TXX-4739, Interim Deficiency Rept CP-86-05 Re Safety Class Pipe Supports Mounted to nonsafety-related Embedded Plates. Initially Reported on 860113.Evaluation Continuing.Next Rept Will Be Submitted by 860425: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 19: | Line 19: | ||
Log # TXX-4739 File # 10110 903.8 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER a 400 NORTH OLIVE NTREET. LB. 51 | Log # TXX-4739 File # 10110 903.8 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER a 400 NORTH OLIVE NTREET. LB. 51 | ||
* DALA.AS. TEXAS 78208 March 25, 1986 WILLIAM G. COUNSIL OscuTvvs wcs passioser | * DALA.AS. TEXAS 78208 March 25, 1986 WILLIAM G. COUNSIL OscuTvvs wcs passioser | ||
, (c, a,, | |||
Oi | Oi PAR 2 81986 U | ||
"Mr. Eric;H.1 Johnson,-Director, | |||
h" Divis f or: of Reactor Safety and Projects U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012 | |||
==SUBJECT:== | ==SUBJECT:== | ||
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET N0. 50-445 SAFETY CLASS PIPE SUPPORTS MOUNTED TO NNS EMBEDDED PLATE SDAR: | COMANCHE PEAK STEAM ELECTRIC STATION DOCKET N0. 50-445 SAFETY CLASS PIPE SUPPORTS MOUNTED TO NNS EMBEDDED PLATE SDAR: | ||
CP-86 INTERIM REPORT | |||
==Dear Mr. Johnson:== | ==Dear Mr. Johnson:== | ||
On. January 13, 1986, we verbally notified your Mr. T. Westerman of a deft-ciency involving four piping systems which have been identified as including safety class pipe supports trounted to non-safety related embedded plates. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We have submitted an interim report logged TXX-4701, dated February 12, 1986. | |||
On. January 13, 1986, we verbally notified your Mr. T. Westerman of a deft-ciency involving four piping systems which have been identified as including safety class pipe supports trounted to non-safety related embedded plates. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We have submitted an interim report logged TXX-4701, dated February 12, 1986. Constraints involving testing-inside the Unit 1 boundary for the remaining single support have delayed completion of our final report on this matter. | Constraints involving testing-inside the Unit 1 boundary for the remaining single support have delayed completion of our final report on this matter. | ||
We are continaing our evaluation and anticipate completion of our final report by April 25, 1986. | We are continaing our evaluation and anticipate completion of our final report by April 25, 1986. | ||
Very truly yours, W. G. Counsil JWA/ arm c - NRC Region IV (0 + 1 copy) | Very truly yours, W. G. Counsil JWA/ arm c - NRC Region IV (0 + 1 copy) | ||
Director, Inspection & Enforcement (15 copies) | Director, Inspection & Enforcement (15 copies) | ||
U. S. Nuclear Regulatory Commission Washington, D.C. 20555 0 | U. S. Nuclear Regulatory Commission Washington, D.C. | ||
gae | 20555 0 | ||
amw---- | gae | ||
ADOCM 05000445 PDR | _.Dt amw---- | ||
as PDR ADOCM 05000445 S | |||
PDR}} | |||
Latest revision as of 23:43, 10 December 2024
| ML20154S534 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 03/25/1986 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-86-05, CP-86-5, TXX-4739, NUDOCS 8604010310 | |
| Download: ML20154S534 (1) | |
Text
_
Log # TXX-4739 File # 10110 903.8 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER a 400 NORTH OLIVE NTREET. LB. 51
, (c, a,,
Oi PAR 2 81986 U
"Mr. Eric;H.1 Johnson,-Director,
h" Divis f or: of Reactor Safety and Projects U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET N0. 50-445 SAFETY CLASS PIPE SUPPORTS MOUNTED TO NNS EMBEDDED PLATE SDAR:
CP-86 INTERIM REPORT
Dear Mr. Johnson:
On. January 13, 1986, we verbally notified your Mr. T. Westerman of a deft-ciency involving four piping systems which have been identified as including safety class pipe supports trounted to non-safety related embedded plates. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We have submitted an interim report logged TXX-4701, dated February 12, 1986.
Constraints involving testing-inside the Unit 1 boundary for the remaining single support have delayed completion of our final report on this matter.
We are continaing our evaluation and anticipate completion of our final report by April 25, 1986.
Very truly yours, W. G. Counsil JWA/ arm c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 0
gae
_.Dt amw----
as PDR ADOCM 05000445 S