TXX-3651, Interim Deficiency Rept Re Vendor Installed HVAC Sys. Initially Reported on 830301.Evaluation Continuing. Completion of Evaluation Anticipated by 830516: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:TEXAS UTILITIES GENEIMTING COMIRNY 2f M H littY \N Tt1% Ett 11\f.l W. TEX W 7.TJot4p G) | {{#Wiki_filter:TEXAS UTILITIES GENEIMTING COMIRNY 2f M H littY \\N Tt1% Ett 11\\f.l W. TEX W 7.TJot4p G) | ||
R. J. GARY "lM'L:::.""L'? | R. J. GARY "lM'L:::.""L'? | ||
March 29, 1983 TXX-3651 G @ }l ')\\lll V % | March 29, 1983 TXX-3651 | ||
7 Mr. G. L. Madsen, Chief | % G @ }l ')\\\\lll V % | ||
Reactor Projects Branch 1 U. S. Nuclear Regulatory Commission | 7 l lE. | ||
, \\ | |||
j\\ | |||
Mr. G. L. Madsen, Chief i | |||
JJ Reactor Projects Branch 1 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.: | |||
50-445 Arlington, TX 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION VENDOR INSTALLED HVAC SYSTEM SDAR-106 CP-83-06 FILE NO.: 10110 | |||
==Dear Mr. Madsen:== | ==Dear Mr. Madsen:== | ||
On March 1, 1983, we verbally informed your Mr. R. G. Taylor of a deficiency identified regarding HVAC hangers which were fabricated at variance with design documents. | On March 1, 1983, we verbally informed your Mr. R. G. Taylor of a deficiency identified regarding HVAC hangers which were fabricated at variance with design documents. | ||
We are continuing our evaluation and anticipate completion of our evaluation by May 16, 1983. | We are continuing our evaluation and anticipate completion of our evaluation by May 16, 1983. | ||
| Line 29: | Line 33: | ||
Director, Inspection & Enforcement (15 copies) | Director, Inspection & Enforcement (15 copies) | ||
U. S. Nuclear Regulatory Commission Washington, DC 20555 4 | U. S. Nuclear Regulatory Commission Washington, DC 20555 4 | ||
8304050406 830329 PDR ADDCK 05000445 S | 8304050406 830329 PDR ADDCK 05000445 S | ||
PDR | |||
.}} | |||
Latest revision as of 05:30, 15 December 2024
| ML20072R006 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 03/29/1983 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, TXX-3651, NUDOCS 8304050406 | |
| Download: ML20072R006 (1) | |
Text
TEXAS UTILITIES GENEIMTING COMIRNY 2f M H littY \\N Tt1% Ett 11\\f.l W. TEX W 7.TJot4p G)
R. J. GARY "lM'L:::.""L'?
March 29, 1983 TXX-3651
% G @ }l ')\\\\lll V %
7 l lE.
, \\
j\\
Mr. G. L. Madsen, Chief i
JJ Reactor Projects Branch 1 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.:
50-445 Arlington, TX 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION VENDOR INSTALLED HVAC SYSTEM SDAR-106 CP-83-06 FILE NO.: 10110
Dear Mr. Madsen:
On March 1, 1983, we verbally informed your Mr. R. G. Taylor of a deficiency identified regarding HVAC hangers which were fabricated at variance with design documents.
We are continuing our evaluation and anticipate completion of our evaluation by May 16, 1983.
Very truly yours, RJG:eaq cc: NRC Region IV - (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, DC 20555 4
8304050406 830329 PDR ADDCK 05000445 S
.