as we see more of these issues
 
resolved this way. I think there is a challenge with
 
complicating an already complicated process from the
 
public's point of view.
 
It's just more adjectives thrown on and
 
a little more screen, it looks like there's a problem
 
that's not getting fixed with that appearance. So,
 
I think I'll withhold judgment on it from that point
 
of view, but I think the public struggles with
 
resource balance of utilities.
 
And the NRC, with respect to running
 
nuclear power-plants, they see it as an endless
 
resource and the stuff we have to monitor, I do
 
applaud the fact that at least the documentation of
 
this in the inspection reports gives us all a chance
 
to look at it in the public view and see what happens.
 
So, I think the book is still open a
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 25
 
little bit on it but there is obviously some benefit
 
to it in general. I just have to be cautious about
 
how we approach it and make sure the public fully
 
understands.
 
COMMISSIONER BARAN: Thanks, Jeff, and
 
of course it is a new process. Laura, do you have
 
thoughts you want to share on this?
 
MS. DUDES: Thanks, and I really
 
appreciated Jeff's comments about the documentation
 
because I think it's important to recognize there's
 
transparency in this process and we're sharing with
 
everyone, here's what we're doing with this, we're
 
not pursuing it at this time.
 
And then it's all important to realize
 
that if new information becomes available to the NRC
 
or the licensee, it doesn't preclude us from
 
revisiting this issue at a different time.
 
So, I really just wanted to highlight the
 
transparency of the process. Thank you.
 
COMMISSIONER BARAN: Ed, do you have
 
something you want to share?
 
MR. LYMAN: Yes, and I think Jeff hit the
 
nail on the head.
 
From our perspective, if there's a safety
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 26
 
problem and it looks like the lay characterization of
 
this process is maybe it's not worth trying to figure
 
out whether or not it's an actual violation, and even
 
if we do that, maybe we'll not require that it be
 
fixed.
 
Those are problematic for us and this
 
stems from our concern about perhaps the overuse and
 
overlying site PRA in these inspection
 
determinations. I think we would want more assurance
 
that these are really very low safety significance
 
and I'm not sure that's always borne out by the PRA
 
analysis, because as we all know, there are
 
uncertainties and deficiencies in missions and the
 
use of things like flex credit, which I'll talk about
 
later, which we have concerns about because of their
 
potential lack of validation.
 
So, we don't want to see safety issues
 
essentially being thrown out because no one wants to
 
take the time to dig through the history and find out
 
if it's really a violation or not.


That says something about the way this
24 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com And actually, at the end, it ultimately improves our nuclear safety posture. So, I appreciate the work that was involved in that application for us.
COMMISSIONER BARAN: Jeff, do you have thoughts on this?
MR. SEMANCIK: Time will tell certainly on this to some extent as we see more of these issues resolved this way. I think there is a challenge with complicating an already complicated process from the public's point of view.
It's just more adjectives thrown on and a little more screen, it looks like there's a problem that's not getting fixed with that appearance. So, I think I'll withhold judgment on it from that point of view, but I think the public struggles with resource balance of utilities.
And the NRC, with respect to running nuclear power-plants, they see it as an endless resource and the stuff we have to monitor, I do applaud the fact that at least the documentation of this in the inspection reports gives us all a chance to look at it in the public view and see what happens.
So, I think the book is still open a


licensing basis has evolved and it would be great to
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com little bit on it but there is obviously some benefit to it in general. I just have to be cautious about how we approach it and make sure the public fully understands.
COMMISSIONER BARAN: Thanks, Jeff, and of course it is a new process. Laura, do you have thoughts you want to share on this?
MS. DUDES: Thanks, and I really appreciated Jeff's comments about the documentation because I think it's important to recognize there's transparency in this process and we're sharing with everyone, here's what we're doing with this, we're not pursuing it at this time.
And then it's all important to realize that if new information becomes available to the NRC or the licensee, it doesn't preclude us from revisiting this issue at a different time.
So, I really just wanted to highlight the transparency of the process. Thank you.
COMMISSIONER BARAN: Ed, do you have something you want to share?
MR. LYMAN: Yes, and I think Jeff hit the nail on the head.
From our perspective, if there's a safety


take a fresh look, I agree, at the safety significance
26 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com problem and it looks like the lay characterization of this process is maybe it's not worth trying to figure out whether or not it's an actual violation, and even if we do that, maybe we'll not require that it be fixed.
 
Those are problematic for us and this stems from our concern about perhaps the overuse and overlying site PRA in these inspection determinations. I think we would want more assurance that these are really very low safety significance and I'm not sure that's always borne out by the PRA analysis, because as we all know, there are uncertainties and deficiencies in missions and the use of things like flex credit, which I'll talk about later, which we have concerns about because of their potential lack of validation.
but maybe not the way it's playing out here.
So, we don't want to see safety issues essentially being thrown out because no one wants to take the time to dig through the history and find out if it's really a violation or not.
 
That says something about the way this licensing basis has evolved and it would be great to take a fresh look, I agree, at the safety significance but maybe not the way it's playing out here.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 27
 
COMMISSIONER BARAN: Any final thoughts
 
on this question before we move on to the next?
 
MR. MORRIS: Yes, I had a thought on
 
this. I think really, the main genesis of this whole
 
process, the safety significance piece is certainly
 
an element of it but the real driver for me in our
 
experience at least in Region 4 has been when you
 
talk about is it or isn't it a violation, what we're
 
really talking about is the licensing basis around
 
this issue clear or not?


27 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com COMMISSIONER BARAN: Any final thoughts on this question before we move on to the next?
MR. MORRIS: Yes, I had a thought on this. I think really, the main genesis of this whole process, the safety significance piece is certainly an element of it but the real driver for me in our experience at least in Region 4 has been when you talk about is it or isn't it a violation, what we're really talking about is the licensing basis around this issue clear or not?
Or is it ambiguous?
Or is it ambiguous?
If that's the case and it happens to be low significance from a safety or risk standpoint, then the LSIR, exercising VLSIR, and all the transparency that Laura talked about is going to happen.
So, it really gets to the ambiguity of the licensing basis given the issue, not the safety significance solely.
And I will say if there is a safety-significant issue and it's not in the licensing basis, we're still going to deal with it.
We're not going to walk away from a safety-significant issue regardless of whether or not


If that's the case and it happens to be
28 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com it's in the licensing basis.
 
low significance from a safety or risk standpoint,
 
then the LSIR, exercising VLSIR, and all the
 
transparency that Laura talked about is going to
 
happen.
 
So, it really gets to the ambiguity of
 
the licensing basis given the issue, not the safety
 
significance solely.
 
And I will say if there is a safety-
 
significant issue and it's not in the licensing
 
basis, we're still going to deal with it.
 
We're not going to walk away from a
 
safety-significant issue regardless of whether or not
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 28
 
it's in the licensing basis.
 
COMMISSIONER BARAN: Any other thoughts?
COMMISSIONER BARAN: Any other thoughts?
Ed looks tempted to respond.
Ed looks tempted to respond.
 
MR. LYMAN: Then you get into backfit space and that's the problem. If it's too hard to follow through on a back fit, that's a very blunt sword you have.
MR. LYMAN: Then you get into backfit
 
space and that's the problem. If it's too hard to
 
follow through on a back fit, that's a very blunt
 
sword you have.
 
COMMISSIONER BARAN: Jeff, go ahead.
COMMISSIONER BARAN: Jeff, go ahead.
 
MR. SEMANCIK: I would also indicate that from a reassurance to the public thing, you have an ambiguous licensing basis and don't really understand it so therefore won't pursue it is less than satisfying.
MR. SEMANCIK: I would also indicate that
So, I think if there's an ambiguous licensing basis, some effort to resolve and clarify that would make sense to me.
 
MR. MORRIS: It's a question of the amount of resources necessary to do that. In a world of limited resources, we obviously want to be risk-smart and focus on the most important things.
from a reassurance to the public thing, you have an
 
ambiguous licensing basis and don't really understand
 
it so therefore won't pursue it is less than
 
satisfying.
 
So, I think if there's an ambiguous
 
licensing basis, some effort to resolve and clarify
 
that would make sense to me.
 
MR. MORRIS: It's a question of the
 
amount of resources necessary to do that. In a world
 
of limited resources, we obviously want to be risk-
 
smart and focus on the most important things.
 
But your points are very well taken.
But your points are very well taken.
COMMISSIONER BARAN: Good discussion on this, it's kind of early days on this program and we welcome the feedback today on going forward on it.


COMMISSIONER BARAN: Good discussion on
29 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com Let's turn to a question from the audience and maybe I'll ask Laura to answer this or take a first stab at it.
 
With retirements and other attrition contributors depleting the workforce of inspectors, what incentives, training, and knowledge management programs are being employed to ensure new inspectors are being recruited, educated, and maintained in the most efficient way?
this, it's kind of early days on this program and we
MS. DUDES: Great question, although I think we could have had a whole RIC session on VLSIR given the very spirited conversation. But I like look forward to in terms of the next generation of NRC inspectors and our EDO, Dan Dorman, has a focus on hiring for this year.
 
And he's got all of the senior leadership focused on hiring. And then I think the question gets to the fact of once you hire them, how do you transfer 30, 40 years of inspection knowledge to this new generation?
welcome the feedback today on going forward on it.
We have multiple strategies in place. I think one of the things we're really proud of now is our Nuclipedia, or our Wiki tool that's a great knowledge management tool that people post videos and  
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 29
 
Let's turn to a question from the audience and maybe
 
I'll ask Laura to answer this or take a first stab at
 
it.
 
With retirements and other attrition
 
contributors depleting the workforce of inspectors,
 
what incentives, training, and knowledge management
 
programs are being employed to ensure new inspectors
 
are being recruited, educated, and maintained in the
 
most efficient way?
 
MS. DUDES: Great question, although I
 
think we could have had a whole RIC session on VLSIR
 
given the very spirited conversation. But I like
 
look forward to in terms of the next generation of
 
NRC inspectors and our EDO, Dan Dorman, has a focus
 
on hiring for this year.
 
And he's got all of the senior leadership
 
focused on hiring. And then I think the question
 
gets to the fact of once you hire them, how do you
 
transfer 30, 40 years of inspection knowledge to this
 
new generation?
 
We have multiple strategies in place. I
 
think one of the things we're really proud of now is
 
our Nuclipedia, or our Wiki tool that's a great
 
knowledge management tool that people post videos and
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 30
 
discussions about knowledge management.
 
And the great thing is it is a one-stop
 
shop and as we build that it will continue to grow in
 
terms of knowledge management.
 
But beyond that, we're really focused on
 
competency modeling, which is a qualification
 
process, really identifying what competencies are
 
needed for inspectors, aligning them with senior
 
inspectors so they're able to work and get on-the-job
 
training.
 
And then competency-based qualifications
 
is another item that we're focused on to make sure
 
that our inspectors are really getting a 360-degree
 
knowledge transfer and training.
 
NRC always has very good training
 
programs and we continue to use our effective
 
training center to give people firsthand experience
 
in simulators and then working with our operator
 
licensing folks because they also have a tremendous
 
amount of plant knowledge.
 
So, I think there's a lot out there but
 
this is something that we are all as a senior
 
leadership team laser focused on as we look at the
 
demographics of the Agency and how we bring new people
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 31
 
in.
 
And I will say, the challenge that we
 
have and one of the things that we're trying to
 
communicate and coordinate on is we're bringing
 
people in in a hybrid work environment.
 
And I think Scott mentioned this earlier
 
in terms of the reasons we were able to be so
 
successful with our remote inspections is because of
 
the quality of our inspectors.
 
And so now as we are working in this
 
hybrid environment we have to be incredibly
 
intentional about taking our new hires, getting them
 
out to the sites, having the senior inspector spend
 
as much time in OJT as possible.
 
Let me pause there and see if there's
 
other comments.
 
COMMISSIONER BARAN: Any other NRC folks
 
want to weigh in?
 
MR. MORRIS: I will just say Laura's
 
points are all absolutely dead on.
 
We've taken other steps, we have weekly
 
question and answer sessions in the region for
 
example, where anyone can come in, seasoned
 
inspectors and brand-new ones and it's an open forum
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 32
 
where people can just ask questions.
 
What does this acronym mean? Why is this
 
issue important? Why did you pursue this line of
 
questioning? And just an open exchange that happens
 
every week, very robust sessions. We do inspection
 
debriefs every time we have an inspection.
 
That inspector comes back and debriefs to
 
their colleagues what they did and what they found
 
and there's an opportunity for conversation and
 
learning there. We're trying to take advantage of
 
opportunities at the sites.
 
I know a lot of Region 4 sites, we've had
 
a fair amount of attrition in our resident inspector
 
cadre and we've obviously got a lot of new folks out
 
there. But we try to match them up with seasoned
 
people and we're putting a lot of our newer hires out
 
in the field for observational rotational assignments
 
and details.
 
Again, it's to maximize that OJT and
 
accelerate that learning. We all know that training
 
and qualification is great, it's important, but it
 
doesn't make you a proficient inspector.
 
Proficiency comes with time and wisdom
 
and just being out there.
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 33
 
COMMISSIONER BARAN: Let me ask a related
 
question so folks can keep answering this one but
 
I'll throw this in as well.
 
We had an audience question of how do you
 
deal with the challenge in terms of mentoring new
 
staff where you have the more experienced inspectors
 
who may be busy or overworked as is and may not have
 
the time that they would want to have to mentor.
 
How does the Agency address that to
 
really make sure this vital part of the role of the
 
more seasoned inspectors have the time and bandwidth
 
to convey that knowledge and experience and help
 
bring newer folks up to their level of capability?
 
MS. DUDES: I think that's a great
 
question. This is a phrase that's often used, it
 
takes a village, right? So, you need your entire
 
organization engaged in attracting this talent and
 
retaining the talent.
 
And so it's not just the seasoned
 
inspectors.
 
I'll give you a great example. We have
 
a lot of new resident inspector development program
 
hires and so we had three Branch Chiefs take them up
 
to the technical training center for three or four
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 34
 
days and they went through how do you respond to an
 
incident?
 
They had the simulator going. That's
 
just one example.
 
And so as an agency and organization, we
 
need to utilize all the resources that we have, bring
 
people together for intentional focused training on
 
specific topics so it's not just hooking them up with
 
a senior inspector but it's using the Branch Chiefs
 
and using the former inspectors at Headquarters and
 
seeing if you can have specialized topic sessions.
 
So, again, you're giving the employee a
 
full 360 experience with the tremendous skills and
 
experience we have in the Agency.
 
COMMISSIONER BARAN: Scott, you have
 
something you want to add?
 
MR. MORRIS: Yes, just real quick, every
 
NRC employee has a performance plan that becomes the
 
foundation of their individual performance assessment
 
at the end of every year.
 
One of the elements of every individual's
 
performance plan including our inspectors is this
 
notion of organizational effectiveness. What have
 
you done to help the organization get better?
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 35
 
Not just what you've done to develop
 
yourself personally and professionally in your own
 
career, but what have you done to contribute to the
 
whole organization?
 
And so directly to your question,
 
mentoring is one way of doing it, imparting
 
knowledge, creating Nuclipedia pages, conducting cam
 
and knowledge management sessions and on and on and
 
on.
 
So, it is an overt expectation on the
 
part of our staff.
 
COMMISSIONER BARAN: Any other thoughts
 
on this before we move on to another question? Let
 
me ask one about inspection findings, since 2015, the
 
number of nationwide inspection findings has declined
 
from 821 per year to 269 per year.


That's a 67 percent decline. All 4
30 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com discussions about knowledge management.
And the great thing is it is a one-stop shop and as we build that it will continue to grow in terms of knowledge management.
But beyond that, we're really focused on competency
: modeling, which is a
qualification process, really identifying what competencies are needed for inspectors, aligning them with senior inspectors so they're able to work and get on-the-job training.
And then competency-based qualifications is another item that we're focused on to make sure that our inspectors are really getting a 360-degree knowledge transfer and training.
NRC always has very good training programs and we continue to use our effective training center to give people firsthand experience in simulators and then working with our operator licensing folks because they also have a tremendous amount of plant knowledge.
So, I think there's a lot out there but this is something that we are all as a senior leadership team laser focused on as we look at the demographics of the Agency and how we bring new people


regions have seen this trend in inspection findings.
31 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com in.
And I will say, the challenge that we have and one of the things that we're trying to communicate and coordinate on is we're bringing people in in a hybrid work environment.
And I think Scott mentioned this earlier in terms of the reasons we were able to be so successful with our remote inspections is because of the quality of our inspectors.
And so now as we are working in this hybrid environment we have to be incredibly intentional about taking our new hires, getting them out to the sites, having the senior inspector spend as much time in OJT as possible.
Let me pause there and see if there's other comments.
COMMISSIONER BARAN: Any other NRC folks want to weigh in?
MR. MORRIS: I will just say Laura's points are all absolutely dead on.
We've taken other steps, we have weekly question and answer sessions in the region for
: example, where anyone can come in, seasoned inspectors and brand-new ones and it's an open forum


What do you think is driving the significant decline
32 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com where people can just ask questions.
What does this acronym mean? Why is this issue important? Why did you pursue this line of questioning? And just an open exchange that happens every week, very robust sessions. We do inspection debriefs every time we have an inspection.
That inspector comes back and debriefs to their colleagues what they did and what they found and there's an opportunity for conversation and learning there. We're trying to take advantage of opportunities at the sites.
I know a lot of Region 4 sites, we've had a fair amount of attrition in our resident inspector cadre and we've obviously got a lot of new folks out there. But we try to match them up with seasoned people and we're putting a lot of our newer hires out in the field for observational rotational assignments and details.
Again, it's to maximize that OJT and accelerate that learning. We all know that training and qualification is great, it's important, but it doesn't make you a proficient inspector.
Proficiency comes with time and wisdom and just being out there.


in inspection findings and are you concerned about
33 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com COMMISSIONER BARAN: Let me ask a related question so folks can keep answering this one but I'll throw this in as well.
We had an audience question of how do you deal with the challenge in terms of mentoring new staff where you have the more experienced inspectors who may be busy or overworked as is and may not have the time that they would want to have to mentor.
How does the Agency address that to really make sure this vital part of the role of the more seasoned inspectors have the time and bandwidth to convey that knowledge and experience and help bring newer folks up to their level of capability?
MS. DUDES: I think that's a great question. This is a phrase that's often used, it takes a village, right? So, you need your entire organization engaged in attracting this talent and retaining the talent.
And so it's not just the seasoned inspectors.
I'll give you a great example. We have a lot of new resident inspector development program hires and so we had three Branch Chiefs take them up to the technical training center for three or four


it?
34 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com days and they went through how do you respond to an incident?
They had the simulator going. That's just one example.
And so as an agency and organization, we need to utilize all the resources that we have, bring people together for intentional focused training on specific topics so it's not just hooking them up with a senior inspector but it's using the Branch Chiefs and using the former inspectors at Headquarters and seeing if you can have specialized topic sessions.
So, again, you're giving the employee a full 360 experience with the tremendous skills and experience we have in the Agency.
COMMISSIONER BARAN: Scott, you have something you want to add?
MR. MORRIS: Yes, just real quick, every NRC employee has a performance plan that becomes the foundation of their individual performance assessment at the end of every year.
One of the elements of every individual's performance plan including our inspectors is this notion of organizational effectiveness. What have you done to help the organization get better?  


