Inspection Manual Change Notice 23-010,: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:NRC INSPECTION MANUAL IRIB
{{#Wiki_filter:Issue Date: 03/29/23 1
 
23-010 NRC INSPECTION MANUAL IRIB CHANGE NOTICE 23-010 DELETED:
CHANGE NOTICE 23-0 10
TRANSMITTED:
 
DELETED: TRANSMITTED:
 
Number Date Number Date
Number Date Number Date
: 1. IMC 0801 03/17/20 IMC 0801 03/29/23
: 1.
 
IMC 0801 03/17/20 IMC 0801 03/29/23 TRAINING:
TRAINING: No special training is required for any documents issued with this Change Notice.
No special training is required for any documents issued with this Change Notice.
 
REMARKS:
REMARKS: IMC 0801, "Inspection Program Feedback Process." Removed references to the branch chief counterpart meeting. Removed requirement for regional supervisor review of FBFs prior to submittal. Simplified and modified FBF to reflect current technological practices. Updated resources. Updated flowchart. Added final coordinator steps for closure of FBFs. Updated FBF template and directions.
IMC 0801, "Inspection Program Feedback Process." Removed references to the branch chief counterpart meeting. Removed requirement for regional supervisor review of FBFs prior to submittal. Simplified and modified FBF to reflect current technological practices. Updated resources. Updated flowchart. Added final coordinator steps for closure of FBFs. Updated FBF template and directions.
Expectation No. 15 of the NRC Memorandum titled, Staff Expectations for Inspection Procedure and Inspection Manual Leads of Reactor Oversight Process Governance Documents, ( non-Public ML19219A225) August 8, 2019, is included in this revision.
Expectation No. 15 of the NRC Memorandum titled, Staff Expectations for Inspection Procedure and Inspection Manual Leads of Reactor Oversight Process Governance Documents, (non-Public ML19219A225) August 8, 2019, is included in this revision.
 
EDITORIAL REVISIONS FROM PREVIOUS CHANGE NOTICES (As Required):
EDITORIAL REVISIONS FROM PREVIOUS CHANGE NOTICES (As Required):
DISTRIBUTION:
DISTRIBUTION:
Standard Official Use Only (OUO)-Security Related Information.
Standard Official Use Only (OUO)-Security Related Information.
Please contact: ______ Phone: ________
Please contact: ______ Phone: ________
 
END}}
END
 
Issue Date: 03/2 9/23 1 23-0 10}}

Latest revision as of 07:39, 27 November 2024

Inspection Manual Change Notice 23-010
ML23088A178
Person / Time
Issue date: 03/29/2023
From: Madeleine Arel
NRC/NRR/DRO/IRIB
To:
References
CN 23-010
Download: ML23088A178 (1)


Text

Issue Date: 03/29/23 1

23-010 NRC INSPECTION MANUAL IRIB CHANGE NOTICE 23-010 DELETED:

TRANSMITTED:

Number Date Number Date

1.

IMC 0801 03/17/20 IMC 0801 03/29/23 TRAINING:

No special training is required for any documents issued with this Change Notice.

REMARKS:

IMC 0801, "Inspection Program Feedback Process." Removed references to the branch chief counterpart meeting. Removed requirement for regional supervisor review of FBFs prior to submittal. Simplified and modified FBF to reflect current technological practices. Updated resources. Updated flowchart. Added final coordinator steps for closure of FBFs. Updated FBF template and directions.

Expectation No. 15 of the NRC Memorandum titled, Staff Expectations for Inspection Procedure and Inspection Manual Leads of Reactor Oversight Process Governance Documents, (non-Public ML19219A225) August 8, 2019, is included in this revision.

EDITORIAL REVISIONS FROM PREVIOUS CHANGE NOTICES (As Required):

DISTRIBUTION:

Standard Official Use Only (OUO)-Security Related Information.

Please contact: ______ Phone: ________

END