{{#Wiki_filter:April 21, 2023 MEMORANDUM TO:                 Antonios Zoulis, Chief PRA Oversight Branch Division of Risk Assessment Office of Nuclear Reactor Regulation FROM:                         Reinaldo Rodriguez, Reliability and Risk Analyst /RA/
{{#Wiki_filter:April 21, 2023
 
MEMORANDUM TO: Antonios Zoulis, Chief PRA Oversight Branch Division of Risk Assessment Office of Nuclear Reactor Regulation
 
FROM: Reinaldo Rodriguez, Reliability and Risk Analyst /RA/
PRA Oversight Branch Division of Risk Assessment Office of Nuclear Reactor Regulation
PRA Oversight Branch Division of Risk Assessment Office of Nuclear Reactor Regulation


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
OF MARCH 30, 2023, PROBABILISTIC R ISK ASSESSMENT CONFIGURATION CONTROL PUBLIC WORKSHOP WITH THE NUCLEAR ENERGY INSTITUTE AND OTHER INDUSTRY STAKEHOLDERS


==SUMMARY==
On March 30, 2023, the U.S. Nuclear Regulatory Commission (NRC) staff held an observation public meeting with the Nuclear Energy Institute and Industry, to continue the discussions between the NRC staff, industry stakeholders, and the public regarding enhancing the NRCs oversight of the licensees implementation of its Probabilistic Risk Assessment (PRA)
OF MARCH 30, 2023, PROBABILISTIC RISK ASSESSMENT CONFIGURATION CONTROL PUBLIC WORKSHOP WITH THE NUCLEAR ENERGY INSTITUTE AND OTHER INDUSTRY STAKEHOLDERS On March 30, 2023, the U.S. Nuclear Regulatory Commission (NRC) staff held an observation public meeting with the Nuclear Energy Institute and Industry, to continue the discussions between the NRC staff, industry stakeholders, and the public regarding enhancing the NRCs oversight of the licensees implementation of its Probabilistic Risk Assessment (PRA)
Configuration Control (PCC) process. Specifically, the staff provided an update of its efforts in developing a balanced approach to enhance the inspection activities of the Reactor Oversight Process associated with PCC. This meeting offered an opportunity for the industry and public to provide feedback on the staffs observations from the voluntary tabletop effort and on the staffs recommendation to enhance the oversight efforts associated with PCC.
Configuration Control (PCC) process. Specifically, the staff provided an update of its efforts in developing a balanced approach to enhance the inspection activities of the Reactor Oversight Process associated with PCC. This meeting offered an opportunity for the industry and public to provide feedback on the staffs observations from the voluntary tabletop effort and on the staffs recommendation to enhance the oversight efforts associated with PCC.
The slides presented for this public meeting are available in Agencywide Documents Access and Management System under Accession No. ML23088A083. A list of attendees is included in . A list of presenters is included in Enclosure 2. The details of the meeting are discussed in Enclosure 3.
 
The slides presented for this public meeting are available in Agencywide D ocuments Access and M anagement System under Accession No. ML23088A083. A list of attendees is included in. A list of presenters is included in Enclosure 2. The details of the meeting are discussed in Enclosure 3.
 
Comments from some members of the industry included:
Comments from some members of the industry included:
* The NRC should carefully consider the frequency in which Operating Experience Smart samples are performed to align with the licensees PRA updates and to avoid inspection fatigue.
* The NRC should carefully consider the frequency in which Operating Experience Smart samples are performed to align with the licensees PRA updates and to avoid inspection fatigue.
Line 29: Line 36:


==Enclosures:==
==Enclosures:==
As stated


As stated CONTACT: Reinaldo Rodriguez, NRR/DRA                 Lundy Pressley, NRR/DRA 404-997-4498                           404-997-4621 Reinaldo.Rodrigues@nrc.gov             Lundy.Pressley@nrc.gov
CONTACT: Reinaldo Rodriguez, NRR/DRA Lundy Pressley, NRR/DRA 404 -997-4498 404-997-4621 Reinaldo.Rodrigues@nrc.gov Lundy.Pressley@nrc.gov A. Zoulis
 
As of the date of this summary, no responses have been received on the Public Meeting Feedback System.