35 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com Not just what you've done to develop yourself personally and professionally in your own career, but what have you done to contribute to the whole organization?
And so directly to your
: question, mentoring is one way of doing it, imparting knowledge, creating Nuclipedia pages, conducting cam and knowledge management sessions and on and on and on.
So, it is an overt expectation on the part of our staff.
COMMISSIONER BARAN: Any other thoughts on this before we move on to another question? Let me ask one about inspection findings, since 2015, the number of nationwide inspection findings has declined from 821 per year to 269 per year.
That's a 67 percent decline. All 4 regions have seen this trend in inspection findings.
What do you think is driving the significant decline in inspection findings and are you concerned about it?
Who wants to chime in on this one?
Who wants to chime in on this one?
MR. MORRIS: I would be happy to but I feel like I've been throwing in too much. I'll just


MR. MORRIS: I would be happy to but I
36 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com kick it off then. Yes, am I concerned about it? No.
 
feel like I've been throwing in too much. I'll just
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 36
 
kick it off then. Yes, am I concerned about it? No.
 
Is it something we need to pay attention to? Yes.
Is it something we need to pay attention to? Yes.
Have we done analyses, detailed analyses, to try to understand the drivers? Yes. In fact, NRR teamed up with us and they did a very detailed analysis of this very issue and what were the drivers behind it?
And I think that analysis is available and it was done about eight or nine management so I don't remember all the details. But I will say the main drivers in my opinion and what came out of that analysis, many aspects.
Number one, we are more focused on spending time on risk-significant issues and we did more focused on the threshold between what's truly minor and what's more than minor and therefore gets documented in a report?
So, there's more scrutiny of that, there's more questions being posed by Branch Chiefs and others during these inspection debriefs for example, where folks are saying why is this more than minor?
I think many people would be surprised the kind of dialog that happens in those inspection


Have we done analyses, detailed analyses,
37 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com debriefs. There's a lot of why did you even look at that? Or why are you even talking about this? How does this meet the minor, more than minor or exceed the criteria?
 
That's one piece of it. Risk models are better, there's more margin that's been identified so the significance of issues that are identified are now potentially less risk-significant than we once thought because the modeling is better.
to try to understand the drivers? Yes. In fact, NRR
I think this notion of consistency among regions, there's been a lot more cross-talk, a lot more dialog across and between regions to make sure there's better alignment, sharing of examples to help people understand.
 
And there's a whole bunch of other reasons but one of the bigger and most fascinating things that I recall from the NRR analysis last year, one of the biggest drivers was this notion of management, really questioning and challenging inspectors on whether or not an issue that they're working on or have raised really meets the criteria of being more than minor.
teamed up with us and they did a very detailed
There's a lot more focus on that and I think in my estimation, that's a big driver here.
 
analysis of this very issue and what were the drivers


behind it?
38 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com And I would be remiss if I didn't say something about industry performance.
 
I think the industry collectively is performing.
And I think that analysis is available
They continue to show improvement year over year I think, there's a lot of data to support that, not necessarily NRC data. I'll stop there.
 
COMMISSIONER BARAN: Jack, do you have thoughts you want to share?
and it was done about eight or nine management so I
MR. GIESSNER: Yes, I do. First, I want to say that at least the preliminary data we have for 2021 shows I think a 15 to 20 percent increase in findings and I think in 2020 there was probably less onsite time.
 
So, we'll get that data so this precipitous drop that people are worried about, I do sense that we're coming to this level. I agree with Scott's assessment that it's probably complex.
don't remember all the details. But I will say the
The one thing I wanted to add is I do think the backfit training added a lot of value, things were Criterion 3 in the past. We've done a good job focusing on that.
 
But one thing that is slightly different than Scott is concern is not a bad thing, I just have a little concern because in some of the feedback maybe  
main drivers in my opinion and what came out of that
 
analysis, many aspects.
 
Number one, we are more focused on
 
spending time on risk-significant issues and we did
 
more focused on the threshold between what's truly
 
minor and what's more than minor and therefore gets
 
documented in a report?
 
So, there's more scrutiny of that,
 
there's more questions being posed by Branch Chiefs
 
and others during these inspection debriefs for
 
example, where folks are saying why is this more than
 
minor?
 
I think many people would be surprised
 
the kind of dialog that happens in those inspection
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 37
 
debriefs. There's a lot of why did you even look at
 
that? Or why are you even talking about this? How
 
does this meet the minor, more than minor or exceed
 
the criteria?
 
That's one piece of it. Risk models are
 
better, there's more margin that's been identified so
 
the significance of issues that are identified are
 
now potentially less risk-significant than we once
 
thought because the modeling is better.
 
I think this notion of consistency among
 
regions, there's been a lot more cross-talk, a lot
 
more dialog across and between regions to make sure
 
there's better alignment, sharing of examples to help
 
people understand.
 
And there's a whole bunch of other
 
reasons but one of the bigger and most fascinating
 
things that I recall from the NRR analysis last year,
 
one of the biggest drivers was this notion of
 
management, really questioning and challenging
 
inspectors on whether or not an issue that they're
 
working on or have raised really meets the criteria
 
of being more than minor.
 
There's a lot more focus on that and I
 
think in my estimation, that's a big driver here.
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 38
 
And I would be remiss if I didn't say something about
 
industry performance. I think the industry
 
collectively is performing.
 
They continue to show improvement year
 
over year I think, there's a lot of data to support
 
that, not necessarily NRC data. I'll stop there.
 
COMMISSIONER BARAN: Jack, do you have
 
thoughts you want to share?
 
MR. GIESSNER: Yes, I do. First, I want
 
to say that at least the preliminary data we have for
 
2021 shows I think a 15 to 20 percent increase in
 
findings and I think in 2020 there was probably less
 
onsite time.
 
So, we'll get that data so this
 
precipitous drop that people are worried about, I do
 
sense that we're coming to this level. I agree with
 
Scott's assessment that it's probably complex.
 
The one thing I wanted to add is I do
 
think the backfit training added a lot of value,
 
things were Criterion 3 in the past. We've done a
 
good job focusing on that.
 
But one thing that is slightly different
 
than Scott is concern is not a bad thing, I just have
 
a little concern because in some of the feedback maybe
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 39
 
some inspectors won't bring up these very low issues.
 
And it's not that somebody is saying
 
they're just going to not inspect and just bring up
 
issues, but when you hear there's potential culture
 
perspectives in there it gives me pause.


39 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com some inspectors won't bring up these very low issues.
And it's not that somebody is saying they're just going to not inspect and just bring up issues, but when you hear there's potential culture perspectives in there it gives me pause.
So, I like to pull the data.
So, I like to pull the data.
 
I do think we have more work to do to ensure that it is a combination of better ideas from minor industry performance, understanding backfit, but anytime there's a drop like that, I want to make sure we're focused on the engagement with the frontline inspectors, our specialty inspectors, and residents to make sure there isn't something there we need to address.
I do think we have more work to do to
I think it's something that's always on our radar and we are going to get feedback on it.
 
ensure that it is a combination of better ideas from
 
minor industry performance, understanding backfit,
 
but anytime there's a drop like that, I want to make
 
sure we're focused on the engagement with the
 
frontline inspectors, our specialty inspectors, and
 
residents to make sure there isn't something there we
 
need to address.
 
I think it's something that's always on
 
our radar and we are going to get feedback on it.
 
That's my two cents, Commissioner.
That's my two cents, Commissioner.
COMMISSIONER BARAN: Let's get one more NRC perspective and then maybe hear from some of our external panelists too. Ray, do you have thoughts?
MR. LORSON: Yes, just briefly, I agree with everything that Jack and Scott have already discussed but I'd particularly like to focus on...concern is not the right term but I just want to


COMMISSIONER BARAN: Let's get one more
40 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com make sure we're not putting unnecessary barriers in place that preclude the inspector from going off and identifying issues and bringing them to fruition if you will.
 
We were aware of the survey that was done of inspectors that NRR had developed a report for and on the topic that Scott brought up of management engagement, we are very concerned that making sure what we're doing as a management team in terms of our actions, behaviors are not precluding or inhibiting inspectors from identifying issues or pushing issues to their final conclusion.
NRC perspective and then maybe hear from some of our
And so we basically called SKIP-level meetings where myself and David Lew, the regional administrator, met with every inspector in the region just to try to get their perspectives and make sure we were not behaving in a way that put forth these artificial barriers.
 
So, we were very pleased with the results of that but that was not necessarily concerning but we just wanted to make sure we weren't making it too hard on folks. Thanks.
external panelists too. Ray, do you have thoughts?
COMMISSIONER BARAN: Ed, do you have something you want to say on this topic?
 
MR. LORSON: Yes, just briefly, I agree
 
with everything that Jack and Scott have already
 
discussed but I'd particularly like to focus
 
on...concern is not the right term but I just want to
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 40
 
make sure we're not putting unnecessary barriers in
 
place that preclude the inspector from going off and
 
identifying issues and bringing them to fruition if
 
you will.
 
We were aware of the survey that was done
 
of inspectors that NRR had developed a report for and
 
on the topic that Scott brought up of management
 
engagement, we are very concerned that making sure
 
what we're doing as a management team in terms of our
 
actions, behaviors are not precluding or inhibiting
 
inspectors from identifying issues or pushing issues
 
to their final conclusion.
 
And so we basically called SKIP-level
 
meetings where myself and David Lew, the regional
 
administrator, met with every inspector in the region
 
just to try to get their perspectives and make sure
 
we were not behaving in a way that put forth these
 
artificial barriers.
 
So, we were very pleased with the results
 
of that but that was not necessarily concerning but


we just wanted to make sure we weren't making it too
41 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com MR. LYMAN: I hope this is tied to better performance and not a dynamic where inspectors are afraid to raise issues because they get too much pushback.
 
And if Scott is referring to the same report, I recall that conclusion was there was no clear improvement in the overall safety performance in the explanation.
hard on folks. Thanks.
So, that makes me concerned and it's not just the total number of findings but it's also the number of findings that are escalator engraved in green. And I did hear also in ROP meetings that the use of flex credit has significantly dropped the number of grey and green findings.
 
And that might be one factor, and that again concerns me because of the potential lack of validation for not only flex human error probabilities but also flex equipment reliability that I think we'll be talking about later.
COMMISSIONER BARAN: Ed, do you have
So, I would certainly not want to see a dynamic where there's pressure on inspectors not to rock the boat and allow these findings to be missed or not dealt with.
 
And as with the low safety significance  
something you want to say on this topic?
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 41
 
MR. LYMAN: I hope this is tied to better
 
performance and not a dynamic where inspectors are
 
afraid to raise issues because they get too much
 
pushback.
 
And if Scott is referring to the same
 
report, I recall that conclusion was there was no
 
clear improvement in the overall safety performance
 
in the explanation.
 
So, that makes me concerned and it's not
 
just the total number of findings but it's also the
 
number of findings that are escalator engraved in
 
green. And I did hear also in ROP meetings that the
 
use of flex credit has significantly dropped the
 
number of grey and green findings.
 
And that might be one factor, and that
 
again concerns me because of the potential lack of
 
validation for not only flex human error
 
probabilities but also flex equipment reliability
 
that I think we'll be talking about later.
 
So, I would certainly not want to see a
 
dynamic where there's pressure on inspectors not to
 
rock the boat and allow these findings to be missed
 
or not dealt with.
 
And as with the low safety significance
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 42
 
resolution process, the accumulation or the
 
aggregation of minor findings could lead to something
 
that's greater than the sum of its parts.


42 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com resolution
: process, the accumulation or the aggregation of minor findings could lead to something that's greater than the sum of its parts.
That's my concern, thank you.
That's my concern, thank you.
 
COMMISSIONER BARAN: Jeff, do you want to chime in?
COMMISSIONER BARAN: Jeff, do you want
 
to chime in?
 
MR. SEMANCIK: Just a couple of things.
MR. SEMANCIK: Just a couple of things.
It would be nice to have a comprehensive review and evaluation of the drop vice anecdotal evidence on there to really understand what are the drivers and determine those.
That would be helpful, especially with maybe some outside perspective as well into some comprehensive review on that.
And then I would just caution that you wonder from an external point of view, the previous discussion about bringing on new Staff and experience, does that tie into the ability to identify findings or the willingness to raise them?
But again, that would also be anecdotal and speculative but it would be good to have that good understanding because I think certainly, if a utility had a drop of 67 percent in the number of condition reports they were submitting, we'd


It would be nice to have a comprehensive review and
43 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com certainly be interested to understand what the difference was that caused that.
 
COMMISSIONER BARAN: Anyone else want to weigh in on this issue? Maria, did you have something you wanted add?
evaluation of the drop vice anecdotal evidence on
MH: I just wanted to add a couple of things. Let's not forget about INPO, INPO has been just a phenomenal standard-setter with standards of excellence that we all have to meet.
 
And I think that definitely has helped us to continue our performance in all aspects of operation. Actually, NEI put out a really good document in 2020, it's NEI 2004.
there to really understand what are the drivers and
It's called the nexus between safety and operational performance in the U.S. nuclear industry and it clearly shows how the industry has continued to improve its safety posture year over year.
 
A lot has to do with the regulations that have been imposed over this timeframe but clearly, it shows that the industry in general has the ability to improve.
determine those.
And it looks at a lot of different areas and there's a lot of good metrics there, and there's a lot of really good basis behind this analysis which  
 
That would be helpful, especially with
 
maybe some outside perspective as well into some
 
comprehensive review on that.
 
And then I would just caution that you
 
wonder from an external point of view, the previous
 
discussion about bringing on new Staff and
 
experience, does that tie into the ability to
 
identify findings or the willingness to raise them?
 
But again, that would also be anecdotal
 
and speculative but it would be good to have that
 
good understanding because I think certainly, if a
 
utility had a drop of 67 percent in the number of
 
condition reports they were submitting, we'd
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 43
 
certainly be interested to understand what the
 
difference was that caused that.
 
COMMISSIONER BARAN: Anyone else want to
 
weigh in on this issue? Maria, did you have
 
something you wanted add?
 
MH: I just wanted to add a couple of
 
things. Let's not forget about INPO, INPO has been
 
just a phenomenal standard-setter with standards of
 
excellence that we all have to meet.
 
And I think that definitely has helped us
 
to continue our performance in all aspects of
 
operation. Actually, NEI put out a really good
 
document in 2020, it's NEI 2004.
 
It's called the nexus between safety and
 
operational performance in the U.S. nuclear industry
 
and it clearly shows how the industry has continued
 
to improve its safety posture year over year.
 
A lot has to do with the regulations that
 
have been imposed over this timeframe but clearly, it
 
shows that the industry in general has the ability to
 
improve.
 
And it looks at a lot of different areas
 
and there's a lot of good metrics there, and there's
 
a lot of really good basis behind this analysis which
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 44
 
a lot of the information comes from the NRC.
 
So, that's a pretty good document to take
 
a look at and really, truly understand the
 
improvements that the industry has shown in safety
 
over the last 10, 20 years.
 
I think also just like the NRC does and
 
shares amongst the different regions, we do the same
 
thing. We share amongst the different sites on
 
inspection findings, we do assessments across sites
 
in preparation for inspections.
 
Clearly, our problem resolution
 
identification programs continue to strengthen and
 
that includes low-level trending and analysis, our
 
issue evaluations and looking for that extended
 
condition and making sure that we close the issues
 
with a lot of rigor in looking for similar gaps in
 
other programs or processes or equipment, et cetera.
 
All of those things truly have I believe
 
kept us focused on the important things and I think
 
the risk-informing regulations and that risk-informed
 
thinking really helps us focus on the more safety-
 
significant issues, getting those resolved quickly
 
and early.
 
COMMISSIONER BARAN: Kelvin, did you
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 45
 
want to jump in?
 
MR. HENDERSON: The only thing I would
 
add to Maria's comment, it also starts with
 
leadership and leadership behaviors and the drive for
 
continuous improvement and really identifying issues
 
at such low levels that we promptly get those created.
 
And that starts with me as a CNO setting
 
the tone throughout the organization that our purpose
 
is to find our own purpose and make sure that we


quickly identify those and quickly get them into the
44 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com a lot of the information comes from the NRC.
So, that's a pretty good document to take a
look at and
: really, truly understand the improvements that the industry has shown in safety over the last 10, 20 years.
I think also just like the NRC does and shares amongst the different regions, we do the same thing. We share amongst the different sites on inspection findings, we do assessments across sites in preparation for inspections.
: Clearly, our problem resolution identification programs continue to strengthen and that includes low-level trending and analysis, our issue evaluations and looking for that extended condition and making sure that we close the issues with a lot of rigor in looking for similar gaps in other programs or processes or equipment, et cetera.
All of those things truly have I believe kept us focused on the important things and I think the risk-informing regulations and that risk-informed thinking really helps us focus on the more safety-significant issues, getting those resolved quickly and early.
COMMISSIONER BARAN: Kelvin, did you


corrective action program and place the right sense
45 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com want to jump in?
 
MR. HENDERSON: The only thing I would add to Maria's comment, it also starts with leadership and leadership behaviors and the drive for continuous improvement and really identifying issues at such low levels that we promptly get those created.
of urgency to get them resolved.
And that starts with me as a CNO setting the tone throughout the organization that our purpose is to find our own purpose and make sure that we quickly identify those and quickly get them into the corrective action program and place the right sense of urgency to get them resolved.
 
