TXX-6951, Interim Deficiency Rept CP-87-58 Re Modeling Errors in Computer Code RELAP-3.Initially Reported on 870814. Reanalysis of Affected Pipe Whip Restraint Designs Using RELAP-5 in Progress.Next Rept Will Be Submitted by 880203: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:m                               -
{{#Wiki_filter:m s-
s-                                            \
\\
i e
i e
                                                      =M                         Log # TXX-6951                       -{
=M Log # TXX-6951
L
-{
                                                      ._,        d              File # 10110                           !
L d
r-         = .                 . 903.6 7UELECTR/C                 Ref#'10CFR50.55(e)-                     )
File # 10110
._,r-
=.
903.6 7UELECTR/C Ref#'10CFR50.55(e)-
)
November' 16', 1987:
November' 16', 1987:
William G. Counsil Ew:utive We Prewknt                                                                                               !
William G. Counsil Ew:utive We Prewknt U. S. Nuclear Regulatory Commission q
U. S. Nuclear Regulatory Commission                                                                             q Attn: Document' Control Desk                                                                                     i Washington, D. C. 20555                                                                                         j
Attn: Document' Control Desk i
                                                                                                                      'I
Washington, D. C.
20555 j
'I


==SUBJECT:==
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)                                                     1 DOCKET NOS. 50-445 AND 50-446                                                                   !
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) 1 DOCKET NOS. 50-445 AND 50-446 COMPUTER MODELING ERROR:
COMPUTER MODELING ERROR:             RELAP-3                                                   1 SDAR CP-87-58 (INTERIM REPORT)
RELAP-3 1
SDAR CP-87-58 (INTERIM REPORT)
I Gentlemen:
I Gentlemen:
On August 14, 1987, we verbally notified your Mr. H. S. Phillips.of a                                           j potentially reportable. item involving modeling errors in the ceouter code,
j On August 14, 1987, we verbally notified your Mr. H. S. Phillips.of a
                                                                                                                      ']
']
RELAP-3. Our last interim report was logged TXX-6707 dated September 14,                                         )
potentially reportable. item involving modeling errors in the ceouter code, RELAP-3. Our last interim report was logged TXX-6707 dated September 14,
1987. After further evaluation we have determined that this'. item is                                           )
)
reportable under the provisions of 10CFR50.55(e) and the required information                                   i follows.
1987. After further evaluation we have determined that this'. item is
Description of Deficiency
)
  . The computer code RELAP-3 was used in calculating pipe rupture blowdown in the.
reportable under the provisions of 10CFR50.55(e) and the required information i
design of pipe whip restraints. .A check of the RELAP-3 results for the main steam lines using RELAP-5 determined that the use of RELAP-3 resulted in                                       1 miscalculation of loads applied to pipe whip restraints. A detailed review of                                   1 the computer code identified a modeling error in RELAP-3. As a result, use of                                   ,
follows.
the RELAP-3 values may have resulted in non-conservative pipe whip restraint-                                   l designs.
Description of Deficiency The computer code RELAP-3 was used in calculating pipe rupture blowdown in the.
The cause of this deficiency is the modeling error in the RELAP-3 computer code. The deficiency         extends to all pipe whip restraints designed using data provided by RELAP-3.                                                                                             ;
design of pipe whip restraints..A check of the RELAP-3 results for the main steam lines using RELAP-5 determined that the use of RELAP-3 resulted in 1
Safety Implications Failure of pipe whip restraints could adversely affect the ability of safety-related systems to perform as required following post accident conditions, due to the effects from the increased pipe whip and jet                                             r impingement zones of influence.
miscalculation of loads applied to pipe whip restraints. A detailed review of 1
8711200079 871116 DR      ADOCK 0500        5 J
the computer code identified a modeling error in RELAP-3.
As a result, use of the RELAP-3 values may have resulted in non-conservative pipe whip restraint-designs.
The cause of this deficiency is the modeling error in the RELAP-3 computer code.
The deficiency extends to all pipe whip restraints designed using data provided by RELAP-3.
Safety Implications Failure of pipe whip restraints could adversely affect the ability of safety-related systems to perform as required following post accident conditions, due to the effects from the increased pipe whip and jet r
impingement zones of influence.
8711200079 871116
[
[
l   k 400 hrth Olive Street     LB 81 Da!!as, Texas 75201                       ,
DR ADOCK 0500 5
                                                                                                  ;  . __      ._o
J l
k 400 hrth Olive Street LB 81 Da!!as, Texas 75201
._o


a
a
                                                                              \
\\
i i
i i
TXX-6951                                                                 I November 16, 1987                                                         f Page 2 of 2 Corrective Action
TXX-6951 I
                                                                              )
November 16, 1987 f
l We are currently conducting a reanalysis of the affected pipe whip restraint designs using RELAP-5. Our corrective actions and schedule of completion for this deficiency will be submitted no later than February 3, 1988.
Page 2 of 2
Very truly yours,             )
)
Corrective Action l
We are currently conducting a reanalysis of the affected pipe whip restraint designs using RELAP-5.
Our corrective actions and schedule of completion for this deficiency will be submitted no later than February 3, 1988.
Very truly yours,
)
69166 W. G. Counsil l
69166 W. G. Counsil l
HAM /grr                                                                 j c - Mr. R. D. Martin, Region IV                                         '
HAM /grr j
Resident Inspectors, CPSES (3)                                       i I
c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) i I
1 1}}
1 1}}

Latest revision as of 00:23, 3 December 2024

Interim Deficiency Rept CP-87-58 Re Modeling Errors in Computer Code RELAP-3.Initially Reported on 870814. Reanalysis of Affected Pipe Whip Restraint Designs Using RELAP-5 in Progress.Next Rept Will Be Submitted by 880203
ML20236Q469
Person / Time
Site: Comanche Peak  
Issue date: 11/16/1987
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-87-58, TXX-6951, NUDOCS 8711200079
Download: ML20236Q469 (2)


Text

{{#Wiki_filter:m s- \\ i e =M Log # TXX-6951 -{ L d File # 10110 ._,r- =. 903.6 7UELECTR/C Ref#'10CFR50.55(e)- ) November' 16', 1987: William G. Counsil Ew:utive We Prewknt U. S. Nuclear Regulatory Commission q Attn: Document' Control Desk i Washington, D. C. 20555 j 'I

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) 1 DOCKET NOS. 50-445 AND 50-446 COMPUTER MODELING ERROR: RELAP-3 1 SDAR CP-87-58 (INTERIM REPORT) I Gentlemen: j On August 14, 1987, we verbally notified your Mr. H. S. Phillips.of a '] potentially reportable. item involving modeling errors in the ceouter code, RELAP-3. Our last interim report was logged TXX-6707 dated September 14, ) 1987. After further evaluation we have determined that this'. item is ) reportable under the provisions of 10CFR50.55(e) and the required information i follows. Description of Deficiency The computer code RELAP-3 was used in calculating pipe rupture blowdown in the. design of pipe whip restraints..A check of the RELAP-3 results for the main steam lines using RELAP-5 determined that the use of RELAP-3 resulted in 1 miscalculation of loads applied to pipe whip restraints. A detailed review of 1 the computer code identified a modeling error in RELAP-3. As a result, use of the RELAP-3 values may have resulted in non-conservative pipe whip restraint-designs. The cause of this deficiency is the modeling error in the RELAP-3 computer code. The deficiency extends to all pipe whip restraints designed using data provided by RELAP-3. Safety Implications Failure of pipe whip restraints could adversely affect the ability of safety-related systems to perform as required following post accident conditions, due to the effects from the increased pipe whip and jet r impingement zones of influence. 8711200079 871116 [ DR ADOCK 0500 5 J l k 400 hrth Olive Street LB 81 Da!!as, Texas 75201 ._o

a \\ i i TXX-6951 I November 16, 1987 f Page 2 of 2 ) Corrective Action l We are currently conducting a reanalysis of the affected pipe whip restraint designs using RELAP-5. Our corrective actions and schedule of completion for this deficiency will be submitted no later than February 3, 1988. Very truly yours, ) 69166 W. G. Counsil l HAM /grr j c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) i I 1 1}}