A. Zoulis                                  As of the date of this summary, no responses have been received on the Public Meeting Feedback System.
No regulatory decisions or commitments were made at the meeting.
No regulatory decisions or commitments were made at the meeting.


Package: ML23115A307 Meeting Notice: ML23065A157 Package of Meeting Slides: ML23088A083 Meeting Summary: ML23115A301                                           *by e-mail OFFICE               NRR/DRA/APOB       NRR/DRA/APOB       NRR/DRA/APOB: BC NAME                 RRodriguez         LPressley           AZoulis DATE                 4/12/2023           4/12/2023           4/13/2023 LIST OF ATTENDEES MARCH 30, 2023, PROBABILISTIC RISK ASSESSMENT CONFIGURATION CONTROL PUBLIC WORKSHOP WITH THE NUCLEAR ENERGY INSTITUTE AND OTHER INDUSTRY STAKEHOLDERS Andrew Mihalik                           NRC Andy Rosebrook                           NRC Antonios Zoulis                           NRC Cale Young                             NRC Chris Speer                           NRC David Werkheiser                           NRC Alex Garmoe                             NRC John Hanna                             NRC Lundy Pressley                           NRC Matthew Humberstone                         NRC Meena Khanna                             NRC Michelle Kichline                         NRC Mike Franovich                           NRC Reinaldo Rodriguez                         NRC Rick Deese                             NRC Russell Felts                           NRC Shane Sandal                             NRC Tania Martinez Navedo                       NRC Enrique Meléndez           Consejo de Seguridad Nuclear (Spain)
A. Zoulis
George Pristas                   DOMINIONENERGY Jake Littlepage                   DOMINIONENERGY James Pak                       DOMINIONENERGY Mary Miller                   DOMINIONENERGY Thomas Jaeger                     DOMINIONENERGY Alexander Rubbicco                     DUKE-ENERGY BryanCarroll                       DUKE-ENERGY Clem Littleton                     DUKE-ENERGY Hadi Hadavi                       DUKE-ENERGY Heather Szews                       DUKE-ENERGY Jennifer Varnedoe                     DUKE-ENERGY Robert Boyer                       DUKE-ENERGY Robert Rishel                     DUKE-ENERGY Se-Kwon Jung                       DUKE-ENERGY Andrew Borsi                     ENERGY HARBOR Daniel Weller                   ENERGY HARBOR Devin S                       ENERGY HARBOR Douglas Rapp                     ENERGY HARBOR Tony Mangan                     ENERGY HARBOR James Laborde                         ENTERGY Wes Johnson                         ENTERGY Rob Burg                           EPM-INC Enclosure 1
 
==SUBJECT:==
==SUMMARY==
OF MARCH 30, 2023, PROBABILISTIC RISK ASSESSMENT CONFIGURATION CONTROL PUBLIC WORKSHOP WITH THE NUCLEAR ENERGY INSTITUTE AND OTHER INDUSTRY STAKEHOLDERS DATED: 4/21/2023
 
DISTRIBUTION:
PUBLIC
 
PM File Copy MKichline, NRR RidsACRS_MailCTR Resource MLeech, NRR RidsNrrDorl Resource LMayros, OCA RidsNrrDorlLlpb Resource SMehta, NRR RidsNrrDra Resource NMelly, RES RidsNrrDraAplb Resource AMihalik, NRR RidsNrrDraApob Resource EMiller, NRR RidsNrrOd Resource CMoulton, NRR RidsResOd Resource CNg, NRR RidsNrrLADHarrison Resource LPressley, NRR RidsRgn1MailCenter Resource JRobinson, NRR RidsRgn2MailCenter Resource RRodriguez, NRR RidsRgn3MailCenter Resource MSalley, RES RidsRgn4MailCenter Resource DStroup, R ES RidsOpaMail Resource JTappert, RES DGasperson, OPA RI GTaylor, RES DScrenci, OPA RII KTetter, NRR VMitlying, OPA RIII CTyree, NRR VDricks, OPA RIV SVasavada, NRR CAraguas, RES SWeerakkody, NRR SBurnell, OPA JRankin, NRR JHanna, NRR SLay, NRR KHamburger, RES RGladney, NRR JHughey, NRR DJohnson, OEDO JHyslop, NRR LMcKown, OEDO
 