And I think that is reflected in what we're seeing as far as industry performance over the past few years. I think it's a direct tie to it but it really starts with us as CNOs and the tone that we set with our organizations.
And I think that is reflected in what
COMMISSIONER BARAN: I think it's been a good discussion. In the course of the discussion up to this point, we heard a couple of references to flex equipment.
 
Let me ask a question on that, one of the most significant post-Fukushima safety enhancements is the presence of flex equipment at reactor sites.  
we're seeing as far as industry performance over the
 
past few years. I think it's a direct tie to it but
 
it really starts with us as CNOs and the tone that we
 
set with our organizations.
 
COMMISSIONER BARAN: I think it's been a
 
good discussion. In the course of the discussion up
 
to this point, we heard a couple of references to
 
flex equipment.
 
Let me ask a question on that, one of the
 
most significant post-Fukushima safety enhancements
 
is the presence of flex equipment at reactor sites.
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 46
 
Maria or Kelvin, can you discuss flex operating
 
experience?
 
And if other panelists want to weigh in
 
about what has been learned about the maintenance and
 
use of flex equipment?


46 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com Maria or Kelvin, can you discuss flex operating experience?
And if other panelists want to weigh in about what has been learned about the maintenance and use of flex equipment?
Maria, you want to start?
Maria, you want to start?
MS. LACAL: When flex came up a number of years ago, we really focused on how do we make our dollars count, not just during the emergency but in our day-to-day operation of our plants?
So, if we're going to spend this large amount of money and resources on flex, let's make sure that we design and follow modifications and procure our flex equipment such that it will help us increase our margins of safety from a day-to-day perspective.
So, that was big focus for us from day one, maximizing our use of flex to maximize our safety posture. I'll say that at Palo Verde we extensively use our flex and portable equipment as mitigating actions for maintenance rule.
We routinely deploy our flex team generator makeups and our portable DC generators to mitigate risk during certain planned maintenance


MS. LACAL: When flex came up a number
47 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com activities as well as an emerging equipment issue.
 
It's baked into our procedures and so it's really part of our work management process now as part of our planned maintenance activities. It maintains our risk profiles low in the green band and making sure we have the right purpose and attention on our risk management action levels.
of years ago, we really focused on how do we make our
I'll say prior to flex our outages were such that we would be in yellow risk for almost the entire outage with clearly a large part of our refueling outages.
 
And now with the deployment of flex we maintain low in the green band posture throughout our entire outage duration.
dollars count, not just during the emergency but in
Our modifications for the connections to flex equipment were designed so that it kept our operators in line and making sure that performance was top of mind so they had easy access, all external connections.
 
They don't require any doors or anything to be left open where we don't traverse cables and hoses, et cetera, throughout the site.
our day-to-day operation of our plants?
The other thing I think that we learned a lot is the proficiency and we talked about that a  
 
So, if we're going to spend this large
 
amount of money and resources on flex, let's make
 
sure that we design and follow modifications and
 
procure our flex equipment such that it will help us
 
increase our margins of safety from a day-to-day
 
perspective.
 
So, that was big focus for us from day
 
one, maximizing our use of flex to maximize our safety
 
posture. I'll say that at Palo Verde we extensively
 
use our flex and portable equipment as mitigating
 
actions for maintenance rule.
 
We routinely deploy our flex team
 
generator makeups and our portable DC generators to
 
mitigate risk during certain planned maintenance
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 47
 
activities as well as an emerging equipment issue.
 
It's baked into our procedures and so
 
it's really part of our work management process now
 
as part of our planned maintenance activities. It
 
maintains our risk profiles low in the green band and
 
making sure we have the right purpose and attention
 
on our risk management action levels.
 
I'll say prior to flex our outages were
 
such that we would be in yellow risk for almost the
 
entire outage with clearly a large part of our
 
refueling outages.
 
And now with the deployment of flex we
 
maintain low in the green band posture throughout our
 
entire outage duration.
 
Our modifications for the connections to
 
flex equipment were designed so that it kept our
 
operators in line and making sure that performance
 
was top of mind so they had easy access, all external
 
connections.
 
They don't require any doors or anything
 
to be left open where we don't traverse cables and
 
hoses, et cetera, throughout the site.
 
The other thing I think that we learned
 
a lot is the proficiency and we talked about that a
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 48
 
little bit of our operators and our maintenance
 
personnel from deploying this equipment a lot.
 
They've got a very high level of proficiency
 
regarding the use of the equipment.
 
At Palo Verde we're fortunate to have a
 
standalone fire protection department and that
 
consists of full-time firefighters, maintenance
 
personnel and engineering personnel.
 
And so our fire protection maintenance
 
organization do a fantastic job maintaining our flex
 
equipment in very top shape, keeping sure that we
 
maintain through the requisite numbers and they
 
ensure that we do all the preventative maintenance,
 
et cetera.
 
I'll say we had early on some indication
 
of some battery failure issues which we communicated
 
to the industry and we have since resolved those but
 
as an industry we collaborate.
 
There's a committee that's focused on
 
flex equipment, sharing operating experience, having
 
routine communications around these. We have
 
dedicated program owners to share this operating
 
experience.
 
We've partnered with EPRI to capture the
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 49
 
data that we have across all of the stations to make
 
sure that we've got a good reliable database and that
 
we share best practices.
 
So, this is all in a very shareable
 
retrievable database for knowledge retention and I
 
think just continued interaction between INPO and
 
EPRI and the industry, sharing that operating
 
experience and using our flex equipment has just been
 
very, very valuable from a reduction of I'll say an
 
increase to safety as a result of flex.


COMMISSIONER BARAN: I think a lot of
48 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com little bit of our operators and our maintenance personnel from deploying this equipment a lot.
 
They've got a very high level of proficiency regarding the use of the equipment.
panelists want to weigh in on this one. How about
At Palo Verde we're fortunate to have a standalone fire protection department and that consists of full-time firefighters, maintenance personnel and engineering personnel.
 
And so our fire protection maintenance organization do a fantastic job maintaining our flex equipment in very top shape, keeping sure that we maintain through the requisite numbers and they ensure that we do all the preventative maintenance, et cetera.
we have the order be Kelvin and then Jeff can weigh
I'll say we had early on some indication of some battery failure issues which we communicated to the industry and we have since resolved those but as an industry we collaborate.
 
There's a committee that's focused on flex equipment, sharing operating experience, having routine communications around these. We have dedicated program owners to share this operating experience.
in and if Ed wants to weigh in and then Ray?
We've partnered with EPRI to capture the


49 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com data that we have across all of the stations to make sure that we've got a good reliable database and that we share best practices.
So, this is all in a very shareable retrievable database for knowledge retention and I think just continued interaction between INPO and EPRI and the industry, sharing that operating experience and using our flex equipment has just been very, very valuable from a reduction of I'll say an increase to safety as a result of flex.
COMMISSIONER BARAN: I think a lot of panelists want to weigh in on this one. How about we have the order be Kelvin and then Jeff can weigh in and if Ed wants to weigh in and then Ray?
MR. HENDERSON: Thank you, Commissioner.
MR. HENDERSON: Thank you, Commissioner.
I agree with everything, obviously, Maria said and the interesting thing is I can remember when we first put flex in place, it was equipment that existed and now it's more part of our overall risk reduction strategy that's ingrained in all of our procedures.
Maria mentioned how it's deployed during refueling outages where in the past we would have elevated risk levels during certain configurations in


I agree with everything, obviously, Maria
50 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com the refueling outage.
 
Now our procedures will require use of staging flex and make sure we have the right things in place to minimize that risk.
said and the interesting thing is I can remember when
We also have leveraged opportunities where we've had degraded components online and we've taken the opportunity where we can take that component out of service online by deploying flex that would allow us to improve the reliability of that safety piece of equipment.
 
And obviously, overall improve plant safety.
we first put flex in place, it was equipment that
In the past, we really didn't have that flexibility but all that's ingrained now in our procedures and processes and strategies so it's not just equipment that exists, it's really part of our overall strategy in how we manage risk.
 
existed and now it's more part of our overall risk
 
reduction strategy that's ingrained in all of our
 
procedures.
 
Maria mentioned how it's deployed during
 
refueling outages where in the past we would have
 
elevated risk levels during certain configurations in
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 50
 
the refueling outage.
 
Now our procedures will require use of
 
staging flex and make sure we have the right things
 
in place to minimize that risk.
 
We also have leveraged opportunities
 
where we've had degraded components online and we've
 
taken the opportunity where we can take that
 
component out of service online by deploying flex
 
that would allow us to improve the reliability of
 
that safety piece of equipment.
 
And obviously, overall improve plant
 
safety.
 
In the past, we really didn't have that
 
flexibility but all that's ingrained now in our
 
procedures and processes and strategies so it's not
 
just equipment that exists, it's really part of our
 
overall strategy in how we manage risk.
 
COMMISSIONER BARAN: Jeff?
COMMISSIONER BARAN: Jeff?
MR. SEMANCIK: I would think in general we really applaud the use of flex and the implementation of flex.
In general the response to Fukushima, it provides a real tangible benefit that we can articulate to the public and demonstrate a commitment


MR. SEMANCIK: I would think in general
51 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com to safety as opposed to a reanalysis or a refinement of something there.
 
So, from the public perspective, they see an action, it's good, and I also applaud the use of it to reduce real risk in refueling outages and online issues.
we really applaud the use of flex and the
So, we do appreciate that because ultimately, that improves safety for all of us.
 
I think the one part I would like to see is it integrated more in emergency plan exercises and just challenging it in those timeframes to see its use in those roles.
implementation of flex.
It would also allow the offsite folks to internalize the ability to have that equipment on and prioritize actions to assist in responding to those types of events.
 
COMMISSIONER BARAN: Ed, do you have thoughts?
In general the response to Fukushima, it
MR. LYMAN: Yes, I already raised this a couple of times.
 
I think the main problem here is the regulatory footprint and since the beginning, we did not think the current requirements for maintenance inspections and flex equipment were sufficient given their importance.  
provides a real tangible benefit that we can
 
articulate to the public and demonstrate a commitment
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 51
 
to safety as opposed to a reanalysis or a refinement
 
of something there.
 
So, from the public perspective, they see
 
an action, it's good, and I also applaud the use of
 
it to reduce real risk in refueling outages and online
 
issues. So, we do appreciate that because
 
ultimately, that improves safety for all of us.
 
I think the one part I would like to see
 
is it integrated more in emergency plan exercises and
 
just challenging it in those timeframes to see its
 
use in those roles.
 
It would also allow the offsite folks to
 
internalize the ability to have that equipment on and
 
prioritize actions to assist in responding to those
 
types of events.
 
COMMISSIONER BARAN: Ed, do you have
 
thoughts?
 
MR. LYMAN: Yes, I already raised this a
 
couple of times.
 
I think the main problem here is the
 
regulatory footprint and since the beginning, we did
 
not think the current requirements for maintenance
 
inspections and flex equipment were sufficient given
 
their importance.
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 52
 
And given they're now being relied on for
 
these other uses including pretty safety-significant
 
maintenance tasks that it's important that the credit
 
for flex does not go beyond the level of reliability
 
and assurance that the NRC has over that equipment.
 
So, looking at the issues at River Bend
 
and Clinton with the diesel generators and potential
 
common cause failures, Id like to have more
 
confidence that the NRC has the regulatory authority
 
to make sure that equipment is in adequate working
 
order, again commensurate with its potential expanded
 
uses.
 
COMMISSIONER BARAN: Ray, do you want to
 
go next? And maybe just for those who are familiar
 
in the audience with River Bend maybe just talk a
 
minute about that or Scott can chime in on that too
 
so people have that background.
 
MR. LORSON: Scott, do you want to go
 
over River Bend and then I'll follow you?
 
MR. MORRIS: It's all a matter of public
 
record at this point but I will say in essence, it
 
came down to a number of portable diesel generators
 
that unfortunately when they went to start them, they
 
didn't start or they started but didn't continue to
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 53
 
run for a variety of different reasons.
 
And ultimately it got traced back to
 
maintenance practices, preventative maintenance
 
practices and some initiate design issues.
 
And we obviously expanded our sample and
 
look at that issue across the fleet particularly in
 
Region 4 and particularly the Entergy fleet since
 
River Bend is one of the Entergy facilities.
 
So, at the end of the day, yes, there
 
were challenges with that, I don't want to go into a
 
lot of detail.
 
I will say that when the initial
 
inspection, we called it a temporary instruction, was
 
performed by the NRC Staff, after all licensees had
 
essentially reported in that they had completed
 
implementation of their flex strategies, our
 
inspections at that stage were more are the licensee
 
strategies for flex in line with EPRI's NEI
 
guidelines that we had endorsed?
 
And had training been performed, were
 
procedures available, that type of thing.
 
Those inspections, those initial
 
inspections, were not what I'll call design
 
inspections where we actually looked at the design of
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 54
 
the generator and looked at was the manner in which
 
the system installed or built in line with the design
 
that had been proposed or ordered or expected?
 
Those are the types of inspections we're
 
doing now, we've moved to that degree of inspection
 
as opposed to I don't want to say cursory but a high
 
level have they taken steps to implement the
 
guidelines, do the procedures and training exist?
 
Now we're taking a deeper look into some
 
of what I'll call the engineering aspects of the
 
equipment.
 
COMMISSIONER BARAN: Thanks for that
 
background. Ray, do you want to take it from there?
 
MR. LORSON: Yes, I certainly agree with


everything I heard. I think to Maria and Kelvin's
52 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com And given they're now being relied on for these other uses including pretty safety-significant maintenance tasks that it's important that the credit for flex does not go beyond the level of reliability and assurance that the NRC has over that equipment.
So, looking at the issues at River Bend and Clinton with the diesel generators and potential common cause failures, Id like to have more confidence that the NRC has the regulatory authority to make sure that equipment is in adequate working order, again commensurate with its potential expanded uses.
COMMISSIONER BARAN: Ray, do you want to go next? And maybe just for those who are familiar in the audience with River Bend maybe just talk a minute about that or Scott can chime in on that too so people have that background.
MR. LORSON: Scott, do you want to go over River Bend and then I'll follow you?
MR. MORRIS: It's all a matter of public record at this point but I will say in essence, it came down to a number of portable diesel generators that unfortunately when they went to start them, they didn't start or they started but didn't continue to


point, obviously licensees have made big investments
53 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com run for a variety of different reasons.
And ultimately it got traced back to maintenance practices, preventative maintenance practices and some initiate design issues.
And we obviously expanded our sample and look at that issue across the fleet particularly in Region 4 and particularly the Entergy fleet since River Bend is one of the Entergy facilities.
So, at the end of the day, yes, there were challenges with that, I don't want to go into a lot of detail.
I will say that when the initial inspection, we called it a temporary instruction, was performed by the NRC Staff, after all licensees had essentially reported in that they had completed implementation of their flex strategies, our inspections at that stage were more are the licensee strategies for flex in line with EPRI's NEI guidelines that we had endorsed?
And had training been performed, were procedures available, that type of thing.
Those inspections, those initial inspections, were not what I'll call design inspections where we actually looked at the design of


in flex and so they expect to see some credit in terms
54 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com the generator and looked at was the manner in which the system installed or built in line with the design that had been proposed or ordered or expected?
Those are the types of inspections we're doing now, we've moved to that degree of inspection as opposed to I don't want to say cursory but a high level have they taken steps to implement the guidelines, do the procedures and training exist?
Now we're taking a deeper look into some of what I'll call the engineering aspects of the equipment.
COMMISSIONER BARAN: Thanks for that background. Ray, do you want to take it from there?
MR. LORSON: Yes, I certainly agree with everything I heard. I think to Maria and Kelvin's point, obviously licensees have made big investments in flex and so they expect to see some credit in terms of the reduction in overall plant risk profiles.
And we would agree with
: that, installation of equipment that wasn't there originally can lower the risk profile. But, and I would add the caveat, if it's properly designed to perform the function and if it's properly maintained to perform the function.


of the reduction in overall plant risk profiles.
55 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com And so Scott talked about some of our initial actions we did in terms of inspections following the original implement of flex. We've embedded review and inspection of flex equipment as part of our baseline inspection program.
 
We have had some findings related to maintenance of flex equipment and to my knowledge, none of the findings have gone beyond the green range if you will. But certainly, we are finding issues.
And we would agree with that,
We recently had a case of a significant diesel failure, a flex diesel failure, at one of our sites that we're still evaluating but the point is the diesel failed in a manner that hadn't been anticipated.
 
So, I think to Maria and Kelvin's point, flex does offer a benefit but the benefit is only achieved if the equipment is properly designed, installed, and maintained.
installation of equipment that wasn't there
Second point with respect to use of risk, we agree with the reduction in risk in general space but I think Ed brings up a very good point, we need to be careful that we don't overcredit how much credit we give for the use of flex as a risk reduction tool.
 
And to that extent, we have used flex in  
originally can lower the risk profile. But, and I
 
would add the caveat, if it's properly designed to
 
perform the function and if it's properly maintained
 
to perform the function.
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 55
 
And so Scott talked about some of our
 
initial actions we did in terms of inspections
 
following the original implement of flex. We've
 
embedded review and inspection of flex equipment as
 
part of our baseline inspection program.
 
We have had some findings related to
 
maintenance of flex equipment and to my knowledge,
 
none of the findings have gone beyond the green range
 
if you will. But certainly, we are finding issues.
 
We recently had a case of a significant
 
diesel failure, a flex diesel failure, at one of our
 
sites that we're still evaluating but the point is
 
the diesel failed in a manner that hadn't been
 
anticipated.
 
So, I think to Maria and Kelvin's point,
 
flex does offer a benefit but the benefit is only
 
achieved if the equipment is properly designed,
 
installed, and maintained.
 
Second point with respect to use of risk,
 
we agree with the reduction in risk in general space
 
but I think Ed brings up a very good point, we need
 
to be careful that we don't overcredit how much credit
 
we give for the use of flex as a risk reduction tool.
 
And to that extent, we have used flex in
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 56
 
terms of adjusting regional some findings where we've
 
seen findings that have maybe gone from white to green
 
when you consider flex.
 
