ML20057F946: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:._ | ||
0 UfelTE D STATES g arf 0, | |||
I | |||
( | |||
NUCLEAR REGULATORY COMMISSION | |||
.y # | |||
jJ.)f | |||
,} | |||
R EG10N IV | |||
$ kN 611 RYAN PLAZA DRIVE, SUITE 400 I | |||
[ | |||
_j AR LINGTON, TEXAS 76011-8064 | |||
**~* | |||
OCT - 819s NOTICE OF SIGNIFICANT LICENSEE MEETING Name of Licensee: | |||
Wolf Creek Nuclear Operating Corporation Name of Facility: | |||
Wolf Creek Generating Station Docket: | |||
50-482 l | |||
Date and Time October 22, 1993 of Meeting: | |||
9:30 a.m. | |||
Location of Meeting: | |||
Eisenhower Nuclear Training Center, Burlington, Kansas l | |||
Purpose of Meeting: | |||
To discuss Wolf Creek Generating Station performance l | |||
and the continuing status of the Performance l | |||
Enhancement Program NRC Attendees: | |||
J. L. Milhoan Regional Administrator E. G. Adensam. Assistant Director for Region IV & V i | |||
Reactors, Office of Nuclear Reactor Regulation T. P. Gwynn. Acting Director, Division of Reactor Projects (DRP) | |||
L. A. Yandell, Chief, Project 5 m B, DRP G. A. Pick. Senior Resident Ins,,u <.cr J. F. Ringwald Resident Inspector Licensee Attendees: | |||
N. S. Carns. Chief Executive Officer and President | |||
: 0. L. Maynara. Vice President, Plant Operations F. | |||
T., Rhodes. Vice President, Engineering R. C. Hagan. Vice President, Nuclear Assurance C. E. Parry. Director, Performance Enhancement Group D. Jacobs, Supervisor, Mechanical Maintenance NOTE: | |||
(1) Attendance by NRC personnel at the NRC/ licensee meeting should be made know by COB on October 15. 1993 via telephone call to Larry Yandell (817) 850-8182. | |||
(2) This meeting is open to attendance by members of the general public. | |||
/, | |||
Approved B : | |||
T. P. Gwynn, Act,ing irgctor Division of Rea to Prgts 9310200006 931008 PDR ADOCK 0500 2 | |||
P | |||
Wolf Creek Nuclear Operating Corporation j | |||
i 1 | |||
Distribution: | |||
DMB (IE 45) | |||
J. H. Sniezek, DEDR (MS 17G21) | |||
H. L. Thompson, DEDS (MS 17G21) | |||
T. E. Murley, D/NRR (MS 12D1) | |||
W. T. Russell, ADT/NRR (MS 12G18) | |||
J. G. Partlow, ADP/NRR (MS 12D9) | |||
J. Lieberman, D/0E (MS 7H5) | |||
L. J. Chandler, OGC (MS 15B18) | |||
) | |||
W. Reckley, Project Manager, NRR OEDO RIV Coordinator (MS 17G21) | |||
J. M. Montgomery, DRA j | |||
G. F. Sanborn, E0 i | |||
C. A. Hackney, RSLO j | |||
J. Gilliland, PAO, RIV NRC Attendees RA Secretary Carol Gordon i | |||
Division Secretary (DRP) | |||
L. S. Ousley RIV File l | |||
l | |||
? | |||
I RIV:C:DRP/A l Pa0 [ ''' | |||
!RSLO l D:DRP db[ | |||
v LAYandellht., JTGilliland lCAHackney ABBeach k I 10/k/93 | |||
[ | |||
10/% /93 l 10/'J /93 l 10/[/93 f I | |||
l l | |||
19000u llo 1 | |||
..}} | |||
Latest revision as of 11:22, 17 December 2024
| ML20057F946 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 10/08/1993 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| NUDOCS 9310200006 | |
| Download: ML20057F946 (2) | |
Text
._
0 UfelTE D STATES g arf 0,
I
(
NUCLEAR REGULATORY COMMISSION
.y #
jJ.)f
,}
R EG10N IV
$ kN 611 RYAN PLAZA DRIVE, SUITE 400 I
[
_j AR LINGTON, TEXAS 76011-8064
- ~*
OCT - 819s NOTICE OF SIGNIFICANT LICENSEE MEETING Name of Licensee:
Wolf Creek Nuclear Operating Corporation Name of Facility:
Wolf Creek Generating Station Docket:
50-482 l
Date and Time October 22, 1993 of Meeting:
9:30 a.m.
Location of Meeting:
Eisenhower Nuclear Training Center, Burlington, Kansas l
Purpose of Meeting:
To discuss Wolf Creek Generating Station performance l
and the continuing status of the Performance l
Enhancement Program NRC Attendees:
J. L. Milhoan Regional Administrator E. G. Adensam. Assistant Director for Region IV & V i
Reactors, Office of Nuclear Reactor Regulation T. P. Gwynn. Acting Director, Division of Reactor Projects (DRP)
L. A. Yandell, Chief, Project 5 m B, DRP G. A. Pick. Senior Resident Ins,,u <.cr J. F. Ringwald Resident Inspector Licensee Attendees:
N. S. Carns. Chief Executive Officer and President
- 0. L. Maynara. Vice President, Plant Operations F.
T., Rhodes. Vice President, Engineering R. C. Hagan. Vice President, Nuclear Assurance C. E. Parry. Director, Performance Enhancement Group D. Jacobs, Supervisor, Mechanical Maintenance NOTE:
(1) Attendance by NRC personnel at the NRC/ licensee meeting should be made know by COB on October 15. 1993 via telephone call to Larry Yandell (817) 850-8182.
(2) This meeting is open to attendance by members of the general public.
/,
Approved B :
T. P. Gwynn, Act,ing irgctor Division of Rea to Prgts 9310200006 931008 PDR ADOCK 0500 2
P
Wolf Creek Nuclear Operating Corporation j
i 1
Distribution:
DMB (IE 45)
J. H. Sniezek, DEDR (MS 17G21)
H. L. Thompson, DEDS (MS 17G21)
T. E. Murley, D/NRR (MS 12D1)
W. T. Russell, ADT/NRR (MS 12G18)
J. G. Partlow, ADP/NRR (MS 12D9)
J. Lieberman, D/0E (MS 7H5)
L. J. Chandler, OGC (MS 15B18)
)
W. Reckley, Project Manager, NRR OEDO RIV Coordinator (MS 17G21)
J. M. Montgomery, DRA j
G. F. Sanborn, E0 i
C. A. Hackney, RSLO j
J. Gilliland, PAO, RIV NRC Attendees RA Secretary Carol Gordon i
Division Secretary (DRP)
L. S. Ousley RIV File l
l
?
I RIV:C:DRP/A l Pa0 [
!RSLO l D:DRP db[
v LAYandellht., JTGilliland lCAHackney ABBeach k I 10/k/93
[
10/% /93 l 10/'J /93 l 10/[/93 f I
l l
19000u llo 1
..