ADAMS Accession Nos.:
Package: ML23115A307 Meeting Notice: ML23065A157 Package of Meeting Slides: ML23088A083 Meeting Summary: ML23115A301 *by e-mail OFFICE NRR/DRA/APOB NRR/DRA/APOB NRR/DRA/APOB: BC NAME RRodriguez LPressley AZoulis DATE 4/12/2023 4/12/2023 4/13/2023 OFFICIAL RECORD COPY LIST OF ATTENDEES MARCH 30, 2023, PROBABILISTIC RISK ASSESSMENT CONFIGURATION CONTROL PUBLIC WORKSHOP WITH THE NUCLEAR ENERGY INSTITUTE AND OTHER INDUSTRY STAKEHOLDERS
 
Andrew Mihalik NRC Andy Rosebrook NRC Antonios Zoulis NRC Cale Young NRC Chris Speer NRC David Werkheiser NRC Alex Garmoe NRC John Hanna NRC Lundy Pressley NRC Matthew Humberstone NRC Meena Khanna NRC Michelle Kichline NRC Mike Franovich NRC Reinaldo Rodriguez NRC Rick Deese NRC Russell Felts NRC Shane Sandal NRC Tania Martinez Navedo NRC Enrique Meléndez Consejo de Seguridad Nuclear (Spain)
George Pristas DOMINIONENERGY Jake Littlepage DOMINIONENERGY James Pak DOMINIONENERGY Mary Miller DOMINIONENERGY Thomas Jaeger DOMINIONENERGY Alexander Rubbicco DUKE-ENERGY BryanCarroll DUKE-ENERGY Clem Littleton DUKE-ENERGY Hadi Hadavi DUKE-ENERGY Heather Szews DUKE-ENERGY Jennifer Varnedoe DUKE-ENERGY Robert Boyer DUKE-ENERGY Robert Rishel DUKE-ENERGY Se-Kwon Jung DUKE-ENERGY Andrew Borsi ENERGY HARBOR Daniel Weller ENERGY HARBOR Devin S ENERGY HARBOR Douglas Rapp ENERGY HARBOR Tony Mangan ENERGY HARBOR James Laborde ENTERGY Wes Johnson ENTERGY Rob Burg EPM-INC
 
Enclosure 1
 
Fernando Ferrante Electric Power Research Institute Steve Catron Florida Power and Light (FPL)
Joseph Stringfellow FPL Keith Vincent FPL Luke Karten FPL Glen Seeman General Electric Amy Pittman JENSENHUGHES Andrew Thomas JENSENHUGHES Andy Ratchford JENSENHUGHES Brian Burgio JENSENHUGHES Brian Nolan JENSENHUGHES Edward Parsley JENSENHUGHES Edward Simbles JENSENHUGHES John Spaargaren JENSENHUGHES Kaven Liu JENSENHUGHES Pupek, Chris JENSENHUGHES Boatwright, Walter LUMINANT Victoria Anderson Nuclear Energy Institute Gary DeMoss Public Service Energy Group of NJ Mohamed Talaat Simpson Gumpertz & Heger Benny Ratnagaran SOUTHERNCO Faramarz Pournia SOUTHERNCO Vish Patel SOUTHERNCO Hudson Molly South Texas Project Electric Generating Station (STPEGS)
Kristin Kaspar STPEGS Mary Billings STPEGS Russell Jones STPEGS Zhiping Li STPEGS Bradley Dolan Tennessee Valley Authority (TVA)
Stephen Farlett TVA Adam Stein XCELENERGY Ronald Jacobson XCELENERGY Aaron Quaderer Unaffiliated/Public Shahin Seyedhosseini Unaffiliated/Public


Fernando Ferrante      Electric Power Research Institute Steve Catron          Florida Power and Light (FPL)
LIST OF PRESENTERS MARCH 30, 2023, PROBABILISTIC RISK ASSESSMENT CONFIGURATION CONTROL PUBLIC WORKSHOP WITH THE NUCLEAR ENERGY INSTITUTE AND OTHER INDUSTRY STAKEHOLDERS
Joseph Stringfellow                    FPL Keith Vincent                        FPL Luke Karten                        FPL Glen Seeman                  General Electric Amy Pittman                  JENSENHUGHES Andrew Thomas                JENSENHUGHES Andy Ratchford                JENSENHUGHES Brian Burgio                JENSENHUGHES Brian Nolan                JENSENHUGHES Edward Parsley                JENSENHUGHES Edward Simbles                JENSENHUGHES John Spaargaren                JENSENHUGHES Kaven Liu                  JENSENHUGHES Pupek, Chris                JENSENHUGHES Boatwright, Walter                LUMINANT Victoria Anderson          Nuclear Energy Institute Gary DeMoss        Public Service Energy Group of NJ Mohamed Talaat          Simpson Gumpertz & Heger Benny Ratnagaran                SOUTHERNCO Faramarz Pournia                SOUTHERNCO Vish Patel                  SOUTHERNCO Hudson Molly      South Texas Project Electric Generating Station (STPEGS)
Kristin Kaspar                    STPEGS Mary Billings                    STPEGS Russell Jones                    STPEGS Zhiping Li                      STPEGS Bradley Dolan      Tennessee Valley Authority (TVA)
Stephen Farlett                      TVA Adam Stein                    XCELENERGY Ronald Jacobson                  XCELENERGY Aaron Quaderer                Unaffiliated/Public Shahin Seyedhosseini            Unaffiliated/Public


LIST OF PRESENTERS MARCH 30, 2023, PROBABILISTIC RISK ASSESSMENT CONFIGURATION CONTROL PUBLIC WORKSHOP WITH THE NUCLEAR ENERGY INSTITUTE AND OTHER INDUSTRY STAKEHOLDERS Lundy Pressley             U.S. Nuclear Regulatory Commission Victoria Anderson                 Nuclear Energy Institute Enclosure 2
Lundy Pressley U.S. Nuclear Regulatory Commission Victoria Anderson Nuclear Energy Institute


MEETING DETAILS MARCH 30, 2023, PROBABILISTIC RISK ASSESSMENT CONFIGURATION CONTROL PUBLIC WORKSHOP WITH THE NUCLEAR ENERGY INSTITUTE AND OTHER INDUSTRY STAKEHOLDERS Purpose The purpose of this meeting was to continue the discussions between the U.S. Nuclear Regulatory Commission (NRC) staff, industry stakeholders, and the public regarding enhancing the NRCs oversight of the licensees implementation of its Probabilistic Risk Assessment (PRA)
Enclosure 2 MEETING DETAILS MARCH 30, 2023, PROBABILISTIC RISK ASSESSMENT CONFIGURATION CONTROL PUBLIC WORKSHOP WITH THE NUCLEAR ENERGY INSTITUTE AND OTHER INDUSTRY STAKEHOLDERS
 
Purpose
 
The purpose of this meeting was to continue the discussions between the U.S. Nuclear Regulatory Commission (NRC) staff, industry stakeholders, and the public regarding enhancing the NRCs oversight of the licensees implementation of its Probabilistic Risk Assessment (PRA)
Configuration Control (PCC) process. Specifically, the staff provided an update of its efforts in developing a balanced approach to enhance the inspection activities of the Reactor Oversight Process associated with PCC. This meeting offered an opportunity for the industry and public to provide feedback on the staffs observations from the voluntary tabletop effort and on the staffs recommendation to enhance the oversight efforts associated with PCC.
Configuration Control (PCC) process. Specifically, the staff provided an update of its efforts in developing a balanced approach to enhance the inspection activities of the Reactor Oversight Process associated with PCC. This meeting offered an opportunity for the industry and public to provide feedback on the staffs observations from the voluntary tabletop effort and on the staffs recommendation to enhance the oversight efforts associated with PCC.


===Background===
===
Background===
The PRA PCC Framework objective is to develop guidance for PRA PCC and a balanced approach of some level of oversight to establish a regulatory footprint in the PRA PCCs area, closing an existing oversight gap in the ROP; and develop the necessary training and qualifications to support those inspections in this area. The framework proposes an eventual graded tiered approach concept for future oversight of risk-informed programs (RIPs) and PCCs within Inspection Manual Chapter 2515, Light Water Reactor Inspection Program Operations Phase, (ADAMS Accession No. ML21062A084) and its Appendices.
The PRA PCC Framework objective is to develop guidance for PRA PCC and a balanced approach of some level of oversight to establish a regulatory footprint in the PRA PCCs area, closing an existing oversight gap in the ROP; and develop the necessary training and qualifications to support those inspections in this area. The framework proposes an eventual graded tiered approach concept for future oversight of risk-informed programs (RIPs) and PCCs within Inspection Manual Chapter 2515, Light Water Reactor Inspection Program Operations Phase, (ADAMS Accession No. ML21062A084) and its Appendices.
This proposed tiered concept for future oversight of RIPs and PRA PCC provides a balanced approach to inspections within the ROP. Training, qualifications, and inspection level of effort will be the key decision inputs and priorities as the staff proceeds with this effort. Those inputs will help shape the recommendations for management review and approval that will be informed by industry feedback.
This proposed tiered concept for future oversight of RIPs and PRA PCC provides a balanced approach to inspections within the ROP. Training, qualifications, and inspection level of effort will be the key decision inputs and priorities as the staff proceeds with this effort. Those inputs will help shape the recommendations for management review and approval that will be informed by industry feedback.
Meeting Details The presenters provided the following presentations:
 
Meeting Details
 
The presenters provided the following presentations:
 
Lundy Pressley of the NRC opened the workshop with a presentation with the following PCC updates:
Lundy Pressley of the NRC opened the workshop with a presentation with the following PCC updates:
* PCC background
* PCC background
* Summary of PCC tabletops site-visits
* Summary of PCC t abletops site-visits
* Observations from the tabletop site-visits Victoria Anderson of the Nuclear Energy Institute addressed the following topics:
* Observations from the tabletop site-visits
 
Victoria Anderson of the Nuclear Energy Institute addressed the following topics:
* Industry lessons-learned from the tabletops evaluations
* Industry lessons-learned from the tabletops evaluations
* Future and ongoing industry actions Enclosure 3
* Future and ongoing industry actions
* Continuing points for future PCC evaluations Mr. Pressley continued the workshop with a presentation on the proposed PCC path forward.
 
Enclosure 3
* Continuing points for future PCC evaluations
 
Mr. Pressley continued the workshop with a presentation on the proposed PCC path forward.
The key messages from Mr. Lundys presentation included the following:
The key messages from Mr. Lundys presentation included the following:
* Some level of oversight is appropriate to ensure the PRA is maintained over the life of the plant. The staff is taking a balanced approach of focused inspections within the existing ROP to monitor Plant/PRA changes and ensure appropriate implementation of PCC programs for licensee PRA models that support risk-informed decision-making.
* Some level of oversight is appropriate to ensure the PRA is maintained over the life of the plant. The staff is taking a balanced approach of focused inspections within the existing ROP to monitor Plant/PRA changes and ensure appropriate implementation of PCC programs for licensee PRA models that support risk-informed decision-making.
Line 64: Line 107:
* The NRC Working Group is proposing an Operating Experience Smart Sample (OpESS), which would be flexible and applicable to the specific risk-informed initiatives in place at the specific site where it would be utilized. The OpESS would also have additional management oversight in its implementation, and conforms with typical OpESS, which is designed to be used as an additional tool for aiding inspection staff to prepare for baseline inspections within the ROP.
* The NRC Working Group is proposing an Operating Experience Smart Sample (OpESS), which would be flexible and applicable to the specific risk-informed initiatives in place at the specific site where it would be utilized. The OpESS would also have additional management oversight in its implementation, and conforms with typical OpESS, which is designed to be used as an additional tool for aiding inspection staff to prepare for baseline inspections within the ROP.
* Any issues identified during the use of the OpESS would be reviewed using cross-regional panels to ensure consistency. The OpESS would provide a means of feedback on any PCC issues identified from associated inspections and contribute to future long-term oversight activities of PCC.
* Any issues identified during the use of the OpESS would be reviewed using cross-regional panels to ensure consistency. The OpESS would provide a means of feedback on any PCC issues identified from associated inspections and contribute to future long-term oversight activities of PCC.
Mr. Pressley concluded with a list of upcoming NRC activities regarding PCC, including conducting additional public meetings with industry as the staff completes various deliverables associated with this initiative.}}
Mr. Pressley concluded with a list of upcoming NRC activities regarding PCC, including conducting additional public meetings with industry as the staff completes various deliverables associated with this initiative.}}

Latest revision as of 19:19, 14 November 2024

Summary of Probabilistic Risk Assessment Configuration Control Public Workshop with the Nuclear Energy Institute and Other Industry Stakeholders
ML23115A301
Person / Time
Issue date: 04/21/2023
From: Reinaldo Rodriguez
NRC/NRR/DRA/APOB
To: Antonios Zoulis
NRC/NRR/DRA/APOB
References
Download: ML23115A301 (8)


Text

April 21, 2023

MEMORANDUM TO: Antonios Zoulis, Chief PRA Oversight Branch Division of Risk Assessment Office of Nuclear Reactor Regulation

FROM: Reinaldo Rodriguez, Reliability and Risk Analyst /RA/

PRA Oversight Branch Division of Risk Assessment Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF MARCH 30, 2023, PROBABILISTIC R ISK ASSESSMENT CONFIGURATION CONTROL PUBLIC WORKSHOP WITH THE NUCLEAR ENERGY INSTITUTE AND OTHER INDUSTRY STAKEHOLDERS

On March 30, 2023, the U.S. Nuclear Regulatory Commission (NRC) staff held an observation public meeting with the Nuclear Energy Institute and Industry, to continue the discussions between the NRC staff, industry stakeholders, and the public regarding enhancing the NRCs oversight of the licensees implementation of its Probabilistic Risk Assessment (PRA)

Configuration Control (PCC) process. Specifically, the staff provided an update of its efforts in developing a balanced approach to enhance the inspection activities of the Reactor Oversight Process associated with PCC. This meeting offered an opportunity for the industry and public to provide feedback on the staffs observations from the voluntary tabletop effort and on the staffs recommendation to enhance the oversight efforts associated with PCC.

The slides presented for this public meeting are available in Agencywide D ocuments Access and M anagement System under Accession No. ML23088A083. A list of attendees is included in. A list of presenters is included in Enclosure 2. The details of the meeting are discussed in Enclosure 3.

Comments from some members of the industry included:

  • The NRC should carefully consider the frequency in which Operating Experience Smart samples are performed to align with the licensees PRA updates and to avoid inspection fatigue.
  • Staff should consider changing the frequency of the inspections based on the performance of the licensee based on previous inspections.

Enclosures:

As stated

CONTACT: Reinaldo Rodriguez, NRR/DRA Lundy Pressley, NRR/DRA 404 -997-4498 404-997-4621 Reinaldo.Rodrigues@nrc.gov Lundy.Pressley@nrc.gov A. Zoulis

As of the date of this summary, no responses have been received on the Public Meeting Feedback System.

No regulatory decisions or commitments were made at the meeting.

A. Zoulis

SUBJECT:

SUMMARY

OF MARCH 30, 2023, PROBABILISTIC RISK ASSESSMENT CONFIGURATION CONTROL PUBLIC WORKSHOP WITH THE NUCLEAR ENERGY INSTITUTE AND OTHER INDUSTRY STAKEHOLDERS DATED: 4/21/2023

DISTRIBUTION:

PUBLIC

PM File Copy MKichline, NRR RidsACRS_MailCTR Resource MLeech, NRR RidsNrrDorl Resource LMayros, OCA RidsNrrDorlLlpb Resource SMehta, NRR RidsNrrDra Resource NMelly, RES RidsNrrDraAplb Resource AMihalik, NRR RidsNrrDraApob Resource EMiller, NRR RidsNrrOd Resource CMoulton, NRR RidsResOd Resource CNg, NRR RidsNrrLADHarrison Resource LPressley, NRR RidsRgn1MailCenter Resource JRobinson, NRR RidsRgn2MailCenter Resource RRodriguez, NRR RidsRgn3MailCenter Resource MSalley, RES RidsRgn4MailCenter Resource DStroup, R ES RidsOpaMail Resource JTappert, RES DGasperson, OPA RI GTaylor, RES DScrenci, OPA RII KTetter, NRR VMitlying, OPA RIII CTyree, NRR VDricks, OPA RIV SVasavada, NRR CAraguas, RES SWeerakkody, NRR SBurnell, OPA JRankin, NRR JHanna, NRR SLay, NRR KHamburger, RES RGladney, NRR JHughey, NRR DJohnson, OEDO JHyslop, NRR LMcKown, OEDO

ADAMS Accession Nos.:

Package: ML23115A307 Meeting Notice: ML23065A157 Package of Meeting Slides: ML23088A083 Meeting Summary: ML23115A301 *by e-mail OFFICE NRR/DRA/APOB NRR/DRA/APOB NRR/DRA/APOB: BC NAME RRodriguez LPressley AZoulis DATE 4/12/2023 4/12/2023 4/13/2023 OFFICIAL RECORD COPY LIST OF ATTENDEES MARCH 30, 2023, PROBABILISTIC RISK ASSESSMENT CONFIGURATION CONTROL PUBLIC WORKSHOP WITH THE NUCLEAR ENERGY INSTITUTE AND OTHER INDUSTRY STAKEHOLDERS

Andrew Mihalik NRC Andy Rosebrook NRC Antonios Zoulis NRC Cale Young NRC Chris Speer NRC David Werkheiser NRC Alex Garmoe NRC John Hanna NRC Lundy Pressley NRC Matthew Humberstone NRC Meena Khanna NRC Michelle Kichline NRC Mike Franovich NRC Reinaldo Rodriguez NRC Rick Deese NRC Russell Felts NRC Shane Sandal NRC Tania Martinez Navedo NRC Enrique Meléndez Consejo de Seguridad Nuclear (Spain)

George Pristas DOMINIONENERGY Jake Littlepage DOMINIONENERGY James Pak DOMINIONENERGY Mary Miller DOMINIONENERGY Thomas Jaeger DOMINIONENERGY Alexander Rubbicco DUKE-ENERGY BryanCarroll DUKE-ENERGY Clem Littleton DUKE-ENERGY Hadi Hadavi DUKE-ENERGY Heather Szews DUKE-ENERGY Jennifer Varnedoe DUKE-ENERGY Robert Boyer DUKE-ENERGY Robert Rishel DUKE-ENERGY Se-Kwon Jung DUKE-ENERGY Andrew Borsi ENERGY HARBOR Daniel Weller ENERGY HARBOR Devin S ENERGY HARBOR Douglas Rapp ENERGY HARBOR Tony Mangan ENERGY HARBOR James Laborde ENTERGY Wes Johnson ENTERGY Rob Burg EPM-INC

Enclosure 1

Fernando Ferrante Electric Power Research Institute Steve Catron Florida Power and Light (FPL)

Joseph Stringfellow FPL Keith Vincent FPL Luke Karten FPL Glen Seeman General Electric Amy Pittman JENSENHUGHES Andrew Thomas JENSENHUGHES Andy Ratchford JENSENHUGHES Brian Burgio JENSENHUGHES Brian Nolan JENSENHUGHES Edward Parsley JENSENHUGHES Edward Simbles JENSENHUGHES John Spaargaren JENSENHUGHES Kaven Liu JENSENHUGHES Pupek, Chris JENSENHUGHES Boatwright, Walter LUMINANT Victoria Anderson Nuclear Energy Institute Gary DeMoss Public Service Energy Group of NJ Mohamed Talaat Simpson Gumpertz & Heger Benny Ratnagaran SOUTHERNCO Faramarz Pournia SOUTHERNCO Vish Patel SOUTHERNCO Hudson Molly South Texas Project Electric Generating Station (STPEGS)

Kristin Kaspar STPEGS Mary Billings STPEGS Russell Jones STPEGS Zhiping Li STPEGS Bradley Dolan Tennessee Valley Authority (TVA)

Stephen Farlett TVA Adam Stein XCELENERGY Ronald Jacobson XCELENERGY Aaron Quaderer Unaffiliated/Public Shahin Seyedhosseini Unaffiliated/Public

LIST OF PRESENTERS MARCH 30, 2023, PROBABILISTIC RISK ASSESSMENT CONFIGURATION CONTROL PUBLIC WORKSHOP WITH THE NUCLEAR ENERGY INSTITUTE AND OTHER INDUSTRY STAKEHOLDERS

Lundy Pressley U.S. Nuclear Regulatory Commission Victoria Anderson Nuclear Energy Institute

Enclosure 2 MEETING DETAILS MARCH 30, 2023, PROBABILISTIC RISK ASSESSMENT CONFIGURATION CONTROL PUBLIC WORKSHOP WITH THE NUCLEAR ENERGY INSTITUTE AND OTHER INDUSTRY STAKEHOLDERS

Purpose

The purpose of this meeting was to continue the discussions between the U.S. Nuclear Regulatory Commission (NRC) staff, industry stakeholders, and the public regarding enhancing the NRCs oversight of the licensees implementation of its Probabilistic Risk Assessment (PRA)

Configuration Control (PCC) process. Specifically, the staff provided an update of its efforts in developing a balanced approach to enhance the inspection activities of the Reactor Oversight Process associated with PCC. This meeting offered an opportunity for the industry and public to provide feedback on the staffs observations from the voluntary tabletop effort and on the staffs recommendation to enhance the oversight efforts associated with PCC.

=

Background===

The PRA PCC Framework objective is to develop guidance for PRA PCC and a balanced approach of some level of oversight to establish a regulatory footprint in the PRA PCCs area, closing an existing oversight gap in the ROP; and develop the necessary training and qualifications to support those inspections in this area. The framework proposes an eventual graded tiered approach concept for future oversight of risk-informed programs (RIPs) and PCCs within Inspection Manual Chapter 2515, Light Water Reactor Inspection Program Operations Phase, (ADAMS Accession No. ML21062A084) and its Appendices.

This proposed tiered concept for future oversight of RIPs and PRA PCC provides a balanced approach to inspections within the ROP. Training, qualifications, and inspection level of effort will be the key decision inputs and priorities as the staff proceeds with this effort. Those inputs will help shape the recommendations for management review and approval that will be informed by industry feedback.

Meeting Details

The presenters provided the following presentations:

Lundy Pressley of the NRC opened the workshop with a presentation with the following PCC updates:

  • PCC background
  • Summary of PCC t abletops site-visits
  • Observations from the tabletop site-visits

Victoria Anderson of the Nuclear Energy Institute addressed the following topics:

  • Industry lessons-learned from the tabletops evaluations
  • Future and ongoing industry actions

Enclosure 3

  • Continuing points for future PCC evaluations

Mr. Pressley continued the workshop with a presentation on the proposed PCC path forward.

The key messages from Mr. Lundys presentation included the following:

  • Some level of oversight is appropriate to ensure the PRA is maintained over the life of the plant. The staff is taking a balanced approach of focused inspections within the existing ROP to monitor Plant/PRA changes and ensure appropriate implementation of PCC programs for licensee PRA models that support risk-informed decision-making.
  • The NRC Working Group has leveraged insights from the information gathered from the voluntarily tabletops that were conducted, as well as interactions with industry and public meetings, to develop its options and draft recommendations for the PCC framework.
  • The NRC Working Group is proposing an Operating Experience Smart Sample (OpESS), which would be flexible and applicable to the specific risk-informed initiatives in place at the specific site where it would be utilized. The OpESS would also have additional management oversight in its implementation, and conforms with typical OpESS, which is designed to be used as an additional tool for aiding inspection staff to prepare for baseline inspections within the ROP.
  • Any issues identified during the use of the OpESS would be reviewed using cross-regional panels to ensure consistency. The OpESS would provide a means of feedback on any PCC issues identified from associated inspections and contribute to future long-term oversight activities of PCC.

Mr. Pressley concluded with a list of upcoming NRC activities regarding PCC, including conducting additional public meetings with industry as the staff completes various deliverables associated with this initiative.