We're very careful and mindful of how we
 
do that in part because we think there's a level of
 
uncertainty related to the reliability data
 
associated with the flex equipment.
 
I know a key aspect of industry right now
 
is trying to get better numbers that we can use to
 
give ourselves more reliability with respect to the
 
uncertainty of this equipment's performance.
 
So, it is a tool to lower inspection
 
findings. That being said, we are very careful of
 
how we use it and making sure that we're not using
 
inappropriate assumptions related to how we use flex.


56 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com terms of adjusting regional some findings where we've seen findings that have maybe gone from white to green when you consider flex.
We're very careful and mindful of how we do that in part because we think there's a level of uncertainty related to the reliability data associated with the flex equipment.
I know a key aspect of industry right now is trying to get better numbers that we can use to give ourselves more reliability with respect to the uncertainty of this equipment's performance.
So, it is a tool to lower inspection findings. That being said, we are very careful of how we use it and making sure that we're not using inappropriate assumptions related to how we use flex.
So, thank you.
So, thank you.
COMMISSIONER BARAN: Good discussion, any other points anyone wants to make on this? We've got about 20 minutes left so I'll just give our audience a reminder that if you have a question, get it into the queue and I'll try to get to it.
Let's turn to one of the questions we got from the audience and it's about gazing into the future a little bit on inspection and also I'd maybe


COMMISSIONER BARAN: Good discussion,
57 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com expand it to operation of the plant.
 
Any considerations for future inspection using robots or artificial intelligence as an effective tool?
any other points anyone wants to make on this? We've
And maybe either one or both of CNOs want to chime in at all about the degree to which they're using AI or robotics at their plants, I think probably folks would be interested in that as well.
 
MR. HENDERSON: Commissioner, I'll start from a CNO perspective. We are really deploying use primarily of robotics.
got about 20 minutes left so I'll just give our
We have robots that now can crawl pipes, we have robots that we can send into spaces where we would have to set up a different configuration to allow a person to go in that space, for example, from a dose standpoint.
 
We have robots that can walk up stairs, that can pick up things, that can take pictures and more in some hazardous environments.
audience a reminder that if you have a question, get
And we've leveraged technology to identify early signs of equipment performance, we've used technology to pick up small vibrations even on large transformers.
 
And we're doing it from the standpoint  
it into the queue and I'll try to get to it.
 
Let's turn to one of the questions we got
 
from the audience and it's about gazing into the
 
future a little bit on inspection and also I'd maybe
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 57
 
expand it to operation of the plant.
 
Any considerations for future inspection
 
using robots or artificial intelligence as an
 
effective tool?
 
And maybe either one or both of CNOs want
 
to chime in at all about the degree to which they're
 
using AI or robotics at their plants, I think probably
 
folks would be interested in that as well.
 
MR. HENDERSON: Commissioner, I'll start
 
from a CNO perspective. We are really deploying use
 
primarily of robotics.
 
We have robots that now can crawl pipes,
 
we have robots that we can send into spaces where we
 
would have to set up a different configuration to
 
allow a person to go in that space, for example, from
 
a dose standpoint.
 
We have robots that can walk up stairs,
 
that can pick up things, that can take pictures and
 
more in some hazardous environments.
 
And we've leveraged technology to
 
identify early signs of equipment performance, we've
 
used technology to pick up small vibrations even on
 
large transformers.
 
And we're doing it from the standpoint
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 58
 
that it helps us optimize our staffing resources
 
because before people would do all that and now we
 
have robots that are able to go in and gather a lot
 
of this data for us.
 
We're starting to work through use of
 
artificial intelligence primarily on data analysis
 
and things of that nature to help us predict either
 
where we could have some performance challenges
 
either with behavioral gaps or equipment gaps.
 
And we're pretty far along in that
 
process and we're actually leveraging others in the
 
industry on what they've learned through use of AI
 
that a lot of technology uses, at least within the
 
Duke system, that we've deployed here over the past
 
few years.
 
COMMISSIONER BARAN: Any other thoughts
 
from an NRC perspective, industry perspective, or
 
other perspective?
 
MS. LACAL: I'll just add one more to
 
Kelvin's list. We do a lot of very similar approach
 
with the use of robotics in radiological-controlled
 
areas and minimized dose, et cetera.
 
But also, we're using drones in our
 
cooling towers and that has significantly saved, from
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 59
 
an investor safety perspective, not having to build
 
scaffolding, et cetera, to try to get to all these
 
areas way up high.
 
And so that's been a technology fairly
 
recent that has proven to be very successful and you
 
can get up close and personal to what you're trying


to see through the use of these drones.
58 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com that it helps us optimize our staffing resources because before people would do all that and now we have robots that are able to go in and gather a lot of this data for us.
We're starting to work through use of artificial intelligence primarily on data analysis and things of that nature to help us predict either where we could have some performance challenges either with behavioral gaps or equipment gaps.
And we're pretty far along in that process and we're actually leveraging others in the industry on what they've learned through use of AI that a lot of technology uses, at least within the Duke system, that we've deployed here over the past few years.
COMMISSIONER BARAN: Any other thoughts from an NRC perspective, industry perspective, or other perspective?
MS. LACAL: I'll just add one more to Kelvin's list. We do a lot of very similar approach with the use of robotics in radiological-controlled areas and minimized dose, et cetera.
But also, we're using drones in our cooling towers and that has significantly saved, from


So, there's a lot of technology out
59 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com an investor safety perspective, not having to build scaffolding, et cetera, to try to get to all these areas way up high.
 
And so that's been a technology fairly recent that has proven to be very successful and you can get up close and personal to what you're trying to see through the use of these drones.
there. I challenge our vendor partners every day.
So, there's a lot of technology out there. I challenge our vendor partners every day.
 
They know a whole lot of more about what's going on globally and what's being used out there globally and bringing it back to us so that we can evaluate and assess whether it makes sense here in the United States and Palo Verde, et cetera.
They know a whole lot of more about
And so that is a big focus area is how do we continue to use the technology to improve the way we do business to optimize the way we do business, whether it's
 
: robotics, drones, artificial intelligence, et cetera.
what's going on globally and what's being used out
There was a really good session yesterday on the use of artificial intelligence at the RIC that was very good.
 
COMMISSIONER BARAN: I moderated a panel on artificial intelligence last year and it was just  
there globally and bringing it back to us so that we
 
can evaluate and assess whether it makes sense here
 
in the United States and Palo Verde, et cetera.
 
And so that is a big focus area is how do
 
we continue to use the technology to improve the way
 
we do business to optimize the way we do business,
 
whether it's robotics, drones, artificial
 
intelligence, et cetera.
 
There was a really good session yesterday
 
on the use of artificial intelligence at the RIC that
 
was very good.
 
COMMISSIONER BARAN: I moderated a panel
 
on artificial intelligence last year and it was just
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 60
 
fascinating. From the NRC folks, anything? Laura,
 
do I see a hand up, or Jack?
 
MS. DUDES: I saw Jack. Why don't you
 
start, Jack?
 
MR. GIESSNER: I was just making a quick
 
comment. That is an area where we're going to have
 
to get up to speed quickly.
 
I've heard a lot of utilities use
 
artificial intelligence to cull through data and make
 
decisions on what to maintain and that's an area where
 
we don't have expertise but we will get the expertise.
 
We'll have to figure that out, that's an
 
area that's on my to-do list looking forward to the
 
future.


60 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com fascinating. From the NRC folks, anything? Laura, do I see a hand up, or Jack?
MS. DUDES: I saw Jack. Why don't you start, Jack?
MR. GIESSNER: I was just making a quick comment. That is an area where we're going to have to get up to speed quickly.
I've heard a lot of utilities use artificial intelligence to cull through data and make decisions on what to maintain and that's an area where we don't have expertise but we will get the expertise.
We'll have to figure that out, that's an area that's on my to-do list looking forward to the future.
That's all I had, Commissioner, thanks.
That's all I had, Commissioner, thanks.
Go ahead, Laura.
Go ahead, Laura.
MS. DUDES: Thanks, Jack. I think I agree with what Jack said and I think there's a lot of benefit to this.
I think we need to keep leaning forward, we need to get the expertise on AI but we also always have to be mindful of the cyber issue as well as we're deploying these technologies.
I'm all for it, I'm in favor, I've seen


MS. DUDES: Thanks, Jack. I think I
61 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com drones go into containment to rapidly identify a leak. In the past you would have had to send humans in there. There was a lot of challenges with that.
 
agree with what Jack said and I think there's a lot
 
of benefit to this.
 
I think we need to keep leaning forward,
 
we need to get the expertise on AI but we also always
 
have to be mindful of the cyber issue as well as we're
 
deploying these technologies.
 
I'm all for it, I'm in favor, I've seen
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 61
 
drones go into containment to rapidly identify a
 
leak. In the past you would have had to send humans
 
in there. There was a lot of challenges with that.
 
So, I think there's a lot of benefit to it.
So, I think there's a lot of benefit to it.
I've actually driven one of the robots down at St. Lucy and actually, they use it to go into their resin rooms. That saved a tremendous amount of dose and that's really a positive for the workers' safety.
But again, we need to just proactively lean in and discuss the cyber issue and find solutions to that issue.
Because I think the technology is great and we should be deploying more of it but we always have to be mindful. And there's a solution for the cyber but we've all got to be coming to the table to talk about that. Thanks.
COMMISSIONER BARAN: Anything you wanted to add, Scott?
MR. MORRIS: Yes, Laura actually made a couple of the points I was going to make so I appreciate that also, and I agree with Jack.
At the end of the day, one of the products we produce as an organization is on behalf of the


I've actually driven one of the robots
62 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com American people is our independent assessment of overall licensee performance relative to safety and security.
 
So, I think any of these tools, any and all, should be used, I'm certainly open to it. I'm admittedly a
down at St. Lucy and actually, they use it to go into
bit skeptical at this
 
: point, particularly when you move away from inspection and into assessment and particularly safety culture assessment.
their resin rooms. That saved a tremendous amount
I'm not quite sure how AI would necessarily help us with that but, hey, I'm open to the future. I need to know more I think. There's a lot to be learned here.
 
COMMISSIONER BARAN: Let's turn to another question, this one is probably more for the NRC folks. It's a follow-up on VLSIR.
of dose and that's really a positive for the workers'
The regions had firsthand experience using the VLSIR process and MSS so the material side of the house where NRC is currently evaluating how it can use VLSIR to address potential issues associated with extreme weather events during fuel offload activities. Are the regions engaging with NMSS to discuss how best to apply the VLSIR process to that kind of situation?  
 
safety.
 
But again, we need to just proactively
 
lean in and discuss the cyber issue and find solutions
 
to that issue.
 
Because I think the technology is great
 
and we should be deploying more of it but we always
 
have to be mindful. And there's a solution for the
 
cyber but we've all got to be coming to the table to
 
talk about that. Thanks.
 
COMMISSIONER BARAN: Anything you wanted
 
to add, Scott?
 
MR. MORRIS: Yes, Laura actually made a
 
couple of the points I was going to make so I
 
appreciate that also, and I agree with Jack.
 
At the end of the day, one of the products
 
we produce as an organization is on behalf of the
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 62
 
American people is our independent assessment of
 
overall licensee performance relative to safety and
 
security.
 
So, I think any of these tools, any and
 
all, should be used, I'm certainly open to it. I'm
 
admittedly a bit skeptical at this point,
 
particularly when you move away from inspection and
 
into assessment and particularly safety culture
 
assessment.
 
I'm not quite sure how AI would
 
necessarily help us with that but, hey, I'm open to
 
the future. I need to know more I think. There's a
 
lot to be learned here.
 
COMMISSIONER BARAN: Let's turn to
 
another question, this one is probably more for the
 
NRC folks. It's a follow-up on VLSIR.
 
The regions had firsthand experience
 
using the VLSIR process and MSS so the material side
 
of the house where NRC is currently evaluating how it
 
can use VLSIR to address potential issues associated
 
with extreme weather events during fuel offload
 
activities. Are the regions engaging with NMSS to
 
discuss how best to apply the VLSIR process to that
 
kind of situation?
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 63
 
MS. DUDES: The short answer is yes,
 
we're actively engaged with the program office and
 
we're talking through the various scenarios. But Ray
 
did a very good job of talking about the distinction
 
on VLSIR as is it a compliance issue or not?
 
And then the significance, I think we
 
agree on the significance, we just need to make sure
 
we work with the program office to identify the
 
compliance aspects but, yes, we're very engaged in
 
that issue.


63 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com MS. DUDES: The short answer is yes, we're actively engaged with the program office and we're talking through the various scenarios. But Ray did a very good job of talking about the distinction on VLSIR as is it a compliance issue or not?
And then the significance, I think we agree on the significance, we just need to make sure we work with the program office to identify the compliance aspects but, yes, we're very engaged in that issue.
COMMISSIONER BARAN: Here's another one.
COMMISSIONER BARAN: Here's another one.
 
Have the regions identified any trends in inspections not being completed within the scheduled timeframe for requiring subsequent reactions?
Have the regions identified any trends in inspections
If so, are there any insights you can share about that?
 
not being completed within the scheduled timeframe
 
for requiring subsequent reactions?
 
If so, are there any insights you can
 
share about that?
 
Any takers on this one?
Any takers on this one?
MR. MORRIS: I'm struggling to come up with one but the one that leapt to my mind, and I don't know if it's a great example or not, but there are certain things that can only be done during planned outages, there are only certain times you can go into containment, et cetera, particularly in a boiling water reactor.


MR. MORRIS: I'm struggling to come up
64 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com So, we've had to defer some of that stuff and some of the required inspections that licensees have to perform have been deferred through the exemption process. So, it's been done proactively and deliberately with good thinking behind the how and why.
 
But for the most part, we've been able to get it done, it's just we've had to adapt and flex a little bit and leverage different resources. But I can't really think of an example that fits that.
with one but the one that leapt to my mind, and I
 
don't know if it's a great example or not, but there
 
are certain things that can only be done during
 
planned outages, there are only certain times you can
 
go into containment, et cetera, particularly in a
 
boiling water reactor.
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 64
 
So, we've had to defer some of that stuff
 
and some of the required inspections that licensees
 
have to perform have been deferred through the
 
exemption process. So, it's been done proactively
 
and deliberately with good thinking behind the how
 
and why.
 
But for the most part, we've been able to
 
get it done, it's just we've had to adapt and flex a
 
little bit and leverage different resources. But I
 
can't really think of an example that fits that.
 
Maybe my colleagues.
Maybe my colleagues.
COMMISSIONER BARAN: Ray?
COMMISSIONER BARAN: Ray?
MR. LORSON: I can just follow on, Scott, and like Scott, I only know of one inspection that we were not able to complete during calendar year 2019.
I don't know of any inspections that we were not able to complete in 2020.
2019 was a COVID-19-related impact, a short fuse opportunity that we just missed because you can only see certain things during certain times, as Scott mentioned. So, we haven't had a significant backlog of, if you will, uncompleted inspections.
We report on that every year to Congress and so we endeavor to complete the inspections on


MR. LORSON: I can just follow on, Scott,
65 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com time.
 
COMMISSIONER BARAN: Let's ask maybe a little bit more of a big-picture question. Jack, I'm sorry, did you want to get in?
and like Scott, I only know of one inspection that we
MR. GIESSNER: Yes, in 2020 there were a couple inspections that we didn't do and we validated the reasonable assurance of safety by other means.
 
A couple were security inspections and a couple, health physics inspections.
were not able to complete during calendar year 2019.
And those related to high COVID-19 incidents in the surrounding community and we were able to use the resident staff and the review of records to follow up and ensure that the delay in the inspection to the following year was okay.
 
And also, we also had containment entry where we elected based on where we were in COVID-19 to not do it and do it later on.
I don't know of any inspections that we were not able
So, I think those are well documented on the public record and I think it shows, as I talked about before, the balance of safety of people and still ensuring safety of the plants.
 
So, I just wanted to highlight ours, thanks.
to complete in 2020.
COMMISSIONER BARAN: Thanks, Jack. Let  
 
2019 was a COVID-19-related impact, a
 
short fuse opportunity that we just missed because
 
you can only see certain things during certain times,
 
as Scott mentioned. So, we haven't had a significant
 
backlog of, if you will, uncompleted inspections.
 
We report on that every year to Congress
 
and so we endeavor to complete the inspections on
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 65
 
time.
 
COMMISSIONER BARAN: Let's ask maybe a
 
little bit more of a big-picture question. Jack, I'm
 
sorry, did you want to get in?
 
MR. GIESSNER: Yes, in 2020 there were a
 
couple inspections that we didn't do and we validated
 
the reasonable assurance of safety by other means.
 
A couple were security inspections and a couple,
 
health physics inspections.
 
And those related to high COVID-19
 
incidents in the surrounding community and we were
 
able to use the resident staff and the review of
 
records to follow up and ensure that the delay in the
 
inspection to the following year was okay.
 
And also, we also had containment entry
 
where we elected based on where we were in COVID-19
 
to not do it and do it later on.
 
So, I think those are well documented on
 
the public record and I think it shows, as I talked
 
about before, the balance of safety of people and
 
still ensuring safety of the plants.
 
So, I just wanted to highlight ours,
 
thanks.
 
COMMISSIONER BARAN: Thanks, Jack. Let
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 66
 
me turn to the more big-picture question.
 
In your work, and this could really apply
 
to the NRC folks or others, but in your work how do
 
you ensure the interests of local and other non-
 
licensee stakeholders are considered?
 
Does someone from the NRC want to start
 
with that? Laura's going to take it.
 
MS. DUDES: To the extent that we can be
 
engaged with our local community, that's the first
 
step and I know we have made ourselves available and
 
have gone out to various community activities such as
 
the Investor River Walk or the Phidalia Onion
 
Festival and had a booth.
 
And so we have to start to have a
 
relationship with the community first and then if
 
there are issues with that community, you can hear
 
from them. But the first step is starting that
 
relationship, engaging with people in the local area.
 
And then once you have that dialog and
 
that relationship, their interests, their thoughts
 
will be shared with you. I do know our residents
 
will typically meet with local community leaders at
 
least once a year.
 
So, it's really about listening first and
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 67
 
developing relationships. I'll pause.
 
COMMISSIONER BARAN: Jeff, do you have
 
something you want to share on this one?
 
