TXX-4900, Interim Part 21 & Deficiency Rept CP-86-46 Re Design Change to Gould Battery Racks Transverse Bracing W/O Formal Evaluation by Vendor.Initially Reported on 860611.Util Evaluation Continuing.Next Rept Will Be Submitted by 860827: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:_____   _.
{{#Wiki_filter:_____
Log # TXX-4900 File # 10110 908.3 TEXAS UTILITIES GENERATING COMPANY NKYWAY TOWER . 400 NORTH OLIVE STREET. L.B. 8 8 . DALLAS. TEXA8 75201 July 11, 1986 O M *: Z E2?h'h                                                               !      -
Log # TXX-4900 File # 10110 908.3 TEXAS UTILITIES GENERATING COMPANY NKYWAY TOWER. 400 NORTH OLIVE STREET. L.B. 8 8. DALLAS. TEXA8 75201 July 11, 1986 O M *: Z E2?h'h lLC (Ci! =
H lLC (Ci! =         .
f ll[ '
Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects I
* 4 ; q- [,_5 j 5/
f -
H I
ll[ '
Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects 1
* 4 ; q- [ ,_5 j 5/
/ (/ DOI !
1     !!
U. S. Nuclear Regulatory Commission 4 gg;
U. S. Nuclear Regulatory Commission                                 /              4 gg;         !, ji 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012                                                      (/ DOI
!, ji 611 Ryan Plaza Drive, Suite 1000
                                                                                                        !        .j j)
.j j)
                                                                                                              ~(     f,l
Arlington, TX 76012
~(
f,l


==SUBJECT:==
==SUBJECT:==
 
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)                         *'  -
DOCKET N0. 50-446 G0ULD BATTERY RACKS TRANVERSE BRACING SDAR:
DOCKET N0. 50-446 G0ULD BATTERY RACKS TRANVERSE BRACING SDAR: CP-86-46 (INTERIM REPORT)
CP-86-46 (INTERIM REPORT)


==Dear Mr. Johnson:==
==Dear Mr. Johnson:==
On June 11, 1986, we verbally notified your Mr. C. Hale of a deficiency involving a design change to vendor supplied equipment being made without formal evaluation by the vendor. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).
On June 11, 1986, we verbally notified your Mr. C. Hale of a deficiency involving a design change to vendor supplied equipment being made without formal evaluation by the vendor. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).
The specific issue involves a design change to Gould battery racks which revises the transverse bracing mounting bolt design from a two-bolt to a one-bolt configuration. This issue is applicable to all Class 1E battery racks in Unit-2. We are continuing our evaluation and anticipate submitting our next report by August 27, 1986.
The specific issue involves a design change to Gould battery racks which revises the transverse bracing mounting bolt design from a two-bolt to a one-bolt configuration. This issue is applicable to all Class 1E battery racks in Unit-2. We are continuing our evaluation and anticipate submitting our next report by August 27, 1986.
Very tiuly yours, (g .
Very tiuly yours, (g.
W. G. Counsil JCH/arh c - NRC Region IV (0 + 1 Copy)
W. G. Counsil JCH/arh c - NRC Region IV (0 + 1 Copy)
Director, Inspection & Enforcement (15 copies)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C. 20555 8607170486 860711 PDR S      ADOCK 05000446 pop Q '~]b]                           a umS10N OF TEXAS UT112 TIER ELECTRIC CtntPANY I
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8607170486 860711 PDR ADOCK 05000446 S
pop Q '~]b]
a umS10N OF TEXAS UT112 TIER ELECTRIC CtntPANY I
L}}
L}}

Latest revision as of 23:32, 6 December 2024

Interim Part 21 & Deficiency Rept CP-86-46 Re Design Change to Gould Battery Racks Transverse Bracing W/O Formal Evaluation by Vendor.Initially Reported on 860611.Util Evaluation Continuing.Next Rept Will Be Submitted by 860827
ML20207B416
Person / Time
Site: Comanche Peak 
Issue date: 07/11/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
REF-PT21-86-292-000 CP-86-46, PT21-86-292, PT21-86-292-000, TXX-4900, NUDOCS 8607170486
Download: ML20207B416 (1)


Text

_____

Log # TXX-4900 File # 10110 908.3 TEXAS UTILITIES GENERATING COMPANY NKYWAY TOWER. 400 NORTH OLIVE STREET. L.B. 8 8. DALLAS. TEXA8 75201 July 11, 1986 O M *: Z E2?h'h lLC (Ci! =

f ll[ '

  • 4 ; q- [,_5 j 5/

H I

Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects 1

/ (/ DOI !

U. S. Nuclear Regulatory Commission 4 gg;

!, ji 611 Ryan Plaza Drive, Suite 1000

.j j)

Arlington, TX 76012

~(

f,l

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET N0. 50-446 G0ULD BATTERY RACKS TRANVERSE BRACING SDAR:

CP-86-46 (INTERIM REPORT)

Dear Mr. Johnson:

On June 11, 1986, we verbally notified your Mr. C. Hale of a deficiency involving a design change to vendor supplied equipment being made without formal evaluation by the vendor. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).

The specific issue involves a design change to Gould battery racks which revises the transverse bracing mounting bolt design from a two-bolt to a one-bolt configuration. This issue is applicable to all Class 1E battery racks in Unit-2. We are continuing our evaluation and anticipate submitting our next report by August 27, 1986.

Very tiuly yours, (g.

W. G. Counsil JCH/arh c - NRC Region IV (0 + 1 Copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 8607170486 860711 PDR ADOCK 05000446 S

pop Q '~]b]

a umS10N OF TEXAS UT112 TIER ELECTRIC CtntPANY I

L