TXX-4880, Interim Potential Deficiency Rept CP-86-30 Re Class 1E Inverters Supplied by Elgar Corp of San Diego.Initially Reported on 860418.Evaluation Continuing.Next Rept Expected by 860815: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Log # TXX-4880
{{#Wiki_filter:Log # TXX-4880 File # 10110
  ~
~
File # 10110 908.3 TEXAS UTILITIES GENERATING COMPANY June 27, 1986
908.3 TEXAS UTILITIES GENERATING COMPANY June 27, 1986
  .'"AT5 AMEN'A Mr. Eric H. Johnson, Director y     g jggg   j l Division of Reactor Safety and Projects                                                          l U. S. Nuclear Regulatory Commission                                     ~
.'"AT5 AMEN'A Mr. Eric H. Johnson, Director y
6l '
g jggg j
611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
l U. S. Nuclear Regulatory Commission
~
6l Division of Reactor Safety and Projects 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012


==SUBJECT:==
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 i
DOCKET NOS. 50-445 AND 50-446 i
UPS INVERTERS SDAR:   CP-86-30 (INTERIM REPORT) 1                                                                                                       l l      
UPS INVERTERS SDAR:
CP-86-30 (INTERIM REPORT) 1 l
l


==Dear Mr. Johnson:==
==Dear Mr. Johnson:==
 
l On April 18, 1986, we verbally notified your Mr. R. Hall of a deficiency involving anomalies observed in Class 1E inverters supplied by Elgar l
l On April 18, 1986, we verbally notified your Mr. R. Hall of a deficiency                       ,
l Corporation of San Diego. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We have submitted an interim report logged TXX-4812, dated May 19, 1986.
involving anomalies observed in Class 1E inverters supplied by Elgar                           l l       Corporation of San Diego. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We have submitted an interim report logged TXX-4812, dated May 19, 1986.
l We are continuing our evaluation and anticipate submitting our next report by August 15, 1986.
l We are continuing our evaluation and anticipate submitting our next report by August 15, 1986.
l Very truly yours,                     ;
Very truly yours, W
l W
l W. G. Counsil JCH/arh l
W. G. Counsil JCH/arh l
c - NRC Region IV (0 + 1 Copy)
c - NRC Region IV (0 + 1 Copy)
Director, Inspection & Enforcement (15 copies)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C. 20555 1
U. S. Nuclear Regulatory Commission Washington, D.C.
                                  ~
20555 1
860707o165 860627 PDR   ADOCK 05000445             ,,
~
S                   PDR        *  -
860707o165 860627 PDR ADOCK 05000445 PDR S
!                                                                                    kh yt 'io fr
kh yt 'io fr
_r# .? 7 A DIVISION OF TEXAS UTILETIES ELECTRIC CDMPANY}}
_r#.? 7 A DIVISION OF TEXAS UTILETIES ELECTRIC CDMPANY}}

Latest revision as of 00:41, 7 December 2024

Interim Potential Deficiency Rept CP-86-30 Re Class 1E Inverters Supplied by Elgar Corp of San Diego.Initially Reported on 860418.Evaluation Continuing.Next Rept Expected by 860815
ML20206R505
Person / Time
Site: Comanche Peak  
Issue date: 06/27/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-30, TXX-4880, NUDOCS 8607070165
Download: ML20206R505 (1)


Text

Log # TXX-4880 File # 10110

~

908.3 TEXAS UTILITIES GENERATING COMPANY June 27, 1986

.'"AT5 AMEN'A Mr. Eric H. Johnson, Director y

g jggg j

l U. S. Nuclear Regulatory Commission

~

6l Division of Reactor Safety and Projects 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 i

UPS INVERTERS SDAR:

CP-86-30 (INTERIM REPORT) 1 l

l

Dear Mr. Johnson:

l On April 18, 1986, we verbally notified your Mr. R. Hall of a deficiency involving anomalies observed in Class 1E inverters supplied by Elgar l

l Corporation of San Diego. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We have submitted an interim report logged TXX-4812, dated May 19, 1986.

l We are continuing our evaluation and anticipate submitting our next report by August 15, 1986.

Very truly yours, W

l W. G. Counsil JCH/arh l

c - NRC Region IV (0 + 1 Copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 1

~

860707o165 860627 PDR ADOCK 05000445 PDR S

kh yt 'io fr

_r#.? 7 A DIVISION OF TEXAS UTILETIES ELECTRIC CDMPANY