MR. SEMANCIK: Yes, this is an
 
interesting one out there.
 
I spent 23 years at a local power-plant
 
as both the senior license operator and management,
 
and when I came over to the state and became the state
 
liaison officer I think I mentioned at one of the
 
early conferences, I had more exposure to senior NRC
 
leadership as a licensee than I did as the state
 
liaison officer.
 
To the Commission's credit, I think you
 
guys responded well to that but I also learned that
 
I've got to really make those interests known. But
 
I think there are some ways to make sure of that.
 
Commissioner Baran, you came up for a
 
visit, I was informed of the visit, we had an
 
opportunity to sit and meet and hear concerns we have.
 
And I think it's important because while I may
 
understand the authority of the Atomic Energy Act,
 
the public really doesn't.
 
And so often my phone is the first one to
 
ring with issues and concerns and things in the paper,
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 68
 
and how the public might perceive it. And I think
 
we're a valuable resource for that.
 
We've also worked through the National
 
Organization and the Conference of Radiation Control
 
Program Directors to form a working group of state
 
representatives that have power-plants so we can keep
 
an eye and look at some of those issues that might be
 
affecting those and see that perspective.
 
And just reaching out for state and local
 
partners is also important, I think we've learned
 
that through the material side of the program and I
 
think although it varies state to state how much
 
interest is out there, I think we can be a valuable
 
resource.
 
And the example I would provide is
 
there's a production facility in New Haven here that
 
has been remediated and the typical approach for the
 
public meetings was put it on the website and let
 
people come see.
 
We were able to reach out and let them
 
know that New Haven has got a very unique community-
 
led structure that's below the Mayor system.
 
We've got the team to the community
 
management team meetings, meetings with the local
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 69
 
alders, and that really helped to get a lot of
 
information out to the public and get some of those
 
direct concerns for in this case a very EJ community
 
that didn't have access to Internet and things like
 
that.
 
And so getting those out there, we were
 
able to help navigate that process. So, I think all
 
those things are really important and I think state
 
and local partners are a good starting point for it
 
too.
 
COMMISSIONER BARAN: It looks like Ray
 
is interested in chiming in and then Ed.
 
MR. LORSON: I agree with basically
 
everything I heard from Jeff. We worked very hard
 
to try to make it effective and strong relationship
 
with our state partners.
 
Jeff, I know you've been out on
 
inspections, I've been on inspections with you and so
 
we do have a state liaison officers in each regional
 
office that report directly to the regional
 
administrator.
 
And so they keep our conduit with
 
information and concerns where if there's something
 
we're doing of interest, we want to communicate that
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 70
 
to the states. So, we try to be very forward-
 
leaning, very proactive in trying to maintain an
 
effective working relationship.
 
We have memorandums of understanding with
 
many of the states in our region and so often, while
 
we have an inspection we'll make them aware of
 
significant inspection activities in advance and
 
invite them to come and participate in all of our
 
inspections from an observation process.
 
The last point I want to make is we have
 
a number of plants in Region 1 that are currently
 
undergoing decommissioning, and as part of the
 
decommissioning that is very much of course a public
 
process.
 
And all of the sites have some form of
 
some sort of citizens advisory panel and so we
 
frequently would go and provide information upon
 
request just to communicate with the local government
 
officials and also with members of the public
 
regarding what our activities entail and what's the
 
next step in the cleanup process.


So, I think it's a very critical
66 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com me turn to the more big-picture question.
In your work, and this could really apply to the NRC folks or others, but in your work how do you ensure the interests of local and other non-licensee stakeholders are considered?
Does someone from the NRC want to start with that? Laura's going to take it.
MS. DUDES: To the extent that we can be engaged with our local community, that's the first step and I know we have made ourselves available and have gone out to various community activities such as the Investor River Walk or the Phidalia Onion Festival and had a booth.
And so we have to start to have a relationship with the community first and then if there are issues with that community, you can hear from them. But the first step is starting that relationship, engaging with people in the local area.
And then once you have that dialog and that relationship, their interests, their thoughts will be shared with you. I do know our residents will typically meet with local community leaders at least once a year.
So, it's really about listening first and


relationship, I appreciate Jeff's participation today
67 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com developing relationships. I'll pause.
COMMISSIONER BARAN: Jeff, do you have something you want to share on this one?
MR.
SEMANCIK:
: Yes, this is an interesting one out there.
I spent 23 years at a local power-plant as both the senior license operator and management, and when I came over to the state and became the state liaison officer I think I mentioned at one of the early conferences, I had more exposure to senior NRC leadership as a licensee than I did as the state liaison officer.
To the Commission's credit, I think you guys responded well to that but I also learned that I've got to really make those interests known. But I think there are some ways to make sure of that.
Commissioner Baran, you came up for a visit, I was informed of the visit, we had an opportunity to sit and meet and hear concerns we have.
And I think it's important because while I may understand the authority of the Atomic Energy Act, the public really doesn't.
And so often my phone is the first one to ring with issues and concerns and things in the paper,


and also everything you've done to help us interact
68 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com and how the public might perceive it. And I think we're a valuable resource for that.
We've also worked through the National Organization and the Conference of Radiation Control Program Directors to form a working group of state representatives that have power-plants so we can keep an eye and look at some of those issues that might be affecting those and see that perspective.
And just reaching out for state and local partners is also important, I think we've learned that through the material side of the program and I think although it varies state to state how much interest is out there, I think we can be a valuable resource.
And the example I would provide is there's a production facility in New Haven here that has been remediated and the typical approach for the public meetings was put it on the website and let people come see.
We were able to reach out and let them know that New Haven has got a very unique community-led structure that's below the Mayor system.
We've got the team to the community management team meetings, meetings with the local


NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 71
69 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com alders, and that really helped to get a lot of information out to the public and get some of those direct concerns for in this case a very EJ community that didn't have access to Internet and things like that.
And so getting those out there, we were able to help navigate that process. So, I think all those things are really important and I think state and local partners are a good starting point for it too.
COMMISSIONER BARAN: It looks like Ray is interested in chiming in and then Ed.
MR. LORSON: I agree with basically everything I heard from Jeff. We worked very hard to try to make it effective and strong relationship with our state partners.
: Jeff, I
know you've been out on inspections, I've been on inspections with you and so we do have a state liaison officers in each regional office that report directly to the regional administrator.
And so they keep our conduit with information and concerns where if there's something we're doing of interest, we want to communicate that


with things going on in Connecticut. Thanks, Jeff.
70 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com to the states. So, we try to be very forward-leaning, very proactive in trying to maintain an effective working relationship.
We have memorandums of understanding with many of the states in our region and so often, while we have an inspection we'll make them aware of significant inspection activities in advance and invite them to come and participate in all of our inspections from an observation process.
The last point I want to make is we have a number of plants in Region 1 that are currently undergoing decommissioning, and as part of the decommissioning that is very much of course a public process.
And all of the sites have some form of some sort of citizens advisory panel and so we frequently would go and provide information upon request just to communicate with the local government officials and also with members of the public regarding what our activities entail and what's the next step in the cleanup process.
So, I think it's a very critical relationship, I appreciate Jeff's participation today and also everything you've done to help us interact


71 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com with things going on in Connecticut. Thanks, Jeff.
COMMISSIONER BARAN: Ed?
COMMISSIONER BARAN: Ed?
MR. LYMAN: Really quickly, I certainly would like to make a plea for more transparency and in this context, a lot of the processes we've been talking about are of a very low safety significance determinations, STP and significance determination process are all pretty inscrutable to the public and there's only so much you can do to explain those often complex proceedings.
But the more open and transparent you are about how decisions are made, I think the better, and that involves these qualitative aspects like the human element to weigh, as we heard, the dynamics of management inspections.
I think for inspector findings it's very interesting and humanizes the Agency, at least makes me understand that it's not just this mechanical black box but there is this human aspect to it and so subjective judgment.
COMMISSIONER BARAN: We have just a couple minutes left, I think we have time for one more question. As always, we have more questions coming in than we really have time to get to, but let


MR. LYMAN: Really quickly, I certainly
72 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com me ask this one and I'll just read this one.
 
The industry is adopting the so-called value-based maintenance and converting many time-based preventative maintenance work items to predictive maintenance.
would like to make a plea for more transparency and
And the question is interested in knowing I think at least NRC folks' view about whether existing compliance activities are going to be adequate to assess the safety impact of that, particularly if licensees are going below the manufacturer-recommended preventative maintenance work.
 
Any insights anyone wants to share on that in our last couple minutes?
in this context, a lot of the processes we've been
MR. MORRIS: I will start by saying this, it's something we're aware of and focused on, Commissioner.
 
When it comes to key equipment, particularly safety-related or important to safety equipment or things that can cause plant trips and challenges, we do have a performance-based rule in place, 10 CFR 5065, affectionately known as the maintenance rule.
talking about are of a very low safety significance
But it does factor in ultimately the  
 
determinations, STP and significance determination
 
process are all pretty inscrutable to the public and
 
there's only so much you can do to explain those often
 
complex proceedings.
 
But the more open and transparent you are
 
about how decisions are made, I think the better, and
 
that involves these qualitative aspects like the
 
human element to weigh, as we heard, the dynamics of
 
management inspections.
 
I think for inspector findings it's very
 
interesting and humanizes the Agency, at least makes
 
me understand that it's not just this mechanical
 
black box but there is this human aspect to it and so
 
subjective judgment.
 
COMMISSIONER BARAN: We have just a
 
couple minutes left, I think we have time for one
 
more question. As always, we have more questions
 
coming in than we really have time to get to, but let
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 72
 
me ask this one and I'll just read this one.
 
The industry is adopting the so-called
 
value-based maintenance and converting many
 
time-based preventative maintenance work items to
 
predictive maintenance.
 
And the question is interested in knowing
 
I think at least NRC folks' view about whether
 
existing compliance activities are going to be
 
adequate to assess the safety impact of that,
 
particularly if licensees are going below the
 
manufacturer-recommended preventative maintenance
 
work.
 
Any insights anyone wants to share on
 
that in our last couple minutes?
 
MR. MORRIS: I will start by saying this,
 
it's something we're aware of and focused on,
 
Commissioner.
 
When it comes to key equipment,
 
particularly safety-related or important to safety
 
equipment or things that can cause plant trips and
 
challenges, we do have a performance-based rule in
 
place, 10 CFR 5065, affectionately known as the
 
maintenance rule.
 
But it does factor in ultimately the
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 73
 
performance of the equipment and condition monitoring
 
of the equipment.
 
So, there is a role for modifying
 
maintenance frequencies and test frequencies based on


operating experience, based on better data and
73 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com performance of the equipment and condition monitoring of the equipment.
 
So, there is a role for modifying maintenance frequencies and test frequencies based on operating experience, based on better data and analytics.
analytics.
But it has to be done in a measured way and I think our regulatory infrastructure is set up to detect significant challenges in that area should they manifest themselves.
 
COMMISSIONER BARAN: Any other thoughts on this issue? Jack?
But it has to be done in a measured way
MR. GIESSNER: I'll just add that a lot of the processes that have some risk-informed already have a feedback loop.
 
For example, the surveillance frequency control program, if you extend the frequency of what you do in your surveillance and you do have a failure, you're required to go back and reassess that.
and I think our regulatory infrastructure is set up
So, in addition to the maintenance rule, the processes that are allowing the licensees a little more flexibility have a tool in them for feedback loop.
 
So, I think I agree with Scott we need to  
to detect significant challenges in that area should
 
they manifest themselves.
 
COMMISSIONER BARAN: Any other thoughts
 
on this issue? Jack?
 
MR. GIESSNER: I'll just add that a lot
 
of the processes that have some risk-informed already
 
have a feedback loop.
 
For example, the surveillance frequency
 
control program, if you extend the frequency of what
 
you do in your surveillance and you do have a failure,
 
you're required to go back and reassess that.
 
So, in addition to the maintenance rule,
 
the processes that are allowing the licensees a
 
little more flexibility have a tool in them for
 
feedback loop.
 
So, I think I agree with Scott we need to
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 74
 
check on that and our processes are going to ensure
 
we don't inadvertently miss that.


74 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com check on that and our processes are going to ensure we don't inadvertently miss that.
Jeff?
Jeff?
MR. SEMANCIK: One aspect of this that is I guess tangentially related or would go back to Ed's call for more transparency.
While generally we're supportive of risk-informed
: programs, some of
: them, like the surveillance frequency control program or 5069 for classification of components, once they're in house to the utility after the initial license amendment, the transparency of those changes is gone.
They become opaque and so you change a diesel surveillance frequency, there is no longer a public piece of that, there's no longer opportunity for state and local feedback on those processes.
So, unlike 5059, which kind of has that annual report that talks about what safety evals were done, a lot of these programs -- I think especially in aggregate it would be nice to see something that enhances the transparency, even if it's a review after the fact to understand what major changes were done, so that folks outside of the NRC and the licensee are aware of them.


MR. SEMANCIK: One aspect of this that
75 COMMISSIONER BARAN: I think we have to stop at that suggestion. It's been a great discussion I think.
 
Thank you all to all of our terrific panelists, I think we covered a lot of ground and a lot of different topics and got a variety of perspectives on so many them.
is I guess tangentially related or would go back to
Thank you all and thank you to those who have been watching and submitting questions, we really appreciate it. Sorry we didn't get to all of them but I think we got to almost all of them.
 
So, thanks so much and enjoy the rest of your day, everyone.
Ed's call for more transparency.
(Whereupon, the above-entitled matter went off the record at 2:30 p.m.)
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 WASHINGTON, D.C. 20009-4309 (202) 234-4433 www.nealrgross.com}}
While generally we're supportive of risk-
 
informed programs, some of them, like the
 
surveillance frequency control program or 5069 for
 
classification of components, once they're in house
 
to the utility after the initial license amendment,
 
the transparency of those changes is gone.
 
They become opaque and so you change a
 
diesel surveillance frequency, there is no longer a
 
public piece of that, there's no longer opportunity
 
for state and local feedback on those processes.
 
So, unlike 5059, which kind of has that
 
annual report that talks about what safety evals were
 
done, a lot of these programs -- I think especially
 
in aggregate it would be nice to see something that
 
enhances the transparency, even if it's a review
 
after the fact to understand what major changes were
 
done, so that folks outside of the NRC and the
 
licensee are aware of them.
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com 75
 
COMMISSIONER BARAN: I think we have to
 
stop at that suggestion. It's been a great
 
discussion I think.
 
Thank you all to all of our terrific
 
panelists, I think we covered a lot of ground and a
 
lot of different topics and got a variety of
 
perspectives on so many them.
 
Thank you all and thank you to those who
 
have been watching and submitting questions, we
 
really appreciate it. Sorry we didn't get to all of
 
them but I think we got to almost all of them.
 
So, thanks so much and enjoy the rest of
 
your day, everyone.
 
(Whereupon, the above-entitled matter
 
went off the record at 2:30 p.m.)
 
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 www.nealrgross.com WASHINGTON, D.C. 20009-4309}}

Latest revision as of 17:19, 27 November 2024

Transcript for Technical Session - W15 Regional Session-Reactor Inspection Program: Leaving Tomorrow Behind
ML22118A890
Person / Time
Issue date: 03/09/2022
From:
NRC/RGN-III
To:
References
Download: ML22118A890 (75)


Text

1 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

+ + + + +

34TH REGULATORY INFORMATION CONFERENCE (RIC)

+ + + + +

TECHNICAL SESSION - W15 REGIONAL SESSION-REACTOR INSPECTION PROGRAM:

LEAVING TOMORROW BEHIND

+ + + + +

WEDNESDAY, MARCH 9, 2022

+ + + + +

The Technical Session met via Video-Teleconference, at 1:00 p.m. EST, Jeff Baran, Commissioner, Nuclear Regulatory Commission, presiding.

PRESENT:

THE HONORABLE JEFF BARAN, Commissioner, NRC KELVIN HENDERSON, Senior Vice President & Chief Nuclear Officer, Duke Energy RAYMOND LORSON, Deputy Regional Administrator, RI/NRC MARIA LACAL, Executive Vice President and Chief

2 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com Nuclear Officer, Arizona Public Service - Palo Verde Nuclear Generating Station LAURA DUDES, Regional Administrator, RII/NRC EDWIN LYMAN, Director of Nuclear Power Safety, Union of Concerned Scientists JACK GIESSNER, Regional Administrator, RIII/NRC JEFF SEMANCIK, Director, Radiation Division, Connecticut Department of Energy and Environmental Protection SCOTT MORRIS, Regional Administrator, RIV/NRC

3 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com Proceedings 1:01 p.m.

COMMISSIONER BARAN: Good afternoon, everyone, and welcome to the regional session. I'm Commissioner Jeff Baran and I'll be moderating today's session. One of the best things about this session is there are no opening statements or long presentations.

It will be 100 percent Q&A with the panel so we can focus on the issues that you're most interested in. As you think of questions, please submit them through the RIC platform. We'll work hard to get through as many questions and topics as we can.

To get things started we have some prepared questions but we're counting on the audience to come up with questions to sustain a great discussion.

Because it's a big panel, in most cases I'll ask one of the regional administrators to respond and invite the other panelists to weigh in if they have thoughts they want to share on the topic.

But every panelist should always feel free to jump in with a different perspective or a

4 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com point they want to make.

Let me start by introducing our terrific panel, first our four NRC regional panelists from our Region 1 Office outside Philadelphia we have Ray Larson, from Region 2 in Atlanta we have Laura Dudes, Jack Giessner is here from our Region 3 Office outside of Chicago, and Scott Morris is our Region 4 administrator from Arlington, Texas.

We're also lucky to have executives from two of our licensees join us, Duke's Chief Nuclear Officer, Kelvin Henderson, and Maria Lacal, Executive Vice President and Chief Nuclear Officer for the Arizona Public Service Company.

For the first time, one of our state partners is joining us on the panel, Jeff Semancik, Director of the Radiation Division of the Connecticut Department of Energy and Environmental Protection.

Rounding out the panel, we have Ed Lyman, Director of Nuclear Power Safety at the Union of Concerned Scientists. I know we're all looking forward to hearing their views on a range of topics so let's get started with the first question.

During the 2019 health emergency, summary actor inspections need to be performed remotely.

5 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com What lessons has the NRC learned about the effectiveness of remote inspections compared to in-person inspections?

What did we learn about technologies that could be used to supplement or enhance in-person inspections, and what do the non-NRC panelists think about the relative narrative remote and in-person inspection?

Scott, do you want to start off on this one?

MR. MORRIS: Yes, sure I'm happy to. Can you hear me okay?

COMMISSIONER BARAN: Yes.

MR. MORRIS: This is a really interesting and important question.

Obviously, because of the public health emergency we out of necessity had to do a lot more remote inspections in order to complete the nominal or at least the minimum set of samples for our baseline inspection program at all operating power reactors. And I think, well, I don't think, we were successful, it was challenging but we learned a lot and we're still learning.

We talk about this all the time, it's an

6 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com important issue that I know that NRR and the other regions are actively focused on in looking for ways to enhance our guidance.

But I'll say this, I think we were successful in large measure over the last couple years doing remote inspections because we started with a set of highly qualified inspectors to begin with.

These are folks who are seasoned inspectors who have been in the field and done most of these inspection procedures I'll call live and in person. And so it was a little bit easier of a transition for them to go remote in the first place because they knew the right questions to ask and who to talk to.

That becomes less impactful the more and more people that we lose through attrition and the more new people we hire. So, that elevates the importance of in-person inspections.

But I will say I personally believe and I'm sure others will weigh in here, there is a role for some remote inspections going forward. It's not the end all be all. Yes, we can get some efficiencies out of doing it.

7 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com For example, we can do document reviews, corrective action program looks, we can look at self-assessments, we can conduct some interviews.

And as a consequence, the time that we do spend on site I think can be more sharply focused on things that really do require in-person inspection.

So, again, I think there's a role for remote inspection. I think in part it can also help supplement team inspections. We do a number of team inspections and we've had cases where we've got one or two folks who are back in the office so to speak and some guys in the field, and there's still mutual support that happens that way.

That's something we've done for years by the way. It also is unfortunately not the end all be all. I think most of us would agree that on-site inspection, in-person inspection is more appropriate, more effective for a lot of reasons.

I think about remote inspections, it's almost like looking through a straw. You can only see what's on the other end of the screen in some cases. You don't necessarily get all the other contextual things that you would get by walking around a plant listening, hearing, smelling, all

8 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com those other sensory inputs.

We add a lot of value I think as an agency and most licensees that I speak to would agree, just are walking around with our inspectors, leaders and managers during site visits, seeing, touching, doing is helpful because we see things that licensees don't necessarily see, many of which are not particularly significant.

But they're observations that we make and we can share those with licensees in real time and bring them to their awareness.

We wouldn't see through remote inspection and I think we add a lot of value as an agency by sharing what I'll call those low-level observations with licensees that never find their way into inspection reports, never find their way into assessment documents.

But a lot has been learned, we're still learning, there is a role for remote inspection but at the end of the day, I think we have much more effective and meaningful engagements and learnings through onsite inspection.

And if we have enough time, I can share some examples to help illustrate that, but I'll stop

9 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com there and let others weigh in.

COMMISSIONER BARAN: Any other panelists want to weigh in on this issue of remote inspections versus in-person inspections and the relative merits?

MS. LACAL: Sure, Commissioner, I'll weigh in if that's okay.

I think we've proven that we can continue to have very effective inspections remotely. I know that we immediately provided our resident inspectors with technology, computers.

They've had access to anything and everything that they wanted access to, whether it was parameters and being able to monitor our plants remotely to being able to participate in all kinds of meetings.

I think it's also really helped us focus on our resources, less time in airport and on airplanes and a lot more time doing the inspection activities.

We've also really homed in on our communications and making sure that we kept our residents in the region involved and engaged, communicated at all times. And I think we've learned a lot through these past two years.

10 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com I know at APS we're transitioning to a hybrid workforce. We're not necessarily all going to come back to the site but it will be more of a hybrid where it will be on site and some folks where it makes sense to be at home.

I think the NRC can do the same when it comes to inspections.

We'll continue to review documents remotely, use Teams meetings, et cetera, and then we've got our resident inspectors so if there's anything that needs to be observed or any sort of activity that needs to happen on site, the resident inspectors are here and can certainly do that for an inspection team.

I'll say we had a great example of that during this timeframe. We had a RAD material control inspection where there was a lot of question around a particular aspect about our storage facility.

And so our senior resident walked down, took photos, and provided that information directly to the inspection team and we were able to resolve the inspection team's questions without necessarily having them come to the site.

So, I think this hybrid approach, we've

11 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com learned a lot and we can continue to think about that going forward beyond hybrid and really try to manage our costs and our precious resources.

COMMISSIONER BARAN: Thanks, Maria. Any other thoughts on this issue?

MR. LORSON: If I could just add one thought related to remote inspections? With respect to some of the technology and the tools, there has been a benefit for us, particularly when it comes to off-hours event response.

In some cases, we've seen situations where the plant may trip in the middle of the night.

In the past, the resident inspector might leave his house and drive in the plant early in the morning whereas now we can use our remote tools to determine whether or not we need to go in immediately or if we can wait a little while.

So, we have achieved some of the benefits but I would also echo what Scott talked about, there's really no substitute for direct onsite visual inspection.

COMMISSIONER BARAN: Thanks, Ray. Ed, you have something you want to add as well?

MR. SEMANCIK: Yes, just as an outsider,

12 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com first of all, I think what the inspections teams have done is amazing to deal with this crisis. And certainly at the height of the pandemic, there was very good reason to move to that remote posture.

But certainly, going forward I

am impressed by the anecdotes that I have been hearing that there is no substituting for the onsite inspection.

I would submit that rather than remote tools be used in lieu of critical inspection functions, they be used to augment and supplement those.

And moving forward, once hopefully the public health emergency resolves, there should be the resumption of a more normal posture. That's my view, thank you.

COMMISSIONER BARAN: Jeff, do you have something you want to add as well?

MR. SEMANCIK: Yes, I'll just also echo Ed. The presence of NRC resident inspectors on the site during the height of the pandemic was pretty quickly a public interest item that we got engaged in at the state level.

And I thought at least regionally here

13 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com they did a great job of keeping us informed of what was going on onsite, what was going on offsite, what was being done hybrid.

And I think also a good common focus on maintaining safety and integrity for the operators at the plant to make sure we weren't putting them at any additional risk that wasn't necessary for it.

But on the whole, I think it went very well and communication was good on it. So, thank you.

COMMISSIONER BARAN: Let's move to another question.

What impacts has the public health emergency had on nuclear power-plant sites and plant safety and what effect has it had on your organization's planning and staffing?

Jack, do you want to take the lead on this one?

MR. GIESSNER: Yes. When I think of this question I break it into two parts. I break it into the impact and safety on the people, the people who running the plant and the oversight, and I also base it on plant safety.

They are not mutually exclusive, nor does

14 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com one guarantee the other. So, when we work on looking at this issue, let's face it, this is a huge challenge and continues to be a huge challenge to the families, to the people.

But the processes and the procedures and the contingencies that the utilities built and the processes and procedures and contingencies the NRC built and frankly, the exemptions that provided that temporary flexibility by the program office at Headquarters ensured the plants continued to operate safely.

I don't want to underestimate the impact to the people. When we initially started the protocols, generally more than what was implemented by the federal outlines, we as good neighbors at the NRC followed those, whether it was masking, social distancing, and testing, we were able to provide that framework.

The resident inspectors went in periodically, every couple days, and some inspections were continued. Our operator licensing needed to continue, it was a mission-critical function.

So, I

wanted to make sure folks understand there's a huge challenge to the people but

15 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com that balance of ensuring safety of our inspectors, safety of the utility folks, we needed to meet and ensure we could oversee correctly and also ensure the safe operations of the plant continued.

We came up with a methodology and looked at yourself, looked at the outside community, looked at the site, and then we looked at the risk.

Ray mentioned we might not have gone in for a trip, but if it was a complex evolution, it could have been a difficult item in an outage, incident response, especially on the SIT teams, we would send those out. They would take the appropriate precautions.

So, in short, we did ensure plants operated safely. Big challenges continue with the Staff and we continue to work through the processes that we have with the help from our folks in the program office.

That's all I had, Commissioner.

COMMISSIONER BARAN: Jeff, did you have anything to add on this one?

MR. SEMANCIK: There's a couple of things I would say from the local perspective.

The first part is early in the pandemic

16 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com we worked with plant staff at the local power-plant to do things like get them priority access to offsite testing when that was running scarce, get them on vaccine lists for critical workers and in the right phases of those.

So, we helped do our part as partners in the area. The other thing we did is we took a strong look at our offsite emergency plan for the COVID-19 pandemic, again during the early parts prior to deployment of vaccines and other measures.

We really took a look at would we shelter in place versus aggregation of large personnel, where we could do hybrid on the offsite response teams, and how we could minimize spreads on that.

So, through that whole process we engaged with all the stakeholders and were able to really I think come up with some of those modifications and also to exercise those modifications by continuing to do some drills to demonstrate proficiency in those.

Thanks.

COMMISSIONER BARAN: Any other comments on this question?

MR.

MORRIS:

If you don't

mind, Commissioner, I'll put in a shameless plug for a

17 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com session I'll be facilitating tomorrow morning where we had a real-time opportunity to respond to a real-world

event, Hurricane Ida going through Southern Louisiana right over the Waterford site and how all of us worked together to combat that in a COVID-19 public health emergency environment.

We'll explore some of these issues related to this question during that session as well.

COMMISSIONER BARAN: Sounds good, let's turn to Kelvin next.

MR. HENDERSON: So, it really did have an impact really only on how we execute our business at the plant.

Our key resources such as operators, maintenance, radiation protection, chemistry folks, the folks that were on the plant day in and day out, they were there from day one of the public health crisis and they were there through the end.

We learned how to operate by coaching each other from a safety standpoint. Social distancing, wearing of masks, things of that nature.

The people that were sent home and working remotely, they still came in for critical evolutions.

So, from a plant safety standpoint, plant

18 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com safety was never jeopardized or even challenged, it was just how we executed. We executed all of our refueling outages in 2020 and 2021 and we were able to do it successfully within the bounds of the allocation for those outages.

So, the organization really learned to adapt and we're carrying some of those learnings to how we operate today.

COMMISSIONER BARAN: It looks like Maria and Ed both have comments. Let's start with Maria and then go to Ed.

MS. LACAL: I think we would be remiss to not recognize the support from the NRC on exemptions to the workout rules.

We submitted those on the spot, very, very timely support so I just really appreciate and thank the NRC for their quick turnaround on those sorts of things.

Much like Kelvin said, we've got two refueling outages every year so we executed all four of our refueling outages without really any incident whatsoever.

I think one of the things that we quickly learned was how important it is to be intentional

19 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com regarding staying connected to the remote workforce and making sure that we had leaders checking in on them and having that heightened communication just to make sure they're onsite as well.

Because they work here on site and we want to make sure things were operating well from home. That was a big learning for us as well.

COMMISSIONER BARAN: Ed?

MR. LYMAN: From the public perspective, it's a little hard for us to really assess the impact of all this, so I hope the NRC will be collecting data in a form that's publicly accessible so that we can see for the usual metrics how safety may or may not have been maintained during this period.

I've been doing my own non-scientific analysis so with regards to one planner at least unplanned SCRAMS, it looks like 2021 was actually lower than it's been.

So, I can't say anything from one data-point but it doesn't look like there was a sudden explosion of operator error and deferred maintenance-related SCRAMS. So that's positive and again, I'd love to see a comprehensive analysis once the situation is settled, thank you.

20 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com COMMISSIONER BARAN: Any other thoughts on this question before we move on to the next one?

A new feature of the reactor oversight process is the very low safety significance issue resolution or the LSIR process.

We got one question about this already.

Ray, can you describe the process and give us a regional perspective on it? I'd also like to hear what the non-NRC panelists think about the process of how it's being implemented.

MR. LORSON: The very low safety significance issue resolution process, or VLSIR, was incorporated into our inspection program in 2019.

And what we did was we had a lot of internal discussion and we developed a process so that we could take issues that previously we might spend an awful lot of time on that we would acknowledge were very low significance, but we were trying to do further investigation to determine if there was an actual violation or not or a regulatory requirement.

And so what the VLSIR process achieved for us, and folks can refer to it, it's Manual Chapter 612, it allowed us to make a conscious decision for

21 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com some issues that are of low risk significance to not expend an inordinate amount of time trying to determine if there was an underlying compliance issue or not.

So, it was just another tool that we had to allow us to better focus our efforts. So, that at a high level is what it is. It's been used successfully approximately a dozen times across the agency that I'm aware of so it is being used.

It's something we routinely think about as we're pursuing issues. That's a little bit about what LSIR is, it's probably also worth talking about what it is not. And it's not a substitute for restoring compliance.

If we determine that there's a compliance issue and we take some type of formal action, let's say for example an enforcement action, the issue still has to be addressed and if there's a disagreement with the action we've taken, then there would be a process for contesting that.

And so that would be outside the LSIR process but it would be an avenue by which a licensee could express disagreement with a conclusion we've reached. Or if we've reached a conclusion and taken

22 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com an enforcement action but we all agree it's of low significance, the licensee has other means they can use to remedy the issue.

For example, they could correct the condition or they could request an exemption. To that extent, a couple years ago NRR developed a risk-informed process for requesting the exemption.

That streamlines the exemption process.

So, all three processes all work together if you will and I think it's just important that we all recognize the importance that the VLSIR tool has provided to us to focus our time on things that are most important.

COMMISSIONER BARAN: Thanks for that overview, Ray. Maria, do you have thoughts on this?

MS. LACAL: Yes, Commissioner, thanks.

I agree with Ray, this is a very effective way of using our precious resources.

I think we had a really good example recently with the use of this process during the NRC's review of an interim change that we made to Staff augmentation time due to the COVID-19 public health emergency.

This was an emergency response organization, staff augmentation time change and so

23 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com the NRC in their review raised some questions regarding facility augmentation times that have been resolved with the NRC really decades earlier.

And so the NRC originally had approved our emergency response organization change to the augmentation time. Back in the early 1990s, 1994, the letters with the NRC region versus NRR and that approval letter at the time didn't have a safety evaluation.

And so even though our example didn't exactly fit into the type of cases that I think were originally believed to be part of this VLSIR process, in our case emergency plan, the team really quickly and effectively resolved and saved a lot of time and resources again due in large part to the NRC's application with this process.

So, it was captured on a condition report and now we've included the basis for the original approval.

So, I agree that really focusing our time and energy on the more safety-significant issues mitigates our distraction on the lower-level things and really helps us maintain laser focus on the things that we need to.

24 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com And actually, at the end, it ultimately improves our nuclear safety posture. So, I appreciate the work that was involved in that application for us.

COMMISSIONER BARAN: Jeff, do you have thoughts on this?

MR. SEMANCIK: Time will tell certainly on this to some extent as we see more of these issues resolved this way. I think there is a challenge with complicating an already complicated process from the public's point of view.

It's just more adjectives thrown on and a little more screen, it looks like there's a problem that's not getting fixed with that appearance. So, I think I'll withhold judgment on it from that point of view, but I think the public struggles with resource balance of utilities.

And the NRC, with respect to running nuclear power-plants, they see it as an endless resource and the stuff we have to monitor, I do applaud the fact that at least the documentation of this in the inspection reports gives us all a chance to look at it in the public view and see what happens.

So, I think the book is still open a

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com little bit on it but there is obviously some benefit to it in general. I just have to be cautious about how we approach it and make sure the public fully understands.

COMMISSIONER BARAN: Thanks, Jeff, and of course it is a new process. Laura, do you have thoughts you want to share on this?

MS. DUDES: Thanks, and I really appreciated Jeff's comments about the documentation because I think it's important to recognize there's transparency in this process and we're sharing with everyone, here's what we're doing with this, we're not pursuing it at this time.

And then it's all important to realize that if new information becomes available to the NRC or the licensee, it doesn't preclude us from revisiting this issue at a different time.

So, I really just wanted to highlight the transparency of the process. Thank you.

COMMISSIONER BARAN: Ed, do you have something you want to share?

MR. LYMAN: Yes, and I think Jeff hit the nail on the head.

From our perspective, if there's a safety

26 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com problem and it looks like the lay characterization of this process is maybe it's not worth trying to figure out whether or not it's an actual violation, and even if we do that, maybe we'll not require that it be fixed.

Those are problematic for us and this stems from our concern about perhaps the overuse and overlying site PRA in these inspection determinations. I think we would want more assurance that these are really very low safety significance and I'm not sure that's always borne out by the PRA analysis, because as we all know, there are uncertainties and deficiencies in missions and the use of things like flex credit, which I'll talk about later, which we have concerns about because of their potential lack of validation.

So, we don't want to see safety issues essentially being thrown out because no one wants to take the time to dig through the history and find out if it's really a violation or not.

That says something about the way this licensing basis has evolved and it would be great to take a fresh look, I agree, at the safety significance but maybe not the way it's playing out here.

27 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com COMMISSIONER BARAN: Any final thoughts on this question before we move on to the next?

MR. MORRIS: Yes, I had a thought on this. I think really, the main genesis of this whole process, the safety significance piece is certainly an element of it but the real driver for me in our experience at least in Region 4 has been when you talk about is it or isn't it a violation, what we're really talking about is the licensing basis around this issue clear or not?

Or is it ambiguous?

If that's the case and it happens to be low significance from a safety or risk standpoint, then the LSIR, exercising VLSIR, and all the transparency that Laura talked about is going to happen.

So, it really gets to the ambiguity of the licensing basis given the issue, not the safety significance solely.

And I will say if there is a safety-significant issue and it's not in the licensing basis, we're still going to deal with it.

We're not going to walk away from a safety-significant issue regardless of whether or not

28 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com it's in the licensing basis.

COMMISSIONER BARAN: Any other thoughts?

Ed looks tempted to respond.

MR. LYMAN: Then you get into backfit space and that's the problem. If it's too hard to follow through on a back fit, that's a very blunt sword you have.

COMMISSIONER BARAN: Jeff, go ahead.

MR. SEMANCIK: I would also indicate that from a reassurance to the public thing, you have an ambiguous licensing basis and don't really understand it so therefore won't pursue it is less than satisfying.

So, I think if there's an ambiguous licensing basis, some effort to resolve and clarify that would make sense to me.

