ML24170A829: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:From:                       Patrick Bosold <bosolds@lisco.com>
{{#Wiki_filter:From:
Sent:                       Friday, June 14, 2024 8:23 AM To:                         MonticelloEnvironmental Resource Cc:                         'Patrick Bosold'
Patrick Bosold <bosolds@lisco.com>
Sent:
Friday, June 14, 2024 8:23 AM To:
MonticelloEnvironmental Resource Cc:  
'Patrick Bosold'  


==Subject:==
==Subject:==
[External_Sender] Public comment on Monticello nuclear power station license renewal application
[External_Sender] Public comment on Monticello nuclear power station license renewal application To the Nuclear Regulatory Commission:
 
To the Nuclear Regulatory Commission:
 
Xcel Energy is seeking the approval of a Site-Specific Environmental Impact Statement for its Monticello nuclear power station license renewal application. This application is for a second 20-year period for this facility, which is located in Minnesota upstream from the Minneapolis-St.
Xcel Energy is seeking the approval of a Site-Specific Environmental Impact Statement for its Monticello nuclear power station license renewal application. This application is for a second 20-year period for this facility, which is located in Minnesota upstream from the Minneapolis-St.
Paul metropolitan area on the Mississippi River. The Monticello nuclear power stations current operating license expires September 8, 2030. The nuclear plant will then be 60 years old. The extension for another 20 years beyond that seeks to increase its operating license from 60 to 80 years.
Paul metropolitan area on the Mississippi River. The Monticello nuclear power stations current operating license expires September 8, 2030. The nuclear plant will then be 60 years old. The extension for another 20 years beyond that seeks to increase its operating license from 60 to 80 years.
Monticellos design is a General Electric Mark I Boiling Water Reactor (BWR). I urge you to deny any further extensions of this facilitys operating license. These aging BRWs are nothing less than a ticking time bomb. They are dangerous, expensive to operate, and they generate tons of high-level radioactive waste that cannot be disposed of, it can only be isolated and must remain so for thousands of years. A major accident, such as a coolant leak or loss of power to the facility, would endanger the air and water for millions of people downstream.
Monticellos design is a General Electric Mark I Boiling Water Reactor (BWR). I urge you to deny any further extensions of this facilitys operating license. These aging BRWs are nothing less than a ticking time bomb. They are dangerous, expensive to operate, and they generate tons of high-level radioactive waste that cannot be disposed of, it can only be isolated and must remain so for thousands of years. A major accident, such as a coolant leak or loss of power to the facility, would endanger the air and water for millions of people downstream.
This facility should be shut down immediately and replaced with solar and wind energy, which is readily attainable and which does not pose any of the dangers associated with a nuclear generation station. If nothing else, at least deny any further licensing extensions for this facility.
This facility should be shut down immediately and replaced with solar and wind energy, which is readily attainable and which does not pose any of the dangers associated with a nuclear generation station. If nothing else, at least deny any further licensing extensions for this facility.
Sincerely, Patrick Bosold 202 N. 5th St.
Fairfield, IA 52556 Tel. 641-472-1691


Sincerely,
Federal Register Notice:
 
89FR31225 Comment Number:
Patrick Bosold 202 N. 5th St.
1103 Mail Envelope Properties (000201dabe55$9d0c7d70$d7257850$)  
Fairfield, IA 52556 Tel. 641-472-1691 Federal Register Notice: 89FR31225 Comment Number:           1103
 
Mail Envelope Properties   (000201dabe55$9d0c7d70$d7257850$)


==Subject:==
==Subject:==
[External_Sender] Public comment on Monticello nuclear power station license renewal application Sent Date:         6/14/2024 8:23:07 AM Received Date:     6/14/2024 8:23:18 AM From:             Patrick Bosold
[External_Sender] Public comment on Monticello nuclear power station license renewal application Sent Date:
 
6/14/2024 8:23:07 AM Received Date:
Created By:       bosolds@lisco.com
6/14/2024 8:23:18 AM From:
 
Patrick Bosold Created By:
Recipients:
bosolds@lisco.com Recipients:  
"'Patrick Bosold'" <bosolds@lisco.com>
"'Patrick Bosold'" <bosolds@lisco.com>
Tracking Status: None "MonticelloEnvironmental Resource" <MonticelloEnvironmental.Resource@nrc.gov>
Tracking Status: None "MonticelloEnvironmental Resource" <MonticelloEnvironmental.Resource@nrc.gov>
Tracking Status: None
Tracking Status: None Post Office:
 
lisco.com Files Size Date & Time MESSAGE 1565 6/14/2024 8:23:18 AM Options Priority:
Post Office:       lisco.com
Normal Return Notification:
 
No Reply Requested:
Files                     Size                 Date & Time MESSAGE                   1565                 6/14/2024 8:23:18 AM
No Sensitivity:
 
Normal Expiration Date:}}
Options Priority:                 Normal Return Notification:     No Reply Requested:         No Sensitivity:             Normal Expiration Date:}}

Latest revision as of 17:50, 24 November 2024

Comment (1103) E-mail Regarding Monticello SLR Draft EIS
ML24170A829
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 06/14/2024
From: Public Commenter
Public Commenter
To:
NRC/NMSS/DREFS
NRC/NMSS/DREFS
References
89FR31225
Download: ML24170A829 (2)


Text

From:

Patrick Bosold <bosolds@lisco.com>

Sent:

Friday, June 14, 2024 8:23 AM To:

MonticelloEnvironmental Resource Cc:

'Patrick Bosold'

Subject:

[External_Sender] Public comment on Monticello nuclear power station license renewal application To the Nuclear Regulatory Commission:

Xcel Energy is seeking the approval of a Site-Specific Environmental Impact Statement for its Monticello nuclear power station license renewal application. This application is for a second 20-year period for this facility, which is located in Minnesota upstream from the Minneapolis-St.

Paul metropolitan area on the Mississippi River. The Monticello nuclear power stations current operating license expires September 8, 2030. The nuclear plant will then be 60 years old. The extension for another 20 years beyond that seeks to increase its operating license from 60 to 80 years.

Monticellos design is a General Electric Mark I Boiling Water Reactor (BWR). I urge you to deny any further extensions of this facilitys operating license. These aging BRWs are nothing less than a ticking time bomb. They are dangerous, expensive to operate, and they generate tons of high-level radioactive waste that cannot be disposed of, it can only be isolated and must remain so for thousands of years. A major accident, such as a coolant leak or loss of power to the facility, would endanger the air and water for millions of people downstream.

This facility should be shut down immediately and replaced with solar and wind energy, which is readily attainable and which does not pose any of the dangers associated with a nuclear generation station. If nothing else, at least deny any further licensing extensions for this facility.

Sincerely, Patrick Bosold 202 N. 5th St.

Fairfield, IA 52556 Tel. 641-472-1691

Federal Register Notice:

89FR31225 Comment Number:

1103 Mail Envelope Properties (000201dabe55$9d0c7d70$d7257850$)

Subject:

[External_Sender] Public comment on Monticello nuclear power station license renewal application Sent Date:

6/14/2024 8:23:07 AM Received Date:

6/14/2024 8:23:18 AM From:

Patrick Bosold Created By:

bosolds@lisco.com Recipients:

"'Patrick Bosold'" <bosolds@lisco.com>

Tracking Status: None "MonticelloEnvironmental Resource" <MonticelloEnvironmental.Resource@nrc.gov>

Tracking Status: None Post Office:

lisco.com Files Size Date & Time MESSAGE 1565 6/14/2024 8:23:18 AM Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date: