TXX-4702, Interim Deficiency Rept CP-85-19 Re Use of Nonrepresentative Sample in Determining Generic Values for Typical Conduit Span Calculations.Initially Reported on 850515.Evaluation Continuing.Next Rept by 860516: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:G Log # TXX-4702 File i 10110 903.9 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER . 400 NORTH OLIVE NTREET. L.B. St = DALLAS. TEXAS 75301 February 12, 1986
{{#Wiki_filter:G Log # TXX-4702 File i 10110 903.9 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 400 NORTH OLIVE NTREET. L.B. St = DALLAS. TEXAS 75301 February 12, 1986
  &*Ak?2Y.?&L W.7 Erie LHT'J6h'iii6n," Acting Director Division"of' Reactor Safety and Projects                               i. 2                   d U.S. Nuclear Regulatory Commission                                     i     FEB I 9 B66     0
&*Ak?2Y.?&L W.7 Erie LHT'J6h'iii6n," Acting Director Division"of' Reactor Safety and Projects
          - 611 Ryan Plaza Drive, Suite 1000                                     h,,,               aj)
: i. 2 d
Arlington, TX 76012                                                   U uL               U
U.S. Nuclear Regulatory Commission i
FEB I 9 B66 0
- 611 Ryan Plaza Drive, Suite 1000 h,,,
aj)
Arlington, TX 76012 U uL U


==SUBJECT:==
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 CONDUIT SUPPORT SPANS SDAR:   CP-85-19
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 CONDUIT SUPPORT SPANS SDAR:
CP-85-19


==Dear Mr. Johnson:==
==Dear Mr. Johnson:==
 
On May 15, 1985, we verbally notified your Mr. O. Hunnicutt of a deficiency regarding the use of a nonrepresentative sample in determining generic values for typical conduit span calculations.
On May 15, 1985, we verbally notified your Mr. O. Hunnicutt of a deficiency regarding the use of a nonrepresentative sample in determining generic values for typical conduit span calculations.                 This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We have submitted interim reports logged TXX-4489 and TXX-4597, dated June 11, 1985, and October 16, 1985, respectively. This issue is related to CP-85-34, Conduit Support Design, which is being evaluated under CPRT Program Plan Item VIII and scheduled for resolution by April 25, 1986.
This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We have submitted interim reports logged TXX-4489 and TXX-4597, dated June 11, 1985, and October 16, 1985, respectively. This issue is related to CP-85-34, Conduit Support Design, which is being evaluated under CPRT Program Plan Item VIII and scheduled for resolution by April 25, 1986.
We are continuing our evaluation and anticipate completion of our final report by May 16, 1986.
We are continuing our evaluation and anticipate completion of our final report by May 16, 1986.
Very truly ours, i?         I W. G. Counsil JCH/ arm c - NRC Region IV (0 + 1 copy)
Very truly ours, i?
I W. G. Counsil JCH/ arm c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C. 20555 II
U. S. Nuclear Regulatory Commission Washington, D.C.
  . y_j q 3                   - oir, on or rexas v,,ta,,es etecre c cournur                       [g-27 8602250346 860212 PDR   ADOCM 05000445 S                     PDR}}
20555 II
[g-27
. y_j q 3
- oir, on or rexas v,,ta,,es etecre c cournur 8602250346 860212 PDR ADOCM 05000445 S
PDR
.}}

Latest revision as of 03:37, 11 December 2024

Interim Deficiency Rept CP-85-19 Re Use of Nonrepresentative Sample in Determining Generic Values for Typical Conduit Span Calculations.Initially Reported on 850515.Evaluation Continuing.Next Rept by 860516
ML20153F233
Person / Time
Site: Comanche Peak  
Issue date: 02/12/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-85-19, TXX-4702, NUDOCS 8602250346
Download: ML20153F233 (1)


Text

G Log # TXX-4702 File i 10110 903.9 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 400 NORTH OLIVE NTREET. L.B. St = DALLAS. TEXAS 75301 February 12, 1986

&*Ak?2Y.?&L W.7 Erie LHT'J6h'iii6n," Acting Director Division"of' Reactor Safety and Projects

i. 2 d

U.S. Nuclear Regulatory Commission i

FEB I 9 B66 0

- 611 Ryan Plaza Drive, Suite 1000 h,,,

aj)

Arlington, TX 76012 U uL U

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 CONDUIT SUPPORT SPANS SDAR:

CP-85-19

Dear Mr. Johnson:

On May 15, 1985, we verbally notified your Mr. O. Hunnicutt of a deficiency regarding the use of a nonrepresentative sample in determining generic values for typical conduit span calculations.

This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We have submitted interim reports logged TXX-4489 and TXX-4597, dated June 11, 1985, and October 16, 1985, respectively. This issue is related to CP-85-34, Conduit Support Design, which is being evaluated under CPRT Program Plan Item VIII and scheduled for resolution by April 25, 1986.

We are continuing our evaluation and anticipate completion of our final report by May 16, 1986.

Very truly ours, i?

I W. G. Counsil JCH/ arm c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 II

[g-27

. y_j q 3

- oir, on or rexas v,,ta,,es etecre c cournur 8602250346 860212 PDR ADOCM 05000445 S

PDR

.