MR. MORRIS: It's a question of the amount of resources necessary to do that. In a world of limited resources, we obviously want to be risk-smart and focus on the most important things.

But your points are very well taken.

COMMISSIONER BARAN: Good discussion on this, it's kind of early days on this program and we welcome the feedback today on going forward on it.

29 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com Let's turn to a question from the audience and maybe I'll ask Laura to answer this or take a first stab at it.

With retirements and other attrition contributors depleting the workforce of inspectors, what incentives, training, and knowledge management programs are being employed to ensure new inspectors are being recruited, educated, and maintained in the most efficient way?

MS. DUDES: Great question, although I think we could have had a whole RIC session on VLSIR given the very spirited conversation. But I like look forward to in terms of the next generation of NRC inspectors and our EDO, Dan Dorman, has a focus on hiring for this year.

And he's got all of the senior leadership focused on hiring. And then I think the question gets to the fact of once you hire them, how do you transfer 30, 40 years of inspection knowledge to this new generation?

We have multiple strategies in place. I think one of the things we're really proud of now is our Nuclipedia, or our Wiki tool that's a great knowledge management tool that people post videos and

30 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com discussions about knowledge management.

And the great thing is it is a one-stop shop and as we build that it will continue to grow in terms of knowledge management.

But beyond that, we're really focused on competency

modeling, which is a

qualification process, really identifying what competencies are needed for inspectors, aligning them with senior inspectors so they're able to work and get on-the-job training.

And then competency-based qualifications is another item that we're focused on to make sure that our inspectors are really getting a 360-degree knowledge transfer and training.

NRC always has very good training programs and we continue to use our effective training center to give people firsthand experience in simulators and then working with our operator licensing folks because they also have a tremendous amount of plant knowledge.

So, I think there's a lot out there but this is something that we are all as a senior leadership team laser focused on as we look at the demographics of the Agency and how we bring new people

31 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com in.

And I will say, the challenge that we have and one of the things that we're trying to communicate and coordinate on is we're bringing people in in a hybrid work environment.

And I think Scott mentioned this earlier in terms of the reasons we were able to be so successful with our remote inspections is because of the quality of our inspectors.

And so now as we are working in this hybrid environment we have to be incredibly intentional about taking our new hires, getting them out to the sites, having the senior inspector spend as much time in OJT as possible.

Let me pause there and see if there's other comments.

COMMISSIONER BARAN: Any other NRC folks want to weigh in?

MR. MORRIS: I will just say Laura's points are all absolutely dead on.

We've taken other steps, we have weekly question and answer sessions in the region for

example, where anyone can come in, seasoned inspectors and brand-new ones and it's an open forum

32 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com where people can just ask questions.

What does this acronym mean? Why is this issue important? Why did you pursue this line of questioning? And just an open exchange that happens every week, very robust sessions. We do inspection debriefs every time we have an inspection.

That inspector comes back and debriefs to their colleagues what they did and what they found and there's an opportunity for conversation and learning there. We're trying to take advantage of opportunities at the sites.

I know a lot of Region 4 sites, we've had a fair amount of attrition in our resident inspector cadre and we've obviously got a lot of new folks out there. But we try to match them up with seasoned people and we're putting a lot of our newer hires out in the field for observational rotational assignments and details.

Again, it's to maximize that OJT and accelerate that learning. We all know that training and qualification is great, it's important, but it doesn't make you a proficient inspector.

Proficiency comes with time and wisdom and just being out there.

33 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com COMMISSIONER BARAN: Let me ask a related question so folks can keep answering this one but I'll throw this in as well.

We had an audience question of how do you deal with the challenge in terms of mentoring new staff where you have the more experienced inspectors who may be busy or overworked as is and may not have the time that they would want to have to mentor.

How does the Agency address that to really make sure this vital part of the role of the more seasoned inspectors have the time and bandwidth to convey that knowledge and experience and help bring newer folks up to their level of capability?

MS. DUDES: I think that's a great question. This is a phrase that's often used, it takes a village, right? So, you need your entire organization engaged in attracting this talent and retaining the talent.

And so it's not just the seasoned inspectors.

I'll give you a great example. We have a lot of new resident inspector development program hires and so we had three Branch Chiefs take them up to the technical training center for three or four

34 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com days and they went through how do you respond to an incident?

They had the simulator going. That's just one example.

And so as an agency and organization, we need to utilize all the resources that we have, bring people together for intentional focused training on specific topics so it's not just hooking them up with a senior inspector but it's using the Branch Chiefs and using the former inspectors at Headquarters and seeing if you can have specialized topic sessions.

So, again, you're giving the employee a full 360 experience with the tremendous skills and experience we have in the Agency.

COMMISSIONER BARAN: Scott, you have something you want to add?

MR. MORRIS: Yes, just real quick, every NRC employee has a performance plan that becomes the foundation of their individual performance assessment at the end of every year.

One of the elements of every individual's performance plan including our inspectors is this notion of organizational effectiveness. What have you done to help the organization get better?

35 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com Not just what you've done to develop yourself personally and professionally in your own career, but what have you done to contribute to the whole organization?

And so directly to your

question, mentoring is one way of doing it, imparting knowledge, creating Nuclipedia pages, conducting cam and knowledge management sessions and on and on and on.

So, it is an overt expectation on the part of our staff.

COMMISSIONER BARAN: Any other thoughts on this before we move on to another question? Let me ask one about inspection findings, since 2015, the number of nationwide inspection findings has declined from 821 per year to 269 per year.

That's a 67 percent decline. All 4 regions have seen this trend in inspection findings.

What do you think is driving the significant decline in inspection findings and are you concerned about it?

Who wants to chime in on this one?

MR. MORRIS: I would be happy to but I feel like I've been throwing in too much. I'll just

36 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com kick it off then. Yes, am I concerned about it? No.

Is it something we need to pay attention to? Yes.

Have we done analyses, detailed analyses, to try to understand the drivers? Yes. In fact, NRR teamed up with us and they did a very detailed analysis of this very issue and what were the drivers behind it?

And I think that analysis is available and it was done about eight or nine management so I don't remember all the details. But I will say the main drivers in my opinion and what came out of that analysis, many aspects.

Number one, we are more focused on spending time on risk-significant issues and we did more focused on the threshold between what's truly minor and what's more than minor and therefore gets documented in a report?

So, there's more scrutiny of that, there's more questions being posed by Branch Chiefs and others during these inspection debriefs for example, where folks are saying why is this more than minor?

I think many people would be surprised the kind of dialog that happens in those inspection

37 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com debriefs. There's a lot of why did you even look at that? Or why are you even talking about this? How does this meet the minor, more than minor or exceed the criteria?

That's one piece of it. Risk models are better, there's more margin that's been identified so the significance of issues that are identified are now potentially less risk-significant than we once thought because the modeling is better.

I think this notion of consistency among regions, there's been a lot more cross-talk, a lot more dialog across and between regions to make sure there's better alignment, sharing of examples to help people understand.

And there's a whole bunch of other reasons but one of the bigger and most fascinating things that I recall from the NRR analysis last year, one of the biggest drivers was this notion of management, really questioning and challenging inspectors on whether or not an issue that they're working on or have raised really meets the criteria of being more than minor.

There's a lot more focus on that and I think in my estimation, that's a big driver here.

38 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com And I would be remiss if I didn't say something about industry performance.

I think the industry collectively is performing.

They continue to show improvement year over year I think, there's a lot of data to support that, not necessarily NRC data. I'll stop there.

COMMISSIONER BARAN: Jack, do you have thoughts you want to share?

MR. GIESSNER: Yes, I do. First, I want to say that at least the preliminary data we have for 2021 shows I think a 15 to 20 percent increase in findings and I think in 2020 there was probably less onsite time.

So, we'll get that data so this precipitous drop that people are worried about, I do sense that we're coming to this level. I agree with Scott's assessment that it's probably complex.

The one thing I wanted to add is I do think the backfit training added a lot of value, things were Criterion 3 in the past. We've done a good job focusing on that.

But one thing that is slightly different than Scott is concern is not a bad thing, I just have a little concern because in some of the feedback maybe

39 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com some inspectors won't bring up these very low issues.

And it's not that somebody is saying they're just going to not inspect and just bring up issues, but when you hear there's potential culture perspectives in there it gives me pause.

So, I like to pull the data.

I do think we have more work to do to ensure that it is a combination of better ideas from minor industry performance, understanding backfit, but anytime there's a drop like that, I want to make sure we're focused on the engagement with the frontline inspectors, our specialty inspectors, and residents to make sure there isn't something there we need to address.

I think it's something that's always on our radar and we are going to get feedback on it.

That's my two cents, Commissioner.

COMMISSIONER BARAN: Let's get one more NRC perspective and then maybe hear from some of our external panelists too. Ray, do you have thoughts?

MR. LORSON: Yes, just briefly, I agree with everything that Jack and Scott have already discussed but I'd particularly like to focus on...concern is not the right term but I just want to

40 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com make sure we're not putting unnecessary barriers in place that preclude the inspector from going off and identifying issues and bringing them to fruition if you will.

We were aware of the survey that was done of inspectors that NRR had developed a report for and on the topic that Scott brought up of management engagement, we are very concerned that making sure what we're doing as a management team in terms of our actions, behaviors are not precluding or inhibiting inspectors from identifying issues or pushing issues to their final conclusion.

And so we basically called SKIP-level meetings where myself and David Lew, the regional administrator, met with every inspector in the region just to try to get their perspectives and make sure we were not behaving in a way that put forth these artificial barriers.

So, we were very pleased with the results of that but that was not necessarily concerning but we just wanted to make sure we weren't making it too hard on folks. Thanks.

COMMISSIONER BARAN: Ed, do you have something you want to say on this topic?

41 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com MR. LYMAN: I hope this is tied to better performance and not a dynamic where inspectors are afraid to raise issues because they get too much pushback.

And if Scott is referring to the same report, I recall that conclusion was there was no clear improvement in the overall safety performance in the explanation.

So, that makes me concerned and it's not just the total number of findings but it's also the number of findings that are escalator engraved in green. And I did hear also in ROP meetings that the use of flex credit has significantly dropped the number of grey and green findings.

And that might be one factor, and that again concerns me because of the potential lack of validation for not only flex human error probabilities but also flex equipment reliability that I think we'll be talking about later.

So, I would certainly not want to see a dynamic where there's pressure on inspectors not to rock the boat and allow these findings to be missed or not dealt with.

And as with the low safety significance

42 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com resolution

process, the accumulation or the aggregation of minor findings could lead to something that's greater than the sum of its parts.

That's my concern, thank you.

COMMISSIONER BARAN: Jeff, do you want to chime in?

MR. SEMANCIK: Just a couple of things.

It would be nice to have a comprehensive review and evaluation of the drop vice anecdotal evidence on there to really understand what are the drivers and determine those.

That would be helpful, especially with maybe some outside perspective as well into some comprehensive review on that.

And then I would just caution that you wonder from an external point of view, the previous discussion about bringing on new Staff and experience, does that tie into the ability to identify findings or the willingness to raise them?

But again, that would also be anecdotal and speculative but it would be good to have that good understanding because I think certainly, if a utility had a drop of 67 percent in the number of condition reports they were submitting, we'd

43 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com certainly be interested to understand what the difference was that caused that.

COMMISSIONER BARAN: Anyone else want to weigh in on this issue? Maria, did you have something you wanted add?

MH: I just wanted to add a couple of things. Let's not forget about INPO, INPO has been just a phenomenal standard-setter with standards of excellence that we all have to meet.

And I think that definitely has helped us to continue our performance in all aspects of operation. Actually, NEI put out a really good document in 2020, it's NEI 2004.

It's called the nexus between safety and operational performance in the U.S. nuclear industry and it clearly shows how the industry has continued to improve its safety posture year over year.

A lot has to do with the regulations that have been imposed over this timeframe but clearly, it shows that the industry in general has the ability to improve.

And it looks at a lot of different areas and there's a lot of good metrics there, and there's a lot of really good basis behind this analysis which

44 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com a lot of the information comes from the NRC.

So, that's a pretty good document to take a

look at and

really, truly understand the improvements that the industry has shown in safety over the last 10, 20 years.

I think also just like the NRC does and shares amongst the different regions, we do the same thing. We share amongst the different sites on inspection findings, we do assessments across sites in preparation for inspections.

Clearly, our problem resolution identification programs continue to strengthen and that includes low-level trending and analysis, our issue evaluations and looking for that extended condition and making sure that we close the issues with a lot of rigor in looking for similar gaps in other programs or processes or equipment, et cetera.

All of those things truly have I believe kept us focused on the important things and I think the risk-informing regulations and that risk-informed thinking really helps us focus on the more safety-significant issues, getting those resolved quickly and early.

COMMISSIONER BARAN: Kelvin, did you

45 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com want to jump in?

MR. HENDERSON: The only thing I would add to Maria's comment, it also starts with leadership and leadership behaviors and the drive for continuous improvement and really identifying issues at such low levels that we promptly get those created.

And that starts with me as a CNO setting the tone throughout the organization that our purpose is to find our own purpose and make sure that we quickly identify those and quickly get them into the corrective action program and place the right sense of urgency to get them resolved.

And I think that is reflected in what we're seeing as far as industry performance over the past few years. I think it's a direct tie to it but it really starts with us as CNOs and the tone that we set with our organizations.

COMMISSIONER BARAN: I think it's been a good discussion. In the course of the discussion up to this point, we heard a couple of references to flex equipment.

Let me ask a question on that, one of the most significant post-Fukushima safety enhancements is the presence of flex equipment at reactor sites.

46 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com Maria or Kelvin, can you discuss flex operating experience?

And if other panelists want to weigh in about what has been learned about the maintenance and use of flex equipment?

Maria, you want to start?

MS. LACAL: When flex came up a number of years ago, we really focused on how do we make our dollars count, not just during the emergency but in our day-to-day operation of our plants?

So, if we're going to spend this large amount of money and resources on flex, let's make sure that we design and follow modifications and procure our flex equipment such that it will help us increase our margins of safety from a day-to-day perspective.

So, that was big focus for us from day one, maximizing our use of flex to maximize our safety posture. I'll say that at Palo Verde we extensively use our flex and portable equipment as mitigating actions for maintenance rule.

We routinely deploy our flex team generator makeups and our portable DC generators to mitigate risk during certain planned maintenance

47 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com activities as well as an emerging equipment issue.

It's baked into our procedures and so it's really part of our work management process now as part of our planned maintenance activities. It maintains our risk profiles low in the green band and making sure we have the right purpose and attention on our risk management action levels.

I'll say prior to flex our outages were such that we would be in yellow risk for almost the entire outage with clearly a large part of our refueling outages.

And now with the deployment of flex we maintain low in the green band posture throughout our entire outage duration.

Our modifications for the connections to flex equipment were designed so that it kept our operators in line and making sure that performance was top of mind so they had easy access, all external connections.

They don't require any doors or anything to be left open where we don't traverse cables and hoses, et cetera, throughout the site.

The other thing I think that we learned a lot is the proficiency and we talked about that a

48 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com little bit of our operators and our maintenance personnel from deploying this equipment a lot.

They've got a very high level of proficiency regarding the use of the equipment.

At Palo Verde we're fortunate to have a standalone fire protection department and that consists of full-time firefighters, maintenance personnel and engineering personnel.

And so our fire protection maintenance organization do a fantastic job maintaining our flex equipment in very top shape, keeping sure that we maintain through the requisite numbers and they ensure that we do all the preventative maintenance, et cetera.

I'll say we had early on some indication of some battery failure issues which we communicated to the industry and we have since resolved those but as an industry we collaborate.

There's a committee that's focused on flex equipment, sharing operating experience, having routine communications around these. We have dedicated program owners to share this operating experience.

We've partnered with EPRI to capture the

49 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com data that we have across all of the stations to make sure that we've got a good reliable database and that we share best practices.

So, this is all in a very shareable retrievable database for knowledge retention and I think just continued interaction between INPO and EPRI and the industry, sharing that operating experience and using our flex equipment has just been very, very valuable from a reduction of I'll say an increase to safety as a result of flex.

COMMISSIONER BARAN: I think a lot of panelists want to weigh in on this one. How about we have the order be Kelvin and then Jeff can weigh in and if Ed wants to weigh in and then Ray?

MR. HENDERSON: Thank you, Commissioner.

I agree with everything, obviously, Maria said and the interesting thing is I can remember when we first put flex in place, it was equipment that existed and now it's more part of our overall risk reduction strategy that's ingrained in all of our procedures.

Maria mentioned how it's deployed during refueling outages where in the past we would have elevated risk levels during certain configurations in

50 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com the refueling outage.

Now our procedures will require use of staging flex and make sure we have the right things in place to minimize that risk.

We also have leveraged opportunities where we've had degraded components online and we've taken the opportunity where we can take that component out of service online by deploying flex that would allow us to improve the reliability of that safety piece of equipment.

And obviously, overall improve plant safety.

In the past, we really didn't have that flexibility but all that's ingrained now in our procedures and processes and strategies so it's not just equipment that exists, it's really part of our overall strategy in how we manage risk.

COMMISSIONER BARAN: Jeff?

MR. SEMANCIK: I would think in general we really applaud the use of flex and the implementation of flex.

In general the response to Fukushima, it provides a real tangible benefit that we can articulate to the public and demonstrate a commitment

51 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com to safety as opposed to a reanalysis or a refinement of something there.

So, from the public perspective, they see an action, it's good, and I also applaud the use of it to reduce real risk in refueling outages and online issues.

So, we do appreciate that because ultimately, that improves safety for all of us.

I think the one part I would like to see is it integrated more in emergency plan exercises and just challenging it in those timeframes to see its use in those roles.

It would also allow the offsite folks to internalize the ability to have that equipment on and prioritize actions to assist in responding to those types of events.

COMMISSIONER BARAN: Ed, do you have thoughts?

MR. LYMAN: Yes, I already raised this a couple of times.

I think the main problem here is the regulatory footprint and since the beginning, we did not think the current requirements for maintenance inspections and flex equipment were sufficient given their importance.

52 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com And given they're now being relied on for these other uses including pretty safety-significant maintenance tasks that it's important that the credit for flex does not go beyond the level of reliability and assurance that the NRC has over that equipment.

So, looking at the issues at River Bend and Clinton with the diesel generators and potential common cause failures, Id like to have more confidence that the NRC has the regulatory authority to make sure that equipment is in adequate working order, again commensurate with its potential expanded uses.

COMMISSIONER BARAN: Ray, do you want to go next? And maybe just for those who are familiar in the audience with River Bend maybe just talk a minute about that or Scott can chime in on that too so people have that background.

MR. LORSON: Scott, do you want to go over River Bend and then I'll follow you?

MR. MORRIS: It's all a matter of public record at this point but I will say in essence, it came down to a number of portable diesel generators that unfortunately when they went to start them, they didn't start or they started but didn't continue to

53 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com run for a variety of different reasons.

And ultimately it got traced back to maintenance practices, preventative maintenance practices and some initiate design issues.

And we obviously expanded our sample and look at that issue across the fleet particularly in Region 4 and particularly the Entergy fleet since River Bend is one of the Entergy facilities.

So, at the end of the day, yes, there were challenges with that, I don't want to go into a lot of detail.

I will say that when the initial inspection, we called it a temporary instruction, was performed by the NRC Staff, after all licensees had essentially reported in that they had completed implementation of their flex strategies, our inspections at that stage were more are the licensee strategies for flex in line with EPRI's NEI guidelines that we had endorsed?

And had training been performed, were procedures available, that type of thing.

Those inspections, those initial inspections, were not what I'll call design inspections where we actually looked at the design of

54 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com the generator and looked at was the manner in which the system installed or built in line with the design that had been proposed or ordered or expected?

Those are the types of inspections we're doing now, we've moved to that degree of inspection as opposed to I don't want to say cursory but a high level have they taken steps to implement the guidelines, do the procedures and training exist?

Now we're taking a deeper look into some of what I'll call the engineering aspects of the equipment.

COMMISSIONER BARAN: Thanks for that background. Ray, do you want to take it from there?

MR. LORSON: Yes, I certainly agree with everything I heard. I think to Maria and Kelvin's point, obviously licensees have made big investments in flex and so they expect to see some credit in terms of the reduction in overall plant risk profiles.

And we would agree with

that, installation of equipment that wasn't there originally can lower the risk profile. But, and I would add the caveat, if it's properly designed to perform the function and if it's properly maintained to perform the function.

55 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com And so Scott talked about some of our initial actions we did in terms of inspections following the original implement of flex. We've embedded review and inspection of flex equipment as part of our baseline inspection program.

We have had some findings related to maintenance of flex equipment and to my knowledge, none of the findings have gone beyond the green range if you will. But certainly, we are finding issues.

We recently had a case of a significant diesel failure, a flex diesel failure, at one of our sites that we're still evaluating but the point is the diesel failed in a manner that hadn't been anticipated.

So, I think to Maria and Kelvin's point, flex does offer a benefit but the benefit is only achieved if the equipment is properly designed, installed, and maintained.

Second point with respect to use of risk, we agree with the reduction in risk in general space but I think Ed brings up a very good point, we need to be careful that we don't overcredit how much credit we give for the use of flex as a risk reduction tool.

And to that extent, we have used flex in

56 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com terms of adjusting regional some findings where we've seen findings that have maybe gone from white to green when you consider flex.

We're very careful and mindful of how we do that in part because we think there's a level of uncertainty related to the reliability data associated with the flex equipment.

I know a key aspect of industry right now is trying to get better numbers that we can use to give ourselves more reliability with respect to the uncertainty of this equipment's performance.

So, it is a tool to lower inspection findings. That being said, we are very careful of how we use it and making sure that we're not using inappropriate assumptions related to how we use flex.

So, thank you.

COMMISSIONER BARAN: Good discussion, any other points anyone wants to make on this? We've got about 20 minutes left so I'll just give our audience a reminder that if you have a question, get it into the queue and I'll try to get to it.

Let's turn to one of the questions we got from the audience and it's about gazing into the future a little bit on inspection and also I'd maybe

57 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com expand it to operation of the plant.

Any considerations for future inspection using robots or artificial intelligence as an effective tool?

And maybe either one or both of CNOs want to chime in at all about the degree to which they're using AI or robotics at their plants, I think probably folks would be interested in that as well.

MR. HENDERSON: Commissioner, I'll start from a CNO perspective. We are really deploying use primarily of robotics.

We have robots that now can crawl pipes, we have robots that we can send into spaces where we would have to set up a different configuration to allow a person to go in that space, for example, from a dose standpoint.

We have robots that can walk up stairs, that can pick up things, that can take pictures and more in some hazardous environments.

And we've leveraged technology to identify early signs of equipment performance, we've used technology to pick up small vibrations even on large transformers.

And we're doing it from the standpoint

58 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com that it helps us optimize our staffing resources because before people would do all that and now we have robots that are able to go in and gather a lot of this data for us.

We're starting to work through use of artificial intelligence primarily on data analysis and things of that nature to help us predict either where we could have some performance challenges either with behavioral gaps or equipment gaps.

And we're pretty far along in that process and we're actually leveraging others in the industry on what they've learned through use of AI that a lot of technology uses, at least within the Duke system, that we've deployed here over the past few years.

COMMISSIONER BARAN: Any other thoughts from an NRC perspective, industry perspective, or other perspective?

MS. LACAL: I'll just add one more to Kelvin's list. We do a lot of very similar approach with the use of robotics in radiological-controlled areas and minimized dose, et cetera.

But also, we're using drones in our cooling towers and that has significantly saved, from

59 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com an investor safety perspective, not having to build scaffolding, et cetera, to try to get to all these areas way up high.

And so that's been a technology fairly recent that has proven to be very successful and you can get up close and personal to what you're trying to see through the use of these drones.

So, there's a lot of technology out there. I challenge our vendor partners every day.

They know a whole lot of more about what's going on globally and what's being used out there globally and bringing it back to us so that we can evaluate and assess whether it makes sense here in the United States and Palo Verde, et cetera.

And so that is a big focus area is how do we continue to use the technology to improve the way we do business to optimize the way we do business, whether it's

robotics, drones, artificial intelligence, et cetera.

There was a really good session yesterday on the use of artificial intelligence at the RIC that was very good.

COMMISSIONER BARAN: I moderated a panel on artificial intelligence last year and it was just

60 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com fascinating. From the NRC folks, anything? Laura, do I see a hand up, or Jack?

MS. DUDES: I saw Jack. Why don't you start, Jack?

MR. GIESSNER: I was just making a quick comment. That is an area where we're going to have to get up to speed quickly.

I've heard a lot of utilities use artificial intelligence to cull through data and make decisions on what to maintain and that's an area where we don't have expertise but we will get the expertise.

We'll have to figure that out, that's an area that's on my to-do list looking forward to the future.

That's all I had, Commissioner, thanks.

Go ahead, Laura.

MS. DUDES: Thanks, Jack. I think I agree with what Jack said and I think there's a lot of benefit to this.

I think we need to keep leaning forward, we need to get the expertise on AI but we also always have to be mindful of the cyber issue as well as we're deploying these technologies.

I'm all for it, I'm in favor, I've seen

61 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com drones go into containment to rapidly identify a leak. In the past you would have had to send humans in there. There was a lot of challenges with that.

So, I think there's a lot of benefit to it.

I've actually driven one of the robots down at St. Lucy and actually, they use it to go into their resin rooms. That saved a tremendous amount of dose and that's really a positive for the workers' safety.

But again, we need to just proactively lean in and discuss the cyber issue and find solutions to that issue.

Because I think the technology is great and we should be deploying more of it but we always have to be mindful. And there's a solution for the cyber but we've all got to be coming to the table to talk about that. Thanks.

COMMISSIONER BARAN: Anything you wanted to add, Scott?

MR. MORRIS: Yes, Laura actually made a couple of the points I was going to make so I appreciate that also, and I agree with Jack.

At the end of the day, one of the products we produce as an organization is on behalf of the

62 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com American people is our independent assessment of overall licensee performance relative to safety and security.

So, I think any of these tools, any and all, should be used, I'm certainly open to it. I'm admittedly a

bit skeptical at this

point, particularly when you move away from inspection and into assessment and particularly safety culture assessment.

I'm not quite sure how AI would necessarily help us with that but, hey, I'm open to the future. I need to know more I think. There's a lot to be learned here.

COMMISSIONER BARAN: Let's turn to another question, this one is probably more for the NRC folks. It's a follow-up on VLSIR.

The regions had firsthand experience using the VLSIR process and MSS so the material side of the house where NRC is currently evaluating how it can use VLSIR to address potential issues associated with extreme weather events during fuel offload activities. Are the regions engaging with NMSS to discuss how best to apply the VLSIR process to that kind of situation?

63 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com MS. DUDES: The short answer is yes, we're actively engaged with the program office and we're talking through the various scenarios. But Ray did a very good job of talking about the distinction on VLSIR as is it a compliance issue or not?

And then the significance, I think we agree on the significance, we just need to make sure we work with the program office to identify the compliance aspects but, yes, we're very engaged in that issue.

COMMISSIONER BARAN: Here's another one.

Have the regions identified any trends in inspections not being completed within the scheduled timeframe for requiring subsequent reactions?

If so, are there any insights you can share about that?

Any takers on this one?

MR. MORRIS: I'm struggling to come up with one but the one that leapt to my mind, and I don't know if it's a great example or not, but there are certain things that can only be done during planned outages, there are only certain times you can go into containment, et cetera, particularly in a boiling water reactor.

64 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com So, we've had to defer some of that stuff and some of the required inspections that licensees have to perform have been deferred through the exemption process. So, it's been done proactively and deliberately with good thinking behind the how and why.

But for the most part, we've been able to get it done, it's just we've had to adapt and flex a little bit and leverage different resources. But I can't really think of an example that fits that.

Maybe my colleagues.

COMMISSIONER BARAN: Ray?

MR. LORSON: I can just follow on, Scott, and like Scott, I only know of one inspection that we were not able to complete during calendar year 2019.

I don't know of any inspections that we were not able to complete in 2020.

2019 was a COVID-19-related impact, a short fuse opportunity that we just missed because you can only see certain things during certain times, as Scott mentioned. So, we haven't had a significant backlog of, if you will, uncompleted inspections.

We report on that every year to Congress and so we endeavor to complete the inspections on

65 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com time.

COMMISSIONER BARAN: Let's ask maybe a little bit more of a big-picture question. Jack, I'm sorry, did you want to get in?

MR. GIESSNER: Yes, in 2020 there were a couple inspections that we didn't do and we validated the reasonable assurance of safety by other means.

A couple were security inspections and a couple, health physics inspections.

And those related to high COVID-19 incidents in the surrounding community and we were able to use the resident staff and the review of records to follow up and ensure that the delay in the inspection to the following year was okay.

And also, we also had containment entry where we elected based on where we were in COVID-19 to not do it and do it later on.

So, I think those are well documented on the public record and I think it shows, as I talked about before, the balance of safety of people and still ensuring safety of the plants.

So, I just wanted to highlight ours, thanks.

COMMISSIONER BARAN: Thanks, Jack. Let

66 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com me turn to the more big-picture question.

In your work, and this could really apply to the NRC folks or others, but in your work how do you ensure the interests of local and other non-licensee stakeholders are considered?

Does someone from the NRC want to start with that? Laura's going to take it.

MS. DUDES: To the extent that we can be engaged with our local community, that's the first step and I know we have made ourselves available and have gone out to various community activities such as the Investor River Walk or the Phidalia Onion Festival and had a booth.

And so we have to start to have a relationship with the community first and then if there are issues with that community, you can hear from them. But the first step is starting that relationship, engaging with people in the local area.

And then once you have that dialog and that relationship, their interests, their thoughts will be shared with you. I do know our residents will typically meet with local community leaders at least once a year.

So, it's really about listening first and

67 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com developing relationships. I'll pause.

COMMISSIONER BARAN: Jeff, do you have something you want to share on this one?

MR.

SEMANCIK:

Yes, this is an interesting one out there.

I spent 23 years at a local power-plant as both the senior license operator and management, and when I came over to the state and became the state liaison officer I think I mentioned at one of the early conferences, I had more exposure to senior NRC leadership as a licensee than I did as the state liaison officer.

To the Commission's credit, I think you guys responded well to that but I also learned that I've got to really make those interests known. But I think there are some ways to make sure of that.

Commissioner Baran, you came up for a visit, I was informed of the visit, we had an opportunity to sit and meet and hear concerns we have.

And I think it's important because while I may understand the authority of the Atomic Energy Act, the public really doesn't.

And so often my phone is the first one to ring with issues and concerns and things in the paper,

68 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com and how the public might perceive it. And I think we're a valuable resource for that.

We've also worked through the National Organization and the Conference of Radiation Control Program Directors to form a working group of state representatives that have power-plants so we can keep an eye and look at some of those issues that might be affecting those and see that perspective.

And just reaching out for state and local partners is also important, I think we've learned that through the material side of the program and I think although it varies state to state how much interest is out there, I think we can be a valuable resource.

And the example I would provide is there's a production facility in New Haven here that has been remediated and the typical approach for the public meetings was put it on the website and let people come see.

We were able to reach out and let them know that New Haven has got a very unique community-led structure that's below the Mayor system.

We've got the team to the community management team meetings, meetings with the local

69 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com alders, and that really helped to get a lot of information out to the public and get some of those direct concerns for in this case a very EJ community that didn't have access to Internet and things like that.

And so getting those out there, we were able to help navigate that process. So, I think all those things are really important and I think state and local partners are a good starting point for it too.

COMMISSIONER BARAN: It looks like Ray is interested in chiming in and then Ed.

MR. LORSON: I agree with basically everything I heard from Jeff. We worked very hard to try to make it effective and strong relationship with our state partners.

Jeff, I

know you've been out on inspections, I've been on inspections with you and so we do have a state liaison officers in each regional office that report directly to the regional administrator.

And so they keep our conduit with information and concerns where if there's something we're doing of interest, we want to communicate that

70 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com to the states. So, we try to be very forward-leaning, very proactive in trying to maintain an effective working relationship.

We have memorandums of understanding with many of the states in our region and so often, while we have an inspection we'll make them aware of significant inspection activities in advance and invite them to come and participate in all of our inspections from an observation process.

The last point I want to make is we have a number of plants in Region 1 that are currently undergoing decommissioning, and as part of the decommissioning that is very much of course a public process.

And all of the sites have some form of some sort of citizens advisory panel and so we frequently would go and provide information upon request just to communicate with the local government officials and also with members of the public regarding what our activities entail and what's the next step in the cleanup process.

So, I think it's a very critical relationship, I appreciate Jeff's participation today and also everything you've done to help us interact

71 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com with things going on in Connecticut. Thanks, Jeff.

COMMISSIONER BARAN: Ed?

MR. LYMAN: Really quickly, I certainly would like to make a plea for more transparency and in this context, a lot of the processes we've been talking about are of a very low safety significance determinations, STP and significance determination process are all pretty inscrutable to the public and there's only so much you can do to explain those often complex proceedings.

But the more open and transparent you are about how decisions are made, I think the better, and that involves these qualitative aspects like the human element to weigh, as we heard, the dynamics of management inspections.

I think for inspector findings it's very interesting and humanizes the Agency, at least makes me understand that it's not just this mechanical black box but there is this human aspect to it and so subjective judgment.

COMMISSIONER BARAN: We have just a couple minutes left, I think we have time for one more question. As always, we have more questions coming in than we really have time to get to, but let

72 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com me ask this one and I'll just read this one.

The industry is adopting the so-called value-based maintenance and converting many time-based preventative maintenance work items to predictive maintenance.

And the question is interested in knowing I think at least NRC folks' view about whether existing compliance activities are going to be adequate to assess the safety impact of that, particularly if licensees are going below the manufacturer-recommended preventative maintenance work.

Any insights anyone wants to share on that in our last couple minutes?

MR. MORRIS: I will start by saying this, it's something we're aware of and focused on, Commissioner.

When it comes to key equipment, particularly safety-related or important to safety equipment or things that can cause plant trips and challenges, we do have a performance-based rule in place, 10 CFR 5065, affectionately known as the maintenance rule.

But it does factor in ultimately the

73 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com performance of the equipment and condition monitoring of the equipment.

So, there is a role for modifying maintenance frequencies and test frequencies based on operating experience, based on better data and analytics.

But it has to be done in a measured way and I think our regulatory infrastructure is set up to detect significant challenges in that area should they manifest themselves.

COMMISSIONER BARAN: Any other thoughts on this issue? Jack?

MR. GIESSNER: I'll just add that a lot of the processes that have some risk-informed already have a feedback loop.

For example, the surveillance frequency control program, if you extend the frequency of what you do in your surveillance and you do have a failure, you're required to go back and reassess that.

So, in addition to the maintenance rule, the processes that are allowing the licensees a little more flexibility have a tool in them for feedback loop.

So, I think I agree with Scott we need to

74 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433 WASHINGTON, D.C. 20009-4309 www.nealrgross.com check on that and our processes are going to ensure we don't inadvertently miss that.

Jeff?

MR. SEMANCIK: One aspect of this that is I guess tangentially related or would go back to Ed's call for more transparency.

While generally we're supportive of risk-informed

programs, some of
them, like the surveillance frequency control program or 5069 for classification of components, once they're in house to the utility after the initial license amendment, the transparency of those changes is gone.

They become opaque and so you change a diesel surveillance frequency, there is no longer a public piece of that, there's no longer opportunity for state and local feedback on those processes.

So, unlike 5059, which kind of has that annual report that talks about what safety evals were done, a lot of these programs -- I think especially in aggregate it would be nice to see something that enhances the transparency, even if it's a review after the fact to understand what major changes were done, so that folks outside of the NRC and the licensee are aware of them.

75 COMMISSIONER BARAN: I think we have to stop at that suggestion. It's been a great discussion I think.

Thank you all to all of our terrific panelists, I think we covered a lot of ground and a lot of different topics and got a variety of perspectives on so many them.

Thank you all and thank you to those who have been watching and submitting questions, we really appreciate it. Sorry we didn't get to all of them but I think we got to almost all of them.

So, thanks so much and enjoy the rest of your day, everyone.

(Whereupon, the above-entitled matter went off the record at 2:30 p.m.)

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 WASHINGTON, D.C. 20009-4309 (202) 234-4433 www.nealrgross.com